You are on page 1of 3

Title of the journal A digital construction framework integrating building information

modeling and reverse engineering technologies for renovation


projects

DOI https://doi.org/10.1016/j.autcon.2019.02.012

The Author Zhikun Ding, Shan Liu, Longhui Liao, Liang Zhang

Purpose This study proposes a digital construction framework that


integrates building information modeling (BIM) and reverse
engineering (RE) to improve information utilization in different
phases and thus reduce mistakes and reworks in renovation projects
during urban renewal.
Object/Subject Three-dimensional (3D) laser scanning is used to enable the RE
process. This framework also incorporates supporting technologies
(virtual reality, 3D printing, and prefabrication) for a better
understanding of design and construction as well as tools (work
breakdown structure and model breakdown structure) for enhanced
organization and management quality.
Method Implementing this proposed framework in a renovated shopping
center in Hainan, China optimized efficiency of the renovation
process by 15%, eliminated design changes by 30% and reworks by
25%, and finally saved two months and 7.41% of cost regarding the
steel structure canopy. (Method Kuantitatif)
Results/Findings Thus, this framework can proactively reduce occurrences of mistakes
and reworks during the renovation process, greatly improving the
effectiveness of urban renewal.

Abstrac
A digital construction framework integrating building information modeling and
reverse engineering technologies for renovation projects

This study proposes a digital construction framework that integrates building information


modeling (BIM) and reverse engineering (RE) to improve information utilization in different
phases and thus reduce mistakes and reworks in renovation projects during urban renewal.
Three-dimensional (3D) laser scanning is used to enable the RE process. This framework also
incorporates supporting technologies (virtual reality, 3D printing, and prefabrication) for a
better understanding of design and construction as well as tools (work breakdown structure
and model breakdown structure) for enhanced organization and management quality.
Implementing this proposed framework in a renovated shopping center in Hainan, China
optimized efficiency of the renovation process by 15%, eliminated design changes by 30%
and reworks by 25%, and finally saved two months and 7.41% of cost regarding the steel
structure canopy. Thus, this framework can proactively reduce occurrences of mistakes and
reworks during the renovation process, greatly improving the effectiveness of urban renewal.

Arti :
Kerangka kerja konstruksi digital yang mengintegrasikan pemodelan informasi
bangunan dan teknologi rekayasa balik untuk proyek renovasi

Studi ini mengusulkan kerangka kerja konstruksi digital yang mengintegrasikan pemodelan
informasi bangunan (BIM) dan reverse engineering (RE) untuk meningkatkan pemanfaatan
informasi dalam fase yang berbeda dan dengan demikian mengurangi kesalahan dan
pengerjaan ulang dalam proyek renovasi selama pembaruan perkotaan. Pemindaian laser tiga
dimensi (3D) digunakan untuk mengaktifkan proses RE. Kerangka kerja ini juga
menggabungkan teknologi pendukung (realitas virtual, pencetakan 3D, dan prefabrikasi)
untuk pemahaman yang lebih baik tentang desain dan konstruksi serta alat (struktur rincian
kerja dan struktur rincian model) untuk meningkatkan kualitas organisasi dan manajemen.
Menerapkan kerangka kerja yang diusulkan ini di pusat perbelanjaan yang telah direnovasi di
Hainan, Cina mengoptimalkan efisiensi proses renovasi sebesar 15%, menghilangkan
perubahan desain sebesar 30% dan pengerjaan ulang sebesar 25%, dan akhirnya menghemat
dua bulan dan 7,41% biaya terkait kanopi struktur baja . Dengan demikian, kerangka kerja ini
dapat secara proaktif mengurangi terjadinya kesalahan dan pengerjaan ulang selama proses
renovasi, sangat meningkatkan efektivitas pembaruan perkotaan.

You might also like