Professional Documents
Culture Documents
OFFSHORE FACILITIES
CRPO BID INVITATION NO. 79 for ZULF AH
TRUNKLINES BI-10-07868 & BI-10-12681
ATTACHMENT 1
Hardware
Flow Meter (location) On supply & return line of each individual consumer.
Anti-Tamper Measures
System Functionality/Quality
Check
Vendor Qualifications
Owner Responsibility
Class Approvals Owner shall obtain proper approvals from Class for
fuel system modification
Calibration Owner shall implement protocols to ensure system
maintenance and calibration is being done per
manufacturer requirements.
Installation Owner is responsible for coordinating system
installation with chosen vendor. Owner shall provide
on-site supervision to oversee installation.
Data transmission Owner shall provide sufficient bandwidth to transmit
the required data at the required interval. There
must be adequate SAT/COM coverage in/around
geographic location to ensure 100% reliability
Charterer Approval Owner shall submit full technical package to
Charterer for approval, including system schematics
showing placement of all flow meters.
System Use Owner shall develop documentation detailing how
fuel monitoring system will be incorporated into
Owner's fuel management processes.