SAUDI ARAMCO ID/PID - 18-MAY-05 - REV 0 (Standards Cutoff - August 2004)

SAIC NUMBER DATE APPROVED QR NUMBER


SAUDI ARAMCO INSPECTION CHECKLIST
Storage, Handling and Preservation of Structural Steel
SAIC-M-1068 18-May-05 CIVIL-
Materials and Components
PROJECT TITLE WBS / BI / JO NUMBER CONTRACTOR / SUBCONTRACTOR

EQUIPMENT ID NUMBER(S) EQUIPMENT DESCRIPTION EQPT CODE SYSTEM ID. PLANT NO.

LAYOUT DRAWING NUMBER REV. NO. PURCHASE ORDER NUMBER EC / PMCC / MCC NO.

SCHEDULED INSPECTION DATE & TIME ACTUAL INSPECTION DATE & TIME QUANTITY INSP. MH's SPENT TRAVEL TIME
SAUDI ARAMCO USE ONLY
SAUDI ARAMCO TIP NUMBER SAUDI ARAMCO ACTIVITY NUMBER WORK PERMIT REQUIRED?

SAUDI ARAMCO INSPECTION LEVEL CONTRACTOR INSPECTION LEVEL

ITEM
ACCEPTANCE CRITERIA REFERENCE PASS FAIL N/A RE-INSP DATE
No.

All materials shall be stored, and handled in a manner that will prevent 12-SAMSS-007
A1
distortion, deterioration, or damage. Para. 6.3.2.2

Material shall be kept free of dirt, grease and other foreign matter. 12-SAMSS-008
A2
(PIP STS05130, Para. 6.1.1) Sec. I

Lifting of painted structural members shall be done with a non-abrasive 12-SAMSS-008


A3
choker. (PIP STS05130, Para. 6.2.8) Sec. I

The bottom base plates shall be kept clean and free of any rust or 12-SAMSS-007
A4
corrossion. Para. 6.3.1.6

Fastener components (bolts, nuts & washers) shall be protected from dirt
and moisture in closed containers at the site of installation. 12-SAMSS-007
A5
(AISC, Specification for Structural Joints Using ASTM A325 or A490 Para. 3.2
Bolts, Para. 2.2)

Fastener components (bolts, nuts & washers) that are not incorporated
into the work shall be returned to protected storage at the end of the 12-SAMSS-007
A6
work shift. (AISC, Specification for Structural Joints Using ASTM A325 or Para. 3.2
A490 Bolts, Para. 2.2)

REMARKS:

REFERENCE DOCUMENTS:
1- 12-SAMSS-007 -- Fabrication of Structural and Miscellaneous Steel, 28 April 2004
2- 12-SAMSS-008 -- Erection of Structural and Miscellaneous Steel, 28 January 2004

Contractor / Third-Party Saudi Aramco


Construction Representative* PMT Representative
Work is Complete and Ready for Inspection: T&I Witnessed QC Record Reviewed Work Verified
Name, Initials and Date: Name, Initials and Date:

QC Inspector PID Representative


Performed Inspection Work / Rework May Proceed T&I Witnessed QC Record Reviewed Work Verified
Name, Initials and Date: Name, Initials and Date:

QC Supervisor Proponent and Others


Quality Record Approved: T&I Witnessed QC Record Reviewed Work Verified
Name, Organization,
Name, Sign and Date:
Initials and Date:

*Person Responsible for Completion of Quality Work / Test Y = YES N = NO F = FAILED

Page 1 of 1