Technical & Financial Proposal


25t x 20ft x 9ft
Lahore

Aadian Stop, Main GT Road, Rana Town, Lahore.

Email @ shahrukh.hafeez@gmail.com
Specialized In: -

Telecom Tower / Solar Systems

Mechanical Fabrications, Erections

Installation & Commissioning

Pre-Fabricated Steel Buildings.

To,

M/s.,

Lahore Ref: Eng/EPS/022/A-12 R-005F

Phone : Proposal for EPS Room

Email :

Dear Sir,

We are pleased to submit the requisite proposal based on layout plans which are in accordance with your inquiry and input
provided.

We are very keen to secure the order of this project and look forward for a long term business relationship with you in
future.

We hope that you will find our proposal as per your requirements and look forward to your valued order.

Assuring you of our best services at all times,

Sincerely Yours,

Shah Rukh Hafeez

Managing Partner

Ph# 0302-4292668, 0342-6126186


Specialized In: -

Telecom Tower / Solar Systems

Mechanical Fabrications, Erections

Installation & Commissioning

Pre-Fabricated Steel Buildings.

SECTION 1:

SCOPE OF SUPPLY

1 Quantity 01

2 Building usage Room -Closed Shed

3 Total Area (Sft) 500-Sft Approximately

SECTION 1:

1 Type Multi Room Span

2 No. Interior NA

3 Width Module (ft) 20’-0” o/o of steel Columns

4 Roof Slope 1: 10

5 Width (ft) 20’-0’’ o/o of steel Columns

6 Length (ft) 25’-0’’ o/o of steel Columns.

7 Exterior Columns Base Condition Pinned (NA)

8 Interior Columns Base Condition Pinned (NA)

9 Height (ft) from FFL 9 Ft Clear Height

10 Bay Spacing (ft) NA

11End walls:

Left End wall Frame Type: EPS 2inch Panels


Specialized In: -

Telecom Tower / Solar Systems

Mechanical Fabrications, Erections

Installation & Commissioning

Pre-Fabricated Steel Buildings.

Wall, Grits: Flush

Column Spacing: NA-

Right End Wall Frame Type: EPS 2inch Panels Wall, Grits: Flush

Column Spacing: NA

12Bracing Type:

At Exterior Walls NA

Between Interior Walls NA

13 Types of Eave Eave Trim.

14 Type of Gable Mono Slope

15 Exterior Rigid Frame Columns NA

16 Fillet Weld of Built up Sections NA

OPEN WALL CONDITIONS:

1. Near Side wall 9 ft is 2” EPS Panel.

2. Far Side wall 9 ft is 2” EPS Panel.

3. Left End wall 9 ft is 2” EPS Panel.

4. Right End wall 9 ft is 2” EPS Panel.


Specialized In: -

Telecom Tower / Solar Systems

Mechanical Fabrications, Erections

Installation & Commissioning

Pre-Fabricated Steel Buildings.

B- SCOPE OF WORK:

ANNEXURE – A

SCOPE OF WORK:

Sr.
DESCRIPTION Remarks
No

Rigid Frames & End wall


1 NA-
Frames

2 Purlins, Grits NA-

ASTM Screw Down low Profile Pre-Painted sheet 0.45 mm thick both side (Strength: Fy
3 Roof Sheeting
= 345 N/mm²) with 2” thick EPS (12Kg to 15Kg Density)

Providing and fixing of wall sheeting with Screw Down Low Profile Pre-Painted sheet 0.45 mm
4 Wall Sheeting
thick both side (Strength: Fy = 345 N/mm²) with 2” thick EPS (12Kg to 15 Kg Density)

5 Angles for Purlin Bracing NA

6 Trim & Flashing All accessories 0.5mm thick Pre-Painted sheet

7 Fasteners ASTM A-325 / A490 HSB & MSB Bolts (ultimate strength : Fu =820 N/mm²)

9 Cables Bracing NA

10 Anchor Bolt Rawal Bolts with U Channel at Bottom

11 Paint work Pre-Painted Sheet

12 Rain Water Accessories 75mm Dia Upvc pipe with bends and elbow etc.

Roof & Wall insulation


13 NA-
(Adds on)

14 Bead Matic Tape NA

C- DESIGN PARAMETERS:
Specialized In: -

Telecom Tower / Solar Systems

Mechanical Fabrications, Erections

Installation & Commissioning

Pre-Fabricated Steel Buildings.

Item Description Quantity

1 Dead Load For Roof 0.1 kN/m2

2 Collateral Load 0 kN/m2

3 Live Load For Roof 0.57 kN/m2

4 Wind Speed 130 km/hr.

5 Wind Code ASCE 7 -05

6 Enclosure of Building Enclosed Building

7 Importance of Wind 1.00

8 Exposure “B”

9 Seismic Zone – 2B -as per UBC-1997

SECTION 3:

EXCLUSIONS

No other work except as per section 1& 2 is in our scope of work.

1. Main Connection of all services i.e. Electricity, Gas, Water supply, Sewerage, Soakage pitch or Septic tank and
overhead water tank etc.
2. Work other than mentioned as above.
3. Area other than covered by Pre-Feb. Structure.
4. All type of Public Health work.
5. All type ridge ventilators
6. All types of sky light
7. Connection of D.B to main power supply of WAPDA.
8. All types of door and Windows.
9. All types of Sliding Gate.
Specialized In: -

Telecom Tower / Solar Systems

Mechanical Fabrications, Erections

Installation & Commissioning

Pre-Fabricated Steel Buildings.

10. All types of civil works including flooring and foundation.


11. All types of insulation (add-ons)

SECTION 4:

CHANGES/ REVISIONS
Any change or revision to the above stated scope of supply may lead to a variation in the price and the delivery
period. A change must not hold payment for work completed as per original contract.

SECTION 5:

ESCALATION CLAUSE
Prices are quoted as per prevailing market conditions; any change in material price can affect the quoted price.

SECTION 6:

ASSUMPTIONS, DEVIATIONS & EXCLUSIONS:


Manufacturing and supply of building will be initiated only after receipt of complete engineering package duly

Approved by the client


Specialized In: -

Telecom Tower / Solar Systems

Mechanical Fabrications, Erections

Installation & Commissioning

Pre-Fabricated Steel Buildings.

SECTION 7:
1. PRICE SUMMARY OF PU Panel Kitchen

PRICE SUMMARY
EPS (Insulated Panels) 2” Thick

COVERED AREA PRICE

PEB STRUCTURE MATERIAL & FABRICATION 500 885,000

SUB TOTAL 885,000

Grand Total Price exclusive of Tax 885,000/-

All Taxes and Govt. Duties are exclusive. Add applicable than charged actual

SECTION 8:

PROPOSAL VALIDITY
Section -A (Material Supply & Fabrication)

 Prices are valid for a period of 05 days from the date of this quote.

SECTION 9:

MODE OF PAYMENT
 50% Advance upon confirmed work order and before the supply of Steel Structure to site.
 45% on before supply of Structure to site
Specialized In: -

Telecom Tower / Solar Systems

Mechanical Fabrications, Erections

Installation & Commissioning

Pre-Fabricated Steel Buildings.

 5% on erection and complete finishes work of the structure.

SECTION 10:

DELIVERY SCHEDULE
Our delivery period is to be established from the date of receipt and acceptance of the following

(i) Signed contract


(ii) Down payment
(iii) Final change order
(iv) Singed final “Approval as noted” Approval Drawings
(v) Final change order

 21 working days for complete Project.


Any delay in above will result in a change to our delivery commitment.

SECTION 11:

OTHER TERMS & CONDITIONS


Other terms and conditions are as follows:

 It is customer’s responsibility to check the specifications of standard supplied items.


 It is costumer’s responsibility to provide electricity on site.
 Any delay / revision to the above stated section -9 may lead to a variation in the price and the delivery
period. A change must not hold payment for work completed as per original contract.