You are on page 1of 3

1.

Nodes
Node Design Conditions/Parameters Drawings / References
1. Propane unloading from ship - To receive Propane from ship into Propane Design Pr.= 275 psig (Unloading Lines-Insulated), 263 psig (Unloading SNOC-3000-PF-PR-PID-2191
storage tank T-2902 using ship pump [Propane loading arm is used for Lines-Uninsulated), 150 psig (Loading arm), (-)50 / 700 mmWC SNOC-3000-PF-PR-PID-2164
unloading Propane from the ship] (Propane Storage Tank) SNOC-3000-PF-PR-PID-2186
Design Temp.= 140 F (Unloading Lines-Insulated), 185 F (Unloading
Lines-Uninsulated), (-)50 F (Loading arm), (-)53.6 F (Propane Storage
Tank)
Op. Pr.= 3.95 psig
Op. Temp.= (-) 41 F
2. Butane unloading from ship - To receive Butane from ship into Butane Design Pr.= 275 psig (Unloading Lines-Insulated), 263 psig (Unloading SNOC-3000-PF-PR-PID-2191
storage tank T-2102 using ship pump [Butane loading arm is used for Lines-Uninsulated), 150 psig (Loading arm), (-)50 / 700 mmWC SNOC-3000-PF-PR-PID-2164
unloading Butane from the ship] (Butane Storage Tank) SNOC-3000-PF-PR-PID-2185
Design Temp.= 140 F (Unloading Lines-Insulated), 185 F (Unloading
Lines-Uninsulated), (-)50 F (Loading arm), 10.8 F (Butane Storage
Tank)
Op. Pr.= 3.44 psig
Op. Temp.= 23.3 F
3. Propane backflow to Sajaa storage - Transfer [backflow] of Propane from T- Design Pr.= FV/570 psig (Pump Discharge), Propane Heater (Cold SNOC-3000-PF-PR-PID-2186
2902 at Hamriyah to T-1102L A/B/C at Sajaa plant using pumps P-9111 Side) SNOC-3000-PF-PR-PID-2164
A/B/C [3x50%] Design Temp.= -53.6 / 185 F (Pump Discharge, Propane Heater (Cold SNOC-3000-PF-PR-PID-2166
Side) SNOC-3000-PF-PR-PID-2168
SNOC-3000-PF-PR-PID-2171
Op. Pr.= 439.5 psig SNOC-3000-PF-PR-PID-2170
Op. Temp.= -44.96 F (Pump discharge), 41 F (Propane Heater Outlet) SNOC-3000-PF-PR-PID-2176
SNOC-3000-PF-PR-PID-2180
SNOC-3000-PF-PR-PID-2190
SNOC-3000-PF-PR-PID-2174
4. Butane backflow to Sajaa storage - Transfer [backflow] of Butane from T- Design Pr.= FV/350 psig (Pump Discharge), Butane Heater (Cold Side) SNOC-3000-PF-PR-PID-2185
2102 at Hamriyah to T-1002L A/B/C at Sajaa plant using pumps P-9101 Design Temp.= 10.4 / 185 F (Pump Discharge, Butane Heater (Cold SNOC-3000-PF-PR-PID-2164
A/B/C [3x50%] Side) SNOC-3000-PF-PR-PID-2165
SNOC-3000-PF-PR-PID-2167
Op. Pr.= 281 psig SNOC-3000-PF-PR-PID-2171
Op. Temp.= 21.3 F (Pump discharge), 41 F (Butane Heater Outlet) SNOC-3000-PF-PR-PID-2170
SNOC-3000-PF-PR-PID-2177
SNOC-3000-PF-PR-PID-2178
SNOC-3000-PF-PR-PID-2179
SNOC-3000-PF-PR-PID-2181
SNOC-3000-PF-PR-PID-2190
SNOC-3000-PF-PR-PID-2174
5. Glycol water system - To receive Glycol water in V-9121 glycol water vessel Design Pr.= FV/438.5 psig (Glycol Water Vessel), SNOC-3000-PF-PR-PID-2169
and to circulate it to Butane / Propane heaters using pumps P-9121A/B FV/524 psig (Glycol Water Pumps, Propane/Butane Heater (Hot Side), SNOC-3000-PF-PR-PID-2167
[2x100%]. Cold water from Butane / Propane heaters is heated up again Glycol Water Air Heater) SNOC-3000-PF-PR-PID-2168
using air heater E-9121 before returning to V-9121 SNOC-3000-PF-PR-PID-2174
Design Temp.= (-)20 F / 185 F (Glycol Water Vessel), (-)53.6 F / 185 F
Propane/Butane Heater (Hot Side), Glycol Water Air Heater

Op. Pr.= 66.7 psig (Pump Discharge)


Op. Temp.= 50 to 94.3 F (Pump discharge), (-)34.2 F to 10.2 F

1 of 3
Node Design Conditions/Parameters Drawings / References
(Propane Heater Outlet-Glycol), 25 F to 34 F (Butane Heater Outlet-
Glycol), 19.8 F to 64.6 F (Glycol Water air heater inlet), 40.3F to 94.1 F
(Glycol water Air heater outlet)

6. Import Propane BOG Compressor system - Propane circuit - To receive boil Design Pressure: SNOC-3000-PF-PR-PID-2186
off propane gas from T-2902 in suction of 2 stage BOG Compressor K- a. 85 psig (Propane Gas Purge drum), (Propane Product SNOC-3000-PF-PR-PID-2188
9310, compress and condense this propane and return the liquid propane to Chiller – 3-Tube Side) E003737-01-101 Sht 1 to 6/7
-T2902 SNOC-3000-PF-PR-PID-2190
b. 150 psig (Propane Product Chiller – 1/2/3 Shell Side)
c. 370 psig (Propane Product Chiller – 1/2-Tube Side)
Compressor Package
d. FV/450 psig (Suction Separator, Low Stage Compressor,
High Stage Compressor, Lube Oil Separator, Secondary Oil
Coalescer, BOG Condenser)
Design Temp:
e. (-) 50 F / 165 F (Propane Gas Purge drum), (Propane
Product Chiller – 3-Tube Side)
f. (-) 5 F / 165 F (Propane Product Chiller – 2 Shell Side)
g. (-) 45 F / 165 F (Propane Product Chiller – 3 Shell Side)
h. 10 F / 165 F (Propane Product Chiller – 1/2-Tube Side)
Compressor Package
i. (-20) F / 300 F (Suction Separator, Low Stage Compressor,
High Stage Compressor, Lube Oil Separator, Secondary Oil
Coalescer, BOG Condenser)

Op. Pr.= 344 psig (Propane Compressor Package outlet), 49.3 psig
(Propane Chiller 3 – tube side inlet)
Op. Temp.= 131 F (Compressor Package outlet), 18.5 F (Propane
Chiller 3 – tube side inlet), -58.1 F (To Propane Tank)
7. Import Butane BOG Compressor system - To receive boil off Butane gas Design Pressure: SNOC-3000-PF-PR-PID-2185
from T-2102 in suction of 2 stage BOG Compressor K-9210, compress and a. 85 psig (Butane Gas Purge drum), (Butane Product Chiller – SNOC-3000-PF-PR-PID-2187
condense this Butane and return the liquid propane to -T2102 2-Tube Side) E003737-02-101 Sht 1 to 5/6
SNOC-3000-PF-PR-PID-2190
b. 150 psig (Butane Product Chiller – 1/2 Shell Side)
c. 265 psig (Butane Product Chiller – 1-Tube Side)
Compressor Package
d. FV/225 psig (Suction Separator, Compressor, Lube Oil
Separator, Secondary Oil Coalescer, BOG Condenser)
Design Temp:
e. 10 F / 165 F (Butane Gas Purge drum), (Butane Product
Chiller – 2-Tube Side)
f. 165 F (Butane Product Chiller – 1 Shell Side, Tube Side)
g. (-)5 F / 165 F (Butane Product Chiller – 2 Shell Side)
h. 10 F / 165 F (Butane Product Chiller –2-Tube Side)

2 of 3
Node Design Conditions/Parameters Drawings / References
Compressor Package
i. (-20) F / 300 F (Suction Separator, Compressor, Lube Oil
Separator, Secondary Oil Coalescer, BOG Condenser)

Op. Pr.= 344 psig (Propane Compressor Package outlet), 49.3 psig
(Propane Chiller 3 – tube side inlet)
Op. Temp.= 131 F (Compressor Package outlet), 51.4 F (Butane
Chiller 2 – tube side inlet), 16.8 F (To Butane Tank)