Professional Documents
Culture Documents
DEPT. OF ARCHITECTURE
230
953
2
2836 953 PLASTIC GRATING NOTES
LALITPUR STONE 300mm ALL THE DIMENSIONS ARE IN MM
708
708
COPING 25mm OVER SHAFT FOR WATER BRICK WALL LINED
230 THE DIMENSIONS SHOULD BE
20mm BED MORTAR 230 SUPPLY PIPE TO WITH RICH PLASTER
lvl +150mm READ ONLY.
4281 WATER FALL
EXCAVATION FOR THE POOL
1141
1141
450
1276 1276 SHOULD BE DONE PROPERLY
LILLY POOL
SCAFFOLDING DETAILS OF THE
4
42
1199 1199 PLASTIC GRATING ON TRENCH SHOULD BE FOLLOWED
1506
42
1242
OVER FLOW CHANNEL DURING CONSTRUCTION.
4
100
230
53
OVER BED MORTAR OF
0
QUALITY.
STEEL REINFORCEMENT 20mm
115 115 STAIR 1 GLASS MOSAIC TILES TO BE USED
STAIR 2 T= 230mm DETAIL AT "C" SHOULD BE OF STANDARD
R.C.C CONTAINER 115mm R= 300mm (SCALE 1:8) QUALITY
T= 230mm
THK. 1 1
6601
3166
2876
R= 100mm LILLY POOL MAIN POOL N= 5 BASE LEVEL OF POOL SHOULD BE
GLASS MOSAIC TILES 8mm N= 5 (decorative pool) ENTRANCE TO POOL MAINTAINED IN THE P.C.C BED.
OVER 15mm RICH MORTAR IN CASE OF UNEVEN LEVELING OF
(1:3) P.C.C CINDER SHOULD BE USED
GLASS MOZAIC TILES 8MM TO ATTAIN THE PROPER SLOPE OF
lvl -1200mm R11156
BRICH MASONARY 115mm OVER 15mm RICH MORTAR POOL.
230
THK. PLASTERED FROM lvl +600mm 0 (1:3)
53 JOINTING OF SWIMMING POOL
BOTH SIDE 2831
1279
CINDER FILLING 40mm AS TILES SHOULD BE DONE
1480
2 COATS OF HOT BITUMEN 230 230 WATER PROOFING ELEMENT PROPERLY.
1199 1199 ALSO TO MAINTAIN SLOPE SUB STRUCTURE SOIL TO BE
4
COMPRESSED EARTH
42
CONSOLIDATED BEFORE THE
OVER FLOW CHANNEL AT R.C.C CONTAINER 75mm CONSTRUCTION OF POOL
15
1276
1141
1141
1276
8
1276
1276
SLOPE 1:100 PROPER SLOPE IS TO BE
P.C.C BED 1:4:8 150mm THK. MAINTAINED IN OVER FLOW
115
230
230
LILLY POOL LAID AT SLOPE
230
EMBEBD IN EARTH
100
T= 230mm
900
R.C.C CONTAINER
R= 300mm 115mm THK. 23/11/2020
N= 5 P.C.C BED (1:4:8) LAID
AT SLOPE 1:100
CONSOLIDATED EARTH TRENCH LINE
173 173
SUBMITTED BY :
DETAIL AT "B" NAVYA BHARDWAJ
(SCALE 1:16) 2017ARA0020
B.ARCH SEM 8 (SEC A)