Professional Documents
Culture Documents
OCHAN GEOFFREY
ATIAK TOWN COUNCIL; AMURU DISTRICT
DESIGN BY.
Notes :
1. All work to be carried out in accordance
with Local Authority regulations
600 200 4,000 200 4,000 200 4,000 2,200 600 6. All inspection chambers in drive area to
have heavy duty covers
600 1,970 2,000 2,200 2,000 560 2,070 1,800 200 2,000
7. Check all dimensions on site
Y
1,000 1,000 200 14,400 200 8. All sanitary work to be in accordance with
MoH rules and regulations.
800
9. 500g polythene sheeting and anti-termite
600
2,000 600
200
200
VERANDAH treatment to be provided under ground floor
2,000
2,000
concrete slab
-0.100
54.412 m2
10. All reinforced concrete work is to be in
accordance with structural engineer's details
-0.100
200
200
200
D-01 D-01 D-01
4,705
2,000x2,400 2,000x2,400 2,000x2,400 11. All measurements in mm
2,770
SHOP A2
7,824
7,964
5,000
SHOP A1 12.000 m2
5,000
20.000 m2 D-02
900x2,400
±0.000
SHOP A3 50 SLOPE 4,705
19.305 m2
2,000x2,400
2,000
D-01
SHOP A2
200
±0.000 7.200 m2
D-03 ±0.000 ±0.000
900x2,400
968
200
2,459
1,500x1,500
W-01
2,000x2,400
W-01
2,000
3,000
STORE B1 SHOP B1
15,148
D-01
580
ROOM 01 6.000 m2
900x2,400
9.600 m2
900x2,400
900x2,400
D-03
D-02
±0.000
1,200
-0.100 Revisions :
EAST
EAST
21,688
150
150
21,888
Client :
WEST
WEST
D-03
1,500x1,500
ROOM 02
X X X X
2,000x2,400
9.600 m2
W-01
50 SLOPE
50 SLOPE
2,000
STORE B2 SHOP B2 Mr Ochan Geoffrey
3,000
3,000
8,764
8,624
D-01
1,400x1,500
9.000 m2
COMPOUND 6.000 m2
(OPEN TO SKY)
W-01
900x2,400
900x2,400
D-02
D-03
-0.300
1,150
44.223 m2
150
150
±0.000
900x2,400
900x2,400
900x2,400
Project title :
D-03
D-03
D-02
ROOM 03
2,000x2,400
9.600 m2
Proposed Commercial Building in
3,000
2,000
3,000
STORE B3 SHOP B3
Atiak Town Council, Kilak North ,
D-01
1,500x1,500
1,400x1,500
9.000 m2
6.000 m2
W-01
W-01
Amuru District
200
200
±0.000 ±0.000
1,294
-0.200 4,000
900x2,400
1,000 640 1,000
±0.000
800 7,200
1,000x1,200
1,520
1,520
Design By:
D-03
STORE
W-02
COMPOUND
750
3.040 m2 D-04 D-04
800x2,400 800x2,400
(OPEN TO SKY)
150
-0.300
50 SLOPE
4,699
1,000x1,200
1,000x1,200
5,278
Male ±0.000 ±0.000 Female
4,306
W-02
W-02
Gate
3,029
Septic Tank
2,100
Soak Pit
200
5,701
600
600
600
600
MH MH MH MH 6,750
Y
Y
200 150 150 150 150 150
600 1,000 1,000 1,000 1,000 1,000 1,000 150 5,500 200 2,000 600
600 12,800 2,000 600 Construction Details
13/11/2020
Drawing title :
Working Drawings
Scale : Paper size :
As Shown A1
Job Number : Drawing Number :
Window Level
8. All sanitary work to be in accordance with
1.600
MoH rules and regulations.
1,225
treatment to be provided under ground floor
Floor Level
0.000
Floor Level
0.000
Floor Level
0.000
Floor Level
0.000 concrete slab
Ground Level Ground Level Ground Level Ground Level
-0.300 -0.300 -0.300 -0.300
Client :
Project title :
Design By:
Door Schedule
Window Schedule
Element ID D-01 D-02 D-03 D-04 D-05 Gate
Element ID W-01 W-02 W-03
1,000 1,000 900 900 800 800
300
300
300
300
300
1,400
700 700
1,000
600
350
450
Elevations
2,100
2,100
2,100
2,100
2,100
Elevations
1,500
1,200
800
1,150
750
General Plan :
Quantity 7 4 8 2 6 1
Quantity 7 3 6
W x H Size 2,000×2,400 900×2,400 900×2,400 800×2,400 800×2,400 4,000×2,000
Size 1,400×1,500 1,000×1,200 600×800
Description Metallic frame double Timber panneled door Metallic frame single Metallic frame single Sill height 1,000 1,200 1,600
Timber flash door Metallic gate
leaf side hinged door leaf side hinged door leaf side hinged door Head height 2,400 2,400 2,400
Metallic double pane Metallic frame Top Metallic frame Top
Glazing Description side hung Window
Leaf: Metallic Leaf: timber Leaf: 6mm clear glass Leaf: 6mm clear glass Leaf: timber Leaf: 6mm clear glass Hung Hung
Middle pane fixed
Transom: Louvered Transom: 6mm glass Transom: Louvered Transom: Louvered Transom: None Transom: Louvered glass
Glazing Panes: 6mm clear Panes: 6mm clear Panes: 6mm clear
Location Construction Details
Kitchen Washrooms glass glass glass
Shops Store Washrooms Transom: Steel louvres Transom: Steel louvres Transom: Steel louvres
Location Date :
Iron mongery
External Washrooms and store Washrooms 13/11/2020
Iron mongery
Drawn by: Lubangakene Brian
Checked by: INNO
Approved by:
Drawing title :
Working Drawings
Scale : Paper size :
As Shown A1
Job Number : Drawing Number :
1,100
6. All inspection chambers in drive area to
have heavy duty covers
1,550
4,035 7. Check all dimensions on site
300
9. 500g polythene sheeting and anti-termite
3,348
ROOM 02 STORE B2 SHOP B2 VERANDAH treatment to be provided under ground floor
concrete slab
2630
2400
2,400
10. All reinforced concrete work is to be in
accordance with structural engineer's details
312
Foundation Notes
230mm thick masonry brick work on
100mm concrete blinding Floor Notes
(690mm strip foundation) Approved floor finish on 100mm thick
mass concrete slab on 1000 guage dpm
sheeting on 50mm blinding treated with
antitermite
on 200mm well compacted hardcore on
rammed earth
Design By:
1,900
1,100
4,810
300
4,260
800
General Plan :
SHOP A2
3,000
SHOP A2 Female
2,630
2,350
2,500
1,448
312
Construction Details
As Shown A1
Job Number : Drawing Number :
ACCESS ROAD
6. All inspection chambers in drive area to
have heavy duty covers
PROPOSED
BUILDING
24,880
OAD
13/11/2020 Issue Date
SS R
Client :
Mr Ochan Geoffrey
ACCE
1,500
21
2,1
1,533
MH Septic
MH Tank
Project title :
MH
MH
Proposed Commercial Building in
Soak
18,800
Pit
Atiak Town Council, Kilak North ,
Amuru District
Design By:
N General Plan :
Construction Details
Date :
13/11/2020
Drawing title :
Working Drawings
Scale : Paper size :
As Shown A1
Job Number : Drawing Number :
SCHEDULE OF MANHOLE SIZES 50 3600 900 3685.5 60.0m Rev. Date Description
MANHOLE-2 DEPTH TO INTERNAL WALL FOUNDATION
INVERT DIMENSIONS THICKNESS THICKNESS 60 3150 1200 1200 4419.0 66.0m Revisions :
230
150
150
NO.OF SEPTIC TANK SOAKPIT CAPACITY 175 5700 1350 1500 11974.5 109.5m Project title :
150
MARK USERS
150
(L)
P Q R S T U V DIAMETER EFF. DEPTH
300
150
Q
150
1. 15 495 500 655 2400 1200 1250 1200 1830 3500 5400 200 6530 1200 1500 13581.0 115.8m Proposed Commercial Building in
P
300 100 100 300 2. 30 495 500 655 3400 1700 1750 1700 1830 3510 10800
3. 45 495 500 655 4160 2080 1250 2080 2500 3860 16200 225 6400 1200 1650 14940.0 121.9m Atiak Town Council, Kilak North ,
U
100
4. 60 495 600 655 4800 2400 1250 2400 3000 4280 21600
5. 75 575 600 825 4500 2450 1500 2450 3000 5400 27000
250 7000 1200 1650 1633.5 128.0m Amuru District
150 230 S T 230 150
6. 90 575 600 825 5300 2700 1500 2700 3000 6430 37400
275 7000 1200 1800 1785.5 134.0m
R
7. 100 575 600 825 5700 2800 1600 3280 3500 6480 35000
NOTES. DESIGNED FOR WATER DISPOSAL ONLY 300 7600 1200 1800 1895.0 140.0m Design By:
DESIGNED TO BE DISLUDGED EVERY THREE (3) YEARS.
LONGITUDINAL SECTION SEPTIC TANK DETAILS
Scale: 1:100
General Plan :
Construction Details
Date :
13/11/2020
Drawing title :
Working Drawings
Scale : Paper size :
As Shown A1
Job Number : Drawing Number :