MOTOR NO LOAD TRIAL-8 HRS + OPN LOGS +CHECKLISTS FILLED +DOR CHECK
DUCT READINESS
GATE
MOTOR NO LOAD TRIAL-8 HRS + OPN LOGS +CHECKLISTS FILLED +DOR CHECK
IGV ERECTION
P&I CHECKS IGV COMMG
COMPLETION
DUCT READINESS
SCHARGE GATES
CC PUMP
ELECTRICAL
READINESS
MOTOR CHECKS
+TESTS
P&I CHECKS
POWER+CONTROL
CABLE CHECKS
BREAKER CHECKS
LIE/LIR ERECTION
CC PUMP COMMISSIONING PROGRAMME
CABLE ERECTED+
ROACH +HAND RAILS +FIRE BOOSTER PUMP MOTOR ERECTION
TAGGING OVER
. AV
CABLE TRESTLE
FOUNDATION
SAFETY READINESS ERECTED
INSTRUMENT+FILTER
CHECKOUT
TANK INSPECTION
+FLUSHING
BMCC COMMG
CABLE ERECTED+
TAGGING OVER
CABLE TRESTLE
ERECTED
LIE/LIR ERECTION
LIE/LIR ERECTION
DC SCA
SIMHADRI STAGE-II -2X500MW DC SCANNER
AIR FAN COMMG FLOW DIAGRAM
MOTOR NO LOAD TRIAL-4 HRS + OPN LOGS +CHECKLISTS FILLED +DOR CHECK FAN-MOTOR
MOTOR CHECKS
LOCAL STARTER PANEL P&I CHECKS
+TESTS SUCTION FITER ER
SCANNER AIR FAN TRIAL RUN -4 HRS +OPN LOGS + CHECK LISTS FILLED
SUCTION + DISCHARGE DUCT+C&I DISCHARGE DAMPER ERECTION 24V SV + IAC CHECK OUT
ERECTION COMPLETION
S FILLED
Y DAMPER COMMD
MOTOR NO LOAD TRIAL-4 HRS + OPN LOGS +CHECKLISTS FILLED +DOR CHECK FAN-MOTOR
MOTOR CHECKS
BMCC P&I CHECKS
+TESTS SUCTION FITER ER
SCANNER AIR FAN TRIAL RUN -4 HRS +OPN LOGS + CHECK LISTS FILLED
SUCTION + DISCHARGE DUCT+C&I DISCHARGE DAMPER ERECTION 24V SV + IAC CHECK OUT
ERECTION COMPLETION
S FILLED
Y DAMPER COMMD
B O I L E R
AVAILABILITY OF CC APPR
BOILER ERECTION COMPLETION PROCEDURE
PUMPS R
AIR CO
SYSTEM CONNECTED WITH HT ERECTED AS PER BOILE
DRAWING
3 NOS PRESSURISING
HP WELDS & NDT TEST COMPLETED AND STRESS (26/16/12 l/m)25/40 HP
RELIEVED
FQA CHECKS OVER & LOGS AVAILABLE
HANGERS SET/LOCKED AS PER RECOMMENDATIONS
AS PER EXPANSION DRAWING , CLEARANCES CONSUMABLES
CHECKED AND LOGGED FOR THERMAL MOVEMENT DM WATE STAGE-I/I
OF SYSTEM HYDRAZINE STAGE-I
ALL RADIOGRAPHS AND STRESS RELIEVING CHARTS AMMONIA
OF PRESSURE PARTS SYSTEM ACCEPTED AND
SIGNED BY BOILER INSPECTOR
ALL SAFETY VALVES WITH SHOP INSTALLED
HYDROSTATIC PLUG ARE INSTALLED
CC PUMPS VOLUTES ARE BLANKED
ALL BUCKSTAYS ARE COMPLETED ALONG WITH
CORNERS CONNECTIONS AND FREE TO EXPAND
ALL FIN WELDING ARE COMPLETED.
ALL ATTACHMENT WELDING COMPLETED
ISOLATING VALVES/BLANKS ARE PROVIDED TO ALL
THE OTHER BRANCHING SYSTEM LIKE SOOT BLOWER
SYSTEM TAPPING, SH/RH SPRAY CONNECTION,
PRESSURE GAUGES ETC.,
ALL NECESSARY VALVES INCLUDING DRAIN AND VENT
VALVES ARE INSTALLED
CHECK THE ENTIRE BOILER TO MAKE CERTAIN THAT
ALL TEMPORARY TIES TO STRUCTURAL STEEL ARE
REMOVED
ALL THE JOINTS OF TEMPORARY LINES(LIKE NEAR
DRAIN HEADER FOR PRESSURIZING PUMP
CONNECTION) ARE TO BE WELDED WITH HP
WELDERS AND ADEQUATELY SUPPORTED
RADIOGRAPHIC PLUGS ARE WELDED AND
INSTRUMENT TAPPINGS ARE CLOSED
READINESS OF STAIR-CASES, HAND RAILS,
PLATFORMS, APPROACHES ETC., SHOULD BE
ENSURED
WELDERS AND ADEQUATELY SUPPORTED
RADIOGRAPHIC PLUGS ARE WELDED AND
INSTRUMENT TAPPINGS ARE CLOSED
READINESS OF STAIR-CASES, HAND RAILS,
PLATFORMS, APPROACHES ETC., SHOULD BE
ENSURED
BOILER HYDRAULIC TEST
E R H Y D R A U L I C T E S T
CONSUMABLES REQUIRED
DM WATE STAGE-I/II-------700 M3
HYDRAZINE STAGE-I/II—500/300L
AMMONIA—150/100 L
SAFETY REQUIREMENT
24 V LAMPS ONLY
ENTRY TO BE RESTRICTED
OF PRESSURIZING PUMPS
PRESSURE SEAMLESS PIPE
HE REQUIRED HIGH
PRESSURE
SIMHADRI STAGE-II -2X500MW ESP
COMMG FLOW DIAGRAM
E L E C T R O S T A T I C P R E C I
APPROVED PROCEDURE
FROM CC-OS
CHARGING OF ACP ESP AC SYSTEM +
#A/B/C/D CR READY
ESP ERECTION FOR AIR LEAK TEST
CHARGING OF ACP
#A/B/C/D
MEASURING
APPROACHES
INSTRUMENTS ERECTED
FOR CHECKING
TEST ERECTED CHARGING OF ESP
BOARD A/B/C/D
COLLECTING/EMITTING
FAN & MOTOR REQUIRED FOR AIR CHARGING OF LOAD TRIAL
LEAKTEST ERECTED. ESPT#A/B/C/D
COLLECTING/EMITTING
11KV SWGR 3UA/UB RAPPERS MOTORS NO
ESP CASING,HOPPERS.INTERNALS COMMG
,INLET/OUTLET FUNNELS ERECTION
COMPLETION & DUCT /HOPPER OUT COLLECTING/EMITTIN
LETS DUMMIED & ESP NOT 11 KV STN SB/SC
COMMG RAPPERS MOTORS + C
INSULATED.
SCRREN COLLECTING /
EMITTING /GD RAPPERS MOTOR
ERECTION COMPLETION
SCRREN COLLECTING /
EMITTING /GD RAPPERS MOTOR
ERECTION COMPLETION
COLLECTING/EMITT
SCREEN RAPPER E
COMPLETION
P R E C I P I T A T O R R E A D I N E S S
ESP A U X I LI R I ES READINESS
INLET/OUT LET GATES
COMMISSIONING
P AC SYSTEM +
READY
INLET/OUT LET GATES
ERECTION COMPLETION
FLUEDISING
BLOWERS
COMMISSIONING
HOPPER LEVEL TRANSMITTER
INTERLOCK WITH FIELD CHECKING
FLUEDISING
COLLECTING/EMITTING RAPPERS BLOWERS ERECTION
LOAD TRIAL COMPLETION HOPPER LEVEL TRANSMITTER
COMMISSIONING
COLLECTING/EMITTING/GD SCREEN
RAPPERS MOTORS + CABLES TESTS HOPPERS HEATERS
COMMISSIONING +INTERLOCK INSULATOR HEATERS
CHECKING COMMISSIONING
COLLECTING/EMITTING /GD SCREEN
RAPPERS ERECTION COMPLETION
HOPPERS HEATERS ERECTION Shaft/SUPPORT insulator
COMPLETION heater ERECTION COMPLETION
OLLECTING / CONTROL +POWER
GD RAPPERS MOTOR CABLE LAYING
OMPLETION
OLLECTING / CONTROL +POWER
GD RAPPERS MOTOR CABLE LAYING
OMPLETION POWER +CONTROL CABLE POWER +CONTROL CABLE
ERECTION ERECTION
GD TEST
ITTER
D CHECKING
HOPPERS INTERNAL
INSPECTION
SIMHADRI STAGE-II -2X500MW ECW
(SG) COMMG FLOW DIAGRAM
ECW PUMP TRIAL
P&I CHECKS
ECW
DISHCHARGE
ELECTRICAL POWER SUPPLY C&I READINESS VALVE COMMG
READINESS READINESS
MOTOR ERECTION COMPLETION +FQA -ERECTION LOGS PUMP ERECTION COMPLETION +FQA -EREC
MOTOR + C&I
INSTRU. ERECTION POWER+CONTROL LOCAL PANEL SAFETY READINESS PUMP + C& I
CABLING +TAGGING ERECTION INSTRU. ERECTION
EMERGENCY MAKE
UP LINES + VALVES
ERECTION +HT
PUMP TRIAL +OPN LOGS + TS + CHECKLIST
ECW P U M P READINESS
R ALIGNMENT
CW OVERHEAD SUCTION
+DISCHARGE PHE ERECTION
NK +INSRUMENT
ECTION +RECIR. +VALVES
LUSHING ERECTION EXCEPT
CV
CW OVERHEAD SUCTION
+DISCHARGE PHE ERECTION
NK +INSRUMENT
ECTION +RECIR. +VALVES
LUSHING ERECTION EXCEPT
CV