You are on page 1of 36

IRCON INTERNATIONAL LTD.

(Govt. of India Undertaking)


KATNI - SINGRAULI RAIL DOUBLING PROJECT
Bill No.:- 2nd RA bill Date:-17/03/2019

Name Of Work - "Construction of Residential Buildings including Approach Road & other miscellaneous work between Due Date of completion as per agreement : 21/03 /2019
Vijay Sota
Name to Niwas Road
of Contractor (including
:- M/S-Delhi both stations)
Engineers in connection
Construction with Katni
Company, - Singrauli
820, kirti Shikhar,Rail Line Centre,Janakpuri,
District Doubling Project (pkg-
New Actual date of completion : Work Under Progress
Delhi-110058
Agreement/LOA No. & Date:- IRCON/2065/katni-singrauli/GM-KTE/tender/Res Bld Pkg-2/019/796 Dtd 21.03.2018 Time extension, if any : NA
Date of commencement as per agreement:- 21/03/2018 Date of billing : 17/3/2019
Actual date of commencement:- 21/03/2018
Total value of work as per agreement/LOA : Rs.13,08,40,000/- Date of measurement : 17/3/2019

QTY. OF WORK EXECUTED Amount's


Item
Upto date Upto last Since last Description of Items Unit Rate Upto date Upto last Since last
BOQ QTY. No.
Certificate Certificate Certificate Certificate Certificate Certificate

SCHEDULE -I
Earth work in excavation as per approved drawings and
dumping at embankment site or spoil heap, within railway land,
including 50m lead and 1.5m lift, the lead to be measured from
the centre of gravity of excavation to centre of gravity of spoil
1 heap: the lift to be measured from natural ground level and
paid for in layers of 1.5m each, including incidental work, as per
specifications-in

10,320.03 0.00 10,320.03 7,534.00 a All kinds of soils cum 115.04 1,187,215.96 0.00 1,187,215.96
Extra over item 011010 for excavation in foundations for
buildings and bridges to cover dressing to neat dimension and
plumbing sides etc. Note : Dressing under this item is payable
10,320.03 0.00 10,320.03 7,534.00 2 for the total quantity of excavation in foundation and not partly cum 12.09 124,769.13 0.00 124,769.13

Extra for watering and ramming earth in foundation and floors


in 15cm layers. Note : This item is payable where ramming is
10,320.03 0.00 10,320.03 8,161.00 3 not included in the original rate for earthwork in filling. cum 21.41 220,951.79 0.00 220,951.79

Dressing Surface (average excavation or filling upto 15 cm)


including removing vegetation in all kind of soil. Payment
23,280.26 0.00 23,280.26 13,812.00 4 against this item is to be made only if it is not included in earth Sqm 77.70 1,808,876.48 0.00 1,808,876.48
work item

Providing and laying in position cement concrete of specified 0.00


proportion excluding cost of cement, centering and shuttering -
5
All works upto Plinth level : 0.00 0.00

1:3:6 (1 cement : 3 sand : 6 graded stone aggregate 20mm 0.00


0.00 0.00 0.00 254.00 a nominal size) cum 1,995.79 0.00 0.00
1:3:6 (1 cement : 3 sand : 6 graded stone aggregate 40mm 1,051,280.83
550.42 0.00 550.42 1,380.00 b nominal size) cum 1,909.97 0.00 1,051,280.83
Providing and laying in position cement concrete of M 20 grade, 0.00
excluding the cost of cement and of centering and shuttering, as
6
per direction of the Engineer in charge : 0.00 0.00

1,448.25 0.00 1,448.25 1,887.00 All works upto Plinth level cum 2,210.32 3,201,087.93 0.00 3,201,087.93
Providing and fixing at or near ground level, Precast M 20 grade 0.00
cement concrete as per approved design and setting in position
with cement mortar 1:3 (1 cement : 3 coarse sand), including
the cost of required centering and shuttering complete but
6a excluding the cost of cement.(cast at site) 0.00 0.00

0.00 804.00 in kerbs, edging etc. cum 2,405.01 0.00 0.00 0.00
Providing and laying in position M 20 Grade concrete for 0.00
reinforced concrete structural elements but excluding cost of
centering, shuttering, reinforcement and Admixtures in
recommended proportion (as per IS:9103) to accelerate, retard
7 setting of concrete, improve workability without impairing 0.00 0.00
strength and durability as per direction of Engineer in charge

All work in buildings above plinth level upto floor two level. 0.00
0.00 2,637.00 a cum 2,725.87 0.00 0.00
Centering and shuttering including strutting, propping etc. and 0.00
8 removal of form for : 0.00 0.00
Foundations, footings, bases of columns, raft foundation of
1,786.51 0.00 1,786.51 1,648.00 a washable aprons, Pile caps, Footings of FOB etc. Sqm 154.99 276,890.91 0.00 276,890.91

Suspended floors, roofs, landings, balconies, FOB slabs, 0.00


0.00 0.00 0.00 18,569.00 b walkway slabs and access platform Sqm 257.94 0.00 0.00
Lintels, beams, plinth beams, bed blocks, girders, bressumers 0.00
0.00 0.00 0.00 5,801.00 c and cantilevers Sqm 221.68 0.00 0.00

1,253.79 0.00 1,253.79 5,752.00 d Columns, pillars, , posts and struts Sqm 271.19 340,014.39 0.00 340,014.39
Tavera, Innova or similar Vehicle/
1.00 0.00 1.00 11.00 75a 30 day 39,145.00 39,145.00 0.00 39,145.00

TOTAL 8250232.41 0.00 8250232.41


Add 4 % as per Quoted Rate 330009.30 0.00 330009.30
TOTAL SCHEDULE -I 8580241.71 0.00 8580241.71
SCHEDULE -II
1 Supply and using cement at worksite.
565.22 0.00 565.22 2135 1(a) OPC 43 grade MT 8184.32 4625973.81 0.00 4,625,973.81
0.00 0.00 0.00 522 1(b) PPC MT 7750.22 0.00 0.00 0.00
TOTAL 4625973.81 0.00 4,625,973.81
Add 2.02 % as per Quoted Rate 93444.67 0.00 93444.67
TOTAL SCHEDULE -II 4719418.48 0.00 4719418.48
SCHEDULE-III
Supplying reinforcement for R.C.C work including straightening,
1 cutting, bending, placing in position and binding all complete

91,001.46 0.00 91,001.46 277875 1(a) High yield strength deformed bars Kg 66.14 6018836.38 0.00 6,018,836.38
TOTAL SCHEDULE -III 6018836.38 0.00 6,018,836.38
Add 2.02 % as per Quoted Rate 121,580.49 - 121,580.49
TOTAL SCHEDULE -II 6140416.88 0.00 6140416.88
NON SCHEDULE ITEMS
Extra item included for Soil bearing Test conducted at diffirent
7.00 0.00 7.00 0.00 1 stations of package-2. Each 16,000.00 112,000.00 0.00 112,000.00
Extra for every additional lift of 1.5m or part thereof,after the
1,510.23 0.00 1,510.23 0.00 2 initial1.5m,for earth work in all soils Cum 11.85 17,896.19 0.00 17,896.19
Back Filling of soil up to NGL. Rates in referance to CPWD
(VOL. 1) 2016 SUB HEAD :2- EARTH WORK PAGE NO.114
6,005.26 0.00 6,005.26 0.00 3
CODE NO. -2.25
Cum 130.77 785,305.44 0.00 785,305.44

TOTAL SCHEDULE -I+SCHEDULE -II+SCHEDULE -III+NON SCHEDULE


20,355,278.70 0.00 20,355,278.70
Net Amount Rs. 20,355,278.70 0.00 20,355,278.70
Say Rs.
20,355,278.70 0.00 20,355,278.70
The measurements were made by Sh.Tushar Shingla,AM/Civil and Sh.Abhisek Kumar,DGM/civil on 28/2/2019 and are recorded is enclosed in sheet from Page No.01 to …

Date :- 17/3/2019
Contractor (Tushar Singla) ( Abhishek kumar )
A. Manager/Civil DGM/Civil

CERTIFICATE
1) Certified that the work has been done as per the terms and conditions of the Contract Agreement (CA).
2) Certified that work has been done as per the approved drawings and specifications.
3) No deprtmental labour, tools and plants have been issued to the contractor for which recoveries are to be made.
4) The billed quantities are not more than the actually quantity executed at site.
5) The electricity & water has not been used from departmental sources.
6) The contractor has employed Supervisors/Engineers as per CA.
7) The measurements have been test checked by competent authority.

Date: 17/3/2019
Contractor (Tushar Singla) ( Abhisek Kumar )
A. Manager/Civil DGM/Civil

Deductions/Recoveries

As per details above on account of this work

Recoveries
Total amount paid
Total upto this bill Total upto last bill In this bill
1.00
2.00
3.00
4.00
5.00
Total -

Payments now to be made by Cash/Cheque

Amount in this bill 0.00


Total Recoveries (as above) 0.00
Net amount payable 0.00

ETB 0.00 Chargeable to _____________________________ and to be included in accounts for

To be paid at _________________ in presence of ________________ by cheque/RTGS on __________________

JGM(Fin.), IRCON Chief General Manager, IRCON


Voucher No. & Date_______________
Date of Payment______________
Detail Of Measurement

Earth work in excavation as per approved drawings and dumping at embankment site or spoil heap,
within railway land, including 50m lead and 1.5m lift, the lead to be measured from the centre of
Work Details 1.a :- gravity of excavation to centre of gravity of spoil heap: the lift to be measured from natural ground
level and paid for in layers of 1.5m each, including incidental work, as per specifications-in a All kinds
of soils

S.No. Particular No. L B H Quantity Unit Remark

1 BEHR-III/1 1 21.600 13.130 1.582 448.668 cum L= (1.5+17.7+1.5+.3+.6)

PORCH 2 2.500 2.400 1.582 18.984 cum

Where 17.7 is grid distance, 1.5 and 1.5


2 BEHR-III/2 1 21.600 13.130 1.946 551.901 cum
are fooing after grid

PORCH 2 2.500 2.400 1.946 23.352 cum

.3 is pcc margin and .6 is excavation


3 BEHR-III/3 1 21.600 13.130 1.480 419.740 cum
margin 300mm each side.
PORCH 2 2.500 2.400 1.480 17.760 cum
4 BEHR-III/4 1 21.600 13.130 2.529 717.245 cum B= (1.38+9.8+1.05+.3+.6)
PORCH 2 2.500 2.400 2.529 30.348 cum
5 BEHR-II/1 1 25.450 7.175 2.126 388.216 cum L=(1.675+21.2+1.675+.3+.6)
1 19.600 3.850 2.126 160.428 cum B=(1.075+3.9+1.3+.3+.6)
PORCH 1 4.100 3.700 2.126 32.251 cum
6 BEHR-II/2 1 25.450 7.175 1.787 326.313 cum L1=(.75+17.2+.75+.3+.6)
1 19.600 3.850 1.787 134.847 cum
PORCH 1 4.100 3.700 1.787 27.109 cum
7 BEHR-II/3 1 25.450 7.175 2.728 498.143 cum total width=(1.55+7.5+1.075+.3+.6)
1 19.600 3.850 2.728 205.855 cum 11.025
PORCH 1 4.100 3.700 2.728 41.384 cum
8 BEHR-II/4 1 25.450 7.175 1.660 303.122 cum B1=Tw-B
1 19.600 3.850 1.660 125.264 cum B1=11.025-B
PORCH 1 4.100 3.700 1.660 25.182 cum
9 BEHR-II/5 1 25.450 7.175 1.399 255.463 cum 3.850
1 19.600 3.850 1.399 105.569 cum
PORCH 1 4.100 3.700 1.399 21.223 cum
10 BEHR-II/6 1 25.450 7.175 1.673 305.496 cum
1 19.600 3.850 1.673 126.245 cum
PORCH 1 4.100 3.700 1.673 25.379 cum
11 BEHR-II/7 1 25.450 7.175 1.612 294.357 cum
1 19.600 3.850 1.612 121.642 cum
PORCH 1 4.100 3.700 1.612 24.454 cum

BOUNDARY 260 2.250 2.150 1.500 1886.625 cum


TYPE 2

12 BEHR-IV/5 1 34.100 16.670 1.600 909.515 cum L=(1+31.2+1+.3+.6)


B=(1.5+12.77+1.5+.3+.6)

13 BEHR-IV/1 1 20.400 16.670 1.500 510.102 cum L=(1.3+17.2+1+.3+.6)

14 BEHR-IV/2 1 20.400 16.670 1.500 510.102 cum B=(1.5+12.77+1.5+.3+.6)

15 BEHR-IV/3 1 20.400 16.670 2.140 727.746 cum

GROSS QTY 10320.027 cum


PREVIOUS QTY cum
THIS BILL QTY 10320.027 cum
Detail Of Measurement
Extra over item 011010 for excavation in foundation forbuilding and bridges to
Work Details 2 :- cover dressing to neat dimentions and plumbing sides etc.note: Dressing under this
S.No. Particular item
No. is payable
L Bfor theHtotal quantity
Quantityof excavation in foundation and not partly
Unit Remark

1 BEHR-III/1 1 21.600 13.130 1.582 448.668 cum L= (1.5+17.7+1.5+.3+.6)


PORCH 2 2.500 2.400 1.582 18.984 cum
Where 17.7 is grid distance, 1.5 and 1.5
2 BEHR-III/2 1 21.600 13.130 1.946 551.901 cum
are fooing after grid
PORCH 2 2.500 2.400 1.946 23.352 cum
.3 is pcc margin and .6 is excavation
3 BEHR-III/3 1 21.600 13.130 1.480 419.740 cum
margin 300mm each side.
PORCH 2 2.500 2.400 1.480 17.760 cum
4 BEHR-III/4 1 21.600 13.130 2.529 717.245 cum B= (1.38+9.8+1.05+.3+.6)
PORCH 2 2.500 2.400 2.529 30.348 cum
5 BEHR-II/1 1 25.450 7.175 2.126 388.216 cum L=(1.675+21.2+1.675+.3+.6)
1 19.600 3.850 2.126 160.428 cum B=(1.075+3.9+1.3+.3+.6)
PORCH 1 4.100 3.700 2.126 32.251 cum
6 BEHR-II/2 1 25.450 7.175 1.787 326.313 cum L1=(.75+17.2+.75+.3+.6)
1 19.600 3.850 1.787 134.847 cum
PORCH 1 4.100 3.700 1.787 27.109 cum
7 BEHR-II/3 1 25.450 7.175 2.728 498.143 cum total width=(1.55+7.5+1.075+.3+.6)
1 19.600 3.850 2.728 205.855 cum 11.025
PORCH 1 4.100 3.700 2.728 41.384 cum
8 BEHR-II/4 1 25.450 7.175 1.660 303.122 cum B1=Tw-B
1 19.600 3.850 1.660 125.264 cum B1=11.025-B
PORCH 1 4.100 3.700 1.660 25.182 cum
9 BEHR-II/5 1 25.450 7.175 1.399 255.463 cum 3.850
1 19.600 3.850 1.399 105.569 cum
PORCH 1 4.100 3.700 1.399 21.223 cum
10 BEHR-II/6 1 25.450 7.175 1.673 305.496 cum
1 19.600 3.850 1.673 126.245 cum
PORCH 1 4.100 3.700 1.673 25.379 cum
11 BEHR-II/7 1 25.450 7.175 1.612 294.357 cum
1 19.600 3.850 1.612 121.642 cum
PORCH 1 4.100 3.700 1.612 24.454 cum

BOUNDARY 260 2.250 2.150 1.500 1886.625 cum


TYPE 2

12 BEHR-IV/5 1 34.100 16.670 1.600 909.515 cum L=(1+31.2+1+.3+.6)


B=(1.5+12.77+1.5+.3+.6)

13 BEHR-IV/1 1 20.400 16.670 1.500 510.102 cum L=(1.3+17.2+1+.3+.6)

14 BEHR-IV/2 1 20.400 16.670 1.500 510.102 cum B=(1.5+12.77+1.5+.3+.6)

15 BEHR-IV/3 1 20.400 16.670 2.140 727.746 cum

GROSS QTY 10320.027 cum


PREVIOUS QTY cum
THIS BILL QTY 10320.027 cum
Detail Of Measurement
Extra for watering and ramming earth in foundation and floors in 15 cm
Work Details 3 :- layers.Note: This item is payable where ramming is not included in the orignal
rate of earthwork in filling.
S.No. Particular No. L B H Quantity Unit Remark

1 BEHR-III/1 1 21.600 13.130 1.582 448.668 cum L= (1.5+17.7+1.5+.3+.6)

PORCH 2 2.500 2.400 1.582 18.984 cum


Where 17.7 is grid distance, 1.5 and 1.5
2 BEHR-III/2 1 21.600 13.130 1.946 551.901 cum
are fooing after grid
PORCH 2 2.500 2.400 1.946 23.352 cum
.3 is pcc margin and .6 is excavation
3 BEHR-III/3 1 21.600 13.130 1.480 419.740 cum
margin 300mm each side.
PORCH 2 2.500 2.400 1.480 17.760 cum
4 BEHR-III/4 1 21.600 13.130 2.529 717.245 cum B= (1.38+9.8+1.05+.3+.6)
PORCH 2 2.500 2.400 2.529 30.348 cum

5 BEHR-II/1 1 25.450 7.175 2.126 388.216 cum L=(1.675+21.2+1.675+.3+.6)


1 19.600 3.850 2.126 160.428 cum B=(1.075+3.9+1.3+.3+.6)
PORCH 1 4.100 3.700 2.126 32.251 cum
6 BEHR-II/2 1 25.450 7.175 1.787 326.313 cum L1=(.75+17.2+.75+.3+.6)
1 19.600 3.850 1.787 134.847 cum
PORCH 1 4.100 3.700 1.787 27.109 cum
7 BEHR-II/3 1 25.450 7.175 2.728 498.143 cum total width=(1.55+7.5+1.075+.3+.6)
1 19.600 3.850 2.728 205.855 cum 11.025
PORCH 1 4.100 3.700 2.728 41.384 cum
8 BEHR-II/4 1 25.450 7.175 1.660 303.122 cum B1=Tw-B
1 19.600 3.850 1.660 125.264 cum B1=11.025-B
PORCH 1 4.100 3.700 1.660 25.182 cum
9 BEHR-II/5 1 25.450 7.175 1.399 255.463 cum 3.850
1 19.600 3.850 1.399 105.569 cum
PORCH 1 4.100 3.700 1.399 21.223 cum
10 BEHR-II/6 1 25.450 7.175 1.673 305.496 cum
1 19.600 3.850 1.673 126.245 cum
PORCH 1 4.100 3.700 1.673 25.379 cum
11 BEHR-II/7 1 25.450 7.175 1.612 294.357 cum
1 19.600 3.850 1.612 121.642 cum
PORCH 1 4.100 3.700 1.612 24.454 cum

BOUNDARY 260 2.250 2.150 1.500 1886.625 cum


TYPE 2

12 BEHR-IV/5 1 34.100 16.670 1.600 909.515 cum L=(1+31.2+1+.3+.6)


B=(1.5+12.77+1.5+.3+.6)

13 BEHR-IV/1 1 20.400 16.670 1.500 510.102 cum L=(1.3+17.2+1+.3+.6)

14 BEHR-IV/2 1 20.400 16.670 1.500 510.102 cum B=(1.5+12.77+1.5+.3+.6)

15 BEHR-IV/3 1 20.400 16.670 2.140 727.746 cum

GROSS QTY 10320.027 cum


PREVIOUS QTY cum
THIS BILL QTY 10320.027 cum
Detail Of Measurement
Work Details Dressing surface(average excavation or filling upto 15 cm)
4 :- including removing vegetation in all kind of soils
S.No. Particular No. L W Quantity Unit Remark

1 Type ll 1 114.46 102.66 11750.464 Sqm

2 Type lll 1 118 85.1 10041.800 Sqm

3 Type lV 3 20 24.8 1488.000 Sqm

GROSS QTY 23280.264


PREVIOUS QTY
THIS BILL QTY 23280.264
Detail Of Measurement

Extra for every additional lift of 1.5m or part


Extra Item - 2
thereof,after the initial1.5m,for earth work in all soils.

S.No. Particular No. L B H Quantity Unit

1 BEHR-III/1 1 21.600 13.130 0.082 23.256 cum


PORCH 2 2.500 2.400 0.082 0.984 cum
2 BEHR-III/2 1 21.600 13.130 0.446 126.489 cum
PORCH 2 2.500 2.400 0.446 5.352 cum
3 BEHR-III/3 1 21.600 13.130 0.000 cum
PORCH 2 2.500 2.400 0.000 cum
4 BEHR-III/4 1 21.600 13.130 1.029 291.833 cum
PORCH 2 2.500 2.400 1.029 12.348 cum
5 BEHR-II/1 1 25.450 7.175 0.626 114.310 cum
2 19.600 3.850 0.626 94.476 cum
PORCH 1 4.100 3.700 0.626 9.496 cum
6 BEHR-II/2 1 25.450 7.175 0.287 52.407 cum
2 19.600 3.850 0.287 43.314 cum
PORCH 1 4.100 3.700 0.287 4.354 cum
7 BEHR-II/3 1 25.450 7.175 1.228 224.237 cum
1 19.600 3.850 1.228 92.665 cum
PORCH 1 4.100 3.700 1.228 18.629 cum
8 BEHR-II/4 1 25.450 7.175 0.160 29.217 cum
1 19.600 3.850 0.160 12.074 cum
PORCH 1 4.100 3.700 0.160 2.427 cum
9 BEHR-II/5 1 25.450 7.175 0.000 cum
1 19.600 3.850 0.000 cum
PORCH 1 4.100 3.700 0.000 cum
10 BEHR-II/6 1 25.450 7.175 0.173 31.590 cum
1 19.600 3.850 0.173 13.055 cum
PORCH 1 4.100 3.700 0.173 2.624 cum
11 BEHR-II/7 1 25.450 7.175 0.112 20.452 cum
1 19.600 3.850 0.112 8.452 cum
PORCH 1 4.100 3.700 0.112 1.699 cum

BOUNDARY 80 1.900 1.900 0.000 0.000 cum


TYPE 2

12 BEHR-IV/5 1 34.100 16.670 0.100 56.845 cum

13 BEHR-IV/1 1 20.400 16.670 0.000 0.000 cum

14 BEHR-IV/2 1 20.400 16.670 0.000 0.000 cum

15 BEHR-IV/3 1 20.400 16.670 0.640 217.644 cum

GROSS QTY 1510.227 cum


PREVIOUS QTY cum
THIS BILL QTY 1510.227 cum
Detail Of Measurement
Work Details :- Back Filling of all kind of soil up NGL
S.No. Particular No. L B H Quantity Unit Remark

1 BEHR-III/1 1 21.600 13.130 1.582 448.668 cum L= (1.5+17.7+1.5+.3+.6)

PORCH 2 2.500 2.400 1.582 18.984 cum

Where 17.7 is grid distance, 1.5 and 1.5


2 BEHR-III/2 1 21.600 13.130 1.946 551.901 cum
are fooing after grid

PORCH 2 2.500 2.400 1.946 23.352 cum

.3 is pcc margin and .6 is excavation


3 BEHR-III/3 1 21.600 13.130 1.480 419.740 cum
margin 300mm each side.
PORCH 2 2.500 2.400 1.480 17.760 cum
4 BEHR-III/4 1 21.600 13.130 2.529 717.245 cum B= (1.38+9.8+1.05+.3+.6)
PORCH 2 2.500 2.400 2.529 30.348 cum
5 BEHR-II/1 1 25.450 7.175 2.126 388.216 cum L=(1.675+21.2+1.675+.3+.6)
1 19.600 3.850 2.126 160.428 cum B=(1.075+3.9+1.3+.3+.6)
PORCH 1 4.100 3.700 2.126 32.251 cum
6 BEHR-II/2 1 25.450 7.175 1.787 326.313 cum L1=(.75+17.2+.75+.3+.6)
1 19.600 3.850 1.787 134.847 cum
PORCH 1 4.100 3.700 1.787 27.109 cum
7 BEHR-II/3 1 25.450 7.175 2.728 498.143 cum total width=(1.55+7.5+1.075+.3+.6)
1 19.600 3.850 2.728 205.855 cum 11.025
PORCH 1 4.100 3.700 2.728 41.384 cum
8 BEHR-II/4 1 25.450 7.175 1.660 303.122 cum B1=Tw-B
1 19.600 3.850 1.660 125.264 cum B1=11.025-B
PORCH 1 4.100 3.700 1.660 25.182 cum
9 BEHR-II/5 1 25.450 7.175 1.399 255.463 cum 3.850
1 19.600 3.850 1.399 105.569 cum
PORCH 1 4.100 3.700 1.399 21.223 cum
10 BEHR-II/6 1 25.450 7.175 1.673 305.496 cum
1 19.600 3.850 1.673 126.245 cum
PORCH 1 4.100 3.700 1.673 25.379 cum
11 BEHR-II/7 1 25.450 7.175 1.612 294.357 cum
1 19.600 3.850 1.612 121.642 cum
PORCH 1 4.100 3.700 1.612 24.454 cum

BOUNDARY 135 1.900 1.900 1.500 731.025 cum


TYPE 2

12 BEHR-IV/5 1 34.100 16.670 1.600 909.515 cum L=(1+31.2+1+.3+.6)


B=(1.5+12.77+1.5+.3+.6)

7416.478 cum

SUBTRACT PCC -498.628


SUBTRACT RCC -912.590
GROSS QTY 6005.260 cum
PREVIOUS QTY cum
THIS BILL QTY 6005.260 cum
Detail Of Measurement
proportion excluding cost of cement, centering and shuttering
Work Details 5.b :-
- All works upto Plinth level : 1:3:6 (1 cement : 3 sand : 6
S.No. Particular BLOCK FOOTING L B H Quantity Unit Remark

1 TYPE IV(93BEHR/M3) PCC Full Block


1 1 1 5.900 0.500 0.150 0.443 cum
2 1 1 20.300 0.600 0.150 1.827 cum
3 1 1 28.700 1.600 0.150 6.888 cum
4 1 1 33.500 5.850 0.150 29.396 cum
5 1 1 30.500 4.700 0.150 21.503 cum
6 1 1 15.100 1.500 0.150 3.398 cum
7 1 1 6.100 1.320 0.150 1.208 cum
64.662

2 TYPE IV(93BEHR/M3) PCC Half Block


1 3 1 6.000 0.500 0.150 1.350 cum
2 3 1 13.200 0.600 0.150 3.564 cum
3 3 1 17.400 1.600 0.150 12.528 cum
4 3 1 19.800 5.850 0.150 52.124 cum
5 3 1 18.300 4.700 0.150 38.705 cum
6 3 1 10.600 1.500 0.150 7.155 cum
7 3 1 6.100 1.320 0.150 3.623 cum
119.048

3 TYPE III(93BEHR/M3) PCC


FC01 4 2 2.250 2.150 0.150 5.805 cum
FC02 4 4 3.050 2.850 0.150 20.862 cum
FC03 4 2 2.300 2.200 0.150 6.072 cum
FC04 4 2 2.650 2.450 0.150 7.791 cum
CFC06 4 1 13.550 3.050 0.150 24.797 cum
CFC07 4 1 13.150 3.735 0.150 29.469 cum
CFC05 4 2 2.763 3.050 0.150 10.113 cum
FC08 4 1 5.230 4.300 0.150 13.493 cum
FC9 4 2 1.900 1.800 0.150 4.104 cum
122.506

4 TYPE II(93 BEHR/M3) PCC


FC01 7 2 3.500 3.100 0.150 22.785 cum
FC02 7 2 2.600 2.500 0.150 13.650 cum
FC03 7 2 3.100 2.900 0.150 18.879 cum
FC07 7 2 4.700 2.900 0.150 28.623 cum
FC06 7 1 5.900 3.650 0.150 22.612 cum
FC04 7 1 5.750 2.900 0.150 17.509 cum
FC08 7 2 4.200 3.100 0.150 27.342 cum
FC05 7 2 2.300 4.650 0.150 22.460 cum
FC01 7 2 1.100 3.100 0.150 7.161 cum
FC9 7 1 3.500 3.100 0.150 11.393 cum
192.413

5 TYPE II BOUNDARY(93 BEHR/M3) PCC


FOOTING 135 1 1.650 1.550 0.150 51.789 cum 51.789

550.417
GROSS QTY 550.417 cum
PREVIOUS QTY cum
THIS BILL QTY 550.417 cum
Detail Of Measurement
Providing and laying in position cement concrete of M 20 grade,
Work Details 6 :- excluding the cost of cement and of centering and shuttering, as per
direction of the Engineer in charge : All works upto Plinth level

S.No. Particular BLOCK NO. FOOTING NO. L B H Quantity Unit Remark

1 TYPE III(93 BEHR/M3)


FOOTINGS
FC01 4 2 1.950 1.850 0.400 11.544 cum
FC02 4 4 2.750 2.550 0.275 30.855 cum
4 4 1.600 1.400 0.275 9.856 cum
FC03 4 2 2.000 1.900 0.400 12.160 cum
FC04 4 2 2.350 2.150 0.450 18.189 cum
FC05 4 6 2.950 2.750 0.300 58.410 cum
4 6 1.700 1.500 0.300 18.360 cum
FC06 4 1 6.600 2.950 0.300 23.364 cum
FC07 4 1 7.200 3.250 0.350 32.760 cum
FC08 4 1 4.930 4.000 0.300 23.664 cum
FC09 4 2 1.600 1.500 0.400 7.680 cum
246.842
2 TYPE II(93 BEHR/M3)
FOOTINGS
FC01 7 4 3.200 2.800 0.500 125.440 cum
FC02 7 2 2.300 2.200 0.375 26.565 cum
FC03 7 2 2.800 2.600 0.425 43.316 cum
FC04 7 2 2.750 2.550 0.425 41.724 cum
FC05 7 2 2.000 1.500 0.300 12.600 cum
FC06 7 2 3.350 2.700 0.500 63.315 cum
FC07 7 2 4.400 2.600 0.400 64.064 cum
FC08 7 2 3.900 2.800 0.400 61.152 cum
FC09 7 1 3.200 2.800 0.500 31.360 cum
469.536
3 TYPE IV(93BEHR/M3) RCC Full Block
FOOTING
1 1 1 5.600 0.500 0.350 0.980 cum
2 1 1 20.300 0.600 0.350 4.263 cum
3 1 1 28.700 1.600 0.350 16.072 cum
4 1 1 33.500 5.550 0.350 65.074 cum
5 1 1 30.500 4.700 0.350 50.173 cum
6 1 1 15.100 1.500 0.350 7.928 cum
7 1 1 5.800 1.320 0.350 2.680 cum
1 CG1 1 2 2.000 2.000 0.050 0.400 cum
2 CG2 1 2 2.000 2.000 0.150 1.200 cum
3 CG3 1 2 2.000 2.000 0.150 1.200 cum
4 CG2 1 2 2.000 2.000 0.150 1.200 cum
5 CG8 1 2 2.000 2.300 0.250 2.300 cum
6 CG8 1 2 2.000 2.000 0.250 2.000 cum
7 CG4/7 1 2 5.200 2.000 0.250 5.200 cum
8 CG4 1 2 5.200 2.000 0.250 5.200 cum
9 CG3 1 2 3.500 2.000 0.150 2.100 cum
10 CG3&5 1 2 4.700 2.000 0.150 2.820 cum
11 CG4 1 2 4.600 2.000 0.250 4.600 cum
12 CG2 1 2 1.500 2.000 0.250 1.500 cum
13 CG9 1 1 5.600 2.700 0.250 3.780 cum
14 CG1 1 1 10.720 5.800 0.250 15.544 cum
196.212
4 TYPE IV(93BEHR/M3) RCC HALF Block
FOOTING
1 3 1 5.600 0.500 0.350 2.940 cum
2 3 1 12.800 0.600 0.350 8.064 cum
3 3 1 17.000 1.600 0.350 28.560 cum
4 3 1 19.400 5.550 0.350 113.054 cum
5 3 1 17.900 4.700 0.350 88.337 cum
6 3 1 10.200 1.500 0.350 16.065 cum
7 3 1 5.700 1.320 0.350 7.900 cum
1 CG1 3 1 2.000 2.000 0.050 0.600 cum
2 CG2 3 1 2.000 2.000 0.150 1.800 cum
3 CG3 3 1 2.000 2.000 0.150 1.800 cum
4 CG2 3 1 2.000 2.000 0.150 1.800 cum
5 CG8 3 1 2.000 2.300 0.250 3.450 cum
6 CG8 3 1 2.000 2.000 0.250 3.000 cum
7 CG4/7 3 1 5.200 2.000 0.250 7.800 cum
8 CG4 3 1 5.200 2.000 0.250 7.800 cum
9 CG3 3 1 3.500 2.000 0.150 3.150 cum
10 CG3&5 3 1 4.700 2.000 0.150 4.230 cum
11 CG4 3 1 4.600 2.000 0.250 6.900 cum
12 CG2 3 1 1.500 2.000 0.250 2.250 cum
13 CG9 3 1 5.600 2.700 0.250 11.340 cum
14 CG1 3 1 10.720 5.800 0.250 46.632 cum
367.471
5 TYPE IV(93BEHR/M3) RCC HALF Block
FOOTING
1 135 1 1.350 1.250 0.300 68.344 cum
68.344
6 TYPE IV(93 BEHR/M3) FULL BLOCK
COLUMN
1 CG1 (350x250) 1 2 0.350 0.250 1.375 0.241
1 2 0.350 0.250 1.175 0.206
2 CG2(450x250) 1 6 0.450 0.250 1.275 0.861
1 2 0.450 0.250 1.175 0.264
3 CG3(450x250) 1 4 0.450 0.250 1.275 0.574
4 CG4(550x250) 1 10 0.550 0.250 1.175 1.616
5 CG5(450x250) 1 2 0.450 0.250 1.275 0.287
1 2 0.450 0.250 1.275 0.287
6 CG6(550x250) 1 4 0.550 0.250 1.175 0.646
7 CG7(550x250) 1 2 0.550 0.250 1.175 0.323
8 CG8(550x250) 1 4 0.550 0.250 1.175 0.646
9 CG9(550x250) 1 2 0.550 0.250 1.175 0.323
6.273
7 TYPE IV(93 BEHR/M3) HALF BLOCK
COLUMN
1 CG1 (350x250) 3 1 0.350 0.250 1.275 0.335
3 2 0.350 0.250 1.075 0.564
2 CG2(450x250) 3 3 0.450 0.250 1.175 1.190
3 1 0.450 0.250 1.075 0.363
3 CG3(450x250) 3 2 0.450 0.250 1.175 0.793
4 CG4(550x250) 3 5 0.550 0.250 1.075 2.217
5 CG5(450x250) 3 1 0.450 0.250 1.175 0.397
3 2 0.450 0.250 1.175 0.793
6 CG6(550x250) 3 4 0.550 0.250 1.075 1.774
7 CG7(550x250) 3 1 0.550 0.250 1.075 0.443
8 CG8(550x250) 3 2 0.550 0.250 1.075 0.887
9 CG9(550x250) 3 2 0.550 0.250 1.075 0.887
10.643
8 TYPE II(93 BEHR/M3)
COLUMN
1 C1,4 7 2 0.350 0.250 3.099 3.796
2 C2,3 7 2 0.350 0.250 3.024 3.704
3 C5,8 7 2 0.350 0.250 2.899 3.551
4 C6,7 7 2 0.350 0.250 2.999 3.674
5 C9,10 7 2 0.450 0.250 2.974 4.684
6 C11,16 7 2 0.450 0.250 2.999 4.723
7 C12,15 7 2 0.550 0.250 2.999 5.773
8 C13,14 7 2 0.450 0.250 2.974 4.684
9 C17,18 7 2 0.350 0.250 3.199 3.919
10 C19,22 7 2 0.350 0.250 2.899 3.551
11 C20,21 7 2 0.450 0.250 2.899 4.566
12 C23,24 7 2 0.350 0.250 2.299 2.816
49.443
9 TYPE III(93 BEHR/M3)
COLUMN
1 C1,7 4 2 0.350 0.250 2.950 2.065
2 C2,6 4 2 0.450 0.250 2.750 2.475
3 C3,4,5 4 3 0.450 0.250 3.050 4.118
4 C8,11 4 2 0.450 0.250 2.800 2.520
5 C9,10 4 2 0.450 0.250 2.750 2.475
6 C12,13,14 4 3 0.450 0.250 2.900 3.915
7 C15,18 4 2 0.450 0.250 2.800 2.520
8 C16,17 4 2 0.450 0.250 2.750 2.475
9 C19,20 4 2 0.450 0.250 2.950 2.655
10 C21,22 4 2 0.350 0.250 3.050 2.135
11 C23,26 4 2 0.350 0.250 2.950 2.065
12 C24,25 4 2 0.450 0.250 2.950 2.655
13 C27 4 2 0.300 0.250 2.350 1.410
33.483
GROSS QTY 1448.246
PREVIOUS QTY
THIS BILL QTY 1448.246
Name of work :-" Construction of residencial Building including approach Road &
other miscellaneous work between Vijay sota to Niwash road(including both station ) in
connection with Katni- singrauli rail line Doubling
(Supply project (Pkg-2)
of Cement)

PKG-2 (BEOHARI)
R.Bill No. -02
S.No. Sub S.No Particular Unit Quantity Remark
Schedule-II
Supply and using cement at worksite.
1 1

1A OPC 43 grade R.C.C. MT 443.163


1A OPC 43 grade P.C.C. MT 122.061
GROSS QTY MT 565.224
PREVIOUS QTY
THIS BILL QTY 565.224
Detail Of Measurement
Centering and shuttering including strutting, propping
Work Details 8a:-
etc. and removal of form for :
S.No. Particular Block Footing L H Quantity Unit Remark

1 TYPE IV(93 BEHR/M2) PCC FULL BLOCK


1 2.000 16.070 0.15 4.821 Sqm
1 2.000 33.500 0.15 10.05 Sqm
14.871
2 TYPE IV(93 BEHR/M2) PCC HALF BLOCK
3 2.000 16.070 0.15 14.463 Sqm
3 2.000 19.800 0.15 17.82 Sqm
32.283

3 TYPE III(93 BEHR/M2) PCC


FC1(X1,Y7;X9,Y7) 4 2 8.8 0.15 10.56 Sqm
FC2(X1,Y6;X9,Y6;X1,Y4;X
4 4 11.8 0.15 28.32 Sqm
9,Y4)
FC3(X1,Y1;X9,Y1) 4 2 9 0.15 10.8 Sqm
FC4(X2,Y1;X8,Y1) 4 2 10.2 0.15 12.24 Sqm
FC8(C19,C20,C21,C22) 4 1 19.06 0.15 11.436 Sqm
FC5*6+FC7 4 1 33.2 0.15 19.92 Sqm
4 1 33.77 0.15 20.262 Sqm
4 2 11.626 0.15 13.9512 Sqm
PORCH 4 2 7.4 0.15 8.88
136.3692
4 TYPE II(93 BEHR/M2) PCC
FC1(C5,C8) 7 2 13.2 0.15 27.72 Sqm
FC3(C9,C10) 7 2 12 0.15 25.2 Sqm
FC7 and FC7A 7 2 15.2 0.15 31.92 Sqm
FC2(C2,C3) 7 2 10.2 0.15 21.42 Sqm
FC8,FC1,FC5 7 2 14.6 0.15 30.66 Sqm
7 2 13.9 0.15 29.19 Sqm
7 2 8.4 0.15 17.64 Sqm
FC6,FC4 7 1 19.1 0.15 20.055 Sqm
7 1 17.3 0.15 18.165 Sqm
PORCH 7 1 13.2 0.15 13.86 Sqm
235.83

5 TYPE II(93 BEHR/M2) BOUNDARY PCC


135 1 6.4 0.15 129.6 Sqm
129.6
6 TYPE III(93 BEHR/M2) RCC
FC01 4 2 7.600 0.400 24.32 Sqm
FC02 4 4 10.600 0.275 46.64 Sqm
4 4 6.000 0.275 26.4 Sqm
FC03 4 2 7.800 0.400 24.96 Sqm
FC04 4 2 9.000 0.450 32.4 Sqm
FC05 4 6 11.40 0.300 82.08 Sqm
4 6 6.40 0.300 46.08 Sqm
FC06 4 1 19.10 0.300 22.92 Sqm
FC07 4 1 20.90 0.350 29.26 Sqm
FC08 4 1 17.86 0.300 21.432 Sqm
356.492
7 TYPE II(93 BEHR/M2) RCC
FC01 7 4 12.000 0.500 168 Sqm
FC02 7 2 9.000 0.375 47.25 Sqm
FC03 7 2 10.800 0.425 64.26 Sqm
FC04 7 2 10.600 0.425 63.07 Sqm
FC05 7 2 7.000 0.300 29.4 Sqm
FC06 7 2 12.10 0.500 84.7 Sqm
FC07 7 2 14.00 0.400 78.4 Sqm
FC08 7 2 13.40 0.400 75.04 Sqm
FC09 7 1 12.00 0.500 42 Sqm
652.120
8 TYPE IV(93 BEHR/M2) FULL BLOCK RCC
1 1 97.94 0.350 34.279 Sqm
CG1 1 2 8.00 0.050 0.8 Sqm
CG2 1 2 8.00 0.150 2.4 Sqm
CG3 1 2 8.00 0.150 2.4 Sqm
CG2 1 2 8.00 0.150 2.4 Sqm
CG8 1 2 8.60 0.250 4.3 Sqm
CG8 1 2 8.00 0.250 4 Sqm
CG4/7 1 2 14.40 0.250 7.2 Sqm
CG4 1 2 14.40 0.250 7.2 Sqm
CG3 1 2 11.00 0.150 3.3 Sqm
CG3&5 1 2 13.40 0.150 4.02 Sqm
CG4 1 2 13.20 0.250 6.6 Sqm
CG2 1 2 7.00 0.250 3.5 Sqm
CG9 1 1 16.60 0.250 4.15 Sqm
CG1 1 1 33.04 0.250 8.26 Sqm
94.809

9 TYPE IV(93 BEHR/M2) HALF BLOCK RCC


1 1 70.64 0.350 24.724 Sqm
CG1 3 1 8.00 0.050 1.2 Sqm
CG2 3 1 8.00 0.150 3.6 Sqm
CG3 3 1 8.00 0.150 3.6 Sqm
CG2 3 1 8.00 0.150 3.6 Sqm
CG8 3 1 8.60 0.250 6.45 Sqm
CG8 3 1 8.00 0.250 6 Sqm
CG4/7 3 1 14.40 0.250 10.8 Sqm
CG4 3 1 14.40 0.250 10.8 Sqm
CG3 3 1 11.00 0.150 4.95 Sqm
CG3&5 3 1 13.40 0.150 6.03 Sqm
CG4 3 1 13.20 0.250 9.9 Sqm
CG2 3 1 7.00 0.250 5.25 Sqm
CG9 3 1 16.60 0.250 12.45 Sqm
CG1 3 1 33.04 0.250 24.78 Sqm
134.134
GROSS QTY 1786.508
PREVIOUS QTY
THIS BILL QTY 1786.508
Detail Of Measurement
Centering and shuttering including strutting, propping
Work Details 8d:-
etc. and removal of form for :
S.No. Particular Block Footing L H Quantity Unit Remark

1 TYPE III(93 BEHR/M2) COLUMN


C1,7 4 2 1.20 2.950 28.32 Sqm
C2,6 4 2 1.40 2.750 30.8 Sqm
C3,4,5 4 3 1.40 3.050 51.24 Sqm
C8,11 4 2 1.40 2.800 31.36 Sqm
C9,10 4 2 1.40 2.750 30.8 Sqm
C12,13,14 4 3 1.40 2.900 48.72 Sqm
C15,18 4 2 1.40 2.800 31.36 Sqm
C16,17 4 2 1.40 2.750 30.8 Sqm
C19,20 4 2 1.40 2.950 33.04 Sqm
C21,22 4 2 1.20 3.050 29.28 Sqm
C23,26 4 2 1.20 2.950 28.32 Sqm
C24,25 4 2 1.40 2.950 33.04 Sqm
407.080
12 TYPE IV(93 BEHR/M3) FULL BLOCK
COLUMN
1 CG1 (350x250) 1 2 1.20 1.375 3.3 Sqm
1 2 1.20 1.175 2.82 Sqm
2 CG2(450x250) 1 6 1.40 1.275 10.71 Sqm
1 2 1.40 1.175 3.29 Sqm
3 CG3(450x250) 1 4 1.40 1.275 7.14 Sqm
4 CG4(550x250) 1 10 1.60 1.175 18.8 Sqm
5 CG5(450x250) 1 2 1.40 1.275 3.57 Sqm
1 2 1.40 1.275 3.57 Sqm
6 CG6(550x250) 1 4 1.60 1.175 7.52 Sqm
7 CG7(550x250) 1 2 1.60 1.175 3.76 Sqm
8 CG8(550x250) 1 4 1.60 1.175 7.52 Sqm
9 CG9(550x250) 1 2 1.60 1.175 3.76 Sqm
75.760

12 TYPE IV(93 BEHR/M3) HALF BLOCK


COLUMN
1 CG1 (350x250) 3 1 1.20 1.275 4.59 Sqm
3 2 1.20 1.075 7.74 Sqm
2 CG2(450x250) 3 3 1.40 1.175 14.805 Sqm
3 1 1.40 1.075 4.515 Sqm
3 CG3(450x250) 3 2 1.40 1.175 9.87 Sqm
4 CG4(550x250) 3 5 1.60 1.075 25.8 Sqm
5 CG5(450x250) 3 1 1.40 1.175 4.935 Sqm
3 2 1.40 1.175 9.87 Sqm
6 CG6(550x250) 3 4 1.60 1.075 20.64 Sqm
7 CG7(550x250) 3 1 1.60 1.075 5.16 Sqm
8 CG8(550x250) 3 2 1.60 1.075 10.32 Sqm
9 CG9(550x250) 3 2 1.60 1.075 10.32 Sqm
128.565
10 TYPE II(93 BEHR/M2) COLUMN

C1,4 7 2 1.20 3.099 52.0632 Sqm


C2,3 7 2 1.20 3.024 50.8032 Sqm
C5,8 7 2 1.20 2.899 48.7032 Sqm
C6,7 7 2 1.20 2.999 50.3832 Sqm
C9,10 7 2 1.40 2.974 58.2904 Sqm
C11,16 7 2 1.40 2.999 58.7804 Sqm
C12,15 7 2 1.60 2.999 67.1776 Sqm
C13,14 7 2 1.40 2.974 58.2904 Sqm
C17,18 7 2 1.20 3.199 53.7432 Sqm
C19,22 7 2 1.20 2.899 48.7032 Sqm
C20,21 7 2 1.40 2.899 56.8204 Sqm
C23,24 7 2 1.20 2.299 38.6232 Sqm
642.382
GROSS QTY 1253.787
PREVIOUS QTY
THIS BILL QTY 1253.787
Detail Of Measurement
Soil Bearing Test conducted at different
Extra Item - 1
stations
S.No. Particular No. Quantity Remark

1 Vijay Sota 1 1

2 Chhatani 1 1

3 Beohari 1 1

4 Dubri Kalan 1 1

5 Joba 1 1

6 Marwas Gram 1 1

7 Niwas Road 1 1

GROSS QTY 7
PREVIOUS QTY
THIS BILL QTY
IRCON INTERNATIONAL LIMITED
KATNI-SINGRAULI RAIL DOUBLING PROJECT
(CONSTRUCTION OF RESIDENTIAL QUARTERS)
BBS FOR TYPE II, 93 SBC ( KHANNA BANJARI,VIJAYSOTA,BEOHARI, DUBRI KALAN, BARGAWAN) DRG. N0. ST-01
DIA OF NO OF BEND CUTTING
S.NO DESCRIPTION NOS CORRECTI LENGTH OF BAR LENGTH OF STEEL TOTAL WT. UNIT SHAPE
BAR BARS ON LENGTH

A B C D E F A+B+C+D 8 10 12 16 20 25
+E+F-B.C

FOOTING NO OF
FOOTING
1 FC1(3200x2800X500) B A CC

BOTTOM MAIN 10 4 22 0.040 3.120 0.410 0.410 3.900 343.200 B C


A
BOTTOM CROSS 10 4 25 0.040 2.720 0.410 0.410 3.500 350.000 B C
A
BOTTOM MAIN SFR 10 4 4 3.120 3.120 49.920
BOTTOM CROSS SFR 10 4 4 2.720 2.720 43.520
2 FC2(2300x2200x375)
BOTTOM MAIN 10 2 13 0.040 2.220 0.285 0.285 2.750 71.500 B C
A
BOTTOM CROSS 10 2 13 0.040 2.120 0.285 0.285 2.650 68.900 B C
A
BOTTOM MAIN SFR 10 2 4 2.220 2.220 17.760
BOTTOM CROSS SFR 10 2 4 2.120 2.120 16.960
3 FC3(2800x2600x425)
BOTTOM MAIN 10 2 17 0.040 2.720 0.335 0.335 3.350 113.900 B C
A
BOTTOM CROSS 10 2 19 0.040 2.520 0.335 0.335 3.150 119.700 B C
A
BOTTOM MAIN SFR 10 2 4 2.720 2.720 21.760
BOTTOM CROSS SFR 10 2 4 2.520 2.520 20.160
4 FC4(2750x2550x425)
BOTTOM MAIN 10 2 17 0.040 2.670 0.335 0.335 3.300 112.200 B C
A
BOTTOM CROSS 10 2 18 0.040 2.470 0.335 0.335 3.100 111.600 B C
A
BOTTOM MAIN SFR 10 2 4 2.670 2.670 21.360
BOTTOM CROSS SFR 10 2 4 2.470 2.470 19.760
5 FC5(2000x1500x300)
BOTTOM MAIN 10 2 7 0.040 1.920 0.210 0.210 2.300 32.200 B C
A
BOTTOM CROSS 10 2 8 0.040 1.420 0.210 0.210 1.800 28.800 B C
A
BOTTOM MAIN SFR 10 2 4 1.920 1.920 15.360
BOTTOM CROSS SFR 10 2 4 1.420 1.420 11.360
6 FC6(3350x2700x500)
BOTTOM MAIN 10 2 22 0.040 3.270 0.410 0.410 4.050 178.200 B C
A
BOTTOM CROSS 10 2 27 0.040 2.620 0.410 0.410 3.400 183.600 B C
A
BOTTOM MAIN SFR 10 2 4 3.270 3.270 26.160
BOTTOM CROSS SFR 10 2 4 2.620 2.620 20.960
7 FC7/FC7A(4400x2600x400)
TOP MAIN 10 2 13 0.040 4.320 0.310 0.310 4.900 127.400 B A C
TOP CROSS 10 2 22 0.040 2.520 0.310 0.310 3.100 136.400 B A C
BOTTOM MAIN 12 2 22 0.048 4.320 0.300 0.300 4.872 214.368 B C
A
BOTTOM CROSS 16 2 37 0.064 2.520 0.300 0.300 3.056 226.144 B C
A
BOTTOM MAIN SFR 10 2 4 4.320 4.320 34.560
BOTTOM CROSS SFR 10 2 4 2.520 2.520 20.160
CHAIR 12 2 8 0.096 1.000 0.262 0.262 0.250 0.250 1.928 30.848
8 FC8/FC8A(3900x2800x400)
TOP MAIN 10 2 16 0.040 3.820 0.310 0.310 4.400 140.800 B A C
TOP CROSS 10 2 22 0.040 2.720 0.310 0.310 3.300 145.200 B A C
BOTTOM MAIN 12 2 23 0.048 3.820 0.310 0.310 4.392 202.032 B C
A
BOTTOM CROSS 12 2 33 0.048 2.720 0.310 0.310 3.292 217.272 B C
A
BOTTOM MAIN SFR 10 2 4 3.820 3.820 30.560
BOTTOM CROSS SFR 10 2 4 2.720 2.720 21.760
CHAIR 12 2 8 0.096 1.000 0.262 0.262 0.250 0.250 1.928 30.848

9 FC9(3200x2800x500)
BOTTOM MAIN 10 1 23 0.040 3.120 0.410 0.410 3.900 89.700 B C
A
BOTTOM CROSS 10 1 27 0.040 2.720 0.410 0.410 3.500 94.500 B C
A
BOTTOM MAIN SFR 10 1 4 3.120 3.120 12.480
BOTTOM CROSS SFR 10 1 4 2.720 2.720 10.880

TOTAL LENGTH (Mtrs.) 0.00 2863.24 695.37 226.14 0.00 METRE B A C

UNIT WT. OF STEEL (KG/Mtr.) 0.395 0.617 0.889 1.580 2.469 3.858 KG/Mtr
TOTAL WEIGHT (Kg) 0.00 1767.43 618.10 357.36 0.00 0.00 2742.90 KGS
COLUMN DETAIL
BEND
S.NO DIA OF Number NO OF CORRECTIO CUTTING SHAPE
DESCRIPTION BAR of column BARS N LENGTH OF BAR LENGTH DIA OF STEEL + LENGTH OF STEEL TOTAL WT. UNIT
A+B+C+D
A B C D E F +E+F-B.C 8 10 12 16 20 25
1 CG1 (350x250)
MAIN 16 8 2 0.032 5.652 0.38 6.00 96.00
A B
MAIN 16 8 2 0.032 3.652 0.38 4.00 64.00
A B
MAIN 16 8 1 0.032 5.652 0.38 6.00 48.00
A B
MAIN 12 8 1 0.024 3.644 0.38 4.00 32.00
A E
STIRUPPS UPTO PLINTH 8 8 18 0.08 0.25 0.15 0.25 0.15 0.08 0.08 0.88 126.72 B D
C F
LINK 8 8 18 0.032 0.15 0.08 0.08 0.28 40.03
2 CG2(350x250)
MAIN 16 2 2 0.032 5.652 0.38 6.00 24.00
A B
MAIN 16 2 2 0.032 3.652 0.38 4.00 16.00
A B
MAIN 12 2 1 0.024 5.644 0.38 6.00 12.00
MAIN 12 2 1 0.024 3.644 0.38 4.00 8.00
A E
STIRUPPS UPTO PLINTH 8 2 18 0.08 0.25 0.15 0.25 0.15 0.08 0.08 0.88 31.68 B D
C F
LINK 8 2 18 0.032 0.15 0.08 0.08 0.28 10.01
3 CG3(450x250)
MAIN 16 2 4 0.032 5.652 0.38 6.00 48.00
A B
MAIN 16 2 4 0.032 3.652 0.38 4.00 32.00
A B
A E
STIRUPPS UPTO PLINTH 8 2 18 0.08 0.35 0.15 0.35 0.15 0.08 0.08 1.08 38.88 B D
C F
A E
STIRUPPS UPTO PLINTH 8 2 18 0.08 0.25 0.15 0.25 0.15 0.08 0.08 0.88 31.68 B D
C F

4 CG4(650x250)
MAIN 12 2 4 0.024 3.644 0.38 4.00 32.00
A B
MAIN 12 2 4 0.024 5.644 0.38 6.00 48.00
A B
A B
A E
STIRUPPS UPTO PLINTH 8 2 18 0.08 0.55 0.15 0.55 0.15 0.08 0.08 1.48 53.28 B D
C F
A E
STIRUPPS UPTO PLINTH 8 2 18 0.08 0.3 0.15 0.3 0.15 0.08 0.08 0.98 35.28 B D
C F
5 CG5(550x250)
MAIN 16 2 4 0.032 5.652 0.38 6.00 48.00
A B
MAIN 16 2 4 0.032 3.652 0.38 4.00 32.00
A B
A E
STIRUPPS UPTO PLINTH 8 2 18 0.08 0.45 0.15 0.45 0.15 0.08 0.08 1.28 46.08 B D
C F
A E
STIRUPPS UPTO PLINTH 8 2 18 0.08 0.25 0.15 0.25 0.15 0.08 0.08 0.88 31.68 B D
C F

6 CG6(450x250)
MAIN 16 2 3 0.032 5.652 0.38 6.00 36.00
A B
MAIN 16 2 3 0.032 3.652 0.38 4.00 24.00
A B
LINK 8 2 18 0.032 0.15 0.08 0.08 0.28 10.01
A E
STIRUPPS UPTO PLINTH 8 2 18 0.08 0.35 0.15 0.35 0.15 0.08 0.08 1.08 38.88 B D
C F

7 CG7(350x250) A B
MAIN 12 2 3 0.024 5.644 0.38 6.00 36.00 A E
B A DB
MAIN 12 2 3 0.024 3.644 0.38 4.00 24.00 A CE F
B A DB
LINK 8 2 18 0.032 0.15 0.08 0.08 0.28 10.01 C F
A E
STIRUPPS UPTO PLINTH 8 2 18 0.08 0.25 0.15 0.25 0.15 0.08 0.08 0.88 31.68 B D
C F

8 CG8(450x250)
MAIN 16 2 3 0.032 5.652 0.38 6.00 36.00
A B
MAIN 16 2 3 0.032 3.652 0.38 4.00 24.00
A B
LINK 8 2 18 0.032 0.15 0.08 0.08 0.28 10.01
A E
STIRUPPS UPTO PLINTH 8 2 18 0.08 0.35 0.15 0.35 0.15 0.08 0.08 1.08 38.88 B D
C F

9 CG1 (350x250)
MAIN 16 2 2 0.032 5.652 0.38 6.00 24.00
A B
MAIN 16 2 2 0.032 5.652 0.38 6.00 24.00
A B
MAIN 12 2 1 0.024 3.644 0.38 4.00 8.00
MAIN 12 2 1 0.024 3.644 0.38 4.00 8.00
A E
STIRUPPS UPTO PLINTH 8 2 15 0.08 0.25 0.15 0.25 0.15 0.08 0.08 0.88 26.40 B D
C F
LINK 8 2 15 0.032 0.15 0.08 0.08 0.28 8.34

Lap
1 CG1 (350x250)
MAIN 16 8 2 4 4.00 64.00
A B
MAIN 16 8 1 4 4.00 32.00
A B
2 CG2(350x250)
MAIN 16 2 2 4 4.00 16.00
A B
MAIN 12 2 1 4 4.00 8.00
3 CG3(450x250)
MAIN 16 2 4 4 4.00 32.00
A B

4 CG4(650x250)
MAIN 12 2 4 4 4.00 32.00
A B
5 CG5(550x250)
MAIN 16 2 4 4 4.00 32.00
A B

6 CG6(450x250)
MAIN 16 2 3 4 4.00 24.00
A B

7 CG7(350x250) A B
MAIN 12 2 3 4 4.00 24.00 A E
B A C F DB
C
8 CG8(450x250)
MAIN 16 2 3 4 4.00 24.00
A B

9 CG1 (350x250)
MAIN 16 2 2 4 4.00 16.00
A B
MAIN 12 2 1 4 4.00 8.00

SUPPORT 12 24 3 0.6 0.60 43.20

TOTAL LENGTH 619.5 0.0 323.2 816.0 0.0 0.0 METRE B A CE F DB


WT. OF STEEL 0.395 0.617 0.889 1.580 2.469 3.858 M/KGS
TOTAL WEIGHT 244.8 0.0 287.3 1289.5 0.0 0.0 1821.5 KGS
IRCON INTERNATIONAL LIMITED
KATNI-SINGRAULI RAIL DOUBLING PROJECT
(CONSTRUCTION OF RESIDENTIAL QUARTERS)
BBS FOR TYPE III, 93 SBC ( KHANNA BANJARI,VIJAYSOTA,BEOHARI, DUBRI KALAN, BARGAWAN) DRG. N0. ST-01
BEND
S.NO DESCRIPTION DIA OF NOS NO OF CORRECT LENGTH OF BAR CUTTING LENGTH OF STEEL of Different Dia. Bars TOTAL WT. UNIT SHAPE
BAR BARS LENGTH
ION

A B C D E F A+B+C+D+ 8 10 12 16 20 25
E+F-B.C
FOOTING Nos. OF
FOOTING
1 FC1(1950x1850x400)
BOTTOM MAIN 10 2 11 0.040 1.87 0.31 0.31 2.4500 53.9000 B C
A
BOTTOM CROSS 10 2 12 0.040 1.77 0.31 0.31 2.3500 56.4000 B C
A
SFR LONG SIDE 10 2 4 1.87 1.8700 14.9600
SFR SHORT SIDE 10 2 4 1.77 1.7700 14.1600
2 FC2(2750x2550x275)(1600x1400x275)
BOTTOM MAIN 10 4 21 0.040 2.67 0.185 0.185 3.0000 252.0000 B A C
BOTTOM CROSS 10 4 22 0.040 2.47 0.185 0.185 2.8000 246.4000 B A C
SFR LONG SIDE 10 4 4 2.67 2.6700 42.7200
SFR SHORT SIDE 10 4 4 2.47 2.4700 39.5200
TOP MAIN 10 4 9 0.080 1.52 0.46 0.46 0.3 0.3 2.9600 106.5600
TOP CROSS 10 4 11 0.080 1.32 0.46 0.46 0.3 0.3 2.7600 121.4400
TOP MAIN SFR 10 4 4 1.52 1.5200 24.3200
TOP CROSS SFR 10 4 4 1.32 1.3200 21.1200
3 FC3(2000x1900x400)
BOTTOM MAIN 10 2 11 0.040 1.92 0.310 0.310 2.5000 55.0000 B C
A
BOTTOM CROSS 10 2 12 0.040 1.82 0.310 0.310 2.4000 57.6000 B C
A
BOTTOM MAIN SFR 10 2 4 1.92 1.9200 15.3600
BOTTOM CROSS SFR 10 2 4 1.82 1.8200 14.5600

4 FC4(2350x2150x450)
BOTTOM MAIN 10 2 15 0.040 2.27 0.360 0.360 2.9500 88.5000 B C
A
BOTTOM CROSS 10 2 16 0.040 2.07 0.360 0.360 2.7500 88.0000 B C
A
BOTTOM MAIN SFR 10 2 4 2.27 2.2700 18.1600
BOTTOM CROSS SFR 10 2 4 2.07 2.0700 16.5600

5 FC5(2950x2750x300)(1700x1500x300)
BOTTOM MAIN 10 6 22 0.040 2.87 0.21 0.21 3.2500 429.0000 B C
A
BOTTOM CROSS 10 6 24 0.040 2.67 0.21 0.21 3.0500 439.2000 B C
A
BOTTOM MAIN SFR 10 6 4 2.87 2.8700 68.8800
BOTTOM CROSS SFR 10 6 4 2.67 2.6700 64.0800
TOP MAIN 10 6 10 0.080 1.62 0.51 0.51 0.3 0.3 3.1600 189.6000
TOP CROSS 10 6 12 0.080 1.42 0.51 0.51 0.3 0.3 2.9600 213.1200
TOP MAIN SFR 10 6 4 1.62 1.6200 38.8800
TOP CROSS SFR 10 6 4 1.42 1.4200 34.0800
6 FC6(6600x2950x300)
TOP MAIN 10 1 15 0.040 6.52 0.21 0.21 6.9000 103.5000 B A C
A C
TOP CROSS 10 1 33 0.040 2.87 0.21 0.21 3.2500 107.2500 B A C
BOTTOM MAIN 10 1 25 0.040 6.52 0.21 0.21 6.9000 172.5000 B C
A
BOTTOM CROSS 10 1 33 0.040 2.87 0.21 0.21 3.2500 107.2500 B C
A
SFR MAIN SIDE 10 1 4 6.52 6.5200 26.0800
SFR CROSS SIDE 10 1 4 2.87 2.8700 11.4800
CHAIR 12 2 8 0.096 1.000 0.170 0.170 0.250 0.250 1.744 27.904
7 FC7(7200x3250x350)
TOP MAIN 10 1 27 0.040 7.12 0.26 0.26 7.6000 205.2000 B A C
TOP CROSS 10 1 48 0.040 3.17 0.26 0.26 3.6500 175.2000 B A C
BOTTOM MAIN 10 1 32 0.040 7.12 0.26 0.26 7.6000 243.2000 B C
A
BOTTOM CROSS 10 1 48 0.040 3.17 0.26 0.26 3.6500 175.2000 B C
A
SFR MAIN SIDE 10 1 4 7.12 7.1200 28.4800
SFR CROSS SIDE 10 1 4 3.17 3.1700 12.6800
CHAIR 12 2 8 0.096 1.000 0.220 0.220 0.250 0.250 1.844 29.504
8 FC8(4930x4000x300)
TOP MAIN 10 1 20 0.040 4.85 0.21 0.21 5.2300 104.6000 B A C
TOP CROSS 10 1 25 0.040 3.92 0.21 0.21 4.3000 107.5000 B A C
BOTTOM MAIN 12 1 40 0.048 4.85 0.21 0.21 5.2220 208.8800 B C
A
BOTTOM CROSS 12 1 49 0.048 3.92 0.21 0.21 4.2920 210.3080 B C
A
SFR MAIN SIDE 10 1 4 4.85 4.8500 19.4000
SFR CROSS SIDE 10 1 4 3.92 3.9200 15.6800
CHAIR 12 2 8 0.096 1.000 0.166 0.166 0.250 0.250 1.736 27.776

9 FC9(1600x1500x400)
BOTTOM MAIN 10 2 10 0.040 1.52 0.310 0.310 2.1000 42.0000 B C
A
BOTTOM CROSS 10 2 10 0.040 1.42 0.310 0.310 2.0000 40.0000 B C
A
BOTTOM MAIN SFR 10 2 4 1.52 1.5200 12.1600
BOTTOM CROSS SFR 10 2 4 1.42 1.4200 11.3600

TOTAL LENGTH (Mtrs.) 0.00 4544.80 504.37 0.00 0.00 Mtrs. B A C

UNIT WT. OF STEEL (KG/Mtr.) 0.395 0.617 0.889 1.580 2.469 3.858 Kg/Mtr.
TOTAL WEIGHT (Kg) 0.00 2805.43 448.33 0.00 0.00 0.00 3253.76 KGS
COLUMN DETAIL
BEND
DIA OF NOS of NO OF CORRECTI CUTTING SHAPE
S.NO DESCRIPTION BAR column BARS ON LENGTH OF BAR LENGTH DIA OF STEEL + LENGTH OF STEEL TOTAL WT. UNIT
A+B+C+D+
A B C D E F E+F-B.C 8 10 12 16 20 25
1 C1,C7(350x250)
MAIN 12 2 3 0.024 3.644 0.38 4.0000 24.0000
A B
MAIN 12 2 3 0.024 5.644 0.38 6.0000 36.0000
A B
STIRUPPS UPTO PLINTH 8 2 17 0.08 0.25 0.15 0.25 0.15 0.08 0.08 0.8800 29.9200 A E
LINK 8 2 17 0.032 0.15 0.08 0.08 0.2780 9.4520 B D
C2,C3,C4,C5,C6,C8,C9,C10,C11,C12,C14,C15,C16,C17,C18(45 C F
2 0x250)
MAIN 16 15 3 0.032 5.652 0.38 6.0000 270.0000
A B
MAIN 16 15 3 0.032 3.652 0.38 4.0000 180.0000
A B
STIRUPPS UPTO PLINTH 8 15 17 0.08 0.35 0.15 0.35 0.15 0.08 0.08 1.0800 275.4000 A E
LINK 8 15 17 0.032 0.15 0.08 0.08 0.2780 70.8900 B D
C F
3 C13(450x250)
MAIN 16 1 2 0.032 5.652 0.38 6.0000 12.0000
A B
A B
MAIN 16 1 2 0.032 3.652 0.38 4.0000 8.0000
A B
MAIN 12 1 1 0.024 5.644 0.38 6.0000 6.0000
A B
MAIN 12 1 1 0.024 3.644 0.38 4.0000 4.0000
STIRUPPS UPTO PLINTH 8 1 17 0.08 0.35 0.15 0.35 0.15 0.08 0.08 1.0800 18.3600 A E
LINK 8 1 17 0.032 0.15 0.08 0.08 0.2780 4.7260 B D
C F
4 C19,20(450X250)
1 MAIN 16 2 2 0.032 5.652 0.38 6.0000 24.0000
A B
2 MAIN 16 2 2 0.032 3.652 0.38 4.0000 16.0000
A B
MAIN 12 2 1 0.024 5.644 0.38 6.0000 12.0000
A B
MAIN 12 2 1 0.024 3.644 0.38 4.0000 8.0000
A B
STIRUPPS UPTO PLINTH 8 2 17 0.08 0.35 0.15 0.35 0.15 0.08 0.08 1.0800 36.7200 A E
LINK 8 2 17 0.032 0.15 0.08 0.08 0.2780 9.4520 B D
C F
5 C21,22(350X250)
MAIN 16 2 2 0.032 5.652 0.38 6.0000 24.0000
A B
MAIN 16 2 2 0.032 3.652 0.38 4.0000 16.0000
A B
MAIN 12 2 1 0.024 5.644 0.38 6.0000 12.0000
A B
MAIN 12 2 1 0.024 3.644 0.38 4.0000 8.0000
A B
STIRUPPS UPTO PLINTH LEVEL 8 2 17 0.08 0.25 0.15 0.25 0.15 0.08 0.08 0.8800 29.9200 A E
LINK 8 2 17 0.032 0.15 0.08 0.08 0.2780 9.4520 B D
C F
6 C23,26(350X250)
MAIN 16 2 2 0.032 5.652 0.38 6.0000 24.0000
A B
MAIN 16 2 2 0.032 3.652 0.38 4.0000 16.0000
A B
MAIN 12 2 1 0.024 5.644 0.38 6.0000 12.0000
A B
MAIN 12 2 1 0.024 3.644 0.38 4.0000 8.0000
A B
LINK 8 2 17 0.032 0.15 0.08 0.08 0.2780 9.4520
STIRUPPS UPTO PLINTH LEVEL 8 2 17 0.08 0.25 0.15 0.25 0.15 0.08 0.08 0.8800 29.9200 A E
B D
7 C24,25(450X250) C F
MAIN 16 2 2 0.032 5.652 0.38 6.0000 24.0000
A B
MAIN 16 2 2 0.032 3.652 0.38 4.0000 16.0000
A B
MAIN 12 2 1 0.024 5.644 0.38 6.0000 12.0000 A E
MAIN 12 2 1 0.024 3.644 0.38 4.0000 8.0000 B A F DB
A E
B A DB
LINK 8 2 17 0.032 0.15 0.08 0.08 0.2780 9.4520 C F
STIRUPPS UPTO PLINTH LEVEL 8 2 17 0.08 0.35 0.15 0.35 0.15 0.08 0.08 1.0800 36.7200 A E
B D
8 C27,28(350x250) C F
MAIN 12 2 3 0.024 5.652 0.38 6.0080 36.0480
A B
MAIN 12 2 3 0.024 3.652 0.38 4.0080 24.0480
A B
STIRUPPS UPTO PLINTH 8 2 17 0.08 0.25 0.15 0.25 0.15 0.08 0.08 0.8800 29.9200 A E
LINK 8 2 17 0.032 0.15 0.08 0.08 0.2780 9.4520 B D
C F

LAP
1 C1,C7(350x250)
MAIN 12 2 3
C2,C3,C4,C5,C6,C8,C9,C10,C11,C12,C14,C15,C16,C17,C18(45 4 4.0000 24.0000
A B
2 0x250)
MAIN 16 15 3 4 4.0000 180.0000
A C B
3 C13(450x250)
MAIN 16 1 2 4 4.0000 8.0000
A B
MAIN 12 1 1 4 4.0000 4.0000
4 C19,20(450X250)
1 MAIN 16 2 2 4 4.0000 16.0000
A B
MAIN 12 2 1 4 4.0000 8.0000
A B
5 C21,22(350X250)
MAIN 16 2 2 4 4.0000 16.0000
A B
MAIN 12 2 1 4 4.0000 8.0000
A B
6 C23,26(350X250)
MAIN 16 2 2 4 4.0000 16.0000
A B
MAIN 12 2 1 4 4.0000 8.0000
A C B
7 C24,25(450X250)
MAIN 16 2 2 4 4.0000 16.0000
A B
MAIN 12 2 1 4 4.0000 8.0000 A E
B A C F DB
8 C27,28(350x250) C
MAIN 12 2 3 4 4.0000 24.0000
A B

SUPPORT 12 26 3 0.6 0.6000 46.8000

TOTAL LENGTH 619.2 0.0 340.9 630.0 0.0 0.0 METRE B A CE F DB


WT. OF STEEL 0.395 0.617 0.889 1.580 2.469 3.858 M/KGS
TOTAL WEIGHT 244.6 0.0 303.0 995.6 0.0 0.0 1543.2 KGS
IRCON INTERNATIONAL LIMITED
KATNI-SINGRAULI RAIL DOUBLING PROJECT (CONSTRUCTION OF RESIDENTIAL QUARTERS)

BBS FOR T IV, FULL BLOCK 93 SBC ( KHANNA BANJARI,VIJAYSOTA,BEOHARI, DUBRI KALAN, BARGAWAN) DRG. N0. ST-01
Number
S.NO of NO OF BEND CUTTING SHAPE
DESCRIPTI DIA OF BAR column BARS CORRECTION LENGTH OF BAR LENGTH DIA OF STEEL + LENGTH OF STEEL TOTAL WT. UNIT
A+B+C+D
A B C D E F +E+F-B.C 8 10 12 16 20 25
1 CG1 (350x250)
MAIN 12 4 3 0.024 3.644 0.38 4.0000 48.0000
MAIN 12 4 3 0.024 5.644 0.38 6.0000 72.0000
STIRUPPS 8 4 10 0.08 0.25 0.15 0.25 0.15 0.08 0.08 0.8800 35.2000 A E
LINK 8 4 10 0.032 0.15 0.08 0.08 0.2780 11.1200 B F D
C
2 CG2(450x250)
MAIN 12 8 3 0.024 3.644 0.38 4.0000 96.0000
A B
MAIN 12 8 3 0.024 5.644 0.38 6.0000 144.0000
STIRUPPS 8 8 10 0.08 0.25 0.15 0.25 0.15 0.08 0.08 0.8800 70.4000 A E
LINK 8 8 10 0.032 0.15 0.08 0.08 0.2780 22.2400 B F D
C
3 CG3(450x250)
MAIN 16 4 2 0.032 3.652 0.38 4.0000 32.0000
A B
MAIN 16 4 2 0.032 5.652 0.38 6.0000 48.0000
A B
MAIN 12 4 2 0.024 3.644 0.38 4.0000 32.0000
A B
STIRUPPS 8 4 10 0.08 0.35 0.15 0.35 0.15 0.08 0.08 1.0800 43.2000 A E
LINK 8 4 10 0.032 0.15 0.08 0.08 0.2780 11.1200 B F D
C

4 CG4(550x250)
MAIN 16 10 2 0.032 3.652 0.38 4.0000 80.0000
A B
MAIN 16 10 2 0.032 5.652 0.38 6.0000 120.0000
A B
MAIN 12 10 2 0.024 3.644 0.38 4.0000 80.0000
A B
MAIN 12 10 2 0.024 5.644 0.38 6.0000 120.0000
STIRUPPS 8 10 10 0.08 0.45 0.15 0.45 0.15 0.08 0.08 1.2800 128.0000 A E
B D
STIRUPPS 8 10 10 0.08 0.25 0.15 0.25 0.15 0.08 0.08 0.8800 88.0000 A CE F
B D
C F
5 CG5(450x250)
MAIN 16 4 2 0.032 3.652 0.38 4.0000 32.0000
A B
MAIN 16 4 2 0.032 5.652 0.38 6.0000 48.0000
A B
MAIN 12 4 2 0.024 3.644 0.38 4.0000 32.0000
A B
MAIN 12 4 2 0.024 5.644 0.38 6.0000 48.0000
A B
STIRUPPS 8 4 10 0.08 0.35 0.15 0.35 0.15 0.08 0.08 1.0800 43.2000 A E
B D
STIRUPPS 8 4 10 0.08 0.25 0.15 0.25 0.15 0.08 0.08 0.8800 35.2000 A CE F
B F D

6 CG6(550x250)
MAIN 16 4 2 0.032 3.652 0.38 4.0000 32.0000
A B
MAIN 16 4 2 0.032 5.652 0.38 6.0000 48.0000
A B
A B
MAIN 20 4 2 0.024 3.644 0.38 4.0000 32.0000
A B
MAIN 20 4 2 0.024 5.644 0.38 6.0000 48.0000
STIRUPPS 8 4 10 0.08 0.45 0.15 0.45 0.15 0.08 0.08 1.2800 51.2000 A E
B D
STIRUPPS 8 4 10 0.08 0.25 0.15 0.25 0.15 0.08 0.08 0.8800 35.2000 A CE F
B F D

7 CG7(550x250)
MAIN 16 2 2 0.032 3.652 0.38 4.0000 16.0000
A B
MAIN 16 2 2 0.032 5.652 0.38 6.0000 24.0000
A B
MAIN 12 2 2 0.024 3.644 0.38 4.0000 16.0000
A B
MAIN 12 2 2 0.024 5.644 0.38 6.0000 24.0000
STIRUPPS 8 2 10 0.08 0.45 0.15 0.45 0.15 0.08 0.08 1.2800 25.6000 A E
B D
STIRUPPS 8 2 10 0.08 0.25 0.15 0.25 0.15 0.08 0.08 0.8800 17.6000 A CE F
B F D

8 CG8(550x250)
MAIN 16 4 4 0.032 3.652 0.38 4.0000 64.0000
A B
MAIN 16 4 4 0.032 5.652 0.38 6.0000 96.0000
A B
STIRUPPS 8 4 10 0.08 0.45 0.15 0.45 0.15 0.08 0.08 1.2800 51.2000 A E
B D
STIRUPPS 8 4 10 0.08 0.25 0.15 0.25 0.15 0.08 0.08 0.8800 35.2000 A CE F
B F D

9 CG9(550x250)
MAIN 12 2 4 0.024 3.644 0.38 4.0000 32.0000
A B
MAIN 12 2 4 0.024 5.644 0.38 6.0000 48.0000
STIRUPPS 8 2 10 0.08 0.45 0.15 0.45 0.15 0.08 0.08 1.2800 25.6000 A E
B D
STIRUPPS 8 2 10 0.08 0.25 0.15 0.25 0.15 0.08 0.08 0.8800 17.6000 A CE F
B F D

0.9 SUPPORT 12 44 3 0.9 0.9000 118.8000

TOTAL LENGTH 746.9 0.0 910.8 640.0 80.0 0.0 METRE B A CE F DB


WT. OF STEEL 0.395 0.617 0.889 1.580 2.469 3.858 M/KGS
TOTAL WEIGHT 295.1 0.0 809.6 1011.4 197.5 0.0 2313.6 KGS
IRCON INTERNATIONAL LIMITED
KATNI-SINGRAULI RAIL DOUBLING PROJECT (CONSTRUCTION OF RESIDENTIAL
QUARTERS)

BBS FOR T IV HALF BLOCK, 93 SBC ( KHANNA BANJARI,VIJAYSOTA,BEOHARI, DUBRI KALAN, BARGAWAN) DRG. N0. ST-01
Number
S.NO of NO OF BEND CUTTING SHAPE
DESCRIPTI DIA OF BAR column BARS CORRECTION LENGTH OF BAR LENGTH DIA OF STEEL + LENGTH OF STEEL TOTAL WT. UNIT
A+B+C+D
A B C D E F +E+F-B.C 8 10 12 16 20 25
1 CG1 (350x250)
MAIN 12 3 3 0.024 3.644 0.38 4.0000 36.0000
MAIN 12 3 3 0.024 5.644 0.38 6.0000 54.0000
STIRUPPS 8 3 10 0.08 0.25 0.15 0.25 0.15 0.08 0.08 0.8800 26.4000 A E
B D
LINK 8 3 10 0.032 0.15 0.08 0.08 0.2780 8.3400 C F
2 CG2(450x250)
MAIN 12 4 3 0.024 3.644 0.38 4.0000 48.0000
A B
MAIN 12 4 3 0.024 5.644 0.38 6.0000 72.0000
STIRUPPS 8 4 10 0.08 0.25 0.15 0.25 0.15 0.08 0.08 0.8800 35.2000 A E
B D
LINK 8 4 10 0.032 0.15 0.08 0.08 0.2780 11.1200 C F
3 CG3(450x250)
MAIN 16 2 2 0.032 3.652 0.38 4.0000 16.0000
A B
MAIN 16 2 2 0.032 5.652 0.38 6.0000 24.0000
A B
MAIN 12 2 2 0.024 3.644 0.38 4.0000 16.0000
A B
STIRUPPS 8 2 10 0.08 0.35 0.15 0.35 0.15 0.08 0.08 1.0800 21.6000 A E
B D
LINK 8 2 10 0.032 0.15 0.08 0.08 0.2780 5.5600 C F

4 CG4(550x250)
MAIN 16 5 2 0.032 3.652 0.38 4.0000 40.0000
A B
MAIN 16 5 2 0.032 5.652 0.38 6.0000 60.0000
A B
MAIN 12 5 2 0.024 3.644 0.38 4.0000 40.0000
A B
MAIN 12 5 2 0.024 5.644 0.38 6.0000 60.0000
STIRUPPS 8 5 10 0.08 0.45 0.15 0.45 0.15 0.08 0.08 1.2800 64.0000 A E
B D
STIRUPPS 8 5 10 0.08 0.25 0.15 0.25 0.15 0.08 0.08 0.8800 44.0000 A CE F
B D
C F
5 CG5(450x250)
MAIN 16 3 2 0.032 3.652 0.38 4.0000 24.0000
A B
MAIN 16 3 2 0.032 5.652 0.38 6.0000 36.0000
A B
MAIN 12 3 2 0.024 3.644 0.38 4.0000 24.0000
A B
MAIN 12 3 2 0.024 5.644 0.38 6.0000 36.0000
A B
STIRUPPS 8 3 10 0.08 0.35 0.15 0.35 0.15 0.08 0.08 1.0800 32.4000 A E
B D
STIRUPPS 8 3 10 0.08 0.25 0.15 0.25 0.15 0.08 0.08 0.8800 26.4000 A CE F
B F D
6 CG6(550x250)
MAIN 16 4 2 0.032 3.652 0.38 4.0000 32.0000
A B
MAIN 16 4 2 0.032 5.652 0.38 6.0000 48.0000
A B
MAIN 20 4 2 0.024 3.644 0.38 4.0000 32.0000
A B
MAIN 20 4 2 0.024 5.644 0.38 6.0000 48.0000
STIRUPPS 8 4 10 0.08 0.45 0.15 0.45 0.15 0.08 0.08 1.2800 51.2000 A E
B D
STIRUPPS 8 4 10 0.08 0.25 0.15 0.25 0.15 0.08 0.08 0.8800 35.2000 A CE F
B F D

7 CG7(550x250)
MAIN 16 1 2 0.032 3.652 0.38 4.0000 8.0000
A B
MAIN 16 1 2 0.032 5.652 0.38 6.0000 12.0000
A B
MAIN 12 1 2 0.024 3.644 0.38 4.0000 8.0000
A B
MAIN 12 1 2 0.024 5.644 0.38 6.0000 12.0000
STIRUPPS 8 1 10 0.08 0.45 0.15 0.45 0.15 0.08 0.08 1.2800 12.8000 A E
B D
STIRUPPS 8 1 10 0.08 0.25 0.15 0.25 0.15 0.08 0.08 0.8800 8.8000 A CE F
B F D
8 CG8(550x250)
MAIN 16 2 4 0.032 3.652 0.38 4.0000 32.0000
A B
MAIN 16 2 4 0.032 5.652 0.38 6.0000 48.0000
A B
STIRUPPS 8 2 10 0.08 0.45 0.15 0.45 0.15 0.08 0.08 1.2800 25.6000 A E
B D
STIRUPPS 8 2 10 0.08 0.25 0.15 0.25 0.15 0.08 0.08 0.8800 17.6000 A CE F
B F D

9 CG9(550x250)
MAIN 12 2 4 0.024 3.644 0.38 4.0000 32.0000
A B
MAIN 12 2 4 0.024 5.644 0.38 6.0000 48.0000
STIRUPPS 8 2 10 0.08 0.45 0.15 0.45 0.15 0.08 0.08 1.2800 25.6000 A E
B D
STIRUPPS 8 2 10 0.08 0.25 0.15 0.25 0.15 0.08 0.08 0.8800 17.6000 A CE F
B F D

SUPPORT 12 26 3 0.9 0.9000 70.2000

TOTAL LENGTH 469.4 0.0 556.2 380.0 80.0 0.0 METRE B A CE F DB


WT. OF STEEL 0.395 0.617 0.889 1.580 2.469 3.858 M/KGS
TOTAL WEIGHT 185.4 0.0 494.4 600.5 197.5 0.0 1477.9 KGS
Name of work :-" Construction of residencial Building including approach Road & other miscellaneous work
between Vijay Sota to Niwas Road (including both station ) in connection with Katni- singrauli rail line Doubling
project (Pkg-2)
(Supply of Reinforcement steel)

PKG-2 (BEOHARI)
R.Bill No. -02
S.No. Sub S.No Particular Unit Quantity Remark

Schedule-III
Supplying reinforcement for R.C.C work including
1 1
straightening, cutting, bending, placing in position and
binding all complete
1A High yield strenth deformation bars TYPEII kg 31950.947
1A High yield strenth deformation bars TYPEIII kg 19187.849
1A High yield strenth deformation bars TYPE IV F kg 11857.523
1A High yield strenth deformation bars TYPE IV HALF kg 21864.494
1A High yield strenth deformation bars Boundary kg 6140.645

Total weight Kg 91001.457


PREVIOUS QTY Kg
THIS BILL QTY Kg 91001.457
IRCON INTERNATIONAL LIMITED
KATNI-SINGRAULI RAIL DOUBLING PROJECT
(CONSTRUCTION OF RESIDENTIAL QUARTERS)
BBS FOR BOUNDARY, 93 SBC ( KHANNA BANJARI,VIJAYSOTA,BEOHARI, DUBRI KALAN, BARGAWAN) DRG. N0. ST-01
BEND
S.NO DESCRIPTION DIA OF NOS NO OF CORRE LENGTH OF BAR CUTTING LENGTH OF STEEL TOTAL UNIT SHAPE
BAR BARS LENGTH WT.
CTION

A+B+C+D
A B C D E F 8 10 12 16 20 25
+E+F-B.C

FOOTING/
FOOTING/
COLUMN COLUMN
1 F (1250x1350x300)
BOTTOM MAIN 10 100 8 0.040 1.170 0.210 0.210 1.550 1240.000
B C
BOTTOM CROSS 10 100 7 0.040 1.270 0.210 0.210 1.650 1155.000 A
B C
BOTTOM MAIN SFR 10 100 4 1.170 1.170 468.000 A
BOTTOM CROSS SFR 10 100 4 1.270 1.270 508.000

2 C (300x200)
MAIN 12 120 3 0.024 3.644 0.38 4.0000 1440.0
A B
MAIN 12 120 3 0.024 5.644 0.38 6.0000 2160.0
A B
STIRUPPS UPTO PLINTH 8 120 17 0.08 0.2 0.1 0.2 0.1 0.08 0.08 0.6800 1387.20 A E
LINK 8 120 17 0.032 0.1 0.08 0.08 0.2280 465.12 B F D
C

SUPPORT 12 120 3 0.4 0.4000 144.00

TOTAL LENGTH 1852.3 3371.0 3744.0 0.0 0.0 0.0 METRE B A CE F DB


WT. OF STEEL 0.395 0.617 0.889 1.580 2.469 3.858 M/KGS
TOTAL WEIGHT 731.8 2080.9 3328.0 0.0 0.0 0.0 6140.6 KGS
STEEL RECONCILIATION
S.NO DESCRIPTION LENGTH OF STEEL TOTAL N0. Total weight Unit

8 10 12 16 20 25

1 Type ll footing 1767 618 357 2743 7 19201 KG


2 Type ll Column 245 287 1290 1822 7 12751 KG
3 Plinth ll 401 468 350 258 100 1577 2 3155 KG
4 Column above plinth 243 187 988 1418 1 1418 KG
5 Type lll footing 2805 448 3254 4 13015 KG
6 Type lll Column 245 303 996 1543 4 6173 KG
7 Type lV Footing full block 6920 2624 9544 1 9544 KG
8 Type lV Column full block 295 810 1011 198 2314 1 2314 KG
9 Type lV Footing half block 4006 1804 5810 3 17431 KG
10 Type lV Column half block 185 494 601 198 1478 3 4433 KG
11 Footing Boundary Wall 6 28 34 205 6929 KG
12 Column Boundary Wall 29 29 232 6682 KG

13 Steel available 5120 2756 1344 2844 326 12390 1 12390 KG

Total steel = 115435 KG