GENERAL MANAGER
Dear Sir:
The maintenance team is pleased to present the attached Monthly report. Included is a detailed
report of operation and maintenance of both Mill A, Mill B and motor vehicle for the month of
September. The maintenance team welcomes any comments or questions on this report.
Sincerely,
Maintenance team
Executive Summary
During last month (September), we experienced one break down for the plan sifter upper
bearing in mill B and this was rectified. Mainly, we carried out prevent maintenance in both
mills. On motor vehicle side, we have carried out both preventive among which was servicing of
brake system & cone bearings for axles and breakdown maintenance on three vehicles.
Sewing machine
after service
Changing bearing for one plan sifter in mill B
Solenoid
during repair
Broken solenoid
Making bag grippers for packing machine
Finished bag
grippers
Cow ring
after
installation
PERSONNEL
The maintenance team includes one motor vehicle & one maintenance mechanic, one welder,
two technical helpers and turn men for motor vehicles. The one technical helper also works in
production shift changeovers as well. The team work hand in hand to deliver precise results.
The team also works hand in hand with productions team to ensure proper mill maintenance