METHOD OF

CONSTRUCTION
Planning &
PROPOSED BCCP-ADMIN Preparation
-Excavation
BLOCK Earth -Backfilling
Works -Compaction
Substructure
(Foundation)

RCC Superstructure -Rebar


-Steel Structure -Formworks MEPF Works
-RC -Concreting
Beams,Slab,Columns
ELECTRICAL
Removal of Forms -Roughing-Ins (Slab &
MEPF Works
Architectural Works Wall)
-Installation of Electrical
Ceiling Works Devices
MECHANICAL (HVAC) -Masonry -Cable Wiring/Pulling
-Roughing-Ins (Slab & Wall) FIRE PRO (CHB) PLUMBING
(BY OTHERS) -Roughing-Ins (Slab & -Painting -Roughing-Ins (Slab &
-Copper Piping Works Wall) -Plastering Wall)
-Pressure Test (BY OTHERS) Works -Piping Works
-Installation of Indoor/outdoor -Installation of -Tiling Works -Fitting fixtures
Units Devices/Pumps -Doors & -Pressure Test
-Testing/Commisioning