and Ilajue.
up to the boundary between Osun and Oyo State at Ilajue lying within latitudes
B—98
Figure B.41: Location of Project Site.
B—99
(d) Project Size
The project covers a length of 5 km
Second Order.
(g) Client:
The project was executed for the Office of the Surveyor General of Osun State to
of the survey were executed in line with SURCON’s Specification for Geodetic
Surveys in Nigeria.
The project documentation contains details of planning made for the survey,
B—100
(i) Project Personnel
The personnel for the execution of the project include a collection of 2
The role of each personnel for this project is listed in the column named
satellite data acquisition and processing and the project determination of the
B—101
B.42 Project Certification
I hereby certify that all the information given in the above named project were
obtained as a result of observations and measurements made by me and that
the Survey was carried out in accordance with the Survey Laws and Regulations.
I solemnly declare that I will abide by all the Regulations governing the conduct
of the Surveyor Council of Nigeria Professional Examination and any false
information given in this project shall automatically disqualify me for the
Examination and the decision of the Council shall be final.
B—102
B.43 Certificate of Attestation
SURVEYORS COUNCIL OF NIGERIA (SURCON)
CERTIFICATE OF ATTESTATION
I hereby declare that he has conducted himself with due diligence, honesty and
sobriety on the said duties and accept liability for any false information
discovered in this project report. I will solemnly accept and abide by any
sanctions instituted against me by the Surveyors Council of Nigeria as a result
of any such false information.
Date: ……………………..……………………
B—103
B.44 Abstract
The purpose of the project was to carry out a horizontal and vertical control
Ilajue in Oyo State to provide reference for cadastral and engineering surveys in
instructions from the Office of the Surveyor General, Osun State. The survey
was carried out using three HuaceNav S-GPS receivers on 18 survey beacons
all the baselines after their normal residuals had been analyzed using datum
controls OSY 026, OSY 027, and OSY 028. Results of the adjustment shows the
final adjusted grid coordinates and heights of the project controls in UTM Zone
accuracy of all points were within ±(2.5 +1×10-6×D)mm while vertical accuracy of
B—104
B.45 Planning for Survey and Satellite Observations
A lot of effort was made before the execution of the project so it will be within
the project scope. The key steps in the planning process were hinged on the
following:
execution.
observations to satellite signals with adequate GPS receivers is one method that
can be used for horizontal and vertical control surveys with high accuracy and
using the baseline solution method for second order surveys, however, three
single frequency receivers manufactured by CHC HuaceNav was selected for use
B—105
It is essential to ensure that every survey instrument is in good working
of the instruments was setup to occupy the known point for about 10 minutes
the computer from which the GPS Processing software was used to inspect the
data. The result displayed the correct time, approximate position and date of
observation. This indicated that all the S-GPS Receivers were in good working
in the project area that had a better accuracy estimate of First Order to serve as
datum control for the project. Control Station YSO 26 was closest to the project
site however, on visit to the location, the beacon had been destroyed hence the
project relied on the next closest control station - OSY 027 after its stability and
values had been confirmed by observation in a 3D test net using OSY 026 and
Their WGS84 datum coordinates listed below, were collected from the Office of
the Surveyor General, Osun State so that measurements obtained from the
survey which is based on WGS 84 datum will be transformed to Clarke 1880 RGS
B—106
The Master of the S-GPS Receivers was set up on OSY 026 and was switched on
for satellite tracking and data collection. 1 Rover of the S-GPS receiver was set
on control monument OSY 027 and allowed to observe for about 30 minutes to
ensure that enough ephemeris data had been gathered on each station. The
Master receiver was transferred to OSY 028 and another rover was used to
occupy OSY 027. The observed data were transferred and processed using the
GPS Processing software. The final coordinates were checked for discrepancies
The result suggested that that the control station OSY 026, OSY 027 and OSY
028 are in situ and could be used as datum control for the project.
secondly on the field. At the office the existing map of the project site was used
to select possible locations such that the controls span the extent of 5km and at
least 3 controls are located within every 1.5km as required by the office of the
Surveyor General. The location of the selected points were noted and
B—107
alia SURCON requirements of not less than 100m between adjacent stations was
ensured in selecting the final station on the field. The stations selected were
The recee diagram drawn during this stage is shown in Appendix B.41
carry out the survey that was shown in the recce diagram. Consequently, the
approval to carry out the project was issued and 18 beacon numbers (OCSS 95 –
The concrete mix was in the ratio of 1:2:3 (1-headpan of cement, 2-headpan of
gravel and 3-headpan of sharp sand). The beacons were cast such that 110cm of
the entire length was buried underground with 40cm of the length above the
ground surface. An iron rod or spike of 12mm in diameter and 150cm in length
was used to define the center of each beacon. The survey control monuments
were stamped with the 18 beacon numbers, one for each serially.
Bearing and distance measurements were made from the stations to all
reference marks and objects such as road, electric pole, building, etc within the
vicinity of the survey beacons, recorded and sketched on the description sheets
B—108
40cm
Ground level
110cm
B—109
(f) Scheduling for Best Satellite Observation Day and Time.
The scheduling of the satellite observation was carried out using the online
and period of the day was appropriate and conducive for the survey. The
requirements are:
B—110
B.46 Satellite Observation
The satellite observations were carried out on the planned dates through the
OCSS 112) using the three S-GPS receivers selected for the project. The
subsidiary Control had been introduced to reduce the distance between the
datum control and the project controls, hence improve accuracy of satellite
At each control and independent occupation, batteries were placed into the
receiver to use and mounted onto the tribrach. The tripod is then centered on
the station using a plumbob and leveled using the footscrews. The height from
the tip of the rod of the station is measured up to the antenna phase centre to
obtain the antenna height which was alongside with other information recorded
in a field book. The receiver is then switched on and it was ensured that the
period of observation corresponded with the distance between the master and
the rover receiver to achieve second order accuracy. All necessary information
In the first group of observation, the master receiver was set on datum control
OSY 027 and one rover set at the subsidiary control OCSS 95. The master
B—111
In the second group of observations, the master was set on OCSS 97 while the
rovers were set to occupy the rest of the project controls OCSS 96 and OCSS 98 –
OSC 112.
The observation data collected during the observation are stored in the internal
memory of the receivers by default and these datasets were transferred to the
B—112
B.47 Static Satellite Data Processing
The computation and analysis of the coordinates of the control points was done
using the GPS processing software after the performance of the satellite
field procedures were okay. The following steps were taken during the
processing.
The parameters peculiar to the project was specified in the software. These
parameters include the project details of name, surveyor and date. The project
coordinate system was set to conform to WGS84 datum which the S-GPS was
The time system of the project was aligned with that of the receivers (UTC +1).
Also units were set to meters (3 decimal places) and angle formats were set to
Finally here it was specified that the minimum duration of observation to accept
for baseline processing should not be less than 45 minutes when satellites
specifications).
The observation data which had been transferred to the computer via FTP were
imported to the Project that had been defined. During the import, Point names
and Antenna Height were edited to fit the station descriptions as recorded in the
field book. The observation data were examined to be certain that there were no
B—113
Step 3: Baseline Processing
After the import of observation data, baseline processing parameters were set
satellites (<300), Data Sampling rate (30secs), Minimum epoch (4) and Ephemeris
(Broadcast). The software is then set to process all the baselines in the project.
At this stage, all baselines that does not fit into the specifications were
eliminated from the project, in which case none for the project.
Step 5: Adjustment
A minimally constrained adjustment was carried out on all the baselines that fit
the specification after their normal residuals had been analyzed to reveal poor
baselines that should be removed from the adjustment, in which case none for
the project.
The adjustment was constrained by fixing the coordinates of the datum control
OSY 027 for the first group of observations to its existing coordinates and the
Results of the static satellite data processing were exported to Microsoft word
and summarized in Appendix B.44. Table B.43 shows the final adjusted grid
B—114
Table B.43 Adjusted Grid Coordinates and Height in WGS84
The final adjusted WGS84 coordinates were transformed to Clarke 1880 RGS
coordinates using the ArcMap 10.3 GIS software. The Clarke 1880 RGS
coordinates of the control points are listed in Table B.44. The GIS software is
between the registered WGS84 and Clarke 1880 RGS Height of OSY 027 which
B—115
Table B.44: Adjusted Coordinates and Height in Clarke 1880 RGS
The plan showing the relative horizontal position of the control points were
produced using ArcGIS 10.3 at a scale of 1:10,000. They were also published
B—116
B.48 Project Analysis
(a) Accuracy Assessment
For the project the Horizontal accuracy of all points were within ±(2.5 +1×10-
6
×D)mm while vertical accuracy of all points within ± (5 +1×10-6×D)mm at the
confidence level of 95% which were within the stated specification for Second
Order Surveys.
Total N36,511.12
-2 x Surveyor x 3 days N47,668.98
-2 x Technical Officers x 3 days N39,256.80
2.0 Monumentation -2 x Skilled Labour x 3 days N12,235.98
18 beacons (Materials)
- 12mm Iron rod (3 Lengths) N10,000.00
- 6 bags of cement N15,000.00
- Gravel (Half load) N6,000.00
- Sand (Half load) N3,000.00
B—117
Project Component Cost Parameters Rate
Total N48,975.26
4.0 Data Processing -1 x Surveyor N7,944.83
-1 x Technical Officer N6,542.80
- Computer / Accessories N10,000.00
-Refreshment
Total N24,487.63
-1 x Surveyor N7,944.83
5.0 Plotting & -1 x Technical Officer N6,542.80
Draughting - Computer / Accessories N10,000.00
Total N24,487.63
- 1 x Surveyor N7,944.83
-1 x Technical Officer N6,542.80
6.0 Technical Report - Computer / Accessories N10,000.00
- Printing Materials N5,000.00
Total N29,487.63
Grand Total N336,111.03
B—118
(c) Conclusion and Recommendations
the reference controls but it was not clear what was responsible for this.
Office of the Surveyor General both in hard and soft copies. The project also
submitted the plan in web formats to enable a faster and quicker access to
B—119
B.49 References
SURCON (2008): Specifications for Geodetic Surveys in Nigeria.
NIS (2008): Professional Scale of Fees. Nigerian Institution of Surveyors.
B—120
Appendices B.41: Recce Diagram for Control Survey
CERTIFICATION
I certify that all the information given here was
obtained as a result of survey duties carried out
by me in accordance with Survey Laws and
Regulations.
Name: Olayanju Oluwafemi Abodunde
Signature: ………………………………………….
Date: …….…………………………………………..
ATTESTATION
I certify that these survey duties were carried
out under my supervision and the records
herein are true copies of the original.
Name: Surv. J.O. Oluborode (mnis)
Address: Toshmap Global Multi-Ent., Ile-Ife,
Registration No: 630 Year: 1989
Signature: …………………………………………..
Date: …………………………………………..........
B—121
Appendix B.42: Control Station Description Sheets
- CERTIFICATION ATTESTATION
I certify that all the information given here was I certify that these survey duties were carried
obtained as a result of survey duties carried out out under my supervision and the records
by me in accordance with Survey Laws and herein are true copies of the original.
Regulations. Name: Surv. J.O. Oluborode (mnis)
Name: Olayanju Oluwafemi Abodunde Address: Toshmap Global Multi-Ent., Ile-Ife,
Registration No: 630 Year: 1989
Signature: ………………………………………….
Signature: …………………………………………..
Date: …….………………………………………….. Date: …………………………………………..........
B—122
CERTIFICATION ATTESTATION
I certify that all the information given here was I certify that these survey duties were carried
obtained as a result of survey duties carried out out under my supervision and the records
by me in accordance with Survey Laws and herein are true copies of the original.
Regulations. Name: Surv. J.O. Oluborode (mnis)
Name: Olayanju Oluwafemi Abodunde Address: Toshmap Global Multi-Ent., Ile-Ife,
Registration No: 630 Year: 1989
Signature: ………………………………………….
Signature: …………………………………………..
Date: …….………………………………………….. Date: …………………………………………..........
B—123
CERTIFICATION ATTESTATION
I certify that all the information given here was I certify that these survey duties were carried
obtained as a result of survey duties carried out out under my supervision and the records
by me in accordance with Survey Laws and herein are true copies of the original.
Regulations. Name: Surv. J.O. Oluborode (mnis)
Name: Olayanju Oluwafemi Abodunde Address: Toshmap Global Multi-Ent., Ile-Ife,
Registration No: 630 Year: 1989
Signature: ………………………………………….
Signature: …………………………………………..
Date: …….…………………………………………..
Date: …………………………………………..........
B—124
CERTIFICATION ATTESTATION
I certify that all the information given here was I certify that these survey duties were carried
obtained as a result of survey duties carried out out under my supervision and the records
by me in accordance with Survey Laws and herein are true copies of the original.
Regulations. Name: Surv. J.O. Oluborode (mnis)
Name: Olayanju Oluwafemi Abodunde Address: Toshmap Global Multi-Ent., Ile-Ife,
Registration No: 630 Year: 1989
Signature: ………………………………………….
Signature: …………………………………………..
Date: …….………………………………………….. Date: …………………………………………..........
B—125
CERTIFICATION ATTESTATION
I certify that all the information given here was I certify that these survey duties were carried
obtained as a result of survey duties carried out out under my supervision and the records
by me in accordance with Survey Laws and herein are true copies of the original.
Regulations. Name: Surv. J.O. Oluborode (mnis)
Name: Olayanju Oluwafemi Abodunde Address: Toshmap Global Multi-Ent., Ile-Ife,
Registration No: 630 Year: 1989
Signature: ………………………………………….
Signature: …………………………………………..
Date: …….…………………………………………..
Date: …………………………………………..........
B—126
CERTIFICATION ATTESTATION
I certify that all the information given here was I certify that these survey duties were carried
obtained as a result of survey duties carried out out under my supervision and the records
by me in accordance with Survey Laws and herein are true copies of the original.
Regulations. Name: Surv. J.O. Oluborode (mnis)
Name: Olayanju Oluwafemi Abodunde Address: Toshmap Global Multi-Ent., Ile-Ife,
Signature: …………………………………………. Registration No: 630 Year: 1989
Signature: …………………………………………..
Date: …….…………………………………………..
Date: …………………………………………..........
B—127
CERTIFICATION ATTESTATION
I certify that all the information given here was I certify that these survey duties were carried
obtained as a result of survey duties carried out out under my supervision and the records
by me in accordance with Survey Laws and herein are true copies of the original.
Regulations. Name: Surv. J.O. Oluborode (mnis)
Name: Olayanju Oluwafemi Abodunde Address: Toshmap Global Multi-Ent., Ile-Ife,
Registration No: 630 Year: 1989
Signature: ………………………………………….
Signature: …………………………………………..
Date: …….………………………………………….. Date: …………………………………………..........
B—128
CERTIFICATION ATTESTATION
I certify that all the information given here was I certify that these survey duties were carried
obtained as a result of survey duties carried out out under my supervision and the records
by me in accordance with Survey Laws and herein are true copies of the original.
Regulations. Name: Surv. J.O. Oluborode (mnis)
Name: Olayanju Oluwafemi Abodunde Address: Toshmap Global Multi-Ent., Ile-Ife,
Registration No: 630 Year: 1989
Signature: ………………………………………….
Signature: …………………………………………..
Date: …….………………………………………….. Date: …………………………………………..........
B—129
CERTIFICATION ATTESTATION
I certify that all the information given here was I certify that these survey duties were carried
obtained as a result of survey duties carried out out under my supervision and the records
by me in accordance with Survey Laws and herein are true copies of the original.
Regulations. Name: Surv. J.O. Oluborode (mnis)
Name: Olayanju Oluwafemi Abodunde Address: Toshmap Global Multi-Ent., Ile-Ife,
Registration No: 630 Year: 1989
Signature: ………………………………………….
Signature: …………………………………………..
Date: …….………………………………………….. Date: …………………………………………..........
B—130
CERTIFICATION ATTESTATION
I certify that all the information given here was I certify that these survey duties were carried
obtained as a result of survey duties carried out out under my supervision and the records
by me in accordance with Survey Laws and herein are true copies of the original.
Regulations. Name: Surv. J.O. Oluborode (mnis)
Name: Olayanju Oluwafemi Abodunde Address: Toshmap Global Multi-Ent., Ile-Ife,
Registration No: 630 Year: 1989
Signature: ………………………………………….
Signature: …………………………………………..
Date: …….………………………………………….. Date: …………………………………………..........
B—131
CERTIFICATION ATTESTATION
I certify that all the information given here was I certify that these survey duties were carried
obtained as a result of survey duties carried out out under my supervision and the records
by me in accordance with Survey Laws and herein are true copies of the original.
Regulations. Name: Surv. J.O. Oluborode (mnis)
Name: Olayanju Oluwafemi Abodunde Address: Toshmap Global Multi-Ent., Ile-Ife,
Registration No: 630 Year: 1989
Signature: ………………………………………….
Signature: …………………………………………..
Date: …….………………………………………….. Date: …………………………………………..........
B—132
CERTIFICATION ATTESTATION
I certify that all the information given here was I certify that these survey duties were carried
obtained as a result of survey duties carried out out under my supervision and the records
by me in accordance with Survey Laws and herein are true copies of the original.
Regulations. Name: Surv. J.O. Oluborode (mnis)
Name: Olayanju Oluwafemi Abodunde Address: Toshmap Global Multi-Ent., Ile-Ife,
Registration No: 630 Year: 1989
Signature: ………………………………………….
Signature: …………………………………………..
Date: …….………………………………………….. Date: …………………………………………..........
B—133
CERTIFICATION ATTESTATION
I certify that all the information given here was I certify that these survey duties were carried
obtained as a result of survey duties carried out out under my supervision and the records
by me in accordance with Survey Laws and herein are true copies of the original.
Regulations. Name: Surv. J.O. Oluborode (mnis)
Name: Olayanju Oluwafemi Abodunde Address: Toshmap Global Multi-Ent., Ile-Ife,
Registration No: 630 Year: 1989
Signature: ………………………………………….
Signature: …………………………………………..
Date: …….………………………………………….. Date: …………………………………………..........
B—134
CERTIFICATION ATTESTATION
I certify that all the information given here was I certify that these survey duties were carried
obtained as a result of survey duties carried out out under my supervision and the records
by me in accordance with Survey Laws and herein are true copies of the original.
Regulations. Name: Surv. J.O. Oluborode (mnis)
Name: Olayanju Oluwafemi Abodunde Address: Toshmap Global Multi-Ent., Ile-Ife,
Registration No: 630 Year: 1989
Signature: ………………………………………….
Signature: …………………………………………..
Date: …….………………………………………….. Date: …………………………………………..........
B—135
CERTIFICATION ATTESTATION
I certify that all the information given here was I certify that these survey duties were carried
obtained as a result of survey duties carried out out under my supervision and the records
by me in accordance with Survey Laws and herein are true copies of the original.
Regulations. Name: Surv. J.O. Oluborode (mnis)
Name: Olayanju Oluwafemi Abodunde Address: Toshmap Global Multi-Ent., Ile-Ife,
Registration No: 630 Year: 1989
Signature: ………………………………………….
Signature: …………………………………………..
Date: …….………………………………………….. Date: …………………………………………..........
B—136
CERTIFICATION ATTESTATION
I certify that all the information given here was I certify that these survey duties were carried
obtained as a result of survey duties carried out out under my supervision and the records
by me in accordance with Survey Laws and herein are true copies of the original.
Regulations. Name: Surv. J.O. Oluborode (mnis)
Name: Olayanju Oluwafemi Abodunde Address: Toshmap Global Multi-Ent., Ile-Ife,
Registration No: 630 Year: 1989
Signature: ………………………………………….
Signature: …………………………………………..
Date: …….…………………………………………..
Date: …………………………………………..........
B—137
CERTIFICATION ATTESTATION
I certify that all the information given here was I certify that these survey duties were carried
obtained as a result of survey duties carried out out under my supervision and the records
by me in accordance with Survey Laws and herein are true copies of the original.
Regulations. Name: Surv. J.O. Oluborode (mnis)
Name: Olayanju Oluwafemi Abodunde Address: Toshmap Global Multi-Ent., Ile-Ife,
Registration No: 630 Year: 1989
Signature: ………………………………………….
Signature: …………………………………………..
Date: …….…………………………………………..
Date: …………………………………………..........
B—138
CERTIFICATION ATTESTATION
I certify that all the information given here was I certify that these survey duties were carried
obtained as a result of survey duties carried out out under my supervision and the records
by me in accordance with Survey Laws and herein are true copies of the original.
Regulations. Name: Surv. J.O. Oluborode (mnis)
Name: Olayanju Oluwafemi Abodunde Address: Toshmap Global Multi-Ent., Ile-Ife,
Registration No: 630 Year: 1989
Signature: ………………………………………….
Signature: …………………………………………..
Date: …….…………………………………………..
Date: …………………………………………..........
B—139
Appendix B.43: Field Records
CERTIFICATION
I certify that all the information given here was
obtained as a result of survey duties carried out
by me in accordance with Survey Laws and
Regulations.
Signature: ………………………………………….
Date: …….…………………………………………..
ATTESTATION
I certify that these survey duties were carried
out under my supervision and the records
herein are true copies of the original.
Name: Surv. J.O. Oluborode (mnis)
Address: Toshmap Global Multi-Ent., Ile-Ife,
Registration No: 630 Year: 1989
Signature: …………………………………………..
Date: …………………………………………..........
B—140
Appendix B.44: Satellite Data Processing Results
Project Attribute
Project Datum: WGS84 Project Name: Transverse Mercator Projection
Coordinate unit: m Height Units: m Distance Units: m
Coordinate System
Ellipsoid Name: WGS84 Major Axis(a): 6378137.000m
Flattening Reciprocal(1/f): 298.2572236000 Projection Method: Transverse
Mercator Projection Central Meridian(L0): 003°00'00.000000"E
Original Latitude: 00°00'00.000000"N Average Latitude: 00°00'00.000000"N
Projection Scale: 1.000000 Projection Height: 0.000m
North Additive Constant(n): 0.000m East Additive Constant(e): 500000.000m
Observation Files
Session 1
NO. Station Duration Antenna Height(m) Receiver
1 OSY 027 00:47:43 1.455 Master – 003863
2 OCSS 95 00:41:17 1.501 Master – 003863
3 OCSS 97 00:49:12 1.188 Rover - 101582
4 OCSS 95 00:48:41 1.509 Rover - 101594
Session 2
NO. Station Duration Antenna Height(m) Receiver
1 OSY 027 00:43:48 1.403 Master – 003863
2 OCSS 95 00:49:18 1.201 Rover – 101594
3 OCSS 97 00:48:54 1.101 Rover – 101594
4 OCSS 95 00:47:52 1.200 Master – 003863
Session 1
Horizontal Vertical D
Ellipsoid
Baseline ID Precision Precision Azimuth Ellipsoid
Dist.(m)
HDOP(m) VDOP(m) Height(m)
B1(OSY 027->OCSS 95) 0.0009 0.0003 310°33'46.22538" 5994.959 -10.364
B2(OCSS 95->OCSS 97) 0.0016 0.0004 322°43'29.24622" 5763.748 52.059
Session 2
Horizontal Vertical D
Ellipsoid
Baseline ID Precision Precision Azimuth Ellipsoid
Dist.(m)
HDOP(m) VDOP(m) Height(m)
B1(OSY 027->OCSS 95) 0.0012 0.0004 310°33'49.89696" 5995.598 -10.194
B2(OCSS 95->OCSS 97) 0.0015 0.0005 142°43'29.95550" 5763.112 -51.891
B—141
Control Points
Number of Points: 3 (OSY 027, OCSS 95, OCSS 97)
Number of Control Points: 1 (OSY 027)
Point ID Type North(m) East(m) Height(m) WGS84 Coordinates
OSY 027 NEh 862020.521 669938.776 338.156
Adjustment Statistics
#Iterations for Successful Adjustment: 2
Precision Confidence Level: 2 sigma
Translation Parameters
Session 1
DX(m) -343.992
DY(m) -69.117
Rotation Angle 000°00'00.00000"
Scale 0.000000
Session 2
DX(m) -343.344
DY(m) -68.337
Rotation Angle 000°00'00.00000"
Scale 0.000000
Adjusted Baselines
Session 1
Observation ID DN(m) Std.DN(m) DE(m) Std.DE(m)
B1 ( OSY 027-> OCSS 95 ) 3899.563 0.000 -4555.675 0.001
B2 ( OCSS 95->OCSS 97) 4587.501 0.001 -3491.603 0.001
Session 2
Observation ID DN(m) Std.DN(m) DE(m) Std.DE(m)
B1 ( OSY 027-> OCSS 95 ) 3900.058 0.000 -4556.089 0.001
B2 ( OCSS 95->OCSS 97) -4587.006 0.001 3491.202 0.001
Session 1
Point ID North(m) East(m)
OSY 027 862020.521 669938.776
OCSS 95 865920.084 665383.101
OCSS 97 870507.585 661891.498
Session 2
Point ID North(m) East(m)
OSY027 862020.521 669938.776
OCSS 95 865920.579 665382.687
OCSS 97 870507.585 661891.485
B—142
Coordinate Change
Session 1
Point ID Delt.North(m) Delt.East(m) Delt.Ellipsoid Height(m)
OSY 027 0.000 0.000 6.231
OCSS 95 -0.248 0.469 4.874
OCSS 97 -0.248 0.469 4.873
Session 2
Point ID Delt.North(m) Delt.East(m) Delt.Ellipsoid Height(m)
OSY027 0.000 0.000 4.073
OCSS 95 0.000 0.000 4.073
OCSS 97 -0.718 -0.362 2.575
Error Ellipse
Session 1
Point ID Semi-major Axis(m) Semi-minor Axis(m) Azimuth
OSY 027 0.000 0.001 079°08'57.69234"
OCSS 95 0.000 0.000 084°36'54.72145"
OCSS 97 0.001 0.001 087°55'39.96366"
Session 2
Point ID Semi-major Axis(m) Semi-minor Axis(m) Azimuth
OSY027 0.000 0.000 062°34'53.31569"
OCSS 95 0.000 0.000 071°28'26.87305"
OCSS 97 0.000 0.000 075°30'16.74259"
Height Fitting
Session 1
Fitting Equation H = H0 +A
A 5.326129
Session 2
Fitting Equation H = H0 +A
A 3.573582
CERTIFICATION ATTESTATION
I certify that all the information given here was I certify that these survey duties were carried
obtained as a result of survey duties carried out out under my supervision and the records
by me in accordance with Survey Laws and herein are true copies of the original.
Regulations. B—143 Name: Surv. J.O. Oluborode (mnis)
Name: Olayanju Oluwafemi Abodunde Address: Toshmap Global Multi-Ent., Ile-Ife,
Registration No: 630 Year: 1989
Project Attribute
Project Datum: WGS84 Project Name: Transverse Mercator Projection
Coordinate unit: m Height Units: m Distance Units: m
Coordinate System
Ellipsoid Name: WGS84 Major Axis(a): 6378137.000m
Flattening Reciprocal(1/f): 298.2572236000 Projection Method: Transverse
Mercator Projection Central Meridian(L0): 003°00'00.000000"E
Original Latitude: 00°00'00.000000"N Average Latitude: 00°00'00.000000"N
Projection Scale: 1.000000 Projection Height: 0.000m
North Additive Constant(n): 0.000m East Additive Constant(e): 500000.000m
Observation Files
Session 1
NO. Station Duration Antenna Height(m) Receiver
1 OCSS 97 06:47:56 1.188 Master- 003863
2 OCSS 99 00:52:23 1.364 Rover - 101582
3 OCSS 103 00:49:04 1.309 Rover – 101582
4 OCSS 105 00:50:24 1.403 Rover – 101582
5 OCSS110 00:48:37 1.405 Rover – 101582
6 OCSS 96 00:47:38 1.410 Rover – 101582
7 OCSS 98 00:45:38 1.310 Rover - 101594
8 OCSS101 00:49:12 1.500 Rover – 101594
9 OCSS104 00:45:08 1.410 Rover – 101594
10 OCSS111 00:49:13 1.440 Rover – 101594
11 OCSS 112 00:48:10 1.450 Rover - 101594
Session 2
NO. Station Duration Antenna Height(m) Receiver
1 OCSS 97 04:16:55 1.101 Master – 003863
2 OCSS 96 00:41:33 1.205 Rover – 101582
3 OCSS 100 00:44:36 1.302 Rover – 101582
4 OSC 6S 00:47:32 1.208 Rover – 101582
5 OCSS 98 00:44:56 1.203 Rover – 101594
6 OCSS 99 00:44:01 1.295 Rover – 101594
7 OCSS 102 00:40:05 1.303 Rover – 101594
8 OCSS 106 00:41:14 1.335 Rover – 101582
9 OCSS 107 00:49:18 1.223 Rover – 101594
10 OCSS 108 00:42:21 1.368 Rover – 101582
11 OCSS 109 00:45:33 1.425 Rover – 101594
B—144
Baseline Summary List
Session 1
Horizontal Vertical D
Ellipsoid
Baseline ID Precision Precision Azimuth Ellipsoid
Dist.(m)
HDOP(m) VDOP(m) Height(m)
B1 (OCSS 97 - OCSS 99) 0.0017 0.0005 344°53'49.44297" 785.456 7.318
B2 (OCSS 97 - OCSS 103) 0.0022 0.0008 300°41'35.24990" 2066.790 16.055
B3 (OCSS 97 - OCSS 105) 0.0029 0.0008 299°47'19.46740" 2696.450 11.185
B4 (OCSS 97 – OCSS 110) 0.0017 0.0006 302°37'45.93983" 3873.402 11.676
B5 (OCSS 97 - OCSS 96) 0.0015 0.0006 162°58'05.58704" 266.804 -9.418
B6 (OCSS 97 - OCSS 98) 0.0022 0.0006 344°20'36.78596" 341.841 6.961
B7 (OCSS 97 – OCSS 101) 0.0016 0.0007 307°54'19.94220" 1547.679 22.249
B8 (OCSS 97 – OCSS 104) 0.0019 0.0007 297°18'02.96203" 2511.430 1.412
B9 (OCSS 97 – OCSS 111) 0.0016 0.0006 306°19'19.30635" 4021.154 12.254
B10(OCSS 97 - OCSS 112) 0.0015 0.0006 310°28'02.48516" 4185.885 9.124
Session 2
Horizontal Vertical D
Ellipsoid
Baseline ID Precision Precision Azimuth Ellipsoid
Dist.(m)
HDOP(m) VDOP(m) Height(m)
B1 (OCSS 97 - OCSS 96) 0.0017 0.0007 162°58'08.75553" 266.790 -9.419
B2 (OCSS 97 - OCSS 100) 0.0016 0.0005 322°19'59.41581" 1083.199 25.241
B3 (OCSS 97 - OSC 6S) 0.0018 0.0005 306°15'47.66382" 1749.709 19.054
B4 (OCSS 97 - OCSS 98) 0.0015 0.0007 344°20'33.56847" 341.844 6.954
B5 (OCSS 97 - OCSS 99) 0.0015 0.0005 344°53'46.15580" 785.460 7.319
B6 (OCSS 97 - OCSS 102) 0.0017 0.0005 305°01'20.25543" 1765.397 15.701
B7 (OCSS 97 - OCSS 106) 0.0018 0.0005 300°30'09.26701" 2899.270 14.846
B8 (OCSS 97 - OCSS 107) 0.0024 0.0007 300°52'46.74823" 3105.235 -3.460
B9 (OCSS 97 - OCSS 108) 0.0022 0.0007 301°50'43.53914" 3441.659 -7.980
B10(OCSS 97 - OCSS 109) 0.0018 0.0006 301°21'58.02112" 3670.031 -4.259
Control Points
Number Of Points: 16(OCSS 96, OCSS 98 – OCSS 112, OSC 6S)
Number Of Control Points: 1 (OCSS 97)
Point ID Type North(m) East(m) Height(m) WGS84 Coordinates
OCSS 97 NEh 870507.585 661891.492 379.582
Adjustment Statistics
#Iterations for Successful Adjustment: 2
Precision Confidence Level: 2 sigma
Translation Parameters
Session 1
DX(m) -345.091
DY(m) -68.539
Rotation Angle 000°00'00.00000"
B—145
Scale 0.000000
Session 2
DX(m) -344.085
DY(m) -68.223
Rotation Angle 000°00'00.00000"
Scale 0.000000
Adjusted Baselines
Session 1
Observation ID DN(m) Std.DN(m) DE(m) Std.DE(m)
B1 (OCSS 97 - OCSS 99) 758.493 0.001 -204.700 0.001
B2 (OCSS 97 - OCSS 103) 1055.214 0.001 -1777.671 0.001
B3 (OCSS 97 - OCSS 105) 1339.942 0.001 -2340.737 0.002
B4 (OCSS 97 - OCSS110) 2089.081 0.001 -3262.909 0.001
B5 (OCSS 97 - OCSS 96) -255.011 0.001 78.119 0.001
B6 (OCSS 97 - OCSS 98) 329.176 0.001 -92.256 0.001
B7 (OCSS 97 - OCSS101) 950.984 0.002 -1221.349 0.002
B8 (OCSS 97 - OCSS104) 1152.199 0.001 -2232.264 0.001
B9 (OCSS 97 - OCSS111) 2382.425 0.001 -3240.668 0.001
B10 (OCSS 97 - OCSS 112) 2717.396 0.002 -3185.334 0.002
Session 2
Observation ID DN(m) Std.DN(m) DE(m) Std.DE(m)
B1 (OCSS 97 - OCSS 96) -255.000 0.001 78.112 0.001
B2 (OCSS 97 - OCSS 100) 857.428 0.001 -661.903 0.001
B3 (OCSS 97 - OSC 6S) 1035.155 0.001 -1411.090 0.001
B4 (OCSS 97 - OCSS 98) 329.178 0.001 -92.263 0.000
B5 (OCSS 97 - OCSS 99) 758.494 0.001 -204.712 0.001
B6 (OCSS 97 - OCSS 102) 1013.378 0.001 -1446.055 0.001
B7 (OCSS 97 - OCSS 106) 1471.606 0.001 -2498.035 0.001
B8 (OCSS 97 - OCSS 107) 1593.723 0.001 -2665.066 0.001
B9 (OCSS 97 - OCSS 108) 1815.924 0.001 -2923.608 0.001
B10(OCSS 97 - OCSS 109) 1910.272 0.001 -3133.694 0.001
Adjusted Grid Coordinates
Session 1
Point ID North(m) North East(m) East
Err.(m) Err.(m)
OCSS 97 870507.585 0.000 661891.492 0.000
OCSS 99 871266.078 0.001 661686.792 0.001
OCSS 103 871562.799 0.001 660113.821 0.001
OCSS 105 871847.527 0.001 659550.755 0.002
OCSS110 872596.666 0.001 658628.583 0.001
OCSS 96 870252.574 0.001 661969.611 0.001
OCSS 98 870836.761 0.001 661799.236 0.001
OCSS101 871458.569 0.002 660670.143 0.001
OCSS104 871659.784 0.001 659659.228 0.001
B—146
OCSS111 872890.010 0.001 658650.824 0.001
OCSS 112 873224.981 0.002 658706.158 0.002
Session 2
Point ID North(m) North East(m) East
Err.(m) Err.(m)
OCSS 100 871365.013 0.000 661229.589 0.000
OCSS 102 871520.963 0.000 660445.437 0.000
OCSS 96 870252.585 0.000 661969.604 0.000
OCSS 97 870507.585 0.000 661891.492 0.000
OCSS 98 870836.763 0.000 661799.229 0.000
OCSS 99 871266.079 0.000 661686.780 0.000
OSC 6S 871542.740 0.000 660480.402 0.000
OCSS 106 871939.772 0.000 659479.190 0.000
OCSS 107 872061.900 0.000 659312.162 0.000
OCSS 108 872284.120 0.000 659053.625 0.000
OCSS 109 872378.477 0.000 658843.543 0.000
Coordinate Change
Session 1
Point ID Delt.North(m) Delt.East(m) Delt.Ellipsoid
Height(m)
OCSS 97 0.000 0.000 2.191
OCSS 99 -0.269 -0.281 4.774
OCSS 103 0.033 0.335 3.436
OCSS 105 0.000 0.000 2.191
OCSS 110 -0.137 0.213 1.747
OCSS 96 0.000 0.000 2.191
OCSS 98 -0.269 -0.282 4.773
OCSS 101 0.000 0.000 2.191
OCSS 104 0.032 0.335 3.436
OCSS 111 -0.137 0.214 1.745
OCSS 112 0.000 0.000 2.191
Session 2
Point ID Delt.North(m) Delt.East(m) Delt.Ellipsoid
Height(m)
OCSS 97 0.000 0.000 5.098
OCSS 96 0.000 0.000 5.098
OCSS 100 0.000 0.000 5.098
OSC 6S 0.000 0.000 5.098
OCSS 98 0.000 0.000 5.098
OCSS 99 0.000 0.000 5.098
OCSS 102 0.000 0.000 5.098
OCSS 106 0.000 0.000 5.098
OCSS 107 0.000 0.000 5.098
OCSS 108 0.000 0.000 5.098
B—147
OCSS 109 0.000 0.000 5.098
Error Ellipse
Session 1
Point ID Semi-major Axis(m) Semi-minor Axis(m) Azimuth
OCSS 97 0.000 0.000 000°00'00.00000"
OCSS 99 0.001 0.001 083°02'48.18501"
OCSS 103 0.001 0.001 009°43'31.38111"
OCSS 105 0.001 0.002 072°04'28.43784"
OCSS 110 0.001 0.001 033°15'18.63550"
OCSS 96 0.001 0.001 067°18'04.07501"
OCSS 98 0.001 0.001 082°22'12.23225"
OCSS 101 0.002 0.001 020°28'25.18456"
OCSS 104 0.001 0.001 009°47'43.50290"
OCSS 111 0.001 0.001 034°18'16.08849"
OCSS 112 0.001 0.002 043°21'13.45375"
Session 2
Point ID Semi-major Axis(m) Semi-minor Axis(m) Azimuth
OCSS 97 0.000 0.000 081°42'15.60784"
OCSS 96 0.001 0.001 074°17'23.88672"
OCSS 100 0.001 0.001 088°49'20.73712"
OSC 6S 0.001 0.001 075°59'19.18998"
OCSS 98 0.001 0.000 060°11'30.72136"
OCSS 99 0.001 0.001 081°46'34.24488"
OCSS 102 0.001 0.001 069°21'07.79584"
OCSS 106 0.001 0.001 087°21'14.04045"
OCSS 107 0.001 0.000 066°23'21.46337"
OCSS 108 0.001 0.001 054°46'43.52388"
OCSS 109 0.001 0.001 018°53'53.51706"
B—148
Height Fitting
Session 1
Fitting Equation H = H0 +A
A 2.806144
Session 2
Fitting Equation H = H0 +A
A 5.097572
CERTIFICATION ATTESTATION
I certify that all the information given here was I certify that these survey duties were carried
obtained as a result of survey duties carried out out under my supervision and the records
by me in accordance with Survey Laws and herein are true copies of the original.
Regulations. Name: Surv. J.O. Oluborode (mnis)
Name: Olayanju Oluwafemi Abodunde Address: Toshmap Global Multi-Ent., Ile-Ife,
Registration No: 630 Year: 1989
Signature: ………………………………………….
Signature: …………………………………………..
Date: …….………………………………………….. Date: …………………………………………..........
B—149