Sharing of Experience From Precast To Mic From Singapore To Hong Kong 11 JULY 2019
Sharing of Experience From Precast To Mic From Singapore To Hong Kong 11 JULY 2019
▪ Key milestones
HK SG SG
• Construction
Singapore
1992
N4C24 – precast beam, slab
and wall
2001
and slab
2003
Precast slab
2005
columns and fascade
2010
precast hollow core slab
2011
homes – precast beam, slab, column
Precast to MiC – some milestones
and wall
2013
– precast biaxial voided deck, shear wall,
balcony, fascade
construction
Foundation
• Difficulty in installation
• Site fix reinforcement formwork still here and there
WE NEED TO SIMPLIFY
WOODSVALE EXECUTIVE CONDOMINIUM (2001)
Precast
columns
Precast
beams
Precast
prestressed half
slab
beam column
1
2
PARK GREEN EXECUTIVE CONDOMINIUM (2005)
Structure logic
THE CREST CONDOMINIUM (2015)
PPVC PVC
PROGRESSION TO MODULAR CONSTRUCTION - PVC
PVC modules
Precast bathroom units (PBU)
Volumetric household shelters
HS
HS
PBU
PVC
PVC
PVC
PVC
PVC
PBU
Coupled with Project adopted All Units adopted All Units adopted
Steel PPVC 100% PBU and DfMA PPVC method. PPVC method.
technology is Mass Engineered technology for 1st project with HHS being
piloted with the Timber (MET) the Balconies HHS integrated integrated with
support of NTU erection with PBU the Bedroom
Fernvale
Glades
Artist’s impression
41
TAMPINES TAPESTRY (2016 - 2018)
TAMPINES TAPESTRY (2016 - 2018)
Overall Installation Progress
HONG KONG HOUSING SOCIETY SHATIN 36C(2016 - 2018)