Professional Documents
Culture Documents
3 Gio Gultom
Question The ease of adjusting resources in response to changes in demand de nes a rm’s ___.
1
Complete Select one:
c. vertical integration.
d. customer involvement.
Question A service counter employs two servers. On average, a server requires 8 minutes to process a
2 customer and service times follow an exponential distribution. Customers arrive at the counter
Complete at the rate of 12 per hour according to a Poisson distribution. The average amount of time spent
Mark 1.00 out
by a customer waiting in line is approximately _____.
of 1.00
Select one:
a. 0.370 minutes
b. 22.20 minutes
c. 14.22 minutes
d. 2.844 minutes
c. 96.25.
d. 93.75.
Question For what level of volume (output) would the rm prefer Process A to Process B?
4
Complete Select one:
Mark 1.00 out a. for all volume levels greater than 125,000
of 1.00
b. for all volume levels greater than 75,000
https://learn.uph.edu/mod/quiz/review.php?attempt=1147258&cmid=809987 1/10
2/27/2021 QUIZ
b. af rmative action
d. diversity
Question When higher levels of output cost more per unit to produce, the facility realizes ____.
8
Complete Select one:
Mark 0.00 out a. diseconomies of scale.
of 1.00
b. economies of scale.
c. capacity cushion.
Question Typical performance improvement resulting from a process innovation project ranges from __.
9
Complete Select one:
Mark 1.00 out a. 25 to 50%.
of 1.00
b 50 to 100%
https://learn.uph.edu/mod/quiz/review.php?attempt=1147258&cmid=809987 2/10
2/27/2021 QUIZ
b. 50 to 100%.
c. 100
to200%. 3 Gio Gultom
d. 5 to 10%.
c. 30,000 units.
d. 62,500 units.
Question The mean absolute percentage deviation (MAPD) measures the absolute error as a percentage
11 of ___.
Complete
Select one:
Mark 1.00 out
of 1.00 a. per-period demand.
c. all errors.
d. total demand.
Question The gradual shift from treating employees as a replaceable part to embracing them as a
12 valuable resource was primarily brought about by the trend toward ___.
Complete
Select one:
Mark 1.00 out
of 1.00 a. customization.
b. quality management.
c. globalization.
d. scienti c management.
Question Capital budgeting techniques, used to evaluate new technology, often examine ___.
13
Complete Select one:
Mark 1.00 out a. annual savings.
of 1.00
b. All of these answer choices are correct.
c. purchase cost.
d. operating costs.
Question The direct labor hours required to produce the rst two units of a new product are 2,000 and
14 1,800, respectively. Using a 90% learning rate the company would estimate the direct labor
Complete hours for the fth unit to be ___.
b. 1566.0 hours.
c. 1620.0 hours.
d. 1692.4 hours.
c. service shop.
d. professional service.
d. As needed basis
c. task analysis.
d. worker analysis.
Question A service counter employs two servers. On average, a server requires 8 minutes to process a
19 customer and service times follow an exponential distribution. Customers arrive at the counter
Complete at the rate of 12 per hour according to a Poisson distribution. The service rate per server for this
Mark 1.00 out
system is ____.
of 1.00
https://learn.uph.edu/mod/quiz/review.php?attempt=1147258&cmid=809987 4/10
2/27/2021 QUIZ
Select one:
3 Gio Gultom
a. 7.5 customers per hour.
Question A small diner has one employee and a counter with seating for 8 customers. The diner does not
20 package food for takeout. Customers arrive at the diner at the rate of 20 per hour (Poisson
Complete distributed). Service times are exponentially distributed and average 24 per hour. Customers
Mark 0.00 out
that arrive when all seats are taken do not enter the diner. What is the average time a customer
of 1.00 spends in the diner?
Select one:
a. 8.94 minutes
b. 5.975 minutes
c. 3 minutes
d. 6.44 minutes
Question Which of the following will not improve design for manufacture and assembly?
21
Complete Select one:
Mark 1.00 out a. designing parts for limited, unique uses
of 1.00
b. designing parts for many, varied uses
Question Directly involving employees in the quality management process is referred to as ____.
22
Complete Select one:
Mark 1.00 out a. participative problem solving.
of 1.00
b. partnering.
c. Six Sigma.
d. a quality circle.
Question The system availability for a system with a mean time between failures (MTBF) of 1000 hours
23 and a mean time to repair (MTTR) of 50 hours would be ___.
Complete
Select one:
Mark 1.00 out
of 1.00 a. 95.24%
b. 97.50%
c. 4.76%
d. 100.00%
Question A ____________ provides historical data on the movement of parts and materials between
24
https://learn.uph.edu/mod/quiz/review.php?attempt=1147258&cmid=809987 5/10
2/27/2021 QUIZ
24 departments.
3 Gio Gultom
Complete
b. relationship diagram
c. block diagram
Question Which of the following quality tools display major causes of poor quality on a graph?
25
Complete Select one:
Mark 1.00 out a. Histogram
of 1.00
b. Process ow chart
c. Fishbone diagram
d. Scatter diagram
Question A company wants to produce 150 units during a 7-hour day. The desired cycle time needed to
26 achieve this level of output is ____.
Complete
b. 3.25 minutes.
c. 3.00 minutes.
d. 3.5 minutes.
c. higher productivity.
Question A small diner has one employee and a counter with seating for 8 customers. The diner does not
28 package food for takeout. Customers arrive at the diner at the rate of 20 per hour (Poisson
Complete distributed). Service times are exponentially distributed and average 24 per hour. Customers
that arrive when all seats are taken do not enter the diner. What is the average time a customer
Mark 1.00 out
of 1.00 spends in the diner?
Select one:
a. 5.975 minutes
b. 6.44 minutes
c. 8.94 minutes
d. 3 minutes
29
Select
3 Gio Gultom
Complete one:
Mark 1.00 out a. continuous production
of 1.00
b. mass production
c. batch production
d. project
Question A mathematical technique for forecasting that relates the dependent variable to an
30 independent variable is ____.
Complete
b. correlation analysis.
c. exponential smoothing.
d. linear regression.
c. lack of responsiveness.
d. ef ciency.
c. Tangible
d. Perishable
b. each time the number of units produced doubles, the processing time per unit increases
by 10%.
c. each time the number of units produced doubles, the processing time per unit decreases
by a constant percentage.
d. each time the number of units produced doubles, the processing time per unit remains
the same.
Question What is the forecasted number of coffee drinks sold if the number of tourists is 25 (thousand)?
34
https://learn.uph.edu/mod/quiz/review.php?attempt=1147258&cmid=809987 7/10
2/27/2021 QUIZ
34
Select
3 Gio Gultom
Complete one:
Mark 1.00 out a. 158
of 1.00
b. 138
c. 128
d. 148
Question the mean absolute deviation (MAD) through the end of October is ____.
35
Complete Select one:
Mark 0.00 out a. -9.20
of 1.00
b. 7.00
c. 9.20
d. 1.00
c. consumers have a strong preference for product characteristics near their ideal value.
d. parts within tolerance limits may produce assemblies that are not within limits.
Question The ________________ is the source of customers for a waiting line system.
37
Complete Select one:
c. arrival rate
d. calling population
Question The sum of the weights in a weighted moving average forecast must ________ .
38
Complete Select one:
c. equal 1.00.
https://learn.uph.edu/mod/quiz/review.php?attempt=1147258&cmid=809987 8/10
2/27/2021 QUIZ
c. xed-position layouts.
3 Gio Gultom
d. process layouts.
c. professional service.
d. service shop.
Question Simultaneously designing new products and the processes to produce them is known as ____.
41
Complete Select one:
c. concurrent design.
d. standard design.
Question Which of the following is not associated with the sourcing continuum?
42
Complete Select one:
Mark 1.00 out a. In-house production
of 1.00
b. Strategic alliance
c. Single contract
d. Joint venture
Question What is the daily production yield for the company if daily input is 500 units?
43
Complete Select one:
Mark 1.00 out a. 485 units
of 1.00
b. 407 units
c. 400 units
d. 465 units
https://learn.uph.edu/mod/quiz/review.php?attempt=1147258&cmid=809987 9/10
2/27/2021 QUIZ
c. 1.500
3 Gio Gultom
d. 1.667
Question A ________ layout encourages customer familiarity, has low costs, and is easy to clean.
45
Complete Select one:
Mark 1.00 out a. spine layout
of 1.00
b. free ow layout
c. grid layout
d. loop layout
https://learn.uph.edu/mod/quiz/review.php?attempt=1147258&cmid=809987 10/10