Professional Documents
Culture Documents
Contract ID : 21OF0221
Contract Name: CONSTRUCTION OF FLOOD MITIGATION STRUCTURE ALONG MARIKINA
RIVER, BARANGAY BATASAN HILLS, QUEZON CITY
Location of the Contract : Quezon City
Dimension Dimension
Category of Work
CODE Category of Work Description Unit of CODE
Description
Unit of
Measure measure
Buildings – Construction – with
BCB lm BICWPHCDP Piles – High Rise – Concrete
Bridges-Construction-Bailey storey
(Frame) – Driven Piles ( 6 and
above Storeys)
Buildings – Construction – with
Bridges – Construction - Steel lm Piles – High Rise – Concrete
BCSDP BICWPHCCP storey
(Superstructure) – with Driven Piles (Frame) – Cast in Place Piles
( 6 and above Storeys)
Buildings – Construction –
Bridges – Construction - Steel lm without Piles – High Rise –
BCSCP BICWOPHC storey
(Superstructure) – with Cast-in-Place Piles Concrete (Frame) – Driven Piles
( 6 and above Storeys)
Buildings – Construction – with
Bridges – Construction - Concrete lm Piles – Low Rise – Steel
BCCDP BICWPLSDP storey
(Superstructure) – with Driven Piles (Frame) – Driven Piles (1 to 5
Storeys)
Buildings – Construction – with
BCCCP Bridges - Rehabilitation - Concrete Piles – Low Rise – Steel
lm BICWPLSCP storey
(Superstructure) – with Cast-in-Place Piles (Frame) – Cast in Place Piles
(1 to 5 Storeys)
Buildings – Construction –
Bridges - Construction - Steel
BRHSDP lm BICWOPLS without Piles – Low Rise – Steel storey
(Superstructure) – with Driven Piles
(Frame) – (1 to 5 Storeys)
Buildings – Construction – with
Bridges – Rehabilitation - Steel Piles – High Rise – Steel
BRHSCP lm BICWPHSDP Storey
(Superstructure) – with Cast-in-Place Piles (Frame) – Driven Piles ( 6 and
above Storeys)
Buildings – Construction – with
Bridges – Rehabilitation - Concrete Piles – High Rise – Steel
BRHCDP lm BICWPHSCP Storey
(Superstructure) – with Driven Piles (Frame) – Cast in Place Piles
(6 and above Storeys)
Buildings – Construction –
Bridges – Rehabilitation - Concrete without Piles – High Rise –
BRHCCP lm BICWOPHS Storey
(Superstructure) – with Cast-in-Place Piles Steel (Frame) (6 and above
Storeys)
Bridges – Retrofitting – Steel Building - Repair
BRTSDP lm BIR storey
(Superstructure) – with Driven Piles
Bridges – Retrofitting – Steel Building – Retrofitting – Low
BRTSCP lm BIRTL Storey
(Superstructure) – with Cast-in-Place Piles Rise
Bridges – Retrofitting – Concrete lm Building – Retrofitting – High storey
BRTCDP BIRTH
(Superstructure) – with Driven Piles . Rise
Bridges – Retrofitting – Concrete lm Flood Control – Construction -
BRTCCP FCG lm
(Superstructure) – with Cast-in-Place Piles Gates
Bridges – Construction - Concrete Flood Control – Construction –
BCCWOP lm FCDG Lm
(Superstructure) – without Piles Dam with Gates
Bridges – Construction - Steel Flood Control – Construction –
BCSWOP
lm FCRB lm
(Superstructure) – without Piles Retarding Basin
Flood Control – Construction –
Bridges - Rehabilitation - Concrete
OP lm FCSP Shore Protection ( Seawall, lm
(Superstructure) – without Piles
Breakwater
Flood Control – Construction –
Slope Protection using non-
BRHSW Bridges - Rehabilitation - Steel
lm FCSPNS structural measures (e.g. lm
OP (Superstructure) – without Piles
vetiver, coconet , other
vegetation)
Flood Control – Construction –
BRTCW Bridges - Retrofitting - Concrete Slope Protection using structural
lm FCSPS lm
OP (Superstructure) – without Piles measures (e.g. Revetment,
Retaining structure, Wirenet)
BRTSW Bridges - Retrofitting - Steel Flood Control – Construction –
lm FCD lm
OP (Superstructure) – without Piles Dams
Flood Control – Maintenance –
RCA Roads – Construction - Asphalt km FMDRE Dredging, Desilting, River lm
Rechanneling/Excavation Works
Flood Control – Construction –
RCG Roads – Construction - Gravel Km FCCE lm
Channel Excavation
RCP Roads – Construction - PCCP km HD Harbors - Dredging
Flood Control – Construction –
RRA Roads – Rehabilitation - Asphalt km FCN Drainage (Closed and open ) lm
Conduits
Flood Control – Construction –
RRP Roads – Rehabilitation - PCCP km FCP lm
Pumping Station
Flood Control – Construction –
RCTP Roads – Construction - Tunnel - PCCP km FCDKL lm
Dikes/Levees
Roads – Construction – Slope Protection Flood Control – Construction –
RCSPNS using non – Structural Measures (e.g. km FCBPS Bank Protection Structure lm
vetiver, coconet, other vegetation
Roads – Construction – Slope Protection Water Supply (Level 1) -
RCSPS using non – Structural Measures (e.g. km WSL1 Construction (Shallow Wells/
Revetment, Retaining Structures, Wirenet) Rainwater Collections)
Water Supply (Level 2 & 3) -
RM Roads - Maintenance km WSL2&3 Construction (Piped Water with
Communal/Private Water Point)
Port/Harbors - Construction -
BM Bridges – Maintenance km PCCWDP Causeway/Wharf – with Driven
Piles
Port/Harbors - Construction -
Traffic Engineering and Management
TES Piece/set PCCWCP Causeway/Wharf – with Cast
System (Including Road Safety Devices)
Place Piles
Buildings – Construction – with Piles – Port/Harbors - Maintenace -
BICWPL
Low Rise – Concrete (Frame) – Cast in storey PMCWDP Causeway/Wharf – with Driven
CDP
Place Piles (1 to 5 Storeys) Piles
Buildings – Construction – with Piles – Port/Harbors - Maintenace -
BICWPL
Low Rise – Concrete (Frame) – Cast in storey PMCWCP Causeway/Wharf – with Cast in
CCP
Place Piles (1 to 5 Storeys) Place Piles
Buildings – Construction – without Piles –
BICWOP
Low Rise – Concrete (Frame) – (1 to 5 storey
LC
Storeys)
Submitted By:
Notes:
1. The BAC Chairman of the Procuring Entity shall submit this form, duly accomplished, to the DPWH
Central Procurement for Civil Works (Attention: Secretariat/TWG) at least 10 calendar days before the 1st
day of Advertisement of the Invitation to Apply for Eligibility and to Bid.