SUB-HEADS

SUB-HEAD SUB-HEAD SUB-HEAD SUB-HEAD SUB-HEAD SUB-HEAD SUB-HEAD SUB-HEAD SUB-HEAD SUB-HEAD
1 2 3 4 5 6 7 8 9 10

HEADS

VIIA Building NA NA NA NA NA NA NA NA
Wiring &
Electrical Installation
ELECTRICAL Work
WORKS a) Motors
(BUILDING)
b) Pumps etc

Cable Jointing Transmission Vegetation


VIIB Overhead Line Underground
Cabling
Switchgear &
Substation
Aerial Cables
Installation Lines Clearing NA NA NA
(a) No Limit (a) No Limit Maintenance
(a) No Limit (a) No Limit (a) No Limit Works (a) No Limit
ELECTRICAL (b) Up to 33 KV (b) Up to 33 KV
(a) No Limit (b) Up to 33
WORKS (b) Up to 33 KV (b) Up to 33 (b) Up to 33 KV KV
(TRANSMISSIO (c) Up to 11 KV (c) Up to 11 KV KV
(c) Up to 11 KV (c) Up to 11 KV (b) Up to 33 KV (c) Up to 11
N/ (d) Up to 415 V KV
(d) Up to 415 V (c) Up to 11
DISTRIBUTION (d) Up to 415 V KV (d) Up to 415 V (c) Up to 11 KV
(d) Up to 415 V
SYSTEM)
(d) Up to 415 V (d) Up to 415 V