Professional Documents
Culture Documents
A WC WC WC WC
WC
LAV
PLUMBING LEGEND:
M WATER METER
LAV LAV
DS DOWNSPOUT
FD FLOOR DRAIN
LAV
B WC
UR
VSTR
W.C
VENT STACK THRU ROOF
WATERCLOSET
UR
LAV LAVATORY
WC
UR SHO SHOWER
UP
WC UR C.O CLEAN OUT
RISER KS KITCHEN SINK
FAU FAUCET
CB CATCH BASIN
C UP
GV GATE VALVE
UP
D DN
UP
HB
E
RISER
WM M
SLOPE 1:12
MS UP PCC 4 PCC 4
RAMP UP
UP
PREPARED BY: SEAL PROJECT TILTLE : APPROVED BY: REVISIONS: REMARKS : SHEET CONTENT: DRAFTED BY : SHEET NO.
CHECKED BY :
PROPOSED THREE-STOREY
1
P
A S S H O W N
MUNICIPAL MULTIPURPOSE BUILDING HON. MELCHOR P. PETRACORTA DATE :
A WC WC WC WC WC
WC
LAV LAV
PLUMBING LEGEND:
LAV LAV
M WATER METER
DS DOWNSPOUT
LAV
FD FLOOR DRAIN
B WC
UR
DN
LAV LAV WC VSTR VENT STACK THRU ROOF
WATERCLOSET
UR W.C
WC
WC
UR
LAV LAVATORY
SHO SHOWER
WC UR
D OPEN TO
BELOW
LAV
UP DN
WC
SHO
E
FAU
RISER
CHECKED BY :
PROPOSED THREE-STOREY
2
P
A S S H O W N
MUNICIPAL MULTIPURPOSE BUILDING HON. MELCHOR P. PETRACORTA DATE :
A
PLUMBING LEGEND:
M WATER METER
DS DOWNSPOUT
FD FLOOR DRAIN
B VSTR
W.C
VENT STACK THRU ROOF
WATERCLOSET
LAV LAVATORY
SHO SHOWER
C.O CLEAN OUT
KS KITCHEN SINK
FAU FAUCET
CB CATCH BASIN
C DN GV GATE VALVE
LAV
WC
UR
WC
WC
LAV
WC
LAV
WC
DN
WC
WC
E RAILING RISER
LAV
PREPARED BY: SEAL PROJECT TILTLE : APPROVED BY: REVISIONS: REMARKS : SHEET CONTENT: DRAFTED BY : SHEET NO.
CHECKED BY :
PROPOSED THREE-STOREY
3
P
A S S H O W N
MUNICIPAL MULTIPURPOSE BUILDING HON. MELCHOR P. PETRACORTA DATE :
.
W.C
V .
LA . W.C
W.C .
V W.C
LA
.
W.C
6
PLUMBING LEGEND:
5
V
LA
M WATER METER
DS DOWNSPOUT
O AU
FD FLOOR DRAIN
V SH F
LA
UP
4
VSTR VENT STACK THRU ROOF
c.
w.
V DN
W.C WATERCLOSET
LA
LAV LAVATORY
. SHO SHOWER
W.C
3
.
.
W.C C.O CLEAN OUT
W.C
V
W.C
. LA KS KITCHEN SINK
V
LA
FAU FAUCET
V UR
LA UP
UR CB CATCH BASIN
UR 2
C
UR PC
W.C
.
GV GATE VALVE
. Y
3 P
2
W.C C NO
. PC
W.C CA
. V 1
W.C LA C
PC
1:12
PE
SLO
5
1
C
PC
.
W.C 5
. C
PC
W.C
. 3
W.C PC
C
UP
. V 5 MP
LA C RA
W.C PC
4
C
LAV PC
5
C
PC
UR
V
LA UR
A
UR UP
. UR
W.C 3
. C
PC
W.C
.
W.C 4
C
PC
B PC
C
1
UP
3
C
PC
C UP
PC
C
2
D
HB
GV
M UP
MS
E
PROPOSED THREE-STOREY LIMASAWA MUNICIPAL HALL
1 W A T E R SUPPLY ISOMETRIC
P4 E 1 SCALE 1:140 MTS
PREPARED BY: SEAL PROJECT TILTLE : APPROVED BY: REVISIONS: REMARKS : SHEET CONTENT: DRAFTED BY : SHEET NO.
CHECKED BY :
PROPOSED THREE-STOREY
4
P
A S S H O W N
MUNICIPAL MULTIPURPOSE BUILDING HON. MELCHOR P. PETRACORTA DATE :
CB CB CB CB CB CB
A CO
WC WC WC WC WC
CO
FD FD FD
RISER
LAV
PLUMBING LEGEND:
LAV LAV
CO
M WATER METER
LAV DS DOWNSPOUT
B WC
UR FD
VSTR
FLOOR DRAIN
VENT STACK THRU ROOF
UR
WC W.C WATERCLOSET
UR
UP LAV LAVATORY
WC UR
FD
FD
SHO SHOWER
CO
CO
C.O CLEAN OUT
KS KITCHEN SINK
FAU FAUCET
C UP
CB CATCH BASIN
UP GV GATE VALVE
D DN
UP
CANOPY
CB
UP PCC 4 PCC 4
SLOPE 1:12
SEPTIC TANK
CB CBRAMP UP
UP
1 A N D S A N I T A R Y L A Y O U T
P5 SCALE 1:140 MTS
PREPARED BY: SEAL PROJECT TILTLE : APPROVED BY: REVISIONS: REMARKS : SHEET CONTENT: DRAFTED BY : SHEET NO.
CHECKED BY :
PROPOSED THREE-STOREY
5
P
A S S H O W N
MUNICIPAL MULTIPURPOSE BUILDING HON. MELCHOR P. PETRACORTA DATE :
A WC WC WC WC
WC
WC
CO
RISER FD
FD FD FD
LAV
PLUMBING LEGEND:
LAV
LAV LAV
CO M WATER METER
DS DOWNSPOUT
LAV
FLOOR DRAIN
B
FD
UR CO LAV
LAV FD WC VSTR VENT STACK THRU ROOF
WC DN
FD
UR
W.C WATERCLOSET
WC
WC
UR LAV LAVATORY
WC UR
SHO SHOWER
FD
FD
CO CO C.O CLEAN OUT
KS KITCHEN SINK
FAU FAUCET
C RAILING
DN UP
CB
GV
CATCH BASIN
GATE VALVE
D OPEN TO
BELOW
CO
LAV
UP DN
FD
WC
FD KS
E
CO CO
DS DS
DS DS
CHECKED BY :
PROPOSED THREE-STOREY
6
P
A S S H O W N
MUNICIPAL MULTIPURPOSE BUILDING HON. MELCHOR P. PETRACORTA DATE :
A DS DS DS DS DS DS
PLUMBING LEGEND:
M WATER METER
B DS
FD
DOWNSPOUT
FLOOR DRAIN
VSTR VENT STACK THRU ROOF
W.C WATERCLOSET
LAV LAVATORY
SHO SHOWER
C.O CLEAN OUT
KS KITCHEN SINK
C DN
FAU FAUCET
CB CATCH BASIN
LAV
FD
WC
CO GV GATE VALVE
WC
WC
WC LAV
LAV
WC
VSTR
DN
WC
FD VSTR
VSTR
WC
E PCC 2 PCC 3
FD
PCC 1 PCC 3
RAILING
PCC 3
FD
LAV
RISER
PREPARED BY: SEAL PROJECT TILTLE : APPROVED BY: REVISIONS: REMARKS : SHEET CONTENT: DRAFTED BY : SHEET NO.
CHECKED BY :
PROPOSED THREE-STOREY
7
P
A S S H O W N
MUNICIPAL MULTIPURPOSE BUILDING HON. MELCHOR P. PETRACORTA DATE :
DS
75mmØ DOWNSPOUT
DS
TR
VS
DS
V STR TR
VS
75mmØ DOWNSPOUT
TR
VS
CO
WC
FD WC
V
LA WC
CO UR
UR FD WC
75mmØ DOWNSPOUT
V
UR LA
V
FD WC LA
ER
DS RIS
FD V
FD LA
C
75mmØ DOWNSPOUT
CO W V
LA
WC
DS
WC
PLUMBING LEGEND:
75mmØ DOWNSPOUT
V
LA
WC
LA
V
CO
FD M WATER METER
WC
DS DOWNSPOUT
6
FD
FD FLOOR DRAIN
CB
75mmØ DOWNSPOUT
WC V
CO LA
FD
VSTR VENT STACK THRU ROOF
5 W.C WATERCLOSET
ZA75mmØ DOWNSPOUT
ER
CO RIS
CB LAV LAVATORY
FD
SHO SHOWER
KS
UP
4
V
LA
WC
LA
V
C.O CLEAN OUT
FD CO FD WC
DN
FD KS KITCHEN SINK
WC
FD
CB DS
CO
WC
FAU FAUCET
3
WC
WC LA
V
FD
LA
V CO CB CATCH BASIN
UR
DS
UR
UR
CB GV GATE VALVE
75mmØ DOWNSPOUT
LA
V UR UP
DS
WC FD 2 N K
WC CO PC
C
TA
IC
WC PT TO
FD PY
SE LL T
2
3
NO E
TFA EE AG
C
PC
CA
OU STRAIN
DR
75mmØ DOWNSPOUT
CO
DS
V 1
CO LA C
WC PC
K CB FD SLO
PE
1:12
AN
75mmØ DOWNSPOUT
1
C
T DS PC
IC
PT WC IN NE
SE FD C
5
MA LI
WC PC
TOEWER
C
3 S
PC
WC
P
PU
CBR
5 AM
CO WC LA
V C
PC
CB CO
FD V CO PC
C
4
LA 5
C
PC
UR
UR TO
LL T E
A
UP
UR
TFA EE AG
UR
OU STRAIN
V
LA
DR
3
WC FD C
PC
WC
CB
CO
4
WC FD
C
PC
CB
B CO
C
1
PROPOSED THREE-STOREY LIMASAWA MUNICIPAL HALL
S T O R M D R A I N A G E
PC
TO
LL T E
TFA EE AG
UP OU STRAIN
C
3
D R
PC
C UP
C
2
1 A N D S A N I T A R Y I S O M E T R I C
PC
D UP
E P8 E 1 SCALE 1:200MTS
TO
LL T E
TFAREE AG
OU ST AIN
D R
PREPARED BY: SEAL PROJECT TILTLE : APPROVED BY: REVISIONS: REMARKS : SHEET CONTENT: DRAFTED BY : SHEET NO.
CHECKED BY :
PROPOSED THREE-STOREY
8
P
A S S H O W N
MUNICIPAL MULTIPURPOSE BUILDING HON. MELCHOR P. PETRACORTA DATE :
1.50
4. ALL PIPES PASSING THROUGH WALLS BE PROVIDED
WITH SLEEVES. ANGULAR SPACE BETWEEN PIPE AND
MANHOLE MANHOLE MANHOLE SLEEVE SHALL BE FILED WITH COAL TAR, ASPHALTIC
4" THICK CHB
COMPOUND OR ANY OTHER MATERIAL FOUND
0.40 EQUALLY APPROVED.
0.60 MTS. 5. WRITTEN DIMENSIONS SHALL TAKE PRECEDENCE OVER
P L A N SCALED DIMENSIONS.
0.20 0.10
INLET .20M. AIR SPACE
8. ALL HORIZONTAL WASTE PIPING (75ØMM) AND SMALLER
3" THICK CONCRETE
COVER
6" Ø PVC SHALL BE LAID WITH A MINIMUM SLOPE OF %) PERCENT
OUTLET
AND 100mm AND LARGER PIPES SHALL HAVE ONE PERCENT (1%).
DIGESTIVE LEACHING LEACHING
CHAMBER CHAMBER CHAMBER
4" PVC PIPE
9. ALL FIXTURES OR GROUP OF FIXTURES SHALL BE
1.50
SEWER FITTINGS EQUIPPED WITH INDIVIDUAL AIR CHAMBER
0.55 MTS.
0.20
ONLY ON VENT PIPE.
10mm. Ø BARS GRAVEL GRADE 11. NO DOUBLE HUB OR DOUBLE TEE BRANCH SHALL BE USED
SPCD. @ 0.25m. O.C.
ON HORIZONTAL SOIL OR WASTE LINES.
4" THICK CHB
0.40 12. PROVIDE PIPE SLEEVES AT WALL, COLUMNS OR SLAB
3" THICK FLOOR SLAB ONE SIZE BIGGER THAN THE ACTUAL LINES PASSING
0.60 MTS. THROUGH WALL COLUMN OR SLAB TO PROTECT FROM
SECTION BEAKAGE.
PREPARED BY: SEAL PROJECT TILTLE : APPROVED BY: REVISIONS: REMARKS : SHEET CONTENT: DRAFTED BY : SHEET NO.
CHECKED BY :
PROPOSED THREE-STOREY
9
P
A S S H O W N
MUNICIPAL MULTIPURPOSE BUILDING HON. MELCHOR P. PETRACORTA DATE :