FOR APPROVAL

D 15.11.2021 I.H.JANG J.H.WOO J.H.WOO FOR APPROVAL


C 12.04.2021 I.H.JANG J.H.WOO J.H.WOO FOR APPROVAL
B 13.01.2021 I.H.JANG J.H.WOO J.H.WOO FOR APPROVAL
A 02.07.2020 T.H.JANG J.I.KIM D.W.KANG FOR APPROVAL
Rev Date Prepared Checked Approved Details of Revision
Owner

Owner’s Engineer

Contractor

DOOSAN HEAVY INDUSTRIES VIETNAM

Sub-Supplier

Project

NGHI SON 2 BOT THERMAL POWER PLANT PROJECT

Title

Commissioning Procedure for Boiler Safety Valve Popping Test

Document No. Rev. Page-No.


NS2-DN05-P1LBF-820001 D 12
Commissioning Procedure for Boiler Safety Valve Popping Test
NS2-DN05-P1LBF-820001

RECORD OF REVISION
Rev. Date Page Affected Description of Revision

A 02.07.2020 First Issue

B 13.01.2021 3, 4 Second Issue

C 12.04.2021 9 Third Issue

D 15.11.2021 3 Fourth Issue

Rev.D 1 of 11
Commissioning Procedure for Boiler Safety Valve Popping Test
NS2-DN05-P1LBF-820001

CONTENTS

1. GENERAL INFORMATION .............................................................................................3


1.1 Objective ............................................................................................................................................. 3
1.2 Scope ................................................................................................................................................... 3
1.3 Safety Precaution during Commissioning........................................................................................ 3
1.4 Risk Assessment And Safety Prescription ........................................................................................ 4
1.5 References ........................................................................................................................................... 4
1.6 System Description............................................................................................................................. 5
1.7 Major Components ............................................................................................................................ 6
1.8 Equipment/Tool List for Commissioning ......................................................................................... 6

2. PRE - COMMISSIONING ..................................................................................................7


2.1 Pre - Commissioning Requirements ................................................................................................. 7
2.2 Safety Requirement ........................................................................................................................... 7

3. COMMISSIONING .............................................................................................................9
3.1 Commissioning Requirement ............................................................................................................ 9
3.2 Boiler Safety Valve Popping Test ...................................................................................................... 9
3.3 Task on Completion ......................................................................................................................... 10

4. ATTACHMENT ................................................................................................................11
Attachment 1. Commissioning Record Sheet .................................................................................................... 11
Attachment 2. P&ID ............................................................................................................................................ 11

Rev.D 2 of 11
Commissioning Procedure for Boiler Safety Valve Popping Test
NS2-DN05-P1LBF-820001

1. GENERAL INFORMATION

1.1 Objective

This document provides the commissioning guideline of Boiler Safety Valve Popping Test for Nghi
Son 2 BOT Thermal Power Plant.

1.2 Scope

The scope of Boiler Safety Valve Popping Test covers the following requirements of the contract,
SCHEDUEL 9 CONSTRUCTION, MECHANICAL COMPLETION, START-UP AND FUNCTIONAL
TESTING
4.3.2. Start-up and Integration of Systems for Functional Testing
(viii) boiler safety valves test

1.3 Safety Precaution during Commissioning


1) Before the start of any testing, it should be confirmed that all power supplies to the system have been
isolated or that they are in a known condition. The Commissioning engineer is responsible for the
safety of those personnel working of the system Check for the presence of harmful electrical or
mechanical potential energy before starting work.
2) Fire is strictly prohibited on site, no smoking there must be a warning mark in hazardous area.
3) Before Commissioning Firefighting should be ready. If it is not yet ready, Portable Fire Extinguishers
must be available.
4) Strictly comply with the safety and environmental protection regulations of local government.
5) In order to ensure the reliable operation of every part of the system, strictly obey the corresponding
procedures.
6) Have a regular maintenance for the long-time standby equipment.
7) Obey the relevant safety regulations of the power plant during commissioning all along. Ensure the
successful commissioning work.
8) All personnel directly involved with the commissioning that will attend a kickoff safety meeting to
review for the dangers. Ensure that all personnel understand the process and the operation. Any
personnel involved in the commissioning have the authority to terminate the operation at any time,
if a serious problem or safety issue develops.
9) During the duration of the test, withdraw all the workers working areas. Only testing team and the
supervisors should be inside of these areas.
10) Safe working clearances must be at all times maintained.
11) Appoint a person looks around the test area.
12) Personal protection equipment is available for commissioning personnel.
13) Warning tape and barrier around test area.
14) All works must be supervised by safety person who is qualified

Rev.D 3 of 11
Commissioning Procedure for Boiler Safety Valve Popping Test
NS2-DN05-P1LBF-820001

15) Passageway have to be kept clean and clear; never block access and egress routes
16) Abide all the site regulations.
17) Follow manufacturer’s safety instructions given in O&M manual or similar documents.
18) LOTO Procedures shall be strictly followed.(NS2-VA08-P0ZEN-169028).
19) PTW procedures shall be implemented. (NS2-VA08-P0ZEN-169050).
20) Mode of communication such as walkie talkie, Telephone shall be used During testing and
Commissioning .

1.4 Risk Assessment And Safety Prescription

The envisaged risks deriving from the operations included in this document are related to the hazards as
listed below. Before the activities, begin the Safety Manager will co-operate with the Commissioning
Manager to prepare the risk assessment.
No. Activity Hazards
Electrical Live Parts
Tripping Hazards
High Pressure Steam Jet
3.2 Safety Valve Popping Test
Hot Surface
Noise
Overpressure of Steam Line

1.5 References

No. Documents No. Drawing Description

1 NS2-XG02-PHAH-310005 P&I Diagram _ Cage & Primary Superheater (1 of 2)

2 NS2-XG02-PHAH-310006 P&I Diagram _ Cage & Primary Superheater (2 of 2)

3 NS2-XG02-PHAH-310007 P&I Diagram _ Platen and Final Superheater

4 NS2-XG02-PHAH-310008 P&I Diagram _ Reheater System

5 NS2-YT01-P0UHA-310081 Data Sheet for Safety Valve for Boiler

6 NS2-YT01-P0UHA-310082 Data Sheet for PORB for Boiler

7 NS2-YU02-P0BTW-140004 Single Line Diagram - DC&UPS System

8 NS2-DT01-P0ZEN-040001 Mechanical Completion Procedure

9 NS2-DT05-P0ZEN-860001 Commissioning Book

10 NS2-DT05-P0ZEN-860002 Permit to Work for Commissioning

Rev.D 4 of 11
Commissioning Procedure for Boiler Safety Valve Popping Test
NS2-DN05-P1LBF-820001

1.6 System Description

Boiler Safety Valve Popping Test will be performed in order to ensure the safety of steam piping.
Hydraulic lift equipment will be used for test since live pop test of the mechanical safety valves may
cause negative effect to steam process. Test will be performed according to following code in ASME
Section 1.

Set Pressure Tolerance


The set pressure tolerance plus or minus shall not exceed that specified in the following table:
Tolerance, Plus or Minus From Set
No. Set Pressure, psi (MPa)
Pressure
1 ≤70 (0.5) 2 psi (15 kPa)

2 >70 (0.5) and ≤300 (2.1) 3% of set pressure

3 >300 (2.1) and ≤1,000 (7.0) 10 psi (70 kPa)

4 >1,000 (7.0) 1% of set pressure

(ASME Section 1, PG-72.2)

Rev.D 5 of 11
Commissioning Procedure for Boiler Safety Valve Popping Test
NS2-DN05-P1LBF-820001

1.7 Major Components

Set Pressure
No. Location Equipment Tag No.
(kg/cm2g)
Primary Superheater Outlet
1 HAH51AA191
Safety Valve #A-1
301
Primary Superheater Outlet
2 Primary HAH52AA191
Safety Valve #B-1
Superheater
Outlet Primary Superheater Outlet
3 HAH51AA192
Safety Valve #A-2
296.9
Primary Superheater Outlet
4 HAH52AA192
Safety Valve #B-2
Final Superheater Outlet
5 LBA01AA191
Safety Valve #A-1
282.5
Final Superheater Outlet
6 LBA02AA191
Safety Valve #B-1
Final Superheater Outlet
7 Final LBA01AA192
Safety Valve #A-2
Superheater 278.4
Outlet Final Superheater Outlet
8 LBA02AA192
Safety Valve #B-2
Final Superheater Outlet
9 LBA01AA193
Power Relief Valve #A
272.9
Final Superheater Outlet
10 LBA02AA193
Power Relief Valve #B
Reheater Inlet Safety Valve
11 LBC80AA191
#A-1
66.9
Reheater Inlet Safety Valve
12 LBC90AA191
#B-1
Reheater Inlet Safety Valve
13 LBC80AA192
#A-2
65.6
Reheater Inlet Safety Valve
14 LBC90AA192
#B-2
Reheater
Reheater Outlet Safety
15 LBB01AA191
Valve #A-1
63.9
Reheater Outlet Safety
16 LBB02AA191
Valve #B-1
Reheater Outlet Safety
17 LBB01AA192
Valve #A-2
63.4
Reheater Outlet Safety
18 LBB02AA192
Valve #B-2
Sootblowing Sootblowing Header Safety
19 HCB10AA191 40.8
Header Valve

1.8 Equipment/Tool List for Commissioning

No. Equipment/Tool Purpose of use

1 Safety Valve Jacking Test Equipment Safety Valve Popping Test

Rev.D 6 of 11
Commissioning Procedure for Boiler Safety Valve Popping Test
NS2-DN05-P1LBF-820001

2. PRE - COMMISSIONING

2.1 Pre - Commissioning Requirements

1) The conditions of mechanical completion have been fulfilled, there are no category A punch items
and the system has been taken-over by commissioning from construction.
2) Piping, equipment installation with necessary instrumentation and control are identified and found
to be completed.
3) The system has been thoroughly checked and hydraulic testing has been completed after erection
and leaks (if any detected) have been rectified.
4) Electrical power system has been tested, energized and available for the required equipment.

No. Description Check


Panel Testing has been completed as per related Commissioning Site Test
1
Procedure.
Panels are energized with permanent power Source.
2
(Refer SLD NS2-YU02-P0ZEN-140001)
Relay setting has been done as per Relay co-ordination documents
3
(NS2-YT10-P0ZEN-140004).
4 Safety signage and boundary LOTO has been completed

5 Motor Feeders ON/OFF Function test has been Completed with DCS/PLC.

5) Instruments functional loop check between DCS and Local instrument has been completed.

No. Description Check


Inter connection Cabling check completed as per Interconnection Wiring
1
Diagram.
2 Each instrument Function test has been Completed with DCS/PLC.

3 Final sensor setting has been completed (vibration, speed, temp, etc.).

4 Analog / Digital signals are verified with DCS/ PLC system.

5 Name plate tag are available (permanent /temporary).

6) Equipment identification is complete, correct and nameplates have been fully installed.
7) Scaffoldings and any other temporary construction items have been removed.

2.2 Safety Requirement

1) Proper communication facilities between various control stations and central control room have
been prepared.
2) Personal protection equipment is available for commissioning personnel.

Rev.D 7 of 11
Commissioning Procedure for Boiler Safety Valve Popping Test
NS2-DN05-P1LBF-820001

3) Warning signs are placed in all concerned operating area.


4) Portable fire extinguishers or permanent firefighting systems are available at critical location.
5) The system taken-over by commissioning has been notified to all parties and is under the PTW
system requirements.

Rev.D 8 of 11
Commissioning Procedure for Boiler Safety Valve Popping Test
NS2-DN05-P1LBF-820001

3. COMMISSIONING

3.1 Commissioning Requirement

No. Description Check

1 Confirm that the plant is ready for turbine bypass operation.

2 A manufacturer’s representative is at the site for the test and adjustment.


Check that hydrostatic plugs of safety valve have been removed, and discs have
3
been installed.
Check that thermal insulation of the valve nozzle & body is not extended above
4
the seat line.

3.2 Boiler Safety Valve Popping Test

3.2.1 Safety Valve


No. Description Check

Ensure that all the safety valves have been gagged except the one valve which
1
is to be tested.
Remove the safety valve cover, and mount the lifting device at the testing
2
safety valve.

3 Ensure that the turbine bypass operation is in progress.


Adjust Boiler pressure below 50~85% of the safety valve’s set pressure.
4
(Boiler pressure target will be determined as per safety valve supervisor’s
recommendation.)
5 When the boiler pressure has reached, lift the safety valve disc by test device.

Check the safety valve’s lifting pressure, and then calibrate the set pressure of
6
the safety valve as required.

3.2.2 PORV (Power Relief Valve)


No. Description Check

1 Install the testing equipment on the pressure transmitter of the PORV.

Check that the PORV is closed, and close the pressure transmitter isolation
2
valves.

3 Check the PORV setting pressure on the PORV controller.

Apply external pressure using the hydraulic pump to pressure transmitter above
4
the ERV set pressure, and verify the PORV is opened.
Slowly relieve the hydraulic pressure of the hydraulic pump below the PORV
5
set pressure, and verify the PORV is closed.
Relieve all the hydraulic pressure from the pump, and disconnect the testing
6
equipment.

7 Open the pressure transmitter isolation valves.

Rev.D 9 of 11
Commissioning Procedure for Boiler Safety Valve Popping Test
NS2-DN05-P1LBF-820001

3.3 Task on Completion


On the completion of the float safety valve exercise, the following tasks should be carried out.
No. Description Check

1 Ensure that all gags are removed.


Ensure that all the adjustment ring pins are secure and all the valve accessoried
2
are correctly refitted, e.g, lever assemblies.
3 Remove the test gauge(s) if used.
Once satisfactorily adjusted, the ring pins, overlap collar and top lever pin
4
should be sealed to confirm with the applicable ASME code.

Rev.D 10 of 11
Commissioning Procedure for Boiler Safety Valve Popping Test
NS2-DN05-P1LBF-820001

4. ATTACHMENT

Attachment 1. Commissioning Record Sheet


Attachment 2. P&ID

Rev.D 11 of 11
Attachment 1. Safety Valve Popping Test Record

Date:
Unit:

Tolerance Popping
Set Pressure
No Description Tag No. Pressure Remark
(kg/cm2g) +1% -1% (kg/cm2g)
1 Primary Superheater Outlet Safety Valve #A-1 HAH51AA191
301 304.01 297.99
2 Primary Superheater Outlet Safety Valve #B-1 HAH52AA191
3 Primary Superheater Outlet Safety Valve #A-2 HAH51AA192
296.9 299.87 293.93
4 Primary Superheater Outlet Safety Valve #B-2 HAH52AA192
5 Final Superheater Outlet Safety Valve #A-1 LBA01AA191
282.5 285.33 279.68
6 Final Superheater Outlet Safety Valve #B-1 LBA02AA191
7 Final Superheater Outlet Safety Valve #A-2 LBA01AA192
278.4 281.18 275.62
8 Final Superheater Outlet Safety Valve #B-2 LBA02AA192
9 Final Superheater Outlet Power Relief Valve #A LBA01AA193
272.9 275.63 270.17
10 Final Superheater Outlet Power Relief Valve #B LBA02AA193

Personnel Doosan Heavy Industries Vietnam WSP / NS2PC

Name

Signature

1 of 2
Date:
Unit:

Tolerance Popping
Set Pressure
No Description Tag No. Pressure Remark
(kg/cm2g) +0.72 kg/cm2 -0.72 kg/cm2 (kg/cm2g)
1 Reheater Inlet Safety Valve #A-1 LBC80AA191
66.9 67.62 66.18
2 Reheater Inlet Safety Valve #B-1 LBC90AA191
3 Reheater Inlet Safety Valve #A-2 LBC80AA192
65.6 66.32 64.88
4 Reheater Inlet Safety Valve #B-2 LBC90AA192
5 Reheater Outlet Safety Valve #A-1 LBB01AA191
63.9 64.62 63.18
6 Reheater Outlet Safety Valve #B-1 LBB02AA191
7 Reheater Outlet Safety Valve #A-2 LBB01AA192
63.4 64.12 62.68
8 Reheater Outlet Safety Valve #B-2 LBB02AA192
9 Sootblowing Header Safety Valve HCB10AA191 40.8 41.52 40.08

Personnel Doosan Heavy Industries Vietnam WSP / NS2PC

Name

Signature

2 of 2
Attachment 2. P&ID 1. DRAWING SHOWS PIPING, COMPONENTS AND EQUIPMENT ASSOCIATED
WITH UNIT1. UNIT2 IS IDENTICAL AND UNIT2 TAGS ARE PREFIXED WITH
“P2” IN PLACE OF “P1” SHOWN HERE.

2. THE SIZE OF ROOT VALVES AND SHORT PIPING FOR


INSTRUMENTS NOT SPECIFIED IN THIS DRAWING IS DN25.

AA502

AA501

AA502

AA501 P1HAH30
BR507
DN25-AAH7 BS001 BS002

FROM AA502 P1HAH30 (DN150)

DN500-HBD6

DN500-HBD6
NITROGEN GAS LINE P1QJA92 P1QJA92
BR001 BR002 P1HAH30

BR192

BR194
P1HAH-310007 (C-7)
DN25-HBD5 DN25-AAH7 BR506
AA201 AA101 DN25-AAH7
AA501 BR191 BR193
DN200-GBD5 DN200-GBD5
TI
P1HAH51CT905 TI
P1HAH30 (DN150) P1HAH51CT903
AA191 AA192

DN40-AAH7

DN40-AAH7
P1HAH30 SET SET
BR402

P1HAH15
BR401 PRESSURE PRESSURE
TT

P1HAH30
TO SAMPLING SYSTEM P1QUB40 P1HAD40 BR505 DN25 : 301.0
DN25 : 296.9
P1HAH51CT005 TW

BR505

BR508
KG/CM2G KG/CM2G
BR601 BR601 DN25-AAH7 P1HAH51CT402
TT TT TT
P1QU-120001 P1HAH51CT006 P1HAH51CT003 P1HAH51CT004
DN15-ACD5 DN25 TO PLATEN SH
AA602 AA601 -AAH7 (SHORT) (LONG)
SAT. STEAM SAMPLING INLET MANIFOLD
P1HAH30 (DN150)
P1HAH-310007 (B-1)
P1HAH30
BR504 ATTEMPERATOR
NO.1-'A'

DN100-AAH7
DN25-AAH7
(AH001)
TI

BR004
P1HAH30CT901
P1HAH30 (DN150)

TT P1HAH30 AA201
P1HAH30CT001 BR503

CAGE SIDE WALL METAL TEMP.


DN25-AAH7
TW
P1HAH51CT401

(LOWER 4 POINTS)
(UPPER 4 POINTS)
DN40-AAH7

P1HAH30 (DN150)
P1HAH05

P1HAH50CT901
TI REFERENCE DOCUMENTS/DRAWINGS
BR501

P1HAH30 TT
BR502 P1HAH51CT001 DOC. & DWG NO. TITLE
DN25-AAH7 TI

DN100-BBH5
P1HAH51CT901
TT NS2-XG02-P0ZEN-110001 GENERAL_P&ID SYMBOL & LEGEND (1/4)

P1LAE21
P1HAH51CT002
TT

BR002
P1HAH50CT001
TT P1HAH30 (DN150) NS2-XG02-P0ZEN-110002 GENERAL_P&ID SYMBOL & LEGEND (2/4)
P1HAH30CT008

PRIMARY S/H METAL TEMP.


P1HAH30 NS2-XG02-P0ZEN-110003 GENERAL_P&ID SYMBOL & LEGEND (3/4)
BR501

(TOTAL 22 POINTS)
DN25-AAH7 GT NS2-XG02-P0ZEN-110004 GENERAL_P&ID SYMBOL & LEGEND (4/4)
P1LAE21AA081
TCV
P1LAE21AA081 MOV M FROM
P1HAH30 (DN150) P1LAE21AA001
FEEDWATER SYSTEM
AS
P1HAH01 (DN200) P1HAC-310001 (E-7)
AA102 80X100 FL 100X80 AA101 NO.1 SPRAY LINE
AA401

SUPPLY PIPE

SUPPLY PIPE

SUPPLY PIPE

SUPPLY PIPE

SUPPLY PIPE

SUPPLY PIPE

SUPPLY PIPE
CAGE SIDEWALL OUTLET HEADERS (P1HAH30)
(DN 25)
FROM SEPARATOR A P1HAH01 AA402
BR501 TT
P1HAG-310003 (B-7) P1HAH50CT022
DN25-AAH7
(P1HAH15)

P1LAE21
P1HAH20

P1HAH20
BR003
P1HAH01 (DN200) CAGE SIDE DN100-BBH5
BR402

BR403
-AAH7

-AAH7
DN25-AAH7

DN25-AAH7

DN25-AAH7

DN25-AAH7
(P1HAH10)

DN40

DN40
WALL TUBE AA103
P1HAH15

BR504
BR501

BR502

BR503
FURNACE ROOF OUTLET / CAGE INLET HEADER

P1HCB10 TO SOOTBLOWER
P1HAH01 (DN200) CAGE BOTTOM RING MAIN HEADER (P1HAH20) BR001 SOOTBLOWER STEAM LINE
P1HAH-310006 (B-7)
FURNACE ROOF INLET HEADER

DN100-AAH7

(P1HAH40)
CAGE ROOF / REAR WALL TUBING P1HAH20

(P1HAH50)
FURNACE ROOF

(P1HAH45)
BR404
P1HAH20
DN40
BR401 -AAH7
DN40
-AAH7
(P1HAH25)

(P1HAH25)

UPPER DIVISION WALL INLET HEADER


(P1HAH25)
(P1HAH25)

PRIMARY SUPERHEATER OUTLET HEADER


PRIMARY SUPERHEATER INLET HEADER
(P1HAH25)

(P1HAH25)

(P1HAH35)

SUPPLY PIPE TO RH SLING TUBE


SUPERHEATER SLING JUNCTION HEADER (FRONT)

DIVISION WALL
SCREEN TUBE
SUPERHEATER SLING JUNCTION HEADER (REAR)

P1HAH02 (DN200)
SUPPLY PIPE TO SH SLING TUBE
SUPERHEATER SLING INLET HEADER (FRONT)

FOR CONSTRUCTION
SUPERHEATER SLING INLET HEADER (REAR)
REAHEATER SLING INLET HEADER (FRONT)

REAHEATER SLING INLET HEADER (REAR)

FROM SEPARATOR B
LOWER DIVISION WALL INLET HEADER

P1HAH02
BR501
P1HAG-310003 (B-7)
DN25-AAH7

P1HAH02 (DN200) CAGE FRONT WALL TUBING

P1HAH02 (DN200)
FROM STORAGE VESSEL

P1HAG-310004 (B-1) UPPER FLOW DIVISION WALL TUBING


0INT2 17.SEP.2019 FOR CONSTRUCTION H.J.KIM J.H.LEE J.H.MOON
P1HAG20
BR501 SUPPLY PIPE TO SH SLING TUBE 0INT1 27.AUG.2019 FOR CONSTRUCTION H.J.KIM J.H.LEE J.H.MOON
DN25-AAH7
SUPPLY PIPE TO RH SLING TUBE 0 12.JUL.2019 FOR CONSTRUCTION H.J.KIM J.H.LEE J.H.MOON
CAGE DRAIN LINE

CAGE DRAIN LINE


P1HAH-310006 (B-4)

P1HAH-310006 (B-11)
P1HAH-310006 (B-7)

0INT2
A3 (420 x 297)
1. DRAWING SHOWS PIPING, COMPONENTS AND EQUIPMENT ASSOCIATED
WITH UNIT1. UNIT2 IS IDENTICAL AND UNIT2 TAGS ARE PREFIXED WITH
“P2” IN PLACE OF “P1” SHOWN HERE.

2. THE SIZE OF ROOT VALVES AND SHORT PIPING FOR

P1HAH-310005 (R-4)

P1HAH-310004 (R-11)
P1HAH-310005 (R-7)
INSTRUMENTS NOT SPECIFIED IN THIS DRAWING IS DN25.

DN100-AAH7
DN100-AAH7

P1HAH20
BR410
BR409
P1HAH20
CAGE DRAIN LINE

CAGE DRAIN LINE


FROM
SOOTBLOWER STEAM LINE
P1HAH-310005 (D-7)

SUPPLY PIPE TO RH SLING TUBE

SUPPLY PIPE TO SH SLING TUBE

(P1HAH25)

(P1HAH25)
P1HCB10 TO SOOTBLOWER

(P1HAH25)

(P1HAH25)
(P1HAH25)

(P1HAH25)
BR003 SOOTBLOWER STEAM LINE
P1HCB-310027 (A-7)
DN100-AAH7

(P1HAH35)

SUPERHEATER SLING INLET HEADER (FRONT)

SUPERHEATER SLING INLET HEADER (FRONT)


SUPERHEATER SLING INLET HEADER (REAR)

SUPERHEATER SLING INLET HEADER (REAR)


REAHEATER SLING INLET HEADER (FRONT)

REAHEATER SLING INLET HEADER (REAR)

(P1HAH50)
(P1HAH45)
UPPER FLOW DIVISION WALL TUBING

LOWER DIVISION WALL INLET HEADER

(P1HAH40)
(P1HAH15)

P1HAH03 (DN200) CAGE FRONT WALL TUBING


FROM SEPARATOR C P1HAH03

PRIMARY SUPERHEATER OUTLET HEADER


PRIMARY SUPERHEATER INLET HEADER
BR501

DIVISION WALL
SCREEN TUBE
P1HAG-310003 (E-7)

UPPER DIVISION WALL INLET HEADER


DN25-AAH7 REFERENCE DOCUMENTS/DRAWINGS
DOC. & DWG NO. TITLE
FURNACE ROOF OUTLET / CAGE INLET HEADER

P1HAH03 (DN200) SUPPLY PIPE TO SH SLING TUBE


P1HCB10 NS2-XG02-P0ZEN-110001 GENERAL_P&ID SYMBOL & LEGEND (1/4)
BR002
SUPPLY PIPE TO RH SLING TUBE DN100-AAH7 NS2-XG02-P0ZEN-110002 GENERAL_P&ID SYMBOL & LEGEND (2/4)
FURNACE ROOF

P1HAH03 (DN200)
NS2-XG02-P0ZEN-110003 GENERAL_P&ID SYMBOL & LEGEND (3/4)
P1HAH20 P1HAH20
(P1HAH10)

BR408 BR405
DN40 DN40 NS2-XG02-P0ZEN-110004 GENERAL_P&ID SYMBOL & LEGEND (4/4)
-AAH7 -AAH7
BS001 BS002

CAGE ROOF / REAR WALL TUBING

DN500-HBD6

DN500-HBD6
CAGE BOTTOM RING MAIN HEADER (P1HAH20)

BR192

BR194
-AAH7
DN25-AAH7

DN25-AAH7

DN25-AAH7

DN25-AAH7

-AAH7

CAGE SIDE
DN40

DN40
P1HAH20
BR407
BR506

BR507

BR508

P1HAH20
P1HAH15

BR509

BR406
WALL TUBE
P1HAH04 (DN200) BR191 BR193
DN200-GBD5 DN200-GBD5
TI
TT P1HAH52CT905 TI
FROM SEPARATOR D P1HAH04 P1HAH52CT001 P1HAH52CT903
BR501 TI AA191 AA192
P1HAG-310003 (D-7) P1HAH52CT901

SUPPLY PIPE

SUPPLY PIPE

SUPPLY PIPE

SUPPLY PIPE

SUPPLY PIPE

SUPPLY PIPE

SUPPLY PIPE
DN25-AAH7 TT SET SET
BR401 PRESSURE BR402 PRESSURE TT
P1HAH52CT002
DN25 : 301.0 DN25 : 296.9
P1HAH52CT005
KG/CM2G KG/CM2G
CAGE SIDEWALL OUTLET HEADERS (P1HAH30) TT TT TT TW
TW P1HAH52CT006 P1HAH52CT003 P1HAH52CT004 P1HAH52CT402
P1HAH04 (DN200) P1HAH52CT401 TO PLATEN SH
(SHORT) (LONG)
INLET MANIFOLD
P1HAH-310007 (E-1)
P1HAH04 (DN200) P1HAH30
(DN150)
P1HAH30 ATTEMPERATOR

DN100-AAH7
BR509 NO.1-'B'
DN25-AAH7 (AH001)

BR004
P1HAH30 (DN150) AA201
P1HAH30
BR510
DN25-AAH7

FOR CONSTRUCTION

DN100-BBH5
P1LAE22
BR002
P1HAH30 (DN150)
AA504 P1HAH30
GT
BR511 P1LAE22CG081

AA503 P1HAH15 DN25-AAH7 TCV MOV


P1LAE22AA081 M FROM
P1LAE22AA001
BR510 FEEDWATER SYSTEM
AS
DN40-AAH7
P1HAC-310001 (E-7)
P1HAH30 (DN150) AA102 80X100 FL 100X80 AA101 NO.1 SPRAY LINE
P1HAH30 AA401
(DN 25)
BR512
AA402
DN25-AAH7 0INT2 17.SEP.2019 FOR CONSTRUCTION H.J.KIM J.H.LEE J.H.MOON

P1LAE22
BR003 0INT1 27.AUG.2019 FOR CONSTRUCTION H.J.KIM J.H.LEE J.H.MOON

DN100-BBH5
P1HAH30 (DN150)
AA103 0 12.JUL.2019 FOR CONSTRUCTION H.J.KIM J.H.LEE J.H.MOON
P1HAH30
BR513
DN25-AAH7

P1HAH30 (DN150)
P1HAH30
BR514
DN25-AAH7

P1HAH30 (DN150)
P1HAH30
BR515 AA504
DN25-AAH7
P1HAH30 AA503
BR516
DN40-AAH7

GT
P1HAH20CG002
M MOV M MOV
P1HAH20AA001 P1HAH20AA002
P1HAH20 P1HAH20 TO BOILER DRAIN VESSEL
BR411 BR412
P1LCL-310009 (B-7)
DN100-AAH7 INC
DN100-DBD5

0INT2
A3 (420 x 297)
1. DRAWING SHOWS PIPING, COMPONENTS AND EQUIPMENT ASSOCIATED
WITH UNIT1. UNIT2 IS IDENTICAL AND UNIT2 TAGS ARE PREFIXED WITH
“P2” IN PLACE OF “P1” SHOWN HERE.

2. THE SIZE OF ROOT VALVES AND SHORT PIPING FOR


INSTRUMENTS NOT SPECIFIED IN THIS DRAWING IS DN25.

3. HOLD LIST
- INSTRUMENT AIR SYSTEM GROUPING
BS001 BS002 BS003

DN350-GAD5
BR196
ERV BR195
LCP DN150-GAD5
GT

DN450-GAD5

DN450-GAD5
P1LAE31CG081
FY
MOV M TCV P1LBA01AA193 FV
P1LAE31AA001 P1LAE31AA081 P1LBA01AA193

BR192

BR194
TO FEEDWATER SYSTEM
AS s
BR191 BR193
P1HAC-310001 (F-7) DN200-GAD5 BR403
DN200-GAD5 AS DN25
NO.2 SPRAY LINE AA101 100X80 FL 80X100 AA102

(DN 25) AA401


AA192

DN100-BBH5
AA191

BR002
P1LAE31
AA402
SET SET LO AA310
PI PRESSURE PRESSURE
P1LAE31 : 282.5
BR401 : 278.4 BR402
P1LBA01CP901
KG/CM2G DN25 KG/CM2G DN25
BR003
DN100-BBH5 LO AA309
AA103 TI
P1LBA01CT901

PIT PIT PP PIT


FROM P1LBA01CP003
P1LBA01CP001 P1LBA01CP002 P1LBA01CP401
STORAGE VESSEL

DN65-AAH5
P1HAG-310004 (D-7) AA308
TI AA302 AA304 AA306 TT TT TT TW

P1LBA01
S/H NO.2 SPRAY WATER WARM UP LINE P1HAH61CT903 P1LBA01CT001 P1LBA01CT002 P1LBA01CT003 P1LBA01CT401
AA101 AA201

BR501
AA307
AA301 AA303 AA305 P1LBA01 TO H.P STEAM TURBINE
AA201 BR001
P1LBA-110001 (C-1)
TT TT TW MAIN STEAM LINE ID310-AAH5

DN100
BR004

-AAH6
P1HAH61CT003 P1HAH61CT004 P1HAH61CT402

TI
P1HAC61CT901
P1HAH60 (DN450)
ATTEMPERATOR
(SHORT) (LONG)
NO.2
TT (AH001)
P1HAH61CT006
FROM PLATEN AA502
S/H1 OUTLET HEADER TT TT
P1HAH60CT001 P1HAH61CT005
S/H PLATEN TUBES METAL TEMP.

TW P1QJA93 P1QJA93
P1HAH-310005 (B-7) P1HAH61CT401 BR002 BR001
THIS DWG. (D-7)
TI DN25-AAH5 DN25-HBD5
AA101 AA201
(TOTAL 92 POINTS)

P1HAH61CT905
P1HAH55 (DN450)

AA501
BR501
TT
P1HAH61CT002
TI
P1HAC61CT901
TT
(LONG)
DN25-AAH5
N2 SUPPLY SYSTEM
P1HAH70CT077
TI REFERENCE DOCUMENTS/DRAWINGS
P1HAH70CT977 (SHORT)

TT TT TT
P1HAH60CT092
P1HAC61CT001 P1HAH70CT078 DOC. & DWG NO. TITLE
FROM NITROGEN GAS
SUPPLY SYSTEM NS2-XG02-P0ZEN-110001 GENERAL_P&ID SYMBOL & LEGEND (1/4)

VENT LINE
P1QJA90
BR001
P0QJA-110001
DN50-HBD5 NS2-XG02-P0ZEN-110002 GENERAL_P&ID SYMBOL & LEGEND (2/4)

NS2-XG02-P0ZEN-110003 GENERAL_P&ID SYMBOL & LEGEND (3/4)


INLET MANIFOLD (P1HAH55)

OUTLET MANIFOLD (P1HAH60)

P1QJA91 TO SEPARATOR VENT LINE


NS2-XG02-P0ZEN-110004 GENERAL_P&ID SYMBOL & LEGEND (4/4)
BR001
DN25-AAH6

P1HAG-310003 (A-1)
DN25-HBD5
P1HAH51

PLATEN SUPERHEATER

PLATEN SUPERHEATER
BR501

P1QJA92 TO STORAGE VESSEL VENT LINE

(P1HAH70)
AA502

(P1HAH65)
BR001
P1HAH-310005 (B-1)
DN25-HBD5
P1QJA95 AA502
BR002 AA501
DN25-AAH6 P1QJA93 TO SUPERHEATER OUTLET VENT LINE

FINAL SUPERHEATER OUTLET MANIFOLD


AA201 AA101
FINAL SUPERHEATER INLET MANIFOLD
DN25-AAH6

AA501 BR001
THIS DWG (B-5)

DN40-AAH5
P1HAH52

DN25-HBD5

P1HAH70
BR501

BR503
P1QJA94 TO REHEATER OUTLET VENT LINE
THIS DWG. (D-7)

BR001
P1HAJ-310008 (C-7)
VENT LINE DN25-HBD5
P1HAE60
VENT LINE BR401
TO PLATEN SUPERHEATER
DN40-AAH6 P1QJA95 INLET VENT LINE
BR001
THIS DWG (C-1)
DN25-HBD5
INLET MANIFOLD (P1HAH55)

OUTLET MANIFOLD (P1HAH60)


PLATEN SUPERHEATER

PLATEN SUPERHEATER

FOR CONSTRUCTION
P1HAH55 (DN450)

TT TI
P1HAH62CT001 P1HAH62CT901

BS001 BS002 BS003


FROM PLATEN TT TI
S/H1 OUTLET HEADER P1HAH62CT905 TI
P1HAH62CT002
P1HAH62CT903 BR502 0INT2 17.SEP.2019 FOR CONSTRUCTION H.J.KIM J.H.LEE J.H.MOON
P1HAH-310006 (D-7) DN25-AAH5

DN350-GAD5
TT 0INT1 27.AUG.2019 FOR CONSTRUCTION H.J.KIM J.H.LEE J.H.MOON
P1HAH62CT005

BR196
TW TT TT TT TW
P1HAH62CT401 P1HAH62CT006 P1HAH62CT003 P1HAH62CT004 P1HAH62CT402 0 16.AUG.2019 FOR CONSTRUCTION H.J.KIM J.H.LEE J.H.MOON
BR195
(SHORT) (LONG) DN150-GAD5
ERV

DN200-GAD5

DN200-GAD5
LCP
P1HAH60 (DN450) ATTEMPERATOR FY

BR192

BR194
NO.2 P1LBA02AA193 FV
(AH001) TT
BR191 P1LBA02AA193
DN100
BR004

-AAH6

P1HAH70CT001
DN200-GAD5 DN200-GAD5 s BR403
DN25
AS LO
AA201
S/H FINAL METAL TEMP.

(TOTAL 76 POINTS)

FROM AA191 AA192


STORAGE VESSEL SET SET LO AA310
PI PRESSURE PRESSURE
: 282.5
BR401 : 278.4 BR402
P1LBA02CP901
P1HAG-310004 (E-7) KG/CM2G DN25 KG/CM2G DN25
S/H NO.2 SPRAY WATER WARM UP LINE AA102 AA202 LO AA309
TI
DN100-BBH5

P1LBA02CT901

PIT PIT PP PIT


P1LAE32

P1LBA02CP001 P1LBA02CP002 P1LBA02CP401 P1LBA02CP003


BR002

DN65-AAH5
TT AA308
GT AA302 AA304 AA306 TT TT TT TW

P1LAB02
P1LAE32CG081 P1HAH70CT076
P1LBA02CT001 P1LBA02CT002 P1LBA02CT003 P1LBA02CT401

BR501
MOV M TCV AA307
P1LAE32AA001 P1LAE32AA081 AA301 AA303 AA305 P1LBA02 TO H.P STEAM TURBINE
TO FEEDWATER SYSTEM
AS
BR001
P1HAC-310001 (F-7) P1LBA-110001 (E-1)
MAIN STEAM LINE ID310-AAH5
NO.2 SPRAY LINE AA101 100X80 FL80X100 AA102 TI
P1HAH70CT901
AA401
(DN 25)
AA402

P1LAE32
BR003
DN100-BBH5
AA103

P1HAH60 TO BOILER DRAIN VESSEL


BR402 FINAL S/H DRAIN LINE
P1HAH-310013 (C-1)
DN40-EAD5
AA401 AA402

0INT2
A3 (420 x 297)
1. DRAWING SHOWS PIPING, COMPONENTS AND EQUIPMENT ASSOCIATED
WITH UNIT1. UNIT2 IS IDENTICAL AND UNIT2 TAGS ARE PREFIXED WITH
“P2” IN PLACE OF “P1” SHOWN HERE.
PI TI FI
P1LAF80CP001 P1LAF80CT001 P1LAF80CF001 2. THE SIZE OF ROOT VALVES AND SHORT PIPING FOR
INSTRUMENTS NOT SPECIFIED IN THIS DRAWING IS DN25.

3. STRAIGHT RUN CONDITION OF FLOW NOZZLE IS FOLLOWING:


PIT TT - UPSTREAM STRAIGHT RUN : 2.90 M
P1LAF80CP001 P1LAF80CT001 FT
P1LAF80CF001 - DOWNSTREAM STRAIGHT RUN : 0.67 M
GT
AA302 AA304 AA306 P1LAF80CG081
MOV M TCV
FROM B.F.P P1LAF80AA001 P1LAF80AA081
INTERSTAGE MANIFOLD P1LAF80 AA301 AA303 AA305
AS
BR001
P1LA-110001 (C-7)
DN100-CBD5
(NOTE 3) AA101 FL AA102
R/H ATTEM. SPRAY WATER LINE FE AA401
P1LAF80CF501 (DN 25) BS001 BS002
AA402

P1LAF80 P1LAF80 BS001 BS002


BR003 AA103 BR004
DN100-CBD5 DN100-EBD5

DN400-GAD6
DN400-GAD6
DN600-HBD6

DN600-HBD6
DN100-EBD5
P1LAF80
BR002

BR194
BR192
BR192
TI

BR194
THIS DWG (F-1) P1HAJ20CT901
R/H ATTEMPERATOR SPRAY WATER LINE BR191 BR193
DN200-GAD6 DN200-GAD6
BR191 BR193
DN250-GBD5 DN250-GBD5

TT AA191 AA192
PI P1HAJ20CT001
P1LBC80CP001 SET SET
PRESSURE BR401 PRESSURE BR402
TI AA191 AA192 TI PI : 63.9
DN25
: 63.4
DN25
P1LBC80CT901 P1LBC80CT903 P1LBB01CP901 KG/CM2G KG/CM2G
SET SET
PRESSURE PRESSURE TI
: 66.9 BR403 : 65.6 BR404 P1LBB01CT901
DN25 DN25

(TOTAL 37 POINTS)
KG/CM2G KG/CM2G
PP

R/H METAL TEMP.


PIT
P1LBC80CP401 P1LBC80CP001
TW TT TT TT TT PIT PP
P1LBC80CT401 P1LBC80CT001 P1LBC80CT002 P1LBC80CT003 P1LBC80CT004 P1LBB01CP001 P1LBB01CP401
AA302 AA304 TT TT TT TW
P1LBB01CT001 P1LBB01CT002 P1LBB01CT003 P1LBB01CT401
AA302 AA304
FROM H.P STEAM TURBINE P1LBC80 AA301 AA303
BR001 1:100
P1LBC-110002 (C-7) AA301 AA303 P1LBB01 TO I.P STEAM TURBINE
DN650-EBD5
REHEATER BR001
P1LBB-110003 (B-1)
(SHORT) (LONG) ATTEMPERATOR REHEAT STEAM LINE DN600-DAD5
TT TT
P1LBC80CT006 AA305 AA306 P1HAJ20CT037
TT AA310 AA309
P1LBC80CT005

LSHH
P1LBC80CL081
LSH
TI P1LBC80CL080
P1LBC80CT905

AA502
AA307 AA308
AA312 AA311
P1QJA94 P1QJA94
BR002 BR001
MOV M P1HAH-310007 (C-7)
P1LBC80AA001 DN25-DAH5 DN25-HBD5
TO DRAIN HEADER P1LBC80 P1LBC80 AA101 AA201
DRAIN LINE BR402 BR401
P1LCL-310009 (D-1) AA501
DN50-GBD5 DN50-EBD5
AA401 REFERENCE DOCUMENTS/DRAWINGS
DOC. & DWG NO. TITLE

DN40-DAH5
AA402

P1HAJ20
(DN 25)
NS2-XG02-P0ZEN-110001 GENERAL_P&ID SYMBOL & LEGEND (1/4)

BR503
AA403

(P1HAJ20)
(P1HAJ10)
BR501 NS2-XG02-P0ZEN-110002 GENERAL_P&ID SYMBOL & LEGEND (2/4)
DN25-DAH5
NS2-XG02-P0ZEN-110003 GENERAL_P&ID SYMBOL & LEGEND (3/4)

REHEATER INLET MANIFOLD

REHEATER OUTLET MANIFOLD


NS2-XG02-P0ZEN-110004 GENERAL_P&ID SYMBOL & LEGEND (4/4)

BS001 BS002

BR502
DN25-DAH5

DN400-GAD6
DN400-GAD6
(LONG)
TT

BR194
BR192
P1HAJ20CT038
BS001 BS002 BR193
TI BR191
(SHORT) DN200-GAD6
P1HAJ20CT938 DN200-GAD6
TT
P1HAJ20CT039
DN600-HBD6

DN600-HBD6
AA191 AA192
BR192

BR194
SET SET
PRESSURE PRESSURE
PI : 63.9 BR401 : 63.4 BR402
P1LBB02CP001 KG/CM2G DN25 KG/CM2G DN25
BR191 BR193
TI
DN250-GBD5 DN250-GBD5 P1LBB02CT901

PI
P1LBC90CP001
PIT PP
TI TI TI P1LBB02CP001 P1LBB02CP401
AA192

FOR CONSTRUCTION
P1LBC90CT901 P1LBC90CT905 P1LBC90CT903
AA191 TT TT TT TW
SET SET P1LBB02CT001 P1LBB02CT002 P1LBB02CT003 P1LBB02CT401
PRESSURE PRESSURE
: 65.6 AA302 AA304
: 66.9
PP PIT KG/CM2G KG/CM2G
P1LBC90CP401 P1LBC90CP001 TT
TW TT TT P1LBC90CT005 BR404 TT TT AA301 AA303 P1LBB02 TO I.P STEAM TURBINE
P1LBC90CT401 P1LBC90CT001 P1LBC90CT002
BR403 DN25 P1LBC90CT003 P1LBC90CT004
TT DN25 BR001
AA302 AA304 P1LBC90CT006 P1LBB-110003 (D-1)
REHEAT STEAM LINE DN600-DAD5
(SHORT) (LONG)
FROM H.P STEAM TURBINE P1LBC90 AA301 AA303
BR001 1:100
P1LBC-110002 (D-7)
DN650-EBD5

REHEATER
ATTEMPERATOR AA305 AA306
AA310 AA309

LSHH
P1LBC90CL081
LSH
P1LBC90CL080

0 12.JUL.2019 FOR CONSTRUCTION H.J.KIM J.H.LEE J.H.MOON


AA307 AA308
AA312 AA311

MOV M
P1LBC90AA001
TO DRAIN HEADER P1LBC90 P1LBC90
DRAIN LINE BR402 BR401
P1LCL-310009 (D-1)
DN50-GBD5 DN50-EBD5
AA401

AA402
(DN 25) AA403

FI
P1LAF90CF001
DN100-EBD5
P1LAF90

FT
BR002

P1LAF90CF001
GT
AA302 AA304 P1LAF90CG081
MOV M TCV
P1LAF90AA001 P1LAF90AA081
P1LAF90 AA301 AA303
AS
BR001
THIS DWG (B-1)
DN100-CBD5
(NOTE 3) REHEATER ATTEMPERATOR SPRAY WATER LINE AA101 FL AA102
FE AA401
P1LAF90CF501 (DN 25)
AA402

P1LAF90 P1LAF90
BR003 AA103 BR004
DN100-CBD5 DN100-EBD5

0
A3 (420 x 297)
1. TT LOCATION ARE AT 2M DOWN STREAM OF FINAL SOOTBLOWER
BS001

FI 2. DRAWING SHOWS PIPING, COMPONENTS AND EQUIPMENT ASSOCIATED

DN250-HBD5
TI PI
P1HCB10CF001
P1HCB10CT001 P1HCB10CP901
WITH UNIT1. UNIT2 IS IDENTICAL AND UNIT2 TAGS ARE PREFIXED WITH
“P2” IN PLACE OF “P1” SHOWN HERE.

BR192
BR191 3. THE SIZE OF ROOT VALVES AND SHORT PIPING FOR
FT DN150-HBD5
PIT PIT PI INSTRUMENTS NOT SPECIFIED IN THIS DRAWING IS DN25.
P1HCB10CF001 P1HCB10CP002 P1HCB10CP001 P1HCB10CP501 PSV GT AA502
TT P1HCB10AA191 P1HCB10CG081
P1HCB10CT001
AA310 AA308 PCV
AA306 AA304 AA302 P1HCB10AA081

AA309 AA307
BR401 M AA501 FROM PRIMARY
AA303 AA301 DN25-EBD6
AA305 P1HCB10 P1HCB10 S/H OUTLET
AS
BR004 BR003
P1HAH-310006 (B-7)
DN150-EBD6 100 FL DN100-AAH7 SOOT BLOWING STEAM LINE
X150 AA101
FE MOV
P1HCB10CF501 P1HCB10AA001
TO FURNACE TO FURNACE
WALL BLOWERS P1HCB17 P1HCB10 P1HCB10 P1HCB18 WALL BLOWERS
BR001 BR005 SOOT BLOWING STEAM LINE BR006 SOOT BLOWING STEAM LINE BR001
P1HCB-310028 (F-1) P1HCB-310028 (A-1)
DN80-EBD6 DN150-EBD6 DN150-EBD6 DN80-EBD6
AA101 AA101

AA101 AA101 AA101 AA101 AA101 AA101

TO AIR HEATER

DN80-EBD6

DN80-EBD6
DN80-EBD6
DN80-EBD6

DN80-EBD6
DN80-EBD6
P1HCB20 SOOT BLOWERS

BR001
BR001

BR001

P1HCB16
BR001
BR001
BR001

P1HCB13

P1HCB11

P1HCB14
P1HCB15

P1HCB12
BR001
P1HCB-310028 (A-5)
DN100-EBD6

147 148

181 182

145 143 141 142 144 146

179 177 175 173 174 176 178 180

139 137 135 136 138 140

171 169 167 165 166 168 170 172


REFERENCE DOCUMENTS/DRAWINGS

133 131 129 130 132 134 DOC. & DWG NO. TITLE
NS2-XG02-P0ZEN-110001 GENERAL_P&ID SYMBOL & LEGEND (1/4)
LEGEND NS2-XG02-P0ZEN-110002 GENERAL_P&ID SYMBOL & LEGEND (2/4)
163 161 162 164 NS2-XG02-P0ZEN-110003 GENERAL_P&ID SYMBOL & LEGEND (3/4)
: WALL BLOWER
FURNACE LEFT WALL-UPPER FURNACE RIGHT WALL-UPPER
F NS2-XG02-P0ZEN-110004 GENERAL_P&ID SYMBOL & LEGEND (4/4)
: FUTURE WALL BLOWER

: LONG RETRACTABLE BLOWER

F
159 157 155 153 154 156 158 160 : FUTURE LONG
RETRACTABLE BLOWER

: PART RETRACTABLE BLOWER

F
: FUTURE
PART RETRACTABLE BLOWER

151 149 150 152

CAGE LEFT (S/H SIDE) CAGE LEFT (R/H SIDE) CAGE RIGHT (R/H SIDE) CAGE RIGHT (S/H SIDE)

TI TT
FOR CONSTRUCTION
P1HCB11CT001 P1HCB11CT001

(NOTE 1) TT TI
P1HCB12CT001 P1HCB12CT001
GS+ (NOTE 1)
P1HCB11CG051
AA401

AA403

GS-
P1HCB11CG051 GS+
AA401

P1HCB12CG051
AA403

GS-
FO

P1HCB12CG051
FO
P1HCB12BP001
AA402

AA404

FO

TV FO
P1HCB11AA051 P1HCB11BP001
TT TI TI TI TI TT
S
AA404

P1HCB15CT001 P1HCB15CT001 P1HCB13CT001 P1HCB14CT001 P1HCB16CT001 P1HCB16CT001


S TV S
AA402

(NOTE 1) BR402 P1HCB12AA051 (NOTE 1) 0INT2 17.SEP.2019 FOR CONSTRUCTION H.J.KIM J.H.LEE J.H.MOON
TY S
AS P1HCB21AA051 DN25-EBD6 AS
GS+ AS BR402 GS+
P1HCB15CG051 TY P1HCB16CG051 0INT1 27.AUG.2019 FOR CONSTRUCTION H.J.KIM J.H.LEE J.H.MOON
TT DN25-EBD6 TT
AA401

AA401
AA403

AA404 FO AA403
GS- TY P1HCB12AA051 TY GS-
P1HCB15CG051
P1HCB13CT001 GS+ P1HCB13AA051 AS P1HCB14AA051 GS+ P1HCB14CT001
P1HCB16CG051
P1HCB13CG051 P1HCB14CG051 0 12.JUL.2019 FOR CONSTRUCTION H.J.KIM J.H.LEE J.H.MOON
(NOTE 1) GS- TV TV GS- (NOTE 1)
P1HCB13CG051 P1HCB13AA051 P1HCB14AA051 P1HCB14CG051
FO
AA404

AA402
AA402

FO TV TV FO
P1HCB15BP001 P1HCB15AA051 AA401 FO AA402 AA402 FO AA401 P1HCB16AA051 P1HCB16BP001
S S
BR402 BR402
BR402 AA403 AA404 DN25-EBD6 AA403 DN25-EBD6 BR402
TY AA404 TY
DN25-EBD6 P1HCB15AA051 P1HCB16AA051 DN25-EBD6
FO FO
AS P1HCB13BP001 P1HCB14BP001 AS
DN50-EBD6
DN50-EBD6

DN50-EBD6
DN50-EBD6
BR401
P1HCB13

BR401

BR401
P1HCB11

P1HCB12

BR401
P1HCB14

P1HCB15 P1HCB16
BR401 BR401
DN50-EBD6 DN50-EBD6

FROM FURNACE FROM AIR HEATER


WALL BLOWERS DRAIN SOOT BLOWERS DRAIN
P1HCB-310028 (F-4) P1HCB-310028 (A-7)

FROM FURNACE FROM FURNACE


WALL BLOWERS DRAIN WALL BLOWERS DRAIN
P1HCB-310028 (F-5) P1HCB-310028 (A-4)

FROM FURNACE
TO FLASH TANK P1HCB30 WALL BLOWERS DRAIN
S.B COMMON DRAIN LINE BR401
P1LCL-310009 (D-1) P1HCB-310028 (A-5)
DN150-EBD6

0INT2
A3 (420 x 297)