You are on page 1of 2

7000

6700

7000 150 100 100 150 150 100 100 150


150 1050 600 500 1140 760 700 950 150
B C D E F G B

500
300
Center Center
marker marker
EP EP

2650

1600
4000

4000
A A Y12 - 175 c/c

Center EP Center EP
marker marker

600
G H

450
50mm dia PVC pipe
for Earth Cu strip

850
100
B C D E F G B

5 nos 2 layer (10 nos) 150mm Compound Kurb Fixed Concrete Bollard 2 nos 2 layer (4 nos) 150mm
dia. PVC class B pipe (100mm x 350mm) (150mm dia) dia. PVC class B pipe
Pipes to be extend beyond drain Pipes to be extend beyond drain
and road kurb of main road and road kurb of main road

CSU PLINTH CROSS SECTION DETAILS


COVERSLAB SCHEDULE CSU PLINTH CROSS SECTION DETAILS
7000
6700 COVERSLAB SIZE THICKNESS
TYPE (l x b) REINFORCEMENT
D 6700
150 100 100 150 150 100 100 150
A 1150mm x 200mm 100mm 4T10 150 150 150 150
1050 600 500 1140 760 700 950
50mm thick Premix
1050 4100 950
B 1050mm x 200mm 100mm 4T10
150mm High Gred 2" Stone Chip
150mm Grade 25 Concrete
50mm Thick Lean Concrete C 1700mm x 200mm 100mm 4T10
150mm Crusher Run (compacted)
Manhole Slab A - 11 Nos Manhole Slab A - 11 Nos

150
50 150

Manhole Slab C - 1 Nos Manhole Slab B - 11 Nos


700

700
300

300
Manhole Slab B - 11 Nos 200 RC (Grade 25 Concrete)
150

150
350

350

350
GR GR GR GR
4T10
Y12 - 175 c/c Y12 - 175 c/c
150

100
300

300
Y12 - 175 c/c Y12 - 175 c/c
225mm thick Brickwall c/w

850

850
850

Plaster on Bothsides COVERSLAB SECTION


150mm Sand Blanket 225mm thick Brickwall c/w
To Fill with Compact Sand 200 150mm Crusher-run with layer Plaster on Bothsides
150 150

150 150
RC (Grade 25 Concrete) 4T10 of Bituminous Prime Coat RC (Grade 25 Concrete)
50mm Thick Lean Concrete 50mm Primix 50mm Thick Lean Concrete

100
150mm Thick Hardcore Filling 150mm Thick Hardcore Filling
50

50
300 BRC A10 150 150 BRC A10 300 300 BRC A10 300 300 BRC A10 300

X-SECTION : A - A X-SECTION : G - G

4000 4000 4000


500 300 2200 150 850 100 325 300 1600 300 1125 100 100 325 300 1600 300 1125 100
75 75 75 75

Manhole Slab A / B 50mm thick Premix Manhole Slab C - 1 Nos


150mm High Gred 2" Stone Chip
150

100
700

700

700
100 100
150

150

150
150

150

150
150

150

150
350

GR GR GR GR GR GR
350

Y12 - 175 c/c Y12 - 175 c/c


300

300

300
Y12 - 175 c/c
850

Compound Kurb 100mmx350mm


225mm thick Brickwall c/w 225mm thick Brickwall c/w 225mm thick Brickwall c/w
Plaster on Bothsides Plaster on Bothsides Plaster on Bothsides
150 150

150 150

150 150
RC (Grade 25 Concrete) RC (Grade 25 Concrete) RC (Grade 25 Concrete)
50mm Thick Lean Concrete 50mm Thick Lean Concrete 50mm Thick Lean Concrete
150mm Thick Hardcore Filling 150mm Thick Hardcore Filling 150mm Thick Hardcore Filling
50

50

50
450 BRC A10 450 450 BRC A10 450 450 BRC A10 450
X-SECTION : B - B X-SECTION : C - C X-SECTION : D - D

4000 4000 4000


100 325 300 1600 300 1125 100 100 325 300 1600 300 1125 100 100 325 300 1600 300 1125 100
75 75 75 75 75 75

150mm Grade 25 Concrete 50mm thick Premix


Y12 - 175 c/c 50mm Thick Lean Concrete 150mm High Gred 2" Stone Chip
150mm Crusher Run (compacted)
700

700

700
100 100 100
150

150

150
150

150

150
150

150

150
GR GR GR GR GR GR

Y12 - 175 c/c


300

300

300
1200

Y12 - 175 c/c


Y12 - 175 c/c

225mm thick Brickwall c/w 225mm thick Brickwall c/w


To Fill with Compact Sand Plaster on Bothsides Plaster on Bothsides
150 150
150 150

150 150
RC (Grade 25 Concrete) RC (Grade 25 Concrete) RC (Grade 25 Concrete)
50mm Thick Lean Concrete 50mm Thick Lean Concrete 50mm Thick Lean Concrete
150mm Thick Hardcore Filling 150mm Thick Hardcore Filling 150mm Thick Hardcore Filling
50
50

50
450 450 450 BRC A10
450 450 BRC A10
450
X-SECTION : E - E X-SECTION : F - F X-SECTION : G - G
New CSU Plinth Details
Drwg_24987_10102018
E

FIX BOLLARD
150
Center
marker Concrete Bollard BOLLARD - Internal Structure
0
10 100
(Grade 30 Reinforce Steel Bar Y12 x 4 nos with Y6
EWT CSU 2640
Concrete) binding at 125 mm interval
SCADA READY

700
A A EWT CSU

125
975
SCADA READY

150
1700
Center
marker GR

300
580
Com Box
700
EARTH POINT/BAR DETAILS PAPAN TANDA PENCAWANG
1245
E
505 330 330

20 20 20 20

20
NO. PJK:

TEL 15454

20
155
NO. F/L:

UTAMAKAN KESELAMATAN

20
155
PENCAWANG ELEKTRIK

210

1005
20
TMN SETIA ALAM NO.1
DILARANG MASUK

210

20
TANPA KEBENARAN
Center

20
marker

155
INDKOM CSU 2640 20 20 20 20 20 20

SCADA READY 155 155 155 195 155 155 155

INDKOM CSU
SCADA READY

1700
Center
marker

NOTA:

580

Com Box
PLINTH PENCAWANG ELEKTRIK PADAT (CSU)
700
1. Tapak (sitting-base /Plinth) PE Padat perlulah disediakan oleh pemaju/pengguna.
2. Tapak (sitting-base / Plinth ) bagi kedudukan sebenar peralatan mestilah dapat
menanggung keberatan minima 7,000 Kg.
3. Pemaju/Pengguna perlu memajukan laporan rekabentuk Tapak Plinth CSU dan SI yang
diperakukan oleh Jurutera Kompeten bagi Tapak PE Padat sebelum Tapak PE Padat dibina:
Soil Investigation (S.I.) Works - shall allow for soil investigation works by boreholes (for
1 locations) inclusive of soil samples, SPT, laboratory testing and other tests deemed
necessary for foundation design. To submit the two (2) copies plinth design report and
S.I report to the Engineer. *report to be Certified by Competent engineer.
4. Konkrit yang digunakan untuk Tapak (sitting-base ) mestilah dari Grade 25 Reinforce
Concrete
5. Kawasan Sekitar Plinth PE Padat perlu dipremix seperti aturan berikut:
- 150mm Sand Blanket
- 150mm Crusher-run with layer of Bituminous Prime Coat (on top)
GR GR GR GR
- 50mm Primix
6. Peparit (Trench's ) PE Padat perlu diisi dengan pasir sungai (Compact wash sand) selepas
semua peralatan dan kabel dipasang.

PEMBUMIAN (EARTHING )
7. Earth Strip (25mm x 3mm) perlu dipasang pada dinding dalam peparit (trench ) 300mm dari
X-SECTION : A - A X-SECTION : F - F
lantai Plinth .
8. Earth Point (Earth Bar) bersaiz 50mm x 6mm x 300mm dengan lubang 10mm sebanyak 5
lubang dipasang pada dinding dalam peparit (trench ) 300mm dari lantai Plinth .
9. Earth Chamber bersaiz 305mm x 305mm x 152mm dengan copper rod dan disambung ke
sistem pembumian PE Padat (CSU).
NO. PJK:

TEL 15454 NO. F/L:

UTAMAKAN KESELAMATAN
PENCAWANG ELEKTRIK
TMN SETIA ALAM NO.1
DILARANG MASUK
TANPA KEBENARAN
PAPAN TANDA PENCAWANG ELEKTRIK PADAT (CSU)
10. Papan tanda Pencawang perlu didirikan secara berasingan menggunakan tiang 65mm x
65mm x 4mm tebal (3.1m tinggi) Hot Dip Galvanised Steel Hollow Section (SHS) (900mm
ditanam di dalam concrete kerb dan asas konkrit bertetulang) dengan 75mm x 40mm x
1200

1200

4mm thk Channel iron untuk top, mid & bottom bracing untuk memegang papan tanda.
GR GR GR GR
11. Ketinggian papan tanda adalah 1200mm dari aras tanah ke bahagian bawah papan tanda.
12. Papan tanda perlu dipasang dibahagian tengah PE menghadap jalan utama.

New CSU Plinth Details


Drwg_24987_10102018