POWER RAIL P6
ASSEMBLY INSTRUCTIONS
step-by-step
assembly and installation
Required Tools
1/2 inch wrench or socket for 5/16 inch module clamp hardware
Torque wrench
Ratchet wrench
Ratchet extension bar
Framing square
Tape Measure
8
2
Compression
PV Block
Flash
NOTE: End
End
Hardware is Clamp
Clamp
dependent on Installed
Correctly
particular features Incorrectly
Installed
and system design.
Therefore, it may
appear different
from these Figure 4-1: Correct and Wrong methods of installing Standard End-Clamp
instructions. (using Carriage or RAD Bolts)
Insert 5/16 x
**
Carriage Bolts into
Slide Carriage Bolts Module Rail
inward, adjacent
to Exterior PV
Exterior Module
PV Module
** 5/16 x 2, 2-1/4,
2-1/2 or 2-3/4
inch bolt. Length
is dependent on
depth of PV
Module frame.
Pre-loaded
Carriage Bolt
shown in Red
dependent on depth of Module frame.
frame) into each Rail, next to the
previously installed exterior Figure 4-6: Installing Modules using
Module. Twist RAD bolt to lock in RAD End Clamp
place. (See Figure 4-7)
PV Module
Notches
WARNING:
Be certain that all Slide
Flange Nuts on
the End and Mid
Clamps are Power
tightened and Universal
Rail
torqued to the End Clamp
stated values.
Failure to do so
could lead to Installed
serious personal (Views looking from underside)
Position
injury and/or
damaged
components and
property.
5/16” Bolt