th
January 15 , 2021
GENERAL MANAGER
Dear Sir:
The maintenance team is pleased to present the attached Monthly report. Included is a
detailed report of operation and maintenance of Mill B and motor vehicle for the month
of December. The maintenance team welcomes any comments or questions on this
report.
Sincerely,
Maintenance team
Executive Summary
The month of December ran well and it was very productive. During last month, we
experienced minor break downs in mill B mainly stitching machines. Majorly, we carried
out prevent maintenance in mill B including general greasing. On motor vehicle side, we
have carried out both preventive and breakdown maintenance on few trucks majority of
which had brake systems faults, air bags and self starters’ failures, though repair of
some vehicles is still pending due to lack of spare parts.
Preventive maintenance done at Mill B
We carried out daily, weekly and monthly prevent maintenance on mill B during the last
month (December), as follows;
Cleaning of inspection glasses for rollers since these are mainly affected by
moisture for Mill B
Blowing of low pressure fans inside mill B to avoid excessive vibrations that
may damage electric motor bearings
New air
bag
New V-arm
Compressor
serviced
parts
One new dumper was
installed
dumper
MS- plates
added to the
springs
Drag link
Dumper
U-bolt
PERSONNEL
The maintenance team includes one motor vehicle & one maintenance mechanic, one
welder, two technical helpers and turn men for motor vehicles. The one technical helper
also works in production shift changeovers as well. The team work hand in hand to
deliver precise results. The team also works hand in hand with productions team to
ensure proper mill maintenance