Jadwal Penerapan Materi yg di sampaikan :

1. Pengenalan Proyek secara Umum :


- Kepemilikan & Organisasi di dalam Proyek :
o Owner
o Consultant Engineer
o Owner Engineer
o Mainkon
o Subcon
o Mandor

- Jenis Jenis Pembangkit & Ciri Khasnya :


o PLTU : Pembangkit Listrik Tenaga Uap : Coal Fire Steam Power Plant
o PLTGU : Pembangkit Listrik Tenaga Gas Uap : Combine Cycle Power Plant
o PLTA : Pelambangkit Listrik Tenaga Air : Hydro Power Plant
o PLTP : Pembangkit Listrik Tenaga Panas Bumi : Geothermal Power Plant
o PLTG : Pembangkit Listrik Tenaga Gas : Simpe Cycle Power Plant
- Jenis Jenis disiplin ilmu didalam Proyek Pembangkit : Civil, Mechanical, Piping, Electrical, I&C

- Jenis jenis pekerjaan Mechanical (sub disiplin mechanical) :


o Rotating Equipment
o Static Equipment
o Storage Tank
o Pipeline
o Pipe Work
o Ducting
o Stack (chimney)
o Conveyor dll.

- Jenis jenis Pekerjaan Civil di Pembangkit :


o Water Intake : Tempat masuknya pengolahan Air
o Building : Main House, WTP Building, CCR Building, Pump House, WWTP Building,
Electrical Building.
o Stukture Besi / Steel Structure : Warehouse, Piperack, Support Cable Tray.
o Jetty : pelabuhan untuk bongkar Batu bara
o Pondasi Pipe Sleeper : Tempat duduknya pipa
o Pondasi Equipment / Equipment Foundation
o Pondasi Storage Tank
o Akses Jalan
o Drainage / Pembuangan Air
o Pagar ( Fance)
o Cooling Tower

- Jenis jenis pekerjaan Electrical :


o Generator Step-up Transformer (GSUT)
o Unit Auxiliary Transformer (UAT)
o Generator Circuit Breaker (GCB)
o Medium Voltage Switchgear
o Non Segregated Phase Bus Ducts
o Power Control Centre
o Low Voltage Motors
o Station Batteries & Chargers
o Unit Metering & Protection Panel
o Lighting Sysytem
o Plant Communication System
o Cathodic Protection System
o Cable and Cabling system
o Grounding and Lighting protection system
o Closed Circuit Television system (CCTV) for security

2. Pengenalan tentang Dokumen Proyek :


- Drawing :
Plot Plan, Arrangement Drawing, Detail Drawing, P&ID, Isomatric Drawing, Piping Arrangement
Drawing.
- Specification project
- Piping List
- Procedure Installation
- ITP (Inspection & Test Plan)
- WPS & PQR
- Progress Report
- Daily Report
- Master Schedule Project
- JSA Job Safety Analysis
- Permit
- Dll.

3. Pengenalan Tentang System yg ada di Proyek Power Plant.


- BOP (Balance of Plant ) System
- Coal Handling System
- Ash Handling System
- Boiler System
- Turbine & Generator System
- Flue Gas Duct System

4. Siklus (Cycle) di Pembangkit :


- Siklus Air (Water System)
- Siklus Udara (Air System)
- Siklus Minyak (Fuel Oil System)
- Siklus Batu Bara (Coal Handling System)
- Siklus Gas (Flue Gas System)
- Siklus Debu (Ash Handling System)
- Siklus Pelumas (Lube Oil System)
- Siklus Uap (Steam System)

5. Mempelajari tentang Cara Installasi, Inspeksi, Test & Commisioning:


- Piping Work
- Rotating Equipment
- Static Equipment
- Storage Tank
- Coal Conveyor

6. Mempelajaritentang PENGELASAN atau Welding dan permasalahnnya :

7. Mempelajari tentang PAINTING

8. Mengenal tentang Istilah Istilah di Proyek Pemangkit

9. MempelajariTentang pembuatan (TOP) TEST PACKET & Turn over Packet untuk Hand over Finish
Project .

10. Belajar menyelesaikan masalah di Proyek.

11. Pengenalan Tentang Tugasdan Tanggung Jawab seorang Engineer, QC & Supervisor Proyek.