DEPARTMENT OF PUBLIC WORKS AND HIGHWAYS

Quezon City I District Engineering Office


Sta. Catalina St., Brgy. Holy Spirit, Quezon City

Contract ID : 21OF0221
Contract Name: CONSTRUCTION OF FLOOD MITIGATION STRUCTURE ALONG MARIKINA
RIVER, BARANGAY BATASAN HILLS, QUEZON CITY
Location of the Contract : Quezon City

Contract Profile for Eligibility Processing


Date:
Advertisement Date :
Procuring Entity : Quezon City I District Engineering Office
Deadline for Receipt of Bids :
Cost of Bidding Documents : Php
Approved Budget Contract (ABC) : Php 85,829,995..00
Contract Duration : 365 C.D.

Cost Estimate for


Major Categories of Dimension Similar Major
Unit of Measure Each Major Category
Work Unit of Measure of Work Categories of Work

FCSPS 152 LM 85,829,995.00

Major Category of Work Table

Dimension Dimension
Category of Work
CODE Category of Work Description Unit of CODE
Description
Unit of
Measure measure
Buildings – Construction – with
BCB lm BICWPHCDP Piles – High Rise – Concrete
Bridges-Construction-Bailey storey
(Frame) – Driven Piles ( 6 and
above Storeys)
Buildings – Construction – with
Bridges – Construction - Steel lm Piles – High Rise – Concrete
BCSDP BICWPHCCP storey
(Superstructure) – with Driven Piles (Frame) – Cast in Place Piles
( 6 and above Storeys)
Buildings – Construction –
Bridges – Construction - Steel lm without Piles – High Rise –
BCSCP BICWOPHC storey
(Superstructure) – with Cast-in-Place Piles Concrete (Frame) – Driven Piles
( 6 and above Storeys)
Buildings – Construction – with
Bridges – Construction - Concrete lm Piles – Low Rise – Steel
BCCDP BICWPLSDP storey
(Superstructure) – with Driven Piles (Frame) – Driven Piles (1 to 5
Storeys)
Buildings – Construction – with
BCCCP Bridges - Rehabilitation - Concrete Piles – Low Rise – Steel
lm BICWPLSCP storey
(Superstructure) – with Cast-in-Place Piles (Frame) – Cast in Place Piles
(1 to 5 Storeys)
Buildings – Construction –
Bridges - Construction - Steel
BRHSDP lm BICWOPLS without Piles – Low Rise – Steel storey
(Superstructure) – with Driven Piles
(Frame) – (1 to 5 Storeys)
Buildings – Construction – with
Bridges – Rehabilitation - Steel Piles – High Rise – Steel
BRHSCP lm BICWPHSDP Storey
(Superstructure) – with Cast-in-Place Piles (Frame) – Driven Piles ( 6 and
above Storeys)
Buildings – Construction – with
Bridges – Rehabilitation - Concrete Piles – High Rise – Steel
BRHCDP lm BICWPHSCP Storey
(Superstructure) – with Driven Piles (Frame) – Cast in Place Piles
(6 and above Storeys)
Buildings – Construction –
Bridges – Rehabilitation - Concrete without Piles – High Rise –
BRHCCP lm BICWOPHS Storey
(Superstructure) – with Cast-in-Place Piles Steel (Frame) (6 and above
Storeys)
Bridges – Retrofitting – Steel Building - Repair
BRTSDP lm BIR storey
(Superstructure) – with Driven Piles
Bridges – Retrofitting – Steel Building – Retrofitting – Low
BRTSCP lm BIRTL Storey
(Superstructure) – with Cast-in-Place Piles Rise
Bridges – Retrofitting – Concrete lm Building – Retrofitting – High storey
BRTCDP BIRTH
(Superstructure) – with Driven Piles . Rise
Bridges – Retrofitting – Concrete lm Flood Control – Construction -
BRTCCP FCG lm
(Superstructure) – with Cast-in-Place Piles Gates
Bridges – Construction - Concrete Flood Control – Construction –
BCCWOP lm FCDG Lm
(Superstructure) – without Piles Dam with Gates
Bridges – Construction - Steel Flood Control – Construction –
BCSWOP
lm FCRB lm
(Superstructure) – without Piles Retarding Basin
Flood Control – Construction –
Bridges - Rehabilitation - Concrete
OP lm FCSP Shore Protection ( Seawall, lm
(Superstructure) – without Piles
Breakwater
Flood Control – Construction –
Slope Protection using non-
BRHSW Bridges - Rehabilitation - Steel
lm FCSPNS structural measures (e.g. lm
OP (Superstructure) – without Piles
vetiver, coconet , other
vegetation)
Flood Control – Construction –
BRTCW Bridges - Retrofitting - Concrete Slope Protection using structural
lm FCSPS lm
OP (Superstructure) – without Piles measures (e.g. Revetment,
Retaining structure, Wirenet)
BRTSW Bridges - Retrofitting - Steel Flood Control – Construction –
lm FCD lm
OP (Superstructure) – without Piles Dams
Flood Control – Maintenance –
RCA Roads – Construction - Asphalt km FMDRE Dredging, Desilting, River lm
Rechanneling/Excavation Works
Flood Control – Construction –
RCG Roads – Construction - Gravel Km FCCE lm
Channel Excavation
RCP Roads – Construction - PCCP km HD Harbors - Dredging
Flood Control – Construction –
RRA Roads – Rehabilitation - Asphalt km FCN Drainage (Closed and open ) lm
Conduits
Flood Control – Construction –
RRP Roads – Rehabilitation - PCCP km FCP lm
Pumping Station
Flood Control – Construction –
RCTP Roads – Construction - Tunnel - PCCP km FCDKL lm
Dikes/Levees
Roads – Construction – Slope Protection Flood Control – Construction –
RCSPNS using non – Structural Measures (e.g. km FCBPS Bank Protection Structure lm
vetiver, coconet, other vegetation
Roads – Construction – Slope Protection Water Supply (Level 1) -
RCSPS using non – Structural Measures (e.g. km WSL1 Construction (Shallow Wells/
Revetment, Retaining Structures, Wirenet) Rainwater Collections)
Water Supply (Level 2 & 3) -
RM Roads - Maintenance km WSL2&3 Construction (Piped Water with
Communal/Private Water Point)
Port/Harbors - Construction -
BM Bridges – Maintenance km PCCWDP Causeway/Wharf – with Driven
Piles
Port/Harbors - Construction -
Traffic Engineering and Management
TES Piece/set PCCWCP Causeway/Wharf – with Cast
System (Including Road Safety Devices)
Place Piles
Buildings – Construction – with Piles – Port/Harbors - Maintenace -
BICWPL
Low Rise – Concrete (Frame) – Cast in storey PMCWDP Causeway/Wharf – with Driven
CDP
Place Piles (1 to 5 Storeys) Piles
Buildings – Construction – with Piles – Port/Harbors - Maintenace -
BICWPL
Low Rise – Concrete (Frame) – Cast in storey PMCWCP Causeway/Wharf – with Cast in
CCP
Place Piles (1 to 5 Storeys) Place Piles
Buildings – Construction – without Piles –
BICWOP
Low Rise – Concrete (Frame) – (1 to 5 storey
LC
Storeys)

Submitted By:

LAURENCE M. VILLAR. Date:


Engineer III
BAC-Chairman

Notes:

1. The BAC Chairman of the Procuring Entity shall submit this form, duly accomplished, to the DPWH
Central Procurement for Civil Works (Attention: Secretariat/TWG) at least 10 calendar days before the 1st
day of Advertisement of the Invitation to Apply for Eligibility and to Bid.

2. All Blanks should be filled up.