Commissioning Procedure for Boiler Safety Valve Popping Test
NS2-DN05-P1LBF-820001
CONTENTS
3. COMMISSIONING .............................................................................................................9
3.1 Commissioning Requirement ............................................................................................................ 9
3.2 Boiler Safety Valve Popping Test ...................................................................................................... 9
3.3 Task on Completion ......................................................................................................................... 10
4. ATTACHMENT ................................................................................................................11
Attachment 1. Commissioning Record Sheet .................................................................................................... 11
Attachment 2. P&ID ............................................................................................................................................ 11
Rev.D 2 of 11
Commissioning Procedure for Boiler Safety Valve Popping Test
NS2-DN05-P1LBF-820001
1. GENERAL INFORMATION
1.1 Objective
This document provides the commissioning guideline of Boiler Safety Valve Popping Test for Nghi
Son 2 BOT Thermal Power Plant.
1.2 Scope
The scope of Boiler Safety Valve Popping Test covers the following requirements of the contract,
SCHEDUEL 9 CONSTRUCTION, MECHANICAL COMPLETION, START-UP AND FUNCTIONAL
TESTING
4.3.2. Start-up and Integration of Systems for Functional Testing
(viii) boiler safety valves test
Rev.D 3 of 11
Commissioning Procedure for Boiler Safety Valve Popping Test
NS2-DN05-P1LBF-820001
15) Passageway have to be kept clean and clear; never block access and egress routes
16) Abide all the site regulations.
17) Follow manufacturer’s safety instructions given in O&M manual or similar documents.
18) LOTO Procedures shall be strictly followed.(NS2-VA08-P0ZEN-169028).
19) PTW procedures shall be implemented. (NS2-VA08-P0ZEN-169050).
20) Mode of communication such as walkie talkie, Telephone shall be used During testing and
Commissioning .
The envisaged risks deriving from the operations included in this document are related to the hazards as
listed below. Before the activities, begin the Safety Manager will co-operate with the Commissioning
Manager to prepare the risk assessment.
No. Activity Hazards
Electrical Live Parts
Tripping Hazards
High Pressure Steam Jet
3.2 Safety Valve Popping Test
Hot Surface
Noise
Overpressure of Steam Line
1.5 References
Rev.D 4 of 11
Commissioning Procedure for Boiler Safety Valve Popping Test
NS2-DN05-P1LBF-820001
Boiler Safety Valve Popping Test will be performed in order to ensure the safety of steam piping.
Hydraulic lift equipment will be used for test since live pop test of the mechanical safety valves may
cause negative effect to steam process. Test will be performed according to following code in ASME
Section 1.
Rev.D 5 of 11
Commissioning Procedure for Boiler Safety Valve Popping Test
NS2-DN05-P1LBF-820001
Set Pressure
No. Location Equipment Tag No.
(kg/cm2g)
Primary Superheater Outlet
1 HAH51AA191
Safety Valve #A-1
301
Primary Superheater Outlet
2 Primary HAH52AA191
Safety Valve #B-1
Superheater
Outlet Primary Superheater Outlet
3 HAH51AA192
Safety Valve #A-2
296.9
Primary Superheater Outlet
4 HAH52AA192
Safety Valve #B-2
Final Superheater Outlet
5 LBA01AA191
Safety Valve #A-1
282.5
Final Superheater Outlet
6 LBA02AA191
Safety Valve #B-1
Final Superheater Outlet
7 Final LBA01AA192
Safety Valve #A-2
Superheater 278.4
Outlet Final Superheater Outlet
8 LBA02AA192
Safety Valve #B-2
Final Superheater Outlet
9 LBA01AA193
Power Relief Valve #A
272.9
Final Superheater Outlet
10 LBA02AA193
Power Relief Valve #B
Reheater Inlet Safety Valve
11 LBC80AA191
#A-1
66.9
Reheater Inlet Safety Valve
12 LBC90AA191
#B-1
Reheater Inlet Safety Valve
13 LBC80AA192
#A-2
65.6
Reheater Inlet Safety Valve
14 LBC90AA192
#B-2
Reheater
Reheater Outlet Safety
15 LBB01AA191
Valve #A-1
63.9
Reheater Outlet Safety
16 LBB02AA191
Valve #B-1
Reheater Outlet Safety
17 LBB01AA192
Valve #A-2
63.4
Reheater Outlet Safety
18 LBB02AA192
Valve #B-2
Sootblowing Sootblowing Header Safety
19 HCB10AA191 40.8
Header Valve
Rev.D 6 of 11
Commissioning Procedure for Boiler Safety Valve Popping Test
NS2-DN05-P1LBF-820001
2. PRE - COMMISSIONING
1) The conditions of mechanical completion have been fulfilled, there are no category A punch items
and the system has been taken-over by commissioning from construction.
2) Piping, equipment installation with necessary instrumentation and control are identified and found
to be completed.
3) The system has been thoroughly checked and hydraulic testing has been completed after erection
and leaks (if any detected) have been rectified.
4) Electrical power system has been tested, energized and available for the required equipment.
5 Motor Feeders ON/OFF Function test has been Completed with DCS/PLC.
5) Instruments functional loop check between DCS and Local instrument has been completed.
3 Final sensor setting has been completed (vibration, speed, temp, etc.).
6) Equipment identification is complete, correct and nameplates have been fully installed.
7) Scaffoldings and any other temporary construction items have been removed.
1) Proper communication facilities between various control stations and central control room have
been prepared.
2) Personal protection equipment is available for commissioning personnel.
Rev.D 7 of 11
Commissioning Procedure for Boiler Safety Valve Popping Test
NS2-DN05-P1LBF-820001
Rev.D 8 of 11
Commissioning Procedure for Boiler Safety Valve Popping Test
NS2-DN05-P1LBF-820001
3. COMMISSIONING
Ensure that all the safety valves have been gagged except the one valve which
1
is to be tested.
Remove the safety valve cover, and mount the lifting device at the testing
2
safety valve.
Check the safety valve’s lifting pressure, and then calibrate the set pressure of
6
the safety valve as required.
Check that the PORV is closed, and close the pressure transmitter isolation
2
valves.
Apply external pressure using the hydraulic pump to pressure transmitter above
4
the ERV set pressure, and verify the PORV is opened.
Slowly relieve the hydraulic pressure of the hydraulic pump below the PORV
5
set pressure, and verify the PORV is closed.
Relieve all the hydraulic pressure from the pump, and disconnect the testing
6
equipment.
Rev.D 9 of 11
Commissioning Procedure for Boiler Safety Valve Popping Test
NS2-DN05-P1LBF-820001
Rev.D 10 of 11
Commissioning Procedure for Boiler Safety Valve Popping Test
NS2-DN05-P1LBF-820001
4. ATTACHMENT
Rev.D 11 of 11
Attachment 1. Safety Valve Popping Test Record
Date:
Unit:
Tolerance Popping
Set Pressure
No Description Tag No. Pressure Remark
(kg/cm2g) +1% -1% (kg/cm2g)
1 Primary Superheater Outlet Safety Valve #A-1 HAH51AA191
301 304.01 297.99
2 Primary Superheater Outlet Safety Valve #B-1 HAH52AA191
3 Primary Superheater Outlet Safety Valve #A-2 HAH51AA192
296.9 299.87 293.93
4 Primary Superheater Outlet Safety Valve #B-2 HAH52AA192
5 Final Superheater Outlet Safety Valve #A-1 LBA01AA191
282.5 285.33 279.68
6 Final Superheater Outlet Safety Valve #B-1 LBA02AA191
7 Final Superheater Outlet Safety Valve #A-2 LBA01AA192
278.4 281.18 275.62
8 Final Superheater Outlet Safety Valve #B-2 LBA02AA192
9 Final Superheater Outlet Power Relief Valve #A LBA01AA193
272.9 275.63 270.17
10 Final Superheater Outlet Power Relief Valve #B LBA02AA193
Name
Signature
1 of 2
Date:
Unit:
Tolerance Popping
Set Pressure
No Description Tag No. Pressure Remark
(kg/cm2g) +0.72 kg/cm2 -0.72 kg/cm2 (kg/cm2g)
1 Reheater Inlet Safety Valve #A-1 LBC80AA191
66.9 67.62 66.18
2 Reheater Inlet Safety Valve #B-1 LBC90AA191
3 Reheater Inlet Safety Valve #A-2 LBC80AA192
65.6 66.32 64.88
4 Reheater Inlet Safety Valve #B-2 LBC90AA192
5 Reheater Outlet Safety Valve #A-1 LBB01AA191
63.9 64.62 63.18
6 Reheater Outlet Safety Valve #B-1 LBB02AA191
7 Reheater Outlet Safety Valve #A-2 LBB01AA192
63.4 64.12 62.68
8 Reheater Outlet Safety Valve #B-2 LBB02AA192
9 Sootblowing Header Safety Valve HCB10AA191 40.8 41.52 40.08
Name
Signature
2 of 2
Attachment 2. P&ID 1. DRAWING SHOWS PIPING, COMPONENTS AND EQUIPMENT ASSOCIATED
WITH UNIT1. UNIT2 IS IDENTICAL AND UNIT2 TAGS ARE PREFIXED WITH
“P2” IN PLACE OF “P1” SHOWN HERE.
AA502
AA501
AA502
AA501 P1HAH30
BR507
DN25-AAH7 BS001 BS002
DN500-HBD6
DN500-HBD6
NITROGEN GAS LINE P1QJA92 P1QJA92
BR001 BR002 P1HAH30
BR192
BR194
P1HAH-310007 (C-7)
DN25-HBD5 DN25-AAH7 BR506
AA201 AA101 DN25-AAH7
AA501 BR191 BR193
DN200-GBD5 DN200-GBD5
TI
P1HAH51CT905 TI
P1HAH30 (DN150) P1HAH51CT903
AA191 AA192
DN40-AAH7
DN40-AAH7
P1HAH30 SET SET
BR402
P1HAH15
BR401 PRESSURE PRESSURE
TT
P1HAH30
TO SAMPLING SYSTEM P1QUB40 P1HAD40 BR505 DN25 : 301.0
DN25 : 296.9
P1HAH51CT005 TW
BR505
BR508
KG/CM2G KG/CM2G
BR601 BR601 DN25-AAH7 P1HAH51CT402
TT TT TT
P1QU-120001 P1HAH51CT006 P1HAH51CT003 P1HAH51CT004
DN15-ACD5 DN25 TO PLATEN SH
AA602 AA601 -AAH7 (SHORT) (LONG)
SAT. STEAM SAMPLING INLET MANIFOLD
P1HAH30 (DN150)
P1HAH-310007 (B-1)
P1HAH30
BR504 ATTEMPERATOR
NO.1-'A'
DN100-AAH7
DN25-AAH7
(AH001)
TI
BR004
P1HAH30CT901
P1HAH30 (DN150)
TT P1HAH30 AA201
P1HAH30CT001 BR503
(LOWER 4 POINTS)
(UPPER 4 POINTS)
DN40-AAH7
P1HAH30 (DN150)
P1HAH05
P1HAH50CT901
TI REFERENCE DOCUMENTS/DRAWINGS
BR501
P1HAH30 TT
BR502 P1HAH51CT001 DOC. & DWG NO. TITLE
DN25-AAH7 TI
DN100-BBH5
P1HAH51CT901
TT NS2-XG02-P0ZEN-110001 GENERAL_P&ID SYMBOL & LEGEND (1/4)
P1LAE21
P1HAH51CT002
TT
BR002
P1HAH50CT001
TT P1HAH30 (DN150) NS2-XG02-P0ZEN-110002 GENERAL_P&ID SYMBOL & LEGEND (2/4)
P1HAH30CT008
(TOTAL 22 POINTS)
DN25-AAH7 GT NS2-XG02-P0ZEN-110004 GENERAL_P&ID SYMBOL & LEGEND (4/4)
P1LAE21AA081
TCV
P1LAE21AA081 MOV M FROM
P1HAH30 (DN150) P1LAE21AA001
FEEDWATER SYSTEM
AS
P1HAH01 (DN200) P1HAC-310001 (E-7)
AA102 80X100 FL 100X80 AA101 NO.1 SPRAY LINE
AA401
SUPPLY PIPE
SUPPLY PIPE
SUPPLY PIPE
SUPPLY PIPE
SUPPLY PIPE
SUPPLY PIPE
SUPPLY PIPE
CAGE SIDEWALL OUTLET HEADERS (P1HAH30)
(DN 25)
FROM SEPARATOR A P1HAH01 AA402
BR501 TT
P1HAG-310003 (B-7) P1HAH50CT022
DN25-AAH7
(P1HAH15)
P1LAE21
P1HAH20
P1HAH20
BR003
P1HAH01 (DN200) CAGE SIDE DN100-BBH5
BR402
BR403
-AAH7
-AAH7
DN25-AAH7
DN25-AAH7
DN25-AAH7
DN25-AAH7
(P1HAH10)
DN40
DN40
WALL TUBE AA103
P1HAH15
BR504
BR501
BR502
BR503
FURNACE ROOF OUTLET / CAGE INLET HEADER
P1HCB10 TO SOOTBLOWER
P1HAH01 (DN200) CAGE BOTTOM RING MAIN HEADER (P1HAH20) BR001 SOOTBLOWER STEAM LINE
P1HAH-310006 (B-7)
FURNACE ROOF INLET HEADER
DN100-AAH7
(P1HAH40)
CAGE ROOF / REAR WALL TUBING P1HAH20
(P1HAH50)
FURNACE ROOF
(P1HAH45)
BR404
P1HAH20
DN40
BR401 -AAH7
DN40
-AAH7
(P1HAH25)
(P1HAH25)
(P1HAH25)
(P1HAH35)
DIVISION WALL
SCREEN TUBE
SUPERHEATER SLING JUNCTION HEADER (REAR)
P1HAH02 (DN200)
SUPPLY PIPE TO SH SLING TUBE
SUPERHEATER SLING INLET HEADER (FRONT)
FOR CONSTRUCTION
SUPERHEATER SLING INLET HEADER (REAR)
REAHEATER SLING INLET HEADER (FRONT)
FROM SEPARATOR B
LOWER DIVISION WALL INLET HEADER
P1HAH02
BR501
P1HAG-310003 (B-7)
DN25-AAH7
P1HAH02 (DN200)
FROM STORAGE VESSEL
P1HAH-310006 (B-11)
P1HAH-310006 (B-7)
0INT2
A3 (420 x 297)
1. DRAWING SHOWS PIPING, COMPONENTS AND EQUIPMENT ASSOCIATED
WITH UNIT1. UNIT2 IS IDENTICAL AND UNIT2 TAGS ARE PREFIXED WITH
“P2” IN PLACE OF “P1” SHOWN HERE.
P1HAH-310005 (R-4)
P1HAH-310004 (R-11)
P1HAH-310005 (R-7)
INSTRUMENTS NOT SPECIFIED IN THIS DRAWING IS DN25.
DN100-AAH7
DN100-AAH7
P1HAH20
BR410
BR409
P1HAH20
CAGE DRAIN LINE
(P1HAH25)
(P1HAH25)
P1HCB10 TO SOOTBLOWER
(P1HAH25)
(P1HAH25)
(P1HAH25)
(P1HAH25)
BR003 SOOTBLOWER STEAM LINE
P1HCB-310027 (A-7)
DN100-AAH7
(P1HAH35)
(P1HAH50)
(P1HAH45)
UPPER FLOW DIVISION WALL TUBING
(P1HAH40)
(P1HAH15)
DIVISION WALL
SCREEN TUBE
P1HAG-310003 (E-7)
P1HAH03 (DN200)
NS2-XG02-P0ZEN-110003 GENERAL_P&ID SYMBOL & LEGEND (3/4)
P1HAH20 P1HAH20
(P1HAH10)
BR408 BR405
DN40 DN40 NS2-XG02-P0ZEN-110004 GENERAL_P&ID SYMBOL & LEGEND (4/4)
-AAH7 -AAH7
BS001 BS002
DN500-HBD6
DN500-HBD6
CAGE BOTTOM RING MAIN HEADER (P1HAH20)
BR192
BR194
-AAH7
DN25-AAH7
DN25-AAH7
DN25-AAH7
DN25-AAH7
-AAH7
CAGE SIDE
DN40
DN40
P1HAH20
BR407
BR506
BR507
BR508
P1HAH20
P1HAH15
BR509
BR406
WALL TUBE
P1HAH04 (DN200) BR191 BR193
DN200-GBD5 DN200-GBD5
TI
TT P1HAH52CT905 TI
FROM SEPARATOR D P1HAH04 P1HAH52CT001 P1HAH52CT903
BR501 TI AA191 AA192
P1HAG-310003 (D-7) P1HAH52CT901
SUPPLY PIPE
SUPPLY PIPE
SUPPLY PIPE
SUPPLY PIPE
SUPPLY PIPE
SUPPLY PIPE
SUPPLY PIPE
DN25-AAH7 TT SET SET
BR401 PRESSURE BR402 PRESSURE TT
P1HAH52CT002
DN25 : 301.0 DN25 : 296.9
P1HAH52CT005
KG/CM2G KG/CM2G
CAGE SIDEWALL OUTLET HEADERS (P1HAH30) TT TT TT TW
TW P1HAH52CT006 P1HAH52CT003 P1HAH52CT004 P1HAH52CT402
P1HAH04 (DN200) P1HAH52CT401 TO PLATEN SH
(SHORT) (LONG)
INLET MANIFOLD
P1HAH-310007 (E-1)
P1HAH04 (DN200) P1HAH30
(DN150)
P1HAH30 ATTEMPERATOR
DN100-AAH7
BR509 NO.1-'B'
DN25-AAH7 (AH001)
BR004
P1HAH30 (DN150) AA201
P1HAH30
BR510
DN25-AAH7
FOR CONSTRUCTION
DN100-BBH5
P1LAE22
BR002
P1HAH30 (DN150)
AA504 P1HAH30
GT
BR511 P1LAE22CG081
P1LAE22
BR003 0INT1 27.AUG.2019 FOR CONSTRUCTION H.J.KIM J.H.LEE J.H.MOON
DN100-BBH5
P1HAH30 (DN150)
AA103 0 12.JUL.2019 FOR CONSTRUCTION H.J.KIM J.H.LEE J.H.MOON
P1HAH30
BR513
DN25-AAH7
P1HAH30 (DN150)
P1HAH30
BR514
DN25-AAH7
P1HAH30 (DN150)
P1HAH30
BR515 AA504
DN25-AAH7
P1HAH30 AA503
BR516
DN40-AAH7
GT
P1HAH20CG002
M MOV M MOV
P1HAH20AA001 P1HAH20AA002
P1HAH20 P1HAH20 TO BOILER DRAIN VESSEL
BR411 BR412
P1LCL-310009 (B-7)
DN100-AAH7 INC
DN100-DBD5
0INT2
A3 (420 x 297)
1. DRAWING SHOWS PIPING, COMPONENTS AND EQUIPMENT ASSOCIATED
WITH UNIT1. UNIT2 IS IDENTICAL AND UNIT2 TAGS ARE PREFIXED WITH
“P2” IN PLACE OF “P1” SHOWN HERE.
3. HOLD LIST
- INSTRUMENT AIR SYSTEM GROUPING
BS001 BS002 BS003
DN350-GAD5
BR196
ERV BR195
LCP DN150-GAD5
GT
DN450-GAD5
DN450-GAD5
P1LAE31CG081
FY
MOV M TCV P1LBA01AA193 FV
P1LAE31AA001 P1LAE31AA081 P1LBA01AA193
BR192
BR194
TO FEEDWATER SYSTEM
AS s
BR191 BR193
P1HAC-310001 (F-7) DN200-GAD5 BR403
DN200-GAD5 AS DN25
NO.2 SPRAY LINE AA101 100X80 FL 80X100 AA102
DN100-BBH5
AA191
BR002
P1LAE31
AA402
SET SET LO AA310
PI PRESSURE PRESSURE
P1LAE31 : 282.5
BR401 : 278.4 BR402
P1LBA01CP901
KG/CM2G DN25 KG/CM2G DN25
BR003
DN100-BBH5 LO AA309
AA103 TI
P1LBA01CT901
DN65-AAH5
P1HAG-310004 (D-7) AA308
TI AA302 AA304 AA306 TT TT TT TW
P1LBA01
S/H NO.2 SPRAY WATER WARM UP LINE P1HAH61CT903 P1LBA01CT001 P1LBA01CT002 P1LBA01CT003 P1LBA01CT401
AA101 AA201
BR501
AA307
AA301 AA303 AA305 P1LBA01 TO H.P STEAM TURBINE
AA201 BR001
P1LBA-110001 (C-1)
TT TT TW MAIN STEAM LINE ID310-AAH5
DN100
BR004
-AAH6
P1HAH61CT003 P1HAH61CT004 P1HAH61CT402
TI
P1HAC61CT901
P1HAH60 (DN450)
ATTEMPERATOR
(SHORT) (LONG)
NO.2
TT (AH001)
P1HAH61CT006
FROM PLATEN AA502
S/H1 OUTLET HEADER TT TT
P1HAH60CT001 P1HAH61CT005
S/H PLATEN TUBES METAL TEMP.
TW P1QJA93 P1QJA93
P1HAH-310005 (B-7) P1HAH61CT401 BR002 BR001
THIS DWG. (D-7)
TI DN25-AAH5 DN25-HBD5
AA101 AA201
(TOTAL 92 POINTS)
P1HAH61CT905
P1HAH55 (DN450)
AA501
BR501
TT
P1HAH61CT002
TI
P1HAC61CT901
TT
(LONG)
DN25-AAH5
N2 SUPPLY SYSTEM
P1HAH70CT077
TI REFERENCE DOCUMENTS/DRAWINGS
P1HAH70CT977 (SHORT)
TT TT TT
P1HAH60CT092
P1HAC61CT001 P1HAH70CT078 DOC. & DWG NO. TITLE
FROM NITROGEN GAS
SUPPLY SYSTEM NS2-XG02-P0ZEN-110001 GENERAL_P&ID SYMBOL & LEGEND (1/4)
VENT LINE
P1QJA90
BR001
P0QJA-110001
DN50-HBD5 NS2-XG02-P0ZEN-110002 GENERAL_P&ID SYMBOL & LEGEND (2/4)
P1HAG-310003 (A-1)
DN25-HBD5
P1HAH51
PLATEN SUPERHEATER
PLATEN SUPERHEATER
BR501
(P1HAH70)
AA502
(P1HAH65)
BR001
P1HAH-310005 (B-1)
DN25-HBD5
P1QJA95 AA502
BR002 AA501
DN25-AAH6 P1QJA93 TO SUPERHEATER OUTLET VENT LINE
AA501 BR001
THIS DWG (B-5)
DN40-AAH5
P1HAH52
DN25-HBD5
P1HAH70
BR501
BR503
P1QJA94 TO REHEATER OUTLET VENT LINE
THIS DWG. (D-7)
BR001
P1HAJ-310008 (C-7)
VENT LINE DN25-HBD5
P1HAE60
VENT LINE BR401
TO PLATEN SUPERHEATER
DN40-AAH6 P1QJA95 INLET VENT LINE
BR001
THIS DWG (C-1)
DN25-HBD5
INLET MANIFOLD (P1HAH55)
PLATEN SUPERHEATER
FOR CONSTRUCTION
P1HAH55 (DN450)
TT TI
P1HAH62CT001 P1HAH62CT901
DN350-GAD5
TT 0INT1 27.AUG.2019 FOR CONSTRUCTION H.J.KIM J.H.LEE J.H.MOON
P1HAH62CT005
BR196
TW TT TT TT TW
P1HAH62CT401 P1HAH62CT006 P1HAH62CT003 P1HAH62CT004 P1HAH62CT402 0 16.AUG.2019 FOR CONSTRUCTION H.J.KIM J.H.LEE J.H.MOON
BR195
(SHORT) (LONG) DN150-GAD5
ERV
DN200-GAD5
DN200-GAD5
LCP
P1HAH60 (DN450) ATTEMPERATOR FY
BR192
BR194
NO.2 P1LBA02AA193 FV
(AH001) TT
BR191 P1LBA02AA193
DN100
BR004
-AAH6
P1HAH70CT001
DN200-GAD5 DN200-GAD5 s BR403
DN25
AS LO
AA201
S/H FINAL METAL TEMP.
(TOTAL 76 POINTS)
P1LBA02CT901
DN65-AAH5
TT AA308
GT AA302 AA304 AA306 TT TT TT TW
P1LAB02
P1LAE32CG081 P1HAH70CT076
P1LBA02CT001 P1LBA02CT002 P1LBA02CT003 P1LBA02CT401
BR501
MOV M TCV AA307
P1LAE32AA001 P1LAE32AA081 AA301 AA303 AA305 P1LBA02 TO H.P STEAM TURBINE
TO FEEDWATER SYSTEM
AS
BR001
P1HAC-310001 (F-7) P1LBA-110001 (E-1)
MAIN STEAM LINE ID310-AAH5
NO.2 SPRAY LINE AA101 100X80 FL80X100 AA102 TI
P1HAH70CT901
AA401
(DN 25)
AA402
P1LAE32
BR003
DN100-BBH5
AA103
0INT2
A3 (420 x 297)
1. DRAWING SHOWS PIPING, COMPONENTS AND EQUIPMENT ASSOCIATED
WITH UNIT1. UNIT2 IS IDENTICAL AND UNIT2 TAGS ARE PREFIXED WITH
“P2” IN PLACE OF “P1” SHOWN HERE.
PI TI FI
P1LAF80CP001 P1LAF80CT001 P1LAF80CF001 2. THE SIZE OF ROOT VALVES AND SHORT PIPING FOR
INSTRUMENTS NOT SPECIFIED IN THIS DRAWING IS DN25.
DN400-GAD6
DN400-GAD6
DN600-HBD6
DN600-HBD6
DN100-EBD5
P1LAF80
BR002
BR194
BR192
BR192
TI
BR194
THIS DWG (F-1) P1HAJ20CT901
R/H ATTEMPERATOR SPRAY WATER LINE BR191 BR193
DN200-GAD6 DN200-GAD6
BR191 BR193
DN250-GBD5 DN250-GBD5
TT AA191 AA192
PI P1HAJ20CT001
P1LBC80CP001 SET SET
PRESSURE BR401 PRESSURE BR402
TI AA191 AA192 TI PI : 63.9
DN25
: 63.4
DN25
P1LBC80CT901 P1LBC80CT903 P1LBB01CP901 KG/CM2G KG/CM2G
SET SET
PRESSURE PRESSURE TI
: 66.9 BR403 : 65.6 BR404 P1LBB01CT901
DN25 DN25
(TOTAL 37 POINTS)
KG/CM2G KG/CM2G
PP
LSHH
P1LBC80CL081
LSH
TI P1LBC80CL080
P1LBC80CT905
AA502
AA307 AA308
AA312 AA311
P1QJA94 P1QJA94
BR002 BR001
MOV M P1HAH-310007 (C-7)
P1LBC80AA001 DN25-DAH5 DN25-HBD5
TO DRAIN HEADER P1LBC80 P1LBC80 AA101 AA201
DRAIN LINE BR402 BR401
P1LCL-310009 (D-1) AA501
DN50-GBD5 DN50-EBD5
AA401 REFERENCE DOCUMENTS/DRAWINGS
DOC. & DWG NO. TITLE
DN40-DAH5
AA402
P1HAJ20
(DN 25)
NS2-XG02-P0ZEN-110001 GENERAL_P&ID SYMBOL & LEGEND (1/4)
BR503
AA403
(P1HAJ20)
(P1HAJ10)
BR501 NS2-XG02-P0ZEN-110002 GENERAL_P&ID SYMBOL & LEGEND (2/4)
DN25-DAH5
NS2-XG02-P0ZEN-110003 GENERAL_P&ID SYMBOL & LEGEND (3/4)
BS001 BS002
BR502
DN25-DAH5
DN400-GAD6
DN400-GAD6
(LONG)
TT
BR194
BR192
P1HAJ20CT038
BS001 BS002 BR193
TI BR191
(SHORT) DN200-GAD6
P1HAJ20CT938 DN200-GAD6
TT
P1HAJ20CT039
DN600-HBD6
DN600-HBD6
AA191 AA192
BR192
BR194
SET SET
PRESSURE PRESSURE
PI : 63.9 BR401 : 63.4 BR402
P1LBB02CP001 KG/CM2G DN25 KG/CM2G DN25
BR191 BR193
TI
DN250-GBD5 DN250-GBD5 P1LBB02CT901
PI
P1LBC90CP001
PIT PP
TI TI TI P1LBB02CP001 P1LBB02CP401
AA192
FOR CONSTRUCTION
P1LBC90CT901 P1LBC90CT905 P1LBC90CT903
AA191 TT TT TT TW
SET SET P1LBB02CT001 P1LBB02CT002 P1LBB02CT003 P1LBB02CT401
PRESSURE PRESSURE
: 65.6 AA302 AA304
: 66.9
PP PIT KG/CM2G KG/CM2G
P1LBC90CP401 P1LBC90CP001 TT
TW TT TT P1LBC90CT005 BR404 TT TT AA301 AA303 P1LBB02 TO I.P STEAM TURBINE
P1LBC90CT401 P1LBC90CT001 P1LBC90CT002
BR403 DN25 P1LBC90CT003 P1LBC90CT004
TT DN25 BR001
AA302 AA304 P1LBC90CT006 P1LBB-110003 (D-1)
REHEAT STEAM LINE DN600-DAD5
(SHORT) (LONG)
FROM H.P STEAM TURBINE P1LBC90 AA301 AA303
BR001 1:100
P1LBC-110002 (D-7)
DN650-EBD5
REHEATER
ATTEMPERATOR AA305 AA306
AA310 AA309
LSHH
P1LBC90CL081
LSH
P1LBC90CL080
MOV M
P1LBC90AA001
TO DRAIN HEADER P1LBC90 P1LBC90
DRAIN LINE BR402 BR401
P1LCL-310009 (D-1)
DN50-GBD5 DN50-EBD5
AA401
AA402
(DN 25) AA403
FI
P1LAF90CF001
DN100-EBD5
P1LAF90
FT
BR002
P1LAF90CF001
GT
AA302 AA304 P1LAF90CG081
MOV M TCV
P1LAF90AA001 P1LAF90AA081
P1LAF90 AA301 AA303
AS
BR001
THIS DWG (B-1)
DN100-CBD5
(NOTE 3) REHEATER ATTEMPERATOR SPRAY WATER LINE AA101 FL AA102
FE AA401
P1LAF90CF501 (DN 25)
AA402
P1LAF90 P1LAF90
BR003 AA103 BR004
DN100-CBD5 DN100-EBD5
0
A3 (420 x 297)
1. TT LOCATION ARE AT 2M DOWN STREAM OF FINAL SOOTBLOWER
BS001
DN250-HBD5
TI PI
P1HCB10CF001
P1HCB10CT001 P1HCB10CP901
WITH UNIT1. UNIT2 IS IDENTICAL AND UNIT2 TAGS ARE PREFIXED WITH
“P2” IN PLACE OF “P1” SHOWN HERE.
BR192
BR191 3. THE SIZE OF ROOT VALVES AND SHORT PIPING FOR
FT DN150-HBD5
PIT PIT PI INSTRUMENTS NOT SPECIFIED IN THIS DRAWING IS DN25.
P1HCB10CF001 P1HCB10CP002 P1HCB10CP001 P1HCB10CP501 PSV GT AA502
TT P1HCB10AA191 P1HCB10CG081
P1HCB10CT001
AA310 AA308 PCV
AA306 AA304 AA302 P1HCB10AA081
AA309 AA307
BR401 M AA501 FROM PRIMARY
AA303 AA301 DN25-EBD6
AA305 P1HCB10 P1HCB10 S/H OUTLET
AS
BR004 BR003
P1HAH-310006 (B-7)
DN150-EBD6 100 FL DN100-AAH7 SOOT BLOWING STEAM LINE
X150 AA101
FE MOV
P1HCB10CF501 P1HCB10AA001
TO FURNACE TO FURNACE
WALL BLOWERS P1HCB17 P1HCB10 P1HCB10 P1HCB18 WALL BLOWERS
BR001 BR005 SOOT BLOWING STEAM LINE BR006 SOOT BLOWING STEAM LINE BR001
P1HCB-310028 (F-1) P1HCB-310028 (A-1)
DN80-EBD6 DN150-EBD6 DN150-EBD6 DN80-EBD6
AA101 AA101
TO AIR HEATER
DN80-EBD6
DN80-EBD6
DN80-EBD6
DN80-EBD6
DN80-EBD6
DN80-EBD6
P1HCB20 SOOT BLOWERS
BR001
BR001
BR001
P1HCB16
BR001
BR001
BR001
P1HCB13
P1HCB11
P1HCB14
P1HCB15
P1HCB12
BR001
P1HCB-310028 (A-5)
DN100-EBD6
147 148
181 182
133 131 129 130 132 134 DOC. & DWG NO. TITLE
NS2-XG02-P0ZEN-110001 GENERAL_P&ID SYMBOL & LEGEND (1/4)
LEGEND NS2-XG02-P0ZEN-110002 GENERAL_P&ID SYMBOL & LEGEND (2/4)
163 161 162 164 NS2-XG02-P0ZEN-110003 GENERAL_P&ID SYMBOL & LEGEND (3/4)
: WALL BLOWER
FURNACE LEFT WALL-UPPER FURNACE RIGHT WALL-UPPER
F NS2-XG02-P0ZEN-110004 GENERAL_P&ID SYMBOL & LEGEND (4/4)
: FUTURE WALL BLOWER
F
159 157 155 153 154 156 158 160 : FUTURE LONG
RETRACTABLE BLOWER
F
: FUTURE
PART RETRACTABLE BLOWER
CAGE LEFT (S/H SIDE) CAGE LEFT (R/H SIDE) CAGE RIGHT (R/H SIDE) CAGE RIGHT (S/H SIDE)
TI TT
FOR CONSTRUCTION
P1HCB11CT001 P1HCB11CT001
(NOTE 1) TT TI
P1HCB12CT001 P1HCB12CT001
GS+ (NOTE 1)
P1HCB11CG051
AA401
AA403
GS-
P1HCB11CG051 GS+
AA401
P1HCB12CG051
AA403
GS-
FO
P1HCB12CG051
FO
P1HCB12BP001
AA402
AA404
FO
TV FO
P1HCB11AA051 P1HCB11BP001
TT TI TI TI TI TT
S
AA404
(NOTE 1) BR402 P1HCB12AA051 (NOTE 1) 0INT2 17.SEP.2019 FOR CONSTRUCTION H.J.KIM J.H.LEE J.H.MOON
TY S
AS P1HCB21AA051 DN25-EBD6 AS
GS+ AS BR402 GS+
P1HCB15CG051 TY P1HCB16CG051 0INT1 27.AUG.2019 FOR CONSTRUCTION H.J.KIM J.H.LEE J.H.MOON
TT DN25-EBD6 TT
AA401
AA401
AA403
AA404 FO AA403
GS- TY P1HCB12AA051 TY GS-
P1HCB15CG051
P1HCB13CT001 GS+ P1HCB13AA051 AS P1HCB14AA051 GS+ P1HCB14CT001
P1HCB16CG051
P1HCB13CG051 P1HCB14CG051 0 12.JUL.2019 FOR CONSTRUCTION H.J.KIM J.H.LEE J.H.MOON
(NOTE 1) GS- TV TV GS- (NOTE 1)
P1HCB13CG051 P1HCB13AA051 P1HCB14AA051 P1HCB14CG051
FO
AA404
AA402
AA402
FO TV TV FO
P1HCB15BP001 P1HCB15AA051 AA401 FO AA402 AA402 FO AA401 P1HCB16AA051 P1HCB16BP001
S S
BR402 BR402
BR402 AA403 AA404 DN25-EBD6 AA403 DN25-EBD6 BR402
TY AA404 TY
DN25-EBD6 P1HCB15AA051 P1HCB16AA051 DN25-EBD6
FO FO
AS P1HCB13BP001 P1HCB14BP001 AS
DN50-EBD6
DN50-EBD6
DN50-EBD6
DN50-EBD6
BR401
P1HCB13
BR401
BR401
P1HCB11
P1HCB12
BR401
P1HCB14
P1HCB15 P1HCB16
BR401 BR401
DN50-EBD6 DN50-EBD6
FROM FURNACE
TO FLASH TANK P1HCB30 WALL BLOWERS DRAIN
S.B COMMON DRAIN LINE BR401
P1LCL-310009 (D-1) P1HCB-310028 (A-5)
DN150-EBD6
0INT2