This document outlines the monthly maintenance schedule for a 60KLD sewage treatment plant located in Artech Gateway, Thrissur, Kerala. It lists 4 maintenance tasks to be completed each month, including changing blower oil and grease, checking foundation bolts and nuts, cleaning air filters, and removing sludge from the hydrolysis tank using a cleaning pump. Operators and supervisors must sign off on the status and remarks for each task.
This document outlines the monthly maintenance schedule for a 60KLD sewage treatment plant located in Artech Gateway, Thrissur, Kerala. It lists 4 maintenance tasks to be completed each month, including changing blower oil and grease, checking foundation bolts and nuts, cleaning air filters, and removing sludge from the hydrolysis tank using a cleaning pump. Operators and supervisors must sign off on the status and remarks for each task.
This document outlines the monthly maintenance schedule for a 60KLD sewage treatment plant located in Artech Gateway, Thrissur, Kerala. It lists 4 maintenance tasks to be completed each month, including changing blower oil and grease, checking foundation bolts and nuts, cleaning air filters, and removing sludge from the hydrolysis tank using a cleaning pump. Operators and supervisors must sign off on the status and remarks for each task.
1st Floor, T.C.79/1779(3), Muttathara, Vallakkadavu.PO, Thiruvananthapuram, Kerala
STP MONTHLY MAINTENANCE SCHEDULE
Note:- Switch-off electrical control panel before starting maintenance work. Site: 60KLD STP, ARTECH GATEWAY, THRISSUR Date: In time: MONTH Operator Name: Out time: Sl No. WORK TO BE DONE STATUS REMARKS 1 Change Blower Oil (SP 320) and Grease (Castrol A-3). Done 2 Check Foundation Bolts and Nuts. Done 3 Clean Air Filter of Blowers. (with Compressed Air.) Done
4 By using Cleaning pump remove sludge from HB tank -5minutes Done
Supervisor Name: Sign:
Site: 60KLD STP, ARTECH GATEWAY, THRISSUR Date: In time:
MONTH Operator Name: Out time: Sl No. WORK TO BE DONE STATUS REMARKS 1 Change Blower Oil (SP 320) and Grease (Castrol A-3). Done 2 Check Foundation Bolts and Nuts. Done 3 Clean Air Filter of Blowers. (with Compressed Air.) Done
4 By using Cleaning pump remove sludge from HB tank -5minutes Done
Supervisor Name: Sign:
Site: 60KLD STP, ARTECH GATEWAY, THRISSUR Date: In time:
MONTH Operator Name: Out time: Sl No. WORK TO BE DONE STATUS REMARKS 1 Change Blower Oil (SP 320) and Grease (Castrol A-3). Done
2 Check Foundation Bolts and Nuts. Done
3 Clean Air Filter of Blowers. (with Compressed Air.) Done 4 By using Cleaning pump remove sludge from HB tank -5minutes Done Supervisor Name: Sign:
Site: 60KLD STP, ARTECH GATEWAY, THRISSUR Date: In time:
MONTH Operator Name: Out time: Sl No. WORK TO BE DONE STATUS REMARKS 1 Change Blower Oil (SP 320) and Grease (Castrol A-3). Done
2 Check Foundation Bolts and Nuts. Done
3 Clean Air Filter of Blowers. (with Compressed Air.) Done 4 By using Cleaning pump remove sludge from HB tank -5minutes Done Supervisor Name: Sign: