HIRE CHARGES OF PLANT& MACHNIERY FOR ROAD & BUILDING WORKS FOR THE YEAR

2019-20
Hire Fuel Crew Total Per
Charges Charges Charges
a) Hire charges of Tipper 5.00 371.40 369.30 200.90 941.60 Hour
Cum capacity
b) Hire charges of Tipper 10 344.30 369.30 200.90 914.50 Hour
Tonnes capacity
c) Hire charges of Water 366.80 369.30 200.90 937.00 Hour
Tanker 8000 Ltrs capacity
d) Hire charges of Truck 10 344.30 369.30 200.90 914.50 Hour
Tonnes capacity
e) Hire charges of FE loader Hour
1.00 Cum bucket capacity @ 2761.20 0.00 0.00 2761.20
45 Cum

CHARGES FOR LABOUR

1 day Head mazdoor 460.00

2 day Mazdoor 420.00

RATES FOR CONVEYANCE BY MACHINERY


1 Mincipal area allowance 0.00%
2 Industrial area allowance 0.00%
3 Agency area allowance 0.00%
4 Allowable allowance 0.00%
5 Add Overhead Charges & Contractor's Profit 0.000%
A) For Earth/Gravel/Sand/Morrum/Lime/Surki (per Cum):
1 Lead up to 1 Km:
Out put = 5.00 Cum Rate Per Amount
0.15 Hrs. hire charges of Tipper 5.00 Cum @ Rs. 371.40 Hour Rs. 55.71
0.15 Hrs. fuel charges of Tipper 5.00 Cum @ Rs. 369.30 Hour Rs. 55.40
0.15 Hrs. crew charges of Tipper 5.00 Cum @ 200.90 Hour Rs. 30.14
0.00 add area allowance at 0% on Rs. 30.14 Rs. 0.00
Rate for 5.00 Cum Rs. 141.25
Rate for 1.00 Cum Rs. 28.25
0.00 add overheads and contractors profit at 0% 28.25 Rs. 0.00
on Rs.
Total rate for 1.00 Cum 28.25
AS per SSR 0r say Rs. 28.30

2 Lead up to 2 Km:
Out put = 5.00 Cum Rate Per Amount
0.21 Hrs. hire charges of Tipper 5.00 Cum @ Rs. 371.40 Hour Rs. 77.99
0.21 Hrs. fuel charges of Tipper 5.00 Cum @ Rs. 369.30 Hour Rs. 77.55
0.21 Hrs. crew charges of Tipper 5.00 Cum @ 200.90 Hour Rs. 42.19
0.00 add area allowance at 0% on Rs. 42.19 Rs. 0.00
Rate for 5.00 Cum Rs. 197.73
Rate for 1.00 Cum Rs. 39.55
0.00 add overheads and contractors profit at 0% 39.55 Hour Rs. 0.00
on Rs.
Total rate for 1.00 Cum 39.55

AS per SSR 0r say Rs. 39.50

3 Lead up to 3 Km:
Out put = 5.00 Cum Rate Per Amount
0.28 Hrs. hire charges of Tipper 5.00 Cum @ Rs. 371.40 Hour Rs. 103.99
0.28 Hrs. fuel charges of Tipper 5.00 Cum @ Rs. 369.30 Hour Rs. 103.40
0.28 Hrs. crew charges of Tipper 5.00 Cum @ 200.90 Hour Rs. 56.25
0.00 add area allowance at 0% on Rs. 56.25 Rs. 0.00
Rate for 5.00 Cum Rs. 263.64
Rate for 1.00 Cum Rs. 52.73
0.00 add overheads and contractors profit at 0% 52.73 Hour Rs. 0.00
on Rs.
Total rate for 1.00 Cum 52.73

AS per SSR 0r say Rs. 52.70

Out put = 5.00 Cum Rate Per Amount


0.34 Hrs. hire charges of Tipper 5.00 Cum @ Rs. 371.40 Hour Rs. 126.28
0.34 Hrs. fuel charges of Tipper 5.00 Cum @ Rs. 369.30 Hour Rs. 125.56
0.34 Hrs. crew charges of Tipper 5.00 Cum @ 200.90 Hour Rs. 68.31
0.00 add area allowance at 0% on Rs. 68.31 Rs. 0.00
Rate for 5.00 Cum Rs. 320.15
Rate for 1.00 Cum Rs. 64.03
0.00 add overheads and contractors profit at 0% 64.03 Hour Rs. 0.00
on Rs.
Total rate for 1.00 Cum 64.03

AS per SSR 0r say Rs. 64.00

5 Lead up to 5 Km:
Out put = 5.00 Cum Rate Per Amount
0.40 Hrs. hire charges of Tipper 5.00 Cum @ Rs. 371.40 Hour Rs. 148.56
0.40 Hrs. fuel charges of Tipper 5.00 Cum @ Rs. 369.30 Hour Rs. 147.72
0.40 Hrs. crew charges of Tipper 5.00 Cum @ 200.90 Hour Rs. 80.36
0.00 add area allowance at 0% on Rs. 80.36 Rs. 0.00
Rate for 5.00 Cum Rs. 376.64
Rate for 1.00 Cum Rs. 75.33
0.00 add overheads and contractors profit at 0% 75.33 Hour Rs. 0.00
on Rs.
Total rate for 1.00 Cum 75.33

AS per SSR 0r say Rs. 75.30

6 Lead for every Km from 5 to 30 Km:


Out put = 5.00 Cum Rate Per Amount
0.06 Hrs. hire charges of Tipper 5.00 Cum @ Rs. 371.40 Hour Rs. 22.28
0.06 Hrs. fuel charges of Tipper 5.00 Cum @ Rs. 369.30 Hour Rs. 22.16
0.06 Hrs. crew charges of Tipper 5.00 Cum @ 200.90 Hour Rs. 12.05
0.00 add area allowance at 0% on Rs. 12.05 Rs. 0.00
Rate for 5.00 Cum Rs. 56.49
Rate for 1.00 Cum Rs. 11.30
0.00 add overheads and contractors profit at 0% 11.30 Hour Rs. 0.00
on Rs.
Total rate for 1.00 Cum Rs. 11.30

7 Lead for every Km beyond 30 Km:


Out put = 5.00 Cum Rate Per Amount
0.05 Hrs. hire charges of Tipper 5.00 Cum @ Rs. 371.40 Hour Rs. 18.57
0.05 Hrs. fuel charges of Tipper 5.00 Cum @ Rs. 369.30 Hour Rs. 18.47
0.05 Hrs. crew charges of Tipper 5.00 Cum @ 200.90 Hour Rs. 10.05
0.00 add area allowance at 0% on Rs. 10.05 Rs. 0.00
Rate for 5.00 Cum Rs. 47.09
Rate for 1.00 Cum Rs. 9.42
0.00 add overheads and contractors profit at 0% 9.42 Rs. 0.00
on Rs.
Total rate for 1.00 Cum Rs. 9.42
AS per SSR 0r say Rs. 9.40
B) For Rubble/Size stones/Cut stones/Coarse aggregates (per Cum):
1 Lead up to 1 Km:
Out put = 5.00 Cum Rate Per Amount
0.15 Hrs. hire charges of Tipper 5.00 Cum @ Rs. 371.40 Hour Rs. 55.71
0.15 Hrs. fuel charges of Tipper 5.00 Cum @ Rs. 369.30 Hour Rs. 55.40
0.15 Hrs. crew charges of Tipper 5.00 Cum @ 200.90 Hour Rs. 30.14
0.00 add area allowance at 0% on Rs. 30.14 Rs. 0.00
Rate for 5.00 Cum Rs. 141.25
Rate for 1.00 Cum Rs. 28.25
0.00 add overheads and contractors profit at 0% 28.25 Rs. 0.00
on Rs.
Total rate for 1.00 Cum 28.25

AS per SSR 0r say Rs. 27.40

2 Lead up to 2 Km:
Out put = 5.00 Cum Rate Per Amount
0.21 Hrs. hire charges of Tipper 5.00 Cum @ Rs. 371.40 Hour Rs. 77.99
0.21 Hrs. fuel charges of Tipper 5.00 Cum @ Rs. 369.30 Hour Rs. 77.55
0.21 Hrs. crew charges of Tipper 5.00 Cum @ 200.90 Hour Rs. 42.19
0.00 add area allowance at 0% on Rs. 42.19 Rs. 0.00
Rate for 5.00 Cum Rs. 197.73
Rate for 1.00 Cum Rs. 39.55
0.00 add overheads and contractors profit at 0% 39.55 Hour Rs. 0.00
on Rs.
Total rate for 1.00 Cum 39.55

AS per SSR 0r say Rs. 38.40

3 Lead up to 3 Km:
Out put = 5.00 Cum Rate Per Amount
0.28 Hrs. hire charges of Tipper 5.00 Cum @ Rs. 371.40 Hour Rs. 103.99
0.28 Hrs. fuel charges of Tipper 5.00 Cum @ Rs. 369.30 Hour Rs. 103.40
0.28 Hrs. crew charges of Tipper 5.00 Cum @ 200.90 Hour Rs. 56.25
0.00 add area allowance at 0% on Rs. 56.25 Rs. 0.00
Rate for 5.00 Cum Rs. 263.64
Rate for 1.00 Cum Rs. 52.73
0.00 add overheads and contractors profit at 0% 52.73 Hour Rs. 0.00
on Rs.
Total rate for 1.00 Cum 52.73

AS per SSR 0r say Rs. 52.70

4 Lead up to 4 Km:
Out put = 5.00 Cum Rate Per Amount
0.34 Hrs. hire charges of Tipper 5.00 Cum @ Rs. 371.40 Hour Rs. 126.28
0.34 Hrs. fuel charges of Tipper 5.00 Cum @ Rs. 369.30 Hour Rs. 125.56
0.34 Hrs. crew charges of Tipper 5.00 Cum @ 200.90 Hour Rs. 68.31
0.00 add area allowance at 0% on Rs. 68.31 Rs. 0.00
Rate for 5.00 Cum Rs. 320.15
Rate for 1.00 Cum Rs. 64.03
0.00 add overheads and contractors profit at 0% 64.03 Hour Rs. 0.00
on Rs.
Total rate for 1.00 Cum 64.03

AS per SSR 0r say Rs. 64.00

5 Lead up to 5 Km:
Out put = 5.00 Cum Rate Per Amount
0.40 Hrs. hire charges of Tipper 5.00 Cum @ Rs. 371.40 Hour Rs. 148.56
0.40 Hrs. fuel charges of Tipper 5.00 Cum @ Rs. 369.30 Hour Rs. 147.72
0.40 Hrs. crew charges of Tipper 5.00 Cum @ 200.90 Hour Rs. 80.36
0.00 add area allowance at 0% on Rs. 80.36 Rs. 0.00
Rate for 5.00 Cum Rs. 376.64
Rate for 1.00 Cum Rs. 75.33
0.00 add overheads and contractors profit at 0% 75.33 Hour Rs. 0.00
on Rs.
Total rate for 1.00 Cum 75.33

AS per SSR 0r say Rs. 75.30

6 Lead for every Km from 5 to 30 Km:


Out put = 5.00 Cum Rate Per Amount
0.06 Hrs. hire charges of Tipper 5.00 Cum @ Rs. 371.40 Hour Rs. 22.28
0.06 Hrs. fuel charges of Tipper 5.00 Cum @ Rs. 369.30 Hour Rs. 22.16
0.06 Hrs. crew charges of Tipper 5.00 Cum @ 200.90 Hour Rs. 12.05
0.00 add area allowance at 0% on Rs. 12.05 Rs. 0.00
Rate for 5.00 Cum Rs. 56.49
Rate for 1.00 Cum Rs. 11.3
0.00 add overheads and contractors profit at 0% 11.30 Hour Rs. 0.00
on Rs.
Total rate for 1.00 Cum 11.30
AS per SSR 0r say Rs. 11.30

7 Lead for every Km beyond 30 Km:


Out put = 5.00 Cum Rate Per Amount
0.05 Hrs. hire charges of Tipper 5.00 Cum @ Rs. 371.40 Hour Rs. 18.57
0.05 Hrs. fuel charges of Tipper 5.00 Cum @ Rs. 369.30 Hour Rs. 18.47
0.05 Hrs. crew charges of Tipper 5.00 Cum @ 200.90 Hour Rs. 10.05
0.00 add area allowance at 0% on Rs. 10.05 Rs. 0.00
Rate for 5.00 Cum Rs. 47.09
Rate for 1.00 Cum Rs. 9.42
0.00 add overheads and contractors profit at 0% 9.42 Rs. 0.00
on Rs.
Total rate for 1.00 Cum 9.42

AS per SSR 0r say Rs. 9.40

C) For Cement/Steel/RCC poles/A.C & G.I sheets/Packed materials (per Tonne):


1 Lead up to 1 Km:
Out put = 8.00 MT Rate Per Amount
0.15 Hrs. hire charges of Tipper 5.00 Cum @ Rs. 371.40 Hour Rs. 55.71
0.15 Hrs. fuel charges of Tipper 5.00 Cum @ Rs. 369.30 Hour Rs. 55.40
0.15 Hrs. crew charges of Tipper 5.00 Cum @ 200.90 Hour Rs. 30.14
0.00 add area allowance at 0% on Rs. 30.14 Rs. 0.00
Rate for 8.00 MT Rs. 141.25
Rate for 1.00 MT Rs. 17.66
0.00 add overheads and contractors profit at 0% 17.66 Rs. 0.00
on Rs.
Total rate for 1.00 MT 17.66

AS per SSR 0r say Rs. 17.10

2 Lead up to 2 Km:
Out put = 8.00 MT Rate Per Amount
0.21 Hrs. hire charges of Tipper 5.00 Cum @ Rs. 371.40 Hour Rs. 77.99
0.21 Hrs. fuel charges of Tipper 5.00 Cum @ Rs. 369.30 Hour Rs. 77.55
0.21 Hrs. crew charges of Tipper 5.00 Cum @ 200.90 Hour Rs. 42.19
0.00 add area allowance at 0% on Rs. 42.19 Rs. 0.00
Rate for 8.00 MT Rs. 197.73
Rate for 1.00 MT Rs. 24.72
0.00 add overheads and contractors profit at 0% 24.72 Hour Rs. 0.00
on Rs.
Total rate for 1.00 MT 24.72

AS per SSR 0r say Rs. 24.00

3 Lead up to 3 Km:
Out put = 8.00 MT Rate Per Amount
0.28 Hrs. hire charges of Tipper 5.00 Cum @ Rs. 371.40 Hour Rs. 103.99
0.28 Hrs. fuel charges of Tipper 5.00 Cum @ Rs. 369.30 Hour Rs. 103.40
0.28 Hrs. crew charges of Tipper 5.00 Cum @ 200.90 Hour Rs. 56.25
0.00 add area allowance at 0% on Rs. 56.25 Rs. 0.00
Rate for 8.00 MT Rs. 263.64
Rate for 1.00 MT Rs. 32.96
0.00 add overheads and contractors profit at 0% 32.96 Hour Rs. 0.00
on Rs.
Total rate for 1.00 MT 32.96

AS per SSR 0r say Rs. 33.00

4 Lead up to 4 Km:
Out put = 8.00 MT Rate Per Amount
0.34 Hrs. hire charges of Tipper 5.00 Cum @ Rs. 371.40 Hour Rs. 126.28
0.34 Hrs. fuel charges of Tipper 5.00 Cum @ Rs. 369.30 Hour Rs. 125.56
0.34 Hrs. crew charges of Tipper 5.00 Cum @ 200.90 Hour Rs. 68.31
0.00 add area allowance at 0% on Rs. 68.31 Rs. 0.00
Rate for 8.00 MT Rs. 320.15
Rate for 1.00 MT Rs. 40.02
0.00 add overheads and contractors profit at 0% 40.02 Hour Rs. 0.00
on Rs.
Total rate for 1.00 MT 40.02

AS per SSR 0r say Rs. 40.00

5 Lead up to 5 Km:
Out put = 8.00 MT Rate Per Amount
0.40 Hrs. hire charges of Tipper 5.00 Cum @ Rs. 371.40 Hour Rs. 148.56
0.40 Hrs. fuel charges of Tipper 5.00 Cum @ Rs. 369.30 Hour Rs. 147.72
0.40 Hrs. crew charges of Tipper 5.00 Cum @ 200.90 Hour Rs. 80.36
0.00 add area allowance at 0% on Rs. 80.36 Rs. 0.00
Rate for 8.00 MT Rs. 376.64
Rate for 1.00 MT Rs. 47.08
0.00 add overheads and contractors profit at 0% 47.08 Hour Rs. 0.00
on Rs.
Total rate for 1.00 MT 47.08

AS per SSR 0r say Rs. 47.10


6 Lead for every Km from 5 to 30 Km:
Out put = 8.00 MT Rate Per Amount
0.06 Hrs. hire charges of Tipper 5.00 Cum @ Rs. 371.40 Hour Rs. 22.28
0.06 Hrs. fuel charges of Tipper 5.00 Cum @ Rs. 369.30 Hour Rs. 22.16
0.06 Hrs. crew charges of Tipper 5.00 Cum @ 200.90 Hour Rs. 12.05
0.00 add area allowance at 0% on Rs. 12.05 Rs. 0.00
Rate for 8.00 MT Rs. 56.49
Rate for 1.00 MT Rs. 7.06
0.00 add overheads and contractors profit at 0% 7.06 Hour Rs. 0.00
on Rs.
Total rate for 1.00 MT 7.06

AS per SSR 0r say Rs. 7.10

7 Lead for every Km beyond 30 Km:


Out put = 8.00 MT Rate Per Amount
0.05 Hrs. hire charges of Tipper 5.00 Cum @ Rs. 371.40 Hour Rs. 18.57
0.05 Hrs. fuel charges of Tipper 5.00 Cum @ Rs. 369.30 Hour Rs. 18.47
0.05 Hrs. crew charges of Tipper 5.00 Cum @ 200.90 Hour Rs. 10.05
0.00 add area allowance at 0% on Rs. 10.05 Rs. 0.00
Rate for 8.00 MT Rs. 47.09
Rate for 1.00 MT Rs. 5.89
0.00 add overheads and contractors profit at 0% 5.89 Rs. 0.00
on Rs.
Total rate for 1.00 MT 5.89

AS per SSR 0r say Rs. 5.90


D) For PCC Slabs/Shabad Slabs/CC & Laterite Blocks/Wood (per Cum):
1 Lead up to 1 Km:
Out put = 3.40 Cum Rate Per Amount
0.15 Hrs. hire charges of Tipper 5.00 Cum @ Rs. 344.00 Hour Rs. 51.60
0.15 Hrs. fuel charges of Tipper 5.00 Cum @ Rs. 369.30 Hour Rs. 55.40
0.15 Hrs. crew charges of Tipper 5.00 Cum @ 200.90 Hour Rs. 30.14
0.00 add area allowance at 0% on Rs. 30.14 Rs. 0.00
Rate for 3.40 Cum Rs. 137.14
Rate for 1.00 Cum Rs. 40.34
0.00 add overheads and contractors profit at 0% 40.34 Rs. 0.00
on Rs.
Total rate for 1.00 Cum 40.34

AS per SSR 0r say Rs. 40.40

2 Lead up to 2 Km:
Out put = 3.40 Cum Rate Per Amount
0.21 Hrs. hire charges of Tipper 5.00 Cum @ Rs. 371.40 Hour Rs. 77.99
0.21 Hrs. fuel charges of Tipper 5.00 Cum @ Rs. 369.30 Hour Rs. 77.55
0.21 Hrs. crew charges of Tipper 5.00 Cum @ 200.90 Hour Rs. 42.19
0.00 add area allowance at 0% on Rs. 42.19 Rs. 0.00
Rate for 3.40 Cum Rs. 197.73
Rate for 1.00 Cum Rs. 58.16
0.00 add overheads and contractors profit at 0% 58.16 Hour Rs. 0.00
on Rs.
Total rate for 1.00 Cum 58.16

AS per SSR 0r say Rs. 56.50

Lead up to 3 Km:
Out put = 3.40 Cum Rate Per Amount
0.28 Hrs. hire charges of Tipper 5.00 Cum @ Rs. 371.40 Hour Rs. 103.99
0.28 Hrs. fuel charges of Tipper 5.00 Cum @ Rs. 369.30 Hour Rs. 103.40
0.28 Hrs. crew charges of Tipper 5.00 Cum @ 200.90 Hour Rs. 56.25
0.00 add area allowance at 0% on Rs. 56.25 Rs. 0.00
Rate for 3.40 Cum Rs. 263.64
Rate for 1.00 Cum Rs. 77.54
0.00 add overheads and contractors profit at 0% 77.54 Hour Rs. 0.00
on Rs.
Total rate for 1.00 Cum 77.54

AS per SSR 0r say Rs. 77.50

4 Lead up to 4 Km:
Out put = 3.40 Cum Rate Per Amount
0.34 Hrs. hire charges of Tipper 5.00 Cum @ Rs. 371.40 Hour Rs. 126.28
0.34 Hrs. fuel charges of Tipper 5.00 Cum @ Rs. 369.30 Hour Rs. 125.56
0.34 Hrs. crew charges of Tipper 5.00 Cum @ 200.90 Hour Rs. 68.31
0.00 add area allowance at 0% on Rs. 68.31 Rs. 0.00
Rate for 3.40 Cum Rs. 320.15
Rate for 1.00 Cum Rs. 94.16
0.00 add overheads and contractors profit at 0% 94.16 Hour Rs. 0.00
on Rs.
Total rate for 1.00 Cum 94.16

AS per SSR 0r say Rs. 94.20

5 Lead up to 5 Km:
Out put = 3.40 Cum Rate Per Amount
0.40 Hrs. hire charges of Tipper 5.00 Cum @ Rs. 371.40 Hour Rs. 148.56
0.40 Hrs. fuel charges of Tipper 5.00 Cum @ Rs. 369.30 Hour Rs. 147.72
0.40 Hrs. crew charges of Tipper 5.00 Cum @ 200.90 Hour Rs. 80.36
0.00 add area allowance at 0% on Rs. 80.36 Rs. 0.00
Rate for 3.40 Cum Rs. 376.64
Rate for 1.00 Cum Rs. 110.78
0.00 add overheads and contractors profit at 0% 110.78 Hour Rs. 0.00
on Rs.
Total rate for 1.00 Cum 110.78

AS per SSR 0r say Rs. 110.80

6 Lead for every Km from 5 to 30 Km:


Out put = 3.40 Cum Rate Per Amount
0.06 Hrs. hire charges of Tipper 5.00 Cum @ Rs. 371.40 Hour Rs. 22.28
0.06 Hrs. fuel charges of Tipper 5.00 Cum @ Rs. 369.30 Hour Rs. 22.16
0.06 Hrs. crew charges of Tipper 5.00 Cum @ 200.90 Hour Rs. 12.05
0.00 add area allowance at 0% on Rs. 12.05 Rs. 0.00
Rate for 3.40 Cum Rs. 56.49
Rate for 1.00 Cum Rs. 16.61
0.00 add overheads and contractors profit at 0% 16.61 Hour Rs. 0.00
on Rs.
Total rate for 1.00 Cum 16.61
AS per SSR 0r say Rs. 16.60

7 Lead for every Km beyond 30 Km:


Out put = 3.40 Cum Rate Per Amount
0.05 Hrs. hire charges of Tipper 5.00 Cum @ Rs. 371.40 Hour Rs. 18.57
0.05 Hrs. fuel charges of Tipper 5.00 Cum @ Rs. 369.30 Hour Rs. 18.47
0.05 Hrs. crew charges of Tipper 5.00 Cum @ 200.90 Hour Rs. 10.05
0.00 add area allowance at 0% on Rs. 10.05 Rs. 0.00
Rate for 3.40 Cum Rs. 47.09
Rate for 1.00 Cum Rs. 13.85
0.00 add overheads and contractors profit at 0% 13.85 Rs. 0.00
on Rs.
Total rate for 1.00 Cum 13.85

AS per SSR 0r say Rs. 13.90

E) For Water (per 1000 Ltrs):


1 Lead up to 1 Km:
Out put = 8000 Ltrs Rate Per Amount
0.15 Hrs. hire charges of water tanker 8000 ltrs 366.80 Hour Rs. 55.02
capacity @ Rs.
0.15 Hrs. fuel charges of water tanker 8000 ltrs 369.30 Hour Rs. 55.40
capacity @ Rs.
0.15 Hrs. crew charges of water tanker 8000 ltrs 200.90 Hour Rs. 30.14
capacity @ Rs.
0.00 add area allowance at 0% on Rs. 30.14 Rs. 0.00
Rate for 8000 Ltrs Rs. 140.56
Rate for 1000 Ltrs Rs. 17.57
0.00 add overheads and contractors profit at 0% 17.57 Rs. 0.00
on Rs.
Total rate for 1000 Ltrs 17.57
AS per SSR 0r say Rs. 17.60

2 Lead up to 2 Km:
Out put = 8000 Ltrs Rate Per Amount
0.21 Hrs. hire charges of water tanker 8000 ltrs 366.80 Hour Rs. 77.03
capacity @ Rs.
0.21 Hrs. fuel charges of water tanker 8000 ltrs 369.30 Hour Rs. 77.55
capacity @ Rs.
0.21 Hrs. crew charges of water tanker 8000 ltrs 200.90 Hour Rs. 42.19
capacity @ Rs.
0.00 add area allowance at 0% on Rs. 42.19 Rs. 0.00
Rate for 8000 Ltrs Rs. 196.77
Rate for 1000 Ltrs Rs. 24.60
0.00 add overheads and contractors profit at 0% 24.60 Rs. 0.00
on Rs.
Total rate for 1000 Ltrs 24.60
AS per SSR or say Rs. 24.60

3 Lead up to 3 Km:
Out put = 8000 Ltrs Rate Per Amount
0.28 Hrs. hire charges of water tanker 8000 ltrs 366.80 Hour Rs. 102.70
capacity @ Rs.
0.28 Hrs. fuel charges of water tanker 8000 ltrs 369.30 Hour Rs. 103.40
capacity @ Rs.
0.28 Hrs. crew charges of water tanker 8000 ltrs 200.90 Hour Rs. 56.25
capacity @ Rs.
0.00 add area allowance at 0% on Rs. 56.25 Rs. 0.00
Rate for 8000 Ltrs Rs. 262.35
Rate for 1000 Ltrs Rs. 32.79
0.00 add overheads and contractors profit at 0% 32.79 Rs. 0.00
on Rs.
Total rate for 1000 Ltrs 32.79
AS per SSR or say Rs. 32.80

4 Lead up to 4 Km:
Out put = 8000 Ltrs Rate Per Amount
0.34 Hrs. hire charges of water tanker 8000 ltrs 366.80 Hour Rs. 124.71
capacity @ Rs.
0.34 Hrs. fuel charges of water tanker 8000 ltrs 369.30 Hour Rs. 125.56
capacity @ Rs.
0.34 Hrs. crew charges of water tanker 8000 ltrs 200.90 Hour Rs. 68.31
capacity @ Rs.
0.00 add area allowance at 0% on Rs. 68.31 Rs. 0.00
Rate for 8000 Ltrs Rs. 318.58
Rate for 1000 Ltrs Rs. 39.82
0.00 add overheads and contractors profit at 0% 39.82 Rs. 0.00
on Rs.
Total rate for 1000 Ltrs 39.82
AS per SSR or say Rs. 39.80

5 Lead up to 5 Km:
Out put = 8000 Ltrs Rate Per Amount
0.40 Hrs. hire charges of water tanker 8000 ltrs 366.80 Hour Rs. 146.72
capacity @ Rs.
0.40 Hrs. fuel charges of water tanker 8000 ltrs 369.30 Hour Rs. 147.72
capacity @ Rs.
0.40 Hrs. crew charges of water tanker 8000 ltrs 200.90 Hour Rs. 80.36
capacity @ Rs.
0.00 add area allowance at 0% on Rs. 80.36 Rs. 0.00
Rate for 8000 Ltrs Rs. 374.80
Rate for 1000 Ltrs Rs. 46.85
0.00 add overheads and contractors profit at 0% 46.85 Rs. 0.00
on Rs.
Total rate for 1000 Ltrs 46.85
AS per SSR or say Rs. 46.90

6 Lead for every Km from 5 to 30 Km:


Out put = 8000 Ltrs Rate Per Amount
0.06 Hrs. hire charges of water tanker 8000 ltrs 366.80 Hour Rs. 22.01
capacity @ Rs.
0.06 Hrs. fuel charges of water tanker 8000 ltrs 369.30 Hour Rs. 22.16
capacity @ Rs.
0.06 Hrs. crew charges of water tanker 8000 ltrs 200.90 Hour Rs. 12.05
capacity @ Rs.
0.00 add area allowance at 0% on Rs. 12.05 Rs. 0.00
Rate for 8000 Ltrs Rs. 56.22
Rate for 1000 Ltrs Rs. 7.03
0.00 add overheads and contractors profit at 0% 7.03 Rs. 0.00
on Rs.
Total rate for 1000 Ltrs 7.03
AS per SSR or say Rs. 7.00

7 Lead for every Km beyond 30 Km:


Out put = 8000 Ltrs Rate Per Amount
0.05 Hrs. hire charges of water tanker 8000 ltrs 366.80 Hour Rs. 18.34
capacity @ Rs.
0.05 Hrs. fuel charges of water tanker 8000 ltrs 369.30 Hour Rs. 18.47
capacity @ Rs.
0.05 Hrs. crew charges of water tanker 8000 ltrs 200.90 Hour Rs. 10.05
capacity @ Rs.
0.00 add area allowance at 0% on Rs. 10.05 Rs. 0.00
Rate for 8000 Ltrs Rs. 46.86
Rate for 1000 Ltrs Rs. 5.86
0.00 add overheads and contractors profit at 0% 5.86 Rs. 0.00
on Rs.
Total rate for 1000 Ltrs 5.86
AS per SSR or say Rs. 5.90

F) For Bricks (per 1000 Nos):


1 Lead up to 1 Km:
Out put = 3000 Nos Rate Per Amount
0.15 Hrs. hire charges of Truck 10 Tonnes 344.30 #N/A Rs. 51.65
capacity @ Rs.
0.15 Hrs. fuel charges of Truck 10 Tonnes 369.30 #N/A Rs. 55.40
capacity @ Rs.
0.15 Hrs. crew charges of Truck 10 Tonnes 200.90 #N/A Rs. 30.14
capacity @ Rs.
0.00 add area allowance at 0% on Rs. 30.14 Rs. 0.00
Rate for 3000 Nos Rs. 137.19
Rate for 1000 Nos Rs. 45.73
0.00 add overheads and contractors profit at 0% 45.73 Rs. 0.00
on Rs.
Total rate for 1000 Nos 45.73
AS per SSR or say Rs. 45.70

2 Lead up to 2 Km:
Out put = 3000 Nos Rate Per Amount
0.21 Hrs. hire charges of Truck 10 Tonnes 344.30 Hour Rs. 72.30
capacity @ Rs.
0.21 Hrs. fuel charges of Truck 10 Tonnes 369.30 Hour Rs. 77.55
capacity @ Rs.
0.21 Hrs. crew charges of Truck 10 Tonnes 200.90 Hour Rs. 42.19
capacity @ Rs.
0.00 add area allowance at 0% on Rs. 42.19 Rs. 0.00
Rate for 3000 Nos Rs. 192.04
Rate for 1000 Nos Rs. 64.01
0.00 add overheads and contractors profit at 0% 64.01 Rs. 0.00
on Rs.
Total rate for 1000 Nos 64.01
AS per SSR or say Rs. 64.00

3 Lead up to 3 Km:
Out put = 3000 Nos Rate Per Amount
0.28 Hrs. hire charges of Truck 10 Tonnes 344.30 Hour Rs. 96.40
capacity @ Rs.
0.28 Hrs. fuel charges of Truck 10 Tonnes 369.30 Hour Rs. 103.40
capacity @ Rs.
0.28 Hrs. crew charges of Truck 10 Tonnes 200.90 Hour Rs. 56.25
capacity @ Rs.
0.00 add area allowance at 0% on Rs. 56.25 Rs. 0.00
Rate for 3000 Nos Rs. 256.05
Rate for 1000 Nos Rs. 85.35
0.00 add overheads and contractors profit at 0% 85.35 Rs. 0.00
on Rs.
Total rate for 1000 Nos 85.35
AS per SSR or say Rs. 85.40

4 Lead up to 4 Km:
Out put = 3000 Nos Rate Per Amount
0.34 Hrs. hire charges of Truck 10 Tonnes 344.30 Hour Rs. 117.06
capacity @ Rs.
0.34 Hrs. fuel charges of Truck 10 Tonnes 369.30 Hour Rs. 125.56
capacity @ Rs.
0.34 Hrs. crew charges of Truck 10 Tonnes 200.90 Hour Rs. 68.31
capacity @ Rs.
0.00 add area allowance at 0% on Rs. 68.31 Rs. 0.00
Rate for 3000 Nos Rs. 310.93
Rate for 1000 Nos Rs. 103.64
0.00 add overheads and contractors profit at 0% 103.64 Rs. 0.00
on Rs.
Total rate for 1000 Nos 103.64
AS per SSR or say Rs. 103.60

5 Lead up to 5 Km:
Out put = 3000 Nos Rate Per Amount
0.40 Hrs. hire charges of Truck 10 Tonnes 344.30 Hour Rs. 137.72
capacity @ Rs.
0.40 Hrs. fuel charges of Truck 10 Tonnes 369.30 Hour Rs. 147.72
capacity @ Rs.
0.40 Hrs. crew charges of Truck 10 Tonnes 200.90 Hour Rs. 80.36
capacity @ Rs.
0.00 add area allowance at 0% on Rs. 80.36 Rs. 0.00
Rate for 3000 Nos Rs. 365.80
Rate for 1000 Nos Rs. 121.93
0.00 add overheads and contractors profit at 0% 121.93 Rs. 0.00
on Rs.
Total rate for 1000 Nos 121.93
AS per SSR or say Rs. 121.90

6 Lead for every Km beyond 5 Kms up to 30 Kms:


Out put = 3000 Nos Rate Per Amount
0.06 Hrs. hire charges of Truck 10 Tonnes 344.30 Hour Rs. 20.66
capacity @ Rs.
0.06 Hrs. fuel charges of Truck 10 Tonnes 369.30 Hour Rs. 22.16
capacity @ Rs.
0.06 Hrs. crew charges of Truck 10 Tonnes 200.90 Hour Rs. 12.05
capacity @ Rs.
0.00 add area allowance at 0% on Rs. 12.05 Rs. 0.00
Rate for 3000 Nos Rs. 54.87
Rate for 1000 Nos Rs. 18.29
0.00 add overheads and contractors profit at 0% 18.29 Rs. 0.00
on Rs.
Total rate for 1000 Nos 18.29
AS per SSR or say Rs. 18.30

7 Lead for every Km beyond 30 Kms:


Out put = 3000 Nos Rate Per Amount
0.05 Hrs. hire charges of Truck 10 Tonnes 344.30 Rs. 17.22
capacity @ Rs.
0.05 Hrs. fuel charges of Truck 10 Tonnes 369.30 Hour Rs. 18.47
capacity @ Rs.
0.05 Hrs. crew charges of Truck 10 Tonnes 200.90 Hour Rs. 10.05
capacity @ Rs.
0.00 add area allowance at 0% on Rs. 10.05 Rs. 0.00
Rate for 3000 Nos Rs. 45.74
Rate for 1000 Nos Rs. 15.25
0.00 add overheads and contractors profit at 0% 15.25 Rs. 0.00
on Rs.
Total rate for 1000 Nos 15.25
AS per SSR or say Rs. 15.20

LOADING & UNLOADING CHARGES BY MANUAL MEANS (EXCLUDING IDLE HIRE


CHARGES OF TRUCKS)
A) For Earth, Sand, Morrum, Manure, Fly Ash (per Cum):
(i) Loading charges:
Out put = 5.50 Cum Rate Per Amount
a) Labour:
0.01 day Head mazdoor 460.00 day Rs. 4.60
0.25 day Mazdoor 420.00 day Rs. 105.00
Rs. 109.60
0.00 add area allowance at 0% on Rs. 109.60 Rs. 0.00
Total labour charges Rs. 109.60
Rate for 5.50 Cum Rs. 109.60
Rate for 1.00 Cum Rs. 19.93
0.00 add overheads and contractors profit at 0% 19.93 Rs. 0.00
on Rs.
Total rate for 1 Cum 19.93
AS per SSR or say Rs. 19.80

(ii) Unloading charges:{50% of loading charges}


Out put = 5.50 Cum Rate Per Amount
a) Labour:
0.010 day Head mazdoor 460.00 day Rs. 4.60
0.250 day Mazdoor 420.00 day Rs. 105.00
Rs. 109.60
0.00 add area allowance at 0% on Rs. 109.60 Rs. 0.00
Total labour charges Rs. 109.60
Rate for 5.50 Cum Rs. 109.60
Rate for 1.00 Cum Rs. 19.93
0.00 add overheads and contractors profit at 0% 19.93 Rs. 0.00
on Rs.
Total rate for 1 Cum 19.93
AS per SSR or say Rs. 9.96

B) For Lime, Agrregate, Stone Boulder, Brick aggregate, Kankar, Building rubbish,
Crushed slag, Stone for masonry work (per Cum):
(i) Loading charges:
Out put = 5.50 Cum Rate Per Amount
a) Labour:
0.02 day Head mazdoor 460.00 day Rs. 9.20
0.50 day Mazdoor 420.00 day Rs. 210.00
Rs. 219.20
0.00 add area allowance at 0% on Rs. 219.20 Rs. 0.00
Total labour charges Rs. 219.20
Rate for 5.50 Cum Rs. 219.20
Rate for 1.00 Cum Rs. 39.85
0.00 add overheads and contractors profit at 0% 39.85 Rs. 0.00
on Rs.
Total rate for 1 Cum 39.85
AS per SSR or say Rs. 39.90
(ii) Unloading charges:
Out put = 5.50 Cum Rate Per Amount
a) Labour:
0.01 day Head mazdoor 460.00 day Rs. 4.60
0.25 day Mazdoor 420.00 day Rs. 105.00
Rs. 109.60
0.00 add area allowance at 0% on Rs. 109.60 Rs. 0.00
Total labour charges Rs. 109.60
Rate for 5.50 Cum Rs. 109.60
Rate for 1.00 Cum Rs. 19.93
0.00 add overheads and contractors profit at 0% 19.93 Rs. 0.00
on Rs.
Total rate for 1 Cum 19.93
AS per SSR or say Rs. 19.95

C) For Cement (per Tonne):


(i) Loading charges:
Out put = 10.00 MT Rate Per Amount
a) Labour:
0.06 day Head mazdoor 460.00 day Rs. 27.60
1.50 day Mazdoor 420.00 day Rs. 630.00
Rs. 657.60
0.00 add area allowance at 0% on Rs. 657.60 Rs. 0.00
Total labour charges Rs. 657.60
Rate for 10.00 MT Rs. 657.60
Rate for 1.00 MT Rs. 65.76
0.00 add overheads and contractors profit at 0% 65.76 Rs. 0.00
on Rs.
Total rate for 1 MT 65.76
AS per SSR or say Rs. 65.80

(ii) Unloading & Stacking charges:


Out put = 10.00 MT Rate Per Amount
a) Labour:
0.06 day Head mazdoor 460.00 day Rs. 27.60
1.50 day Mazdoor 420.00 day Rs. 630.00
Rs. 657.60
0.00 add area allowance at 0% on Rs. 657.60 Rs. 0.00
Total labour charges Rs. 657.60
Rate for 10.00 MT Rs. 657.60
Rate for 1.00 MT Rs. 65.76
0.00 add overheads and contractors profit at 0% 65.76 Rs. 0.00
on Rs.
Total rate for 1 MT 65.76
AS per SSR or say Rs. 65.80

D) For Structural steel, Steel bars (per Tonne):


(i) Loading charges:
Out put = 10.00 MT Rate Per Amount
a) Labour:
0.07 day Head mazdoor 460.00 day Rs. 32.20
1.80 day Mazdoor 420.00 day Rs. 756.00
Rs. 788.20
0.00 add area allowance at 0% on Rs. 788.20 Rs. 0.00
Total labour charges Rs. 788.20
Rate for 10.00 MT Rs. 788.20
Rate for 1.00 MT Rs. 78.82
0.00 add overheads and contractors profit at 0% 78.82 Rs. 0.00
on Rs.
Total rate for 1 MT 78.82
AS per SSR or say Rs. 78.80

(ii) Unloading & Stacking charges:


Out put = 10.00 MT Rate Per Amount
a) Labour:
0.07 day Head mazdoor 460.00 day Rs. 32.20
1.80 day Mazdoor 420.00 day Rs. 756.00
Rs. 788.20
0.00 add area allowance at 0% on Rs. 788.20 Rs. 0.00
Total labour charges Rs. 788.20
Rate for 10.00 MT Rs. 788.20
Rate for 1.00 MT Rs. 78.82
0.00 add overheads and contractors profit at 0% 78.82 Rs. 0.00
on Rs.
Total rate for 1 MT 78.82
AS per SSR or say Rs. 78.80

E) For Bricks of size 225 x 140 x 70mm (per 1000 Nos):


(i) Loading charges:
Out put = 2000.00 Nos Rate Per Amount
a) Labour:
0.01 day Head mazdoor 460.00 day Rs. 4.60
0.25 day Mazdoor 420.00 day Rs. 105.00
Rs. 109.60
0.00 add area allowance at 0% on Rs. 109.60 Rs. 0.00
Total labour charges Rs. 109.60
Rate for 2000 Nos Rs. 109.60
Rate for 1000 Nos Rs. 54.80
0.00 add overheads and contractors profit at 0% 54.80 Rs. 0.00
on Rs.
Total rate for 1000 Nos 54.80
AS per SSR or say Rs. 54.80

(ii) Unloading & Stacking charges:


Out put = 2000.00 Nos Rate Per Amount
a) Labour:
0.01 day Head mazdoor 460.00 day Rs. 4.60
0.25 day Mazdoor 420.00 day Rs. 105.00
Rs. 109.60
0.00 add area allowance at 0% on Rs. 109.60 Rs. 0.00
Total labour charges Rs. 109.60
Rate for 2000 Nos Rs. 109.60
Rate for 1000 Nos Rs. 54.80
0.00 add overheads and contractors profit at 0% 54.80 Rs. 0.00
on Rs.
Total rate for 1000 Nos 54.80
AS per SSR 0r say Rs. 54.80

LOADING & UNLOADING CHARGES BY MANUAL MEANS (INCLUDING IDLE HIRE CHARGES
OF TRUCKS)
A) For Earth, Sand, Morrum, Manure, Fly Ash (per Cum):
(i) Loading charges:
Out put = 5.50 Cum Rate Per Amount
a) Labour:
0.01 day Head mazdoor 460.00 day Rs. 4.60
0.25 day Mazdoor 420.00 day Rs. 105.00
Rs. 109.60
0.00 add area allowance at 0% on Rs. 109.60 Rs. 0.00
Total labour charges Rs. 109.60
b) Machinery:
0.50 Hrs. hire charges of Truck 10 Tonnes 344.30 Hour Rs. 172.15
capacity @ Rs.
0.50 Hrs. fuel charges of Truck 10 Tonnes 369.30 Hour Rs. 184.65
capacity @ Rs.
0.50 Hrs. crew charges of Truck 10 Tonnes 200.90 Hour Rs. 100.45
capacity @ Rs.
0.00 add area allowance at 0% on Rs. 100.45 Rs. 0.00
Total machinery charges Rs. 457.25
Total labour and machinery charges Rs. 566.85
Rate for 5.50 Cum Rs. 566.85
Rate for 1.00 Cum Rs. 103.06
0.00 add overheads and contractors profit at 0% 103.06 Rs. 0.00
on Rs.
Total rate for 1 Cum 103.06
AS per SSR 0r say Rs. 103.10

(ii) Unloading charges:


Out put = 5.50 Cum Rate Per Amount
a) Labour:
0.005 day Head mazdoor 460.00 day Rs. 2.30
0.125 day Mazdoor 420.00 day Rs. 52.50
Rs. 54.80
0.00 add area allowance at 0% on Rs. 54.80 Rs. 0.00
Total labour charges Rs. 54.80
b) Machinery:
0.166 Hrs. hire charges of Truck 10 Tonnes 344.30 Hour Rs. 57.15
capacity @ Rs.
0.166 Hrs. fuel charges of Truck 10 Tonnes 369.30 Hour Rs. 61.30
capacity @ Rs.
0.166 Hrs. crew charges of Truck 10 Tonnes 200.90 Hour Rs. 33.35
capacity @ Rs.
0.00 add area allowance at 0% on Rs. 33.35 Rs. 0.00
Total machinery charges Rs. 151.80
Total labour and machinery charges Rs. 206.60
Rate for 5.50 Cum Rs. 206.60
Rate for 1.00 Cum Rs. 37.56
0.00 add overheads and contractors profit at 0% 37.56 Rs. 0.00
on Rs.
Total rate for 1 Cum 37.56
AS per SSR 0r say Rs. 37.60

B) For Lime, Agrregate, Stone Boulder, Brick aggregate, Kankar, Building rubbish,
Crushed slag, Stone for machinery work (per Cum):
(i) Loading charges:
Out put = 5.50 Cum Rate Per Amount
a) Labour:
0.02 day Head mazdoor 460.00 day Rs. 9.20
0.50 day Mazdoor 420.00 day Rs. 210.00
Rs. 219.20
0.00 add area allowance at 0% on Rs. 219.20 Rs. 0.00
Total labour charges Rs. 219.20
b) Machinery:
0.50 Hrs. hire charges of Truck 10 Tonnes 344.30 Hour Rs. 172.15
capacity @ Rs.
0.50 Hrs. fuel charges of Truck 10 Tonnes 369.30 Hour Rs. 184.65
capacity @ Rs.
0.50 Hrs. crew charges of Truck 10 Tonnes 200.90 Hour Rs. 100.45
capacity @ Rs.
0.00 add area allowance at 0% on Rs. 100.45 Rs. 0.00
Total machinery charges Rs. 457.25
Total labour and machinery charges Rs. 676.45
Rate for 5.50 Cum Rs. 676.45
Rate for 1.00 Cum Rs. 122.99
0.00 add overheads and contractors profit at 0% 122.99 Rs. 0.00
on Rs.
Total rate for 1 Cum 122.99
AS per SSR 0r say Rs. 123.00

(ii) Unloading charges:(50% of loading charges)


Out put = 5.50 Cum Rate Per Amount
a) Labour:
0.01 day Head mazdoor 460.00 day Rs. 4.60
0.25 day Mazdoor 420.00 day Rs. 105.00
Rs. 109.60
0.00 add area allowance at 0% on Rs. 109.60 Rs. 0.00
Total labour charges Rs. 109.60
b) Machinery:
0.25 Hrs. hire charges of Truck 10 Tonnes 344.30 Hour Rs. 86.08
capacity @ Rs.
0.25 Hrs. fuel charges of Truck 10 Tonnes 369.30 Hour Rs. 92.33
capacity @ Rs.
0.25 Hrs. crew charges of Truck 10 Tonnes 200.90 Hour Rs. 50.23
capacity @ Rs.
0.00 add area allowance at 0% on Rs. 50.23 Rs. 0.00
Total machinery charges Rs. 228.64
Total labour and machinery charges Rs. 338.24
Rate for 5.50 Cum Rs. 338.24
Rate for 1.00 Cum Rs. 61.5
0.00 add overheads and contractors profit at 0% 61.50 Rs. 0.00
on Rs.
Total rate for 1 Cum 61.50
AS per SSR 0r say Rs. 61.50

C) For Cement (per Tonne):


(i) Loading charges:
Out put = 10.00 MT Rate Per Amount
a) Labour:
0.06 day Head mazdoor 460.00 day Rs. 27.60
1.50 day Mazdoor 420.00 day Rs. 630.00
Rs. 657.60
0.00 add area allowance at 0% on Rs. 657.60 Rs. 0.00
Total labour charges Rs. 657.60
b) Machinery:
1.00 Hrs. hire charges of Truck 10 Tonnes 344.30 Hour Rs. 344.30
capacity @ Rs.
1.00 Hrs. fuel charges of Truck 10 Tonnes 369.30 Hour Rs. 369.30
capacity @ Rs.
1.00 Hrs. crew charges of Truck 10 Tonnes 200.90 Hour Rs. 200.90
capacity @ Rs.
0.00 add area allowance at 0% on Rs. 200.90 Rs. 0.00
Total machinery charges Rs. 914.50
Total labour and machinery charges Rs. 1572.10
Rate for 10.00 MT Rs. 1572.10
Rate for 1.00 MT Rs. 157.21
0.00 add overheads and contractors profit at 0% 157.21 Rs. 0.00
on Rs.
Total rate for 1 MT 157.21
AS per SSR 0r say Rs. 157.20

(ii) Unloading & Stacking charges:


Out put = 10.00 MT Rate Per Amount
a) Labour:
0.06 day Head mazdoor 460.00 day Rs. 27.60
1.50 day Mazdoor 420.00 day Rs. 630.00
Rs. 657.60
0.00 add area allowance at 0% on Rs. 657.60 Rs. 0.00
Total labour charges Rs. 657.60
b) Machinery:
1.00 Hrs. hire charges of Truck 10 Tonnes 344.30 Hour Rs. 344.30
capacity @ Rs.
1.00 Hrs. fuel charges of Truck 10 Tonnes 369.30 Hour Rs. 369.30
capacity @ Rs.
1.00 Hrs. crew charges of Truck 10 Tonnes 200.90 Hour Rs. 200.90
capacity @ Rs.
0.00 add area allowance at 0% on Rs. 200.90 Rs. 0.00
Total machinery charges Rs. 914.50
Total labour and machinery charges Rs. 1572.10
Rate for 10.00 MT Rs. 1572.10
Rate for 1.00 MT Rs. 157.21
0.00 add overheads and contractors profit at 0% 157.21 Rs. 0.00
on Rs.
Total rate for 1 MT 157.21
AS per SSR 0r say Rs. 157.20

D) For Structural steel, Steel bars (per Tonne):


(i) Loading charges:
Out put = 10.00 MT Rate Per Amount
a) Labour:
0.07 day Head mazdoor 460.00 day Rs. 32.20
1.80 day Mazdoor 420.00 day Rs. 756.00
Rs. 788.20
0.00 add area allowance at 0% on Rs. 788.20 Rs. 0.00
Total labour charges Rs. 788.20
b) Machinery:
1.00 Hrs. hire charges of Truck 10 Tonnes 344.30 Hour Rs. 344.30
capacity @ Rs.
1.00 Hrs. fuel charges of Truck 10 Tonnes 369.30 Hour Rs. 369.30
capacity @ Rs.
1.00 Hrs. crew charges of Truck 10 Tonnes 200.90 Hour Rs. 200.90
capacity @ Rs.
0.00 add area allowance at 0% on Rs. 200.90 Rs. 0.00
Total machinery charges Rs. 914.50
Total labour and machinery charges Rs. 1702.70
Rate for 10.00 MT Rs. 1702.70
Rate for 1.00 MT Rs. 170.27
0.00 add overheads and contractors profit at 0% 170.27 Rs. 0.00
on Rs.
Total rate for 1 MT 170.27
AS per SSR 0r say Rs. 170.30

(ii) Unloading & Stacking charges:


Out put = 10.00 MT Rate Per Amount
a) Labour:
0.07 day Head mazdoor 460.00 day Rs. 32.20
1.80 day Mazdoor 420.00 day Rs. 756.00
Rs. 788.20
0.00 add area allowance at 0% on Rs. 788.20 Rs. 0.00
Total labour charges Rs. 788.20
b) Machinery:
1.00 Hrs. hire charges of Truck 10 Tonnes 344.30 Hour Rs. 344.30
capacity @ Rs.
1.00 Hrs. fuel charges of Truck 10 Tonnes 369.30 Hour Rs. 369.30
capacity @ Rs.
1.00 Hrs. crew charges of Truck 10 Tonnes 200.90 Hour Rs. 200.90
capacity @ Rs.
0.00 add area allowance at 0% on Rs. 200.90 Rs. 0.00
Total machinery charges Rs. 914.50
Total labour and machinery charges Rs. 1702.70
Rate for 10.00 MT Rs. 1702.70
Rate for 1.00 MT Rs. 170.27
0.00 add overheads and contractors profit at 0% 170.27 Rs. 0.00
on Rs.
Total rate for 1 MT 170.27
AS per SSR 0r say Rs. 170.30

E) For Bricks of size 225 x 140 x 70mm (per 1000 Nos):


(i) Loading charges:
Out put = 2000.00 Nos Rate Per Amount
a) Labour:
0.01 day Head mazdoor 460.00 day Rs. 4.60
0.25 day Mazdoor 420.00 day Rs. 105.00
Rs. 109.60
0.00 add area allowance at 0% on Rs. 109.60 Rs. 0.00
Total labour charges Rs. 109.60
b) Machinery:
0.33 Hrs. hire charges of Truck 10 Tonnes 344.30 Hour Rs. 113.62
capacity @ Rs.
0.33 Hrs. fuel charges of Truck 10 Tonnes 369.30 Hour Rs. 121.87
capacity @ Rs.
0.33 Hrs. crew charges of Truck 10 Tonnes 200.90 Hour Rs. 66.30
capacity @ Rs.
0.00 add area allowance at 0% on Rs. 66.30 Rs. 0.00

Total machinery charges Rs. 301.79

Total labour and machinery charges Rs. 411.39

Rate for 2000 Nos Rs. 411.39


Rate for 1000 Nos Rs. 205.70
0.00 add overheads and contractors profit at 0% 205.70 Rs. 0.00
on Rs.
Total rate for 1000 Nos Rs. 205.70

(ii) Unloading & Stacking charges:


Out put = 2000.00 Nos Rate Per Amount
a) Labour:
0.01 day Head mazdoor 460.00 day Rs. 4.60
0.25 day Mazdoor 420.00 day Rs. 105.00
Rs. 109.60
0.00 add area allowance at 0% on Rs. 109.60 Rs. 0.00
Total labour charges Rs. 109.60
b) Machinery:
0.33 Hrs. hire charges of Truck 10 Tonnes 344.30 Hour Rs. 113.62
capacity @ Rs.
0.33 Hrs. fuel charges of Truck 10 Tonnes 369.30 Hour Rs. 121.87
capacity @ Rs.
0.33 Hrs. crew charges of Truck 10 Tonnes 200.90 Hour Rs. 66.30
capacity @ Rs.
0.00 add area allowance at 0% on Rs. 66.30 Rs. 0.00
Total machinery charges Rs. 301.79
Total labour and machinery charges Rs. 411.39
Rate for 2000 Nos Rs. 411.39
Rate for 1000 Nos Rs. 205.7
0.00 add overheads and contractors profit at 0% 205.70 Rs. 0.00
on Rs.
Total rate for 1000 Nos Rs. 205.70

LOADING & UNLOADING CHARGES BY MECHANICAL MEANS (INCLUDING IDLE HIRE


CHARGES OF TRUCKS)
A) For Earth, Sand, Morrum, Manure, Fly Ash (per Cum):
(i) Loading charges:
Out put = 5.50 Cum Rate Per Amount
a) Machinery:
0.105 Hrs. hire charges of Tipper 10 Tonnes 344.30 Hour Rs. 36.15
capacity @ Rs.
0.105 Hrs. fuel charges of Tipper 10 Tonnes 369.30 Hour Rs. 38.78
capacity @ Rs.
0.105 Hrs. crew charges of Tipper 10 Tonnes 200.90 Hour Rs. 21.09
capacity @ Rs.
0.055 Hrs. FE loader 1.00 Cum bucket capacity @ 2761.20 Hour Rs. 151.87
45 Cum including Hire charges, fuel charges
and crew charges @ Rs.

0.00 add area allowance at 0% on Rs. 0.00 Rs. 0.00


Total machinery charges Rs. 247.89
Rate for 5.50 Cum Rs. 247.89
Rate for 1.00 Cum Rs. 45.07
0.00 add overheads and contractors profit at 0% 45.07 Rs. 0.00
on Rs.
Total rate for 1 Cum 45.07
AS per SSR 0r say Rs. 45.60

(ii) Unloading charges:


Out put = 5.50 Cum Rate Per Amount
a) Machinery:
0.105 Hrs. hire charges of Tipper 5 Tonnes 344.30 Hour Rs. 36.15
capacity @ Rs.
0.105 Hrs. fuel charges of Tipper 5Tonnes 369.30 Hour Rs. 38.78
capacity @ Rs.
0.105 Hrs. crew charges of Tipper 10 Tonnes 200.90 Hour Rs. 21.09
capacity @ Rs.
0.055 Hrs. FE loader 1.00 Cum bucket capacity @ 2761.20 Hour Rs. 151.87
45 Cum including Hire charges, fuel charges
and crew charges @ Rs.

Total machinery charges Rs. 247.89


Rate for 5.50 Cum Rs. 247.89
Rate for 1.00 Cum Rs. 45.07
0.00 add overheads and contractors profit at 0% 45.07 Rs. 0.00
on Rs.
Total rate for 1 Cum 45.07
AS per SSR 0r say Rs. 45.60

B) For Lime, Agrregate, Stone Boulder, Brick aggregate, Kankar, Building rubbish,
Crushed slag, Stone for machinery work (per Cum):
(i) Loading charges:
Out put = 5.50 Cum Rate Per Amount
a) Machinery:
0.17 Hrs. hire charges of Tipper 10 Tonnes 344.30 Hour Rs. 58.53
capacity @ Rs.
0.17 Hrs. fuel charges of Tipper 10 Tonnes 369.30 Hour Rs. 62.78
capacity @ Rs.
0.17 Hrs. crew charges of Tipper 10 Tonnes 200.90 Hour Rs. 34.15
capacity @ Rs.
0.12 Hrs. FE loader 1.00 Cum bucket capacity @ 2761.20 Hour Rs. 331.34
45 Cum including Hire charges, fuel charges
and crew charges @ Rs.

0.00 add area allowance at 0% on Rs. 0.00 Rs. 0.00


Total machinery charges Rs. 486.80
Rate for 5.50 Cum Rs. 486.80
Rate for 1.00 Cum Rs. 88.51
0.00 add overheads and contractors profit at 0% 88.51 Rs. 0.00
on Rs.
Total rate for 1 Cum 88.51
AS per SSR 0r say Rs. 90.80
CONVEYANCE CHARGES AS PER COMMON SSR 2019 - 2020

PCC
Rubble/Size Cement/Steel/RC
Earth/Sand/ Slabs/Shabad
Sl. Lead in Stone/Cut C poles/A.C & G.I
Gravel/Murru Slabs/CC & Water Bricks
No Kms Stone/Coarse Sheets/Packed
m/Lime/Surki Laterite
aggregates materials
Blocks/Wood

1 1 2 3 4 5 6 7
### 1 1.00 0.00 0.00 0.00 0.00 0.00 0.00
2 2.00 11.20 11.00 6.90 16.10 7.00 18.30
3 3.00 24.40 25.30 15.90 37.10 15.20 39.70
4 4.00 35.70 36.60 22.90 53.80 22.20 57.90
5 5.00 47.00 47.90 30.00 70.40 29.30 76.20
6 6.00 58.30 59.20 37.10 87.00 36.30 94.50
7 7.00 69.60 70.50 44.20 103.60 43.30 112.80
8 8.00 80.90 81.80 51.30 120.20 50.30 131.10
9 9.00 92.20 93.10 58.40 136.80 57.30 149.40
10 10.00 103.50 104.40 65.50 153.40 64.30 167.70
11 11.00 114.80 115.70 72.60 170.00 71.30 186.00
12 12.00 126.10 127.00 79.70 186.60 78.30 204.30
13 13.00 137.40 138.30 86.80 203.20 85.30 222.60
14 14.00 148.70 149.60 93.90 219.80 92.30 240.90
15 15.00 160.00 160.90 101.00 236.40 99.30 259.20
16 16.00 171.30 172.20 108.10 253.00 106.30 277.50
17 17.00 182.60 183.50 115.20 269.60 113.30 295.80
18 18.00 193.90 194.80 122.30 286.20 120.30 314.10
19 19.00 205.20 206.10 129.40 302.80 127.30 332.40
20 20.00 216.50 217.40 136.50 319.40 134.30 350.70
21 21.00 227.80 228.70 143.60 336.00 141.30 369.00
22 22.00 239.10 240.00 150.70 352.60 148.30 387.30
23 23.00 250.40 251.30 157.80 369.20 155.30 405.60
24 24.00 261.70 262.60 164.90 385.80 162.30 423.90
25 25.00 273.00 273.90 172.00 402.40 169.30 442.20
26 26.00 284.30 285.20 179.10 419.00 176.30 460.50
27 27.00 295.60 296.50 186.20 435.60 183.30 478.80
28 28.00 306.90 307.80 193.30 452.20 190.30 497.10
29 29.00 318.20 319.10 200.40 468.80 197.30 515.40
30 30.00 329.50 330.40 207.50 485.40 204.30 533.70
31 31.00 338.90 339.80 213.40 499.30 210.20 548.90
32 32.00 348.30 349.20 219.30 513.20 216.10 564.10
33 33.00 357.70 358.60 225.20 527.10 222.00 579.30
34 34.00 367.10 368.00 231.10 541.00 227.90 594.50
35 35.00 376.50 377.40 237.00 554.90 233.80 609.70
36 36.00 385.90 386.80 242.90 568.80 239.70 624.90
37 37.00 395.30 396.20 248.80 582.70 245.60 640.10
38 38.00 404.70 405.60 254.70 596.60 251.50 655.30
39 39.00 414.10 415.00 260.60 610.50 257.40 670.50
40 40.00 423.50 424.40 266.50 624.40 263.30 685.70
41 41.00 432.90 433.80 272.40 638.30 269.20 700.90
42 42.00 442.30 443.20 278.30 652.20 275.10 716.10
43 43.00 451.70 452.60 284.20 666.10 281.00 731.30
44 44.00 461.10 462.00 290.10 680.00 286.90 746.50
45 45.00 470.50 471.40 296.00 693.90 292.80 761.70
46 46.00 479.90 480.80 301.90 707.80 298.70 776.90
47 47.00 489.30 490.20 307.80 721.70 304.60 792.10
48 48.00 498.70 499.60 313.70 735.60 310.50 807.30
49 49.00 508.10 509.00 319.60 749.50 316.40 822.50
50 50.00 517.50 518.40 325.50 763.40 322.30 837.70
51 51.00 526.90 527.80 331.40 777.30 328.20 852.90
52 52.00 536.30 537.20 337.30 791.20 334.10 868.10
53 53.00 545.70 546.60 343.20 805.10 340.00 883.30
54 54.00 555.10 556.00 349.10 819.00 345.90 898.50
55 55.00 564.50 565.40 355.00 832.90 351.80 913.70
56 56.00 573.90 574.80 360.90 846.80 357.70 928.90
57 57.00 583.30 584.20 366.80 860.70 363.60 944.10
58 58.00 592.70 593.60 372.70 874.60 369.50 959.30
59 59.00 602.10 603.00 378.60 888.50 375.40 974.50
60 60.00 611.50 612.40 384.50 902.40 381.30 989.70
61 61.00 620.90 621.80 390.40 916.30 387.20 1004.90
62 62.00 630.30 631.20 396.30 930.20 393.10 1020.10
63 63.00 639.70 640.60 402.20 944.10 399.00 1035.30
64 64.00 649.10 650.00 408.10 958.00 404.90 1050.50
65 65.00 658.50 659.40 414.00 971.90 410.80 1065.70
66 66.00 667.90 668.80 419.90 985.80 416.70 1080.90
67 67.00 677.30 678.20 425.80 999.70 422.60 1096.10
68 68.00 686.70 687.60 431.70 1013.60 428.50 1111.30
69 69.00 696.10 697.00 437.60 1027.50 434.40 1126.50
70 70.00 705.50 706.40 443.50 1041.40 440.30 1141.70
71 71.00 714.90 715.80 449.40 1055.30 446.20 1156.90
72 72.00 724.30 725.20 455.30 1069.20 452.10 1172.10
73 73.00 733.70 734.60 461.20 1083.10 458.00 1187.30
74 74.00 743.10 744.00 467.10 1097.00 463.90 1202.50
75 75.00 752.50 753.40 473.00 1110.90 469.80 1217.70
76 76.00 761.90 762.80 478.90 1124.80 475.70 1232.90
77 77.00 771.30 772.20 484.80 1138.70 481.60 1248.10
78 78.00 780.70 781.60 490.70 1152.60 487.50 1263.30
79 79.00 790.10 791.00 496.60 1166.50 493.40 1278.50
80 80.00 799.50 800.40 502.50 1180.40 499.30 1293.70
81 81.00 808.90 809.80 508.40 1194.30 505.20 1308.90
82 82.00 818.30 819.20 514.30 1208.20 511.10 1324.10
83 83.00 827.70 828.60 520.20 1222.10 517.00 1339.30
84 84.00 837.10 838.00 526.10 1236.00 522.90 1354.50
85 85.00 846.50 847.40 532.00 1249.90 528.80 1369.70
86 86.00 855.90 856.80 537.90 1263.80 534.70 1384.90
87 87.00 865.30 866.20 543.80 1277.70 540.60 1400.10
88 88.00 874.70 875.60 549.70 1291.60 546.50 1415.30
89 89.00 884.10 885.00 555.60 1305.50 552.40 1430.50
90 90.00 893.50 894.40 561.50 1319.40 558.30 1445.70
91 91.00 902.90 903.80 567.40 1333.30 564.20 1460.90
92 92.00 912.30 913.20 573.30 1347.20 570.10 1476.10
93 93.00 921.70 922.60 579.20 1361.10 576.00 1491.30
94 94.00 931.10 932.00 585.10 1375.00 581.90 1506.50
95 95.00 940.50 941.40 591.00 1388.90 587.80 1521.70
96 96.00 949.90 950.80 596.90 1402.80 593.70 1536.90
97 97.00 959.30 960.20 602.80 1416.70 599.60 1552.10
98 98.00 968.70 969.60 608.70 1430.60 605.50 1567.30
99 99.00 978.10 979.00 614.60 1444.50 611.40 1582.50
100 100.00 987.50 988.40 620.50 1458.40 617.30 1597.70
101 101.00 996.90 997.80 626.40 1472.30 623.20 1612.90
102 102.00 1006.30 1007.20 632.30 1486.20 629.10 1628.10
103 103.00 1015.70 1016.60 638.20 1500.10 635.00 1643.30
104 104.00 1025.10 1026.00 644.10 1514.00 640.90 1658.50
105 105.00 1034.50 1035.40 650.00 1527.90 646.80 1673.70
106 106.00 1043.90 1044.80 655.90 1541.80 652.70 1688.90
107 107.00 1053.30 1054.20 661.80 1555.70 658.60 1704.10
108 108.00 1062.70 1063.60 667.70 1569.60 664.50 1719.30
109 109.00 1072.10 1073.00 673.60 1583.50 670.40 1734.50
110 110.00 1081.50 1082.40 679.50 1597.40 676.30 1749.70
111 111.00 1090.90 1091.80 685.40 1611.30 682.20 1764.90
112 112.00 1100.30 1101.20 691.30 1625.20 688.10 1780.10
113 113.00 1109.70 1110.60 697.20 1639.10 694.00 1795.30
114 114.00 1119.10 1120.00 703.10 1653.00 699.90 1810.50
115 115.00 1128.50 1129.40 709.00 1666.90 705.80 1825.70
116 116.00 1137.90 1138.80 714.90 1680.80 711.70 1840.90
117 117.00 1147.30 1148.20 720.80 1694.70 717.60 1856.10
118 118.00 1156.70 1157.60 726.70 1708.60 723.50 1871.30
119 119.00 1166.10 1167.00 732.60 1722.50 729.40 1886.50
120 120.00 1175.50 1176.40 738.50 1736.40 735.30 1901.70
121 121.00 1184.90 1185.80 744.40 1750.30 741.20 1916.90
122 122.00 1194.30 1195.20 750.30 1764.20 747.10 1932.10
123 123.00 1203.70 1204.60 756.20 1778.10 753.00 1947.30
124 124.00 1213.10 1214.00 762.10 1792.00 758.90 1962.50
125 125.00 1222.50 1223.40 768.00 1805.90 764.80 1977.70
126 126.00 1231.90 1232.80 773.90 1819.80 770.70 1992.90
127 127.00 1241.30 1242.20 779.80 1833.70 776.60 2008.10
128 128.00 1250.70 1251.60 785.70 1847.60 782.50 2023.30
129 129.00 1260.10 1261.00 791.60 1861.50 788.40 2038.50
130 130.00 1269.50 1270.40 797.50 1875.40 794.30 2053.70
131 131.00 1278.90 1279.80 803.40 1889.30 800.20 2068.90
132 132.00 1288.30 1289.20 809.30 1903.20 806.10 2084.10
133 133.00 1297.70 1298.60 815.20 1917.10 812.00 2099.30
134 134.00 1307.10 1308.00 821.10 1931.00 817.90 2114.50
135 135.00 1316.50 1317.40 827.00 1944.90 823.80 2129.70
136 136.00 1325.90 1326.80 832.90 1958.80 829.70 2144.90
137 137.00 1335.30 1336.20 838.80 1972.70 835.60 2160.10
138 138.00 1344.70 1345.60 844.70 1986.60 841.50 2175.30
139 139.00 1354.10 1355.00 850.60 2000.50 847.40 2190.50
140 140.00 1363.50 1364.40 856.50 2014.40 853.30 2205.70
141 141.00 1372.90 1373.80 862.40 2028.30 859.20 2220.90
142 142.00 1382.30 1383.20 868.30 2042.20 865.10 2236.10
143 143.00 1391.70 1392.60 874.20 2056.10 871.00 2251.30
144 144.00 1401.10 1402.00 880.10 2070.00 876.90 2266.50
145 145.00 1410.50 1411.40 886.00 2083.90 882.80 2281.70
146 146.00 1419.90 1420.80 891.90 2097.80 888.70 2296.90
147 147.00 1429.30 1430.20 897.80 2111.70 894.60 2312.10
148 148.00 1438.70 1439.60 903.70 2125.60 900.50 2327.30
149 149.00 1448.10 1449.00 909.60 2139.50 906.40 2342.50
150 150.00 1457.50 1458.40 915.50 2153.40 912.30 2357.70
151 151.00 1466.90 1467.80 921.40 2167.30 918.20 2372.90
152 152.00 1476.30 1477.20 927.30 2181.20 924.10 2388.10
153 153.00 1485.70 1486.60 933.20 2195.10 930.00 2403.30
154 154.00 1495.10 1496.00 939.10 2209.00 935.90 2418.50
155 155.00 1504.50 1505.40 945.00 2222.90 941.80 2433.70
156 156.00 1513.90 1514.80 950.90 2236.80 947.70 2448.90
157 157.00 1523.30 1524.20 956.80 2250.70 953.60 2464.10
158 158.00 1532.70 1533.60 962.70 2264.60 959.50 2479.30
159 159.00 1542.10 1543.00 968.60 2278.50 965.40 2494.50
160 160.00 1551.50 1552.40 974.50 2292.40 971.30 2509.70
161 161.00 1560.90 1561.80 980.40 2306.30 977.20 2524.90
162 162.00 1570.30 1571.20 986.30 2320.20 983.10 2540.10
163 163.00 1579.70 1580.60 992.20 2334.10 989.00 2555.30
164 164.00 1589.10 1590.00 998.10 2348.00 994.90 2570.50
165 165.00 1598.50 1599.40 1004.00 2361.90 1000.80 2585.70
166 166.00 1607.90 1608.80 1009.90 2375.80 1006.70 2600.90
167 167.00 1617.30 1618.20 1015.80 2389.70 1012.60 2616.10
168 168.00 1626.70 1627.60 1021.70 2403.60 1018.50 2631.30
169 169.00 1636.10 1637.00 1027.60 2417.50 1024.40 2646.50
170 170.00 1645.50 1646.40 1033.50 2431.40 1030.30 2661.70
171 171.00 1654.90 1655.80 1039.40 2445.30 1036.20 2676.90
172 172.00 1664.30 1665.20 1045.30 2459.20 1042.10 2692.10
173 173.00 1673.70 1674.60 1051.20 2473.10 1048.00 2707.30
174 174.00 1683.10 1684.00 1057.10 2487.00 1053.90 2722.50
175 175.00 1692.50 1693.40 1063.00 2500.90 1059.80 2737.70
176 176.00 1701.90 1702.80 1068.90 2514.80 1065.70 2752.90
177 177.00 1711.30 1712.20 1074.80 2528.70 1071.60 2768.10
178 178.00 1720.70 1721.60 1080.70 2542.60 1077.50 2783.30
179 179.00 1730.10 1731.00 1086.60 2556.50 1083.40 2798.50
180 180.00 1739.50 1740.40 1092.50 2570.40 1089.30 2813.70
181 181.00 1748.90 1749.80 1098.40 2584.30 1095.20 2828.90
182 182.00 1758.30 1759.20 1104.30 2598.20 1101.10 2844.10
183 183.00 1767.70 1768.60 1110.20 2612.10 1107.00 2859.30
184 184.00 1777.10 1778.00 1116.10 2626.00 1112.90 2874.50
185 185.00 1786.50 1787.40 1122.00 2639.90 1118.80 2889.70
186 186.00 1795.90 1796.80 1127.90 2653.80 1124.70 2904.90
187 187.00 1805.30 1806.20 1133.80 2667.70 1130.60 2920.10
188 188.00 1814.70 1815.60 1139.70 2681.60 1136.50 2935.30
189 189.00 1824.10 1825.00 1145.60 2695.50 1142.40 2950.50
190 190.00 1833.50 1834.40 1151.50 2709.40 1148.30 2965.70
191 191.00 1842.90 1843.80 1157.40 2723.30 1154.20 2980.90
192 192.00 1852.30 1853.20 1163.30 2737.20 1160.10 2996.10
193 193.00 1861.70 1862.60 1169.20 2751.10 1166.00 3011.30
194 194.00 1871.10 1872.00 1175.10 2765.00 1171.90 3026.50
195 195.00 1880.50 1881.40 1181.00 2778.90 1177.80 3041.70
196 196.00 1889.90 1890.80 1186.90 2792.80 1183.70 3056.90
197 197.00 1899.30 1900.20 1192.80 2806.70 1189.60 3072.10
198 198.00 1908.70 1909.60 1198.70 2820.60 1195.50 3087.30
199 199.00 1918.10 1919.00 1204.60 2834.50 1201.40 3102.50
200 200.00 1927.50 1928.40 1210.50 2848.40 1207.30 3117.70
201 201.00 1936.90 1937.80 1216.40 2862.30 1213.20 3132.90
202 202.00 1946.30 1947.20 1222.30 2876.20 1219.10 3148.10
203 203.00 1955.70 1956.60 1228.20 2890.10 1225.00 3163.30
204 204.00 1965.10 1966.00 1234.10 2904.00 1230.90 3178.50
205 205.00 1974.50 1975.40 1240.00 2917.90 1236.80 3193.70
206 206.00 1983.90 1984.80 1245.90 2931.80 1242.70 3208.90
207 207.00 1993.30 1994.20 1251.80 2945.70 1248.60 3224.10
208 208.00 2002.70 2003.60 1257.70 2959.60 1254.50 3239.30
209 209.00 2012.10 2013.00 1263.60 2973.50 1260.40 3254.50
210 210.00 2021.50 2022.40 1269.50 2987.40 1266.30 3269.70
211 211.00 2030.90 2031.80 1275.40 3001.30 1272.20 3284.90
212 212.00 2040.30 2041.20 1281.30 3015.20 1278.10 3300.10
213 213.00 2049.70 2050.60 1287.20 3029.10 1284.00 3315.30
214 214.00 2059.10 2060.00 1293.10 3043.00 1289.90 3330.50
215 215.00 2068.50 2069.40 1299.00 3056.90 1295.80 3345.70
216 216.00 2077.90 2078.80 1304.90 3070.80 1301.70 3360.90
217 217.00 2087.30 2088.20 1310.80 3084.70 1307.60 3376.10
218 218.00 2096.70 2097.60 1316.70 3098.60 1313.50 3391.30
219 219.00 2106.10 2107.00 1322.60 3112.50 1319.40 3406.50
220 220.00 2115.50 2116.40 1328.50 3126.40 1325.30 3421.70
221 221.00 2124.90 2125.80 1334.40 3140.30 1331.20 3436.90
222 222.00 2134.30 2135.20 1340.30 3154.20 1337.10 3452.10
223 223.00 2143.70 2144.60 1346.20 3168.10 1343.00 3467.30
224 224.00 2153.10 2154.00 1352.10 3182.00 1348.90 3482.50
225 225.00 2162.50 2163.40 1358.00 3195.90 1354.80 3497.70
226 226.00 2171.90 2172.80 1363.90 3209.80 1360.70 3512.90
227 227.00 2181.30 2182.20 1369.80 3223.70 1366.60 3528.10
228 228.00 2190.70 2191.60 1375.70 3237.60 1372.50 3543.30
229 229.00 2200.10 2201.00 1381.60 3251.50 1378.40 3558.50
230 230.00 2209.50 2210.40 1387.50 3265.40 1384.30 3573.70
231 231.00 2218.90 2219.80 1393.40 3279.30 1390.20 3588.90
232 232.00 2228.30 2229.20 1399.30 3293.20 1396.10 3604.10
233 233.00 2237.70 2238.60 1405.20 3307.10 1402.00 3619.30
234 234.00 2247.10 2248.00 1411.10 3321.00 1407.90 3634.50
235 235.00 2256.50 2257.40 1417.00 3334.90 1413.80 3649.70
236 236.00 2265.90 2266.80 1422.90 3348.80 1419.70 3664.90
237 237.00 2275.30 2276.20 1428.80 3362.70 1425.60 3680.10
238 238.00 2284.70 2285.60 1434.70 3376.60 1431.50 3695.30
239 239.00 2294.10 2295.00 1440.60 3390.50 1437.40 3710.50
240 240.00 2303.50 2304.40 1446.50 3404.40 1443.30 3725.70
241 241.00 2312.90 2313.80 1452.40 3418.30 1449.20 3740.90
242 242.00 2322.30 2323.20 1458.30 3432.20 1455.10 3756.10
243 243.00 2331.70 2332.60 1464.20 3446.10 1461.00 3771.30
244 244.00 2341.10 2342.00 1470.10 3460.00 1466.90 3786.50
245 245.00 2350.50 2351.40 1476.00 3473.90 1472.80 3801.70
246 246.00 2359.90 2360.80 1481.90 3487.80 1478.70 3816.90
247 247.00 2369.30 2370.20 1487.80 3501.70 1484.60 3832.10
248 248.00 2378.70 2379.60 1493.70 3515.60 1490.50 3847.30
249 249.00 2388.10 2389.00 1499.60 3529.50 1496.40 3862.50
250 250.00 2397.50 2398.40 1505.50 3543.40 1502.30 3877.70
251 251.00 2406.90 2407.80 1511.40 3557.30 1508.20 3892.90
252 252.00 2416.30 2417.20 1517.30 3571.20 1514.10 3908.10
253 253.00 2425.70 2426.60 1523.20 3585.10 1520.00 3923.30
254 254.00 2435.10 2436.00 1529.10 3599.00 1525.90 3938.50
255 255.00 2444.50 2445.40 1535.00 3612.90 1531.80 3953.70
256 256.00 2453.90 2454.80 1540.90 3626.80 1537.70 3968.90
257 257.00 2463.30 2464.20 1546.80 3640.70 1543.60 3984.10
258 258.00 2472.70 2473.60 1552.70 3654.60 1549.50 3999.30
259 259.00 2482.10 2483.00 1558.60 3668.50 1555.40 4014.50
260 260.00 2491.50 2492.40 1564.50 3682.40 1561.30 4029.70
261 261.00 2500.90 2501.80 1570.40 3696.30 1567.20 4044.90
262 262.00 2510.30 2511.20 1576.30 3710.20 1573.10 4060.10
263 263.00 2519.70 2520.60 1582.20 3724.10 1579.00 4075.30
264 264.00 2529.10 2530.00 1588.10 3738.00 1584.90 4090.50
265 265.00 2538.50 2539.40 1594.00 3751.90 1590.80 4105.70
266 266.00 2547.90 2548.80 1599.90 3765.80 1596.70 4120.90
267 267.00 2557.30 2558.20 1605.80 3779.70 1602.60 4136.10
268 268.00 2566.70 2567.60 1611.70 3793.60 1608.50 4151.30
269 269.00 2576.10 2577.00 1617.60 3807.50 1614.40 4166.50
270 270.00 2585.50 2586.40 1623.50 3821.40 1620.30 4181.70
271 271.00 2594.90 2595.80 1629.40 3835.30 1626.20 4196.90
272 272.00 2604.30 2605.20 1635.30 3849.20 1632.10 4212.10
273 273.00 2613.70 2614.60 1641.20 3863.10 1638.00 4227.30
274 274.00 2623.10 2624.00 1647.10 3877.00 1643.90 4242.50
275 275.00 2632.50 2633.40 1653.00 3890.90 1649.80 4257.70
276 276.00 2641.90 2642.80 1658.90 3904.80 1655.70 4272.90
277 277.00 2651.30 2652.20 1664.80 3918.70 1661.60 4288.10
278 278.00 2660.70 2661.60 1670.70 3932.60 1667.50 4303.30
279 279.00 2670.10 2671.00 1676.60 3946.50 1673.40 4318.50
280 280.00 2679.50 2680.40 1682.50 3960.40 1679.30 4333.70
281 281.00 2688.90 2689.80 1688.40 3974.30 1685.20 4348.90
282 282.00 2698.30 2699.20 1694.30 3988.20 1691.10 4364.10
283 283.00 2707.70 2708.60 1700.20 4002.10 1697.00 4379.30
284 284.00 2717.10 2718.00 1706.10 4016.00 1702.90 4394.50
285 285.00 2726.50 2727.40 1712.00 4029.90 1708.80 4409.70
286 286.00 2735.90 2736.80 1717.90 4043.80 1714.70 4424.90
287 287.00 2745.30 2746.20 1723.80 4057.70 1720.60 4440.10
288 288.00 2754.70 2755.60 1729.70 4071.60 1726.50 4455.30
289 289.00 2764.10 2765.00 1735.60 4085.50 1732.40 4470.50
290 290.00 2773.50 2774.40 1741.50 4099.40 1738.30 4485.70
291 291.00 2782.90 2783.80 1747.40 4113.30 1744.20 4500.90
292 292.00 2792.30 2793.20 1753.30 4127.20 1750.10 4516.10
293 293.00 2801.70 2802.60 1759.20 4141.10 1756.00 4531.30
294 294.00 2811.10 2812.00 1765.10 4155.00 1761.90 4546.50
295 295.00 2820.50 2821.40 1771.00 4168.90 1767.80 4561.70
296 296.00 2829.90 2830.80 1776.90 4182.80 1773.70 4576.90
297 297.00 2839.30 2840.20 1782.80 4196.70 1779.60 4592.10
298 298.00 2848.70 2849.60 1788.70 4210.60 1785.50 4607.30
299 299.00 2858.10 2859.00 1794.60 4224.50 1791.40 4622.50
300 300.00 2867.50 2868.40 1800.50 4238.40 1797.30 4637.70
301 301.00 2876.90 2877.80 1806.40 4252.30 1803.20 4652.90
302 302.00 2886.30 2887.20 1812.30 4266.20 1809.10 4668.10
303 303.00 2895.70 2896.60 1818.20 4280.10 1815.00 4683.30
304 304.00 2905.10 2906.00 1824.10 4294.00 1820.90 4698.50
305 305.00 2914.50 2915.40 1830.00 4307.90 1826.80 4713.70
306 306.00 2923.90 2924.80 1835.90 4321.80 1832.70 4728.90
307 307.00 2933.30 2934.20 1841.80 4335.70 1838.60 4744.10
308 308.00 2942.70 2943.60 1847.70 4349.60 1844.50 4759.30
309 309.00 2952.10 2953.00 1853.60 4363.50 1850.40 4774.50
310 310.00 2961.50 2962.40 1859.50 4377.40 1856.30 4789.70
311 311.00 2970.90 2971.80 1865.40 4391.30 1862.20 4804.90
312 312.00 2980.30 2981.20 1871.30 4405.20 1868.10 4820.10
313 313.00 2989.70 2990.60 1877.20 4419.10 1874.00 4835.30
314 314.00 2999.10 3000.00 1883.10 4433.00 1879.90 4850.50
315 315.00 3008.50 3009.40 1889.00 4446.90 1885.80 4865.70
316 316.00 3017.90 3018.80 1894.90 4460.80 1891.70 4880.90
317 317.00 3027.30 3028.20 1900.80 4474.70 1897.60 4896.10
318 318.00 3036.70 3037.60 1906.70 4488.60 1903.50 4911.30
319 319.00 3046.10 3047.00 1912.60 4502.50 1909.40 4926.50
320 320.00 3055.50 3056.40 1918.50 4516.40 1915.30 4941.70
321 321.00 3064.90 3065.80 1924.40 4530.30 1921.20 4956.90
322 322.00 3074.30 3075.20 1930.30 4544.20 1927.10 4972.10
323 323.00 3083.70 3084.60 1936.20 4558.10 1933.00 4987.30
324 324.00 3093.10 3094.00 1942.10 4572.00 1938.90 5002.50
325 325.00 3102.50 3103.40 1948.00 4585.90 1944.80 5017.70
326 326.00 3111.90 3112.80 1953.90 4599.80 1950.70 5032.90
327 327.00 3121.30 3122.20 1959.80 4613.70 1956.60 5048.10
328 328.00 3130.70 3131.60 1965.70 4627.60 1962.50 5063.30
329 329.00 3140.10 3141.00 1971.60 4641.50 1968.40 5078.50
330 330.00 3149.50 3150.40 1977.50 4655.40 1974.30 5093.70
331 331.00 3158.90 3159.80 1983.40 4669.30 1980.20 5108.90
332 332.00 3168.30 3169.20 1989.30 4683.20 1986.10 5124.10
333 333.00 3177.70 3178.60 1995.20 4697.10 1992.00 5139.30
334 334.00 3187.10 3188.00 2001.10 4711.00 1997.90 5154.50
335 335.00 3196.50 3197.40 2007.00 4724.90 2003.80 5169.70
336 336.00 3205.90 3206.80 2012.90 4738.80 2009.70 5184.90
337 337.00 3215.30 3216.20 2018.80 4752.70 2015.60 5200.10
338 338.00 3224.70 3225.60 2024.70 4766.60 2021.50 5215.30
339 339.00 3234.10 3235.00 2030.60 4780.50 2027.40 5230.50
340 340.00 3243.50 3244.40 2036.50 4794.40 2033.30 5245.70
341 341.00 3252.90 3253.80 2042.40 4808.30 2039.20 5260.90
342 342.00 3262.30 3263.20 2048.30 4822.20 2045.10 5276.10
343 343.00 3271.70 3272.60 2054.20 4836.10 2051.00 5291.30
344 344.00 3281.10 3282.00 2060.10 4850.00 2056.90 5306.50
345 345.00 3290.50 3291.40 2066.00 4863.90 2062.80 5321.70
346 346.00 3299.90 3300.80 2071.90 4877.80 2068.70 5336.90
347 347.00 3309.30 3310.20 2077.80 4891.70 2074.60 5352.10
348 348.00 3318.70 3319.60 2083.70 4905.60 2080.50 5367.30
349 349.00 3328.10 3329.00 2089.60 4919.50 2086.40 5382.50
350 350.00 3337.50 3338.40 2095.50 4933.40 2092.30 5397.70
351 351.00 3346.90 3347.80 2101.40 4947.30 2098.20 5412.90
352 352.00 3356.30 3357.20 2107.30 4961.20 2104.10 5428.10
353 353.00 3365.70 3366.60 2113.20 4975.10 2110.00 5443.30
354 354.00 3375.10 3376.00 2119.10 4989.00 2115.90 5458.50
355 355.00 3384.50 3385.40 2125.00 5002.90 2121.80 5473.70
356 356.00 3393.90 3394.80 2130.90 5016.80 2127.70 5488.90
357 357.00 3403.30 3404.20 2136.80 5030.70 2133.60 5504.10
358 358.00 3412.70 3413.60 2142.70 5044.60 2139.50 5519.30
359 359.00 3422.10 3423.00 2148.60 5058.50 2145.40 5534.50
360 360.00 3431.50 3432.40 2154.50 5072.40 2151.30 5549.70
361 361.00 3440.90 3441.80 2160.40 5086.30 2157.20 5564.90
362 362.00 3450.30 3451.20 2166.30 5100.20 2163.10 5580.10
363 363.00 3459.70 3460.60 2172.20 5114.10 2169.00 5595.30
364 364.00 3469.10 3470.00 2178.10 5128.00 2174.90 5610.50
365 365.00 3478.50 3479.40 2184.00 5141.90 2180.80 5625.70
366 366.00 3487.90 3488.80 2189.90 5155.80 2186.70 5640.90
367 367.00 3497.30 3498.20 2195.80 5169.70 2192.60 5656.10
368 368.00 3506.70 3507.60 2201.70 5183.60 2198.50 5671.30
369 369.00 3516.10 3517.00 2207.60 5197.50 2204.40 5686.50
370 370.00 3525.50 3526.40 2213.50 5211.40 2210.30 5701.70
371 371.00 3534.90 3535.80 2219.40 5225.30 2216.20 5716.90
372 372.00 3544.30 3545.20 2225.30 5239.20 2222.10 5732.10
373 373.00 3553.70 3554.60 2231.20 5253.10 2228.00 5747.30
374 374.00 3563.10 3564.00 2237.10 5267.00 2233.90 5762.50
375 375.00 3572.50 3573.40 2243.00 5280.90 2239.80 5777.70
376 376.00 3581.90 3582.80 2248.90 5294.80 2245.70 5792.90
377 377.00 3591.30 3592.20 2254.80 5308.70 2251.60 5808.10
378 378.00 3600.70 3601.60 2260.70 5322.60 2257.50 5823.30
379 379.00 3610.10 3611.00 2266.60 5336.50 2263.40 5838.50
380 380.00 3619.50 3620.40 2272.50 5350.40 2269.30 5853.70
381 381.00 3628.90 3629.80 2278.40 5364.30 2275.20 5868.90
382 382.00 3638.30 3639.20 2284.30 5378.20 2281.10 5884.10
383 383.00 3647.70 3648.60 2290.20 5392.10 2287.00 5899.30
384 384.00 3657.10 3658.00 2296.10 5406.00 2292.90 5914.50
385 385.00 3666.50 3667.40 2302.00 5419.90 2298.80 5929.70
386 386.00 3675.90 3676.80 2307.90 5433.80 2304.70 5944.90
387 387.00 3685.30 3686.20 2313.80 5447.70 2310.60 5960.10
388 388.00 3694.70 3695.60 2319.70 5461.60 2316.50 5975.30
389 389.00 3704.10 3705.00 2325.60 5475.50 2322.40 5990.50
390 390.00 3713.50 3714.40 2331.50 5489.40 2328.30 6005.70
391 391.00 3722.90 3723.80 2337.40 5503.30 2334.20 6020.90
392 392.00 3732.30 3733.20 2343.30 5517.20 2340.10 6036.10
393 393.00 3741.70 3742.60 2349.20 5531.10 2346.00 6051.30
394 394.00 3751.10 3752.00 2355.10 5545.00 2351.90 6066.50
395 395.00 3760.50 3761.40 2361.00 5558.90 2357.80 6081.70
396 396.00 3769.90 3770.80 2366.90 5572.80 2363.70 6096.90
397 397.00 3779.30 3780.20 2372.80 5586.70 2369.60 6112.10
398 398.00 3788.70 3789.60 2378.70 5600.60 2375.50 6127.30
399 399.00 3798.10 3799.00 2384.60 5614.50 2381.40 6142.50
400 400.00 3807.50 3808.40 2390.50 5628.40 2387.30 6157.70
401 401.00 3816.90 3817.80 2396.40 5642.30 2393.20 6172.90
402 402.00 3826.30 3827.20 2402.30 5656.20 2399.10 6188.10
403 403.00 3835.70 3836.60 2408.20 5670.10 2405.00 6203.30
404 404.00 3845.10 3846.00 2414.10 5684.00 2410.90 6218.50
405 405.00 3854.50 3855.40 2420.00 5697.90 2416.80 6233.70
406 406.00 3863.90 3864.80 2425.90 5711.80 2422.70 6248.90
407 407.00 3873.30 3874.20 2431.80 5725.70 2428.60 6264.10
408 408.00 3882.70 3883.60 2437.70 5739.60 2434.50 6279.30
409 409.00 3892.10 3893.00 2443.60 5753.50 2440.40 6294.50
410 410.00 3901.50 3902.40 2449.50 5767.40 2446.30 6309.70
411 411.00 3910.90 3911.80 2455.40 5781.30 2452.20 6324.90
412 412.00 3920.30 3921.20 2461.30 5795.20 2458.10 6340.10
413 413.00 3929.70 3930.60 2467.20 5809.10 2464.00 6355.30
414 414.00 3939.10 3940.00 2473.10 5823.00 2469.90 6370.50
415 415.00 3948.50 3949.40 2479.00 5836.90 2475.80 6385.70
416 416.00 3957.90 3958.80 2484.90 5850.80 2481.70 6400.90
417 417.00 3967.30 3968.20 2490.80 5864.70 2487.60 6416.10
418 418.00 3976.70 3977.60 2496.70 5878.60 2493.50 6431.30
419 419.00 3986.10 3987.00 2502.60 5892.50 2499.40 6446.50
420 420.00 3995.50 3996.40 2508.50 5906.40 2505.30 6461.70
421 421.00 4004.90 4005.80 2514.40 5920.30 2511.20 6476.90
422 422.00 4014.30 4015.20 2520.30 5934.20 2517.10 6492.10
423 423.00 4023.70 4024.60 2526.20 5948.10 2523.00 6507.30
424 424.00 4033.10 4034.00 2532.10 5962.00 2528.90 6522.50
425 425.00 4042.50 4043.40 2538.00 5975.90 2534.80 6537.70
426 426.00 4051.90 4052.80 2543.90 5989.80 2540.70 6552.90
427 427.00 4061.30 4062.20 2549.80 6003.70 2546.60 6568.10
428 428.00 4070.70 4071.60 2555.70 6017.60 2552.50 6583.30
429 429.00 4080.10 4081.00 2561.60 6031.50 2558.40 6598.50
430 430.00 4089.50 4090.40 2567.50 6045.40 2564.30 6613.70
431 431.00 4098.90 4099.80 2573.40 6059.30 2570.20 6628.90
432 432.00 4108.30 4109.20 2579.30 6073.20 2576.10 6644.10
433 433.00 4117.70 4118.60 2585.20 6087.10 2582.00 6659.30
434 434.00 4127.10 4128.00 2591.10 6101.00 2587.90 6674.50
435 435.00 4136.50 4137.40 2597.00 6114.90 2593.80 6689.70
436 436.00 4145.90 4146.80 2602.90 6128.80 2599.70 6704.90
437 437.00 4155.30 4156.20 2608.80 6142.70 2605.60 6720.10
438 438.00 4164.70 4165.60 2614.70 6156.60 2611.50 6735.30
439 439.00 4174.10 4175.00 2620.60 6170.50 2617.40 6750.50
440 440.00 4183.50 4184.40 2626.50 6184.40 2623.30 6765.70
441 441.00 4192.90 4193.80 2632.40 6198.30 2629.20 6780.90
442 442.00 4202.30 4203.20 2638.30 6212.20 2635.10 6796.10
443 443.00 4211.70 4212.60 2644.20 6226.10 2641.00 6811.30
444 444.00 4221.10 4222.00 2650.10 6240.00 2646.90 6826.50
445 445.00 4230.50 4231.40 2656.00 6253.90 2652.80 6841.70
446 446.00 4239.90 4240.80 2661.90 6267.80 2658.70 6856.90
447 447.00 4249.30 4250.20 2667.80 6281.70 2664.60 6872.10
448 448.00 4258.70 4259.60 2673.70 6295.60 2670.50 6887.30
449 449.00 4268.10 4269.00 2679.60 6309.50 2676.40 6902.50
450 450.00 4277.50 4278.40 2685.50 6323.40 2682.30 6917.70
451 451.00 4286.90 4287.80 2691.40 6337.30 2688.20 6932.90
452 452.00 4296.30 4297.20 2697.30 6351.20 2694.10 6948.10
453 453.00 4305.70 4306.60 2703.20 6365.10 2700.00 6963.30
454 454.00 4315.10 4316.00 2709.10 6379.00 2705.90 6978.50
455 455.00 4324.50 4325.40 2715.00 6392.90 2711.80 6993.70
456 456.00 4333.90 4334.80 2720.90 6406.80 2717.70 7008.90
457 457.00 4343.30 4344.20 2726.80 6420.70 2723.60 7024.10
458 458.00 4352.70 4353.60 2732.70 6434.60 2729.50 7039.30
459 459.00 4362.10 4363.00 2738.60 6448.50 2735.40 7054.50
460 460.00 4371.50 4372.40 2744.50 6462.40 2741.30 7069.70
461 461.00 4380.90 4381.80 2750.40 6476.30 2747.20 7084.90
462 462.00 4390.30 4391.20 2756.30 6490.20 2753.10 7100.10
463 463.00 4399.70 4400.60 2762.20 6504.10 2759.00 7115.30
464 464.00 4409.10 4410.00 2768.10 6518.00 2764.90 7130.50
465 465.00 4418.50 4419.40 2774.00 6531.90 2770.80 7145.70
466 466.00 4427.90 4428.80 2779.90 6545.80 2776.70 7160.90
467 467.00 4437.30 4438.20 2785.80 6559.70 2782.60 7176.10
468 468.00 4446.70 4447.60 2791.70 6573.60 2788.50 7191.30
469 469.00 4456.10 4457.00 2797.60 6587.50 2794.40 7206.50
470 470.00 4465.50 4466.40 2803.50 6601.40 2800.30 7221.70
471 471.00 4474.90 4475.80 2809.40 6615.30 2806.20 7236.90
472 472.00 4484.30 4485.20 2815.30 6629.20 2812.10 7252.10
473 473.00 4493.70 4494.60 2821.20 6643.10 2818.00 7267.30
474 474.00 4503.10 4504.00 2827.10 6657.00 2823.90 7282.50
475 475.00 4512.50 4513.40 2833.00 6670.90 2829.80 7297.70
476 476.00 4521.90 4522.80 2838.90 6684.80 2835.70 7312.90
477 477.00 4531.30 4532.20 2844.80 6698.70 2841.60 7328.10
478 478.00 4540.70 4541.60 2850.70 6712.60 2847.50 7343.30
479 479.00 4550.10 4551.00 2856.60 6726.50 2853.40 7358.50
480 480.00 4559.50 4560.40 2862.50 6740.40 2859.30 7373.70
481 481.00 4568.90 4569.80 2868.40 6754.30 2865.20 7388.90
482 482.00 4578.30 4579.20 2874.30 6768.20 2871.10 7404.10
483 483.00 4587.70 4588.60 2880.20 6782.10 2877.00 7419.30
484 484.00 4597.10 4598.00 2886.10 6796.00 2882.90 7434.50
485 485.00 4606.50 4607.40 2892.00 6809.90 2888.80 7449.70
486 486.00 4615.90 4616.80 2897.90 6823.80 2894.70 7464.90
487 487.00 4625.30 4626.20 2903.80 6837.70 2900.60 7480.10
488 488.00 4634.70 4635.60 2909.70 6851.60 2906.50 7495.30
489 489.00 4644.10 4645.00 2915.60 6865.50 2912.40 7510.50
490 490.00 4653.50 4654.40 2921.50 6879.40 2918.30 7525.70
491 491.00 4662.90 4663.80 2927.40 6893.30 2924.20 7540.90
492 492.00 4672.30 4673.20 2933.30 6907.20 2930.10 7556.10
493 493.00 4681.70 4682.60 2939.20 6921.10 2936.00 7571.30
494 494.00 4691.10 4692.00 2945.10 6935.00 2941.90 7586.50
495 495.00 4700.50 4701.40 2951.00 6948.90 2947.80 7601.70
496 496.00 4709.90 4710.80 2956.90 6962.80 2953.70 7616.90
497 497.00 4719.30 4720.20 2962.80 6976.70 2959.60 7632.10
498 498.00 4728.70 4729.60 2968.70 6990.60 2965.50 7647.30
499 499.00 4738.10 4739.00 2974.60 7004.50 2971.40 7662.50
500 500.00 4747.50 4748.40 2980.50 7018.40 2977.30 7677.70
501 501.00 4756.90 4757.80 2986.40 7032.30 2983.20 7692.90
502 502.00 4766.30 4767.20 2992.30 7046.20 2989.10 7708.10
503 503.00 4775.70 4776.60 2998.20 7060.10 2995.00 7723.30
504 504.00 4785.10 4786.00 3004.10 7074.00 3000.90 7738.50
505 505.00 4794.50 4795.40 3010.00 7087.90 3006.80 7753.70
506 506.00 4803.90 4804.80 3015.90 7101.80 3012.70 7768.90
507 507.00 4813.30 4814.20 3021.80 7115.70 3018.60 7784.10
508 508.00 4822.70 4823.60 3027.70 7129.60 3024.50 7799.30
509 509.00 4832.10 4833.00 3033.60 7143.50 3030.40 7814.50
510 510.00 4841.50 4842.40 3039.50 7157.40 3036.30 7829.70
511 511.00 4850.90 4851.80 3045.40 7171.30 3042.20 7844.90
512 512.00 4860.30 4861.20 3051.30 7185.20 3048.10 7860.10
513 513.00 4869.70 4870.60 3057.20 7199.10 3054.00 7875.30
514 514.00 4879.10 4880.00 3063.10 7213.00 3059.90 7890.50
515 515.00 4888.50 4889.40 3069.00 7226.90 3065.80 7905.70
Name of the Work

Estimate Cost: Rs. 55.08 Lakhs

Item
Type of
Estimate short
work Rate (Rs.)
Quantity descriptio Apss/mor
S.no Descripation of Work (200 up to 2 Unit Amount (Rs.)
(only n (100 d number
charector decimals
figures) charector
s)
s)
Ground Floor
1 160.00 Earth work excavation and depositing on bank with initial lead of 10m and Earth Earth 308 133.80 Cum 21408.00
initial lift of 3m in Loamy & Clayey Soils like BC Soils, Red Earth & work work
Ordinary Gravelly Soils ( SS 20-B) including all operational incidental
labour charges such as shoring, strutting, sheeting, planking and
dewatering including cost of hire charges of T & P, labour charges etc.,
complete for finished item of work including seignerage charges excluding
dewatering charges etc., complete for Foundation of Building.(APSS No.
308)

2 13.00 Plain Cement Concrete corresponding to M7.5 grade as per IS 456 PCC PCC 402 2924.45 Cum 38018.00
equivalent to (1:4:8) proportion nominal mix (cement: fine aggregate: M7.5 M7.5
Coarse aggregate) using 40mm size Hard Blasted Granite (IS383, 1970)
metal from approved quarry including cost and conveyance of all
materials like cement, sand, coarse aggregate, water etc. to site,
including seigniorage charges, sales & other taxes on all materials, all
operational, incidental, and labour charges such as mixing, laying and
ramming concrete in layers in position not exceeding 15cm, finishing top
surface, curing concrete, etc., complete for finished item of work for
Foundations (APSS No. 402)

3 25.50 Plain Cement Concrete corresponding to M5 grade as per IS 456 PCC PCC 402 2752.50 Cum 70189.00
equivalent to (1:5:10) proportion nominal mix (cement: fine aggregate: M5 M5
Coarse aggregate) using 40mm size Hard Blasted Granite (IS383, 1970)
metal from approved quarry including cost and conveyance of all
materials like cement, sand, coarse aggregate, water etc. to site,
including seigniorage charges, sales & other taxes on all materials, all
operational, incidental, and labour charges such as mixing, laying and
ramming concrete in layers in position not exceeding 15cm, finishing top
surface, curing concrete, etc., complete for finished item of work for
Foundations and Flooring Bed (APSS No. 402) .

Page 30 of 420
4 44.00 Random Rubble stone masonry, in CM (1:8) prop: (Cement: Sand) using RR Stone RR Stone 601 & 2326.35 Cum 102359.00
Hard blasted Granite stones from approved quarry including cost and Masonry Masonry 615
conveyance of all materials like Granite stones, cement, sand, water,
etc., to site including seigniorage charges, sales & other taxes on all
materials, all operational, incidental, and labour charges such as cutting
stones to required size and shape, mixing of cement mortar, constructing
masonry, curing etc., complete for finished item of work for foundation
and basement (APSS No. 601 & 615)
5 26.50 Vibrated Reinforced Cement Concrete M 20 Design Mix ( by weigh VRCC VRCC 402 & 403 7008.20 Cum 185717.00
batching ) using 20mm size (SS5) hard blasted granite machine crushed M20 mix M20 mix
graded metal (Coarse aggregate) from approved quarry, using a
minimum quantity of 350 kgs. of cement per 1 cum of concreteincluding
cost and conveyance of all materials like cement, fine aggregate
(Sand), coarse aggregate, water etc., to site and cost of seigniorage
charges on all materials including centering using Steel scaffolding
pipes, jack props, wallers, foot plates, brackets, steel centering plates,
etc., shuttering , machine mixing, laying concrete, vibrating,lift charges,
curing etc., complete but excluding cost of steel and it’s fabrication
charges for finished item of work (APSS No. 402 & 403) : for Column
Footings

6 3.00 Vibrated Reinforced Cement Concrete M 20 Design Mix ( by weigh VRCC VRCC 402 & 403 7342.10 Cum 22026.00
batching ) using 20mm size (SS5) hard blasted granite machine crushed M20 mix M20 mix
graded metal (Coarse aggregate) from approved quarry, using a
minimum quantity of 350 kgs. of cement per 1 cum of concreteincluding
cost and conveyance of all materials like cement, fine aggregate
(Sand), coarse aggregate, water etc., to site and cost of seigniorage
charges on all materials including centering using Steel scaffolding
pipes, jack props, wallers, foot plates, brackets, steel centering plates,
etc., shuttering , machine mixing, laying concrete, vibrating,lift charges,
curing etc., complete but excluding cost of steel and it’s fabrication
charges for finished item of work (APSS No. 402 & 403) : for Column
Pedastal

Page 31 of 420
7 12.50 Vibrated Reinforced Cement Concrete M 20 Design Mix ( by weigh VRCC VRCC 402 & 403 8207.40 Cum 102593.00
batching ) using 20mm size (SS5) hard blasted granite machine crushed M20 mix M20 mix
graded metal (Coarse aggregate) from approved quarry, using a
minimum quantity of 350 kgs. of cement per 1 cum of concreteincluding
cost and conveyance of all materials like cement, fine aggregate
(Sand), coarse aggregate, water etc., to site and cost of seigniorage
charges on all materials including centering using Steel scaffolding
pipes, jack props, wallers, foot plates, brackets, steel centering plates,
etc., shuttering , machine mixing, laying concrete, vibrating,lift charges,
curing etc., complete but excluding cost of steel and it’s fabrication
charges for finished item of work (APSS No. 402 & 403) : for Column

8 9.50 Vibrated Reinforced Cement Concrete M 20 Design Mix ( by weigh VRCC VRCC 402 & 403 8820.50 Cum 83795.00
batching ) using 20mm size (SS5) hard blasted granite machine crushed M20 mix M20 mix
graded metal (Coarse aggregate) from approved quarry, using a
minimum quantity of 350 kgs. of cement per 1 cum of concreteincluding
cost and conveyance of all materials like cement, fine aggregate
(Sand), coarse aggregate, water etc., to site and cost of seigniorage
charges on all materials including centering using Steel scaffolding
pipes, jack props, wallers, foot plates, brackets, steel centering plates,
etc., shuttering , machine mixing, laying concrete, vibrating,lift charges,
curing etc., complete but excluding cost of steel and it’s fabrication
charges for finished item of work (APSS No. 402 & 403) : for Plinth Beam

9 15.00 Vibrated Reinforced Cement Concrete M 20 Design Mix ( by weigh VRCC VRCC 402 & 403 7381.95 Cum 110729.00
batching ) using 20mm size (SS5) hard blasted granite machine crushed M20 mix M20 mix
graded metal (Coarse aggregate) from approved quarry, using a
minimum quantity of 350 kgs. of cement per 1 cum of concreteincluding
cost and conveyance of all materials like cement, fine aggregate
(Sand), coarse aggregate, water etc., to site and cost of seigniorage
charges on all materials including centering using Steel scaffolding
pipes, jack props, wallers, foot plates, brackets, steel centering plates,
etc., shuttering , machine mixing, laying concrete, vibrating,lift charges,
curing etc., complete but excluding cost of steel and it’s fabrication
charges for finished item of work (APSS No. 402 & 403) : for Roof Beams

Page 32 of 420
10 233.00 Vibrated Reinforced Cement Concrete M 20 Design Mix ( by weigh VRCC VRCC 402 & 403 892.30 Sqm 207906.00
batching ) using 20mm size (SS5) hard blasted granite machine crushed M20 mix M20 mix
graded metal (Coarse aggregate) from approved quarry, using a
minimum quantity of 350 kgs. of cement per 1 cum of concreteincluding
cost and conveyance of all materials like cement, fine aggregate
(Sand), coarse aggregate, water etc., to site and cost of seigniorage
charges on all materials including centering using Steel scaffolding
pipes, jack props, wallers, foot plates, brackets, steel centering plates,
etc., shuttering , machine mixing, laying concrete, vibrating,lift charges,
curing etc., complete but excluding cost of steel and it’s fabrication
charges for finished item of work (APSS No. 402 & 403) : for 125mm
thick Slab

11 17.50 Vibrated Reinforced Cement Concrete M 20 Design Mix ( by weigh VRCC VRCC 402 & 403 1140.45 Sqm 19958.00
batching ) using 20mm size (SS5) hard blasted granite machine crushed M20 mix M20 mix
graded metal (Coarse aggregate) from approved quarry, using a
minimum quantity of 350 kgs. of cement per 1 cum of concreteincluding
cost and conveyance of all materials like cement, fine aggregate
(Sand), coarse aggregate, water etc., to site and cost of seigniorage
charges on all materials including centering using Steel scaffolding
pipes, jack props, wallers, foot plates, brackets, steel centering plates,
etc., shuttering , machine mixing, laying concrete, vibrating,lift charges,
curing etc., complete but excluding cost of steel and it’s fabrication
charges for finished item of work (APSS No. 402 & 403) : for 175mm
thick Slab

12 1.00 Reinforced Cement Concrete M 20 Design Mix ( by weigh batching ) RCC M20 RCC M20 402 & 403 8102.35 Cum 8102.00
using 20mm size (SS5) hard blasted granite machine crushed graded mix mix
metal (Coarse aggregate) from approved quarry, using a minimum
quantity of 350 kgs. of cement per 1 cum of concreteincluding cost and
conveyance of all materials like cement, fine aggregate (Sand), coarse
aggregate, water etc., to site and cost of seigniorage charges on all
materials including centering using Steel scaffolding pipes, jack props,
wallers, foot plates, brackets, steel centering plates, etc., shuttering ,
machine mixing, laying concrete, vibrating,lift charges, curing etc.,
complete but excluding cost of steel and it’s fabrication charges for
finished item of work (APSS No. 402 & 403) : for Lintels

Page 33 of 420
13 10.00 Reinforced Cement Concrete M 20 Design Mix ( by weigh batching ) RCC M20 RCC M20 402 & 403 606.75 Sqm 6068.00
using 20mm size (SS5) hard blasted granite machine crushed graded mix mix
metal (Coarse aggregate) from approved quarry, using a minimum
quantity of 350 kgs. of cement per 1 cum of concreteincluding cost and
conveyance of all materials like cement, fine aggregate (Sand), coarse
aggregate, water etc., to site and cost of seigniorage charges on all
materials including centering using Steel scaffolding pipes, jack props,
wallers, foot plates, brackets, steel centering plates, etc., shuttering ,
machine mixing, laying concrete, vibrating,lift charges, curing etc.,
complete but excluding cost of steel and it’s fabrication charges for
finished item of work (APSS No. 402 & 403) : for Sunshades

14 88.50 Filling with useful available excavated earth (excluding rock) in trenches, Filling Filling 309 & 310 199.20 Cum 17629.00
sides of foundations and basement with initial lead in layers not
exceeding 15cm thick, consolidating No deposited layer by watering and
ramming including cost and conveyence of water to work site and all
operational, incidental, labour charges, hire charges of T & P etc.,
complete for finished item of work. (APSS NO. 309 & 310)

15 119.00 Filling with Gravel in trenches, sides of foundations and basement with Filling Filling 309 & 310 278.70 Cum 33165.00
initial lead in layers not exceeding 15cm thick, consolidating each
deposited layer by watering and ramming including cost and conveyence
of water to the work site and all operational, incidental, labour charges,
seignorage charges, hire charges of T & P etc., complete for finished item
of work. (APSS NO. 309 & 310)
16 53.00 Brick Masonry in superstructure with CM (1:8) prop: using second class Brick Brick 501 & 504 4776.60 Cum 253160.00
bricks from approved source having minimum crushing strength of 40 Masonry Masonry
Kg/Sqcm. including cost and conveyance of all materials like cement,
sand, bricks, water etc., to site, including seigniorage charges, sales &
other taxes on all materials, all operational, incidental and labour charges
such as mixing cement mortar, constructing masonry, scaffolding
charges, lift charges, curing, etc., complete for finished item of work.
(APSS No. 501 & 504).
17 4.00 Supply and Fixing of 18guage MS Plain sheet Door of size 1.22 x 2.13 M.S.Doors M.S.Doors As per 6625.00 No 26500.00
mts with outer angular frame of rolled steel equal angle 40 x 40 x 6m Incharge
and inner shutter angular frame rolled steel equal angle 32 x 32 x 4 mm Engineer
with Double leaf shutter,MS Flats 25x5mm-6N

Page 34 of 420
18 11.00 Supply and fixing of 18 guage M.S. Plain Sheet WINDOW of size 1.52 M x M.S. M.S. As per 6723.35 No 73957.00
1.22 M (Six Leafs shutters with outer angular frame of rolled steel equal Windows Windows Incharge
angle ISA 4040 of Size 40mm x 40mm x 6mm and inner shutter angular Engineer
frame of rolled steel equal angle ISA 2525 of size 25mm x 25mm x 5mm
and rolled steel Tee Bars 40mm x 40mm x 6mm and 25x5mm flat , 1
Nos. Horizontal, 2 Nos. verticles also bended with fixtures such as M.S.
Powder coated tower bolts 100mm long 6 Nos., M.S. Powder coated butt
Hinges 12 Nos., M.S. Powder coated handles 125mm long 6 Nos., and
safety rods 10mm MS square rods at 10 Nos welded horizontally to full
width of window & 4 Nos of MS Hold fasts of 230mm long including
redoxide primer grade I quality coating including cost and conveynace of
all materials, labour charges etc., complete for finished item of work.
19 2.00 Supply and Fixing of Ventilator of size 1.52 x 0.3 with 25mm x 25mm x MS MS As per 578.80 No 1158.00
3mm thick equal L angles and 10mm square rods @ 150mm c/c fixing in Ventilator Ventilator Incharge
position ,complete for finsihed item of work Engineer

20 4.00 Supply and Fixing of Ventilator of size 1.22 x 0.3 with 25mm x 25mm x MS MS As per 472.90 No 1892.00
3mm thick equal L angles and 10mm square rods @ 150mm c/c fixing in Ventilator Ventilator Incharge
position ,complete for finsihed item of work Engineer

21 265.00 Ornamental Plastering 12mm thick in two coats with base coat of 8mm Plastering Plastering 901 & 906 285.45 Sqm 75644.00
thick in CM (1:5) and top coat of 4mm thick in CM (1:3) dubara sponge
finish including cost and conveyance of all materials like cement, sand,
water etc., to site, seigniorage charges, sales & other taxes on all
materials,all operational, incidental and labour charges such as mixing
mortar, scaffolding charges, lift charges, including cutting of Grooves
wherever necessary as directed by Engineer - in - charge, finishing,
curing, etc., complete for Even Surfaces of Wall for finished item of
work. (APSS 901,903 & 904)

22 397.00 Plastering 12mm thick in two coats with base coat of 8mm thick in CM Plastering Plastering 901, 903 271.95 Sqm 107964.00
(1:6) and top coat of 4mm thick in CM (1:4) dubara sponge finish & 904
including cost and conveyance of all materials like cement, sand, water
etc., to site, seigniorage charges, sales & other taxes on all materials,all
operational, incidental and labour charges such as mixing mortar,
scaffolding charges, lift charges, including cutting of Grooves wherever
necessary as directed by Engineer - in - charge, finishing, curing, etc.,
complete for Even Surfaces of Wall for finished item of work. (APSS
901,903 & 904)

Page 35 of 420
23 270.00 Plastering 20mm thick in two coats with base coat of 16mm thick in CM Plastering Plastering 901, 903 283.55 Sqm 76559.00
(1:6) and top coat of 4mm thick in CM (1:4) dubara sponge finish & 904
including cost and conveyance of all materials like cement, sand, water
etc., to site, seigniorage charges, sales & other taxes on all materials, all
operational, incidental and labour charges such as mixing
mortar,scaffolding charges, lift charges, finishing,including cutting of
Grooves wherever necessary as directed by Engineer - in - charge,
curing, etc., complete for Uneven Surfaces of Brick Wall for finished
item of work. (APSS 901,903 & 904)

24 15.04 Making Green Chalk Board of size 3.00Mx1.20Mts including border with Green Green 1603 520.00 Sqm 7821.00
plastering in CM (1:2) 12mm thick as base coat and 3mm thick top coat Chalk Chalk
with cement green oxide powder in (1:1) prop. and making border of Board Board
50x20mm thick alround the chalk board over existing plastered surface
and painting the chalk board surface with chalk board paint as per
direction of Engineer-in-Charge including cost and conveyance of all
materials, sales and other taxes on cost of materials and all operational,
incidental and labour charges etc., complete for finished item of work
(APSS No.1603)

25 82.00 Painting to New Iron work with two coats of ready mixed synthetic Painting Painting 1201 & 81.90 Sqm 6716.00
enamel paint first quality all shades having VOC (Volatile Organic 1212
Compound ) content less than 50 grams/ liter over an existing steel
primer including cost and conveyance of all materials to site, sales &
other taxes, incidental, operational and all labour charges etc., complete
for finished item of work. (APSS No. 1201, 1207 & 1212).in All Floors

26 662.00 Whiting to new walls and ceiling in two coats with Birla White or Painting Painting 901 & 908 27.70 Sqm 18337.00
equavalent quality to give an even shade after thoroughly brushing the
surface to remove all loose powdered materials including cost and
conveyance of all materials and water to site, sales & other taxes, all
operational, incidental and labour charges such as cleaning the surface,
painting, curing etc., complete for finished item of work for internal walls.
(APSS No.901 & 908) in All Floors

27 270.00 Painting to New walls with two coats of acrylic exterior emulsion paint Painting Painting 912 120.20 Sqm 32454.00
having VOC (Volatile Organic Compound ) content less than 50 grams/
liter. of superior quality of approved brand and shade over base coat of
cement primer grade -I making three coats in all to give an even shade
after thoroughly brushing the surface to remove all loose powdered
materials, including cost and conveyance of all materials, including cost
and conveyance of all materials, cost of brushes, water to site, etc., sales
& other taxes, all operational, incidental and labour charges such as
scaffolding charges, lift charges, curing etc., complete for finished item of
work in all floors for Walls.(APSS No. 912) in All Floors

Page 36 of 420
28 223.00 Flooring with Polished Black Kadapa slabs minimum of 15 mm thick Flooring Flooring 703 & 701 468.00 Sqm 104364.00
(0.457M x 0.457M) set over a base coat of CM (1:8), 12mm thick (joints
of stone must be flushed) over C.C. bed already laid or R.C.C. roof slab
only after it is properly cured, cleaned, moistered and where
necessary treated with neat grey cement slurry of honey like consistency
spred at3.3 kgs of cement for 1 sqm. and jointed with neat cement paste
to full depth, including cost and conveyance of all materials like cement,
sand, water, flooring stones etc. to site, seigniorage charges, sales and
other taxes on all materials, all operational, incidental and labour charges
such as dressing of flooring stones to the required sizes, mixing of
cement mortar, laying, jointing, curing, lift charges etc., complete for
finished item of work.(APSS No.703 & 701)
29 13.00 Providing skirting to internal walls 12.5 Cm high withPolished Black Skirting Skirting 703 & 701 498.00 Sqm 6474.00
Kadapa slabs minimum of 15 mm thick (0.457M x 0.457M) with length
equal to flooring stones set over a base coat of CM (1:3), 12mm thick
with cement slurry of honey like consistency spread @ 3.3 Kgs per sqm
and jointed with neat cement paste mixed with pigment of matching
shade to full depth (joints of stone should be flushed), including cost and
conveyance of all materials like cement, sand, water, flooring stones etc.
to site, seigniorage charges, sales and other taxes on all materials, all
operational, incidental and labour charges such as dressing of flooring
stones to the required sizes, mixing of cement mortar, laying, jointing,
curing, lift charges etc., complete for finished item of work.(APSS No.701
& 707)

30 22.00 Reinforced cement mortar Facia 5 cm thick in CM (1:3) for drop walls, RCM Facia RCM Facia 703 & 701 1031.70 Sqm 22697.00
Fins & staircase railing with rabbit wire mesh & nominal reinforcement as
directed by Engineer-in-charge with dubara spong finishing including cost
& conveyence of all materials to site, including seigniorage charges, sales
and other taxes on all materials and all operational, incidental charges
such as labour charges, like mixing cement mortar, scaffolding charges,
lift charges, curing, for making 50 mm thick RCM Paradah walls (RCM
Drop walls) including tying Rabbit (chicken) wire mesh to the existing
mild steel / HYSD Steel reinforcement applying mortar lumps, finishing,
plastering to both faces, sponge finishing etc complete for finished item of
work but excluding cost of steel and its fabrication charges in All Floors

Page 37 of 420
31 15.00 Providing High Yield Strength Deformed (HYSD) steel bars (Fe 500 grade HYSD HYSD 126 45731.80 Mt 685977.00
as per IS 1786-1985) of 8mm to 40mm diameters, cutting, bending, to Steel Steel
required sizes and shapes placing in position with cover blocks of
approved size and binding wire of 20SWG, forming grills for
reinforcement work as per approved designs and drawings including cost
and conveyance of bars from approved sources to site of work, including
cost and conveyance of binding wire, cover blocks, chairs, overlaps,
spacers, dowels, wastage etc., and all operational, incidental, and labour
charges such as cutting, bending, placing in position, tying etc., and sales
& other taxes,on cost of all materials complete for finished item of work
(APSS No.126) in all floors.

First Floor
32 4.60 Vibrated Reinforced Cement Concrete M 20 Design Mix ( by weigh VRCC VRCC 402 & 403 8568.50 Cum 39415.00
batching ) using 20mm size (SS5) hard blasted granite machine crushed M20 mix M20 mix
graded metal (Coarse aggregate) from approved quarry, using a
minimum quantity of 350 kgs. of cement per 1 cum of concreteincluding
cost and conveyance of all materials like cement, fine aggregate
(Sand), coarse aggregate, water etc., to site and cost of seigniorage
charges on all materials including centering using Steel scaffolding
pipes, jack props, wallers, foot plates, brackets, steel centering plates,
etc., shuttering , machine mixing, laying concrete, vibrating,lift charges,
curing etc., complete but excluding cost of steel and it’s fabrication
charges for finished item of work (APSS No. 402 & 403) : for Column

33 6.40 Vibrated Reinforced Cement Concrete M 20 Design Mix ( by weigh VRCC VRCC 402 & 403 7621.55 Cum 48778.00
batching ) using 20mm size (SS5) hard blasted granite machine crushed M20 mix M20 mix
graded metal (Coarse aggregate) from approved quarry, using a
minimum quantity of 350 kgs. of cement per 1 cum of concreteincluding
cost and conveyance of all materials like cement, fine aggregate
(Sand), coarse aggregate, water etc., to site and cost of seigniorage
charges on all materials including centering using Steel scaffolding
pipes, jack props, wallers, foot plates, brackets, steel centering plates,
etc., shuttering , machine mixing, laying concrete, vibrating,lift charges,
curing etc., complete but excluding cost of steel and it’s fabrication
charges for finished item of work (APSS No. 402 & 403) : for Roof Beams

Page 38 of 420
34 130.00 Vibrated Reinforced Cement Concrete M 20 Design Mix ( by weigh VRCC VRCC 402 & 403 920.90 Sqm 119717.00
batching ) using 20mm size (SS5) hard blasted granite machine crushed M20 mix M20 mix
graded metal (Coarse aggregate) from approved quarry, using a
minimum quantity of 350 kgs. of cement per 1 cum of concreteincluding
cost and conveyance of all materials like cement, fine aggregate
(Sand), coarse aggregate, water etc., to site and cost of seigniorage
charges on all materials including centering using Steel scaffolding
pipes, jack props, wallers, foot plates, brackets, steel centering plates,
etc., shuttering , machine mixing, laying concrete, vibrating,lift charges,
curing etc., complete but excluding cost of steel and it’s fabrication
charges for finished item of work (APSS No. 402 & 403) : for 125mm
thick Slab

35 1.00 Reinforced Cement Concrete M 20 Design Mix ( by weigh batching ) RCC M20 RCC M20 402 & 403 8423.05 Cum 8423.00
using 20mm size (SS5) hard blasted granite machine crushed graded mix mix
metal (Coarse aggregate) from approved quarry, using a minimum
quantity of 350 kgs. of cement per 1 cum of concreteincluding cost and
conveyance of all materials like cement, fine aggregate (Sand), coarse
aggregate, water etc., to site and cost of seigniorage charges on all
materials including centering using Steel scaffolding pipes, jack props,
wallers, foot plates, brackets, steel centering plates, etc., shuttering ,
machine mixing, laying concrete, vibrating,lift charges, curing etc.,
complete but excluding cost of steel and it’s fabrication charges for
finished item of work (APSS No. 402 & 403) : for Lintels

36 7.00 Reinforced Cement Concrete M 20 Design Mix ( by weigh batching ) RCC M20 RCC M20 402 & 403 629.70 Sqm 4408.00
using 20mm size (SS5) hard blasted granite machine crushed graded mix mix
metal (Coarse aggregate) from approved quarry, using a minimum
quantity of 350 kgs. of cement per 1 cum of concreteincluding cost and
conveyance of all materials like cement, fine aggregate (Sand), coarse
aggregate, water etc., to site and cost of seigniorage charges on all
materials including centering using Steel scaffolding pipes, jack props,
wallers, foot plates, brackets, steel centering plates, etc., shuttering ,
machine mixing, laying concrete, vibrating,lift charges, curing etc.,
complete but excluding cost of steel and it’s fabrication charges for
finished item of work (APSS No. 402 & 403) : for Sunshades

37 36.00 Brick Masonry in superstructure with CM (1:8) prop: using second class Brick Brick 501 & 504 5001.90 Cum 180068.00
bricks from approved source having minimum crushing strength of 40 Masonry Masonry
Kg/Sqcm. including cost and conveyance of all materials like cement,
sand, bricks, water etc., to site, including seigniorage charges, sales &
other taxes on all materials, all operational, incidental and labour charges
such as mixing cement mortar, constructing masonry, scaffolding
charges, lift charges, curing, etc., complete for finished item of work.
(APSS No. 501 & 504).
Page 39 of 420
38 2.00 Supply and Fixing of 18guage MS Plain sheet Door of size 1.22 x 2.13 mts M.S.Doors M.S.Doors As per 6625.00 No 13250.00
with outer angular frame of rolled steel equal angle 40 x 40 x 6m and Incharge
inner shutter angular frame rolled steel equal angle 32 x 32 x 4 mm with Engineer
Double leaf shutter,MS Flats 25x5mm-6No

39 7.00 Supply and fixing of 18 guage M.S. Plain Sheet WINDOW of size 1.52 M x M.S. M.S. As per 6723.35 No 47063.00
1.22 M (Six Leafs shutters with outer angular frame of rolled steel equal Windows Windows Incharge
angle ISA 4040 of Size 40mm x 40mm x 6mm and inner shutter angular Engineer
frame of rolled steel equal angle ISA 2525

40 1.00 Supply and Fixing of Ventilator of size 1.52 x 0.3 with 25mm x 25mm x MS MS As per 578.80 No 579.00
3mm thick equal L angles and 10mm square rods @ 150mm c/c fixing in Ventilator Ventilator Incharge
position ,complete for finsihed item of work Engineer

41 2.00 Supply and Fixing of Ventilator of size 1.22 x 0.3 with 25mm x 25mm x MS MS As per 472.90 No 946.00
3mm thick equal L angles and 10mm square rods @ 150mm c/c fixing in Ventilator Ventilator Incharge
position ,complete for finsihed item of work Engineer

42 165.00 Ornamental Plastering 12mm thick in two coats with base coat of 8mm Plastering Plastering 901 , 903 314.25 Sqm 51851.00
thick in CM (1:5) and top coat of 4mm thick in CM (1:3) dubara sponge & 904
finish including cost and conveyance of all materials like cement, sand,
water etc., to site, seigniorage charges, sales & other taxes on all
materials,all operational, incidental and labour charges such as mixing
mortar, scaffolding charges, lift charges, including cutting of Grooves
wherever necessary as directed by Engineer - in - charge, finishing,
curing, etc., complete for Even Surfaces of Wall for finished item of
work. (APSS 901,903 & 904)

Page 40 of 420
43 171.00 Plastering 12mm thick in two coats with base coat of 8mm thick in CM Plastering Plastering 901 , 903 298.10 Sqm 50975.00
(1:6) and top coat of 4mm thick in CM (1:4) dubara sponge finish & 904
including cost and conveyance of all materials like cement, sand, water
etc., to site, seigniorage charges, sales & other taxes on all materials,all
operational, incidental and labour charges such as mixing mortar,
scaffolding charges, lift charges, including cutting of Grooves wherever
necessary as directed by Engineer - in - charge, finishing, curing, etc.,
complete for Even Surfaces of Wall for finished item of work. (APSS
901,903 & 904)

44 219.00 Plastering 20mm thick in two coats with base coat of 16mm thick in CM Plastering Plastering 901 , 903 309.75 Sqm 67835.00
(1:6) and top coat of 4mm thick in CM (1:4) dubara sponge finish & 904
including cost and conveyance of all materials like cement, sand, water
etc., to site, seigniorage charges, sales & other taxes on all materials, all
operational, incidental and labour charges such as mixing
mortar,scaffolding charges, lift charges, finishing,including cutting of
Grooves wherever necessary as directed by Engineer - in - charge,
curing, etc., complete for Uneven Surfaces of Brick Wall for finished
item of work. (APSS 901,903 & 904)

45 49.00 Painting to New Iron work with two coats of ready mixed synthetic Painting Painting 1201, 81.90 Sqm 4013.00
enamel paint first quality all shades having VOC (Volatile Organic 1207 &
Compound ) content less than 50 grams/ liter over an existing steel 1212
primer including cost and conveyance of all materials to site, sales &
other taxes, incidental, operational and all labour charges etc., complete
for finished item of work. (APSS No. 1201, 1207 & 1212).in All Floors

46 336.00 Whiting to new walls and ceiling in two coats with Birla White or Painting Painting 901 & 908 27.70 Sqm 9307.00
equavalent quality to give an even shade after thoroughly brushing the
surface to remove all loose powdered materials including cost and
conveyance of all materials and water to site, sales & other taxes, all
operational, incidental and labour charges such as cleaning the surface,
painting, curing etc., complete for finished item of work for internal walls.
(APSS No.901 & 908) in All Floors
47 219.00 Painting to New walls with two coats of acrylic exterior emulsion paint Painting Painting 912 120.20 Sqm 26324.00
having VOC (Volatile Organic Compound ) content less than 50 grams/
liter. of superior quality of approved brand and shade over base coat of
cement primer grade -I making three coats in all to give an even shade
after thoroughly brushing the surface to remove all loose powdered
materials, including cost and conveyance of all materials, including cost
and conveyance of all materials, cost of brushes, water to site, etc., sales
& other taxes, all operational, incidental and labour charges such as
scaffolding charges, lift charges, curing etc., complete for finished item of
work in all floors for Walls.(APSS No. 912) in All Floors

Page 41 of 420
48 110.00 Flooring with Polished Black Kadapa slabs minimum of 15 mm thick Flooring Flooring 703 & 701 490.75 Sqm 53983.00
(0.457M x 0.457M) set over a base coat of CM (1:8), 12mm thick (joints
of stone must be flushed) over C.C. bed already laid or R.C.C. roof slab
only after it is properly cured, cleaned, moistered and where
necessary treated with neat grey cement slurry of honey like consistency
spred at3.3 kgs of cement for 1 sqm. and jointed with neat cement paste
to full depth, including cost and conveyance of all materials like cement,
sand, water, flooring stones etc. to site, seigniorage charges, sales and
other taxes on all materials, all operational, incidental and labour charges
such as dressing of flooring stones to the required sizes, mixing of
cement mortar, laying, jointing, curing, lift charges etc., complete for
finished item of work.(APSS No.703 & 701)

49 7.50 Providing skirting to internal walls 12.5 Cm high withPolished Black Skerting Skerting 701 & 707 523.80 Sqm 3928.00
Kadapa slabs minimum of 15 mm thick (0.457M x 0.457M) with length
equal to flooring stones set over a base coat of CM (1:3), 12mm thick
with cement slurry of honey like consistency spread @ 3.3 Kgs per sqm
and jointed with neat cement paste mixed with pigment of matching
shade to full depth (joints of stone should be flushed), including cost and
conveyance of all materials like cement, sand, water, flooring stones etc.
to site, seigniorage charges, sales and other taxes on all materials, all
operational, incidental and labour charges such as dressing of flooring
stones to the required sizes, mixing of cement mortar, laying, jointing,
curing, lift charges etc., complete for finished item of work.(APSS No.701
& 707)

50 9.50 Reinforced cement mortar Facia 5 cm thick in CM (1:3) for drop walls, RCM Facia RCM Facia 703 & 701 1112.40 Sqm 10568.00
Fins & staircase railing with rabbit wire mesh & nominal reinforcement as
directed by Engineer-in-charge with dubara spong finishing including cost
& conveyence of all materials to site, including seigniorage charges, sales
and other taxes on all materials and all operational, incidental charges
such as labour charges, like mixing cement mortar, scaffolding charges,
lift charges, curing, for making 50 mm thick RCM Paradah walls (RCM
Drop walls) including tying Rabbit (chicken) wire mesh to the existing
mild steel / HYSD Steel reinforcement applying mortar lumps, finishing,
plastering to both faces, sponge finishing etc complete for finished item of
work but excluding cost of steel and its fabrication charges in All Floors

Page 42 of 420
51 6.00 Providing High Yield Strength Deformed (HYSD) steel bars (Fe 500 grade Hysd Hysd 126 46566.55 Mt 279399.00
as per IS 1786-1985) of 8mm to 40mm diameters, cutting, bending, to Steel Steel
required sizes and shapes placing in position with cover blocks of
approved size and binding wire of 20SWG, forming grills for
reinforcement work as per approved designs and drawings including cost
and conveyance of bars from approved sources to site of work, including
cost and conveyance of binding wire, cover blocks, chairs, overlaps,
spacers, dowels, wastage etc., and all operational, incidental, and labour
charges such as cutting, bending, placing in position, tying etc., and sales
& other taxes,on cost of all materials complete for finished item of work
(APSS No.126) in all floors.

52 121.50 Providing impervious coat over RCC roof slab to required slopes with CM Imperviou Imperviou 901 & 903 340.25 Sqm 41340.00
(1:3) prop. 20mm thick (average) mixed with water proofing compound s Coat s Coat
manufactured by reputed manufacturers as approved by Engineer-in-
charge at 1Kg/bag of cement, laid over roof slab when it is green,
finished smooth with a floating coat of neat cement and thread lining at
regular intervals of 45cmx45cm including cost and conveyance of all
materials like cement, sand, water proofing compound, water etc., to
site, seigniorage charges, sales & other taxes on all materials, all
operational, incidental and labour charges such as mixing mortar, laying,
rounding off at junctions of wall and slab, rendering smooth with thread
lining, curing, lift charges, etc., complete for finished item of work (APSS
No. 901 & 903).

53 10.03 Making Green Chalk Board of size 3.00Mx1.20Mts including border with Green Green As per 520.00 Sqm 5215.00
plastering in CM (1:2) 12mm thick as base coat and 3mm thick top coat Chalk Chalk Incharge
with cement green oxide powder in (1:1) prop. and making border of Board Board Engineer
50x20mm thick alround the chalk board over existing plastered surface
and painting the chalk board surface with chalk board paint as per
direction of Engineer-in-Charge including cost and conveyance of all
materials, sales and other taxes on cost of materials and all operational,
incidental and labour charges etc., complete for finished item of work
(APSS No.1603)

54 35.00 Supply and fixing of 110mm dia ISI mark PVC rain water spouts of 2.5 PVC Pipe PVC Pipe As per 515.95 Rmt 18058.00
Kg/cm2 pressure including Cost of necessary pvc bends, shoes and Incharge
M.S.clamps and all other accessories and fixing in position including cost Engineer
and conveyance of all materials to site , sei

Electrical

Page 43 of 420
55 60.00 Wiring with 2 runs of 14/0.3mm (1.0 Sqmm) FRLS / HFFR PVC insulated Wiring Wiring As per 483 Point 28980.00
1100V grade as per IS:694/1990 specification for Copper cable in Incharge
existing pipe with 6A / 10A 1 Way 1 Module Modular Switch control with 6 Engineer
Module Hot Dip Galvanized modular type Metal Box covered with 6
Modular Cover Frame, 3 Plate Jumbo Ceiling Rose including all labour
charges etc., complete for light, bell, fan and exhaust fan points in Non-
Residential Buildings.Copper wire make:Polycab /RPG / Million / Power
Flex / Anchor / V-Guard.Modular Switch, Socket, Metal box & Cover frame
Make:GM Four-Five / Legrand Arteor / Schneider Zen celo / MK
Blenge.Ceiling Rose Make:Anchor / Gold Medal Olive / Million Zoom.

56 10.00 Supply and Fixing of 20A 2 Module Modular Socket with shutter and 16A / 20A 20A As per 551.5 No 5515.00
20A 1 Way 1 Module Modular Switch duly recessed in wall with 3 Module Modular Modular Incharge
Hot Dip Galvanized Modular Metal Box size covered with 3 Modular Cover Socket Socket Engineer
Frame including earth connections and all

57 10.00 Supply and fixing of 6A / 10A 3/2 Pin 2 Module Modular Socket with 6A 6A As per 246.305 No 2463.00
shutter with 6A / 10A 1 Way 1 Module Modular Switch control on a Modular Modular Incharge
Common switch board with with 3 Module Hot Dip Galvanized Modular Socket Socket Engineer
Metal Box covered with 3 Modular Cover Frame with earth continuity
including wire leads, earth connections along with all labour charges etc.,
complete.Modular Switch, Socket, Metal box & Cover frame Make:GM
Four-Five / Legrand Arteor / Schneider Zen celo / MK Blenge.
58 200.00 Supply and run of 2 of 36/0.3mm (2.5 Sqmm) and one run of 14/0.3mm Copper Copper As per 74.40 Rmt 14880.00
(1.0 Sqmm) flexible copper wire for earthing FRLS / HFFR PVC insulated Cable Cable Incharge
1100V grade as per IS:694/1990 specification for Copper cable in Engineer
existing pipe for mains inlcuding all labour char

59 12.00 Supply of 1 x 36/40W Box type tube light luminaire powder coated CRCA Tube Tube As per 969.65 No 11636.00
sheet steel housing with Electronic Ballast Chokes and all standard Light Light Incharge
accessories with 36/40W tube and Fixing of 20W/18W led tube light Engineer
luminaire on wall / Ceiling with / TW /PVC round blocks with all
accessories including giving connections and all labour charges etc.,
complete. Makes : Wipro / G.E. / Phillips / Crompton / Bajaj .
60 12.00 Supply of 1200 mm (48") sweep 230V, A.C 50 Hz.Ceiling fan with 3 Ceiling Ceiling As per 1717 No 20604.00
Blades and double ball bearings with all standard accessories. Makes: Fan Fan Incharge
Crompton Decora / Bajaj Ultima /Havells Velocity / Usha Astra / Orient Engineer
PSPO.

Page 44 of 420
61 12.00 Labour charges for Fixing of Ceiling fan and regulator including Labour Labour As per 124.8 No 1498.00
transportation and giving connections with twin core wire etc., complete. Charges Charges Incharge
Engineer
62 12.00 Supply of 1 Module Modular type Electronic step type Fan Regulator with Electronic Electronic As per 494.00 No 5928.00
2 Module Hot Dip Galvanized Modular Metal Box covered with 2 step type step type Incharge
modular cover frame etc., complete.Makes : GM Four-Five / Legrand Fan Fan Engineer
Arteor / SchneiderZen celo / MK Blenge. Regulator Regulator

63 75.00 Supply and Run of 2 of 10 Sq.mm WPSC Aluminium cable along with WPSC WPSC As per 53.23 Rmt 3992.00
No.10 SWG G.I bearer wire through PVC cleats with all accessories Aluminiu Aluminiu Incharge
including labour charges etc., complete for service mains. m cable m cable Engineer

64 1.00 Providing independent earthling by excavating a trench to a depth of 2.1 Earthing Earthing As per 2911.00 No 2911.00
M in all soils, as per size specified in the Data, using 40mm dia 'B' class Incharge
GI pipe of 2.5 Mtrs length with necessary accessories with hume pipe ring Engineer
duly providing staggered holes including c/c of all materials such as GI
Pipe, Nuts & Bolts, Hume ring , Salt, Charcoal etc. filling with equal
proportion of Salt and Charcoal in layers and all labour charges etc.,
complete for small quarters.
65 2.00 Supply and fixing of 8 Way SPN DB with IP 43 Protection as per IS:13032 SPN DB SPN DB As per 3293.50 No 6587.00
and suitable for singile phase 6 Nos S.P out goings and for 1No Incommer Incharge
including internal connection and labour charges for flush mounting etc., Engineer
complete.
Incommer: 40A DP Isolator

66 200.00 Supply and Fixing of 25mm outer dia heavy (2.20mm thickness) grade, PVC Pipe PVC Pipe As per 62.02 Rmt 12404.00
FRLS with IS:9537 part 3 regid PVC pipe (ISI MARK) concealed in Roof Incharge
Slabs with all required accessories including masonary work and labour Engineer
charges etc., complete. Makes : Sudhakar / Modi ( ISI mark).

Total 3734177.00
(Rupees thirty Sseven lacs thirty four thousand one hundred and seventy eight only)
Total items one fifty seven (111) only

4063008
114156

Page 45 of 420
SUB ESTIMATE : GROUND FLOOR

Name of the Work

SBC 100KN/SQMT
Sl. Measurements
No. Description of item QTY Unit Rate Amount
Nos. L B D
1 2 3 4 5 6 7 8 9
1 Earth work excavation and depositing on bank (manual means) with
initial lead of 10m and initial lift of 3m in Loamy & Clayey Soils like
BC Soils, Red Earth & Ordinary Gravelly Soils ( SS 20-B) including
all operational incidental labour charges such as shoring, strutting,
sheeting, planking and dewatering including cost of hire charges of T
& P, labour charges etc., complete for finished item of work excluding
seignerage charges and dewatering charges etc., complete for
Foundation of Building.(APSS No. 308)

Walls 1 x 2 44.30 0.75 0.90 59.81


59.81
Or say 60.00 Cum 152.90 9174
2 Plain Cement Concrete corresponding to M5 grade as per IS 456
equivalent to (1:5:10) proportion nominal mix (cement: fine
aggregate: Coarse aggregate) using 40mm size Hard Blasted Granite
(IS383, 1970) metal from approved quarry including cost and
conveyance of all materials like cement, sand, coarse aggregate, water
etc. to site, including sales & other taxes on all materials, all
operational, incidental, and labour charges such as mixing, laying and
ramming concrete in layers in position not exceeding 15cm, finishing
top surface, curing concrete, etc., complete but excluding seigniorage
chargesfor finished item of work for Foundations and Flooring Bed
(APSS No. 402)

For Long walls


Walls 1 x 2 44.3 0.75 0.10 6.65
under flooring
Path ways 1 x 2 44.30 3.05 0.08 21.62
28.26
Or say 28.50 Cum 3238.37 92293
3 Brick Masonry in superstructure with CM (1:6) prop: using Fly ASH
Bricks of size 290x225x140mm with compressive of 50 Kgs / Sqcm
from approved source including cost and conveyance of all materials
like cement, sand, fly ash bricks, water etc., to site, including
seigniorage charges, sales & other taxes on all materials, all
operational, incidental and labour charges such as mixing cement
mortar, constructing masonry, scaffolding charges, lift charges,
curing, etc., complete for finished item of work. for basement (APSS
No. 501 & 504).

Path Way 46 of 420


Sl. Measurements
No. Description of item QTY Unit Rate Amount
Nos. L B D
1 2 3 4 5 6 7 8 9
Fly ash masonry wall
Walls 1 x 2 44.3 0.60 0.30 15.95
1 x 2 44.3 0.45 0.50 19.94
1 x 2 44.30 0.30 1.35 35.88
71.77
Or say 72.00 Cum 4842.05 348628

4 Plastering with CM(1:4) Prop: 20mm thick in single coat including


cost and conveyance of all materials like cement, sand, water etc., to
site, including seigniorage charges, sales & other taxes on all
materials, all operational, incidental charges and labour charges such
as mixing mortar, finishing, curing, etc., complete for finished item of
work. (APSS 901,906)

Walls 1 x 2 44.3 1.35 119.61


Or say 120.00 Sqm 260.75 31290
5 Filling with useful available excavated earth (excluding rock) in
trenches, sides of foundations and basement with initial lead in layers
not exceeding 15cm thick, consolidating each deposited layer by
watering and ramming including cost and conveyence of water to
work site and all operational, incidental, labour charges, hire charges
of T & P etc., complete for finished item of work. (APSS NO. 309 &
310)

Same as Earth Work Quantity 60.00


60.00
Or say 60.00 Cum 32.55 1953
6 Filling with Gravel in trenches, sides of foundations and basement
with initial lead in layers not exceeding 15cm thick, consolidating
each deposited layer by watering and ramming including cost and
conveyence of water to the work site and all operational, incidental,
labour charges, hire charges of T & P etc., completebut but excluding
seignorage charges, for finished item of work. (APSS NO. 309 & 310)

Path ways 1 x 2 44.30 3.05 1.35 364.81


364.81
Or say 365.00 Cum 300.90 109829

Path Way 47 of 420


Sl. Measurements
No. Description of item QTY Unit Rate Amount
Nos. L B D
1 2 3 4 5 6 7 8 9
7 In - situ - Granolithic Concrete Flooring 20mm thick with CC(1:1:2)
Prop: using 6mm to 12mm size HBG machine crushed metal laid
monolithically over 100mm thick CC flooring bed (1:5:10) with
40mm HBG metal in alternate panels of size not exceeding 1.50m x
1.50m and finishing the top surface to required smoothness and
slopes, thread lining as directed by the Engineer - in - charge including
cost and conveyance of all materials like cement, sand, water, etc. to
site, seigniorage charges, sales and other taxes on all materials, all
operational, incidental and labour charges such as mixing of cement
concrete, laying, curing, lift charges etc., complete for finished item of
work (APSS
No.701 & 710)

Path ways 1 x 2 44.3 3.05 270.23


270.23
Or say 270.50 Sqm 327.55 88602

8 Supplying and fixing of GI pipe hand railing as per approved drawing


with top & middle rail of 50mm dia pipe with medium grade
properties and vertical posts of 50mm dia with medium properties for
each one meter length fixed in bed blocks including cost and
conveyance of all materials, electrodes, welding charges, cost of all
consumables, labour charges , overheads & contractors
profit etc., complete for finished item of work.

1 x 2 44.30 88.60
Or say 89.00 Rmt LS 165000
TOTAL >>> 846769

Path Way 48 of 420


GOVERNMENT OF ANDHRA PRADESH
RURAL WATER SUPPLY & SANITATION DEPARTMENT

DETAILED ESTIMATE

Name of the Work : Construction of Compound wall to MPPS Gollapalle


H/O Gollapalle of B.Kothakota Mandal with RCC
footings

Estimate Amount : 0.59 Lakhs

Grant : MGNREGS

Mandal : Peddamandyam

District : Chittoor
In Put Data

Construction of Compound wall to MPPS Gollapalle H/O Gollapalle of


Name of the Work
B.Kothakota Mandal with RCC footings

Mandal : Peddamandyam Estimate Cost. Rs. 0.59 Lakhs

Material
Component
Total Cost
S. No Task Name Qty Units Rate (Rs.) un skilled Skilled/ Semi
Skilled/ (Rs)
Labour (Rs)

(B) Wage component (Un skilled


1 8 Days 211.00 1789 0 1789
Labour) (Concrete items)
2 CW02 Cement 33.83 Bags 275.00 9304 9304

3 CW 03 Sand for filling 0.00 Cum 336.66 0 0

4 CW05 Sand for mortar & plastering 0.00 Cum 903.80 0 0

5 CW05 Sand for Concreting 2.70 Cum 819.80 2211 2211

CW 06: 40 mm nominal HBG /HBT


6 1.53 Cum 1110.60 1700 1700
graded metal
CW 07:20mm HBG graded metal
7 2.57 Cum 1646.10 4238 4238
consisting of 20mm Metal
CW08 12mm HBG graded metal
8 1.29 Cum 1373.10 1768 1768
consisting of

9 Steel 0.32 MT 43660.00 14059 14059

1789 33280 35069

CW09: Graded Metal consisting of


10 60% of 40mm and 40% of 20mm to
10mm graded HBG/HBT metal

CW 10: Cost towards engaging skilled


labour ,semi skilled labour,other
11 materials and equipment charges 24130
including all other materials not covered
above

12 CW 12 QC @0.5% 287
121
13 CW13 Seignorage charges 539
14 Stationary and Filing charges
Total 59199
Unforseen items if any

Grand Total 59199

Asst. Exe. Engineer Dy. Executive Engineer


RWS&S, B.kothakota RWS&S Subdivision, Thamballapalli
Name of the Work Construction of Compound wall to MPPS Gollapalle H/O Gollapalle of B.Kothakota Mandal with RCC footings

Description of Item Nos. Lengt Breadth Depth Quantity Rate per Amount Material component Unskilled Labour
Sl. h component
No.
Rate Amount Rate Amount
1 2 3 4 5 6 7 8 9 10 11 12 13
Earth work excavation and depositing on bank with initial lead of 10m and initial lift of
3m in Loamy & Clayey Soils like BC Soils, Red Earth & Ordinary Gravelly Soils ( SS
20-B) including all operational incidental labour charges such as shoring, strutting,
1 sheeting, planking and dewatering including cost of hire charges of T & P, labour
charges etc., complete for finished item of work including seignerage charges
excluding dewatering charges etc., complete for Foundation of Building.(APSS No.
308)

For footing to compound wall 1 x 13 1.00 1.00 0.90 11.70


at expansion joints 1 x 0 1.15 1.15 1.00 0.00
Gate column footings 1 x 0 1.50 1.50 1.00 0.00
for plinthbeam 1 x 0 30.00 0.3 0.4 0.00
deduction of column pits portion 1 x 0 1.00 0.3 0.4 0.00
11.70 cum 152.90 cum 1789 0 152.90 1789
Filling with useful available excavated earth (excluding rock) in trenches, sides of
foundations and basement with initial lead in layers not exceeding 15cm thick,
consolidating each deposited layer by watering and ramming including cost and
2 conveyence of water to work site and all operational, incidental, labour charges, hire
charges of T & P etc., complete for finished item of work. (APSS NO. 309 & 310)

EWE 11.70
PCC (1:5:10) -1.70
footing -3.09
column up to GL -1.20
Refilling qty cum 32.55 /cum 0 0 32.55 0
Plain Cement Concrete corresponding to M7.5 grade as per IS 456 equivalent to
(1:4:8) proportion nominal mix (cement: fine aggregate: Coarse aggregate) using
40mm size Hard Blasted Granite (IS383, 1970) metal from approved quarry including
cost and conveyance of all materials like cement, sand, coarse aggregate, water etc.
to site, including seigniorage charges, sales & other taxes on all materials, all
3
operational, incidental, and labour charges such as mixing, laying and ramming
concrete in layers in position not exceeding 15cm, finishing top surface, curing
concrete, etc., complete for finished item of work for Foundations (APSS No. 402)

PCC foundation 1 x 21 0.90 0.90 0.10 1.70

at expansion joints 1 x 0 1.15 1.15 0.10 0.00


Gate column footings 1 x 0 1.50 1.50 0.10 0.00
for plinthbeam 1 x 0 30.23 0.3 0.1 0.00
deduction of column portion 1 x 0 0.23 0.23 0.1 0.00
1.70 cum 3416.70 /cum 5812 3416.70 5812 0 0
Description of Item Nos. Lengt Breadth Depth Quantity Rate per Amount Material component Unskilled Labour
Sl. h component
No.
Rate Amount Rate Amount
1 2 3 4 5 6 7 8 9 10 11 12 13

RCC M- 20 Nominal mix (Cement:fine aggregate: coarse aggregate) corresponding to


Table 9 of IS 456 using 20mm-6mm size graded machine crushed hard granite metal
(coarse aggregate) from approved quarry including cost and conveyance of all
materials like cement, fine aggregate (sand) coarse aggregate, water etc., to site and
4 including sales & other taxes on all materials including all operational, incidental and
labour charges such as machine mixing, laying concrete, curing etc.,complete but
excluding cost of steel and its fabrication charges ,Seigniorage charges for finished
item of work, including centering, shuttering.

For footings
for cwall 1 x 21 0.80 0.80 0.23 3.09
at expansion joints 1 x 0 1.00 1.00 0.20 0.00
Gate column footings 1 x 0 1.25 1.25 0.20 0.00
3.09 Cum 6904.64 Cum 21344 6904.64 21344 0 0
For columns
upto GL 1 x 21 0.23 0.23 0.70 0.78
at expansion joints 1 x 0 0.23 0.23 0.70 0.00
For gate 1 x 2 0.45 0.45 0.70 0.28
Above GL 1 x 21 0.23 0.23 1.50 1.67
at expansion joints 1 x 0 0.23 0.23 1.50 0.00
For gate 1 x 2 0.45 0.45 1.50 0.61
1.20 Cum 9041.64 Cum 10850 9041.64 10850 0 0

Plinth beams 1 x 0 30.23 0.23 0.23 0.00


cum 8896.64 Cum 0 8896.64 0 0 0

Plain Cement Concrete corresponding to M15 grade as per IS 456 equivalent to


(1:2:4) proportion nominal mix (cement: fine aggregate: Coarse aggregate) using
20mm size Hard Blasted Granite (IS383, 1970) Machine Crushed graded metal from
approved quarry including cost and conveyance of all materials like cement, sand,
5 coarse aggregate, water etc. to site, including seigniorage charges, sales & other
taxes on all materials, all operational, incidental and labour charges such as mixing,
laying, curing concrete, etc., complete for finished item of work (APSS No. 402)

FOR DPC 1 x 0 30.23 0.23 0.10 0.00


cum 5040.80 Cum 0 5040.80 0 0 0
Description of Item Nos. Lengt Breadth Depth Quantity Rate per Amount Material component Unskilled Labour
Sl. h component
No.
Rate Amount Rate Amount
1 2 3 4 5 6 7 8 9 10 11 12 13
Cost supply and fabrication of FE 415 grade HYSD steel bars of different sizes of C/C
of all materials labour charges for wrought and put up like decoiling straighting cutting
bending cranking using biniding wire for tying after placing at required place and
6 position as for design and drawing of specified structure including cost and
conveyance of all materials and lobour charges etc., complete for finished item of
work as per design and drawing and as per engineer -in-charge at site.

For plinth beams @ 0 Kg


100Kg/Cum(approx)
For Footings @45Kg/Cum 322
for columns @140Kg/Cum 168
0.32 MT 54703.50 /MT 17615 54703.50 17615 0 0
Random Rubble stone masonry, in CM (1:8) prop: (Cement: Sand) using Hard blasted
Granite stones from approved quarry including cost and conveyance of all materials
like Granite stones, cement, sand, water, etc., to site including seigniorage charges,
7 sales & other taxes on all materials, all operational, incidental, and labour charges
such as cutting stones to required size and shape, mixing of cement mortar,
constructing masonry, curing etc., complete for finished item of work for foundation
and basement (APSS No. 601 & 615)

Below ground base for plinth 1 x 1 150.00 0.3 0.3 13.50


deduct column portion 1 x 55 0.23 0.23 0.3 -0.87
cum 2890.15 /cum 0 2890.15 0 0.00 0

Brick Masonry in superstructure with CM (1:8) prop: using Fly ASH Bricks of size
290x225x140mm with compressive of 50 Kgs / Sqcm from approved source including
cost and conveyance of all materials like cement, sand, fly ash bricks, water etc., to
8 site, including seigniorage charges, sales & other taxes on all materials, all
operational, incidental and labour charges such as mixing cement mortar, constructing
masonry, scaffolding charges, lift charges, curing, etc., complete for finished item of
work. (APSS No. 501 & 504).

for compound wall pillars 1 x 21 2.77 0.14 1.5 12.22


at expansion joint 1 x 0 2.77 0.14 1.5 0.00
cum 5208.05 /cum 0 5208.05 0 0.00 0

Plastering with CM(1:5) Prop: 12mm thick in single coat including cost and
conveyance of all materials like cement, sand, water etc., to site, including
seigniorage charges, sales & other taxes on all materials, all operational, incidental
9 charges and labour charges such as mixing mortar, finishing, curing, etc., complete
for finished item of work. (APSS 901,906)

for compound wall 1 x 21 2.77 3.82 222.21


Description of Item Nos. Lengt Breadth Depth Quantity Rate per Amount Material component Unskilled Labour
Sl. h component
No.
Rate Amount Rate Amount
1 2 3 4 5 6 7 8 9 10 11 12 13
230x230mm pillars 1 x 21 0.69 1.50 21.74
pillar top 1 x 21 0.23 0.23 1.11
sqm 236.70 sqm 0 236.70 0 0.00 0
Painting to New walls with two coats of Plastic Emulsion paint of superior quality of
approved brand and shade over base coat of cement primer grade -I making three
10 coats in all to give an even shade after thoroughly brushing the surface to remove all
lo
Qty as per plastering 0.00 sqm 167.60 Sqm 0 167.60 0 0.00 0

Cost, supply, fabrication and fixing of MS iron angles, of size 65x65x6 angle for
11 supporting of barbed wire fancing

1 x 21 0.90 5.80 Kgs 76.84 Kgs 0 76.84 0 0.00 0

Supplying and fixing galvanised steel barbed wire (IS : 278-1962 Type I) weighing rmt 10.95 rmt 0 10.95 0 0.00 0
9.38 Kg per 100 metres (min.), Straining and fixing to any type of standard, rails,
straining bolts, including securing with and provision of galvanised mild steel wire,
12 stapples or steel pins, etc., as directed (Posts and struts of wood, concrete, steel,
etc.) and straining bolts shall be paid for separately).

Writing of name board Sqft 28.00 Sqft 0 28.00 0 0.00 0


13

Cost, supply, fabrication and fixing of MS iron gate using MS angles, pipes Kgs 76.84 Kg 0 76.84 0 0.00 0
14

57410 55620 1789


15 QC Charges @ 0.5%
16 Add Seineroage charges
17 Statinary and filing charges

12 Add Seineroage charges & Unforcin items , 57410.00 8


Total = Rs: 57410
Rate for 1Mt = Rs:

885000

Asst. Exe. Engineer Dy. Executive Engineer


RWS&S, B.kothakota RWS&S Subdivision, Thamballapalli
SPECIFICATION REPORT

Construction of Compound wall to MPPS Gollapalle H/O Gollapalle of B.kothakota mandal

Est. Cost : Rs. 0.59 Lakhs

The estimate is prepared for the work, "Construction of Compound wall to MPPS
Gollapalle H/O Gollapalle of B.kothakota mandal ". which is accorded Administrative Sanction vide
Progs.Roc. No.1373/SSA/CWs/MGNREGS/STMS/Compound wall//2019-20, Dt 06.01.2020 of the
District Collector/DPC,MGNREGS,AP,Chittoor. The estimated prepared for cost of Rs. 6.50 Lakhs,
under MGNREGS grant.

Compound Wall

1 Earth work excavation and depositing on bank with initial lead of 10m and initial lift of 3m
in Loamy & Clayey Soils like BC Soils, Red Earth & Ordinary Gravelly Soils ( SS 20-B)
including all operational incidental labour charges such as shoring, strutting,

2 Plain Cement Concrete corresponding to M7.5 grade as per IS 456 equivalent to (1:4:8)
proportion nominal mix (cement: fine aggregate: Coarse aggregate) using 40mm size
Hard Blasted Granite
3 RCC M- 20 Nominal mix (Cement:fine aggregate: coarse aggregate) corresponding to
Table 9 of IS 456 using 20mm-6mm size graded machine crushed hard granite metal
(coarse aggregate) from approved quarry for Footings,Columns,Plint beam

4 Plain Cement Concrete corresponding to M15 grade as per IS 456 equivalent to (1:2:4)
proportion nominal mix (cement: fine aggregate: Coarse aggregate) using 20mm size
Hard Blasted Granite for DPC
5 Cost supply and fabrication of FE 415 grade HYSD steel bars of different sizes of C/C of
all materials labour charges
6 Plastering 12 mm thick in two coats with CM (1:4)

7 Brick Masonry in superstructure with CM (1:8) prop: using Fly ASH Bricks of size
290x225x140mm with compressive of 50 Kgs / Sqcm from approved source

8 Painting to New walls with Two Coats of Plastic Emulsion Paint of superior quality

The general items like Administrative Charges at 2% , Q.C charges @ 0.5%, Seignorage
charges and Unforeseen items are also provided in this estimate.

The estimate is prepared duly adopting the rates of SSR 2019-20 and the work will be carried
out as per the Standard Specifications of APDSS.
Asst. Exe. Engineer Dy. Executive Engineer
RWS&S, B.kothakota RWS&S Subdivision, Thamballapalli
Material calculations
Through Sand for
stones
40mm 20mm 12mm RR Fly ash Cement in
S.No Item Qty unit factor 25 x 25x
metal metal metal Stone bricks Kgs
45 to 60 Filling Plastering Concrete
cms

1 PCC 1:5:10/1:4:8

40mm metal 1.70 Cum 0.9 1.53

sand 1.70 Cum 0.45 0.77

Cement 1.70 Cum 162 275.56

2 RRM,CM(1:8)

RR Stone 0.00 Cum 0.50 0.00


Through stones 25 x 25x 45 to
60 cms 0.00 Cum 0.16 0.00

sand 0.00 Cum 0.33 0.00

Cement 0.00 Cum 59.40 0.00

3 RCC

20mm size agg 4.29 Cum 0.6 2.57

12mm size agg 4.2912 Cum 0.3 1.29

sand 4.2912 Cum 0.45 1.93

Cement 4.2912 Cum 330 1416.10

3 Brick masonary CM(1:6)

sand 0.00 Cum 0.1 0.00

bricks 0 Cum 110 0.00


Cement 0.00 Cum 18 0.00

4 Plastering 12mm thick

sand 0.00 Sqm 0.016 0.00

Cement 0.00 Sqm 4.32 0.00

1.53 2.57 1.29 0.00 0.00 0.00 0.00 2.70 0.00 1691.66

Through
RR stones
40mm 20mm 12mm Stone filling mortar concrete Bricks 33.83

Seineorage charges Rs. 75 75 75 75 75 50 50 50 60

Amount in Rs. 114.82 193.10 96.55 0.00 0.00 0.00 0.00 134.82 0.00 539.30

Asst. Exe. Engineer Dy. Executive Engineer


RWS&S, B.kothakota RWS&S Subdivision, Thamballapalli
LEAD CHART

Name of the Work Construction of Compound wall to MPPS Gollapalle H/O Gollapalle of B.Kothakota Mandal with RCC footings

RATES AS PER COMMON SSR OF 2019-20 with cement and steel rates of January - 2020 29.10.2019

Lead in KM Initial Cost Add Area


including Differenc allowence
Convenc 1%
Sl. Source of Stacking in Loading unloading on loading
Description e towards GST Total Unit per
No. Material Charges Seignio- charges charges & unloading
CT Total Charges storage
wherever rage charges @
necesssary Charges 0%

(1) (2) (5) (6) (7) (8) (9) (10) (11) (12) (13) (14) (15) (16) (17)
Sand (un-screened) for
1 Burlapalle 26.00 0.00 26.00 284.30 510.00 0.00 0.00 0.00 0.00 0.00 25.50 819.80 Cum.
Concrete & Filtering items
Sand (screened) for
Mortar, Plastering items and
2 Burlapalle 26.00 0.00 26.00 284.30 590.00 0.00 0.00 0.00 0.00 0.00 29.50 903.80 Cum.
Sand blasting
items
Sand (unscreened) for
3 Burlapalle 26.00 0.00 26.00 284.30 375.00 0.00 0.00 0.00 0.00 0.00 18.75 678.05 Cum.
filling& blindage

4 Gravel Local 5.00 0.00 5.00 47.00 113.00 0.00 0.00 0.00 0.00 0.00 0.00 160.00 Cum.

5 Random Rubble Stone Settipalle 22.00 0.00 22.00 239.10 250.00 0.00 0.00 0.00 0.00 0.00 12.50 501.60 Cum.

Coursed rubble stone 30 x 30 x


6 Settipalle 22.00 0.00 22.00 239.10 500.00 0.00 0.00 0.00 0.00 0.00 25.00 764.10 Cum.
60 cm

Through stones 25 x 25 x 45 to
7 Settipalle 22.00 0.00 22.00 239.10 1188.57 0.00 0.00 0.00 0.00 0.00 59.43 1487.10 Cum.
60 cm long

Aggregates 40 mm nominal
8 Settipalle 22.00 0.00 22.00 239.10 830.00 0.00 0.00 0.00 0.00 0.00 41.50 1110.60 Cum.
size (IS383-1970)

Aggregates 20 mm nominal
9 size M/c chips (IS383- Settipalle 22.00 0.00 22.00 239.10 1340.00 0.00 0.00 0.00 0.00 0.00 67.00 1646.10 Cum.
1970)
Aggregates 13.2/12.5 mm
10 nominal size M/c chips Settipalle 22.00 0.00 22.00 239.10 1080.00 0.00 0.00 0.00 0.00 0.00 54.00 1373.10 Cum.
(IS383-1970)

Aggregates 10 mm nominal
11 size M/c chips (IS383- Settipalle 22.00 0.00 22.00 239.10 920.00 0.00 0.00 0.00 0.00 0.00 46.00 1205.10 Cum.
1970)

LEAD 59
Lead in KM Initial Cost Add Area
including Differenc allowence
Convenc 1%
Sl. Source of Stacking in Loading unloading on loading
Description e towards GST Total Unit per
No. Material Charges Seignio- charges charges & unloading
CT Total Charges storage
wherever rage charges @
necesssary Charges 0%

Aggregates 6 mm nominal size


12 Settipalle 22.00 0.00 22.00 239.10 725.00 0.00 0.00 0.00 0.00 0.00 36.25 1000.35 Cum.
M/c chips (IS383-1970)
2nd Class Bricks of size
13 Local 10.00 0.00 10.00 103.50 6000.00 0.00 0.00 54.80 54.80 0.00 300.00 6513.10 1000 Nos
23x11x7cm

Fly Ash Bricks of size 290 x225


14 x 140 mm with compressive Madanapalle 22.00 0.00 22.00 239.10 24000.00 0.00 0.00 54.80 54.80 0.00 1200.00 25548.70 1000 Nos
strength of 50 Kg/sq .cm

15 water Local 0.50 0.00 0.50 0.00 107.00 0.00 0.00 107.00 KL

16 Cement At Site 0.00 0.00 0.00 4300.00 0.00 0.00 0.00 0.00 0.00 1204.00 5504.00 M.T
Mild Steel Bars (Fe 250) for
17 At Site 0.00 0.00 0.00 38500.00 0.00 0.00 0.00 0.00 0.00 6930.00 45430.00 M.T
6mm
High Yield Strength Deformed
18 Bars (Fe 415) for 8mm to 40mm At Site 0.00 0.00 0.00 36500.00 0.00 0.00 0.00 0.00 0.00 6570.00 43070.00 M.T
dia

High Yield Strength Deformed


19 Bars (Fe 500D) for 8mm to At Site 0.00 0.00 0.00 37000.00 0.00 0.00 0.00 0.00 0.00 6660.00 43660.00 M.T
40mm dia

Mild Steel, Structural steel, I,e,


20 At Site 0.00 0.00 0.00 38000.00 0.00 0.00 0.00 0.00 0.00 6840.00 44840.00 M.T
Angles, Channels & I-Sections

21 M.S. Flats At Site 0.00 0.00 0.00 40000.00 0.00 0.00 0.00 0.00 0.00 7200.00 47200.00 M.T

22 M.S. Plates At Site 0.00 0.00 0.00 40000.00 0.00 0.00 0.00 0.00 0.00 7200.00 47200.00 M.T

CERTIFICATES:-
1 Certified that the above leads are true and correct to the best of my knowledge
2 Certified that the quarry requries blasting for RR, CRS, 6mm, 10mm, 12mm, 20mm & 40mm Metal
3 Certified that the 20mm, 12mm, 10mm, 6mm Metal requires Machine Crushing

LEAD 60
Lead in KM Initial Cost Add Area
including Differenc allowence
Convenc 1%
Sl. Source of Stacking in Loading unloading on loading
Description e towards GST Total Unit per
No. Material Charges Seignio- charges charges & unloading
CT Total Charges storage
wherever rage charges @
necesssary Charges 0%

Asst. Exe. Engineer Dy. Executive Engineer


RWS&S, B.kothakota RWS&S Subdivision,
Thamballapalli

LEAD 61
DATA
Name of the Construction of Compound wall to MPPS Gollapalle H/O Gollapalle of B.Kothakota Mandal with RCC
Work footings

Overheads 0.000%

COMMON STANDARD SCHEDULE OF RATES FOR THE YEAR 2019-2020


0% AGENCY / MUNICIPAL / LALI ALLOWANCE

DATA
Name of the Work

Qty Rate Per Amount


CEMENT MORTAR (1:2)
Material
Cost of Sand 1.05 Cum 903.80 1.00 Cum 948.99
Cost of Cement 720 Kgs 5504.00 1000.00 Kgs 3962.88
Man Power
Light Mazdoor 0.20 Nos 420.00 1.00 Day 84.00

Rate per cum. 4995.87

CEMENT MORTAR (1:3)


Material
Cost of Sand 1.05 Cum 903.80 1.00 Cum 948.99

Cost of Cement 480 Kgs 5504.00 1000.00 Kgs 2641.92

Man Power
Light Mazdoor 0.20 Nos 420.00 1.00 Day 84.00

Rate per cum. 3674.91

CEMENT MORTAR (1:4)


Material
Cost of Sand 1.05 Cum 903.80 1.00 Cum 948.99

Cost of Cement 360 Kgs 5504.00 1000.00 Kgs 1981.44

Man Power
Light Mazdoor 0.20 Nos 420.00 1.00 Day 84.00
Rate per cum. 3014.43

CEMENT MORTAR (1:5)


Material
Cost of Sand 1.05 Cum 903.80 1.00 Cum 948.99
Cost of Cement 288 Kgs 5504.00 1000.00 Kgs 1585.15
Man Power
Light Mazdoor 0.20 Nos 420.00 1.00 Day 84.00
Rate per cum. 2618.14

CEMENT MORTAR (1:6)


Material
Cost of Sand 1.05 Cum 903.80 1.00 Cum 948.99
Cost of Cement 240 Kgs 5504.00 1000.00 Kgs 1320.96
Man Power
Light Mazdoor 0.20 Nos 420.00 1.00 Day 84.00
Rate per cum. 2353.95

CEMENT MORTAR (1:8)


Material

Page 62
Cost of Sand 1.05 Cum 903.80 1.00 Cum 948.99
Cost of Cement 180 Kgs 5504.00 1000.00 Kgs 990.72
Man Power
Light Mazdoor 0.20 Nos 420.00 1.00 Day 84.00
Rate per cum. 2023.71
Cost andConvenyance of 20mm
to 6mm HBG Graded Metal /
(Trap Metal)

20mm 0.60 Cum 1646.10 1.00 Cum 987.66


12mm 0.15 Cum 1373.10 1.00 Cum 205.97
10mm 0.15 Cum 1205.10 1.00 Cum 180.77
6mm 0.10 Cum 1000.35 1.00 Cum 100.04
Rate per 1 cum. Total 1474.43

Cost and Convenyance of 12mm


to 6mm HBG Graded Metal /
(Trap Metal)

12mm 0.60 Cum 1373.10 1.00 Cum 823.86


10mm 0.20 Cum 1205.10 1.00 Cum 241.02
6mm 0.20 Cum 1000.35 1.00 Cum 200.07
Rate per 1 cum. Total 1264.95
Hire charges of machinery
Rate (Rs.) Amount
Sl. No. Description Quantity Per Unit
(Rs.)
1 Earth work excavation and depositing on bank with initial lead of 10m and initial lift of 3m in
Loamy & Clayey Soils like BC Soils, Red Earth & Ordinary Gravelly Soils ( SS 20-B)
including all operational incidental labour charges such as shoring, strutting, sheeting,
planking and dewatering including cost of hire charges of T & P, labour charges etc., complete
for finished item of work including seignerage charges excluding dewatering charges etc.,
complete for Foundation of Building.(APSS No. 308)

Light Mazdoor 0.364 Nos 420.00 1.00 Day 152.88


Add 75% for excavation of 1 cum. 0.00 1.00 cum. 0.00
foundation of building

add seigniorage charges 1 cum 0.00 1.00 cum 0.00


0.00 cum. 0.00000 1.00 cum. 0.00
Add Overheads & Contractors Profit
@13.615%

Rate per 1 cum. Total 152.90

2 Filling with useful available excavated earth (excluding rock) in trenches, sides of
foundations and basement with initial lead in layers not exceeding 15cm thick, consolidating
each deposited layer by watering and ramming including cost and conveyence of water to work
site and all operational, incidental, labour charges, hire charges of T & P etc., complete for
finished item of work. (APSS NO. 309 & 310)

Light Mazdoor 0.052 Nos 420.00 1.00 Nos 21.84


Water 0.1 KL 107.00 1.00 KL 10.70
Add Overheads & Contractors Profit 32.54 0.000000 1.00 0.00
@13.615%
Rate per 1 cum. Total 32.55

Page 63
3 Plain Cement Concrete corresponding to M5 grade as per IS 456 equivalent to (1:5:10)
proportion nominal mix (cement: fine aggregate: Coarse aggregate) using 40mm size Hard
Blasted Granite (IS383, 1970) metal from approved quarry including cost and conveyance of all
materials like cement, sand, coarse aggregate, water etc. to site, including seigniorage charges,
sales & other taxes on all materials, all operational, incidental, and labour charges such as
mixing, laying and ramming concrete in layers in position not exceeding 15cm, finishing top
surface, curing concrete, etc., complete for finished item of work for Foundations and
Flooring Bed (APSS No. 402)

Material
Cement 129.6 Kgs. 5504.00 1000.00 Kgs. 713.32
Coarse aggregate Metal 40mm 0.9 cum. 1110.60 1.00 cum. 999.54
Coarse aggregate Sand 0.45 cum. 819.80 1.00 cum. 368.91
Water 1.2 KL 107.00 1.00 KL 128.40
Machinery
Concrete mixer300/200 (diesel) 1 Hour 394.40 1.00 Hour 394.40

Labour Allowence on crew charges 0% 252.20 1.00 0.00

Labour
1st class mason 0.1 Nos. 500.00 1.00 Each 50.00
Light Mazdoor 1.39 Nos. 420.00 1.00 Each 583.80
Add Overheads & Contractors Profit 3238.37 cum. 0.00000 1.00 cum. 0.00
@13.615%

Rate per cum. Total 3238.37


Without over heads PCC(1:5:10) 3238.37 cum.

4 Plain Cement Concrete corresponding to M7.5 grade as per IS 456 equivalent to (1:4:8)
proportion nominal mix (cement: fine aggregate: Coarse aggregate) using 40mm size Hard
Blasted Granite (IS383, 1970) metal from approved quarry including cost and conveyance of all
materials like cement, sand, coarse aggregate, water etc. to site, including seigniorage charges,
sales & other taxes on all materials, all operational, incidental, and labour charges such as
mixing, laying and ramming concrete in layers in position not exceeding 15cm, finishing top
surface, curing concrete, etc., complete for finished item of work for Foundations (APSS No.
402)

Material
Cement 162 Kgs. 5504.00 1000.00 Kgs. 891.65
Coarse aggregate Metal 40mm 0.9 cum. 1110.60 1.00 cum. 999.54

Coarse aggregate Sand 0.45 cum. 819.80 1.00 cum. 368.91


Water 1.2 KL 107.00 1.00 KL 128.40
Machinery
concrete mixer300/200 (diesel) 1 Hour 394.40 1.00 Hour 394.40

Labour Allowence on crew charges 0% 252.20 1.00 0.00

Labour
Light Mazdoor 1.39 Nos. 420.00 1.00 Each 583.80
Add Overheads & Contractors Profit 3416.70 cum. 0.00000 1.00 cum. 0.00
@13.615%

Rate per cum. Total 3416.70

Page 64
5 Plain Cement Concrete corresponding to M15 grade as per IS 456 equivalent to (1:2:4)
proportion nominal mix (cement: fine aggregate: Coarse aggregate) using 20mm size Hard
Blasted Granite (IS383, 1970) Machine Crushed graded metal from approved quarry including
cost and conveyance of all materials like cement, sand, coarse aggregate, water etc. to site,
including seigniorage charges, sales & other taxes on all materials, all operational, incidental
and labour charges such as mixing, laying, curing concrete, etc., complete for finished item of
work (APSS No. 402)

Material
Cement 324 Kgs. 5504.00 1000.00 Kgs. 1783.30
Coarse aggregate Graded Metal 0.9 cum. 1474.43 1.00 cum. 1326.98
20mm to 6mm

Coarse aggregate Sand 0.45 cum. 819.80 1.00 cum. 368.91


Water 1.2 KL 107.00 1.00 KL 128.40
Machinery
concrete mixer300/200 (diesel) 1 Hour 394.40 1.00 Hour 394.40
Labour Allowence on crew charges 0% 252.20 1.00 0.00
Labour
1st class mason 0.1 cum. 500.00 1.00 cum. 50.00
men &women Mazdoor 1.39 Nos. 420.00 1.00 Each 583.80
Basic rate per Cum. Total 4635.79
Rate for other Floors GF FF SF TF 4th 5th
Basic Rate of P.C.C(1:2:4) per Cum. 4635.79 4635.79 4635.79 4635.79 4635.79 4635.79

Hire charges on centering material 64.00 64.00 64.00 64.00 64.00 64.00
Labour charges for centering 341.00 375.00 409.00 443.00 477.00 477.00
Labour Allowence on centering 0% 0.00 0.00 0.00 0.00 0.00 0.00
labour charges
Lift Charges per Cum. 0.00 63.38 126.76 190.14 253.52 316.90
5040.79 5138.17 5235.55 5332.93 5430.31 5493.69
Add Overheads & Contractors Profit 0.00000 0.00 0.00 0.00 0.00 0.00 0.00
@13.615%
Rate per cum. Total 5040.80 5138.20 5235.55 5332.95 5430.35 5493.70

6 Plain Cement Concrete M20 Design Mix ( by weigh batching ) using 20mm size (SS5) hard
blasted granite machine crushed graded metal (Coarse aggregate) from approved quarry, using
a minimum quantity of 350 kgs. of cement per 1 cum of concrete including cost and conveyance
of all materials like cement, fine aggregate (Sand), coarse aggregate, water etc., to site and
cost of seigniorage charges on all materials including steel centering, shuttering, machine
mixing, laying concrete, lift charges, curing etc., complete for finished item of work for steps
(APSS No. 402 )

Material
Cement 350 kgs 5504.00 1000.00 kgs 1926.40
Coarse aggregate Graded Metal 0.80 cum. 1474.43 1.00 cum. 1179.54
20mm to 6mm

Coarse aggregate Sand 0.40 cum. 819.80 1.00 cum. 327.92


Water 1.2 KL 107.00 1.00 KL 128.40
Machinery
Batching plant 0.5 cum 1.333 Hour 610.30 1.00 Hour 813.53
needle vibrator 40 mm (petrol) 1.333 Hour 209.10 1.00 Hour 278.73
Labour Allowence on crew charges 0% 758.34 1.00 0.00

Labour
1st class Masons 0.1 Nos. 500.00 1.00 Each 50.00
Man and Mazdoor 1.39 Nos. 420.00 1.00 Each 583.80
Basic rate per Cum. 5288.32

Page 65
Rate for other Floors GF FF SF TF 4th 5th
Basic Rate of P.C.C(1:1.5:3) per 5288.32 5288.32 5288.32 5288.32 5288.32 5288.32
Cum.

Hire charges on centering material 288.00 288.00 288.00 288.00 288.00 288.00

Labour charges for centering 631.00 694.00 757.00 820.00 883.00 947.00

Labour Allowence on centering 0% 0.00 0.00 0.00 0.00 0.00 0.00


labour charges
Lift Charges per Cum. 0.00 63.38 126.76 190.14 253.52 316.90
6207.32 6333.70 6460.08 6586.46 6712.84 6840.22
Add Overheads & Contractors Profit 0.00000 0.00 0.00 0.00 0.00 0.00 0.00
@13.615%
Rate per cum. Total 6207.35 6333.75 6460.10 6586.50 6712.85 6840.25

7 Random Rubble stone masonry, in CM (1:8) prop: (Cement: Sand) using Hard blasted Granite
stones from approved quarry including cost and conveyance of all materials like Granite stones,
cement, sand, water, etc., to site including seigniorage charges, sales & other taxes on all
materials, all operational, incidental, and labour charges such as cutting stones to required size
and shape, mixing of cement mortar, constructing masonry, curing etc., complete for finished
item of work for foundation and basement (APSS No. 601 & 615)

Cost of cement 59.40 Kgs 5504.00 1000.00 Kgs 326.94


RR Stone 0.50 Cum 501.60 1.00 Cum 250.80
CR 0.44 Cum 764.10 1.00 Cum 336.20
Through stones 25 x 25x 45 to 60 0.16 Cum 1487.10 1.00 Cum 237.94
cms
Sand 0.33 cum. 903.80 1.00 cum. 298.25
1st Class Mason 1.20 Nos 500.00 1.00 Each 600.00
Light Mazdoor 2.00 Nos 420.00 1.00 Each 840.00
2890.13
Add Overheads & Contractors Profit 2890.13 cum. 0.00000 1.00 cum. 0.00
@13.615%

Rate per cum. Total 2890.15

RCC M- 20 Nominal mix (Cement:fine aggregate: coarse aggregate) corresponding to Table 9 of


IS 456 using 20mm-6mm size graded machine crushed hard granite metal (coarse aggregate)
from approved quarry including cost and conveyance of all materials like cement, fine aggregate
8 (sand) coarse aggregate, water etc., to site and including sales & other taxes on all materials
including all operational, incidental and labour charges such as machine mixing, laying
concrete, curing etc.,complete but excluding cost of steel and its fabrication charges
,Seigniorage charges for finished item of work, including centering, shuttering.

A Unit=1cum
A. MATERIALS:
20mm HBG graded metal cum 0.600 1646.10 987.66
12mm HBG graded metal cum 0.300 1373.10 411.93
6mm HBG graded metal cum 0.000 1000.35 0.00
Sand cum 0.450 819.80 368.91
Cement Kgs 330.00 5.50 1816.32
B. LABOUR:
1st Class Mason day 0.133 500.00 66.50
2nd Class Mason day 0.267 460.00 122.82
Mazdoor (Both Men and Women) day 3.600 420.00 1512.00
Add Area Allowance 0% 0.00
B. MACHINERY
Concrete mixer 300/200 (diesel) hour 1.000 394.40 394.40
Vibrator hire charges hour 1.000 209.10 209.10
Water (including for curing) kl 1.200 80.00 96.00
BASIC COST per 1 cum 5985.64
Without vibration 5776.54

Page 66
For Raft 5985.64
FOOTINGS
BASIC COST per 1 cum cum 1.00 5985.64 5985.64
Centering charges cum 1.00 919.00 919.00
Total 6904.64
PEDASTALS
BASIC COST per 1 cum cum 1.00 5985.64 5985.64
Centering charges cum 1.00 1332.00 1332.00
Total 7317.64
PLINTH BEAMS
BASIC COST per 1 cum cum 1.00 5985.64 5985.64
Centering charges cum 1.00 2911.00 2911.00
Total 8896.64
COLUMNS, LINTELS, WATER TANKS, RCC WALLS IN BUILDINGS
B GF

Lintels and
A. MATERIALS: Columns
sunshades
20mm HBG graded metal cum 0.600 1646.10 987.66 987.66
12mm HBG graded metal cum 0.300 1373.10 411.93 411.93
6mm HBG graded metal cum 0.000 1000.35 0.00 0.00
Sand cum 0.450 819.80 368.91 368.91
Cement Kgs 330.000 5.50 1816.32 1816.32
B. LABOUR:
1st Class Mason day 0.167 500.00 83.50 83.50
2nd Class Mason day 0.167 460.00 76.82 76.82
Mazdoor (Both Men and Women) day 4.700 420.00 1974.00 1974.00
Add Area Allowance 0% 0.00 0.00
Add 10% Extra LC on Labour
B. MACHINERY
Concrete mixer 300/200 (diesel) hour 1.000 394.40 394.40 394.40
Needle Vibrator hire charges hour 1.000 209.10 209.10
Water (including for curing) kl 1.200 80.00 96.00 96.00
BASIC COST per 1 cum 6418.64 6209.54
FF SF
Lintels
Lintels &
and
Columns sunshade Columns
sunshade
s
s
20mm HBG graded metal 987.66 987.66 987.66 987.66
12mm HBG graded metal 411.93 411.93 411.93 411.93
6mm HBG graded metal 0.00 0.00 0.00 0.00
Sand 368.91 368.91 368.91 368.91
Cement 1816.32 1816.32 1816.32 1816.32
B. LABOUR:
1st Class Mason 83.50 83.50 83.50 83.50
2nd Class Mason 76.82 76.82 76.82 76.82
Mazdoor (Both Men and Women) 1974.00 1974.00 1974.00 1974.00
Add Area Allowance 25% 0.00 0.00 0.00 0.00
Add 10% Extra LC on Labour 213.43 213.43 426.86 426.86
B. MACHINERY
Concrete mixer 300/200 (diesel) 394.40 394.40 394.40 394.40
Vibrator hire charges 209.10 209.10
Water (including for curing) 96.00 96.00 96.00 96.00
BASIC COST per 1 cum 6632.07 6422.97 6845.50 6636.40
COLUMNS
GF
BASIC COST per 1 cum cum 1.00 6418.64
Centering charges cum 1.00 2623.00
Total 9041.64

Page 67
9 Brick Masonry in superstructure with CM (1:8) prop: using Fly ASH Bricks of size
290x225x140mm with compressive of 50 Kgs / Sqcm from approved source including cost and
conveyance of all materials like cement, sand, fly ash bricks, water etc., to site, including
seigniorage charges, sales & other taxes on all materials, all operational, incidental and labour
charges such as mixing cement mortar, constructing masonry, scaffolding charges, lift charges,
curing, etc., complete for finished item of work. (APSS No. 501 & 504).

Wall thickness 0.225


Material
Fly Ash Bricks 290x225x140mm 110 Nos 25548.70 1000.00 Nos 2810.36 0.009135
Cement for Cement Mortar (1:8) 18 Kgs 5.50 1.00 Kgs 99.07 18
Sand for Cement Mortar (1:8) 0.1 cum. 903.80 1.00 cum. 90.38
Labour
1st class mason 0.42 cum. 500.00 1.00 cum. 210.00
2nd class mason 0.92 Nos. 460.00 1.00 Each 423.20
Man Mazdoor 0.7 Nos. 420.00 1.00 Each 294.00
Woman Mazdoor 2.1 Nos. 420.00 1.00 Each 882.00
Basic Rate per Cum. 4809.01

Rate for other Floors GF FF SF TF 4th 5th


Basic rate per Cum 4809.01 4809.01 4809.01 4809.01 4809.01 4809.01
Hire charges of stage scafflding per 45.87 45.87 45.87 45.87 45.87 45.87
cum
Labour charges for stage scaffolding 353.16 505.69 658.18 810.71 963.20 1115.69
per cumAllowence on scaffolding
Labour 0% 0.00 0.00 0.00 0.00 0.00 0.00
Lift charges @ 10% extra on each 180.92 361.84 542.76 723.68 904.60
floor 5208.04 5541.49 5874.90 6208.35 6541.76 6875.17
Add Overheads & Contractors Profit 0.00000 0.00 0.00 0.00 0.00 0.00 0.00
@13.615%
Rate per Cum. Total 5208.05 5541.50 5874.90 6208.35 6541.80 6875.20

10 Providing High Yield Strength Deformed (HYSD) steel bars (Fe 415 grade as per IS 1786-1985) of
8mm to 40mm diameters, cutting, bending, to required sizes and shapes placing in position
with cover blocks of approved size and binding wire of 20SWG, forming grills for reinforcement
work as per approved Designs and drawings including cost and conveyance of bars from
approved sources to site of work, including cost and conveyance of binding wire, cover blocks,
chairs, overlaps, spacers, dowels, wastage etc., and all operational, incidental, and labour
charges such as cutting, bending, placing in position, tying etc., and sales & other taxes,on cost
of all materials complete for finished item of work (APSS No.126) in all floors.

Material
Cost of steel including 5% wastage 1.05 MT 43070.00 1.00 MT 45223.50
and
cost overlaps
of binding wire 6 Kg 55.00 1.00 Kg 330.00
Labour
Blacksmith/Tin Smith/Bar bender 10 Nos 495.00 1.00 Nos 4950.00
I st class

Blacksmith/Tin Smith/Bar bender 0 Nos 0.00 1.00 Nos 0.00


II st class

Light mazdoor 10 Nos 420.00 1.00 Nos 4200.00


Rate per MT Total 54703.50

Rate for other Floors GF FF SF TF 4th 5th


Basic rate per MT 54703.50 54703.50 54703.50 54703.50 54703.50 54703.50
Lift Charges per MT @10% extra on 915.00 1830.00 2745.00 3660.00 4575.00
labour per floor 54703.50 55618.50 56533.50 57448.50 58363.50 59278.50
Add Overheads & Contractors Profit 0.00000 0.00 0.00 0.00 0.00 0.00 0.00
@13.615%
Rate per One MT Total 54703.50 55618.50 56533.50 57448.50 58363.50 59278.50

Page 68
11 Plastering with CM(1:5) Prop: 12mm thick in single coat including cost and conveyance of all
materials like cement, sand, water etc., to site, including seigniorage charges, sales & other
taxes on all materials, all operational, incidental charges and labour charges such as mixing
mortar, finishing, curing, etc., complete for finished item of work. (APSS 901,906)

COST of Cement Mortar (1:5) 0.015 cum. 2618.14 1.00 cum. 39.27
1st Class Mason 0.045 Nos. 500.00 1.00 Each 22.50
2nd Class Mason 0.105 Nos. 460.00 1.00 Each 48.30
Man mazdoor 0.28 Nos. 420.00 1.00 Each 117.60
Rate per 1 Sqmt. Total 227.70
Rate for other Floors GF FF SF TF 4th 5th
Basic rate per 1 Sqmt. 227.70 227.70 227.70 227.70 227.70 227.70
Hire charges of access scafflding 1.03 1.03 1.03 1.03 1.03 1.03
pers qm
Labour charges for access 7.95 11.38 14.81 18.24 21.67 25.10
scaffolding per sqm
Labour Allowence on scaffolding 0% 0.00 0.00 0.00 0.00 0.00 0.00
Lift charges @ 10% extra on each 18.84 37.68 56.52 75.36 94.20
floor
236.68 258.95 281.22 303.49 325.76 348.03
Add Overheads & Contractors Profit 0.00000 0.00 0.00 0.00 0.00 0.00 0.00
@13.615%
Rate per 1 Sqmt. Total 236.70 258.95 281.25 303.50 325.80 348.05

12 Painting to New Iron work with two coats of ready mixed Synthetic Enamel paints in all
shades Grade - I having VOC (Volatile Organic Compound ) content less than 50 grams/ liter
over an existing steel primer including cost and conveyance of all materials to site, sales & other
taxes, incidental, operational and all labour charges etc., complete for finished item of work.
(APSS No. 1201, 1207 & 1212).in All Floors

Cost of Synthetic Enamel Paint 0.11 Ltr 248.00 1.00 Ltr 27.28
1st Class Painter 0.033 Nos. 580.00 1.00 Each 19.14
2nd Class Painter 0.077 Nos. 460.00 1.00 Each 35.42
81.84
Add Overheads & Contractors Profit 0.00000 81.84 0.00
@13.615%
Rater per 1 Sqmt. for all floors Total 81.85

13 Supply and Fixing MS GRILLS including Labour Charges for fixing complete including cost and
conveyance of all materials to site, sales and other taxes, all labour charges etc., complete for
finished item of work

BASIC RATE 1 Kgs. 44.84 1.00 Kgs. 44.84


a) LABOUR
Fabrication charges 1 Kg 27.00 1.00 Kg 27.00
Fixing charges 1 Kg 5.00 1.00 Kg 5.00

Add Overheads & Contractors Profit 0.00000 76.84 0.00


@13.615%
Rate per Kg. 76.84

Page 69
14 Painting to New walls with two coats of acrylic emulsion paint weather proof waterbased,
modified acrylic with silicon additives exterior grade having VOC (Volatile Organic Compound )
content less than 50 grams/ liter of superior quality of approved brand and shade over base
coat of cement primer grade -I making three coats in all to give an even shade after thoroughly
brushing the surface to remove all loose powdered materials, including cost and conveyance of
all materials, including cost and conveyance of all materials, cost of brushes, water to site, etc.,
sales & other taxes, all operational, incidental and labour charges such as scaffolding charges,
lift charges, curing etc., complete for finished item of work in all floors for Walls.(APSS No. 911)
in All Floors EXTERNAL

Supply of water based Cement 0.1 Kgs 180.00 1.00 Kgs 18.00
Primer of Exterior Grade- 2

Supply of acrylic emulsion paint 0.08 Ltr 214.00 1.00 Ltr 17.12
weather proof waterbased, modified
acrylic with silicon additives
exterior grade having VOC (Volatile
Organic Compound ) content less
than 50 grams/ liter

Labour for Priming Coat


1st class painter 0.021 Nos. 580.00 1.00 Each 12.18
2nd class painter 0.049 Nos. 460.00 1.00 Each 22.54
Labour for Two Coats
1st class painter 0.021 Nos. 580.00 1.00 Each 12.18
2nd class painter 0.049 Nos. 460.00 1.00 Each 22.54
Mazdoor 0.150 Nos. 420.00 1.00 Each 63.00
167.56
Add Overheads & Contractors Profit 0.00000 167.56 0.00
@13.615%
Rater per 1 Sqmt. for all floors Total 167.60
Supplying and fixing galvanised steel barbed wire (IS : 278-1962 Type I) weighing 9.38 Kg per
100 metres (min.), Straining and fixing to any type of standard, rails, straining bolts, including
15 securing with and provision of galvanised mild steel wire, stapples or steel pins, etc., as directed
(Posts and struts of wood, concrete, steel, etc.) and straining bolts shall be paid for separately).

Details of Cost per 100 metres (day


line of wire)
Materials:—
kg
Galvanised steel barbed wire IS
9.380 81.00 1.00 Kg 759.78
type I weighing 9.38 Kg/100 metre

Carriage of barbed wire1% 0.81


G.I. staples steel pins or binding LS
60.00
wire
Labour :-
For fixing & stretching wire
Blacksmith, 1st Class day 0.300 495.00 1.00 148.50
Blacksmith, 2nd Class day 0.150 0.00 1.00 0.00
Mazdoor (male). day 0.300 420.00 1.00 126.00
Sundries. 0.00

Cost for 100 metres day line of wire 1095.09

Rate per m 10.95

Asst. Exe. Engineer Dy. Executive Engineer 0.00

Page 70
RWS&S, B.kothakota RWS&S Subdivision, Thamballapa 0.00

Page 71
129.6

Page 72
Standard Data - Electrical Items SSR 2016-2017

Name of the Work

Area allowence
Overheads and contractors profit on
materials
Overheads and contractors profit on 0.000%
labour
Index Specific Description Unit QTY Rate Rs. Amount Rs. ohr
-code ation
No.
1 2 3 4 5 6 7
1 1.4.2 Supply and Fixing of 25mm dia 2.20mm thick PVC pipe (ISI MARK) concealed in Roof Slabs
with all required accessories including masonary work and labour charges etc., complete.
(C) Make : Sudhakar/ Maco Plast / Modi

Taking Output = 100 M


a) Material
elec-1.2.4 25mm dia 2mm thick PVC pipe 100 M 1 3100.00 3100.00
elec-1.2.32 25mm dia 1,2,3 & 4 way deep Junction Box Each 12 25.00 300.00
elec-1.2.37 25mm PVC bends Each 12 4.00 48.00
3448.00
Add contr profit @14% on material 0.00 0.00
Total material cost 3448.00
b) Labour charges :
elec-8.1.74 Skilled Electrician day 2 515.00 1030.00
elec-8.1.75 Semi skilled Electrician day 2 400.00 800.00
elec-8.1.76 Helpers day 2 400.00 800.00
Add area allowence on labour charges @ 0% 0.00

Add contr profit @14% on Labour 0% 2630.00 0.00


C) Cost for 100 RM 6078.00
Rate per Metre = C/100 60.80

Note : 1. If 25mm dia PVC / MS pipes are used for


2 1.4.2 Supply and Fixing of 25mm dia 1.80mm thick P.V.C. pipe (ISI MARK) concealed in wall with
all required accessories including masonary work for light, fan and separate plug point with
(b) well seasoned TW box including all labour charges etc., complete. Make :

Taking Output = 100 M


a) Material
elec-1.2.3 25mm dia 1.5mm thick PVC pipe 100 M 1 2800.00 2800.00
elec-8.1.7 U' Links 100 2 44.00 88.00
Nos
elec-1.3.5 8"x10" TW deep boxes Each 2 179.00 358.00
elec-1.2.32 25mm dia 1,2,3 & 4 way deep Junction Box Each 12 25.00 300.00
elec-1.2.37 25mm PVC bends Each 12 6.00 72.00
elec-8.1.50 Cement kg 50 7.00 350.00
3968.00
Add contr profit @14% on material 0.00 0.00
Total material cost 3968.00
b) Labour charges :
elec-8.1.74 Skilled Electrician day 2 515.00 1030.00
elec-8.1.75 Semi skilled Electrician day 2 400.00 800.00
elec-8.1.76 Helpers day 2 400.00 800.00
ELEC-8.1.77 Mason Ist class day 2 445.00 890.00
Add area allowence on labour charges @ 0% 0.00

Add contr profit @14% on Labour 0% 3520.00 0.00


C) Cost for 100 RM 7488.00
Rate per Metre = C/100 74.90

El Data old P No 73
Index Specific Description Unit QTY Rate Rs. Amount Rs. ohr
-code ation
No.
1 2 3 4 5 6 7
3 2.1.1 Wiring with 2 runs of 14/0.3mm (1.0 Sq.mm) Fire Retardant Low Smoke (FRLS) P.V.C. The R&B
insulated flexible copper cable (ISI MARK) in existing pipe with 6A switch, Ceiling rose and Department
3mm thick hylam sheet covering to switch control box including all labour charges etc., Proposed
complete for light, bell, fan and exhaust fan points in Non-Residential Buildings Labour, for
Makes of Wires : Finolex / R.R.Cable Makes of Switches : Anchor Penta both piping &
Cherry / Gold Madel Olive / Million Zoom / Great white omega wiring
considering
40% Labour,
Taking Output = 6 Points Million
for Wire/ draw.
RPG/
Keeping this,
a) Material paragon
the labour is
elec-1.5.1 14/0.3mm (1.00 Sqmm) FRLS PVC insulated 100 M 1 1051.00 1051.00
proposed for
flexible copper wire
wiring 100
elec-1.7.1 6A Switch @18/- each each 6 18.00 108.00 RM.
elec-1.7.13 6A 3 way Ceiling Rose@21/-each each 6 21.00 126.00
elec-8.1.51 25 x 20 cms (10" x8") Hylam sheet 3mm thick no 1 47.25 47.25

1332.25
Add contr profit @14% on material 0.00 0.00
Total material cost 1332.25
b) Labour charges :
elec-8.1.74 Skilled Electrician day 0.6 515.00 309.00
elec-8.1.75 Semi skilled Electrician day 1.2 400.00 480.00
elec-8.1.76 Helpers day 0.6 400.00 240.00
Add area allowence on labour charges @ 0% 0.00

Add contr profit @14% on Labour 0% 1029.00 0.00


C) Cost for 6 Points 2361.25
Rate per Point = C/6 393.55
4 12 Supply and Fixing of 16A 3pin and 6A 3pin plug socket with and 16A switch control duly
recessed in wall with MS switch deep box of 6" x8" x2 1/2" size covered with hylam sheet
including earth connections and all labour charges etc., complete.
Makes : G

Taking Output = each


a) Material
ELEC- 20 x 15 cms (8" x6") MS switch deep box each 1 105.00 105.00
1.3.10
elec-1.4.18 21.6 x 16.6 cms (8.5 x 6.5") 3mm thick hylam each 1 262.00 262.00
sheet
elec-1.7.11 16A 3 pin / 6A 3pin plug socket (5 in 1) each 1 50.00 50.00
417.00
Add contr profit @14% on material 0.00 0.00
Total material cost 417.00
b) Labour charges :
elec-8.1.77 Skilled Electrician day 0.1 515.00 51.50
elec-8.1.78 Semi Skilled Electrician day 0.1 400.00 40.00
elec-8.1.85 Helpers day 0.1 400.00 40.00
Add area allowence on labour charges @ 0% 0.00

Add contr profit @14% on Labour 0% 131.50 0.00


Rate per each 548.50
Note : Labour Charges proposed for 10 jobs per day

5 19 Supply and run of 2 of 2.5 Sq mm PVC insulated flexible copper cable and 1 run of 1.00 Sq
mm flexible PVC insulated flexible copper cable in the existing conduit pipe for run of mains
from main panel board to TPN DB'S with pin type lugs and connectio

Taking Output = 100 M


a) Material
elec-1.5.3 36/0.3mm (2.5 sqmm) FR PVC copper cable 100 M 2 2389.20 4778.40

El Data old P No 74
Index Specific Description Unit QTY Rate Rs. Amount Rs. ohr
-code ation
No.
1 2 3 4 5 6 7
elec-1.5.1 14/0.3mm FR PVC copper cable 100 M 1 1051.00 1051.00
5829.40
Add contr profit @14% on material 0.00 0.00
Total material cost 5829.40
b) Labour charges :
elec-8.1.77 Skilled Electrician (2.0 + 0.5) day 1.005 515.00 517.58
elec-8.1.78 Semi skilled Electrician (6 + 1.5) day 3 400.00 1200.00
elec-8.1.85 Helpers (2.0 + 0.5) day 1.005 400.00 402.00
Add area allowence on labour charges @ 0% 0.00

Add contr profit @14% on Labour 0% 2119.58 0.00


Sundries
C) Cost for 100 RM 7948.98
Rate per Metre = C/100 79.50
Note : Labour Charges considered for 100 M / day

6 21 Supply and fixing TPN Distribution board with IP-43 protection (Metal Door) suitable for 3
phase ELCB / RCCB / FP Isolator as incomer and 10kA SP MCBs as outing going including
internal connection and labour charges for flush mounting etc., complete.
Mak

A 40A FP Isolator - 1 No for incomer, 10kA-


6-32A SP MCBs - 12Nos for outgoing.

Taking Output = each


a) Material
elec.2.12.4 4way TPN, D.B with IP-43 Protection (MD) each 1 2200.00 2200.00
2 suitable for 3 phase ELCB / RCCB/ FP
Isolator as incommer.
elec- 40A, 4 Pole Isolator each 1 678.00 678.00
2.10.14
elec-2.9.9 10kA - 6-32A range SP MCBs each 12 162.00 1944.00
4822.00
Add contr profit @14% on material 0.00 0.00
Total material cost 4822.00
b) Labour charges :
elec-8.1.77 Skilled Electrician day 0.5 515.00 257.50
elec-8.1.78 Semi Skilled Electrician day 1 400.00 400.00
elec-8.1.85 Helpers day 1 400.00 400.00
Add area allowence on labour charges @ 0% 0.00

Add contr profit @14% on Labour 0% 1057.50 0.00


Sundries such as TW Plugs, Screws Cement LS 14.00 14.00
etc,
Rate per each 5893.50
Note : Labour Charges considered for 2 jobs / day

7 26 Providing independent earthling by excavating a trench to a depth of 2.1 M in all soils, as per
size specified in the Data, using 40mm dia 'B' class GI pipe of 2.5 Mtrs length with necessary
accessories with hume pipe ring duly providing staggered holes

a) Material
elec-8.1.52 Earth Work Excavation of Hard gravel Soil cum 0.81 110.00 89.10
with small boulder for trench 1st step of size
1.5 x 0.6 x 0.9 m
Excavation of Hard disteggrated rocks and cum 0.864 152.90 132.11
boulders for trench 2nd Step of size 1.2 x 0.6
x 1.2 m (Civil SSR)

El Data old P No 75
Index Specific Description Unit QTY Rate Rs. Amount Rs. ohr
-code ation
No.
1 2 3 4 5 6 7
25% extra for narrow trench & pit and back 1 27.50 27.50
filling with Sand, Coke, Salt etc., and leveling

elec-8.1.58 40mm dia 'B' Class G.I pipe Mtr 2.5 381.00 952.50
25 x 6 mm (1"X 1/4") G.I Flat duly drilled Each 1 75.00 75.00
12mm holes (4 Nos) of 200 mm (8") length
elec.8.1.59 Drilling of 16 Nos through holes of 12mm dia Each 16 6.00 96.00
to G.I pipe
elec-8.1.9 G.I Nuts, Bolts an Washers Set 4 13.00 52.00
elec.8.1.61 18" dia hume pipe ring Each 1 220.00 220.00
elec-8.1.13 Hard Coke Kg 40 20.00 800.00
elec-8.1.14 Salt Kg 20 10.00 200.00
2644.21
Add contr profit @14% on material 0.00 0.00
Total material cost 2644.21
b) labour charges for fixing pipe ring and Each
connections
elec-8.1.78 Semi skilled Electrician Nos 0.5 400.00 200.00
elec-8.1.85 Helpers Nos 0.5 400.00 200.00
Add area allowence on labour charges @ 0% 0.00

Add contr profit @14% on Labour 0% 400.00 0.00


Sundries
Rate per each 3044.21
Say 3044.25
8 28 Supply, Transportation and fixing of 4' - 40 Watt box type flourescent single Tube Light fitting
with Energy saving electronic ballast, consuming 28 W suitable for 40 Watt tube on
varnished teak wood round blocks with flexible 3 core wire etc.,, complet Makes : Chowk:
Trinic , tube : Philips / crompton

a) Material
elec-3.6.1 Supply of 1 x 36/40W Box type tube light each 1 800.00 800.00
luminaire powder coated CRCA sheet steel
housing with Electronic Ballast Chokes and all
standard accessories. Makes: Wipro / G.E. /
Phillips / Crompton / Bajaj
elec-3.7.7 Lamp cost of 40W each 1 45.00 45.00
elec-8.1.31 Tw Round blocks each 2 10.00 20.00
ELEC-8.1.6 pvc rawl plugs each 2 40.00 80.00
Elec-1.6.8 23/0060 twin core flexible copper cable M 1.5 10.40 15.60
Rate per each 960.60
Add contr profit @14% on material 0.00 0.00
Total for material 960.60
a) Labour charges
elec-8.1.77 Skilled Electrician day 0.10 515.00 51.50
elec-8.1.78 Semi Skilled Electrician day 0.10 400.00 40.00
Labour for 1 No 1052.10
9 29 Supply and fixing of batten holder / slanting holder in lieu of ceiling rose of light point
complete with all connections and all labour charges with 5.0W LED Lamp with input voltage
90 to 300V, Colour temparature 3000k - 6500k, Beam angle 170 - 220 degrees, B22 base,
350 Lumens. Makes: Phillips / Crompton / Bajaj / Havells / Halonix / VIN / Jaquor / Renesola
(for new installation).
Makes : Gold Medal /Million / Vimal

Taking Output = each


a) Material
elec-1.7.15 PVC batten holder each 1 17.00
ELEC- 5.0W LED Lamp with input voltage each 1 250.00
3.7.33
elec-1.7.13 Deduct Cost of Ceiling Rose each 1 -21.00

El Data old P No 76
Index Specific Description Unit QTY Rate Rs. Amount Rs. ohr
-code ation
No.
1 2 3 4 5 6 7
11.00
Add contr profit @14% on material 0.00 0.00
Total for material 257.00
b) Labour charges :
elec-8.1.77 Skilled Electrician day 0.05 515.00 25.75
elec-8.1.85 Helpers day 0.05 400.00 20.00
Add area allowence on labour charges @ 0% 0.00

Add contr profit @14% on Labour 0% 45.75 0.00


Rate per each 302.75
Note : 1. The Cost of Ceiling Rose may be
deducted in view of holder.
2. Labour Charges proposed for 20 jobs per day

10 32 Supply of 1200 mm (48") sweep 230V, A.C 50 Hz.Ceiling fan with 3 Blades and double ball
bearings with all standard accessories.
Makes: Crompton Decora / Bajaj Ultima /Havells Velocity / Usha Astra / Orient PSPO.

a) Material
elec-5.1.1 1200 mm (48") Ceiling Fan each 1 1700.00 1700

Transportation Charges on Unit Cost 1% 17.00 17.00


1717.00
Add contr profit @14% on material 0.00 0.00
Total material cost 1717.00

11 33 Supply and erecting Electronic type regulator for ceiling fans 1200 mm sweep complete
erected on existing board.Make : Anchor / Gold Medal Olive / Million Zoom

a) Material
elec-1.7.12 Steeped type Electronics type Regulator M 1 198.00 198.00
Add contr profit @14% on material 0.00 0.00
Total material cost 198.00
b) Labour charges.
elec-8.1.78 Semi skilled Electrician day 0.1 400.00 40.00
Sundries. 21.20
Add area allowence on labour charges @ 0% 0.00

Add contr profit @14% on Labour 0% 61.20 0.00


Rate per Each 259.20
Note : Labour is Considered for 10 jobs /
day

34 Labour Charges
12 Labour charges for Fixing of Ceiling fan and regulator including transportation and giving
connections with twin core wire etc., complete.
a) Material
elec-1.6.8 23/0060 Twin Core wire M 1 10.40 10.40
Unforseen item works, such as painting to LS 1 3.00 3.00
down rod, screws etc.,
13.40
Add contr profit @14% on material 0.00 0.00
Total for material 13.40
b) Labour charges.
elec-8.1.77 Skilled Electrician day 0.125 515.00 64.38
elec-8.1.85 Helper day 0.125 400.00 50.00
Add area allowence on labour charges @ 0% 0.00

Add contr profit @14% on Labour 0% 114.38 0.00


Rate per Each 127.80

El Data old P No 77
Index Specific Description Unit QTY Rate Rs. Amount Rs. ohr
-code ation
No.
1 2 3 4 5 6 7
Note : Labour is Considered for 8 fans /
day

Exe.Engineer Dy.Exe.Engineer Asst.Engineer


APEWIDC, Chittoor APEWIDC, Madanapalli APEWIDC, Madanapalli

El Data old P No 78
WINDOWS DATA

Name of the Work

1 Supply and fixing of 18 guage M.S. Plain Sheet WINDOW of size 1.52 M x 1.22 M (Six Leafs
shutters with outer angular frame of rolled steel equal angle ISA 4040 of Size 40mm x
40mm x 6mm and inner shutter angular frame of rolled steel equal angle ISA 2525 of size
25mm x 25mm x 4mm and rolled steel Tee Bars 40mm x 40mm x 6mm and 25x5mm flat ,
1 Nos. Horizontal, 2 Nos. verticles also bended with fixtures such as M.S. Powder coated
tower bolts 100mm long 6 Nos., M.S. Powder coated butt Hinges 12 Nos., M.S. Powder
coated handles 125mm long 6 Nos., and safety rods 10mm MS square rods at 10 Nos
welded horizontally to full width of window & 4 Nos of MS Hold fasts of 230mm long
including redoxide primer grade I quality coating including cost and conveynace of all
materials, labour charges etc., complete for finished item of work.

Area 1.52 x 1.22 1.85


Theoritical Requirement of Materials
(A) Outer frame 40 x 40 x 6mm
Verticals (L angle) 2 x 1.22 2.44
Verticals (T Section) 2 x 1.22 2.44
Horizontal (L angle) 2 x 1.52 3.04
Horizontal (T angle) 1 x 1.52 1.52
Hold fasts 4 x 0.23 0.92
10.36
10.36 x 3.50 Kg/1Rm 36.26 Kg

(B) Inner angle frame 25 x 25 x 4 mm


Verticals 12 x 0.59 7.08
Horizontals 12 x 0.48 5.76
12.84
12.84 x 1.40 Kg/1Rm 17.98 Kg

(C) 10 mm Square Safety rods


Safety Rods 10 x 1.5
Equivalent weight (0.78 Kg/ Rmt.)
Total Weight 15.00 x 0.780 Kg/1Rm 11.70 Kg
Total ( A to C ) 65.94 Kg
0.00 Kg
Total ( A to C ) 65.94 Kg

(D) 25x5mm MS flat


6 x 0.47 2.82
2.82
Weight 2.82 x 0.98 2.76 Kg
0.00 Kg
Total (D) 2.76 Kg

(E) 18 Guage MS Sheet 3 0.48 1.18 1.70 Sqm


Area of Sheet (3 x 0.48 x 1.18)
Equivalent (9.80 Kg per Sqm.)
Total Weight 1.70 x 9.80 Kg/1sqm 16.65 Kg
0.00 Kg
16.65 Kg

DATA
65.94 Kg Cost of angle ( A to C) 35.57 1 Kg 2345.07
2.76 Kg Cost of Flats (D) 36.57 1 Kg 101.05
16.65 Kg Cost of 18 Gauge MS Sheet (E) 40.07 1 Kg 667.18
85.35 Kg Fabrication Charges BMM-V.14 24.00 1 Kg 2048.44
85.35 Kg Fixing Charges BMM-V.15 4.00 1 Kg 341.41
3.71 sqm Cost of Red Oxide Painting 38.83 1 sqm 144.01
6 Nos. MS Tower Bolts 100mm long (BMT-G.14) 26.00 1 No. 156.00
12 Nos. MS Butt Hinges 100mm long (BMT-G.28) 23.00 1 No. 276.00
6 Nos. MS Handle 125mm long (BMT-G.35) 34.00 1 No. 204.00
6 Nos. MS Wind appliances 20.00 1 No. 120.00
Total 6403.16
Add Overheads & Contractors Profit @13.615% 0.000% 0.00
Rate of Door 6403.16
Say 6403.20

2 Supply and Fixing of M.S. Iron Grill Gate of size 35 mm x 35mm x 6mmwith
10mm Square rods 100mm including Cost and conveyance of all materials,
welding, fabrication of charges and sales and other taxes etc., complete for
finished item of work.
1.05 Kg 10mm Square Safety Rods 44.05 1 Kg 46.25
3.05 Kg Fabrication Charges BMM-V.14 24.00 1 Kg 73.20
3.05 Kg Fixing Charges BMM-V.15 4.00 1 Kg 12.20
Total 131.65
131.65
Add Overheads & Contractors Profit @13.615% 0.000% 0.00
131.65
Say

Asst. Exe. Engineer Dy. Executive Engineer 0


RWS&S, B.kothakota RWS&S Subdivision, Thamballapalli 0
DATAS FOR MS Ventilators

Name of the Work

Sno Qty Description of Item Rate Unit Per

1 Supply and Fixing of Ventilator of size 1.22 x 0.30 with 25mm x 25mm x 3mm thick equal L
angles and 10mm square rods @ 150mm c/c fixing in position ,complete for finsihed item of
work

VENTILATOR SIZE 1.20 x 0.30 mtrs : 1.22 X 0.3


Area = 0.36
Angular sqm
frame 25 x 25 x 3mm thick
Verticals 1 x 2 x 0.294 = 0.59 m
Horizental 1 x2 x 1.20 = 2.40 m
For Hold fasts 1 x 2 x 0.15 = 0.30
Total 3.29 m 3.6168
=
10 mm square rods @ 150 mm c/c
Verticals 1 x 7 x 0.294 = 2.06
Horizental 1 x2 x 1.194 = 2.39
total 4.45 m 3.46788
ABSTRACT
a)MATERIAL
7.08 Cost of Structural Steel 35.57 1 Cum
a) LABOUR
7.08 Fabrication Charges ( BMM-V.14) 24.00 1 Kg
7.08 Fixing Charges ( BNN-V.15) 4.00 1 Kg

Add overheads @ 5%
Rate per / Each

2 Supply and Fixing of Ventilator of size 1.52 x 0.30 with 25mm x 25mm x 3mm thick equal L
angles and 10mm square rods @ 150mm c/c fixing in position ,complete for finsihed item of
work
VENTILATOR SIZE 1.50 x 0.30 1.52 X 0.3
mtrs : Area
Angular = 0.46
frame 25 x sqm
25 x 3mm thick
Verticals 1 x 2 x 0.294 = 0.59 m
Horizental 1 x2 x 1.50 = 3.00 m
For Hold fasts 1 x 2 x 0.15 = 0.30
Total 3.89 m 4.2768
=
10 mm square rods @ 150 mm c/c
Verticals 1 x 9 x 0.294 = 2.65
Horizental 1 x 2 x 1.494 = 2.99
total 5.63 m 4.39452
ABSTRACT
a)MATERIAL
8.67 Cost of Structural Steel 35.57 1 Cum
a) LABOUR
8.67 Fabrication Charges ( BMM-V.14) 24.00 1 Kg
8.67 Fixing Charges ( BNN-V.15) 4.00 1 Kg

Add overheads @ 5%
Rate per / Each

5 Supply and Fixing of Ventilator of size 1.00 x 0.3 with 25mm x 25mm x 3mm thick equal L
angles and 10mm square rods @ 150mm c/c fixing in position ,complete for finsihed item of
work

VENTILATOR SIZE 1.00 x 0.3 mtrs : 1.00 X 0.3


Area = 0.30
Angular frame 25 x 25 x 3mm thick
Verticals 1 x 2 x 0.294 = 0.59 m
Horizental 1 x2 x 1.00 = 2.00 m
For Hold fasts 1 x 2 x 0.15 = 0.30
Total 2.89 m 3.1768
=

10 mm square rods @ 150 mm c/c


Verticals 1 x 6 x 0.294 = 1.76
Horizental 1 x2 x 0.994 = 1.99
total 3.75 m 2.92656
ABSTRACT
a)MATERIAL
6.10 Cost of Structural Steel 35.57 1 Cum
a) LABOUR
6.10 Fabrication Charges 24.00 1 Kg
6.10 Fixing Charges 4.00 1 Kg

Add overheads @ 5%
Rate per / Each

3 Supply and Fixing of Ventilator of size 1.20 x 1.20 with 25mm x 25mm x 5mm thick equal L
angles and 10mm square rods @ 150mm c/c fixing in position ,complete for finsihed item of
work

Grill SIZE 1.20 x 1.20 mtrs : Area = 1.2 X 1.2


1.44 sqm
Angular frame 25 x 25 x 5mm thick
Verticals 1 x 2 x 1.20 = 2.40 m
Horizental 1 x2 x 1.20 = 2.40 m
For Hold fasts 2 x 2 x 0.15 = 0.60
Total 5.40 m 9.72
=
10 mm square rods @ 150 mm c/c
Verticals 1 x 7 x 1.200 = 8.40
Horizental 1 x 7 x 1.20 = 8.40
total 16.80 m 13.188
ABSTRACT
a)MATERIAL
22.91 Cost of Structural Steel 35.57 1 Cum
a) LABOUR
22.91 Fabrication Charges ( BMM-V.14) 24.00 1 Kg
22.91 Fixing Charges ( BNN-V.15) 4.00 1 Kg

Add overheads @ 5%
Rate per / Each

12 Supply and fixing of MS grill Window of .9X 1.35 mts by using 40 x40 x
6mm MS Angle section for outer frame and 10 mm square safety bars @
100 mm C/C both ways including cost & conveyance of all materials and
labour charges for finished item of work

Frame 40x40x6 mm (GW)


Verticals 2 x 1.35 2.7
Harizontal 2 x .9 1.8
4.5 3.5 15.75
10 mm SQ rod@ 100c/c
Verticals 8 x 1.32 10.56
Harizontal 12x .9 10.8
21.36 0.78 16.6608
MS Aldrop,Tower Bolt and Holdfast 0.55
total weight 32.9608
Rate analysis
cost of MS steel 32.96 33.57
Fabrication charges BMM -V-14 32.96 24.00
Fixing Charges BMM -V-15 32.96 Err:520
Over Head Charges Err:520 0.13615

Say
9 Supply and fixing of MS grill Window of 1.5X 1.35 mts by using 40 x40 x
6mm MS Angle section for outer frame and 10 mm square safety bars @
100 mm C/C both ways including cost & conveyance of all materials and
labour charges for finished item of work

Frame 40x40x6 mm (GW)


Verticals 2 x 1.35 2.7
Harizontal 2 x 1.5 3
5.7 3.5 19.95
10 mm SQ rod@ 100c/c
Verticals 14 x 1.32 18.48
Harizontal 12x 1.5 18
36.48 0.78 28.4544
MS Aldrop,Tower Bolt and Holdfast 0.25
total weight 48.6544
Rate analysis
cost of MS steel 48.65 33.57
Fabrication charges BMM -V-14 48.65 24.00
Fixing Charges BMM -V-15 48.65 Err:520
Over Head Charges Err:520 0.1362

Say

9 Supply and fixing of MS grill Window of 1.2X 1.35 mts by using 40 x40 x
6mm MS Angle section for outer frame and 10 mm square safety bars @
100 mm C/C both ways including cost & conveyance of all materials and
labour charges for finished item of work

Frame 40x40x6 mm (GW)


Verticals 2 x 1.35 2.7
Harizontal 2 x 1.2 2.4
5.1 3.5 17.85
10 mm SQ rod@ 100c/c
Verticals 11 x 1.32 14.52
Harizontal 12*1.2 14.4
28.92 0.78 22.5576
MS Aldrop,Tower Bolt and Holdfast 0.55
total weight 40.9576
Rate analysis
cost of MS steel 40.96 33.57
Fabrication charges BMM -V-14 40.96 24.00
Fixing Charges BMM -V-15 40.96 Err:520
Over Head Charges Err:520 0.13615
Say

9 Supply and fixing of MS grill Window of 2.1 x1.35 mts by using 40 x40 x
6mm
FrameMS Angle mm
40x40x6 section
(GW)for outer frame and 10 mm square safety bars @
100 mm C/C both ways including cost & conveyance of all materials and
Verticals 2 x 1.35
labour charges for finished item of work 2.7
Harizontal 2 x 2.1 4.2
6.9 3.5 24.15
10 mm SQ rod@ 100c/c
Verticals 20 x 1.32 15.84
Harizontal 12x 2.07 43.47
59.31 0.78 46.2618
MS Aldrop,Tower Bolt and Holdfast 0.55
total weight 70.9618
Rate analysis
cost of MS steel 70.96 33.57
Fabrication charges BMM -V-14 70.96 24.00
Fixing Charges BMM -V-15 70.96 Err:520
Over Head Charges Err:520 0.13615

Say
Amount

mm thick equal L
r finsihed item of

0.37

Kgs

Kgs

251.97

170.03
28.34
450.34
22.52
472.90

mm thick equal L
r finsihed item of

0.46

Kgs
Kgs

308.40

208.11
34.69
551.20
27.56
578.80

m thick equal L
r finsihed item of

0.3

Kgs

Kgs

217.07

146.48
24.41
387.96
19.40
407.40

mm thick equal L
r finsihed item of

1.44
Kgs

Kgs

814.74

549.79
91.63
1456.16
72.81
1529.00

1106.49
791.06
Err:520
Err:520
Err:520
Err:520
1633.33
1167.71
Err:520
Err:520
Err:520
Err:520

1374.95
982.98
Err:520
Err:520
Err:520
Err:520

2382.19
1703.08
Err:520
Err:520
Err:520
Err:520
DATAS 2019-20 for Water supply and Sanitary arrangements
DATAS
AREA ALLOWENCE 0%
ADD OVERHEADS @ 0.000%
Sl. Amount
DESCRIPTION ITEM CODE COEF. UNIT RATE PER UNIT
No (Rs.)
1 Constructing 904.0 mm (3’0”) dia brick masonry inspection chamber as per IS - 4111: Part-1:1986 with cement mortar (1:6)
prop using 2nd Class Clay Bricks of 225 mm thick from approved source having a minimum crushing strength of 5 N/sq.mm
including plastering with cement mortar 1:3 prop; ½” thick both inside and outside fitted with 20” dia RCC manhole covers and
frames including excavating pits up to a depth of 904 mm (3'-0") in all sorts of soils (exculding rock) and laying cement conrete
(1:4:8) 150 mm thick using 40 mm HBG Metal and P.C.C. 1:2:4 benching and channel 100 mm thick as per Standard
specification and including cost and conveyance of all materials like cement, sand, bricks, water etc., to site, cost of seigniorage
charges on all materials and all incidental and operational, labour charges like mixing cement mortar, constructing masonry,
lift charges, curing etc., complete for finished item of work as per Standard specification.

basic rate as per ssr item BMW-B.03 1.00 Nos 5518.00 1.00 Nos 5518.00
Area allowence on labour charges 0% 0.00 1.00 0.00 0.00
5518.00
ADD OVERHEADS @ 0.000% 0.00
Total rate per 1 Nos 5518.00
2 Constructing 904.0 mm (3’0”) dia brick masonry inspection chamber as per IS - 4111: Part-1:1986 with cement mortar (1:6)
prop using 2nd Class Clay Bricks of 225 mm thick from approved source having a minimum crushing strength of 5 N/sq.mm
including plastering with cement mortar 1:3 prop; ½” thick both inside and outside fitted with 20” dia RCC manhole covers and
frames including excavating pits up to a depth of 1524 mm (5'-0") in all sorts of soils (exculding rock) and laying cement conrete
(1:4:8) 150 mm thick using 40 mm HBG Metal and P.C.C. 1:2:4 benching and channel 100 mm thick as per Standard
specification and including cost and conveyance of all materials like cement, sand, bricks, water etc., to site, cost of seigniorage
charges on all materials and all incidental and operational, labour charges like mixing cement mortar, constructing masonry,
lift charges, curing etc., complete for finished item of work as per Standard specification.

basic rate as per ssr item BMW-B.04 1.00 Nos 8619.00 1.00 Nos 8619.00
Area allowence on labour charges 0% 0.00 1.00 0.00 0.00
8619.00
ADD OVERHEADS @ 0.000% 0.00
Total rate per 1 Nos 8619.00

3 Supplying and fixing 150.00mmx100.00mm SWG gully trap 1st class confirming to ISI 651 & 4127 with CI grating and
constructing single brick masonry wall chamber of size 20" x 14" x 12” in CM (1:6) prop. Over a CC (1:5:10)prop. bed, and fitted
with 304.8 mm x 225.6 mm(12" x 9") CI frame and hinged cover and plastering 12mm thk. in CM (1:4) prop. both inside and
outside surfaces and including cost and conveyance of all materials to site, labour charges etc., complete for finished item of
work. SSR ITEM NO.527

Basic rate as per ssr item BMW-A.72 1.00 Nos 485.00 1.00 Nos 485.00
Area allowence on labour charges BMW-A.74 0% 30.00 1.00 0.00 0.00
485.00
ADD OVERHEADS @ 0.000% 0.00
Total rate per 1 Nos 485.00

4 Supplying and fixing Indian make Flat Back Wash Hand Basin (HSW/Parryware/ Neycer) 1st quality conforming to IS:2556-
Part-4:1972 of size 550mm x 400mm with waste fittings like rubber plug, chain, 32 mm nominal size C.P. Fitting with parallel
pipe thread conforming to IS:2963-1979 and fitted with 15 mm nominal bore Chromium Plated Pillar Tap of 1st quality Indian
make 400 grams Seiko/ Esso or equivalent complete with standard CI brackets including wooden block ,1 No.12.70mm PVC
connection with brass union nuts CP coated , 1 No.12.70mm NP bib tap 300 gms Seiko or equivalent including cost and
conveyance of all materials to site, labour charges etc. complete for finished item of work

A Basic rate as per ssr item BMW-D.25 1.00 Nos 1894.00 1.00 Nos 1894.00
Area allowence on labour charges BMW-D.28 0% 319.00 1.00 0.00 0.00
1894.00
ADD OVERHEADS @ 0.000% 0.00
Total rate per 1 Nos 1894.00

WS SA 92 of 420
B Basic rate as per ssr item 12.7MM DIA PVC BMW-I.48 1.00 Nos 86.00 1.00 Nos 86.00
conection with brass union nut CP coated

Area allowence on labour charges BMW-I.49 0% 17.00 1.00 0.00 0.00


86.00
ADD OVERHEADS @ 0.000% 0.00
Total rate per 1 Nos 86.00
C Basic rate as per ssr item 12.7 MM ANGLE BMW-E.05 1.00 Nos 408.00 1.00 Nos 408.00
STOP COCK first quality Indian make 400
gms Seiko

Area allowence on labour charges BMW-E 06 0% 43.00 1.00 0.00 0.00


408.00
ADD OVERHEADS @ 0.000% 0.00
Total rate per 1 Nos 408.00
D Basic rate as per ssr item 38.1 MM CP BMW-E.31 1.00 Nos 205.00 1.00 Nos 205.00
WASTE COUPLING half or full thread 1st
quality indian make paryware or equivalent

Area allowence on labour charges BMW-E.32 0% 29.00 1.00 0.00 0.00


205.00
ADD OVERHEADS @ 0.000% 0.00
Total rate per 1 Nos 205.00
E Basic rate as per ssr item 31.75 MM dia PVC BMW-G.05 1.00 Nos 22.00 1.00 Nos 22.00
fleible waste pipe of 914.4 mm length of first
quality

Area allowence on labour charges 0% 0.00 1.00 0.00 0.00


22.00
ADD OVERHEADS @ 0.000% 0.00
Total rate per 1 Nos 22.00
TOTAL COST (A+B+C+D+E) Rs 2615.00

5 Supplying and fixing NP soap dish heavy type of approved make ISI quality with NP screws etc., complete including cost and
conveyance of all materials, labour charges for fixing etc., complete for finished item of work in all floors as per ssr item no 598

Basic rate as per ssr item BMW-I.28 1.00 Nos 208.00 1.00 Nos 208.00
Area allowence on labour charges BMW-I.29 0% 12.00 1.00 0.00 0.00
208.00
ADD OVERHEADS @ 0.000% 0.00
Total rate per 1 Nos 208.00
6 Supplying and fixing TV shape mirror with plastic frame of size 609.6mm x 457.2mm , plywood back with NP screws 1st quality
including cost and conveyance of all materials, labour charges etc., complete for finished item of work in all floors.

Basic rate as per ssr item BMW-I.105 1.00 Nos 452.00 1.00 Nos 452.00
Area allowence on labour charges BMW-I.106 0% 116.00 1.00 0.00 0.00
452.00
ADD OVERHEADS @ 0.000% 0.00
Total rate per 1 Nos 452.00
7 Supplying and fixing of 20mm dia , 609.6mm long CP towel rods with brackets and aluminium screws including cost and
conveyance of all materials, labour charges etc., complete for finished item of work.

As per the SSR Item NO BMW-I.132 BMW-I.132 1.00 Nos 341.00 1.00 Nos 341.00
Area allowence on labour charges BMW-I. 21 0% 44.00 1.00 0.00 0.00
341.00
ADD OVERHEADS @ 0.000% 0.00
Total rate per 1 Nos 341.00

8 Supplying and fixing NP bib taps of size 12.70mm dia of Indian make Seiko or equivalent including cost and conveyance of all
materials, labour charges etc., complete for finished item of work in all floors.

a) 300 grams
Basic rate as per ssr item BMW-E.09 1.00 Nos 223.00 1.00 Nos 223.00
Area allowence on labour charges BMW-E.10 0% 29.00 1.00 0.00 0.00
223.00
ADD OVERHEADS @ 0.000% 0.00

WS SA 93 of 420
Total rate per 1 Nos 223.00
b) 400 gms
Basic rate as per ssr item BMW-E.07 1.00 Nos 349.00 1.00 Nos 349.00
Area allowence on labour charges BMW-E.08 0% 29.00 1.00 0.00 0.00
349.00
ADD OVERHEADS @ 0.000% 0.00
Total rate per 1 Nos 349.00
9 Supplying and fixing of SWR/ PVC pipes (as per ISI standards) 4 Kg/Sq.cm. Prince/sudhakar or any ISI brand and fixing all
special such as plain bends, off sets, door bends, single junctions, double junctions as per site requirement, fixing with PVC
clamps if necessary with required number of Bombay nails including cost and conveyance of all materials to site, labour charges
etc.complete for finished item of work at all floor levels. (APSS No. 1302 1319 & 1326)

(a) 90mm dia 3 Mts single socket


Basic rate as per ssr item BMW-G.12 1.00 RM 343.00 3.00 RMT 114.33
Area allowence on labour charges BMW-G.152 0% 70.00 1.00 0.00 0.00
114.33
ADD OVERHEADS @ 0.000% 0.00
Total rate per 1 RMT 114.35
(b) 110mm dia 3 Mts single socket
Basic rate as per ssr item BMW-G.13 1.00 RM 410.00 3.00 RMT 136.67
Area allowence on labour charges BMW-G.152 0% RM 70.00 1.00 RM 0.00
136.67
ADD OVERHEADS @ 0.000% 0.00
Total rate per 1 RMT 136.70
10 Supplying & fixing Ashirvad/Astral flow guard for equivalent CPVC Pipes with fittings in ground or on wall including cost of
tees, elbows, bends, reducers, couplings, running joints, union flanges, unions etc. with necessary excavation in all types of
soils except rock requiring blasting, refilling, chiselling masonry walls and making good the walls & floors to the original surface
and fixing MS clamps on TW blocks on walls including cost and conveyance of all materials and labour charges complete for
finished item of work.

a) 15.90 mm dia CPVC SDR 13.50


Basic rate as per ssr item BMW-I.220 1.00 Rmt 53.00 1.00 Rmt 53.00
Labour charges for laying, joining, welding,
fixing and commissioning the PPR pipes
including all specials such as couplers/
bends/ tees etc including fixing necessary
fittings like bends, plugs, couplers, junctions,
tees, etc with welding the joint as per
standard practice - up to 40 mm dia

Area allowence on labour charges BMW-I 415 0% Rmt 31.00 1.00 0.00
53.00
ADD OVERHEADS @ 0.000% 0.00
Total rate per 1 RMT 53.00

a) 22.20 mm dia CPVC SDR 13.50


Basic rate as per ssr item BMW-I 221 1.00 Rmt 85.00 1.00 Rmt 85.00
Area allowence on labour charges BMW-I 415 0% Rmt 31.00 1.00 Rmt 0.00
85.00
ADD OVERHEADS @ 0.000% 0.00
Total rate per 1 RMT 85.00

b) 28.60 mm dia CPVC SDR 13.50


Basic rate as per ssr item BMW-I. 222 1.00 Rmt 123.00 1.00 RMT 123.00
Area allowence on labour charges BMW-I 415 0% Rmt 31.00 1.00 Rmt 0.00
123.00
ADD OVERHEADS @ 0.000% 0.00
Total rate per 1 RMT 123.00

c) 34.90 mm dia CPVC SDR 13.50


Basic rate as per ssr item BMW-I.223 1.00 Rmt 193.00 1.00 RMT 193.00
Area allowence on labour charges BMW-I 415 0% Rmt 31.00 1.00 Rmt 0.00
193.00

WS SA 94 of 420
ADD OVERHEADS @ 0.000% 0.00
Total rate per 1 RMT 193.00

D 41.30 mm dia CPVC SDR 13.50


Basic rate as per ssr item BMW-I.224 1.00 Rmt 266.00 1.00 RMT 266.00
Area allowence on labour charges BMW-I. 415 0% Rmt 31.00 1.00 Rmt 0.00
266.00
ADD OVERHEADS @ 0.000% 0.00
Total rate per 1 RMT 266.00

E 54 mm dia CPVC SDR 13.50


Basic rate as per ssr item BMW-I 225 1.00 Rmt 437.00 1.00 RMT 437.00
Area allowence on labour charges BMW-I 415 0% Rmt 31.00 1.00 Rmt 0.00
437.00
ADD OVERHEADS @ 0.000% 0.00
Total rate per 1 RMT 437.00

11 Construction of brick masonry support for GI pipe of size 304.80mm x 228.60mm x 228.60 mm in CM (1:8) prop including
plastering and finishing with 12mm thick in CM (1:5) including cost and conveyance of all materials and all labour charges etc.
complete

Basic rate as per ssr item BMW-I.63 1.00 Nos 68.00 1.00 Nos 68.00
Area allowence on labour charges BMW-i.64 0% 22.00 1.00 0.00 0.00
68.00
ADD OVERHEADS @ 0.000% 0.00
Total rate per 1 No 68.00
12 Supplying and fixing PVC Nahani traps 100 mm (4") dia Inlet- 75 mm (3") outlet pipe - 4 Kgs 1st quality ISI marked conforming
to IS:1729-1979 with C.P. Grating fixing with white cement as per site requirements with standard practice for all floors
including cost and conveyance of all materials to site, labour charges etc., complete for finished item of work.

A Basic rate as per ssr item Nahany trap BMW-G.114 1.00 Nos 83.00 1.00 Nos 83.00
Area allowence on labour charges BMW-C.42 0% 50.00 1.00 0.00 0.00
83.00
ADD OVERHEADS @ 0.000% 0.00
Total rate per 1 No 83.00

B Basic rate as per ssr item Nahany trap cover BMW-I.12 1.00 Nos 29.00 1.00 Nos 29.00

Area allowence on labour charges BMW-I.13 0% 19.00 1.00 0.00 0.00


29.00
ADD OVERHEADS @ 0.000% 0.00
Total rate per 1 No 29.00
Total cost (A +B) 112.00

13 Supplying and fixing 580 mm x 440 mm long Orissa pan white glazed Water Closet 1st qualityISI marked confirming to IS:2556-
Part-3-1981 with "P" or "S" trap Hindware / Parryware / Neycer with brick masonry seat, CC squatting plate and fixing
12.70mm dia NP Push cock 1st quality , P trap or S trap of Indian W.C. shall be encased on CC (1:2:4) 150mm alround well
above the joint to stop leakage at the joint etc., complete including cost and conveyance of all materials to site, cost of CC bed,
labour charges and seigniorage charges etc., complete for finished item of work.

Basic rate as per ssr item BMW-D.04 1.00 Nos 1399.00 1.00 Nos 1399.00
Area allowence on labour charges BMW-D.06 0% 377.00 1.00 0.00 0.00
Providing brick masonry seat BMW-D.09 1.00 Nos 278.00 1.00 Nos 278.00
1677.00
ADD OVERHEADS @ 0.000% 0.00
Rate per No. 1677.00

WS SA 95 of 420
14 Supplying and fixing European Water Closet of 1st quality conforming to IS:2556-Part-2-1973 of white glazed
with 'S' trap,supplying and fixing best Indian make plastic seat and lid for European water closets with rubber or
plastic Buffers as per IS 2548-1996 and 10 litres capacity single flush PVC low level cistern with internal
components and fixed using required size of nails and screws, angle stop cock 12.70mm dia. first quality Indian
make heavy duty, 12mm PVC connections with brass union nuts CP coated including cost and conveyance of all
materials to site, overheads & contractors profit etc., complete for finished item of work for all floors.

Cost of EWC with 'S' trap BMW-D.14 1.00 1703.00 1 Each 1703.00
Add MA on labour charges for fixing EWC BMW-D.15 0% 264.00 0.00
Supply and fixing of 10 lts. Capacity lowdown
PVC flushing tank BMW-G.08
1.00 1254.00 1 Each 1254.00
Plastic seat and lid for European Water Closet
and rubber buffers BMW-D.16
1.00 766.00 1 Each 766.00
Add MA on labour charges for fixing Plastic
seat and lid for EWC and rubber buffers BMW-D.17
0% 76.00 0.00
Angle stop cock 12.70mm BMW-E.05 1.00 408.00 1 Each 408.00
Add MA on labour charges for fixing angle
stop cock BMW-E.06
0% 43.00 0.00
12.70mm dia PVC connection with brass
union nuts BMW-I.48
1.00 86.00 1 Each 86.00
Add MA on labour charges for fixing PVC
connection with brass union nuts BMW-I.49
0% 17.00 0.00
Cutting holes in brick masonry BMW-I.46 1.00 47.00 1 Each 47.00
Add MA on labour charges for cutting holes in
brick masonry BMW-I.46
0% 47.00 0.00
Cost of 76.2 x 101.60 mm teakwood blocks BMW-I.42 2.00 23.00 1 Each 46.00
Add MA on labour charges for fixing Teak
wood blocks BMW-I.43
0% 9.00 0.00
4310.00
ADD OVERHEADS @ 0.000% 4310.00 0.00
4310.00
Rate per Each 4310.00

15 Providing and placing on terrace (at all floor levels) polyetheylene water storage tank with double layer approved brand and
manufacture with cover and suitable locking arrangement and making necessary holes for inlet and outlets and over flow pipes
but without fittings and base support for tanks including cost and conveyance of all materials and labour charges for placing
and fixing in position as directed by Engineer-in-Charge.

Basic rate as per ssr item BMW-G.01 1.00 Lit 5.00 1.00 Lit 5.00
Area allowence on labour charges BMW-G.02 0% 1.00 1.00 0.00 0.00
5.00
ADD OVERHEADS @ 0.000% 0.00
Total rate per 1 Ltr 5.00

16 Constructing 457.2mm x 457.2mm (1'-6" x 1'-6") brick in CM (1:6) prop. Masonry inspection chamber upto 914.4mm (3'-0") and
fitted with light weight 457.2mm x 457.2mm (1'-6" x 1"-6") frame and cover of 20kg., including cost and convenyance of all
materials to site, all labour charges, sales and otehr taxes on all materials etc., complete for finished item of work

Basic rate as per ssr item BMW-B.06 1.00 Nos 3238.00 1.00 Nos 3238.00
Area allowence on labour charges BMW-B.08 0% 71.00 1.00 0.00 0.00
3238.00
ADD OVERHEADS @ 0.000% 0.00
Total rate per 1 No 3238.00

17 Construction of 50.8mm thick RCM Baffle wall with 2.267 Kg steel and rabit wire mesh in CM (1:3) prop: with fine rendering in
neat cement in septic tank including cost and convenyance of all materials to site, seigonarage charges sales and othe taxes on
all materials , and all labour charges etc., complete for finished item of work.

Basic rate as per ssr item BMW-I.95 1.00 Nos 212.00 1.00 Nos 212.00

WS SA 96 of 420
Area allowence on labour charges BMW-I.97 0% 44.00 1.00 0.00 0.00
212.00
ADD OVERHEADS @ 0.000% 0.00
Total rate per 1 No 212.00

18 Supplying and fixing PPR Ball valve as per ISI Class - I , Indian make heavy type including cost and conveyance of all materials ,
labour charges etc. complete for finished item of work.

a) 25mm PPR Ball valve


Basic rate as per ssr item BMW-I.404 1.00 Nos 207.00 1.00 Nos 207.00
Area allowence on labour charges BMW-F.18 0% 44.00 1.00 0.00 0.00
207.00
ADD OVERHEADS @ 0.000% 0.00
Total rate per 1 No 207.00

b) 32mm PPR Ball valve


Basic rate as per ssr item BMW-I. 405 1.00 Nos 218.00 1.00 Nos 218.00
Area allowence on labour charges BMW-F.18 0% 44.00 1.00 0.00 0.00
218.00
ADD OVERHEADS @ 0.000% 0.00
Total rate per 1 No 218.00

19
Supplying and laying, filling, jointing and testing SWG SP-1 pipes of ISI make confirming to IS 1651 & 4127 1st quality with air
tight Cement joints in CM (1.5:1)prop. including excavation of trenches and socket pits in any soil (except rock requiring
blasting) and refilling with watering and tamping including cost and conveyance of all materials to site and all labour charges
for finished item of work (APSS NO 1301 & 1318)
a) 101.60 mm dia SWG pipe upto 3' depth BMW-A.02 1.00 Rmt 376.00 1.00 Rmt 376.00
Area allowence on labour charges BMW-A.05 0.00% 232.00 1.00 0.00 0.00
376.00
Rate per 1 Sqmts. 0.000% 0.00
Total rate per 1 Rmt 376.00
b) 152.40mm dia SWG pipe upto 5' depth BMW-A.03 1.00 Rmt 559.00 1.00 Rmt 559.00
Area allowence on labour charges BMW-A.06 0.00% 288.00 1.00 0.00 0.00
559.00
Rate per 1 Sqmts. 0.000% 0.00
Total rate per 1 Rmt 559.00

20 Manufacture, supply & delivery of 50mm of outer dia HDPE pipes of 10 Kg/Sqcm. conforming to IS 4984 - 1995
including transportation to site including laying and jointing of HDPE pipes as per BIS No.7634 Part -II/75 including
fixing required specials /fittings including excavation of trenches up to 0.50 mts depth in all soils except rock
requires blasting and refilling trenches after laying and jointing of pipes as per standard specifications including cost
and conveyance of all materials to site, all labour charges, sales and other taxes on all materials etc., complete for
finished item of work.

Basic rate as per ssr item TABLE 1.00 RMT 93.00 1.00 RMT 93.00
16(1) page
52
Labour charges for laying and jointing 12 (b) page 1.00 RMT 31.00 1.00 RMT 31.00
5 of PH ssr

Area allowence on labour charges 20% 31.00 6.20


130.20
Rate per 1 Sqmts. 0.000% 0.00
Total rate per 1Rmt 130.20

21 Supply and Fixing of CI Steps for Septic Tank / Manhole complete for finished item of work including cost and conveyance of all
materials to site, all labour charges, sales and other taxes on all materials etc., complete for finished item of work.

Basic rate as per ssr item BMW-I.89 1.00 Nos 57.00 1.00 Nos 57.00
Area allowence on labour charges BMW-I90 0% 11.00 1.00 0.00 0.00

WS SA 97 of 420
57.00
Rate per 1 Sqmts. 0.000% 0.00
Total rate per 1 No 57.00

22 Supply and fixing of 100 mm dia CI Vent pipe of 3 mts length double socket fitted with AC cowl and mosquito proof wire mesh
including cost and conveyance of all materials to site and labour charges for placing and fixing in position etc., complete for
finished item of work.

Basic rate as per ssr item BMW-H.05 1.00 Nos 1902.00 1.00 Nos 1902.00
Area allowence on labour charges 0% 0.00 1.00 0.00 0.00
1902.00
Rate per 1 Sqmts. 0.000% 0.00
Total rate per 1 No 1902.00

Asst. Exe. Engineer Dy. Executive Engineer 0.00


RWS&S, B.kothakota RWS&S Subdivision, Thamballapalli 0.00

WS SA 98 of 420
DATAS FOR DOORS AND WINDOWS 2019-20
Sl.No Description of Item Qty
1 Supply and Fixing of Medium Teak wood panalled Main Door of size 2.00 x2.70m made with outer Frame of
sections size 100X125mm ( 2 Verticals, 3 horizontals and top partition of 1 vertical @ glass portion and fixed
with iron grill alround 25x6mm MS Flat welded with 12mm square rods 3 horizontals, 6 Verticals of size
0.86x0.45- 2no.s. The teak wood double shutter are made by styles 115x50- 2no.s and middle 95x50mm-
1no., and Rails are 125x50- 2no.s, 175x50- 2no.s, Teak wood planks of size 0.365x0.405x 0.025m -4no.s,
0.365x0.765x0.025m- 2no.s, top fixed cooling glass 6mm thick 1.86x0.23m- 1no. 10mm beading alround
fixed with nails including fixing all fixtures such as 1No Brass Aldrop (IS:2681) 450 mm long, 4Nos Brass
Tower Bolt-200 mmlong, 2Nos Brass fancy handles 150 mm long, 8Nos Brass Butt hinges 150 mm Long etc
including all labour charges wrought and putup all other charges etc complete for finsihed item of work.
Frame fitted with Adhesive foam finished with putty.

DOOR SIZE 2.00 X 2.70 5.40


Medium Teak Wood for Frame
Verticals 2.00 2.70 0.13 0.10 : 0.0675 cum
Horizental 3 2 0.125 0.1 : 0.07500
Total qnty for Scantlings upto 3.00 mtrs & above 2.00 mtrs 0.1425 cum
Medium teak Wood Shutters
Verticals 1 0.66 0.125 0.10 0 0.00825
Styles 2 2 1.96 0.115 0.050 0.04508
Styles 1 2 1.96 0.095 0.050 0.01862
Rails 2 2 0.92 0.125 0.050 0.02300
Rails 2 2 0.92 0.170 0.050 0.03128
Teak Beeding 1 2 1.86 0.01 0.01 0.000372
alround Glass
Teak Beeding 1 2
0.23 0.01 0.01 4.6E-05
alround
Total Glass
qnty for Scantlings upto
2.00 mtrs 0.12665
Planks 2 4 0.365 0.405 0.025 0.02957
Planks 2 2 0.365 0.765 0.025 0.02792
Total qnty of Medium teak wood for Planks 0.05749

6mm cooling Glass 1.86 0.51 0.9486


Grill:
Alround 25x6mm flat 1.31 2 2 5.24 1.18 6.18
(0.45+0.86)
12mm Square 4.86 2 9.72 1.13 10.98
rods[(0.45x6) + (0.72x3)] 17.17 kgs

Abstract
Material
0.1425 Cost of Medium Teak Wood BMT-E.01 71195 1 cum 10145.29
0.12665 scantlings:
Cost up to Teak
of Medium 2.0 MWood BMT-E.02 79106 1 cum 10018.62
0.05749 scantlings:
Cost 2.0 toTeak
of Medium 3.0 M
Wood BMT-E.04 142391 1 cum 8185.70
0.9486 Plancks: any thickness
Cost of Plain Float Glass 6 BMT-I.03 593 1 cum 562.52
17.17 mm
Costthick
of 10mmX10mm MS 44.84 1 kg 769.76
6.00 squre
Cost ofrods
MS Z Hold fasts - 300 BMS W.69 32 1 Each 192.00
2.00 mm
Costlong of 40Aldrop
of Brass x 40 x (IS:2681)
5 mm BMT-G.38 2094 1 Each 4188.00
3.00 350 mm
Cost long Tower Bolt-10
of Brass BMT-G.58 299 1 Each 897.00
2.00 mm Bolt
Cost (IS:204)
of Brass 250
fancy mm
handles BMT-G.22 324 1 Each 648.00
6.00 150 mm
Aluminium Flat Latches: 300 BMT-G.50 144 1 Each 864.00
1.00 mm
Costlong
of Brass Door Stoppers BMT-G.46 168 1 Each 168.00

Labour
17.167 Labour charges for fabricating BMM-V.14 27 1 Each 463.50
steel works
17.17 Labour of Window
charges Grills
for fixing Iron BMM-V.15 5 1 Each 85.83
Windows
5.40 Labour and Window
charges Grills in BMM-V.39
for wrought 1388 1 Each 7495.20
and put up 44683.42
Add Overheads & Contractors Profit 13.6150% 6083.65

Doors Data 99 of 420


Rate per / Each 50767.07

2 Supply and Fixing of Door with Double leaf shutter, Door Size 1.22x2.13 mtrs with Medium teak wood
Frame of sections size 75mm x 100mm with Flush Door Shutter Solid Bond Wood block board type with
commercial ply on both faces of 35mm thick including cost of fixtures such as Aluminium Tower Bolts
250mm long 2 Nos, Aluminium Handles 150mm long 2 Nos, 300mm long Aluminium Aldrops 1No, 125 mm
long M.S.Powder Coated butt hinges 6Nos, 300 mm long Aluminium Flat latch 1No, Door stoppers 2 Nos,
MS Hold fasts 6Nos 300mm long including cost and convenyance of all materials to site all Labour charges
such as Fixing of Door Frame and shutter Fixing in position , with Hardware fixtures etc., complete for
finsihed item of work.

DOOR SIZE 1.22 X 2.13 2.60


Medium Teak Wood for Frame
Verticals 2.00 2.13 0.075 0.10 : 0.03195 cum
Horizental 1 1.22 0.075 0.1 : 0.00915
Total qnty for Scantlings upto 3.00 mtrs & above 2.00 mtrs 0.0411 cum
Flush door shutters, solid bond wood block board type with
commercial
35 mmthick ply on bothto
conforming faces.
IS:2202
2 0.55 2.065 2.2715
Abstract
Material
0.03195 Cost of Medium Teak Wood BMT-E.01 71195 1 cum 2274.68
0.00915 scantlings: up toTeak
Cost of Medium 2.0 MWood BMT-E.04 142391 1 cum 1302.88
scantlings:
2.27150 Cost 2.0door
of Flush to 3.0 M
shutters, BMT-N.17 1396 1 cum 3171.01
solid bond wood block board
6.00 Cost of MS Z Hold fasts - 300 BMS W.69 32 1 cum 192.00
1.00 mm
Costlong of 40 xLong
of 300mm 40 x 5 mm BMT-G.42 308 1 kg 308.00
1.00 Aluminium Aldrops
Cost of 250 long Aluminium BMT-G.10 124 1 Each 124.00
2.00 Towerbolts
Cost of 150mm Long BMT-G.34 103 1 Each 206.00
6.00 Aluminium
Cost of 125mmHandles
long BMT-G.29 31 1 Each 186.00
1.00 M.S.Powder
Cost Coated
of Flat latch but hinges
Aluminium BMT-G.50 144 1 Each 144.00
2.00 300long
Cost of Heavy duty Aluminium BMT-G.57 53 1 Each 106.00
Door stopper
Labour
0.220 Carpenter class I Page No.10, 580.00 1 Each 127.60
Sl.No.3-c

0.51 Carpenter class II Page No.11, 460.00 1 Each 234.60


Sl.No.46- c

0.36 Light mazdoor 420.00 151.20


Page No.12,
Sl.No.73-2

2.27 Labour charges for fixing BMM-V.23 383 1 Each 869.98


Flush door shutters of any 9397.96
Add Overheads & Contractors Profit 13.6150% 1279.53
Rate per / Each 10677.49

3 Supply and Fixing of Door with Double leaf shutter, Door Size 0.90 x 2.13 mtrs with Medium teak wood
Frame of sections size 75mm x 100mm with Flush Door Shutter Solid Bond Wood block board type with
commercial ply on both faces of 35mm thick including cost of fixtures such as Aluminium Tower Bolts
250mm long 2 Nos, Aluminium Handles 150mm long 2 Nos, 300mm long Aluminium Aldrops 1No, 125 mm
long M.S.Powder Coated butt hinges 6Nos, 300 mm long Aluminium Flat latch 1No, Door stoppers 2 Nos,
MS Hold fasts 6Nos 300mm long including cost and convenyance of all materials to site all Labour charges
such as Fixing of Door Frame and shutter Fixing in position , with Hardware fixtures etc., complete for
finsihed item of work.

Doors Data 100 of 420


DOOR SIZE 0.90 X 2.13 1.92
Medium Teak Wood for Frame
Verticals 2.00 2.10 0.075 0.10 : 0.0315 cum
Horizental 1 0.9 0.075 0.1 : 0.00675
Total qnty for Scantlings upto 3.00 mtrs & above 2.00 mtrs 0.03825 cum
Flush door shutters, solid bond wood block board type with
commercial
35 mmthick ply on bothto
conforming faces.
IS:2202
1 0.78 2 1.56
Abstract
Material
0.0315 Cost of Medium Teak Wood BMT-E.01 71195 1 cum 2242.64
0.00675 scantlings: up toTeak
Cost of Medium 2.0 MWood BMT-E.04 142391 1 cum 961.14
scantlings:
1.56000 Cost 2.0door
of Flush to 3.0 M
shutters, BMT-N.17 1396 1 cum 2177.76
solid bond wood block board
6.00 Cost of MS Z Hold fasts - 300 BMS W.69 32 1 cum 192.00
1.00 mm
Costlong of 40 xLong
of 300mm 40 x 5 mm BMT-G.42 308 1 kg 308.00
2.00 Aluminium Aldrops
Cost of 250 long Aluminium BMT-G.10 124 1 Each 248.00
1.00 Towerbolts
Cost of 150mm Long BMT-G.34 103 1 Each 103.00
3.00 Aluminium
Cost Handles
of 125mm long BMT-G.29 31 1 Each 93.00
1.00 M.S.Powder
Cost Coated
of Flat latch but hinges
Aluminium BMT-G.50 144 1 Each 144.00
1.00 300long
MS-Powder Coated - Door BMT-G.53 45 1 Each 45.00
Stoppersr
Labour
0.220 Carpenter class I Page No.10, 580.00 1 Each 127.60
Sl.No.3-c

0.51 Carpenter class II Page No.11, 460.00 1 Each 234.60


Sl.No.46- c

0.36 Light mazdoor 420.00 151.20


Page No.12,
Sl.No.73-2

1.56 Labour charges for fixing BMM-V.23 383 1 Each 597.48


Flush door shutters of any 7625.42
Add Overheads & Contractors Profit 13.6150% 1038.20
Rate per / Each 8663.62

4 Providing and fixing factory made polyvinyl chloride (PVC) Door Frame of the size 50 x 47mm with a wall
thickness of 5mm, made out of extruded 5mm rigid PVC foam sheet, mitre cut at two corners and joined
with 2nos. of 150mm long brackets of 15x15mm M.S. square tube. The two vertical door profiles are to be
reinforced with 19x19mm M.S. Square tube of 19 gauge. The door frame shall be fixed to the wall using
65/100mm long M.S. Screws through the frame by using PVC fasteners. A minimum of 4nos. of screws to
be provided for each vertical member & minimum 2nos. for horizontal member etc. complete as per
manufacturers specification and direction of Engineer-in-Charge for finished item of work

Material
Cost of rajasri door frame BMT- 330 1 rmt 330.00
N.01,Item
Sl No 643
330.00
Add Overheads & Contractors Profit 13.6150% 44.93
Rate per / Each 374.93

Doors Data 101 of 420


5 Providing and fixing 30mm thick Solid panel PVC door shutter consisting of frame made out of M.S. tubes of
19 gauge thickness and size of 19mm x 19mm for stiles, & 15mm x 15mm for top & bottom rails. M.S. frame
shall have a coat of steel primers of approved make and manufacture. M.S. frame shall be covered with 5mm
thick heat moulded PVC „C‟ channel of size 30 x 50mm forming stiles, and 5mm thick, 75mm wide PVC
sheets for top rail, lock rail &bottom rail on either side, and 10mm (5mm x 2) thick, 20mm wide cross PVC
sheet as gap insert for top rail & bottom rail. Panelling of 5mm thick PVC sheet to be fitted in the M.S. frame
welded / sealed to the stiles & rails with 30mm wide x 5mm thick PVC sheet beading on either side, and
joined together with solvent cement adhesive etc. An additional 5mm thick PVC strip of 20mm width is to be
stuck on the interior side of the „C‟ Channel using PVC solvent adhesive. Complete as per direction of
Engineer-in-charge, manufacturer‟s specification & drawing for finished item of work .

Material
Cost of PVC Door frame Sl. No. 717 2270 1 Rmt 2270.00
BMT-N.02
2270.00
Add Overheads & Contractors Profit 13.6150% 309.06
Rate per / Each 2579.06
6 Providing and fixing of Openable Windows made of pre-painted steel (Base steel as per IS 513 of 0.58 mm
thick galvanized as per IS 277 with Zinc of 120 GSM), primer coated with epoxy primer of 5-7 microns thick,
finish painted with a polyester paint of 12-16 microns thick and back coated with 5-7 microns thick alkyd
backer and section for outer frame of 48 x 50 mm, centre mullion of 48 x 50 mm, section for shutter of 48 x
25 mm and the fixed glass beading section should be 12 x 12 mm and the outer frame and mullions to have
rebate for glazed shutter with a 20 mm provision for guard bars/grills and the sections cut to length metre
joined with corner bracket, centre mullion fixed with mullion cap, handle, stay, 2 nos. of stainless steel
heavy duty pivot hinges provided per shutter and windows fitted with 5 mm thick plain float glass with
rubber gaskets including fixing the frames in concrete/masonry wall by means of self expanding screws,
Including 10mm Square guard bars with 6” (152.4mm) pitch etc., complete for finished item of work.

a) Centre fixed both side openable shutter window 5’0”x4’0”


(1524mm x1219.2mm)/6’0”x4’0” (1828.8mm x1219.2mm)
Outer frame section size of 48x50mm. Shutter frame section
size of 48x25mm. Mullion section size of 48x50mm. Fixed
beading section size of 12x12mm.

basic rate as per ssr item code Sl.No. - 772, BMT-P.07 5411 5411.00
Sqm
Add Overheads & Contractors Profit 13.6150% 736.71

Rate per sqmt. 6147.71

a) Double shutter Window with vertical mullion 3’0” x 4’0”


( 914.4mm x 1219.2mm)/4’0” x 4’0” ( 1219.2 mm x 1219.2mm
outer frame section size of 48x50mm shutter frame section size
of 48x25mm. Mullion section size of 48x50mm.

basic rate as per ssr item Sl. No. 768 BMT-P.03 6074 6074.00

Add Overheads & Contractors Profit Sqm


Rate per sqmt. 13.6150% 826.98
6900.98

Doors Data 102 of 420


7 Providing and fixing of top hung Ventilators made of prepainted steel (Base steel as per IS 513 of 0.80 mm
thick galvanized as per IS 277 with Zinc of 120 GSM), finish painted with a polyester paint of 60-65 microns
thick and section for outer frame of 80 x 45 mm, centre mullion of 80 x 60 mm, section for shutter of 52 x
25 mm x 0.6 mm thick, outer frame and mullions to have rebate for glazed shutter with a provision for
guard bars/grills and the sections cut to length metre joined with corner bracket, centre mullion fixed with
mullion cap, 1 No. of High grade nylon latch handle, window stopper, 2 nos. of with MS Powder coated /SS
ball bearing butt Hinges provided per shutter and windows fitted
with 4 mm thick plain float glass with rubber gaskets including fixing the frames in concrete/masonry wall
by means of self expanding screws, Including 10 mm Square guard bars with 6” (152.4mm) pitch etc.,
complete for finished item of work.

Single openable ventilator shutter size of 2‟ 0” x 2‟ 0” (609.6 x


609.6mm) outer frame section size of 80 x 45mm, shutter frame
section size of 52 x 25mm thick

basic rate as per ssr item Sl. No. 832 BMT-P.56 5550 5550.00
Sqm
Add Overheads & Contractors Profit 13.6150% 755.63
Rate per sqmt. 6305.63

Asst. Exe. Engineer Dy. Executive Engineer 0


RWS&S, B.kothakotaRWS&S Subdivision, Thamballapalli 0

Doors Data 103 of 420


Electrical Datas 2019-20
S.No SSR No Description Qty Unit Rate Amount
ROOF SLAB CONDUIT PIPE
Overheads and contractors profit on
0.000%
labour
Area allowence Initial Final
0%
Rate Rate
Skilled Electrician 575.00 575.00 day
Lineman Electric / Telephone 460.00 460.00 day
Mason Cl- I / Brick layer Cl- I 500.00 500.00 day
Semi skilled Electrician 471.00 471.00 day
Helpers(Electrical) 460.00 460.00 day

1 1.4.2(c) Supply and Laying of ISI 25mm outer


dia heavy (2.20mm thickness) grade with
IS:9537 part 3 FRLS regid PVC Pipe
concealed in Roof Slabs with all required
PVC / Metallic Deep Boxes including
masonary work and labour charges etc.,
complete. Makes : VIP /GoldMedal /
Million plast /GM / Sudhakar/ Polyline /
Ploycab/ Precision / AKG / Universal &
Marudhar / Orbit.

a) Labour charges :
1 Skilled Electrician. 2 day 1 day 575.00 1150
2 Lineman Electric / Telephone 2 day 1 day 460.00 920
3 Helper (Electrical). 2 day 1 day 460.00 920
Labour Rate Per 100 Rm 2990
Labour Rate for 1 Mtr 29.9
b) Material
ELEC- Supply of 25mm PVC deep Junction 12 Nos 1 Nos 25 300
1.2.7b Boxes confirms to IS:3419. Make VIP/
Goldmedal / Million Plast /Sudhakar /
Polyline /Precision/ AKG / Universal &
Marudhar /Orbit ( SOR-2018-19-ELEC-
1.2.7b)
ELEC- Supply of 25mm dia 1.5mm thick PVC 12 Nos 1 Nos 8 96
1.2.8b Bends. Makes: VIP/ GoldMedal/
Millionplast /GM/ Sudhakar/ Polyline /
Polycab/ Precision / AKG / Universal @
Marudhar / Orbit make. (SOR-2018-19-
ELEC-1.2.8b)
ELEC- Supply of ISI 25mm outer dia heavy 100 Mtr 1 Mtr 33 3300
1.2.1b (2.20mm thickness) grade with IS:9537
part 3 FRLS regid PVC PIPE Makes: VIP
/GoldMedal / Million plast /GM /
Sudhakar/ Polyline / Ploycab/ Precision /
AKG / Universal & Marudhar / Orbit
(SOR-2018-19-ELEC-1.2.1b)

Material Rate for 100 Mtrs 3696.00


Material Rate for 1 Mtr 36.96
Total Cost of Material + Labour Charges 66.80

66.80
Over heads @13.615% 9.09
Rate per Meter 75.89
2 1.4.2 (c) Supply and Laying of ISI 20mm outer
dia heavy (2.10mm thickness) grade with
IS:9537 part 3 FRLS regid PVC Pipe
concealed in Roof Slabs with all required
PVC / Metallic Deep Boxes including
masonary work and labour charges etc.,
complete. Makes : VIP /GoldMedal /
Million plast /GM / Sudhakar/ Polyline /
Ploycab/ Precision / AKG / Universal &
Marudhar / Orbit.

a) Labour charges :
1 Skilled Electrician. 2 day 1 day 575.00 1150
2 Lineman Electric / Telephone 2 day 1 day 460.00 920
3 Helper (Electrical). 2 day 1 day 460.00 920
Labour Rate Per 100 Rm 2990.00
Labour Rate for 1 Mtr 29.90
b) Material
ELEC- Supply of 19/20mm PVC deep Junction 12 Nos 1 Nos 23 276
1.2.7a Boxes confirms to IS:3419. Make VIP/
Goldmedal / Million Plast /Sudhakar /
Polyline /Precision/ AKG / Universal &
Marudhar /Orbit ( SOR-2018-19-ELEC-
1.2.7a)
ELEC- Supply of 19/20mm dia 1.5mm thick PVC 12 Nos 1 Nos 6 72
1.2.8a Bends. Makes: VIP/ GoldMedal/
Millionplast /GM/ Sudhakar/ Polyline /
Polycab/ Precision / AKG / Universal @
Marudhar / Orbit make. (SOR-2018-19-
ELEC-1.2.8a)
ELEC- Supply of ISI 20mm outer dia heavy 100 Mtr 1 Mtr 25 2500
1.2.1a (2.10mm thickness) grade with IS:9537
part 3 FRLS regid PVC PIPE Makes: VIP
/GoldMedal / Million plast /GM /
Sudhakar/ Polyline / Ploycab/ Precision /
AKG / Universal & Marudhar / Orbit
(SOR-2018-19-ELEC-1.2.1a)

Material Rate for 100 Mtrs 2572.00


Material Rate for 1 Mtr 25.72
Total Cost of Material + Labour 55.60
Charges
Over heads @13.615% 7.57
Rate per Meter 63.17

Concealed Wall Conduit Pipe for point wiring


3 1.4.1 Supply and Fixing of 25mm outer dia
(a) medium (1.80mm thickness) grade with
IS:9537 part 3 FRLS Regid PVC Pipe
concealed in wall with all required
accessories including masonary work for
light, fan and separate plug point with
suitable modular deep boxes including all
labour charges etc., complete. PVC PIPE
Makes: VIP /GoldMedal / Million plast
/GM / Sudhakar/ Polyline / Ploycab/
Precision / AKG / Universal & Marudhar /
Orbit

a) Labour charges :
1 Skilled Electrician. 2 day 1 day 575.00 1150
2 Lineman Electric / Telephone 2 day 1 day 460.00 920
3 Helper (Electrical). 2 day 1 day 460.00 920
4 Mason Cl- I / Brick layer Cl- I 2.00 day 1 day 500.00 1000.00
Labour Rate Per 100 Rm 3990.00
Labour Rate Per 1 Mtr 39.90
b) Material
8.4.13 Cement. 50 kg 1 Kg 8 400
8.1.4 U Nails. 200 Nos 100 Nos 30 60
1.3.1e Supply of 8 or 9Module Hot Dip 3 Nos 1 Nos 170 510
galvanized 20/18 SWG Module box with
earthing terminal. (SOR-2018-19-ELEC-
1.3.1e)
ELEC- Supply of 25mm PVC deep Junction 12 Nos 1 Nos 25 300
1.2.7b Boxes confirms to IS:3419. Make VIP/
Goldmedal / Million Plast /Sudhakar /
Polyline /Precision/ AKG / Universal &
Marudhar /Orbit ( SOR-2018-19-ELEC-
1.2.7b)
ELEC- Supply of 25mm dia 1.5mm thick PVC 12 Nos 1 Nos 8 96
1.2.8b Bends. Makes: VIP/ GoldMedal/
Millionplast /GM/ Sudhakar/ Polyline /
Polycab/ Precision / AKG / Universal @
Marudhar / Orbit make. (SOR-2018-19-
ELEC-1.2.8b)
ELEC- Supply of ISI 25mm outer dia medium 100 Mtr 1 Mtr 25 2500
1.2.2b (1.80mm thickness) grade with IS:9537
part 3 FRLS Regid PVC PIPE Makes:
VIP /GoldMedal / Million plast /GM /
Sudhakar/ Polyline / Ploycab/ Precision /
AKG / Universal & Marudhar / Orbit
(SOR-2018-19-ELEC-1.2.2b)

Material Rate for 100 Mtrs 3866.00


Material Rate for 1 Mtr 38.66
Total Cost of Material + Labour 78.50
Charges
Over heads @13.615% 10.69
Rate per Meter 11.00 89.19
4 1.4.1 Supply and Fixing of 20mm outer dia
(b) medium (1.55mm thickness) grade with
IS:9537 part 3 FRLS regid PVC PVC
Pipe concealed in wall with all required
accessories including masonary work for
light, fan and separate plug point with
suitable modular deep boxes including all
labour charges etc., complete. PVC PIPE
Makes: VIP /GoldMedal / Million plast
/GM / Sudhakar/ Polyline / Ploycab/
Precision / AKG / Universal & Marudhar /
Orbit

a) Labour charges :
1 Skilled Electrician. 2 day 1 day 575.00 1150
2 Lineman Electric / Telephone 2 day 1 day 460.00 920
3 Helper (Electrical). 2.00 day 1 day 460.00 920.00
4 Mason Cl- I / Brick layer Cl- I 2.00 day 1 day 500.00 1000.00
Labour Rate Per 100 Rm 3990.00
Labour Rate Per 1 Mtr 39.90
b) Material
8.4.11 Cement. 50 kg 1 Kg 8 400
8.1.4 U Nails. 200 Nos 100 Nos 30 60
1.3.1e Supply of 8 or 9Module Hot Dip 3 Nos 1 Nos 170 510
galvanized 20/18 SWG Module box with
earthing terminal. (SOR-2018-19-ELEC-
1.3.1e)
ELEC- Supply of 19/20mm PVC deep Junction 12 Nos 1 Nos 23 276
1.2.7a Boxes confirms to IS:3419. Make VIP/
Goldmedal / Million Plast /Sudhakar /
Polyline /Precision/ AKG / Universal &
Marudhar /Orbit ( SOR-2018-19-ELEC-
1.2.7a)
ELEC- Supply of 19/20mm dia 1.5mm thick PVC 12 Nos 1 Nos 6 72
1.2.8a Bends. Makes: VIP/ GoldMedal/
Millionplast /GM/ Sudhakar/ Polyline /
Polycab/ Precision / AKG / Universal @
Marudhar / Orbit make. (SOR-2018-19-
ELEC-1.2.8a)
ELEC- Supply of ISI 20mm outer dia medium 100 Mtr 1 Mtr 18 1800
1.2.2a (1.55mm thickness) grade with IS:9537
part 3 FRLS regid PVC PVC PIPE
Makes: VIP /GoldMedal / Million plast
/GM / Sudhakar/ Polyline / Ploycab/
Precision / AKG / Universal & Marudhar /
Orbit (SOR-2018-19-ELEC-1.2.2a)

Material Rate for 100 Mtrs 3118.00


Material Rate for 1 Mtr 31.18
Total Cost of Material + Labour 71.00
Charges
Over heads @13.615% 9.67
Rate per Meter 80.67
Concealed Wall Conduit Pipe for run of mains

2 1.4.2 Supply and laying of ISI 25mm outer dia


(a) medium (1.80mm thickness) grade with
IS:9537 part 3 FRLS Regid PVC pipe
concealed in wall with all required PVC /
Metallic Junction Boxes including
masonary work and labour charges etc.,
for run of mains. Make VIP/ Goldmedal /
Million Plast /Sudhakar / Polyline
/Precision/ AKG / Universal &
Marudhar /Orbit.

a) Labour charges :
1 Skilled Electrician. 2.00 day 1 day 575.00 1150.00
2 Lineman Electric / Telephone 2.00 day 1 day 460.00 920.00
3 Helper (Electrical). 2.00 day 1 day 460.00 920.00
4 Mason Cl- I / Brick layer Cl- I 2.00 day 1 day 500.00 1000.00
Labour Rate Per 100 Rm 3990.00
Labour Rate for 1 Mtr 39.90
b) Material
8.4.11 Cement. 50 kg 1 Kg 8 400
8.1.4 U Nails. 200 Nos 100 Nos 30 60
ELEC- Supply of 25mm PVC deep Junction 12 Nos 1 Nos 25 300
1.2.7b Boxes confirms to IS:3419. Make VIP/
Goldmedal / Million Plast /Sudhakar /
Polyline /Precision/ AKG / Universal &
Marudhar /Orbit ( SOR-2018-19-ELEC-
1.2.7b)
ELEC- Supply of 25mm dia 1.5mm thick PVC 12 Nos 1 Nos 8 96
1.2.8b Bends. Makes: VIP/ GoldMedal/
Millionplast /GM/ Sudhakar/ Polyline /
Polycab/ Precision / AKG / Universal @
Marudhar / Orbit make. (SOR-2018-19-
ELEC-1.2.8b)
ELEC- Supply of ISI 25mm outer dia medium 100 Mtr 1 Mtr 25 2500
1.2.2b (1.80mm thickness) grade with IS:9537
part 3 FRLS Regid PVC PIPE Makes:
VIP /GoldMedal / Million plast /GM /
Sudhakar/ Polyline / Ploycab/ Precision /
AKG / Universal & Marudhar / Orbit
(SOR-2018-19-ELEC-1.2.2b)

Material Rate for 100 Mtrs 3356.00


Material Rate for 1 Mtr 33.56
Total Cost of Material + Labour 73.40
Charges
Over heads @13.615% 9.99
Rate per Meter 83.39

3 1.4.2 Supply and laying of ISI 20mm outer dia


(b) medium (1.55mm thickness) grade with
IS:9537 part 3 FRLS regid PVC PVC
pipe concealed in wall with all required
PVC / Metallic Junction Boxes including
masonary work and labour charges etc.,
for run of mains. Make VIP/ Goldmedal /
Million Plast /Sudhakar / Polyline
/Precision/ AKG / Universal &
Marudhar /Orbit.

a) Labour charges :
1 Skilled Electrician. 2.00 day 1 day 575.00 1150.00
2 Lineman Electric / Telephone 2.00 day 1 day 460.00 920.00
3 Helper (Electrical). 2.00 day 1 day 460.00 920.00
4 Mason Cl- I / Brick layer Cl- I 2.00 day 1 day 500.00 1000.00
Labour Rate Per 100 Rm 3990.00
Labour Rate for 1 Mtr 39.90
b) Material
8.4.13 Cement. 50 kg 1 Kg 8 400
8.1.4 U Nails. 200 Nos 100 Nos 30 60
ELEC- Supply of 19/20mm PVC deep Junction 12 Nos 1 Nos 23 276
1.2.7a Boxes confirms to IS:3419. Make VIP/
Goldmedal / Million Plast /Sudhakar /
Polyline /Precision/ AKG / Universal &
Marudhar /Orbit ( SOR-2018-19-ELEC-
1.2.7a)
ELEC- Supply of 19/20mm dia 1.5mm thick PVC 12 Nos 1 Nos 6 72
1.2.8a Bends. Makes: VIP/ GoldMedal/
Millionplast /GM/ Sudhakar/ Polyline /
Polycab/ Precision / AKG / Universal @
Marudhar / Orbit make. (SOR-2018-19-
ELEC-1.2.8a)
ELEC- Supply of ISI 20mm outer dia medium 100 Mtr 1 Mtr 18 1800
1.2.2a (1.55mm thickness) grade with IS:9537
part 3 FRLS regid PVC PVC PIPE
Makes: VIP /GoldMedal / Million plast
/GM / Sudhakar/ Polyline / Ploycab/
Precision / AKG / Universal & Marudhar /
Orbit (SOR-2018-19-ELEC-1.2.2a)

Material Rate for 100 Mtrs 2608.00


Material Rate for 1 Mtr 26.08
Total Cost of Material + Labour 65.90
Charges
Over heads @13.615% 8.97
Rate per Meter 74.87

4 1.4.2 Supply and laying of ISI 32mm outer dia


(b) medium (2.10mm thickness) grade with
IS:9537 part 3 FRLS Regid PVC pipe
concealed in wall with all required PVC /
Metallic Junction Boxes including
masonary work and labour charges etc.,
for run of mains. Make VIP/ Goldmedal /
Million Plast /Sudhakar / Polyline
/Precision/ AKG / Universal &
Marudhar /Orbit.

a) Labour charges :
a) Labour charges :
1 Skilled Electrician. 2.00 day 1 day 575.00 1150.00
2 Lineman Electric / Telephone 2.00 day 1 day 460.00 920.00
3 Helper (Electrical). 2.00 day 1 day 460.00 920.00
4 Mason Cl- I / Brick layer Cl- I 2.00 day 1 day 500.00 1000.00
Labour Rate Per 100 Rm 3990.00
Labour Rate for 1 Mtr 39.90
8.4.13 Cement. 50 kg 1 Kg 8 400
8.1.4 U Nails. 200 Nos 100 Nos 30 60
ELEC- Supply of 32mm PVC deep Junction 12 Nos 1 Nos 40 480
1.2.7c Boxes confirms to IS:3419. Make VIP/
Goldmedal / Million Plast /Sudhakar /
Polyline /Precision/ AKG / Universal &
Marudhar /Orbit ( SOR-2018-19-ELEC-
1.2.7c)
ELEC- Supply of 32mm dia 2.0mm thick PVC 12 Nos 1 Nos 18 216
1.2.8c Bends. Makes: VIP/ GoldMedal/
Millionplast /GM/ Sudhakar/ Polyline /
Polycab/ Precision / AKG / Universal @
Marudhar / Orbit make. (SOR-2018-19-
ELEC-1.2.c)
ELEC- Supply of ISI 32mm outer dia medium 100 Mtr 1 Mtr 39 3900
1.2.2c (2.10mm thickness) grade with IS:9537
part 3 FRLS Regid PVC PIPE Makes:
VIP /GoldMedal / Million plast /GM /
Sudhakar/ Polyline / Ploycab/ Precision /
AKG / Universal & Marudhar / Orbit
(SOR-2018-19-ELEC-1.2.2c)

Material Rate for 100 Mtrs 5056.00


Material Rate for 1 Mtr 50.56
Total Cost of Material + Labour 90.46
Charges
Over heads @13.615% 12.32
Rate per Meter 102.78

Surface Wall Conduit Pipe for Point Wiring

5 1.3.1 Supply and Fixing of 25mm outer dia


medium (1.80mm thickness) grade with
IS:9537 part 3 FRLS Regid PVC Pipe
surface on wall/ ceiling with all required
saddles and accessories including
masonary work for light, fan and
separate plug point with suitable modular
boxes including all labour charges etc.,
complete. PVC PIPE Makes: VIP
/GoldMedal / Million plast /GM /
Sudhakar/ Polyline / Ploycab/ Precision /
AKG / Universal & Marudhar / Orbit

a) Labour charges :
1 Skilled Electrician. 2.00 day 1 day 575.00 1150.00
2 Lineman Electric / Telephone 2.00 day 1 day 460.00 920.00
3 Helper (Electrical). 2.00 day 1 day 460.00 920.00
Labour Rate Per 100 Rm 2990.00
Labour Rate for 1 Mtr 29.90
b) Material
8.1.2 PVC Rawl Plugs. 200 Nos 100 Nos 30 60
ELEC- Supply of No.8 Screws of 35/38mm. 200 Nos 100 Nos 100 200
1.4.4d (SOR-2018-19-ELEC-1.4.4d)

8.4.13 Cement. 25 kg 1 Kg 8 200


ELEC- Supply of 25mm Saddles with Base. 200 Nos 100 Nos 225 450
1.1.8b (SOR-2018-19-ELEC-1.1.8b)
1.3.1e Supply of 8 or 9Module Hot Dip 3 Nos 1 Nos 170 510
galvanized 20/18 SWG Module box with
earthing terminal. (SOR-2018-19-ELEC-
1.3.1e)
ELEC- Supply of 25mm PVC Junction Boxes 12 Nos 1 No 20 240
1.2.6b confirms to IS:3419. Make VIP/
Goldmedal / Million Plast /Sudhakar /
Polyline /Precision/ AKG / Universal &
Marudhar /Orbit. (SOR-2018-19-ELEC-
1.2.6b)
ELEC- Supply of 25mm dia 1.5mm thick PVC 12 Nos 1 Nos 8 96
1.2.8b Bends. Makes: VIP/ GoldMedal/
Millionplast /GM/ Sudhakar/ Polyline /
Polycab/ Precision / AKG / Universal @
Marudhar / Orbit make. (SOR-2018-19-
ELEC-1.2.8b)
ELEC- Supply of ISI 25mm outer dia medium 100 Mtr 1 Mtr 25 2500
1.2.2b (1.80mm thickness) grade with IS:9537
part 3 FRLS Regid PVC PIPE Makes:
VIP /GoldMedal / Million plast /GM /
Sudhakar/ Polyline / Ploycab/ Precision /
AKG / Universal & Marudhar / Orbit
(SOR-2018-19-ELEC-1.2.2b)

Material Rate for 100 Mtrs 4256.00


Material Rate for 1 Mtr 42.56
Total Cost of Material + Labour 72.40
Charges
Over heads @13.615% 9.86
Rate per Meter 82.26

9 1.3.1 Supply and Fixing of 20mm outer dia


medium (1.55mm thickness) grade with
IS:9537 part 3 FRLS Regid PVC Pipe
surface on wall/ ceiling with all required
saddles and accessories including
masonary work for light, fan and
separate plug point with suitable modular
boxes including all labour charges etc.,
complete. PVC PIPE Makes: VIP
/GoldMedal / Million plast /GM /
Sudhakar/ Polyline / Ploycab/ Precision /
AKG / Universal & Marudhar / Orbit

a) Labour charges :
1 Skilled Electrician. 2 day 1 day 575.00 1150
2 Lineman Electric / Telephone 2 day 1 day 460.00 920
3 Helper (Electrical). 2 day 1 day 460.00 920
Labour Rate Per 100 Rm 2990
Labour Rate for 1 Mtr 29.9
b) Material
8.1.2 PVC Rawl Plugs. 200.00 Nos 100 Nos 30.00 60.00
ELEC- Supply of No.8 Screws of 35/38mm. 200 Nos 100 Nos 100 200
1.4.4d (SOR-2018-19-ELEC-1.4.4d)

8.4.13 Cement. 25 kg 1 Kg 8 200


1.3.1e Supply of 8 or 9Module Hot Dip 3 Nos 1 Nos 160 480
galvanized 20/18 SWG Module box with
earthing terminal. (SOR-2018-19-ELEC-
1.3.1e)
ELEC- Supply of 19/20mm Saddles with Base. 200 Nos 100 Nos 215 430
1.1.8a (SOR-2018-19-ELEC-1.1.8a)
ELEC- Supply of 19/20mm PVC Junction Boxes 12 Nos 1 No 19 228
1.2.6a confirms to IS:3419. Make VIP/
Goldmedal / Million Plast /Sudhakar /
Polyline /Precision/ AKG / Universal &
Marudhar /Orbit. (SOR-2018-19-ELEC-
1.2.6a)
ELEC- Supply of 19/20mm dia 1.5mm thick PVC 12 Nos 1 Nos 6 72
1.2.8a Bends. Makes: VIP/ GoldMedal/
Millionplast /GM/ Sudhakar/ Polyline /
Polycab/ Precision / AKG / Universal @
Marudhar / Orbit make. (SOR-2018-19-
ELEC-1.2.8a)
ELEC- Supply of ISI 20mm outer dia medium 100 Mtr 1 Mtr 18 1800
1.2.2a (1.55mm thickness) grade with IS:9537
part 3 FRLS regid PVC PVC PIPE
Makes: VIP /GoldMedal / Million plast
/GM / Sudhakar/ Polyline / Ploycab/
Precision / AKG / Universal & Marudhar /
Orbit (SOR-2018-19-ELEC-1.2.2a)

Material Rate for 100 Mtrs 3470.00


Material Rate for 1 Mtr 34.70
Total Cost of Material + Labour 64.60
Charges
Over heads @13.615% 8.80
Rate per Meter 73.40

Surface Wall Conduit Pipe for run of Mains


10 1.3.2 Supply and Fixing of 25mm outer dia
medium (1.80mm thickness) grade with
IS:9537 part 3 FRLS Regid PVC Pipe
(ISI MARK) with all accessories fixing on
chromium plated metallic base saddles
including all labour charges etc.,
complete for run of mains. PVC PIPE
Makes: VIP /GoldMedal / Million plast
/GM / Sudhakar/ Polyline / Ploycab/
Precision / AKG / Universal & Marudhar /
Orbit

a) Labour charges :
1 Skilled Electrician. 2.00 day 1 day 575.00 1150.00
2 Lineman Electric / Telephone 2.00 day 1 day 460.00 920.00
3 Helper (Electrical). 2.00 day 1 day 460.00 920.00
Labour Rate Per 100 Rm 2990.00
Labour Rate for 1 Mtr 29.90
b) Material
8.1.2 PVC Rawl Plugs. 200.00 Nos 100 Nos 30.00 60.00
ELEC- Supply of No.8 Screws of 35/38mm. 200 Nos 100 Nos 100 200
1.4.4d (SOR-2018-19-ELEC-1.4.4d)

8.4.13 Cement. 25 kg 1 Kg 8 200


ELEC- Supply of 25mm Saddles with Base. 200 Nos 100 Nos 225 450
1.1.8b (SOR-2018-19-ELEC-1.1.8b)
ELEC- Supply of 25mm PVC Junction Boxes 12 Nos 1 No 20 240
1.2.6b confirms to IS:3419. Make VIP/
Goldmedal / Million Plast /Sudhakar /
Polyline /Precision/ AKG / Universal &
Marudhar /Orbit. (SOR-2018-19-ELEC-
1.2.6b)
ELEC- Supply of 25mm dia 1.5mm thick PVC 12 Nos 1 Nos 8 96
1.2.8b Bends. Makes: VIP/ GoldMedal/
Millionplast /GM/ Sudhakar/ Polyline /
Polycab/ Precision / AKG / Universal @
Marudhar / Orbit make. (SOR-2018-19-
ELEC-1.2.8b)
ELEC- Supply of ISI 25mm outer dia medium 100 Mtr 1 Mtr 25 2500
1.2.2b (1.80mm thickness) grade with IS:9537
part 3 FRLS Regid PVC PIPE Makes:
VIP /GoldMedal / Million plast /GM /
Sudhakar/ Polyline / Ploycab/ Precision /
AKG / Universal & Marudhar / Orbit
(SOR-2018-19-ELEC-1.2.2b)

Material Rate for 100 Mtrs 3746.00


Material Rate for 1 Mtr 37.46
Total Cost of Material + Labour 67.30
Charges
Over heads @13.615% 9.16
Rate per Meter 76.46

11 1.3.2 Supply and Fixing of 20mm outer dia


medium (1.55mm thickness) grade with
IS:9537 part 3 FRLS Regid PVC Pipe
(ISI MARK) with all accessories fixing on
chromium plated metallic base saddles
including all labour charges etc.,
complete for run of mains. PVC PIPE
Makes: VIP /GoldMedal / Million plast
/GM / Sudhakar/ Polyline / Ploycab/
Precision / AKG / Universal & Marudhar /
Orbit

a) Labour charges :
1 Skilled Electrician. 2.00 day 1 day 575.00 1150.00
2 Lineman Electric / Telephone 2.00 day 1 day 460.00 920.00
3 Helper (Electrical). 2.00 day 1 day 460.00 920.00
Labour Rate Per 100 Rmt 2990.00
Labour Rate for 1 Mtr 29.90
b) Material
8.1.2 PVC Rawl Plugs. 200.00 Nos 100 Nos 30.00 60.00
ELEC- Supply of No.8 Screws of 35/38mm. 200 Nos 100 Nos 100 200
1.4.4d (SOR-2018-19-ELEC-1.4.4d)

8.4.13 Cement. 25 kg 1 Kg 8 200


ELEC- Supply of 19/20mm Saddles with Base. 200 Nos 100 Nos 215 430
1.1.8a (SOR-2018-19-ELEC-1.1.8a)
ELEC- Supply of 19/20mm PVC Junction Boxes 12 Nos 1 No 19 228
1.2.6a confirms to IS:3419. Make VIP/
Goldmedal / Million Plast /Sudhakar /
Polyline /Precision/ AKG / Universal &
Marudhar /Orbit. (SOR-2018-19-ELEC-
1.2.6a)
ELEC- Supply of 19/20mm dia 1.5mm thick PVC 12 Nos 1 Nos 6 72
1.2.8a Bends. Makes: VIP/ GoldMedal/
Millionplast /GM/ Sudhakar/ Polyline /
Polycab/ Precision / AKG / Universal @
Marudhar / Orbit make. (SOR-2018-19-
ELEC-1.2.8a)
ELEC- Supply of ISI 20mm outer dia medium 100 Mtr 1 Mtr 18 1800
1.2.2a (1.55mm thickness) grade with IS:9537
part 3 FRLS regid PVC PVC PIPE
Makes: VIP /GoldMedal / Million plast
/GM / Sudhakar/ Polyline / Ploycab/
Precision / AKG / Universal & Marudhar /
Orbit (SOR-2018-19-ELEC-1.2.2a)

Material Rate for 100 Mtrs 2990.00


Material Rate for 1 Mtr 29.90
Total Cost of Material + Labour 59.80
Charges
Over heads @13.615% 8.14
Rate per Meter 67.94

12 1.3.3 Supply and Fixing of 32mm outer dia


medium (2.10mm thickness) grade with
IS:9537 part 3 FRLS Regid PVC Pipe
(ISI MARK) with all accessories fixing on
chromium plated metallic base saddles
including all labour charges etc.,
complete for run of mains. PVC PIPE
Makes: VIP /GoldMedal / Million plast
/GM / Sudhakar/ Polyline / Ploycab/
Precision / AKG / Universal & Marudhar /
Orbit

a) Labour charges :
1 Skilled Electrician. 2.00 day 1 day 575.00 1150.00
2 Lineman Electric / Telephone 2.00 day 1 day 460.00 920.00
3 Helper (Electrical). 2.00 day 1 day 460.00 920.00
Labour Rate Per 100 Rm 2990.00
Labour Rate for 1 Mtr 29.90
b) Material
8.1.2 PVC Rawl Plugs. 200.00 Nos 100 Nos 30.00 60.00
ELEC- Supply of No.8 Screws of 35/38mm. 200 Nos 100 Nos 100 200
1.4.4d (SOR-2018-19-ELEC-1.4.4d)

8.4.13 Cement. 25 kg 1 Kg 8 200


ELEC- Supply of 32mm Saddles with Base. 200 Nos 100 Nos 380 760
1.1.8c (SOR-2018-19-ELEC-1.1.8c)
ELEC- Supply of 32mm PVC Junction Boxes 12 Nos 1 No 35 420
1.2.6c confirms to IS:3419. Make VIP/
Goldmedal / Million Plast /Sudhakar /
Polyline /Precision/ AKG / Universal &
Marudhar /Orbit. (SOR-2018-19-ELEC-
1.2.6c)
ELEC- Supply of 32mm dia 2.0mm thick PVC 12 Nos 1 Nos 18 216
1.2.8c Bends. Makes: VIP/ GoldMedal/
Millionplast /GM/ Sudhakar/ Polyline /
Polycab/ Precision / AKG / Universal @
Marudhar / Orbit make. (SOR-2018-19-
ELEC-1.2.8c)
ELEC- Supply of ISI 32mm (2.10 mm thickness) 100 Mtr 1 Mtr 39 3900
1.2.2c grade with IS:9537 part 3 FRLS Regid
PVC PIPE Makes: VIP /GoldMedal /
Million plast /GM / Sudhakar/ Polyline /
Ploycab/ Precision / AKG / Universal &
Marudhar / Orbit (SOR-2018-19-ELEC-
1.2.2c)

Material Rate for 100 Mtrs 5756.00


Material Rate for 1 Mtr 57.56
Total Cost of Material + Labour 87.40
Charges
Over heads @13.615% 11.90
Rate per Meter 99.30

Casing and caping

13 1.5.2 Supply and Laying of P.V.C casing and


caping (ISI MARK) with double locking
arrangments with groover trunking of size
not below 12.5mm height 25mm size with
all accessories, duly sealed at points and
erected on Wall / Ceiling including cost of
all materials and labour charges
complete. Makes: Precision/VIP / Modi/
GoldMedal / Million plast / GM /
Sudhakar / Polyline/Orbit/Anchor

a) Labour charges :
1 Skilled Electrician. 1 day 1 day 575.00 575
2 Lineman Electric / Telephone 1 day 1 day 460.00 460
3 Helper (Electrical). 2 day 1 day 460.00 920
Labour Rate Per 100 Rm 1955.00
Labour Rate for 1 Mtr 19.55
b) Material
1.2.11 Supply of ISI 25mm width and 12.5mm 100 Rm 1 Rm 30 3000
height Casing and Caping.
Makes: Precision/VIP / Modi/
GoldMedal / Million plast / GM /
Sudhakar / Polyline/Orbit/Anchor
Material Rate for 100 Mtrs 3000.00
Material Rate for 1 Mtr 30.00
Total Cost of Material + Labour 49.50
Charges
Over heads @13.615% 6.74
Rate per Meter 56.24

Fan Hooks -Box Type

14 Supply and erecting PVC / GI / MS


Galvanished fan hook box with hook in
RCC slab including all Labour charges
etc., complete.
a) Material
ELEC- Consealed box PVC / MS with hook for each 1 1 Nos 100 100
8.1.22 fan
ELEC- PVC Box ( LESS COST OF DEEP BOX ) each 1 1 Nos 25 25
1.2.7b
Rate 75.00
Over heads @13.615% 10.21
Rate per Each 85.21

Fan Hook -grouting (in repairs)

3 Supply and erecting fan hook of


12/15mm dia M.S. rod / bar grouted in
RCC slab with making the slab as
original.
a) Material
ELEC- 19 / 20 mm Steel tube fan down rod each 1 1 Nos 30.00 30.00
8.1.20
1 Cement, Sand and Rounding off LS 1 1 Nos 20.00 20.00
2 Material Cost 50.00
b) Labour charges for grouting in RCC
slab, Fixing of Fan hook with masonary
work.
ELEC- Mason 0.166 day 1 day 500.00 83.00
8.1.78
4 Helper 0.166 day 1 day 460.00 76.36
Labour Charges 159.36
Total Cost of Material + Labour 209.30
Charges
Over heads @13.615% 28.50
Rate per Meter 237.80
Wiring
Point wiring in Non Residential Building

4 2.1.1 Wiring with run of 2 of 22/0.3mm (1.5


Sqmm) FRLS / HFFR / ZHFR PVC
insulated flexible ISI mark copper cable
in existing PVC conduit pipe including
Supply and fixing of Jumbo Ceiling
rose/BH /SBH and 6A/10A ISI Mark
1way Modular switch with required
modular box and cover frame in existing
Surface or Concealed pipe wiring
including cost and conveyance of all
material and all labour charges etc.,
complete for light and bell points in
N.R.B.
Copper cable Makes: Finolex / RR kabel
/ Havells /KEI
Accessories Makes: Makes: Legrand
Arteor / Schneider Zen celo/ Crabtree
Murano or Amare/L&T-englaze/ GM-
Zenova/Goldmedal(i-Push)

a) Labour charges :
1 Skilled Electrician. 0.60 day 1 day 575.00 345.00
2 Semi Skilled Electrician / Lineman. 1.20 day 1 day 471.00 565.20
3 Helper 0.60 day 1 day 460.00 276.00
Labour for 6 Points 1186.20
Labour for 1 Point 197.70
b) Material
Supply of Hot Dip galvanized 20/18 SWG 2 Nos 1 No 80.00 160.00
ELEC-
3 Module box with earthing terminal
1.3.1B
Supply of 3 Modular cover frame. 2 Nos 1 No 70.00 140.00
Makes: Legrand Arteor / Schneider Zen
ELEC- celo/ Crabtree Murano or Amare/L&T-
1.8.3b englaze/ GM-Zenova/Goldmedal(i-Push)

Supply of 6A / 10A 1 Way 1 Module 6 Nos 1 No 85.00 510.00


Modular Switch.
ELEC- Makes: Legrand Arteor / Schneider Zen
1.8.1a celo/ Crabtree Murano or Amare/L&T-
englaze/ GM-Zenova/Goldmedal(i-Push)

Supply of 3 Plate Jumbo Ceiling Rose. 6 Nos 1 No 19.00 114.00


ELEC- Makes: GM G Home / Gold Medal Olive /
1.7.1m Million Zoom / Great white
Omega/Koncept/Vimal opel/Anchor
Supply of 22/0.3mm (1.5Sqmm) FRLS / 100.00 Mtrs 100 Mtrs 1510.00 1510.00
HFFR / ZHFR PVC insulated 1100V
ELEC- grade as per IS : 694 / 1990 specification
1.5.1b for Copper cable.
Makes: Finolex / RR kabel / Havells /KEI

Cost of Material for 6 Points 2434.00


Cost of Material Rate per 1 Point 405.67
Total Cost of Material + Labour 603.00
Charges
Over heads @13.615% 82.10
Rate per Each 685.10

5 2.1.1 Wiring with run of 2 of 22/0.3mm (1.5


Sqmm) FRLS / HFFR / ZHFR PVC
insulated flexible ISI mark copper cable
in existing PVC conduit pipe including
Supply and fixing of Jumbo Ceiling
rose/BH /SBH and 6A/10A ISI Mark
1way Modular switch with required
modular box and cover frame in existing
Surface or Concealed pipe wiring
including cost and conveyance of all
material and all labour charges etc.,
complete for light and bell points in
N.R.B.
Copper cable Makes: Gloster/ Polycab /
Bonton / V-Guard / GM / Million / HPL /
Goldmedal / Finecab /Fortune Art /
Kundan
cab/Sudhakar/Orbit/Standard/Tamra/Anc
hor
Accessories Makes : Legrand Myrius /
Crabtree verona / L&T/ HPL/ Schneider
Livia/ GM- Zicono/
C&S/Goldmedal(Curve/Air) / Million
Mway / Logus Platina/ Panasonic Vision /
Salzer
S90series/Precision/Koncept(Samrat/Qur
a)/Polycab(Levana)/ Anchor-Roma/
Amron/IndoAsian/Pointer

a) Labour charges :
1 Skilled Electrician. 0.60 day 1 day 575.00 345.00
2 Semi Skilled Electrician / Lineman. 1.20 day 1 day 471.00 565.20
3 Helper 0.60 day 1 day 460.00 276.00
Labour for 6 Points 1186.20
Labour for 1 Point 197.70
b) Material
Supply of Hot Dip galvanized 20/18 SWG 2 Nos 1 No 80.00 160.00
ELEC-
3 Module box with earthing terminal
1.3.1B

Supply of 3 Modular cover frame. 2 Nos 1 No 60.00 120.00


Makes: Legrand Myrius / Crabtree
verona / L&T/ HPL/ Schneider Livia/ GM-
Zicono/ C&S/Goldmedal(Curve/Air) /
ELEC- Million Mway / Logus Platina/ Panasonic
Vision / Salzer
1.8.4B
S90series/Precision/Koncept(Samrat/Qur
a)/Ploycab(Levana)/ Anchor-Roma/
Amron/IndoAsian/Pointer

Supply of 6A / 10A 1 Way 1 Module 6 Nos 1 No 55.00 330.00


Modular Switch.
Makes: Legrand Myrius / Crabtree
verona / L&T/ HPL/ Schneider Livia/ GM-
Zicono/ C&S/Goldmedal(Curve/Air) /
ELEC- Million Mway / Logus Platina/ Panasonic
1.8.2A Vision / Salzer
S90series/Precision/Koncept(Samrat/Qur
a)/Ploycab(Levana)/ Anchor-Roma/
Amron/IndoAsian/Pointer

Supply of 3 Plate Jumbo Ceiling Rose. 6 Nos 1 No 19.00 114.00


ELEC- Makes: GM G Home / Gold Medal Olive /
1.7.1m Million Zoom / Great white
Omega/Koncept/Vimal opel/Anchor
Supply of 22/0.3mm (1.5Sqmm) FRLS / 100.00 Mtrs 100 Mtrs 1320.00 1320.00
HFFR / ZHFR PVC insulated 1100V
grade as per IS : 694 / 1990 specification
for Copper cable. Makes: Gloster/
ELEC- Polycab / Bonton / V-Guard / GM /
1.5.2 b Million / HPL / Goldmedal / Finecab
/Fortune Art / Kundan
cab/Sudhakar/Orbit/Standard/Tamra/Anc
hor

Cost of Material for 6 Points 2044.00


Cost of Material Rate per 1 Point 340.67
Total Cost of Material + Labour 538.00
Charges
Over heads @13.615% 73.25
Rate per Each 611.25

Point wiring in Residential Building


6 2.1.2 Wiring with run of 2 of 22/0.3mm (1.5
Sqmm) FRLS / HFFR / ZHFR PVC
insulated flexible ISI mark copper cable
in existing PVC conduit pipe including
Supply and fixing of Jumbo Ceiling
rose/BH /SBH and 6A/10A ISI Mark
1way Modular switch with required
modular box and cover frame in existing
Surface or Concealed pipe wiring
including cost and conveyance of all
material and all labour charges etc.,
complete for light and bell points in R.B.
Copper cable Makes: Finolex / RR kabel
/ Havells /KEI
Accessories Makes: Makes: Legrand
Arteor / Schneider Zen celo/ Crabtree
Murano or Amare/L&T-englaze/ GM-
Zenova/Goldmedal(i-Push)

a) Labour charges :
1 Skilled Electrician. 0.70 day 1 day 575.00 402.50
2 Semi Skilled Electrician / Lineman. 1.40 day 1 day 471.00 659.40
3 Helper 0.70 day 1 day 460.00 322.00
Labour for 7 Points 1383.90
Labour for 1 Point 197.70
b) Material
Supply of Hot Dip galvanized 20/18 SWG 3 Nos 1 No 80.00 240.00
ELEC-
3 Module box with earthing terminal
1.3.1B

Supply of 3 Modular cover frame. 3 Nos 1 No 70.00 210.00


Makes: Legrand Arteor / Schneider Zen
ELEC- celo/ Crabtree Murano or Amare/L&T-
1.8.3b englaze/ GM-Zenova/Goldmedal(i-Push)

Supply of 6A / 10A 1 Way 1 Module 7 Nos 1 No 85.00 595.00


Modular Switch.
ELEC- Makes: Legrand Arteor / Schneider Zen
1.8.1a celo/ Crabtree Murano or Amare/L&T-
englaze/ GM-Zenova/Goldmedal(i-Push)

Supply of 3 Plate Jumbo Ceiling Rose. 7 Nos 1 No 19.00 133.00


ELEC- Makes: GM G Home / Gold Medal Olive /
1.7.1m Million Zoom / Great white
Omega/Koncept/Vimal opel/Anchor
Supply of 22/0.3mm (1.5Sqmm) FRLS / 100.00 Mtrs 100 Mtrs 1510.00 1510.00
HFFR / ZHFR PVC insulated 1100V
ELEC- grade as per IS : 694 / 1990 specification
1.5.1b for Copper cable.
Makes: Finolex / RR kabel / Havells /KEI

Cost of Material for 7 Points 2688.00


Cost of Material Rate per 1 Point 384.00
Total Cost of Material + Labour 581.00
Charges
Over heads @13.615% 79.10
Rate per Each 660.10
Supply of 6A / 10A 1 Way 1 Module 7 Nos 1 No 55.00 385.00
Modular Switch.
Makes: Legrand Myrius / Crabtree
verona / L&T/ HPL/ Schneider Livia/ GM-
Zicono/ C&S/Goldmedal(Curve/Air) /
ELEC- Million Mway / Logus Platina/ Panasonic
1.8.2A Vision / Salzer
S90series/Precision/Koncept(Samrat/Qur
a)/Ploycab(Levana)/ Anchor-Roma/
Amron/IndoAsian/Pointer

Supply of 3 Plate Jumbo Ceiling Rose. 7 Nos 1 No 19.00 133.00


ELEC- Makes: GM G Home / Gold Medal Olive /
1.7.1m Million Zoom / Great white
Omega/Koncept/Vimal opel/Anchor
Supply of 22/0.3mm (1.5Sqmm) FRLS / 100.00 Mtrs 100 Mtrs 1320.00 1320.00
HFFR / ZHFR PVC insulated 1100V
grade as per IS : 694 / 1990 specification
for Copper cable. Makes: Gloster/
ELEC- Polycab / Bonton / V-Guard / GM /
1.5.2 b Million / HPL / Goldmedal / Finecab
/Fortune Art / Kundan
cab/Sudhakar/Orbit/Standard/Tamra/Anc
hor

Cost of Material for 7 Points 2258.00


Cost of Material Rate per 1 Point 322.57
Total Cost of Material + Labour 520.00
Charges
Over heads @13.615% 70.80
Rate per Each 590.80

20b Wiring with run of 3 of 22/0.3mm (1.5


Sqmm) FRLS / HFFR / ZHFR PVC
insulated flexible ISI mark copper cable
in existing PVC conduit pipe including
Supply and fixing of Jumbo Ceiling
rose/BH /SBH and 6A/10A ISI Mark
1way Modular switch with required
modular box and cover frame in existing
Surface or Concealed pipe wiring
including cost and conveyance of all
material and all labour charges etc.,
complete for fan, Exhaust fan, street light
and ceiling light points in R.B.
Copper cable Makes: Gloster/ Polycab /
Bonton / V-Guard / GM / Million / HPL /
Goldmedal / Finecab /Fortune Art /
Kundan
cab/Sudhakar/Orbit/Standard/Tamra/Anc
hor
Accessories Makes : Legrand Myrius /
Crabtree verona / L&T/ HPL/ Schneider
Livia/ GM- Zicono/
C&S/Goldmedal(Curve/Air) / Million
Mway / Logus Platina/ Panasonic Vision /
Salzer
S90series/Precision/Koncept(Samrat/Qur
a)/Polycab(Levana)/ Anchor-Roma/
Amron/IndoAsian/Pointer

a) Labour charges :
1 Skilled Electrician. 0.75 day 1 day 575.00 431.25
2 Semi Skilled Electrician / Lineman. 1.50 day 1 day 471.00 706.50
3 Helper 0.75 day 1 day 460.00 345.00
Labour for 7 Points 1482.75
Labour for 1 Point 211.82
b) Material
Supply of Hot Dip galvanized 20/18 SWG 3 Nos 1 No 80.00 240.00
ELEC-
3 Module box with earthing terminal
1.3.1B

Supply of 3 Modular cover frame. 3 Nos 1 No 60.00 180.00


Makes: Legrand Myrius / Crabtree
verona / L&T/ HPL/ Schneider Livia/ GM-
Zicono/ C&S/Goldmedal(Curve/Air) /
Million Mway / Logus Platina/ Panasonic
ELEC-
1.8.4B Vision / Salzer
S90series/Precision/Koncept(Samrat/Qur
a)/Ploycab(Levana)/ Anchor-Roma/
Amron/IndoAsian/Pointer

Supply of 6A / 10A 1 Way 1 Module 7 Nos 1 No 65.00 455.00


Modular Switch.
Makes: Legrand Myrius / Crabtree
verona / L&T/ HPL/ Schneider Livia/ GM-
Zicono/ C&S/Goldmedal(Curve/Air) /
ELEC- Million Mway / Logus Platina/ Panasonic
1.8.2A Vision / Salzer
S90series/Precision/Koncept(Samrat/Qur
a)/Ploycab(Levana)/ Anchor-Roma/
Amron/IndoAsian/Pointer

Supply of 3 Plate Jumbo Ceiling Rose. 7 Nos 1 No 19.00 133.00


ELEC- Makes: GM G Home / Gold Medal Olive /
1.7.1m Million Zoom / Great white
Omega/Koncept/Vimal opel/Anchor
Supply of 22/0.3mm (1.5Sqmm) FRLS / 150.00 Mtrs 100 Mtrs 1320.00 1980.00
HFFR / ZHFR PVC insulated 1100V
grade as per IS : 694 / 1990 specification
for Copper cable. Makes: Gloster/
ELEC- Polycab / Bonton / V-Guard / GM /
1.5.2 b Million / HPL / Goldmedal / Finecab
/Fortune Art / Kundan
cab/Sudhakar/Orbit/Standard/Tamra/Anc
hor

Cost of Material for 7 Points 2988.00


Cost of Material Rate per 1 Point 426.86
Total Cost of Material + Labour 638.00
Charges
Over heads @13.615% 86.86
724.86
Rate per Each

Common Socket
21a 2.1.4 Supply and fixing of 6A ISI Mark 3/2 pin
Modular socket with 6A 1way Modular
switch, 3 Module box with cover frame
and GI switch box on common switch
board with connections etc., complete.
Accessories Makes: Makes: Legrand
Arteor / Schneider Zen celo/ Crabtree
Murano or Amare/L&T-englaze/ GM-
Zenova/Goldmedal(i-Push)

a) Labour charges :
1 Skilled Electrician. 0.067 day 1 day 575.00 38.53
2 Helper (Electrical). 0.067 day 1 day 460.00 30.82
Labour for 1 Point 69.35
b) Material
Supply of Hot Dip galvanized 20/18 SWG 1 Nos 1 No 80.00 80.00
ELEC-
3 Module box with earthing terminal
1.3.1B

Supply of 3 Modular cover frame. 1 Nos 1 No 70.00 70.00


Makes: Legrand Arteor / Schneider Zen
ELEC- celo/ Crabtree Murano or Amare/L&T-
1.8.3b englaze/ GM-Zenova/Goldmedal(i-Push)

Supply of 6A / 10A 1 Way 1 Module 1 Nos 1 No 85.00 85.00


Modular Switch.
ELEC- Makes: Legrand Arteor / Schneider Zen
1.8.1a celo/ Crabtree Murano or Amare/L&T-
englaze/ GM-Zenova/Goldmedal(i-Push)

ELEC- 6A / 10A 3/2 Pin 2 Module Modular 1 No 1 No 130.00 130.00


1.8.1d Socket with shutter.
Cost of Material Rate per 1 Point 365.00
Total Cost of Material + Labour 434.00
Charges
Over heads @13.615% 59.09
Rate per Each 493.09

21b 2.1.4 Supply and fixing of 6A ISI Mark 3/2 pin


Modular socket with 6A 1way Modular
switch, 3 Module box with cover frame
and GI switch box on common switch
board with connections etc., complete.
Accessories Makes : Legrand Myrius /
Crabtree verona / L&T/ HPL/ Schneider
Livia/ GM- Zicono/
C&S/Goldmedal(Curve/Air) / Million
Mway / Logus Platina/ Panasonic Vision /
Salzer
S90series/Precision/Koncept(Samrat/Qur
a)/Polycab(Levana)/ Anchor-Roma/
Amron/IndoAsian/Pointer

a) Labour charges :
1 Skilled Electrician. 0.067 day 1 day 575.00 38.53
2 Helper (Electrical). 0.067 day 1 day 460.00 30.82
Labour for 1 Point 69.35
b) Material
Supply of Hot Dip galvanized 20/18 SWG 1 Nos 1 No 80.00 80.00
ELEC-
3 Module box with earthing terminal
1.3.1B
Supply of 3 Modular cover frame. 1 Nos 1 No 60.00 60.00
Makes: Legrand Myrius / Crabtree
verona / L&T/ HPL/ Schneider Livia/ GM-
Zicono/ C&S/Goldmedal(Curve/Air) /
Million Mway / Logus Platina/ Panasonic
ELEC-
Vision / Salzer
1.8.4B
S90series/Precision/Koncept(Samrat/Qur
a)/Ploycab(Levana)/ Anchor-Roma/
Amron/IndoAsian/Pointer

Supply of 6A / 10A 1 Way 1 Module 1 Nos 1 No 55.00 55.00


Modular Switch.
Makes: Legrand Myrius / Crabtree
verona / L&T/ HPL/ Schneider Livia/ GM-
Zicono/ C&S/Goldmedal(Curve/Air) /
ELEC- Million Mway / Logus Platina/ Panasonic
1.8.2A Vision / Salzer
S90series/Precision/Koncept(Samrat/Qur
a)/Ploycab(Levana)/ Anchor-Roma/
Amron/IndoAsian/Pointer

ELEC- 6A / 10A 3/2 Pin 2 Module Modular 1 No 1 No 130.00 130.00


1.8.1d Socket with shutter.
Cost of Material Rate per 1 Point 325.00
Total Cost of Material + Labour 394.00
Charges
Over heads @13.615% 53.64
Rate per Each 447.64

Separate Socket
22a 2.1.3 Wiring with 3 of 22/0.3mm ( 1.5 Sq.mm)
FRLS / HFFR P.V.C. insulated flexible
copper cable (ISI MARK) in existing pipe
with 6A switch and 6A, 3/2 pin socket
Modular type with 6A switch control and
cover plate and Suitable size modular
box fixing on separate board including all
labour charges etc., complete.
Copper cable Makes: Finolex / RR kabel
/ Havells /KEI
Accessories Makes: Makes: Legrand
Arteor / Schneider Zen celo/ Crabtree
Murano or Amare/L&T-englaze/ GM-
Zenova/Goldmedal(i-Push)

a) Labour charges :
1 Skilled Electrician. 1.50 day 1 day 575.00 862.50
2 Lineman Electric / Telephone 1.50 day 1 day 460.00 690.00
3 Helper (Electrical). 1.50 day 1 day 460.00 690.00
Labour for 15 Points 2242.50
Labour for 1 Point 149.50
b) Material
Supply of Hot Dip galvanized 20/18 SWG 15 Nos 1 No 80.00 1200.00
ELEC-
3 Module box with earthing terminal
1.3.1B

Supply of 3 Modular cover frame. 15 Nos 1 No 70.00 1050.00


Makes: Legrand Arteor / Schneider Zen
ELEC- celo/ Crabtree Murano or Amare/L&T-
1.8.3b englaze/ GM-Zenova/Goldmedal(i-Push)
Supply of 6A / 10A 1 Way 1 Module 15 Nos 1 No 95.00 1425.00
Modular Switch.
ELEC- Makes: Legrand Arteor / Schneider Zen
1.8.1a celo/ Crabtree Murano or Amare/L&T-
englaze/ GM-Zenova/Goldmedal(i-Push)

ELEC- 6A / 10A 3/2 Pin 2 Module Modular 15 No 1 No 130.00 1950.00


1.8.1d Socket with shutter.
Supply of 22/0.3mm (1.5Sqmm) FRLS / 150.00 Mtrs 100 Mtrs 1510.00 2265.00
HFFR / ZHFR PVC insulated 1100V
ELEC- grade as per IS : 694 / 1990 specification
1.5.1b for Copper cable.
Makes: Finolex / RR kabel / Havells /KEI

Cost of Material for 15 Points 7890.00


Cost of Material Rate per 1 Point 526.00
Total Cost of Material + Labour 675.00
Charges
Over heads @13.615% 91.90
Rate per Each 766.90

22b 2.1.3 Wiring with 3 of 22/0.3mm ( 1.5 Sq.mm)


FRLS / HFFR P.V.C. insulated flexible
copper cable (ISI MARK) in existing pipe
with 6A switch and 6A, 3/2 pin socket
Modular type with 6A switch control and
cover plate and Suitable size modular
box fixing on separate board including all
labour charges etc., complete.
Copper cable Makes: Gloster/ Polycab /
Bonton / V-Guard / GM / Million / HPL /
Goldmedal / Finecab /Fortune Art /
Kundan
cab/Sudhakar/Orbit/Standard/Tamra/Anc
hor
Accessories Makes : Legrand Myrius /
Crabtree verona / L&T/ HPL/ Schneider
Livia/ GM- Zicono/
C&S/Goldmedal(Curve/Air) / Million
Mway / Logus Platina/ Panasonic Vision /
Salzer
S90series/Precision/Koncept(Samrat/Qur
a)/Polycab(Levana)/ Anchor-Roma/
Amron/IndoAsian/Pointer

a) Labour charges :
1 Skilled Electrician. 1.50 day 1 day 575.00 862.50
2 Lineman Electric / Telephone 1.50 day 1 day 460.00 690.00
3 Helper (Electrical). 1.50 day 1 day 460.00 690.00
Labour for 15 Points 2242.50
Labour for 1 Point 149.50
b) Material
Supply of Hot Dip galvanized 20/18 SWG 15 Nos 1 No 80.00 1200.00
ELEC-
3 Module box with earthing terminal
1.3.1B
Supply of 3 Modular cover frame. 15 Nos 1 No 70.00 1050.00
Makes: Legrand Myrius / Crabtree
verona / L&T/ HPL/ Schneider Livia/ GM-
Zicono/ C&S/Goldmedal(Curve/Air) /
Million Mway / Logus Platina/ Panasonic
ELEC-
Vision / Salzer
1.8.4B
S90series/Precision/Koncept(Samrat/Qur
a)/Ploycab(Levana)/ Anchor-Roma/
Amron/IndoAsian/Pointer

Supply of 6A / 10A 1 Way 1 Module 15 Nos 1 No 55.00 825.00


Modular Switch.
Makes: Legrand Myrius / Crabtree
verona / L&T/ HPL/ Schneider Livia/ GM-
Zicono/ C&S/Goldmedal(Curve/Air) /
ELEC- Million Mway / Logus Platina/ Panasonic
1.8.2A Vision / Salzer
S90series/Precision/Koncept(Samrat/Qur
a)/Ploycab(Levana)/ Anchor-Roma/
Amron/IndoAsian/Pointer

ELEC- 6A / 10A 3/2 Pin 2 Module Modular 15 No 1 No 130.00 1950.00


1.8.1d Socket with shutter.
Supply of 22/0.3mm (1.5Sqmm) FRLS / 150.00 Mtrs 100 Mtrs 1320.00 1980.00
HFFR / ZHFR PVC insulated 1100V
grade as per IS : 694 / 1990 specification
for Copper cable. Makes: Gloster/
ELEC- Polycab / Bonton / V-Guard / GM /
1.5.2 b Million / HPL / Goldmedal / Finecab
/Fortune Art / Kundan
cab/Sudhakar/Orbit/Standard/Tamra/Anc
hor

Cost of Material for 15 Points 7005.00


Cost of Material Rate per 1 Point 467.00
Total Cost of Material + Labour 616.00
Charges
Over heads @13.615% 83.87
Rate per Each 699.87

6A Switches - 2 Nos & 6A Sockets - 2 Nos


23a 2.1.3 Supply and fixing of 6A switchs - 2 Nos
and 6A 3/2 pin socket - 2 Nos Modular
type with cover plate and Suitable size
modular box fixing on separate board
including all labour charges etc.,
complete.
Makes: Legrand Arteor / Schneider Zen
celo/ Crabtree Murano or Amare/L&T-
englaze/ GM-Zenova/Goldmedal(i-Push)

a) Labour charges :
1 Skilled Electrician. 0.20 day 1 day 575.00 115.00
2 Helper (Electrical). 0.20 day 1 day 460.00 92.00
Labour for 1 No 207.00
b) Material
Supply of Hot Dip galvanized 20/18 SWG 1 No 1 No 130.00 130.00
ELEC-
6 Module box with earthing terminal
1.3.1d

ELEC- Supply of 6 Modular Cover Frame. 1 Nos 1 No 120.00 120.00


1.8.3d
Supply of 6A / 10A 1 Way 1 Module 2 Nos 1 No 85.00 170.00
Modular Switch.
ELEC- Makes: Legrand Arteor / Schneider Zen
1.8.1a celo/ Crabtree Murano or Amare/L&T-
englaze/ GM-Zenova/Goldmedal(i-Push)

ELEC- 6A / 10A 3/2 Pin 2 Module Modular 2 No 1 No 130.00 260.00


1.8.1d Socket with shutter.
Cost of Material for 1 No 680.00
Total Cost of Material + Labour 887.00
Charges
Over heads @13.615% 120.77
Rate per Each 1007.77

23b Supply and fixing of 6A switchs - 2 Nos


and 6A 3/2 pin socket - 2 Nos Modular
type with cover plate and Suitable size
modular box fixing on separate board
including all labour charges etc.,
complete.
Accessories Makes : Legrand Myrius /
Crabtree verona / L&T/ HPL/ Schneider
Livia/ GM- Zicono/
C&S/Goldmedal(Curve/Air) / Million
Mway / Logus Platina/ Panasonic Vision /
Salzer
S90series/Precision/Koncept(Samrat/Qur
a)/Polycab(Levana)/ Anchor-Roma/
Amron/IndoAsian/Pointer

a) Labour charges :
1 Skilled Electrician. 0.20 day 1 day 575.00 115.00
2 Helper (Electrical). 0.20 day 1 day 460.00 92.00
Labour for 1 No 207.00
b) Material
Supply of Hot Dip galvanized 20/18 SWG 1 No 1 No 125.00 125.00
ELEC-
6 Module box with earthing terminal
1.3.1d

ELEC- Supply of 6 Modular Cover Frame. 1 Nos 1 No 100.00 100.00


1.8.4d
Supply of 6A / 10A 1 Way 1 Module 2 Nos 1 No 55.00 110.00
Modular Switch.
Makes: Legrand Myrius / Crabtree
verona / L&T/ HPL/ Schneider Livia/ GM-
Zicono/ C&S/Goldmedal(Curve/Air) /
ELEC- Million Mway / Logus Platina/ Panasonic
1.8.2A Vision / Salzer
S90series/Precision/Koncept(Samrat/Qur
a)/Ploycab(Levana)/ Anchor-Roma/
Amron/IndoAsian/Pointer

ELEC- 6A / 10A 3/2 Pin 2 Module Modular 2 No 1 No 130.00 260.00


1.8.1d Socket with shutter.
Cost of Material for 1 No 595.00
Total Cost of Material + Labour 802.00
Charges
Over heads @13.615% 109.19
Rate per Each 911.19

6A Switches - 3 Nos & 6A Sockets - 3 Nos


23a Supply and fixing of 6A switchs - 3 Nos
and 6A 3/2 pin socket - 3 Nos Modular
type with cover plate and suitable size
Modular box fixing on separate board
including all labour charges etc.,
complete.
Makes: Legrand Arteor / Schneider Zen
celo/ Crabtree Murano or Amare/L&T-
englaze/ GM-Zenova/Goldmedal(i-Push)

a) Labour charges :
1 Skilled Electrician. 0.20 day 1 day 575.00 115.00
2 Helper (Electrical). 0.20 day 1 day 460.00 92.00
Labour for 1 No 207.00
b) Material
Supply of Hot Dip galvanized 20/18 SWG 1 No 1 No 170.00 170.00
ELEC-
9 Module box with earthing terminal
1.3.1e

ELEC- Supply of 9 Modular Cover Frame. 1 Nos 1 No 155.00 155.00


1.8.3e
Supply of 6A / 10A 1 Way 1 Module 3 Nos 1 No 105.00 315.00
Modular Switch.
ELEC- Makes: Legrand Arteor / Schneider Zen
1.8.1a celo/ Crabtree Murano or Amare/L&T-
englaze/ GM-Zenova/Goldmedal(i-Push)

ELEC- 6A / 10A 3/2 Pin 2 Module Modular 3 No 1 No 130.00 390.00


1.8.1d Socket with shutter.
Cost of Material for 1 No 1030.00
Total Cost of Material + Labour 1237.00
Charges
Over heads @13.615% 168.42
Rate per Each 1405.42

23b Supply and fixing of 6A switchs - 3 Nos


and 6A 3/2 pin socket - 3 Nos Modular
type with cover plate and suitable size
modular box fixing on separate board
including all labour charges etc.,
complete.
Accessories Makes : Legrand Myrius /
Crabtree verona / L&T/ HPL/ Schneider
Livia/ GM- Zicono/
C&S/Goldmedal(Curve/Air) / Million
Mway / Logus Platina/ Panasonic Vision /
Salzer
S90series/Precision/Koncept(Samrat/Qur
a)/Polycab(Levana)/ Anchor-Roma/
Amron/IndoAsian/Pointer

a) Labour charges :
1 Skilled Electrician. 0.20 day 1 day 575.00 115.00
2 Helper (Electrical). 0.20 day 1 day 460.00 92.00
Labour for 1 No 207.00
b) Material
Supply of Hot Dip galvanized 20/18 SWG 1 No 1 No 170.00 170.00
ELEC-
9 Module box with earthing terminal
1.3.1e

ELEC- Supply of 9 Modular Cover Frame. 1 Nos 1 No 125.00 125.00


1.8.4e
Supply of 6A / 10A 1 Way 1 Module 3 Nos 1 No 57.00 171.00
Modular Switch.
Makes: Legrand Myrius / Crabtree
verona / L&T/ HPL/ Schneider Livia/ GM-
Zicono/ C&S/Goldmedal(Curve/Air) /
ELEC- Million Mway / Logus Platina/ Panasonic
1.3.1A Vision / Salzer
S90series/Precision/Koncept(Samrat/Qur
a)/Ploycab(Levana)/ Anchor-Roma/
Amron/IndoAsian/Pointer

ELEC- 6A / 10A 3/2 Pin 2 Module Modular 3 No 1 No 130.00 390.00


1.8.1d Socket with shutter.
Cost of Material for 1 No 856.00
Total Cost of Material + Labour 1063.00
Charges
Over heads @13.615% 144.73
Rate per Each 1207.73

16 A Socket
7 Supply & fixing of 16A/6A, 2 in one
socket with 16A switch control modular
type with and Suitable size modular box
with front cover plate including all labour
charges etc., complete.
Makes: Legrand Arteor / Schneider Zen
celo/ Crabtree Murano or Amare/L&T-
englaze/ GM-Zenova/Goldmedal(i-Push)

a) Labour charges :
1 Skilled Electrician. 0.10 day 1 day 575.00 57.50
2 Helper (Electrical). 0.10 day 1 day 460.00 46.00
Labour for 1 No 103.50
b) Material
Supply of Hot Dip galvanized 20/18 SWG 1 Nos 1 No 80.00 80.00
ELEC-
3 Module box with earthing terminal
1.3.1B

Supply of 3 Modular cover frame. 1 Nos 1 No 70.00 70.00


Makes: Legrand Arteor / Schneider Zen
ELEC- celo/ Crabtree Murano or Amare/L&T-
1.8.3b englaze/ GM-Zenova/Goldmedal(i-Push)

ELEC- 16A / 20A 1 Way 1 Module Modular 1 No 1 No 115.00 115.00


1.8.1h Switch.
ELEC- 16A/6A 1 way Combi Socket Modular 1 No 1 No 180.00 180.00
1.8.2 l Socket with shutter
Cost of Material for 1 No 445.00
Total Cost of Material + Labour 548.00
Charges
Over heads @13.615% 74.61
Rate per Each 622.61
Run of Mains

8 Supply and run of 1 of 22 /0.3mm (1.5


Sq.mm) FRLS / HFFR / ZHFR P.V.C.
insulated flexible copper cable in existing
conduit pipe for earth continuity including
all labour charges etc., complete.
Makes of wires : Makes: Finolex / RR
kabel / Havells /KEI

a) Labour charges :
1 Skilled Electrician. 0.34 day 1 day 575.00 195.50
2 Lineman Electric / Telephone 0.70 day 1 day 460.00 322.00
3 Helper (Electrical). 0.34 day 1 day 460.00 156.40
Labour for 100 Mtr 673.90
Labour for 1 Mtr 6.74
b) Material
Supply of 22/0.3mm(1.5sqmm) FRLS / 100.00 Mtrs 100 Mtrs 1510.00 1510.00
HFFR / ZHFR PVC insulated 1100V
ELEC- grade as per IS : 694 / 1990 specification
1.5.1b for Copper cable.
Makes: Finolex / RR kabel / Havells /KEI

Cost of Material for 100 Metres 1510.00


Cost of Material Rate per Mtr= C/100 15.10
Total Cost of Material + Labour 21.80
Charges
Over heads @13.615% 2.97
Rate per Meter 24.77

27a Supply and run of 3 of 36 /0.3mm (2.5


Sq.mm) (phase, neutral and earth) FRLS
/ HFFR / ZHFR P.V.C. insulated flexible
copper cable in existing conduit pipe for
individual lighting circuits including labour
charges etc., complete as required for
switch boards.
Makes of wires : Makes: Finolex / RR
kabel / Havells /KEI

a) Labour charges :
1 Skilled Electrician. 1.00 day 1 day 575.00 575.00
2 Lineman Electric / Telephone 2.50 day 1 day 460.00 1150.00
3 Helper (Electrical). 1.00 day 1 day 460.00 460.00
Labour for 100 Mtr 2185.00
Labour for 1 Mtr 21.85
b) Material
Supply of 36/0.3mm(2.5sqmm) FRLS / 300.00 Mtrs 100 Mtrs 2440.00 7320.00
HFFR / ZHFR PVC insulated 1100V
ELEC- grade as per IS : 694 / 1990 specification
1.5.1c for Copper cable.
Makes: Finolex / RR kabel / Havells /KEI

Cost of Material for 100 Metres 7320.00


Cost of Material Rate per Mtr= C/100 73.20
Total Cost of Material + Labour 95.00
Charges
Over heads @13.615% 12.93
Rate per Meter 107.93
28a Supply and 3 runs of 4.0 sq mm (56/0.3
mm) (phase neutral and earth) FRLS /
HFFR/ZHFR PVC insulated flexible
copper cable in existing conduit pipe
including labour charges etc., complete
for 16A sockets.
Makes of wires : Finolex / RR Kabel /
Havells / KEI

a) Labour charges :
1 Skilled Electrician. 1.00 day 1 day 575.00 575.00
2 Lineman Electric / Telephone 3.00 day 1 day 460.00 1380.00
3 Helper (Electrical). 1.00 day 1 day 460.00 460.00
Labour for 100 Mtr 2415.00
Labour for 1 Mtr 24.15
b) Material
Supply of 56/0.3mm(4.0sqmm) FRLS / 300.00 Mtrs 100 Mtrs 3725.00 11175.00
HFFR / ZHFR PVC insulated 1100V
ELEC- grade as per IS : 694 / 1990 specification
1.5.1d for Copper cable.
Makes: Finolex / RR kabel / Havells /KEI

Cost of Material for 100 Metres 11175.00


Cost of Material Rate per Mtr= C/100 111.75
Total Cost of Material + Labour 135.90
Charges
Over heads @13.615% 18.50
Rate per Meter 154.40

29a Supply and 3 runs of 6.0 sq mm


(84/0.3mm) (phase neutral and earth)
PVC FRLS / HFFR /ZHFR insulated
flexible copper cable in existing conduit
pipe for AC's and SPNDB's including
labour charges etc.,
Makes of wires : Finolex / RR Kabel /
Havells / KEI

a) Labour charges :
1 Skilled Electrician. 1.00 day 1 day 575.00 575.00
2 Lineman Electric / Telephone 3.00 day 1 day 460.00 1380.00
3 Helper (Electrical). 1.00 day 1 day 460.00 460.00
Labour for 100 Mtr 2415.00
Labour for 1 Mtr 24.15
b) Material
Supply of 84/0.3mm(6.0sqmm) FRLS / 300.00 Mtrs 100 Mtrs 5700.00 17100.00
HFFR / ZHFR PVC insulated 1100V
ELEC- grade as per IS : 694 / 1990 specification
1.5.1e for Copper cable.
Makes: Finolex / RR kabel / Havells /KEI

Cost of Material for 100 Metres 17100.00


Cost of Material Rate per Mtr= C/100 171.00
Total Cost of Material + Labour 195.10
Charges
Over heads @13.615% 26.56
Rate per Meter 221.66
30a Supply & run of 5 of 6.0 Sqmm
(84/0.3mm) (3 phases, neutral and earth)
FRLS / HFFR /ZHFR PVC insulated
flexible copper cable in the existing
conduict pipe for run of mains from
Power panel board to TPN DB"s with pin
type lugs and connections etc., complete.
[for LDBs]
Makes of wires : Finolex / RR Kabel /
Havells / KEI

a) Labour charges :
1 Skilled Electrician. 2.00 day 1 day 575.00 1150.00
2 Lineman Electric / Telephone 5.50 day 1 day 460.00 2530.00
3 Helper (Electrical). 2.00 day 1 day 460.00 920.00
Labour for 100 Mtr 4600.00
Labour for 1 Mtr 46.00
b) Material
Supply of 84/0.3mm(6.0sqmm) FRLS / 500.00 Mtrs 100 Mtrs 5700.00 28500.00
HFFR / ZHFR PVC insulated 1100V
ELEC- grade as per IS : 694 / 1990 specification
1.5.1e for Copper cable.
Makes: Finolex / RR kabel / Havells /KEI

Cost of Material for 100 Metres 28500.00


Cost of Material Rate per Mtr= C/100 285.00
Total Cost of Material + Labour 331.00
Charges
Over heads @13.615% 45.07
Rate per Meter 376.07

31a Supply & run of 5 of 10.0 Sqmm (140/0.3


mm) (3 phases, neutral and earth) FRLS
/ HFFR /ZHFR PVC insulated flexible
copper cable in the existing conduict pipe
for run of mains from Power panel board
to TPN DB"s with pin type lugs and
connections etc., complete. [for PDBs]
Makes of wires : Finolex / RR Kabel /
Havells / KEI

a) Labour charges :
1 Skilled Electrician. 2.34 day 1 day 575.00 1345.50
2 Lineman Electric / Telephone 6.50 day 1 day 460.00 2990.00
3 Helper (Electrical). 2.34 day 1 day 460.00 1076.40
Labour for 100 Mtr 5411.90
Labour for 1 Mtr 54.12
b) Material
Supply of 140/0.3mm(10.0sqmm) 500.00 Mtrs 100 Mtrs 8800.00 44000.00
FRLS / HFFR / ZHFR PVC insulated
ELEC- 1100V grade as per IS : 694 / 1990
1.5.1F specification for Copper cable.
Makes: Finolex / RR kabel / Havells /KEI

Cost of Material for 100 Metres 44000.00


Cost of Material Rate per Mtr= C/100 440.00
Total Cost of Material + Labour 494.10
Charges
Over heads @13.615% 67.27
Rate per Meter 561.37
26b Supply and run of 1 of 22 /0.3mm (1.5
Sq.mm) FRLS / HFFR / ZHFR P.V.C.
insulated flexible copper cable in existing
conduit pipe for earth continuity including
all labour charges etc., complete.
Makes of wires : Gloster/ Polycab /
Bonton / V-Guard / GM / Million / HPL /
Goldmedal / Finecab /Fortune Art /
Kundan
cab/Sudhakar/Orbit/Standard/Tamra/Anc
hor

a) Labour charges :
1 Skilled Electrician. 0.34 day 1 day 575.00 195.50
2 Lineman Electric / Telephone 0.70 day 1 day 460.00 322.00
3 Helper (Electrical). 0.34 day 1 day 460.00 156.40
Labour for 100 Mtr 673.90
Labour for 1 Mtr 6.74
b) Material
Supply of 22/0.3mm(1.5sqmm) FRLS / 100.00 Mtrs 100 Mtrs 1320.00 1320.00
HFFR / ZHFR PVC insulated 1100V
grade as per IS : 694 / 1990 specification
for Copper cable.
ELEC- Makes: Gloster/ Polycab / Bonton / V-
1.5.2b Guard / GM / Million / HPL /
Goldmedal / Finecab /Fortune Art /
Kundan
cab/Sudhakar/Orbit/Standard/Tamra/Anc
hor

Cost of Material for 100 Metres 1320.00


Cost of Material Rate per Mtr= C/100 13.20
Total Cost of Material + Labour 19.90
Charges
Over heads @13.615% 2.71
Rate per Meter 22.61

27b Supply and run of 3 of 36 /0.3mm (2.5


Sq.mm) (phase, neutral and earth) FRLS
/ HFFR / ZHFR P.V.C. insulated flexible
copper cable in existing conduit pipe for
individual lighting circuits including labour
charges etc., complete as required for
switch boards.
Makes of wires : Makes: Gloster/ Polycab
/ Bonton / V-Guard / GM / Million / HPL /
Goldmedal / Finecab /Fortune Art /
Kundan
cab/Sudhakar/Orbit/Standard/Tamra/Anc
hor

a) Labour charges :
1 Skilled Electrician. 1.00 day 1 day 575.00 575.00
2 Lineman Electric / Telephone 2.50 day 1 day 460.00 1150.00
3 Helper (Electrical). 1.00 day 1 day 460.00 460.00
Labour for 100 Mtr 2185.00
Labour for 1 Mtr 21.85
b) Material
Supply of 36/0.3mm(2.5sqmm) FRLS / 300.00 Mtrs 100 Mtrs 2140.00 6420.00
HFFR / ZHFR PVC insulated 1100V
grade as per IS : 694 / 1990 specification
for Copper cable.
Makes: Gloster/ Polycab / Bonton / V-
ELEC-
Guard / GM / Million / HPL /
1.5.2c
Goldmedal / Finecab /Fortune Art /
Kundan
cab/Sudhakar/Orbit/Standard/Tamra/Anc
hor

Cost of Material for 100 Metres 6420.00


Cost of Material Rate per Mtr= C/100 64.20
Total Cost of Material + Labour 86.00
Charges
Over heads @13.615% 11.71
Rate per Meter 97.71

28b Supply and 3 runs of 4.0 sq mm (56/0.3


mm) (phase neutral and earth) FRLS /
HFFR/ZHFR PVC insulated flexible
copper cable in existing conduit pipe
including labour charges etc., complete
for 16A sockets.
Makes of wires : Gloster/ Polycab /
Bonton / V-Guard / GM / Million / HPL /
Goldmedal / Finecab /Fortune Art /
Kundan
cab/Sudhakar/Orbit/Standard/Tamra/Anc
hor

a) Labour charges :
1 Skilled Electrician. 1.00 day 1 day 575.00 575.00
2 Lineman Electric / Telephone 3.00 day 1 day 460.00 1380.00
3 Helper (Electrical). 1.00 day 1 day 460.00 460.00
Labour for 100 Mtr 2415.00
Labour for 1 Mtr 24.15
b) Material
Supply of 56/0.3mm(4.0sqmm) FRLS / 300.00 Mtrs 100 Mtrs 3300.00 9900.00
HFFR / ZHFR PVC insulated 1100V
grade as per IS : 694 / 1990 specification
for Copper cable.
ELEC- Makes: Gloster/ Polycab / Bonton / V-
1.5.2d Guard / GM / Million / HPL /
Goldmedal / Finecab /Fortune Art /
Kundan
cab/Sudhakar/Orbit/Standard/Tamra/Anc
hor

Cost of Material for 100 Metres 9900.00


Cost of Material Rate per Mtr= C/100 99.00
Total Cost of Material + Labour 123.10
Charges
Over heads @13.615% 16.76
Rate per Meter 139.86
29b Supply and 3 runs of 6.0 sq mm
(84/0.3mm) (phase neutral and earth)
PVC FRLS / HFFR /ZHFR insulated
flexible copper cable in existing conduit
pipe for AC's and SPNDB's including
labour charges etc.,
Makes of wires :Gloster/ Polycab /
Bonton / V-Guard / GM / Million / HPL /
Goldmedal / Finecab /Fortune Art /
Kundan
cab/Sudhakar/Orbit/Standard/Tamra/Anc
hor

a) Labour charges :
1 Skilled Electrician. 1.00 day 1 day 575.00 575.00
2 Lineman Electric / Telephone 3.00 day 1 day 460.00 1380.00
3 Helper (Electrical). 1.00 day 1 day 460.00 460.00
Labour for 100 Mtr 2415.00
Labour for 1 Mtr 24.15
b) Material
Supply of 84/0.3mm(6.0sqmm) FRLS / 300.00 Mtrs 100 Mtrs 5100.00 15300.00
HFFR / ZHFR PVC insulated 1100V
grade as per IS : 694 / 1990 specification
for Copper cable.
Makes: Gloster/ Polycab / Bonton / V-
ELEC-
Guard / GM / Million / HPL /
1.5.2e
Goldmedal / Finecab /Fortune Art /
Kundan
cab/Sudhakar/Orbit/Standard/Tamra/Anc
hor

Cost of Material for 100 Metres 15300.00


Cost of Material Rate per Mtr= C/100 153.00
Total Cost of Material + Labour 177.10
Charges
Over heads @13.615% 24.11
Rate per Meter 201.21

30b Supply & run of 5 of 6.0 Sqmm


(84/0.3mm) (3 phases, neutral and earth)
FRLS / HFFR /ZHFR PVC insulated
flexible copper cable in the existing
conduict pipe for run of mains from
Power panel board to TPN DB"s with pin
type lugs and connections etc., complete.
[for LDBs]
Makes of wires : Gloster/ Polycab /
Bonton / V-Guard / GM / Million / HPL /
Goldmedal / Finecab /Fortune Art /
Kundan
cab/Sudhakar/Orbit/Standard/Tamra/Anc
hor

a) Labour charges :
1 Skilled Electrician. 2.00 day 1 day 575.00 1150.00
2 Lineman Electric / Telephone 5.50 day 1 day 460.00 2530.00
3 Helper (Electrical). 2.00 day 1 day 460.00 920.00
Labour for 100 Mtr 4600.00
Labour for 1 Mtr 46.00
b) Material
Supply of 84/0.3mm(6.0sqmm) FRLS / 500.00 Mtrs 100 Mtrs 5100.00 25500.00
HFFR / ZHFR PVC insulated 1100V
grade as per IS : 694 / 1990 specification
for Copper cable.
Makes: Gloster/ Polycab / Bonton / V-
ELEC-
Guard / GM / Million / HPL /
1.5.2e
Goldmedal / Finecab /Fortune Art /
Kundan
cab/Sudhakar/Orbit/Standard/Tamra/Anc
hor

Cost of Material for 100 Metres 25500.00


Cost of Material Rate per Mtr= C/100 255.00
Total Cost of Material + Labour 301.00
Charges
Over heads @13.615% 40.98
Rate per Meter 341.98

31b Supply & run of 5 of 10.0 Sqmm (140/0.3


mm) (3 phases, neutral and earth) FRLS
/ HFFR /ZHFR PVC insulated flexible
copper cable in the existing conduict pipe
for run of mains from Power panel board
to TPN DB"s with pin type lugs and
connections etc., complete. [for PDBs]
Makes of wires : Gloster/ Polycab /
Bonton / V-Guard / GM / Million / HPL /
Goldmedal / Finecab /Fortune Art /
Kundan
cab/Sudhakar/Orbit/Standard/Tamra/Anc
hor

a) Labour charges :
1 Skilled Electrician. 2.34 day 1 day 575.00 1345.50
2 Lineman Electric / Telephone 6.50 day 1 day 460.00 2990.00
3 Helper (Electrical). 2.34 day 1 day 460.00 1076.40
Labour for 100 Mtr 5411.90
Labour for 1 Mtr 54.12
b) Material
Supply of 140/0.3mm(10.0sqmm) 500.00 Mtrs 100 Mtrs 7750.00 38750.00
FRLS / HFFR / ZHFR PVC insulated
1100V grade as per IS : 694 / 1990
specification for Copper cable.
Makes: Gloster/ Polycab / Bonton / V-
ELEC-
Guard / GM / Million / HPL /
1.5.2F
Goldmedal / Finecab /Fortune Art /
Kundan
cab/Sudhakar/Orbit/Standard/Tamra/Anc
hor

Cost of Material for 100 Metres 38750.00


Cost of Material Rate per Mtr= C/100 387.50
Total Cost of Material + Labour 441.60
Charges
Over heads @13.615% 60.12
Rate per Meter 501.72

AC BOX
32 Supply and fixing single phase DB in
sheet steel enclosure with metalic plug
and socket with 1 No. 20/32A,10KA 'c'
curve SPMCB (Motor characteristics
MCBs) control including making
connections etc., complete concealing in
wall.
SS enclosure Makes:Legrand(Ekinox 3) /
Schneider-Acti9/Hager -Novello+/
Seimens/Crabtree Xpro classique-II/L&T-
Newrange .
MCB Makes: Legrand-DX3 / Schneider-
Acti9/Hager-h3/ Siemens-5SX4/
Crabtree-Xpro/L&T-AU

MATERIAL
Supply of 20A SP Plug and Socket in SS 1 Nos 1 No 985.00 985.00
enclosure.
ELEC- Makes:Legrand(Ekinox 3) / Schneider-
2.13.13 Acti9/Hager -Novello+/
a Seimens/Crabtree Xpro classique-II/L&T-
Newrange .
Supply of 6-32A SP 10KA C/D Curve ISI 1 Nos 1 No 190.00 190.00
Mark.
ELEC- Makes: Legrand-DX3 / Schneider-
2.10.1a Acti9/Hager-h3/ Siemens-5SX4/
Crabtree-Xpro/L&T-AU
ELEC- Cement. 5.00 Kg 1 Kg 8.00 40.00
8.4.13
COST OF MATERIAL FOR FULSH 1215.00
MOUNTING
LABOUR
1 Skilled Electrician. 0.25 day 1 day 575.00 143.75
2 Helper (Electrical). 0.25 day 1 day 460.00 115.00
Mason Cl- I / Brick layer Cl- I 0.15 day 1 day 500.00 75.00
COST OF LABOUR FOR FULSH 333.75
MOUNTING
TOTAL COST OF MATERIAL + 1548.75
LABOUR FOR FULSHMOUNTING
Over heads @13.615% 210.86231
Rate per Each 1759.61

33 Supply and fixing of FP Metal Enclosure


with IP 20 Protection DB Make with 1 No
20A, 10 KA FP MCB Make: Legrand /
Schneider including internal connection
and labour charges for Flush Mounting
etc., complete.Makes: Legrand-DX3 /
Schneider-Acti9/Hager-h3/ Siemens-
5SX4/ Crabtree-Xpro/L&T-AU

MATERIAL
2.13.16 Supply of …. Enclosure with IP 20 1 Nos 1 No 400.00 400.00
Protection etc., complete as per IS 8623;
IS
13032; IEC 61439-3. .
Makes: Legrand(Ekinox 3) / Schneider-
Acti9/Hager -Novello+/
Seimens/Crabtree
Xpro classique-II/L&T-Newrange/Indo
Asian-Opti Pro..
Supply of 40-63A FP MCB, C/D Curve 1 Nos 1 No 1835.00 1835.00
ELEC- ISI Mark. Makes: Legrand-DX3 /
2.10.1h Schneider-Acti9/Hager-h3/ Siemens-
5SX4/ Crabtree-Xpro/L&T-AU
ELEC- Cement. 5.00 Kg 1 Kg 8.00 40.00
8.4.13
COST OF MATERIAL FOR FULSH 2275.00
MOUNTING
LABOUR
Skilled Electrician. 0.25 day 1 day 575.00 143.75
Helper (Electrical). 0.25 day 1 day 460.00 115.00
Mason Cl- I / Brick layer Cl- I 0.15 day 1 day 500.00 75.00
COST OF LABOUR FOR FULSH 75.00
MOUNTING
TOTAL COST OF MATERIAL + 2350.00
LABOUR FOR FULSH MOUNTING
Over heads @13.615% 319.95
Rate per Each 2669.95

LDB
9 Supply and fixing of (8 +12) 4 Way TPN
DB Horizontal with IP 43 Protection
suitable for 12Nos S.P. out goings and
Supply and Fixing of 1 No., of 32A FP
MCB as incomer and 12 Nos 6-32 A
10kA SP MCBs for 1 No 4 pole
Incommer etc complete as per IS 8623;
IS 13032; IEC 61439-3 Makes:
Legrand(Ekinox 3) / Schneider-
Acti9/Hager -Novello+/
Seimens/Crabtree Xpro classique-II/L&T-
Newrange as out goings including
internal connections and labour charges
for FLUSH Mounting etc., complete. (For
Lighting DBs)

MATERIAL
Supply of (8 +12) 4 Way TPN DB 1 Nos 1 No 2700.00 2700.00
Horizontal with IP 43 Protection suitable
for 12 Nos S.P. out goings and for 1 No 4
pole Incommer etc complete as per IS
ELEC- 8623; IS 13032; IEC 61439-3. Makes:
2.13.4c Legrand(Ekinox 3) / Schneider-
Acti9/Hager -Novello+/
Seimens/Crabtree Xpro classique-II/L&T-
Newrange .

Supply of 32A 4pole MCB 10KA C/D 1 No 1 No 1260.00 1260.00


Curve ISI Mark.
ELEC- Makes: Legrand-DX3 / Schneider-
2.10.1g Acti9/Hager-h3/ Siemens-5SX4/
Crabtree-Xpro/L&T-AU
Supply of 6-32A SP MCB 10KA C/D 12 Nos 1 No 190.00 2280.00
Curve ISI Mark.
ELEC- Makes: Legrand-DX3 / Schneider-
2.10.1a Acti9/Hager-h3/ Siemens-5SX4/
Crabtree-Xpro/L&T-AU
ELEC- Cement. 12.50 Kg 1 Kg 8.00 100.00
8.4.13
Sundries 4.00
6344.00
LABOUR
1 Skilled Electrician. 0.70 day 1 day 575.00 402.50
2 Lineman Electric / Telephone 1.00 day 1 day 460.00 460.00
3 Helper (Electrical). 1.00 day 1 day 460.00 460.00
4 Mason Cl- I / Brick layer Cl- I 0.50 day 1 day 500.00 250.00
1572.50
TOTAL COST OF MATERIAL + FLUSH 7916.50
LABOUR FOR FLUSH MOUNTING
Over heads @13.615% 1077.83
Rate per Each 8994.33

8 Way SPNDB
10 8WAY SPN DB with IP43nProtection
suitable for 8Nos S.P out goings and
Supply and fixing 40A DP Isolator as
Incommer and 6Nos 6-32A 10KA SP
MCBs as outgongs etc complete as per
IS 8623; IS 13032; IEC 61439-3. Makes:
Legrand(Ekinox 3) / Schneider-
Acti9/Hager -Novello+/
Seimens/Crabtree Xpro classique-II/L&T-
Newrange ., concealing in wall etc
complete.

MATERIAL
2.12.4 Supply of 8WAY SPN DB with 1 Nos 1 No 1800.00 1800.00
IP43nProtection suitable for 8Nos S.P
out goings and Supply and fixing 40A
DP Isolator as Incommer and 6Nos 6-
32A 10KA SP MCBs as outgongs etc
complete as per IS 8623; IS 13032; IEC
61439-3.
Makes: Legrand(Ekinox 3) / Schneider-
Acti9/Hager -Novello+/
Seimens/Crabtree Xpro classique-II/L&T-
Newrange .

Supply of 40A Isolator. 1 No 1 No 360.00 360.00


ELEC- Makes:Legrand-DX3 / Schneider-
2.11.1b Acti9/Hager-h3/ Siemens-5SX4/
Crabtree-Xpro/L&T-AU
Supply of 6-32A SP MCB 10KA C/D 6 Nos 1 No 190.00 1140.00
Curve ISI Mark.
ELEC- Makes: Legrand-DX3 / Schneider-
2.10.1a Acti9/Hager-h3/ Siemens-5SX4/
Crabtree-Xpro/L&T-AU
ELEC- 12.50 Kg 1 Kg 8.00 100.00
Cement.
8.4.13
3400.00
LABOUR
1 Skilled Electrician. 0.50 day 1 day 575.00 287.50
2 Lineman Electric / Telephone 0.50 day 1 day 460.00 230.00
3 Mason Cl- I / Brick layer Cl- I 0.50 day 1 day 500.00 250.00
767.50
TOTAL COST OF MATERIAL + FLUSH 4167.50
LABOUR FOR FLUSH MOUNTING
Over heads @13.615% 567.41
Rate per Each 4734.91

Earthings
11 Providing independent earthing by
exacavating a pit to a depth of 2.25Mtr in
all soils as per size specified in the data
for Important equipment with 2.5Mtr
length 40mm dia 'B' class G.I pipe and
18" dia 3" thick hume pipe ring with
R.C.C. Slab cover duly providing
staggered holes filling with 20Kg Salt and
40Kg Charcoal or 40Kg bentonite powder
from the bottom of the pipe giving earth
connection from electrode through G.I
strip of 25 x 6mm x 200mm length to be
bolted with nut bolts including supply and
termination of No.8 G.I.wire from bottm of
the pipe with all accessories and labour
charges complete, as per IS
specifications 732/1982 (Part II)

b) labour charges for fixing pipe


1 Skilled Electrician. 1.00 No 1 No 575.00 575.00
Sub Total 575.00
a) Material
40mm Nominal Bore Medium grade 2.50 Mtr 1 Mtr 350.00 875.00
ELEC-
G.I.Pipe.
8.4.15D

ELEC- G.I. Strip / Plate / Wire (per K. G). 0.24 Kgs 1 Kg 65.00 15.60
8.3.6
ELEC- G.I. Strip / Plate / Wire (per K. G). 0.83 Kgs 1 kg 65.00 53.95
8.3.6
ELEC- Drilling of through holes of 12mm dia to 16.00 Nos 1 No 6.00 96.00
8.4.18 G.I pipe.
ELEC- G.I Nuts, Bolts an Washers each set. 4.00 Sets 1 Set 12.00 48.00
ELEC-
8.4.21
ELEC- 18" dia 3" hume pipe ring. 1.00 No 1 No 250.00 250.00
8.4.22
ELEC- Hard Coke. 40.00 Kg 1 Kg 20.00 800.00
8.1.10
ELEC- Salt. 20.00 Kg 1 Kg 15.00 300.00
8.1.11
ELEC- Earth work excacvation including all soils 1.27 cum 1 cum 250.00 317.50
8.4.17 for trench, Pole Pit and Earth Pit
ELEC- Earth work excacvation including all soils 1.87 cum 1 cum 250.00 467.50
8.4.19 for trench, Pole Pit and Earth Pit
Earth work excacvation including all soils 25% 785.00 196.25
for trench, Pole Pit and Earth Pit of Hard
ELEC- disteggrated rocks and boulders for
8.4.17 trench 2nd Step of size 0.9 x 0.6 x 1.2 m
(Civil SSR) (3'x2'x4')
Sundries such as Lugs and Saddles 43.00
Rate per each 3462.80
Total Cost of Material + Labour 4037.00
Charges
Over heads @13.615% 549.64
4586.64
12 Supply and Run of No.8 SWG G.I wire
including cost of all accessories and
labour charges etc., complete.
(0.104Kgs/1Mtr)
a) Labour charges :
1 Helper (Electrical). 2.00 day 1 day 460.00 920.00
Labour for 100 Mtrs 920.00
Labour for 1 Mtr 9.20
b) Material
ELEC- G.I. Strip / Plate / Wire
10.40 Kgs 1 Kg 65.00 676.00
8.3.6
ELEC- U Nails
150.00 Nos 100 Nos 30.00 45.00
8.1.4
Sundries.
Cost of Material for 100 Metres 721.00
Cost of Material Rate per Mtr= C/100 7.21
Total Cost of Material + Labour 16.40
Charges
Over heads @13.615% 2.23
Rate per Meter 18.63

FIXTURES
13 Supply and fixing of 1x36w Box type
tube light luminaire powder coated CRCA
sheet steel housing with Electronic
Ballast Chokes and all standard
accessories.
Makes: Wipro / G.E. / Phillips / Crompton
/ Bajaj/Havells/HPL/Halonix

a) Labour charges
1 Skilled Electrician. 0.10 day 1 day 575.00 57.50
2 Lineman Electric / Telephone 0.10 day 1 day 460.00 46.00
Labour for 1 No 103.50
b) Material
Supply of 23 / 0060 twin core twisted / 1.00 Mtr 100 Mtrs 950.00 9.50
flat heavy Copper wire.
ELEC- Makes: Finolex / Polycab / Havells / V-
1.5.6 Guard / Gold Medal / GM / Million / Vimal
/Airson/CRI/ Tamra/ ollvin/Avocab

ELEC- Supply of No.8 Screws of 35/38mm. 2 Nos 100 Nos 100.00 2.00
1.4.4d
ELEC- PVC Rawl Plugs 2.00 Nos 100 Nos 30.00 0.60
8.1.2
Fixing arrangements on wall with 2 Nos 1 Nos 5.00 10.00
required support on wall
Supply of 1x36w Box type tube light 1 Nos 1 Nos 720.00 720.00
luminaire powder coated CRCA sheet
ELEC- steel housing with Electronic Ballast
3.6.1A Chokes and all standard accessories.
Makes: Wipro / G.E. / Phillips / Crompton
/ Bajaj/Havells/HPL/Halonix
Supply of 36/40W fluorescent tube. 1 Nos 1 Nos 40.00 40.00
ELEC-
Makes: Phillips / Crompton / Bajaj /
3.7.3
Surya / Style Lamp / Capart
Cost of Material for fixing luminaire 782.10
Total Cost of Material + Labour
886
Charges
Over heads @13.615% 120.57
Rate per Each 1006.17
BH/SBH
14 Supply and fixing of ISI mark batten
holder / slanting holder Makes : Anchor /
Gold Medal Olive / Million Zoom in lieu of
ceiling rose of light point complete with
all connections and all labour charges
with 5.0W LED Lamp.
Makes: Phillips /Crompton / Bajaj /
Havells / Halonix/GM/HPL

a) Labour charges :
Skilled Electrician. 0.03 day 1 day 575.00 17.25
Helper (Electrical). 0.03 day 1 day 460.00 13.80
Labour for 1 No 31.05
b) Material
ELEC- Supply of BH / SBH ofMakes 1 No 1 No 18.00 18.00
1.7.1n
Supply of 0.5W LED Lamp with input 1 No 1 No 50.00 50.00
voltage 90 to 300V, Colour temparature
ELEC- 3000k - 6500k, Beam angle 170 - 220
3.7.5a degrees, B22 base, .
Makes: Phillips /Crompton / Bajaj /
Havells / Halonix/GM/HPL
ELEC- Less Cost of 3 Plate Jumbo Ceiling Rose 1 No -1 No 19.00 -19.00
1.7.1m
Cost of Material 49.00
Total Cost of Material + Labour 80.00
Charges
Over heads @13.615% 10.89
Rate per Each 90.89

15 Supply of 48" (1200mm) 5 star rated


Sweep ISI mark Ceiling Fan as per IS
374 - 1979 and, with double ball bearings
but without Regulator.
Makes: Crompton HS Decora / Bajaj
Regal Star / Havells ES Plus / Orient
summer crown / Usha technix decorative

Supply of 48" (1200mm) Sweep Each 1 1 Nos 2300.00 2300.00


decorative Ceiling
Fan, with double ball bearings with all
accessories
without Regulator.
ELEC-
5.1.4 Makes: Crompton HS Decora / Bajaj
Regal Star /
Havells Spark deco / Orient summer
crown
/Halonix(Zephyr) /Polycab(India Glory)

Transportation 0.02 46.00


2346
Over heads @13.615% 319.41
Rate per Each 2665.41

16 Supply and fixing of Modular type


Electronic step type Fan Regulator for
sweep AC ceiling fans of 1200mm /
1420mm complete with connections.
Makes : GM G Home / Gold Medal
Olive / Million Zoom / Anchor Penta
Cherry / Great white Omega / HPL
a) Labour charges
1 Lineman Electric / Telephone 0.05 Nos 1 Nos 460.00 23.00
Labour for 1 No 23.00
b) Material
ELEC- Supply of Electronic type stepped type 1 Nos 1 Nos 180.00 180.00
1.7.1L Electronic Regulator.
Cost of Material for 1 No 180.00
Total Cost of Material + Labour 203.00
Charges
Over heads @13.615% 27.64
Rate per Each 230.64

17 Labour charges for fixing of ceiling fan


and regulator including transportation
and giving connections with twin core
wire etc., complete.
a) Labour charges
1 Skilled Electrician. 0.125 day 1 day 575.00 71.88
2 Helper (Electrical). 0.125 day 1 day 460.00 57.50
Labour for 1 No 129.38
b) Material
Supply of 23 / 0060 twin core twisted / 1.00 Mtrs 100 Mtrs 950.00 9.50
flat heavy Copper wire.
ELEC- Makes: Finolex / Polycab / Havells / V-
1.5.6 Guard / Gold Medal / GM / Million / Vimal
/Airson/CRI/ Tamra/ ollvin/Avocab

Cost of Material for fixing fan 9.50


Total Cost of Material + Labour 138.00
Charges
Over heads @13.615% 18.79
Rate per Each 156.79

18 Supply,Transportation of 12" (300mm)


ISI, 900 RPM Heavy duty exhaust fan
with metallic blades wiremesh with all
accessories etc complete Makes :
Crompton / Almounard / Havells Turbo
Force.
5.1.13 Supply of 12" (300mm) ISI, 900 RPM Each 1 1 Nos 2750.00 2750.00
Heavy duty exhaust fan with metallic
blades with Mark.
Makes: Crompton / Almounard / Havells
Turbo Force.
Transportation 0.02 55.00
2805.00
Over heads @13.615% 381.90
Rate per Each 3186.90

19 Labour charges for fixing the Light duty


exhaust fan in wall with necessary
connections and masonary work of
making hole, finishing etc., complete.
a) Labour charges
1 Skilled Electrician. 0.250 day 1 day 575.00 143.75
2 Lineman Electric / Telephone 0.250 day 1 day 460.00 115.00
3 Mason Cl- I / Brick layer Cl- I 0.250 day 1 day 500.00 125.00
Labour for 1 No 383.75
Supply of 23 / 0060 twin core twisted / 1.00 Mtrs 100 Mtrs 950.00 9.50
flat heavy Copper wire.
ELEC- Makes: Finolex / Polycab / Havells / V-
1.5.6 Guard / Gold Medal / GM / Million / Vimal
/Airson/CRI/ Tamra/ ollvin/Avocab

ELEC- Cement. 25 Kg 1 Kg 8.00 200.00


8.4.13
Sundries such as Sand, Bolt, Nuts etc. 1 Job 1 Job 15.00 15.00
Cost of Material for fixing fan 224.50
Total Cost of Material + Labour 608.00
Charges
Over heads @13.615% 82.78
Rate per Each 690.78

20 Supply of 35 Sqmm 3.5 Core XLPE RMS 1 1 One 250.00 250.00


insulated, 1100V grade armoured Rmt
ELEC- alluminium cable as per specification
4.1.1h confirming to IS:7098 (Part - I)./1554-I
Makes : Torrent / Universal / Unicab /
Polycab / Havells / Gloster / KEI.
250.00
Over heads @13.615% 34.04
Rate per Meter 284.04

21 Earth work excavation of Trench in hard


ground soil and Sand filling shall be
provided at the bottom of trench before
laying the cable and laying of U.G cables
up to 70 sqmm covering the cable with
back filling of Trench duly providing route
indicator embedded in C.C including
cost and conveyance of materials and
labour charges etc., complete.

b) Labour charges
1 Skilled Electrician. 1.00 day 1 day 575.00 575.00
2 Helper (Electrical). 2.00 day 1 day 460.00 920.00
3 Man Mazdoor for spreading the sand and 2.50 day 1 day 440.00 1100.00
back filling of the exacavated soils.
4 Man Mazdoor for concreating and 2.00 day 1 day 400.00 800.00
embedding of cable route indicators.
Labour Charges for 100 Mtrs 3395.00
Labour Charges for 1 Mtr 33.95
a) Material
Earth work excacvation including all soils 36.00 Cum 1 Cum 250.00 9000.00
ELEC-
for trench,
8.4.19
Pole Pit and Earth Pit
ELEC- Cost of Sand. 4.00 Cum 1 Cum 600.00 2400.00
8.4.14
ELEC- Cost of Bricks. 1000.00 Nos 952 Nos 4000.00 3808.00
8.4.15
ELEC- Cement. 25.00 Kg 1 Kg 8.00 200.00
8.4.13
Cable root Indicators of size 152mm 12.00 Nos 1 Nos 85.00 1020.00
ELEC-
round / 102mm x 102mm /
8.1.25
152mm x 152mm
Cost of Material for laying of cable in 100.00 Mtrs 16428.00
trench for
Cost of Material for laying of cable in 1.00 Mtrs 164.28
trench for
Total Cost of Material + Labour 198.00
Charges
Over heads @13.615% 26.96
224.96
Rate per Meter 225.00
22 Earth work excavation of Trench in hard
ground soil and Sand filling shall be
provided at the bottom of trench before
laying the cable and laying of U.G cables
from 95 Sqmm up to 400 sqmm covering
the cable with bricks and back filling of
Trench duly providing route indicator at
every 8 Mtrs distance embedded in C.C
including cost and conveyance of
materials and labour charges etc.,
complete.

b) Labour charges
1 Skilled Electrician. 1.60 day 1 day 575.00 920.00
2 Helper (Electrical). 3.30 day 1 day 460.00 1518.00
3 Man Mazdoor for spreading the sand and 2.50 day 1 day 440.00 1100.00
back filling of the exacavated soils.
4 Man Mazdoor for concreating and 2.00 day 1 day 400.00 800.00
embedding of cable route indicators.
Labour Charges for 100 Mtrs 4338.00
Labour Charges for 1 Mtr 43.38
a) Material
Earth work excacvation including all soils 36.00 Cum 1 Cum 250.00 9000.00
ELEC-
for trench,
8.4.19
Pole Pit and Earth Pit
ELEC- Cost of Sand. 4.00 Cum 1 Cum 600.00 2400.00
8.4.14
ELEC- Cost of Bricks. 1000.00 Nos 952 Nos 4000.00 3808.00
8.4.15
ELEC- Cement. 25.00 Kg 1 Kg 8.00 200.00
8.4.13
Cable root Indicators of size 152mm 12.00 Nos 1 Nos 85.00 1020.00
ELEC-
round / 102mm x 102mm /
8.1.25
152mm x 152mm
Cost of Material for laying of cable in 100.00 Mtrs 16428.00
trench for
Cost of Material for laying of cable in 1.00 Mtrs 164.28
trench for
Total Cost of Material + Labour 207.00
Charges
Over heads @13.615% 28.18
235.18
Rate per Meter 235.00

23 Laying of PVC armoured under ground


cable up to 70 Sqmm fixing on chromium
plated metallic base saddles on wall as
per IS 1255 and as directed by the
department including cost and
conveyance of all materials and labour
charges etc., complete.

b) Labour charges
1 Skilled Electrician. 1.50 day 1 day 575.00 862.50
2 Helper (Electrical). 2.00 day 1 day 460.00 920.00
Labour Charges for 100 Mtrs 1782.50
Labour Charges for 1 Mtr 17.83
a) Material
ELEC- PVC Rawl Plugs 4.00 Nos 100 Nos 30.00 1.20
8.1.2
ELEC- Supply of No.8 Screws of 35/38mm. 4.00 Nos 100 Nos 100.00 4.00
1.4.4d
ELEC- Supply of Saddle / Clamps for Cable. 2.00 Nos 100 Nos 550.00 11.00
8.4.25f
Cost of Material for Laying on wall for 1.00 Mtr 16.20
Total Cost of Material + Labour 35.00
Charges
Over heads @13.615% 4.77
39.77
Rate per Meter 40.00

24 Laying of PVC armoured under ground


cable from 95 Sq.mm to 400 Sqmm fixing
on chromium plated metallic base
saddles on wall as per IS 1255 and as
directed by the department including cost
and conveyance of all materials and
labour charges etc., complete.

b) Labour charges
1 Skilled Electrician. 1.50 day 1 day 575.00 862.50
2 Helper (Electrical). 2.00 day 1 day 460.00 920.00
Labour Charges for 100 Mtrs 1782.50
Labour Charges for 1 Mtr 17.83
a) Material
ELEC- PVC Rawl Plugs 4.00 Nos 100 Nos 30.00 1.20
8.1.2
ELEC- Supply of No.8 Screws of 63/75mm. 4.00 Nos 100 Nos 140.00 5.60
1.4.4f
ELEC- Supply of Saddle / Clamps for Cable. 2.00 Nos 100 Nos 850.00 17.00
8.4.25h
23.80
Total Cost of Material + Labour 42.00
Charges
Over heads @13.615% 5.72
47.72
Rate per Meter 48.00

Cable Terminations:
25 Termination of UG cables of 4 core 10
sq.mm & 4 core 16 sq.mm including with
required cable glands, Lugs complete
with all required accessories as directed
by the department including cost and
conveyance of all materials and labour
charges etc., complete.
Makes:Dowels/Comet/SMI

b) Labour charges
1 Skilled Electrician. 0.020 day 1 day 575.00 11.50
2 Lineman Electric / Telephone 0.020 day 1 day 460.00 9.20
3 Helper (Electrical). 0.020 day 1 day 460.00 9.20
Labour Charges for each 29.90
a) Material
Supply and making one end termination 1.00 Nos 1 Nos 85.00 85.00
with heavy duty single compression
brass gland as per BS 6121:2005 ,IP 66
complete, SIBG type, heavy duty
Alluminium lugs duly crimped with
ELEC- crimping tool, PVC tape etc for following
4.1.11b size of Armoured PVC insulated & PVC
sheathed/ XLPE aluminium conductor
cable of 1100 volt grade as required of
size.Makes:Dowels/Comet/SMI

ELEC- aluminium lugs for cable upto 16 4.00 Nos 1 Nos 10.00 40.00
4.1.13a Sq.mm
125.00
Total Cost of Material + Labour 154.00
Charges
Over heads @13.615% 20.97
174.97
Rate per Each 175.00

26 Termination of UG cables of 3.5 core 25


Sq.mm including with required cable
glands, Lugs complete with all required
accessories as directed by the
department including cost and
conveyance of all materials and labour
charges etc., complete.

b) Labour charges
1 Skilled Electrician. 0.020 day 1 day 575.00 11.50
2 Lineman Electric / Telephone 0.020 day 1 day 460.00 9.20
3 Helper (Electrical). 0.020 day 1 day 460.00 9.20
Labour Charges for each 29.90
a) Material
ELEC- glands for 3.5 core XLPE armoured 1.00 Nos 1 Nos 100.00 100.00
4.1.11c cable from 25 Sqmm to 50.0 Sq.mm
ELEC- aluminium lugs for cable upto 16 1.00 Nos 1 Nos 10.00 10.00
4.1.13a Sq.mm
4.1.13b aluminium lugs confirming to I.S 3.00 Nos 1 Nos 15.00 45.00
specifications for cable of 25 Sq.mm
155.00
Total Cost of Material + Labour 184.00
Charges
Over heads @13.615% 25.05
209.05
Rate per Each 209.00

27 Termination of UG cables of 3.5 core 35


Sq.mm including with required cable
glands, Lugs complete with all required
accessories as directed by the
department including cost and
conveyance of all materials and labour
charges etc., complete.

b) Labour charges
1 Skilled Electrician. 0.020 day 1 day 575.00 11.50
2 Lineman Electric / Telephone 0.020 day 1 day 460.00 9.20
3 Helper (Electrical). 0.020 day 1 day 460.00 9.20
Labour Charges for each 29.90
a) Material
ELEC- glands for 3.5 core XLPE armoured 1.00 Nos 1 Nos 150.00 150.00
4.1.11d cable from 25 Sqmm to 50.0 Sq.mm
ELEC- aluminium lugs for cable upto 16 1.00 Nos 1 Nos 10.00 10.00
4.1.13a Sq.mm
ELEC- aluminium lugs for cable of 35 Sq.mm 3.00 Nos 1 Nos 20.00 60.00
4.1.13c
220.00
Total Cost of Material + Labour 249.00
Charges
Over heads @13.615% 33.90
282.90
Rate per Each 283.00

28 Termination of UG cables of 3.5 core 50


Sq.mm including with required cable
glands, Lugs complete with all required
accessories as directed by the
department including cost and
conveyance of all materials and labour
charges etc., complete.

b) Labour charges
1 Skilled Electrician. 0.020 day 1 day 575.00 11.50
2 Lineman Electric / Telephone 0.020 day 1 day 460.00 9.20
3 Helper (Electrical). 0.020 day 1 day 460.00 9.20
Labour Charges for each 29.90
a) Material
ELEC- glands for 3.5 core XLPE armoured 1.00 Nos 1 Nos 160.00 160.00
4.1.11e cable from 25 Sqmm to 50.0 Sq.mm
ELEC- aluminium lugs for cable of 25 Sq.mm 1.00 Nos 1 Nos 15.00 15.00
4.1.13b
ELEC- aluminium lugs for cable of 50 Sq.mm 3.00 Nos 1 Nos 25.00 75.00
4.1.13d
250.00
Total Cost of Material + Labour 279.00
Charges
Over heads @13.615% 37.99
316.99
Rate per Each 317.00

29 Termination of UG cables of 3.5 core 70


Sq.mm including with required cable
glands, Lugs complete with all required
accessories as directed by the
department including cost and
conveyance of all materials and labour
charges etc., complete.

b) Labour charges
1 Skilled Electrician. 0.020 day 1 day 575.00 11.50
2 Lineman Electric / Telephone 0.020 day 1 day 460.00 9.20
3 Helper (Electrical). 0.020 day 1 day 460.00 9.20
Labour Charges for each 29.90
a) Material
ELEC- glands for 3.5 core XLPE armoured 1.00 Nos 1 Nos 175.00 175.00
4.1.11F cable from 70 Sqmm to 150.0 Sq.mm
aluminium lugs for cable of 35 Sq.mm 1.00 Nos 1 Nos 20.00 20.00
ELEC-
4.1.13C

ELEC- aluminium lugs confirming to I.S 3.00 Nos 1 Nos 30.00 90.00
4.1.13E specifications for cable of 70 Sq.mm
285.00
Total Cost of Material + Labour 314.00
Charges
Over heads @13.615% 42.75
356.75
Rate per Each 357.00

30 Termination of UG cables of 3.5 core 95


Sq.mm including with required cable
glands, Lugs complete with all required
accessories as directed by the
department including cost and
conveyance of all materials and labour
charges etc., complete.

b) Labour charges
1 Skilled Electrician. 0.030 day 1 day 575.00 17.25
2 Lineman Electric / Telephone 0.030 day 1 day 460.00 13.80
3 Helper (Electrical). 0.030 day 1 day 460.00 13.80
Labour Charges for each 44.85
a) Material
glands for 3.5 core XLPE armoured 1.00 Nos 1 Nos 210.00 210.00
ELEC-
cable from 70 Sqmm to 150.0 Sq.mm
4.1.11G

aluminium lugs for cable of 50 Sq.mm 1.00 Nos 1 Nos 25.00 25.00
ELEC-
4.1.13D

ELEC- aluminium lugs for cable of 95 Sq.mm 3.00 Nos 1 Nos 35.00 105.00
4.1.13F
340.00
Total Cost of Material + Labour 384.00
Charges
Over heads @13.615% 52.28
436.28
Rate per Each 436.00

31 Termination of UG cables of 3.5 core 120


Sq.mm including with required cable
glands, Lugs complete with all required
accessories as directed by the
department including cost and
conveyance of all materials and labour
charges etc., complete.

b) Labour charges
1 Skilled Electrician. 0.030 day 1 day 575.00 17.25
2 Lineman Electric / Telephone 0.030 day 1 day 460.00 13.80
3 Helper (Electrical). 0.030 day 1 day 460.00 13.80
Labour Charges for each 44.85
a) Material
ELEC- glands for 3.5 core XLPE armoured 1.00 Nos 1 Nos 250.00 250.00
4.1.11H cable from 70 Sqmm to 150.0 Sq.mm
ELEC- aluminium lugs for cable of 70 Sq.mm 1.00 Nos 1 Nos 30.00 30.00
4.1.13E
aluminium lugs for cable of 120 Sq.mm 3.00 Nos 1 Nos 40.00 120.00
ELEC-
4.1.13G

400.00
Total Cost of Material + Labour 444.00
Charges
Over heads @13.615% 60.45
504.45
Rate per Each 504.00

32 Termination of UG cables of 3.5 core 150


Sq.mm including with required cable
glands, Lugs complete with all required
accessories as directed by the
department including cost and
conveyance of all materials and labour
charges etc., complete.

b) Labour charges
1 Skilled Electrician. 0.040 day 1 day 575.00 23.00
2 Lineman Electric / Telephone 0.030 day 1 day 460.00 13.80
3 Helper (Electrical). 0.030 day 1 day 460.00 13.80
Labour Charges for each 50.60
a) Material
ELEC- glands for 3.5 core XLPE armoured 1.00 Nos 1 Nos 450.00 450.00
4.1.11I cable from 70 Sqmm to 150.0 Sq.mm
ELEC- aluminium lugs for cable of 95 Sq.mm 1.00 Nos 1 Nos 35.00 35.00
4.1.13F
ELEC- aluminium lugs confirming to I.S 3.00 Nos 1 Nos 45.00 135.00
4.1.13H specifications for cable of 150 Sq.mm
620.00
Total Cost of Material + Labour 670.00
Charges
Over heads @13.615% 91.22
761.22
Rate per Each 761.00

33 Termination of UG cables of 3.5 core 185


Sq.mm including with required cable
glands, Lugs complete with all required
accessories as directed by the
department including cost and
conveyance of all materials and labour
charges etc., complete.

b) Labour charges
1 Skilled Electrician. 0.080 day 1 day 575.00 46.00
2 Lineman Electric / Telephone 0.080 day 1 day 460.00 36.80
3 Helper (Electrical). 0.080 day 1 day 460.00 36.80
Labour Charges for each 119.60
a) Material
ELEC- glands for 3.5 core XLPE armoured 1.00 Nos 1 Nos 550.00 550.00
4.1.11J cable for 185 Sqmm
ELEC- aluminium lugs for cable of 95 Sq.mm 1.00 Nos 1 Nos 35.00 35.00
4.1.13F
ELEC- aluminium lugs confirming to I.S 3.00 Nos 1 Nos 55.00 165.00
4.1.13I specifications for cable of 185 Sq.mm
750.00
Total Cost of Material + Labour 869.00
Charges
Over heads @13.615% 118.31
987.31
Rate per Each 987.00
34 Termination of UG cables of 3.5 core 240
Sq.mm including with required cable
glands, Lugs complete with all required
accessories as directed by the
department including cost and
conveyance of all materials and labour
charges etc., complete.

b) Labour charges
1 Skilled Electrician. 0.100 day 1 day 575.00 57.50
2 Lineman Electric / Telephone 0.100 day 1 day 460.00 46.00
3 Helper (Electrical). 0.100 day 1 day 460.00 46.00
Labour Charges for each 149.50
a) Material
ELEC- glands for 3.5 core XLPE armoured 1.00 Nos 1 Nos 650.00 650.00
4.1.11K cable for 240Sqmm
aluminium lugs for cable of 120 Sq.mm 1.00 Nos 1 Nos 40.00 40.00
ELEC-
4.1.13G

ELEC- aluminium lugs for cable of 240 Sq.mm 3.00 Nos 1 Nos 80.00 240.00
4.1.13J
930.00
Total Cost of Material + Labour 1079.00
Charges
Over heads @13.615% 146.91
1225.91
Rate per Each 1226.00

35 Termination of UG cables of 3.5 core 300


Sq.mm including with required cable
glands, Lugs complete with all required
accessories as directed by the
department including cost and
conveyance of all materials and labour
charges etc., complete.

b) Labour charges
1 Skilled Electrician. 0.100 day 1 day 575.00 57.50
2 Lineman Electric / Telephone 0.100 day 1 day 460.00 46.00
3 Helper (Electrical). 0.100 day 1 day 460.00 46.00
Labour Charges for each 149.50
a) Material
ELEC- glands for 3.5 core XLPE armoured 1.00 Nos 1 Nos 900.00 900.00
4.1.11L cable for 300Sqmm
ELEC- aluminium lugs for cable of 150 Sq.mm 1.00 Nos 1 Nos 45.00 45.00
4.1.13H
ELEC- aluminium lugs for cable of 300 Sq.mm 3.00 Nos 1 Nos 100.00 300.00
4.1.13K
1245.00
Total Cost of Material + Labour 1394.00
Charges
Over heads @13.615% 189.79
1583.79
Rate per Each 1584.00
36 Termination of UG cables of 3.5 core 400
Sq.mm including with required cable
glands, Lugs complete with all required
accessories as directed by the
department including cost and
conveyance of all materials and labour
charges etc., complete.

b) Labour charges
1 Skilled Electrician. 0.150 day 1 day 575.00 86.25
2 Lineman Electric / Telephone 0.150 day 1 day 460.00 69.00
3 Helper (Electrical). 0.200 day 1 day 460.00 92.00
Labour Charges for each 247.25
a) Material
glands for 3.5 core XLPE armoured 1.00 Nos 1 Nos 1200.00 1200.00
ELEC-
cable for 400 Sqmm
4.1.11M

ELEC- aluminium lugs for cable of 185 Sq.mm. 1.00 Nos 1 Nos 55.00 55.00
4.1.13I
ELEC- aluminium lugs confirming to I.S 3.00 Nos 1 Nos 170.00 510.00
4.1.13L specifications for cable of 400 Sq.mm
1765.00
Total Cost of Material + Labour 2012.00
Charges
Over heads @13.615% 273.93
2285.93
Rate per Each 2286.00

37 Supply,transporatation & installation of 1.00 Mtr 1 Mtr 600.00 600.00


300mm x 50mm x 1.6mm sizes of Hot
Dipped Galvanized Iron perforated cable
trays without cover, including horizontal
and vertical bends, reducers tees,cross
members and other accessories as
ELEC- required and duly suspended from the
4.2.1C ceiling/Wall with suspenders etc.,
complete
(NB:Add 30% Extra for perforated cable
tray with cover)

600.00
Over heads @13.615% 81.69
681.69 681.69
681.69
Hence Rate allowed 682.00

Telephone
38 Supply, Transportation and Run of 1 of 5
Pair, 0.5mm telephone copper wire
Makes : Finolex / Delton / Surabi /
Polycab in the existing cable tray/
conduit pipe and labour charges etc.,
complete.
Taking Output = 100 M
a) Material
Supply of 5 Pair telephone copper wire. 100 M 1 1 rmt 2500.00 2500
ELEC- Makes: Finolex / Delton / Surabi /
7.3.6 Polycab

b) Labour charges :
Skilled Electrician day 0.50 1 day 575.00 287.5
Semi Skilled Electrician day 1.00 1 day 471.00 471
Helpers day 0.50 1 day 460.00 230
Sundries LS 1 6
C) Cost for 100 RM 3494.5
Over heads @13.615% 475.78
Rate per Metre 3970.28
Rate per Meter 3970.28

39 2.1.5 Supply and fixing of Modular telephone


Jack with connector on modular box with
cover frame Makes : Makes: Legrand
Arteor / Schneider Zen celo/ Crabtree
Murano or Amare/L&T-englaze/ GM-
Zenova/Goldmedal(i-Push) in existing
consealed pipe wiring including cost and
coveyance of all material and all labour
charges etc., complete in N.R.B. / R.B.

1 a) Labour charges :
2 Lineman Electric / Telephone 0.050 day 1 day 460.00 23.00
Labour for 1 No 23.00
b) Material
ELEC- Supply of 1 or 2 Module box. 1.00 Nos 1 No 57.00 57.00
1.3.1a
ELEC- Supply of 1 or 2 Modular Cover Frame. 1.00 Nos 1 No 60.00 60.00
1.8.3a
ELEC- Supply of Modular socket type 1.00 Nos 1 No 90.00 90.00
1.8.1o Telephone jack with Connector.
Cost of Material 207.00
Total Cost of Material + Labour 230.00
Charges
Over heads @13.615% 31.31
261.31
Hence Rate allowed 261.00

40 Supply, Transportation and Run of 1 of


10 Pair, telephone copper wire in the
existing cable tray/ conduit pipe and
labour charges etc., complete. Makes :
Finolex / Delton / Surabi / Polycab.
b) Labour charges
1 Skilled Electrician. 0.50 day 1 day 575.00 287.50
2 Lineman Electric / Telephone 1.00 day 1 day 460.00 460.00
3 Helper (Electrical). 1.00 day 1 day 460.00 460.00
Labour for 100 Mtrs 1207.50
Labour for 1 Mtr 12.08
a) Material
ELEC- Supply of 10 Pair telephone Copper wire. 1.00 Mtrs 1 Mtrs 35.00 35.00
7.3.9
Cost of Material for 1 Mtrs 35.00
Total Cost of Material + Labour 47.00
Charges
Over heads @13.615% 6.40
53.40
Rate per Meter 54.00
41 Supply, Transportation and Run of 1 of
20 Pair, telephone copper wire in the
existing cable tray/ conduit pipe and
labour charges etc., complete. Makes :
Finolex / Delton / Surabi / Polycab.
b) Labour charges
1 Skilled Electrician. 0.50 day 1 day 575.00 287.50
2 Lineman Electric / Telephone 1.00 day 1 day 460.00 460.00
3 Helper (Electrical). 1.00 day 1 day 460.00 460.00
Labour for 100 Mtrs 1207.50
Labour for 1 Mtr 12.08
a) Material
ELEC- Supply of 20 Pair telephone Copper wire. 1.00 Mtrs 1 Mtrs 70.00 70.00
7.3.10
Cost of Material for 1 Mtrs 70.00
Total Cost of Material + Labour 82.00
Charges
Over heads @13.615% 11.16
93.16
Rate per Meter

42 Supply, Transportation and Run of 1 of


50 Pair, telephone copper wire in the
existing cable tray/ conduit pipe and
labour charges etc., complete. Makes :
Finolex / Delton / Surabi / Polycab.
b) Labour charges
1 Skilled Electrician. 0.50 day 1 day 575.00 287.50
2 Lineman Electric / Telephone 1.00 day 1 day 460.00 460.00
3 Helper (Electrical). 1.00 day 1 day 460.00 460.00
Labour for 100 Mtrs 1207.50
Labour for 1 Mtr 12.08
a) Material
ELEC- Supply of 50 Pair telephone Copper wire. 1.00 Mtrs 1 Mtrs 175.00 175.00
7.3.11
Cost of Material for 1 Mtrs 175.00
Total Cost of Material + Labour 187.00
Charges
Over heads @13.615% 25.46
Rate per Meter 212.46

43 Supply, Transportation and Run of 1 of


100 Pair raiser cable for telephone in
the existing cable tray/ conduit pipe and
labour charges etc., complete. Makes :
Finolex / Delton / Surabi / Polycab.

b) Labour charges
1 Skilled Electrician. 0.50 day 1 day 575.00 287.50
2 Lineman Electric / Telephone 1.00 day 1 day 460.00 460.00
3 Helper (Electrical). 1.00 day 1 day 460.00 460.00
Labour for 100 Mtrs 1207.50
Labour for 1 Mtr 12.08
a) Material
ELEC- 100 Pair raiser cable for telephone 1.00 Mtrs 1 Mtrs 350.00 350.00
7.3.8
Cost of Material for 1 Mtrs 350.00
Total Cost of Material + Labour 362.00
Charges
Over heads @13.615% 49.29
Rate per Meter 411.29

44 Supply anf fixing of 200 pair Telephone


distribution box with back mount frame,
krone connector, powder coated metal
body with lock and key arrangement.
Make:Krone
b) Labour charges
1 Skilled Electrician. 0.50 day 1 day 575.00 287.50
2 Lineman Electric / Telephone 1.00 day 1 day 460.00 460.00
Labour Charges 747.50
a) Material
Supply of 200 pair Telephone 1.00 No 1 Each 7160.00 7160.00
ELEC- distribution box with back mount frame,
7.3.15 krone connector, powder coated metal
body with lock and key arrangement.
Cost of Material for 1 Mtrs 7160.00
Total Cost of Material + Labour 7907.50
Charges
Over heads @13.615% 1076.61
Rate per Each 8984.11

45 Supply anf fixing of 100 pair Telephone


distribution box with back mount frame,
krone connector, powder coated metal
body with lock and key arrangement.
Make:Krone
b) Labour charges
1 Skilled Electrician. 0.15 day 1 day 575.00 86.25
2 Lineman Electric / Telephone 0.15 day 1 day 460.00 69.00
Labour Charges 155.25
a) Material
Supply of 100 pair MDF loaded with 2/10 1.00 No 1 Each 3330.00 3330.00
ELEC-
Modular.
7.3.7
Makes: Krone or its equivalent.
Cost of Material for 1 Mtrs 3330.00
Total Cost of Material + Labour 3485.25
Charges
Over heads @13.615% 474.52
Rate per Each 3959.77

46 Supply anf fixing of 50 pair Telephone


distribution box with back mount frame,
krone connector, powder coated metal
body with lock and key arrangement.
Make:Krone
b) Labour charges
1 Skilled Electrician. 0.15 day 1 day 575.00 86.25
2 Lineman Electric / Telephone 0.15 day 1 day 460.00 69.00
Labour Charges 155.25
a) Material
Supply of 50 pair Telephone distribution 1.00 No 1 Each 1875.00 1875.00
ELEC- box with back mount frame, krone
7.3.14 connector, powder coated metal body
with lock and key arrangement.
Cost of Material for 1 Mtrs 1875.00
Total Cost of Material + Labour 2030.25
Charges
Over heads @13.615% 276.42
2306.67
Rate per Each 2307.00

47 Supply anf fixing of 20 pair Telephone


distribution box with back mount frame,
krone connector, powder coated metal
body with lock and key arrangement.
Make:Krone
b) Labour charges
1 Skilled Electrician. 0.15 day 1 day 575.00 86.25
2 Lineman Electric / Telephone 0.15 day 1 day 460.00 69.00
Labour Charges 155.25
a) Material
Supply of 20 pair Telephone distribution 1.00 No 1 Each 900.00 900.00
ELEC- box with back mount frame, krone
7.3.13 connector, powder coated metal body
with lock and key arrangement.
Cost of Material for 1 Mtrs 900.00
Total Cost of Material + Labour 1055.25
Charges
Over heads @13.615% 143.67
1198.92
1199.00
Rate per Each

48 Supply anf fixing of 10 pair Telephone


distribution box with back mount frame,
krone connector, powder coated metal
body with lock and key arrangement.
Make:Krone
b) Labour charges
1 Skilled Electrician. 0.10 day 1 day 575.00 57.50
2 Lineman Electric / Telephone 0.10 day 1 day 460.00 46.00
Labour Charges 103.50
a) Material
Supply of 10 pair Telephone distribution 1.00 No 1 Each 590.00 590.00
ELEC- box with back mount frame, krone
7.3.12 connector, powder coated metal body
with lock and key arrangement.
Cost of Material for 1 Mtrs 590.00
Total Cost of Material + Labour 259.90
Charges
Over heads @13.615% 35.39
295.29
Rate per Each 296.00

49
Supply and laying of 10 pair, 0.5mm UG
telephone copper cable in the existing
trench with connections etc.,complete.
Makes: Polycab / Finolex / DELTON.

b) Labour charges
1 Skilled Electrician. 0.34 day 1 day 575.00 195.50
2 Lineman Electric / Telephone 1.00 day 1 day 460.00 460.00
3 Helper (Electrical). 0.34 day 1 day 460.00 156.40
Labour for 100 Mtrs 811.90
a) Material
Supply of 10 Pair telephone Copper wire. 100.00 Mtrs 1 Mtrs 35.00 3500.00
ELEC- Makes: Finolex / Delton / Surabi /
7.3.9 Polycab

Cost of Material for 100 Mtrs 3500.00


Total Cost of Material + Labour 4311.90
Charges
Over heads @13.615% 587.07
4898.97
Rate per meter 4899.00
Rate per Meter

50
Supply and laying of 20 pair, 0.5mm UG
telephone copper cable in the existing
trench with connections etc.,complete.
Makes: Polycab / Finolex / DELTON.

b) Labour charges
1 Skilled Electrician. 0.34 day 1 day 575.00 195.50
2 Lineman Electric / Telephone 1.00 day 1 day 460.00 460.00
3 Helper (Electrical). 0.34 day 1 day 460.00 156.40
Labour for 100 Mtrs 811.90
a) Material
Supply of 20 Pair telephone Copper wire. 100.00 Mtrs 1 Mtrs 70.00 7000.00
ELEC- Makes: Finolex / Delton / Surabi /
7.3.10 Polycab

Cost of Material for 100 Mtrs 7000.00


Total Cost of Material + Labour 7811.90
Charges
Over heads @13.615% 1063.59
Rate per meter 8875.49
Rate per Meter 8876.00
51
Supply and laying of 50 pair, 0.5mm UG
telephone copper cable in the existing
trench with connections etc.,complete.
Makes: Polycab / Finolex / DELTON.

b) Labour charges
1 Skilled Electrician. 0.34 day 1 day 575.00 195.50
2 Lineman Electric / Telephone 1.00 day 1 day 460.00 460.00
3 Helper (Electrical). 0.34 day 1 day 460.00 156.40
Labour for 100 Mtrs 811.90
Labour for 1 Mtr
a) Material
Supply of 50 Pair telephone Copper wire. 100.00 Mtrs 1 Mtrs 175.00 17500.00
ELEC- Makes: Finolex / Delton / Surabi /
7.3.11 Polycab.

Cost of Material for 1 Mtrs 183.12


Total Cost of Material + Labour 995.02
Charges
Over heads @13.615% 135.47
Rate per Meter 1130.49
52
Supply and laying of 100 pair, 0.5mm UG
telephone copper cable in the existing
trench with connections etc.,complete.
Makes: Polycab / Finolex / DELTON.

b) Labour charges
1 Skilled Electrician. 0.34 day 1 day 575.00 195.50
2 Lineman Electric / Telephone 1.00 day 1 day 460.00 460.00
3 Helper (Electrical). 0.34 day 1 day 460.00 156.40
Labour for 100 Mtrs 811.90
Labour for 1 Mtr
a) Material
Supply of 100 Pair raiser cable for 100.00 Mtrs 1 Mtrs 350.00 35000.00
ELEC- telephone
7.3.8 Makes: Finolex / Delton / Surabi /
Polycab.
Cost of Material for 1 Mtrs 35811.90
Total Cost of Material + Labour 358.12
Charges
Over heads @13.615% 48.76
406.88
Rate per Meter

LAN
53 Supply and termination of cat-6 RJ 45
out lets including dual face plate of
Makes:Systimax /AMP/ Panduit/
Siemond/ Molex/Legrand
a) Material
7.1.4c Supply installation testing and each 1 250.00 250
commisioning of 4 pair 23AWG Cat6
UTP ,flexible ,double ended patch cords
along with 2 nos of RJ 45 connectors
with strain relief boots Compatible to
T568A,T568Bspecifications including
making connections to information
outlets
Makes: Systimax /AMP/ Panduit/
Siemond/ Molex/Legrand

1 Nos
b) Labour charges :
Skilled Electrician. day 0.067 1 day 575.00 38.525
Lineman Electric / Telephone day 0.067 1 day 460.00 30.82
Helper (Electrical). day 0 1 day 460.00 0
Rate per each 319.00
Over heads @13.615% 43.43
Rate per Meter 362.43

54 Supply and laying of Cat 6 UTP cable


including all taxes etc complete.
Makes: Systimax /AMP/ Panduit/
Siemond/ Molex/Legrand
a) Material
Supply,laying ,testing and commisioning 100 M 1 3200 3200
of 4-pair, Cat6 Solid (Third party ETL
Intertek tested 600 MHZ above) to
support 1Gbps with Cross (+) filler pair
seperator & PVC sheath 23 AWG, UTP
Cable , Meets or exceeds ANSI/TIA-568-
C.2 and UL Listed &RoHS Compliant in
the existing raceways /pvc conduits
ELEC- including making connections to
7.1.1 information outlets and patch panels with
ferruling at both ends for identifiation with
necessary tools for punching stripping
crimping and testing required etc.,
complete
Makes: Systimax /AMP/ Panduit/
Siemond/ Molex/Legrand

1 rmt
b) Labour charges :
Skilled Electrician day 0.5 1 day 575.00 287.5
Lineman Electric / Telephone day 0.5 1 day 460.00 207
Helpers day 1 1 day 460.00 460
Sundries LS 1 3.25
C) Cost for 100 RM 4157.75
Over heads @13.615% 566.08
Rate per Meter 4723.83

55 Supply and Fixing of 24 port patch


panels etc., complete of
Makes: Systimax
/Legrand/Molex/Panduit/Siemond/AMP
a) Material
Supply , Installation, Testing and each 1 Nos 5500 5500
Comissioning of Rack
mounted 19", Cat 6 UTP,1.5-1.6 MM
CRS chasis ,
powder coated Modular Patch Panels
(upgradable to
intelligent panels with use of sensor
strips) with
collapsible shutters on jacks to support
latest
ELEC-
ammendments of TIA / EIA Cat 6
7.1.13d
Specifications in
Existing Communication Rack along with
necessory
connections of Cat 6 UTP Cables, With
Rear Cable
management trays and clamps.
Makes: Systimax
/Legrand/Molex/Panduit/Siemond/AMP

1
b) Labour charges :
Skilled Electrician day 0.3 1 day 575.00 172.5
Semi Skilled Electrician day 0.3 1 day 471.00 141.3
Cost for Each 5813.8
Over heads @13.615% 791.55
Rate per Meter 6605.35
116 Supply and Fixing of 24 port managable
switch etc., complete of Make :Cisco
Model SG350-28 or equivalent in
Juniper/Extreme
a) Material
Supply ,Installation ,Testing and each 1 Nos 13000 13000
Commissioning of Small Business 24
ELEC- port Gigabit Managed Switch , Make
7.1.16 :Cisco Model SG350-28 or equivalent in
Juniper/Extreme 1
b) Labour charges :
Skilled Electrician day 0.3 1 day 575.00 172.5
Lineman Electric / Telephone day 0.3 1 day 460.00 138
Cost for Each 13310.5
Over heads @13.615% 1812.22
Rate per Meter 15122.72

117 Supply and fixing of 6 U Floor / Wall


mounting net work Rack with power
spike including all accessories etc.,
complete.
Make: APW/HCL/Valrack/Netrack
a) Material
Supply , Installation, Testing and each 1 1 Nos 4680 4680
Comissioning of Wall
mounted Communication rack in two
sections viz rear
wall mount Section and hinged front
section with glass
doors, swing handles ,lock , Top and
Bottom Cable
entries,Supports for mounting rack on
wall , Cable
managers, Fan tray with 2 x 230 Volt
ELEC- fans, Equipment
7.1.14a mounting hardware, wire managers ,
power supply box
for supplying power to hubs, fans etc
along with earth
continuity kit, Mcb, indicator, moulded
power supply
cable, Blank panels , sliding shelves etc.
Make: APW/HCL/Valrack/Netrack

b) Labour charges :
Skilled Electrician day 0.3 1 day 575.00 172.5
Semi Skilled Electrician day 0.3 1 day 471.00 141.3
Cost for Each 4993.8
Rate per Each 4994.00

118 Supply and fixing of 9 U Floor / Wall


mounting net work Rack with power
spike including all accessories etc.,
complete.
Make: APW/HCL/Valrack/Netrack
a) Material
ELEC- 9 U Floor / Wall mounting net work Rack each 1 1 Nos 5500 5500
7.1.14b
b) Labour charges :
Skilled Electrician day 0.3 1 day 575.00 172.5
Lineman Electric / Telephone day 0.3 1 day 460.00 138
Cost for Each 5810.5
Over heads @13.615% 791.10
Rate per Meter 6601.60

119 Supply and fixing of 12 U Floor / Wall


mounting net work Rack with power
spike including all accessories etc.,
complete.
Make: APW/HCL/Valrack/Netrack
a) Material
ELEC- 12 U Floor / Wall mounting net work each 1 1 Nos 6460 6460
7.1.14c Rack
b) Labour charges :
Skilled Electrician day 0.3 1 day 575.00 172.5
Lineman Electric / Telephone day 0.3 1 day 460.00 138
Cost for Each 6770.5
Over heads @13.615% 921.80
Rate per Meter 7692.30

120 Supply and fixing of 15 U Floor / Wall


mounting net work Rack with power
spike including all accessories etc.,
complete.
Make: APW/HCL/Valrack/Netrack
a) Material
ELEC- 15 U Floor / Wall mounting net work each 1 1 Nos 7320 7320
7.1.14d Rack
b) Labour charges :
Skilled Electrician day 0.3 1 day 575.00 172.5
Lineman Electric / Telephone day 0.3 1 day 460.00 138
Cost for Each 7630.5
Over heads @13.615% 1038.89
Rate per Meter 8669.39

121 Supply and fixing of 22 U Floor / Wall


mounting net work Rack with power
spike including all accessories etc.,
complete.
Make: APW/HCL/Valrack/Netrack
a) Material
Supply , Installation, Testing and each 1 1 Nos 20500 20500
Comissioning of Floor
mounted Communication rack in two
sections viz rear
Steel Door and hinged front section with
glass doors,
swing handles ,lock on both doors, Top
and Bottom
Cable entries with gland plates ,Castor
with brakes , 7
no Cable managers, 1 no Fan tray with 2
x 230 Volt
fans, Equipment mounting hardware,
wire managers ,
ELEC- power supply box for supplying power to
7.1.15a hubs, fans etc
along with earth continuity kit, Mcb,
indicator, moulded
power supply cable, Blank panels of 1u /
2 u , sliding
shelves .Frame of communication rack
should be made
of heavy grade Aluminum profile PS grey
painted and
panels should be made from CRCA steel
18 swg RS
Beige painted .
Make: APW/HCL/Valrack/Netrack

b) Labour charges :
Skilled Electrician day 0.3 1 day 575.00 172.5
Lineman Electric / Telephone day 0.3 1 day 460.00 138
Cost for Each 20810.5
Over heads @13.615% 2833.35
Rate per Meter 23643.85
122 Supply and fixing of 42 U Floor / Wall
mounting net work Rack with power
spike including all accessories etc.,
complete of Make: Make:
APW/HCL/Valrack/Netrack
a) Material
Supply , Installation, Testing and each 1 1 Nos 41800 41800
Comissioning of Floor
mounted Communication rack in two
sections viz rear
Steel Door and hinged front section with
glass doors,
swing handles ,lock on both doors, Top
and Bottom
Cable entries with gland plates ,Castor
with brakes , 7
no Cable managers, 1 no Fan tray with 2
x 230 Volt
fans, Equipment mounting hardware,
wire managers ,
ELEC- power supply box for supplying power to
7.1.15d hubs, fans etc
along with earth continuity kit, Mcb,
indicator, moulded
power supply cable, Blank panels of 1u /
2 u , sliding
shelves .Frame of communication rack
should be made
of heavy grade Aluminum profile PS grey
painted and
panels should be made from CRCA steel
18 swg RS
Beige painted .
Make: APW/HCL/Valrack/Netrack

b) Labour charges :
Skilled Electrician day 0.3 1 day 575.00 172.5
Semi Skilled Electrician day 0.3 1 day 471.00 141.3
Cost for Each 42113.8
Over heads @13.615% 5733.79
Rate per Meter 47847.59

Street Lights
22 Supply, Transportation and fixing of 1 x
36/40 W fluorescent street light luminaire
with sheet alluminium housing and UV
stabilised acrylic cover with Electronic
ballast with all standard accessories
including 1.0 Mtr 25mm dia 'B' Class GI
pipe bracket, anti tilting MS flat, required
twin core wire including 40W tube and
connections etc., complete. Makes:
Phillips / Crompton / Bajaj / HPL/Surya

a) Labour charges
1 Skilled Electrician. 0.20 day 1 day 575.00 115.00
2 Lineman Electric / Telephone 0.20 day 1 day 460.00 92.00
3 Helper (Electrical). 0.20 day 1 day 460.00 92.00
Labour for 1 No 299.00
b) Material
Supply of 23 / 0060 twin core twisted / 2.00 Mtrs 100 Mtrs 950.00 19.00
flat heavy Copper wire.
ELEC- Makes: Finolex / Polycab / Havells / V-
1.5.6 Guard / Gold Medal / GM / Million / Vimal
/Airson/CRI/ Tamra/ ollvin/Avocab
ELEC- 25mm Nominal Bore Medium grade 1.00 Mtrs 1 Mtrs 245.00 245.00
8.4.17 G.I.Pipe.
Pipe bending charges LS 20.00
M.S flat and welding charges LS 20.00
Supply of 1X36W fluorescent street light 1 Nos 1 Nos 1150.00 1150.00
luminaire with sheet alluminium housing
and UV stabilised acrylic cover with
ELEC- Electronic ballast and all standard
3.1.1 accessories etc.
Makes: Phillips / Crompton / Bajaj /
HPL/Surya

Supply of 36/40W fluorescent tube. 1 Nos 1 Nos 40.00 40.00


ELEC-
Makes: Phillips / Crompton / Bajaj /
3.7.3
Surya / Style Lamp / Capart
Cost of Material for 1 No 1494.00
Total Cost of Material + Labour 1793.00
Charges
Over heads @13.615% 244.12
Rate per Meter 2037.12

23 Supply, Transportation and fixing of


Integral 150 W MH Street light luminaire
integral with pressure diecast alluminium
housing having pot optics with IP66
protection with all standard accessories
including 150W MH lamp and fixing of
luminaire on wall with 1.0Mt 40mm dia
GI pipe bracket and anti-tilting
arrangements,required twin core wire
including masonary work and all labour
charges and giving connections etc.,
complete. Makes: Phillips / Crompton /
Bajaj / Surya / Venture / Halonix

a) Labour charges
1 Skilled Electrician. 0.25 day 1 day 575.00 143.75
2 Lineman Electric / Telephone 0.25 day 1 day 460.00 115.00
3 Helper (Electrical). 0.25 day 1 day 460.00 115.00
Labour for 1 No 373.75
b) Material
Supply of 36/0.3mm (2.5 Sqmm)FRLS / 4.00 Mtrs 100 Mtrs 2440.00 97.60
HFFR / ZHFR PVC insulated 1100V
ELEC- grade as per IS : 694 / 1990 specification
1.5.1c for Copper cable.
Makes: Finolex / RR kabel / Havells /KEI

ELEC- 40mm Nominal Bore Medium grade 1.00 Mtrs 1 Mtr 350.00 350.00
8.4.17d G.I.Pipe.
Pipe bending charges LS 40.00
M.S flat and welding charges LS 50.00
Supply of 150W Street light luminaire 1 Nos 1 Nos 3800.00 3800.00
integral with pressure diecast alluminium
housing having pot optics with IP66
ELEC- protection with all standard accessories
3.1.3b etc.
Makes: Phillips / Crompton / Bajaj /
Surya / Venture / Halonix

Supply of 150W Lamp with ISI mark. 1 Nos 1 Nos 800.00 800.00
ELEC-
Makes: Phillips / Osram / Crompton /
3.4.1g
Bajaj / Surya / Venture / Halonix/HPL.
Cost of Material for 1 No 5137.60
Total Cost of Material + Labour 5512.00
Charges
Over heads @13.615% 750.46
Rate per Meter 6262.46

24 Supply, Transportation and fixing of 60 W


LED Street light Luminaire made of
pressure diecast alluminium body with
powder coated, having protective
toughned glass, Supply Input voltage
120 - 270 V AC, P.F > 0.90, high power
LED's having System efficacy > 110
lm/W and junction temprature < 70°C,
with Ingrees protection IP66, Luminaire
performance complies to IS 10322 (Part
5 / Sec-3), Driver surge protection 4KV,
external Surge protection 10 KV with
optics distribution , THD<10% at 110
Volts AC, driver efficiency >90%, CCT:
3000K - 5700K, minimum CRI>70, etc.,
complete
a) LUMINAIRE MAKE : Wipro / Philips
(Green line) / GE-Venture /
Crompton(Hawk) / Bajaj (Edge+) /
Halonix(Lumos - Super) / Havells
(Endura Pearl)
/Capart(Premium)/Keselec/HPL/Jaquar
b) LED MAKE : PHILIPS LUMILEDS /
CREE / NICHIA / OSRAM / SAMSUNG /
LG and fixing of luminaire on wall with
1.0Mt 40mm dia GI pipe bracket and
anti-tilting arrangements, 1.5 Sq.mm
flexible copper cable including masonary
work and all labour charges and giving
connections etc., complete.
a) Labour charges
1 Skilled Electrician. 0.25 day 1 day 575.00 143.75
2 Lineman Electric / Telephone 0.25 day 1 day 460.00 115.00
3 Helper (Electrical). 0.25 day 1 day 460.00 115.00
Labour for 1 No 373.75
b) Material
Supply of 36/0.3mm (2.5 Sqmm)FRLS / 4.00 Mtrs 100 Mtrs 2440.00 97.60
HFFR / ZHFR PVC insulated 1100V
ELEC- grade as per IS : 694 / 1990 specification
1.5.1c for Copper cable.
Makes: Finolex / RR kabel / Havells /KEI

ELEC- 40mm Nominal Bore Medium grade 1.00 Mtrs 1 Mtr 350.00 350.00
8.4.17d G.I.Pipe.
Pipe bending charges LS 40.00
M.S flat and welding charges LS 50.00
Cost of Material for fixing luminaire 537.60
Supply and transportation of 60W LED 1 Nos 1 Nos 5900.00 5900.00
Street light Luminaire made of pressure
diecast alluminium body with powder
coated, having protective toughned
glass, Supply Input voltage 120 - 270 V
AC, P.F > 0.90, high power LED's having
System efficacy > 110 lm/W and junction
temprature < 70°C, with Ingrees
protection IP66, Luminaire performance
complies to IS 10322 (Part 5 / Sec-3),
Driver surge protection 4KV, external
Surge protection 10 KV with optics
distribution , THD<10% at 110 Volts AC,
driver efficiency >90%, CCT: 3000K -
ELEC- 5700K, minimum CRI>70, etc.,
3.8.23d complete
a) LUMINAIRE MAKE : Wipro / Philips
(Green line) / GE-Venture /
Crompton(Hawk) / Bajaj (Edge+) /
Halonix(Lumos - Super) / Havells
(Endura Pearl)
/Capart(Premium)/Keselec/HPL/Jaquar
b) LED MAKE : PHILIPS LUMILEDS /
CREE / NICHIA / OSRAM / SAMSUNG /
LG

Cost of Material for 1 No 5900.00


Total Cost of Material + Labour 6437.60
Charges
Over heads @13.615% 876.48
Rate per Meter 7314.08

126 Supply, Transportation and fixing of 90 W


LED Street light Luminaire made of
pressure diecast alluminium body with
powder coated, having protective
toughned glass, Supply Input voltage
120 - 270 V AC, P.F > 0.90, high power
LED's System efficacy >110 lm/W and
junction temprature < 70°C, with Ingrees
protection IP66, Luminaire performance
complies to IS 10322 (Part 5 / Sec-3),
Driver surge protection 4KV, external
Surge protection 10 KV with optics
distribution , THD<10% at 110 Volts AC,
driver efficiency >90%, CCT: 3000K -
5700K, minimum CRI>70, etc.,
complete .

a) Luminaire Make : Wipro / Philips


(Greenline Extra) / GE-Venture /
Crompton(Hawk-II) / Bajaj (Edge+) /
Halonix (Modular/ Lumos-Super) /
Havells (Endura City liner Neo)
/Capart(Premium) /Keselec / HPL/Jaquar

b) LED MAKE :PHILIPS LUMILEDS /


CREE / NICHIA / OSRAM / SAMSUNG /
LG. and fixing of luminaire on wall with
1.0Mt 40mm dia GI pipe bracket and
anti-tilting arrangements, 1.5 Sq.mm
flexible copper cable including masonary
work and all labour charges and giving
a) Labour charges
1 Skilled Electrician. 0.25 day 1 day 575.00 143.75
2 Lineman Electric / Telephone 0.25 day 1 day 460.00 115.00
3 Helper (Electrical). 0.25 day 1 day 460.00 115.00
Labour for 1 No 373.75
b) Material
Supply of 36/0.3mm (2.5 Sqmm)FRLS / 4.00 Mtrs 100 Mtrs 2440.00 97.60
HFFR / ZHFR PVC insulated 1100V
ELEC- grade as per IS : 694 / 1990 specification
1.5.1c for Copper cable.
Makes: Finolex / RR kabel / Havells /KEI

ELEC- 40mm Nominal Bore Medium grade 1.00 Mtrs 1 Mtr 350.00 350.00
8.4.17d G.I.Pipe.
Pipe bending charges LS 40.00
M.S flat and welding charges LS 50.00
Cost of Material for fixing luminaire 537.60
Supply and transportation of 90W LED 1 Nos 1 Nos 9200.00 9200.00
Street light Luminaire made of pressure
diecast alluminium body with powder
coated, having protective toughned
glass, Supply Input voltage 120 - 270 V
AC, P.F > 0.90, high power LED's
System efficacy >110 lm/W and junction
temprature < 70°C, with Ingrees
protection IP66, Luminaire performance
complies to IS 10322 (Part 5 / Sec-3),
Driver surge protection 4KV, external
Surge protection 10 KV with optics
distribution , THD<10% at 110 Volts AC,
driver efficiency >90%, CCT: 3000K -
ELEC- 5700K, minimum CRI>70, etc.,
3.8.24a complete .

a) Luminaire Make : Wipro / Philips


(Greenline Extra) / GE-Venture /
Crompton(Hawk-II) / Bajaj (Edge+) /
Halonix (Modular/ Lumos-Super) /
Havells (Endura City liner Neo)
/Capart(Premium) /Keselec / HPL/Jaquar

b) LED MAKE :PHILIPS LUMILEDS /


CREE / NICHIA / OSRAM / SAMSUNG /
LG.

Cost of Material for 1 No 9737.60


Total Cost of Material + Labour
Charges

Rate per Each


Split Airconditioners
Supply, transportation and installation of
split AC unit with high wall mounted
indoor unit and outdoor condencing unit
Hermetically sealed compressor suitable
for operation on 230V, 50Hz, 1Phase AC
supply capable of performing cooling
dehumidifying air circulating and filtering
with cooling and condensing units with
3.5 mts of copper piping, insulation kit
and 4 mts of 3 core copper flexible
chord , built-in stabilizer (Voltage range
160- 264 volts) and cordless remote
control.

( 1.5 TR 3 STAR)
127 a) 1.5 Ton ( 3 STAR)
Make: Mitsubishi SRIC18CS-S6
1.5 TR 3 Star capable of delivering 1 Nos 1 Each 41500 41500.00
18000 BTU / hr and above with operating
ELEC- on refrigerant R-32 / R-410A Makes:
5.5.1b Toshiba RAS18S3KS / Blue Star VA or
VC series / Daikin FTE-M or N Sereis /
Hitachi / Voltas / Carrier Superia.
ELEC- Installation charges
5.9.30 1600.00
Transportation @ 2% 830.00
LS for Hard ware etc.,
Rate per each 43930
43930.00
Over heads @13.615% 5981.07
Rate per Meter 49911.07

( 1.5 TR 3 STAR)
128 1.5 TR 3 Star capable of delivering
18000 BTU/hr and above with operating
on refrigerant R-32/ R-410A. Makes:
Mitsubishi MS-H18VA / O General
ASGA18FETA
ELEC- 1.5 Ton ( 3 star rates) 1 Nos 1 Each 44500 44500.00
5.5.1a
ELEC- Installation charges
5.9.30 1600.00
Transportation @ 2% 890.00
LS for Hard ware etc.,
Rate per each 46990
46990.00
Over heads @13.615% 6397.69
Rate per Meter 53387.69
( 1.5 TR 5 STAR)

129 1.5 TR 5 Star capable of delivering


18000 BTU/hr and above with operating
on refrigerant R-32/ R-410A Makes:
Toshiba RAS18S3KPS / Daikin / Blue
Star 5HW12SBU / Hitachi / Voltas /
Carrier Superia.
ELEC- 1.5 Ton ( 5 star rates) 1 Nos 1 Each 48500 48500.00
5.5.2e
ELEC- Installation charges
5.9.30 1600.00
Transportation @ 2% 970.00
LS for Hard ware etc.,
Rate per each 51070
Over heads @13.615% 6953.18
Rate per Meter 58023.18

( 1.5 TR 5 STAR)
130 1.5 TR 5 Star capable of delivering
18000 BTU/hr and above with operating
on refrigerant R-32/ R-410A Makes:
Mitsubishi MS-GK18VA / O General
ASGA18FTTA
ELEC- 1.5 Ton ( 5 star rates) 1 Nos 1 Each 48500 48500.00
5.5.2e
ELEC- Installation charges
5.9.30 1600.00
Transportation @ 2% 970.00
LS for Hard ware etc.,
Rate per each 51070
Over heads @13.615% 6953.18
58023.18
Rate per each 58023.00

( 2.0 TR 3 STAR)
131 2.0 TR 3 Star capable of delivering
24000 BTU/ hr and above with operating
on refrigerant R-32 / R-410A
Makes: Toshiba RAS24S3KS / Hitachi /
Blue Star / Daikin / Voltas / Carrier
Superia.
ELEC- 2.0 Ton ( 3 star rates) 1 Nos 1 Each 45500 45500.00
5.5.1d
ELEC- Installation charges
5.9.30 1600.00
Transportation @ 2% 910.00
LS for Hard ware etc.,
Rate per each 48010
48010.00
Over heads @13.615% 6536.56
Rate per Meter 54546.56

132 2.0 TR 3 Star capable of delivering


24000 BTU/ hr and above with operating
on refrigerant R-32 / R-410A
Makes: Mitsubishi MS-HK24VA / O
General ASGA24FETA
ELEC- 2.0 Ton ( 3 star rates) 1 Nos 1 Each 51500 51500.00
5.5.1c
ELEC- Installation charges
5.9.30 1600.00
Transportation @ 2% 1030.00
LS for Hard ware etc.,
Rate per each 54130
54130.00
Over heads @13.615% 7369.80
Rate per Meter 61499.80
( 2.0 TR 5 STAR)
133 2.0 TR 5 Star capable of delivering
24000 BTU/ hr and above with operating
on refrigerant R-32 / R-410A
Makes: Toshiba RAS24S3KPS / Blue
star 5HW24AAX1 / Hitachi / Daikin.
ELEC- 2.0 Ton ( 5 star rates) 1 Nos 1 Each 59000 59000.00
5.5.2j
ELEC- Installation charges
5.9.30 1600.00
Transportation @ 2% 1180.00
LS for Hard ware etc.,
Rate per each 61780
Over heads @13.615% 8411.35
Rate per each 70191.35

134 2.0 TR 5 Star capable of delivering


24000 BTU/ hr and above with operating
on refrigerant R-32 / R-410A
Makes: Mitsubishi MS-GK24VA / O
General ASG24FTTA
ELEC- 2.0 Ton ( 5 star rates) 1 Nos 1 Each 66500 66500.00
5.5.2i
ELEC- Installation charges
5.9.30 1600.00
Transportation @ 2% 1330.00
LS for Hard ware etc.,
Rate per each 69430
Over heads @13.615% 9452.89
Rate per each 78882.89

Stabilizers
135 Supply and erecting fully automatic line
voltage stabilizer for operation on input
voltage 200 to 250V. rated for 3 KVA
maximum load and time delay model with
3 core flexible chord and 3 pin 6/16A
plug top suitable for refrigerator for
continuous operation including cost and
conveyance of all mateials and all labour
charges etc., complete. Makes: V-Guard
/ Real Guard / Uni Stab / ITL.

a) Material
ELEC- 3 KVA Stabilizer 1 each 2000 2000.00
5.8.1c No 1
b) Labour Charges
Skilled Electrician 0.1 day 1 day 575.00 57.50
Helper 0.1 day 1 day 460.00 46.00
Transportation Charges on Unit Cost 2% 40.00
Rate per Each 2144
Over heads @13.615% 291.84
Hence Rate allowed 2435.34
136 Supply and erecting fully automatic line
voltage stabilizer for operation on input
voltage 200 to 250V. rated for 4 KVA
maximum load and time delay model with
3 core flexible chord and 3 pin 6/16A
plug top suitable for refrigerator for
continuous operation including cost and
conveyance of all mateials and all labour
charges etc., complete. Makes: V-Guard
/ Real Guard / Uni Stab / ITL.

a) Material
ELEC- 4 KVA Stabilizer 1 each 2700 2700.00
5.8.1d No 1
b) Labour Charges
Skilled Electrician 0.1 day 1 day 575.00 57.50
Helper 0.1 day 1 day 460.00 46.00
Transportation Charges on Unit Cost 2% 54.00
Over heads @13.615% 7
61.35
Hence Rate allowed 61.00

137 Supply and erecting fully automatic line


voltage stabilizer for operation on input
voltage 200 to 250V. rated for 5 KVA
maximum load and time delay model with
3 core flexible chord and 3 pin 6/16A
plug top suitable for refrigerator for
continuous operation including cost and
conveyance of all mateials and all labour
charges etc., complete. Makes: V-Guard
/ Real Guard / Uni Stab / ITL.

a) Material
ELEC- 5 KVA Stabilizer 1 each 3300 3300.00
5.8.1e No 1
b) Labour Charges
Skilled Electrician 0.1 day 1 day 575.00 57.50
Helper 0.1 day 1 day 460.00 46.00
Transportation Charges on Unit Cost 2% 66.00
Rate per Each 3470
Over heads @13.615% 472.37
Hence Rate allowed 3941.87

Asst. Exe. Engineer Dy. Executive Engineer 0


RWS&S, B.kothakota RWS&S Subdivision, Thamballapalli 0
DOORS DATA

Name of the Work

1 Supply and Fixing of 18guage MS Plain sheet Door of size 1.22 x 2.13 mts with
outer angular frame of rolled steel equal angle 40 x 40 x 6m and inner shutter
angular frame rolled steel equal angle 32 x 32 x 4 mm with Double leaf shutter,MS
Flats 25x5mm-6Nos for Horizontal ( 3 Nos for each shutter )to the Door MS Aldrop
300 mm long-2No , MS Tower bolt 150mm long-2Nos,MS Hinges 150mm long-
6Nos. MS 125mm Handles- 2 No and 6 Nos of MS Hold fasts 230mm long with
primary coat of Red oxide paint including cost,conveyance of all materials to site
,sales and other taxes on all materials and labour charges etc complete.

Area 1.22 x 2.13 2.60 Sqm


(A) Outer Angle Frame 40 x 40 x 6mm

Horizontal 1 x 2 1.22 2.44


Vertical 1 x 2 2.13 4.26
Hold fasts 1 x 6 0.23 1.38
8.08
Weight 8.08 3.50 Kg/1Rm 28.28 Kg
(B) Inner angle frame 32 x 32 x 4 mm

Horizontal 1 x 2 1.17 2.34


Vertical 1 x 4 2.08 8.32
10.66
Weight 10.66 2.50 26.65 Kg
Total 54.93 Kg
0.00 Kg
Total (A) + (B) 54.93 Kg

(c) 25X 5 mm Flat


1 x 6 0.55 3.30
Weight at 0.98 kg/rm 3.23 Kg
Total 3.23 Kg
0.00 Kg
Total (C) 3.23 Kg

(D) 18 Guage MS Sheet 1 x 2 0.59 2.08

Weight of the Sheet 2.45 9.80 Kg/1sqm 24.05 Kg


0.00 Kg
24.05 Kg

DATA
54.93 Kg Cost of Angular 35.57 1 Kg 1953.63
3.23 Kg Cost of Flats (C) 36.57 1 Kg 118.25
24.05 Kg Cost of 18 Gauge MS Sheet 40.07 1 Kg 963.71
82.22 Kg Fabrication Charges BMM-V.14 27.00 1 Kg 2219.86
82.22 Kg Fixing Charges BMM-V.15 5.00 1 Kg 411.09
2 No. MS Aldrop 300mm long (BMT-G.45) 154.00 1 No. 308.00
2 Nos. MS Tower Blt 150mm long ( BMT-G.15) 35.00 1 No. 70.00
6 Nos. MS Hinges 150mm long (BMT-G.30) 39.00 1 No. 234.00
2 Nos. MS Handle 125mm long (BMT-G.35) 32.00 1 No. 64.00
5.20 sqm Cost of Red Oxide Painting 38.83 1 sqm 201.81
Total 6544.35
Add Overheads & Contractors Profit @13.615% 0.000% 0.00
Rate of Door 6544.35
Say 6544.35

2 Supply and Fixing of 18guage MS Plain sheet Door of size 1.00 x 2.13 mts with
outer angular frame of rolled steel equal angle 40 x 40 x 6m and inner shutter
angular frame rolled steel equal angle 35 x 35 x 5 mm with Double leaf shutter,MS
Flats 25x5mm-6Nos for Horizontal to the Door MS Aldrop 300 mm long-2No MS
Tower bolt 150mm long-2Nos,MS Hinges 150mm long-6Nos. MS 125mm Handle- 2
No and 6 Nos of MS Hold fasts 230mm long with primary coat of Red oxide paint
including cost,conveyance of all materials to site ,sales and other taxes on all
materials and labour charges etc complete

Area 1.00 x 2.13 2.13 Sqm


(A) Outer Angle Frame 40 x 40 x 6mm

Horizontal 1 x 2 1.00 2.00


Vertical 1 x 2 2.13 4.26
Hold fasts 1 x 6 0.23 1.38
7.64
Weight 7.64 3.50 Kg/1Rm 26.74 Kg

(B) Inner angle frame 35 x 35 x 5 mm

Horizontal 1 x 2 0.97 1.94


Vertical 1 x 4 2.08 8.32
10.26
Weight 10.26 2.60 Kg/1Rm 26.68 Kg
Total 53.42 Kg
0.00 Kg
Total (A) + (B) 53.42 Kg

(C) 25X 5 mm Flat


1 x 6 0.48 2.88
Weight 2.88 at 0.98 kg/rm 2.82 Kg
Total 2.82 Kg
0.00 Kg
Total (C) 2.82 Kg

(D) 18 Guage MS Sheet 1 x 1 0.97 2.08

Weight of the Sheet 2.02 9.8 19.80 Kg


0.00 Kg
19.80 Kg

DATA
53.42 Kg Cost of Angular 35.57 1 Kg 1899.78
2.82 Kg Cost of Flats (C) 36.57 1 Kg 103.20
19.80 Kg Cost of 18 Gauge MS Sheet 40.07 1 Kg 793.14
76.03 Kg Fabrication Charges BMM-V.14 27.00 1 Kg 2052.93
76.03 Kg Fixing Charges BMM-V.15 5.00 1 Kg 380.17
2 No. MS Aldrop 300mm long (BMT-G.45) 154.00 1 No. 308.00
2 Nos. MS Tower Blt 150mm long ( BMT-G.15) 35.00 1 No. 70.00
6 Nos. MS Hinges 150mm long (BMT-G.30) 39.00 1 No. 234.00
2 Nos. MS Handle 125mm long (BMT-G.35) 32.00 1 No. 64.00
4.26 sqm Cost of Red Oxide Painting 38.83 1 sqm 165.42
Total 6070.65
Add Overheads & Contractors Profit @13.615% 0.000% 0.00
Rate of Door 6070.65
Say 6070.65

Asst. Exe. Engineer Dy. Executive Engineer 0


RWS&S, B.kothakotaRWS&S Subdivision, Thamballapalli 0
Standard Data - Electrical Items For Buildings
Specific
ation Description Unit Quantity Rate Rs. Amount Rs.
No.
1 2 3 4 5 6
1 MS / PVC / Trunks Coduit Laying
1.1 M.S.CONDUIT (Surface)
1.1.1 Supply and Fixing of 20mm dia 16 SWG (ISI Mark)
MS Surface conduit pipe duly threading at Joints
with all required accessories fixing on T.W.
Separators with chromium plated base saddles and
No.18 SWG MS box for light, fan and separate plug
points including cost of Cement, all materials,
accessories and all labour charges etc., complete.

Taking Output = 100 M


a) Material
20mm dia 16 SWG MS conduit 100 M 1
T.W seperators 100 Nos 2
30mm Screws No.8 100 Nos 2
Rawal Plugs 100 Nos 2
12mm Screws 100 Nos 4
20mm Saddles MS 100 Nos 2
20mm 1,2,3 & 4 way Junction box Dozen 1
20mm dia HG bends Dozen 1
200mm x 250mm sheet metal deep box Each 3
Cement (As per civil SSR) kg 12.5
b) Labour charges :
Skilled Electrician day 3
Semi skilled Electrician day 3
Helpers day 3
Sundries
C) Cost for 100 RM
Rate per Metre = C/100
1.1.2 Supply and Fixing of 25mm dia 16 SWG (ISI MARK)
MS Surface pipe duly threading at Joints with all
required accessories fixing on T.W. Seperators with
chromium plated base saddles and No.18 SWG MS
box for run of mains including cost of Cement, all
materials, accessories and all labour charges etc.,
complete.

Taking Output = 100 M


a) Material
25mm dia 16 SWG MS conduit 100 M 1
T.W seperators 100 Nos 1.5
38mm Screws No.8 100 Nos 1.5
Rawal Plugs 100 Nos 1.5
12mm Screws 100 Nos 3
25mm Saddles MS 100 Nos 1.5
25mm 1,2,3 & 4 way Junction box Dozen 0.5
25mm dia HG bends Dozen 1
Cement (As per civil SSR) kg 12.5
b) Labour charges :
Skilled Electrician day 3
Semi skilled Electrician day 3
Helpers day 3
Sundries
C) Cost for 100 RM
Rate per Metre = C/100
1.1.3 Supply and Fixing of 32mm dia 16 SWG (ISI MARK)
MS Surface pipe duly threading at Joints with all
required accessories fixing on T.W. Seperators with
chromium plated base saddles and No.18 SWG MS
box for run of mains including cost of Cement, all
materials, accessories and all labour charges etc.,
complete.

Unit = 1Metre
Taking Output = 100 M
a) Material
32mm dia 16 SWG MS conduit 100 M 1
T.W seperators 100 Nos 1.5
38mm Screws No.8 100 Nos 1.5
Rawal Plugs 100 Nos 1.5
12mm Screws 100 Nos 3
32mm Saddles MS 100 Nos 1.5
32mm 1,2,3 & 4 way Junction box Dozen 0.5
32mm dia HG bends Dozen 1
Cement (As per civil SSR) kg 12.5
b) Labour charges :
Skilled Electrician day 3
Semi skilled Electrician day 3
Helpers day 3
Sundries
C) Cost for 100 RM
Rate per Metre = C/100
1.2 MS Conduit Concealed
1.2.1 Supply and Fixing of 20mm dia 16 SWG (ISI Mark)
MS concealed conduit, duly threadig at Joints, on
wall with required accessories including chiselling
the wall for light, Fan and separate plug point
including necessary sheet metal deep boxes,
masonsary work and all labour charges etc.
complete.

Taking Output = 100 M


a) Material
20mm dia 16 SWG MS conduit pipe 100 M 1
U' Nails 100 Nos 2
200mm x 250mm sheet metal deep box Each 3
20mm HG bends Dozen 1
Cement kg 12.5
b) Labour charges :
Skilled Electrician day 3
Semi skilled Electrician day 3
Helpers day 3
Mason Ist class day 3
Sundries
C) Cost for 100 RM
Rate per Metre = C/100
1.2.2 Supply and Fixing of 25mm dia 16 SWG (ISI MARK)
MS concealed conduit, duly threadig at Joints in
Slab and on wall with required accessories including
chiselling the wall and necessary Masonary and all
labour charges etc. complete for run of mains.

Taking Output = 100 M


a) Material
25mm dia 16 SWG MS conduit pipe 100 M 1
U' Nails 100 Nos 2
25 mm Deep Junction Box Dozen 1
25mm HG bends Dozen 1
Cement kg 50
b) Labour charges :
Skilled Electrician day 3
Semi skilled Electrician day 3
Helpers day 3
Mason Ist class day 3
Sundries
C) Cost for 100 RM
Rate per Metre = C/100
1.2.3 Supply and Fixing of 32mm dia 16 SWG (ISI Mark)
MS concealed conduit, duly threadig at Joints in
Slab and on wall with required accessories including
chiselling the wall and necessary Masonary and all
labour charges etc. complete for run of mains.

Taking Output = 100 M


a) Material
32mm dia 16 SWG MS conduit pipe 100 M 1
U' Nails 100 Nos 2
32 mm Deep Junction Box Dozen 1
32mm HG bends Dozen 1
Cement kg 50
b) Labour charges :
Skilled Electrician day 3
Semi skilled Electrician day 3
Helpers day 3
Mason Ist class day 3
Sundries
C) Cost for 100 RM
Rate per Metre = C/100
NOTE : For Laying MS Concealed Conduit pipe in roof Slab,
1.3 deduct the Cost of
P.V.C. Conduit Cement and U' Nails.
(Surface)
1.3.1 Supply and Fixing of 20mm dia 1.5mm thick surface P.V.C.
pipe (ISI MARK) with all accessories fixing on chromium
plated metallic base saddles and decolam board for
switches for Light, Fan and separate plug point including all
labour charges etc., complete.

Taking Output = 100 M


a) Material
20mm dia 1.5mm thick PVC pipe 100 M 1
Rawl Plugs 100 Nos 2
35mm Screws 100 Nos 2
Chromium Plated saddles with base Each 200
20mm 1,2,3, & 4 way Junction boxes Each 12
20mm PVC Bends Each 12
8" x10" Decolam Board Each 3
Cement kg 25
b) Labour charges :
Skilled Electrician day 2
Semi skilled Electrician day 2
Helpers day 2
Sundries
C) Cost for 100 RM
Rate per Metre = C/100
1.3.2 Supply and Fixing of 25mm dia 1.5mm thick surface P.V.C.
pipe (ISI MARK) with all accessories fixing on chromium
plated metallic base saddles including all labour charges
etc., complete for run of mains.

Taking Output = 100 M


a) Material
25mm dia 1.5mm thick PVC pipe 100 M 1
Rawl Plugs 100 Nos 2
35mm Screws 100 Nos 2
Chromium Plated saddles with base Each 200
25mm 1,2,3, & 4 way Junction boxes Each 12
25mm PVC Bends Each 12
Cement kg 25
b) Labour charges :
Skilled Electrician day 2
Semi skilled Electrician day 2
Helpers day 2
Sundries
C) Cost for 100 RM
Rate per Metre = C/100
1.3.3 Supply and Fixing of 32mm dia 2mm thick surface P.V.C.
pipe (ISI Mark) with all accessories fixing on chromium
plated metallic base saddles including all labour charges
etc., complete for run of mains

Taking Output = 100 M


a) Material
32mm dia 1.5mm thick PVC pipe 100 M 1
Rawl Plugs 100 Nos 2
35mm Screws 100 Nos 2
Chromium Plated saddles with base Each 200
32mm 1,2,3, & 4 way Junction boxes Each 12
32mm PVC Bends Each 12
Cement kg 25
b) Labour charges :
Skilled Electrician day 2
Semi skilled Electrician day 2
Helpers day 2
Sundries
C) Cost for 100 RM
Rate per Metre = C/100
1.3.4 Supply and Fixing of 40mm dia 2mm thick surface P.V.C.
pipe (ISI MARK) with all accessories fixing on chromium
plated metallic base saddles including all labour charges
etc., complete for run of mains.

Taking Output = 100 M


a) Material
40mm dia 1.5mm thick PVC pipe 100 M 1
Rawl Plugs 100 Nos 2
35mm Screws 100 Nos 2
Chromium Plated saddles with base Each 200
40mm 1,2,3, & 4 way Junction boxes Each 12
40mm PVC Bends Each 12
Cement kg 25
b) Labour charges :
Skilled Electrician day 2
Semi skilled Electrician day 2
Helpers day 2
Sundries
C) Cost for 100 RM
Rate per Metre = C/100
1.3.5 Supply and Fixing of 50mm dia 2mm thick surface P.V.C.
pipe (ISI MARK) with all accessories fixing on chromium
plated metallic base saddles including all labour charges
etc., complete for run of mains.

Taking Output = 100 M


a) Material
50mm dia 1.5mm thick PVC pipe 100 M 1
Rawl Plugs 100 Nos 2
35mm Screws 100 Nos 2
Chromium Plated saddles with base Each 200
50mm 1,2,3, & 4 way Junction boxes Each 12
50mm PVC Bends Each 12
Cement kg 25
b) Labour charges :
Skilled Electrician day 2
Semi skilled Electrician day 2
Helpers day 2
Sundries
C) Cost for 100 RM
Rate per Metre = C/100
1.4 P.V.C. Conduit (Concealed)
1.4.1 Supply and Fixing of 20mm dia 2mm thick P.V.C. pipe (ISI
(a) MARK) concealed in wall with all required accessories
including masonary work for light, fan and separate plug
point with well seasoned wooden deep box including all
labour charges etc., complete.

Taking Output = 100 M


a) Material
20mm dia 2mm thick PVC pipe 100 M 1
U' Links 100 Nos 2
10" x 8" Wooden deep box Each 3
20mm dia 1,2,3 & 4 way deep Junction Box Each 12
20mm PVC bends Each 12
Cement kg 50
b) Labour charges :
Skilled Electrician day 2
Semi skilled Electrician day 2
Helpers day 2
Mason Ist class day 2
Sundries
C) Cost for 100 RM
Rate per Metre = C/100
1.4.1 Supply and Fixing of 20mm dia 1.5mm thick P.V.C.
(b) pipe (ISI MARK) concealed in wall with all required
accessories including masonary work for light, fan
and separate plug point with well seasoned wooden
deep box including all labour charges etc., complete.

Taking Output = 100 M


a) Material
20mm dia 1.5mm thick PVC pipe 100 M 1
U' Links 100 Nos 2
10" x 8" Wooden deep box Each 3
20mm dia 1,2,3 & 4 way deep Junction Box Each 12
20mm PVC bends Each 12
Cement kg 50
b) Labour charges :
Skilled Electrician day 2
Semi skilled Electrician day 2
Helpers day 2
Mason Ist class day 2
Sundries
C) Cost for 100 RM
Rate per Metre = C/100
1.4.2 Supply and Fixing of 25mm dia 2mm thick PVC pipe (ISI
(a) MARK) concealed in wall with all required accessories
including masonary work and labour charges etc.,
complete.

Taking Output = 100 M


a) Material
25mm dia 2mm thick PVC pipe 100 M 1
U' Links 100 Nos 2
25mm dia 1,2,3 & 4 way deep Junction Box Each 12
25mm PVC bends Each 12
Cement kg 50
b) Labour charges :
Skilled Electrician day 2
Semi skilled Electrician day 2
Helpers day 2
Mason Ist class day 2
Sundries
C) Cost for 100 RM
Rate per Metre = C/100
(b) Supply and Fixing of 25mm dia 1.5mm thick PVC pipe (ISI
MARK) concealed in wall with all required accessories
including masonary work and labour charges etc.,
complete.

Taking Output = 100 M


a) Material
25mm dia 1.5mm thick PVC pipe 100 M 1
U' Links 100 Nos 2
25mm dia 1,2,3 & 4 way deep Junction Box Each 12
25mm PVC bends Each 12
Cement kg 50
b) Labour charges :
Skilled Electrician day 2
Semi skilled Electrician day 2
Helpers day 2
Mason Ist class day 2
Sundries
C) Cost for 100 RM
Rate per Metre = C/100
1.4.2 Supply and Fixing of 25mm dia 2mm thick PVC pipe (ISI
(c) MARK) concealed in Roof Slabs with all required
accessories including masonary work and labour charges
etc., complete.

Taking Output = 100 M


a) Material
25mm dia 2mm thick PVC pipe 100 M 1
25mm dia 1,2,3 & 4 way deep Junction Box Each 12
25mm PVC bends Each 12
b) Labour charges :
Skilled Electrician day 2
Semi skilled Electrician day 2
Helpers day 2
Sundries
C) Cost for 100 RM
Rate per Metre = C/100
Note : 1. If 25mm dia PVC / MS pipes are used for light / fan
1.5 point,
P.V.C. add the and
Casing costCaping
of sheet metal / well seasoned wooden
1.5.1 Supply and Laying of P.V.C casing and caping (ISI
MARK) with double locking arrangments with
groover trunking of size not below 12.5mm height
19/20mm size with all accessories, duly sealed at
points and erected on Wall / Ceiling including cost of
all materials and labour charges complete.

Taking Output = 100 M


a) Material
19mm / 20mm x 12.5 mm height Casing and Caping 100 M 1

b) Labour charges :
Skilled Electrician day 1
Semi skilled Electrician day 1
Helpers day 2
Sundries such as screws, Rawal Plugs, Gutting, LS
Cement, Sand and Rounding off.
C) Cost for 100 RM
Rate per Metre = C/100
1.5.2 Supply and Laying of P.V.C casing and caping (ISI
MARK) with double locking arrangments with
groover trunking of size not below 12.5mm height
25mm size with all accessories, duly sealed at
points and erected on Wall / Ceiling including cost of
all materials and labour charges complete.

Taking Output = 100 M


a) Material
25mm x 12.5 mm height Casing and Caping 100 M 1
b) Labour charges :
Skilled Electrician day 1
Semi skilled Electrician day 1
Helpers day 2
Sundries such as screws, Rawal Plugs, Gutting, LS
Cement, Sand and Rounding off.
C) Cost for 100 RM
Rate per Metre = C/100
1.5.3 Supply and Laying of P.V.C casing and caping (ISI
MARK) with double locking arrangments with
groover trunking of size not below 12.5mm height
31/32mm size with all accessories, duly sealed at
points and erected on Wall / Ceiling including cost of
all materials and labour charges complete.

Taking Output = 100 M


a) Material
30 / 32mm x 12.5 mm height Casing and Caping 100 M 1

b) Labour charges :
Skilled Electrician day 1
Semi skilled Electrician day 1
Helpers day 2
Sundries such as screws, Rawal Plugs, Gutting, LS
Cement, Sand and Rounding off.
C) Cost for 100 RM
Rate per Metre = C/100
1.5.4 Supply and Laying of P.V.C casing and caping (ISI
MARK) with double locking arrangments with
groover trunking of size not below 12.5mm height
38/40 size with all accessories, duly sealed at points
and erected on Wall / Ceiling including cost of all
materials and labour charges complete.

Taking Output = 100 M


a) Material
38 / 40mm x 12.5 mm height Casing and Caping 100 M 1

b) Labour charges :
Skilled Electrician day 1
Semi skilled Electrician day 1
Helpers day 2
Sundries such as screws, Rawal Plugs, Gutting, LS
Cement, Sand and Rounding off.
C) Cost for 100 RM
Rate per Metre = C/100
2 Wiring
2.1 Copper Wiring
2.1.1 Wiring with 2 runs of 14/0.3mm (1.0 Sq.mm) Fire
Retardant (FR) P.V.C. insulated flexible copper
cable (ISI MARK) in existing pipe with 6A switch,
Ceiling rose and 3mm thick hylam sheet covering to
switch control box including all labour charges etc.,
complete for light, bell, fan and exhaust fan points in
Non-Residential Buildings

Taking Output = 6 Points


a) Material
14/0.3mm PVC FR flexible copper wire 100 M 1
6A Switch @16/each each 6
6A 2 way Ceiling Rose@17/each each 6
25 x 20 cms (10" x8") Hylam sheet 3mm thick sqm 0.05
b) Labour charges :
Skilled Electrician day 0.6
Semi skilled Electrician day 1.2
Helpers day 0.6
C) Cost for 6 Points
Rate per Point = C/6
2.1.2 Wiring with 2 runs of 14/0.3mm (1.0 Sq.mm) P.V.C.
insulated F.R flexible copper cable (ISI MARK) in existing
pipe with 6A switch, Ceiling rose and 3mm thick hylam
sheet covering to switch control box including all labour
charges etc., complete for light, bell, fan and exhaust fan
points in Residential Buildings.

Taking Output = 7 Points


a) Material
14/0.3mm PVC FR flexible copper wire 100 M 1
6A Switch @16/each each 7
6A 2 way Ceiling Rose@17/each each 7
25 x 20 cms (10" x8") Hylam sheet 3mm thick sqm 0.05
b) Labour charges :
Skilled Electrician day 0.7
Semi skilled Electrician day 1.4
Helpers day 0.7
C) Cost for 7 Points
Rate per Points = C/7
2.1.3 Wiring with 2 of 14/0.3mm (1.0 Sq.mm) P.V.C. insulated
F.R. flexible copper cable (ISI MARK) in existing pipe with
6A switch control and 3/2 pin sockets fixing on separate
board including all labour charges etc., complete.

Taking Output = 15 Points


a) Material
14/0.3mm PVC FR flexible copper wire 100 M 1
6A switches @16/each each 15
6A 3 pin / 2 Pin Socket each 15
b) Labour charges :
Skilled Electrician day 1.5
Semi skilled Electrician day 1.5
Helpers day 1.5
C) Cost for 15 Points
Rate per Points = C/15
2.1.4 Supply and fixing of 6A 3 pin wall plug socket with 6A
switch control on a common switch board with earth
continuity including wire leads, earth connections along with
all labour charges etc., complete.

Taking Output = each


a) Material
6A 3 pin / 2 pin Socket each 1
6A switch each 1
b) Labour charges :
Skilled Electrician day 0.067
Helpers day 0.067
Rate per each
Note : Labour Charges proposed for 1point considering 15 per day
2.1.5 Supply and fixing of 16A 3pin / 6A 3pin plug socket with
indicator lamp and 16Amps fuse unit and 16 Amps switch
control (5 in one) on decolam sheet covered board
including earth connection and all labour charges etc.,
complete on wall.
Taking Output = each
a) Material
20 x 15 cms (8" x6") Decolam sheet covered board each 1

16A 3 pin / 6A 3pin Plug socket with indicator lamp, each 1


fuse unit (5 in 1)
b) Labour charges :
Skilled Electrician day 0.1
Helpers day 0.1
Rate per each
Note : Labour Charges proposed for 1point considering 10 per day
2.1.6 Supply and Fixing of 16A 3pin and 6A 3pin plug
socket with indicator lamp and 16A fuse unit and
16A switch control (5 in 1) duly recessed in wall with
wooden deep box of 6" x8" x2 1/2" size covered with
hylam sheet including earth connections and all
labour charges etc., complete.

Taking Output = each


a) Material
20 x 15 cms (8" x6") Wooden deep box each 1
21.6 x 16.6 cms (8.5 x 6.5") 3mm thick hylam sheet each 1

16A 3 pin / 6A 3pin plug socket (5 in 1) each 1


b) Labour charges :
Skilled Electrician day 0.1
Semi Skilled Electrician day 0.1
Helpers day 0.1
Rate per each
Note : Labour Charges proposed for 10 jobs per day
2.1.7 Supply and fixing of batten holder / slanting holder in
lieu of ceiling rose of light point complete with all
connections and all labour charges with 40W bulb
(for new installation).
Taking Output = each
a) Material
PVC batten holder each 1
40W bulb each 1
b) Labour charges :
Skilled Electrician day 0.05
Helpers day 0.05
Rate per each
Note : 1. The Cost of Ceiling Rose may be deducted in view of
holder.
2. Labour Charges proposed for 20 jobs per day
2.1.8 Supply and fixing of batten holder / angle holder on
existing block, but without bulb including all
connections etc., complete (For replacement).
Taking Output = each
a) Material
PVC batten holder each 1
Less : Cost of ceiling Rose
b) Labour charges :
Skilled Electrician day 0.05
Helpers day 0.05
Rate per each
NOTE : Labour Charges proposed for 20 jobs per day
2.1.9 Supply and fixing of 0.5mtr length angle iron upright
of size 40mmx40mmx6mm with eye bolt and
shackle insulator with accessories and all labour
charges etc., complete.
Taking Output = each
a) Material
40x40x6mm angle iron Kg 5
Eye bolt. each 1
Shackle Insulator each 1
b) Labour charges :
Semi Skilled Electrician day 0.125
Mason 2nd class day 0.125
Welder 2nd Class day 0.125
Rate per each
NOTE : Labour Charges proposed for 8 jobs per day
2.1.10 Supply and fixing of bed light transformer with M.C.
holders including giving connections and cost of all
accessories and all labour charges etc., complete
with bulb.
Taking Output = each
a) Material
Bed light transformer each 1
M.C.holder each 1
6V bulb each 1
b) Labour charges :
Skilled Electrician day 0.05
Helpers day 0.05
Rate per each
NOTE : Labour Charges proposed for 20 jobs per day
2.1.11 Supply and fixing of night lamp fixed at 30 cms
height from floor level with 100 x 178 x 20 mm
(4"x7"x3/4") wooden deep box, acrylic cover and
batten holder including cost of all accessories and
labour charges etc., complete with bulb.

Taking Output = each


a) Material
100 x 178 (4"x7") wooden deep box each 1
Acrylic cover each 1
Batten holder each 1
Zero watt bulb each 1
b) Labour charges :
Skilled Electrician day 0.05
Helpers day 0.05
Rate per each
NOTE : Labour Charges proposed for 20 jobs per day
2.1.12 Supply and fixing of buzzer / Calling bell on 100 x
100 mm (4"x4") decolam block including giving
connections, cost of all accessories and labour
charges etc., complete.
Taking Output = each
a) Material
Buzzer each 1
100 x 100 mm (4"x4") decolam block each 1
b) Labour charges :
Skilled Electrician day 0.062
Helpers day 0.062
Rate per each
NOTE : Labour Charges proposed for 16 jobs per day
2.1.13 Supply and fixing of ding dong bell on 100 x 178 mm
(4"x7") decolam block including giving connections
cost of all accessories and all labour charges etc.,
complete.
Taking Output = each
a) Material
Ding Dong bell each 1
100 x 178 mm (4"x7") Decolam block each 1
b) Labour charges :
Skilled Electrician day 0.062
Helpers day 0.062
Rate per each
NOTE : Labour Charges proposed for 16 jobs per day
2.1.14 Supply and fixing of Electronic musical bell on 150 x
200 mm (6"x8") decolam block including giving
connections cost of all accessories and all labour
charges etc., complete.
Taking Output = each
a) Material
Electronic Musical bell Nos 1
150 x 200 mm (6"x8") Decolam block Nos 1
b) Labour charges :
Skilled Electrician day 0.062
Helpers day 0.062
Rate per each
NOTE : Labour Charges proposed for 16 jobs per day
3 RUN OF MAINS
3.1 Wiring with F.R P.V.C. insulated flexible copper
cable
3.1.1 Supply and run of 2 of 14/0.3mm (1.0 Sq.mm) F.R
P.V.C. insulated flexible copper cable in existing
pipe for mains inlcuding all labour charges etc.,
complete.
Taking Output = 100 M
a) Material
14/0.3mm FR PVC copper wire 100 M 2
b) Labour charges :
Skilled Electrician day 0.67
Semi Skilled Electrician day 2
Helpers day 0.67
Sundries
C) Cost for 100 RM
Rate per Metre = C/100
Note : Labour Charges considered for 150 M / day
3.1.2 Supply and run of 1 of 14 /0.3mm (1.0 Sq.mm) FR
P.V.C. insulated flexible copper cable in existing
pipe for earth continuity including all labour charges
etc., complete.
Taking Output = 100 M
a) Material
14/0.3mm FR PVC copper wire 100 M 1
b) Labour charges :
Skilled Electrician day 0.34
Semi Skilled Electrician day 1
Helpers day 0.34
Sundries
C) Cost for 100 RM
Rate per Metre = C/100
Note : Labour Charges considered for 150 M / day
3.1.3 Supply and run of 2 of 22/0.3mm (1.5 Sq.mm) F.R
P.V.C. insulated flexible copper cable in existing
pipe for mains inlcuding all labour charges etc.,
complete.
Taking Output = 100 M
a) Material
22/0.3mm FR PVC copper wire 100 M 2
b) Labour charges :
Skilled Electrician day 0.67
Semi Skilled Electrician day 2
Helpers day 0.67
Sundries
C) Cost for 100 RM
Rate per Metre = C/100
Note : Labour Charges considered for 150 M / day
3.1.4 Supply and run of 2 of 36/0.3mm (2.5 Sq.mm) F.R
P.V.C. insulated flexible copper cable in existing
pipe for mains inlcuding all labour charges etc.,
complete.
Taking Output = 100 M
a) Material
36/0.3mm (2.5 sqmm) FR PVC copper wire 100 M 2
b) Labour charges :
Skilled Electrician day 0.67
Semi Skilled Electrician day 2
Helpers day 0.67
Sundries
C) Cost for 100 RM
Rate per Metre = C/100
Note : Labour Charges considered for 150 M / day
3.1.4 Supply and run of 1 of 36/0.3mm (2.5 Sq.mm) F.R
(a) P.V.C. insulated flexible copper cable in existing
pipe for earth continuity inlcuding all labour charges
etc., complete.
Taking Output = 100 M
a) Material
36/0.3mm (2.5 sqmm) FR PVC copper wire 100 M 1
b) Labour charges :
Skilled Electrician day 0.34
Semi Skilled Electrician day 1
Helpers day 0.34
Sundries
C) Cost for 100 RM
Rate per Metre = C/100
Note : Labour Charges considered for 150 M / day
3.1.5 Supply and run of 2 of 56/0.3mm (4 Sq.mm) FR
P.V.C. insulated flexible copper cable in existing
pipe for mains inlcuding all labour charges etc.,
complete.
Taking Output = 100 M
a) Material
56 /0.3mm (4 sqmm)FR PVC flexible copper wire. 100 M 2

b) Labour charges :
Skilled Electrician day 1
Semi Skilled Electrician day 3
Helpers day 1
Sundries
C) Cost for 100 RM
Rate per Metre = C/100
Note : Labour Charges considered for 100 M / day
3.1.6 Supply and run of 2 of 84/0.3mm (6.0 Sq.mm) FR
P.V.C. insulated flexible copper cable in existing
pipe for mains inlcuding all labour charges etc.,
complete.
Taking Output = 100 M
a) Material
84 /0.3mm (6 Sq.mm) FR PVC flexible copper wire. 100 M 2

b) Labour charges :
Skilled Electrician day 1
Semi Skilled Electrician day 3
Helpers day 1
Sundries
C) Cost for 100 RM
Rate per Metre = C/100
Note : Labour Charges considered for 100 M / day
3.3.7 Supply and run of 2 of 140 /0.3mm (10 Sq.mm) F.R
PVC insulated flexible copper cable in existing pipe
for mains including all labour charges etc.,
complete.
Taking Output = 100 M
a) Material
140/0.3 (10 Sq.mm) FR PVC flexible copper wire 100 M 2

b) Labour charges :
Skilled Electrician day 1
Semi Skilled Electrician day 3
Helpers day 1
Sundries
C) Cost for 100 RM
Rate per Metre = C/100
Note : Labour Charges considered for 100 M / day
3.3.8 Supply and run of 2 of 126 /0.4mm (16 Sq.mm) F.R
PVC insulated flexible copper cable in existing pipe
for mains including all labour charges etc.,
complete.
Taking Output = 100 M
a) Material
126/0.4mm (16 Sq.mm) FR PVC flexible copper wire 100 M 2

b) Labour charges :
Skilled Electrician day 1
Semi Skilled Electrician day 3
Helpers day 1
Sundries
C) Cost for 100 RM
Rate per Metre = C/100
Note : Labour Charges considered for 100 M / day
4 SWITCH GEAR & MCB DISTRIBUTION BOARDS.
4.1 Panel Mounting Cubical type SDF
4.1.1 Supply and erection of Panel mounting cubical type
30 / 32A TPN 415V, 50 Hz. switch disconnector fuse
unit complete with front drive mechanism with door
inter lock, padlocking arrangement etc., complete
with fuse links on existing control panel.

Taking Output = each


a) Material
30 / 32A TPN 415V, 50 Hz. switchs Disconnector each 1
fuse unit with HRC fuses.
b) Labour charges :
Skilled Electrician day 0.167
Semi Skilled Electrician day 0.167
Helpers day 0.333
Sundries such as hardware etc., LS
Rate per each
Note : Labour Charges considered for 6 jobs / day
4.1.2 Supply and erection of Panel mounting cubical type
60 / 63A TPN 415V, 50 Hz. switch disconnector fuse
unit complete with front drive mechanism with door
inter lock, padlocking arrangement etc., complete
with fuse links on existing control panel.

Taking Output = each


a) Material
60 / 63A TPN 415V, 50 Hz. switchs Disconnector each 1
fuse unit with HRC fuses.
b) Labour charges :
Skilled Electrician day 0.167
Semi Skilled Electrician day 0.167
Helpers day 0.333
Sundries such as hardware etc., LS
Rate per each
Note : Labour Charges considered for 6 jobs / day
4.1.3 Supply and erection of Panel mounting cubical type
125A TPN 415V, 50 Hz. switch disconnector fuse
unit complete with front drive mechanism with door
inter lock, padlocking arrangement etc., complete
with fuse links on existing control panel.

Taking Output = each


a) Material
125A TPN 415V, 50 Hz. switchs Disconnector fuse each 1
unit with HRC fuses.
b) Labour charges :
Skilled Electrician day 0.167
Semi Skilled Electrician day 0.167
Helpers day 0.333
Sundries such as hardware etc., LS
Rate per each
Note : Labour Charges considered for 6 jobs / day
4.1.4 Supply and erection of Panel mounting cubical type
200A TPN 415V, 50 Hz. switch disconnector fuse
unit complete with front drive mechanism with door
inter lock, padlocking arrangement etc., complete
with fuse links on existing control panel.

Taking Output = each


a) Material
200A TPN 415V, 50 Hz. switchs Disconnector fuse each 1
unit with HRC fuses.
b) Labour charges :
Skilled Electrician day 0.2
Semi Skilled Electrician day 0.4
Helpers day 0.4
Sundries such as hardware etc., LS
Rate per each
Note : Labour Charges considered for 5 jobs / day
4.1.5 Supply and erection of Panel mounting cubical type
250A TPN 415V, 50 Hz. switch disconnector fuse
unit complete with front drive mechanism with door
inter lock, padlocking arrangement etc., complete
with fuse links on existing control panel.

Taking Output = each


a) Material
250A TPN 415V, 50 Hz. switchs Disconnector fuse each 1
unit with HRC fuses. 8740 8740
b) Labour charges :
Skilled Electrician day 0.2 355 71
Semi Skilled Electrician day 0.4 285 114
Helpers day 0.4 285 114
Sundries such as hardware etc., LS 1
Rate per each 9040
Note : Labour Charges considered for 5 jobs / day
4.1.6 Supply and erection of Panel mounting cubical type
400A TPN 415V, 50 Hz. switch disconnector fuse
unit complete with front drive mechanism with door
inter lock, padlocking arrangement etc., complete
with fuse links on existing control panel.

Taking Output = each


a) Material
400A TPN 415V, 50 Hz. switchs Disconnector fuse each 1
unit with HRC fuses.
b) Labour charges :
Skilled Electrician day 0.25
Semi Skilled Electrician day 0.5
Helpers day 0.5
Sundries such as hardware etc., LS
Rate per each
Note : Labour Charges considered for 4 jobs / day
4.1.7 Supply and erection of Panel mounting cubical type 630A
TPN 415V, 50 Hz. switch disconnector fuse unit complete
with front drive mechanism with door inter lock, padlocking
arrangement etc., complete with fuse links on existing
control panel.

Taking Output = each


a) Material
630A TPN 415V, 50 Hz. switchs Disconnector fuse each 1
unit with HRC fuses.
b) Labour charges :
Skilled Electrician day 0.25
Semi Skilled Electrician day 0.5
Helpers day 0.5
Sundries such as hardware etc., LS
Rate per each
Note : Labour Charges considered for 4 jobs / day
4.2 Panel Mounting Cubical type, 4pole onload
change over switch confirming to IS 13947-3-
1993.
4.2.1 Supply and erection of Panel mounting cubical type L.T
heavy duty ON LOAD change over switch of 60 / 63A, 4
pole, 415V, 50 Hz. with all accessories etc., complete on
existing control panel.

Taking Output = each


a) Material
60 / 63A, 4 Pole, 415V, 50 Hz. On load cubical type each 1
C.O.S
b) Labour charges :
Skilled Electrician day 0.167
Semi Skilled Electrician day 0.167
Helpers day 0.333
Sundries such as hardware etc., LS
Rate per each
Note : Labour Charges considered for 6 jobs / day
4.2.2 Supply and erection of Panel mounting cubical type L.T
heavy duty ON LOAD change over switch of 125A, 4 pole,
415V, 50 Hz. with all accessories etc., complete on existing
control panel.

Taking Output = each


a) Material
125A, 4 Pole, 415V, 50 Hz. On load cubical type C.O.S each 1

b) Labour charges :
Skilled Electrician day 0.167
Semi Skilled Electrician day 0.167
Helpers day 0.333
Sundries such as hardware etc., LS
Rate per each
Note : Labour Charges considered for 6 jobs / day
4.2.3 Supply and erection of Panel mounting cubical type L.T
heavy duty ON LOAD change over switch of 200A, 4 pole,
415V, 50 Hz. with all accessories etc., complete on existing
control panel.

Taking Output = each


a) Material
200A, 4 Pole, 415V, 50 Hz. On load cubical type C.O.S each 1

b) Labour charges :
Skilled Electrician day 0.2
Semi Skilled Electrician day 0.4
Helpers day 0.4
Sundries such as hardware etc., LS
Rate per each
Note : Labour Charges considered for 5 jobs / day
4.2.4 Supply and erection of Panel mounting cubical type
L.T heavy duty ON LOAD change over switch of
250A, 4 pole, 415V, 50 Hz. with all accessories etc.,
complete on existing control panel.

Taking Output = each


a) Material
250A, 4 Pole, 415V, 50 Hz. On load cubical type each 1
C.O.S
b) Labour charges :
Skilled Electrician day 0.2
Semi Skilled Electrician day 0.4
Helpers day 0.4
Sundries such as hardware etc., LS
Rate per each
Note : Labour Charges considered for 5 jobs / day
4.2.5 Supply and erection of Panel mounting cubical type
L.T heavy duty ON LOAD change over switch of
400A, 4 pole, 415V, 50 Hz. with all accessories etc.,
complete on existing control panel.

Taking Output = each


a) Material
400A, 4 Pole, 415V, 50 Hz. On load cubical type each 1
C.O.S
b) Labour charges :
Skilled Electrician day 0.25
Semi Skilled Electrician day 0.5
Helpers day 0.5
Sundries such as hardware etc., LS
Rate per each
Note : Labour Charges considered for 4 jobs / day
4.2.6 Supply and erection of Panel mounting cubical type
L.T heavy duty ON LOAD change over switch of
630A, 4 pole, 415V, 50 Hz. with all accessories etc.,
complete on existing control panel.

Taking Output = each


a) Material
630A, 4 Pole, 415V, 50 Hz. On load cubical type each 1
C.O.S
b) Labour charges :
Skilled Electrician day 0.25
Semi Skilled Electrician day 0.5
Helpers day 0.5
Sundries such as hardware etc., LS
Rate per each
Note : Labour Charges considered for 4 jobs / day
4.2.7 Supply and erection of Panel mounting cubical type
L.T heavy duty ON LOAD change over switch of
800A, 4 pole, 415V, 50 Hz. with all accessories etc.,
complete on existing control panel.

Taking Output = each


a) Material
800A, 4 Pole, 415V, 50 Hz. On load cubical type each 1
C.O.S
b) Labour charges :
Skilled Electrician day 1
Semi Skilled Electrician day 1
Helpers day 1
Sundries such as hardware etc., LS
Rate per each
4.2.8 Supply and erection of Panel mounting cubical type L.T
heavy duty ON LOAD change over switch of 1060A, 4 pole,
415V, 50 Hz. with all accessories etc., complete on existing
control panel.

Taking Output = each


a) Material
1060A, 4 Pole, 415V, 50 Hz. On load cubical type each 1
C.O.S
b) Labour charges :
Skilled Electrician day 1
Semi Skilled Electrician day 1
Helpers day 1
Sundries such as hardware etc., LS
Rate per each
4.3 Panel Mounting Moulded Case Circute Breakers
(MCCBs)
4.3.1 Supply and erection of Panel mounting 60 / 63A, 3 Pole,
10 /16kA, MCCB with thermal magnetic setting /
Microprocessor based release arrangement with all
connections etc., complete on existing panel.

Taking Output = each


a) Material
60 / 63A, 3 Pole, 10 / 16kA, MCCB. each 1
b) Labour charges :
Skilled Electrician day 0.167
Semi Skilled Electrician day 0.167
Helpers day 0.333
Sundries such as hardware etc., LS
Rate per each
Note : Labour Charges considered for 6 jobs / day
4.3.2 Supply and erection of Panel mounting 60 / 63A, 4 Pole,
10 / 16kA, MCCB with thermal magnetic setting /
Microprocessor based release arrangement with all
connections etc., complete on existing panel.

Taking Output = each


a) Material
Cost of 60 / 63A, 4 Pole Panel mounting 10 / 16 each 1
kA, MCCB
b) Labour charges :
Skilled Electrician day 0.167
Semi Skilled Electrician day 0.167
Helpers day 0.333
Sundries such as hardware etc., LS
Rate per each
Note : Labour Charges considered for 6 jobs / day
4.3.3 Supply and erection of Panel mounting 125A, 3 Pole, 25kA,
MCCB with thermal magnetic setting / Microprocessor
based release arrangement with all connections etc.,
complete on existing panel.

Taking Output = each


a) Material
Cost of 125A, 3 Pole, 25 kA panel mounting MCCB. each 1

b) Labour charges :
Skilled Electrician day 0.167
Semi Skilled Electrician day 0.167
Helpers day 0.333
Sundries such as hardware etc., LS
Rate per each
Note : Labour Charges considered for 6 jobs / day
4.3.4 Supply and erection of Panel mounting 125A, 4
Pole, 25kA, MCCB with thermal magnetic setting /
Microprocessor based release arrangement with all
connections etc., complete on existing panel.

Taking Output = each


a) Material
Cost of 125A, 4 Pole, 25 kA panel mounting MCCB. each 1

b) Labour charges :
Skilled Electrician day 0.167
Semi Skilled Electrician day 0.167
Helpers day 0.333
Sundries such as hardware etc., LS
Rate per each
Note : Labour Charges considered for 6 jobs / day
4.3.5 Supply and erection of Panel mounting 250A, 4
Pole, 35 / 36kA, MCCB with thermal magnetic
setting / Microprocessor based release arrangement
with all connections etc., complete on existing
panel.

Taking Output = each


a) Material
250A, 4 Pole, 36/35kA panel mounting MCCB each 1
b) Labour charges :
Skilled Electrician day 0.2
Semi Skilled Electrician day 0.4
Helpers day 0.4
Sundries such as hardware etc., LS
Rate per each
Note : Labour Charges considered for 5 jobs / day
4.3.6 Supply and erection of Panel mounting 400A, 4
Pole, 35 /36kA, MCCB with thermal magnetic setting
/ Microprocessor based release arrangement with
all connections etc., complete on existing panel.

Taking Output = each


a) Material
400A, 4 Pole, 36/35kA panel mounting MCCB each 1
b) Labour charges :
Skilled Electrician day 0.2
Semi Skilled Electrician day 0.4
Helpers day 0.4
Sundries such as hardware etc., LS
Rate per each
Note : Labour Charges considered for 5 jobs / day
4.4 DISTRIBUTION BOARDS
4.4.1 Supply and fixing SPN Distribution board with IP-20
protection suitable for single phase Earth Leakage
Circute Braker (ELCB) / Residual Current Circute
Braker (RCCB) / Double Pole (DP) Isolator as
incomer and 10kA SP MCBs as out going including
internal connections and labour charges for surface /
flush mounting etc., complete.

A 40A DP Isolator / RCCB / ELCB - 1 No for


incomer, 6-32A SP MCBs - 4Nos for outgoing.

Taking Output = each


a) Material
SPN 4way D.B with IP-20 Protection suitable for each 1
single phase ECCB / RCCB/ DP Isolator.
40A D.P.Isolator / ECCB / RCCB each 1
10 kA - 6-32A range SP MCBs each 4
b) Labour charges :
Skilled Electrician day 0.5
Semi Skilled Electrician day 0.5
Helpers day 1
Sundries such as hardware, cement etc, LS
Rate per each
Note : Labour Charges considered for 2 jobs / day
B 40A DP Isolator / RCCB / ELCB - 1 No for
incomer, 6-32A SP MCBs - 6Nos for outgoing.

Taking Output = each


a) Material
SPN 8way D.B with IP-20 Protection suitable for each 1
single phase ECCB / RCCB/ DP Isolator.
40A D.P.Isolator / ECCB / RCCB each 1
10 kA - 6-32A range SP MCBs each 6
b) Labour charges :
Skilled Electrician day 0.5
Semi Skilled Electrician day 0.5
Helpers day 1
Sundries such as hardware, cement etc, LS
Rate per each
Note : Labour Charges considered for 2 jobs / day
C 40A DP Isolator / RCCB / ELCB - 1 No for
incomer, 6-32A SP MCBs - 8Nos for outgoing.

Taking Output = each


a) Material
SPN 12 way D.B with IP-20 Protection suitable for each 1
single phase ECCB / RCCB/ DP Isolator.
40A D.P.Isolator / ECCB / RCCB each 1
10 kA - 6-32A range SP MCBs each 8
b) Labour charges :
Skilled Electrician day 0.5
Semi Skilled Electrician day 0.5
Helpers day 1
Sundries such as hardware, cement etc, LS
Rate per each
Note : Labour Charges considered for 2 jobs / day
4.4.2 Supply and fixing SPN Distribution board with IP-42
protection (Metal Door) suitable for single phase
ELCB / RCCB/DP Isolator as incomer and 10kA SP
MCBs as outing going including internal connection
and labour charges for surface / flush mounting etc.,
complete.

A 40A DP Isolator/ RCCB / ELCB - 1 No for


incomer, 6-32A SP MCBs - 4Nos for outgoing.

Taking Output = each


a) Material
SPN 4 way D.B with IP-42 Protection (MD) suitable each 1
for single phase ECCB / RCCB/ DP Isolator.

40A D.P.Isolator / ECCB / RCCB each 1


10 kA - 6-32A range SP MCBs each 4
b) Labour charges :
Skilled Electrician day 0.5
Semi Skilled Electrician day 0.5
Helpers day 1
Sundries such as hardware, cement etc, LS
Rate per each
Note : Labour Charges considered for 2 jobs / day
B 40A DP Isolator / RCCB / ELCB - 1 No for incomer, 6-
32A SP MCBs - 6Nos for outgoing.
Taking Output = each
a) Material
SPN 8 way D.B with IP-42 Protection (MD) suitable each 1
for single phase ECCB / RCCB/ DP Isolator.

40A D.P.Isolator / ECCB / RCCB each 1


10 kA - 6-32A range SP MCBs each 6
b) Labour charges :
Skilled Electrician day 0.5
Semi Skilled Electrician day 0.5
Helpers day 1
Sundries such as hardware, cement etc, LS
Rate per each
Note : Labour Charges considered for 2 jobs / day
C 40A DP Isolator/ RCCB / ELCB - 1 No for
incomer, 6-32A SP MCBs - 8 Nos for outgoing.

Taking Output = each


a) Material
SPN 12 way D.B with IP-42 Protection (MD) suitable each 1
for single phase ECCB / RCCB/ DP Isolator.

40A D.P.Isolator / ECCB / RCCB each 1


10 kA - 6-32A range SP MCBs each 8
b) Labour charges :
Skilled Electrician day 0.5
Semi Skilled Electrician day 0.5
Helpers day 1
Sundries such as hardware, cement etc, LS
Rate per each
Note : Labour Charges considered for 2 jobs / day
4.4.3 Supply and fixing TPN Distribution board with IP-20
protection suitable for 3 phase ELCB / RCCB / FP
Isolator as incomer and 10kA SP MCBs as outing
going including internal connection and labour
charges for surface / flush mounting etc., complete.

A 40A FP Isolator/ RCCB / ELCB - 1 No for


incomer, 10kA-6-32A SP MCBs - 12Nos
for outgoing.
Taking Output = each
a) Material
4way TPN, D.B with IP-20 Protection suitable for 3 each 1
phase ELCB / RCCB/ FP Isolator as incommer.

40A, 4 Pole Isolator / ELCB / RCCB each 1


10kA - 6-32A range SP MCBs each 12
b) Labour charges :
Skilled Electrician day 0.5
Semi Skilled Electrician day 1
Helpers day 1
Sundries such as TW Plugs, Screws Cement etc, LS

Rate per each


Note : Labour Charges considered for 2 jobs / day
B 63A FP Isolator - 1 No for incomer, 10kA- 6-32A
SP MCBs - 12Nos for outgoing.
Taking Output = each
a) Material
4way TPN, D.B with IP-20 Protection suitable for 3 each 1
phase ELCB / RCCB/ FP Isolator as incommer.

63A, 4 Pole Isolator / ELCB / RCCB each 1


10kA - 6-32A range SP MCBs each 12
b) Labour charges :
Skilled Electrician day 0.5
Semi Skilled Electrician day 1
Helpers day 1
Sundries such as TW Plugs, Screws Cement etc, LS

Rate per each


Note : Labour Charges considered for 2 jobs / day
C 80A FP Isolator - 1 No for incomer, 10kA- 6-32A
SP MCBs - 18Nos for outgoing.
Taking Output = each
a) Material
6 way TPN, D.B with IP-20 Protection suitable for 3 each 1
phase ELCB / RCCB/ FP Isolator as incommer.

80A, 4 Pole Isolator / ELCB / RCCB each 1


10kA - 6-32A range SP MCBs each 18
b) Labour charges :
Skilled Electrician day 0.5
Semi Skilled Electrician day 1
Helpers day 1
Sundries such as TW Plugs, Screws Cement etc, LS

Rate per each


Note : Labour Charges considered for 2 jobs / day
4.4.4 Supply and fixing TPN Distribution board with IP-42
protection (Metal Door) suitable for 3 phase ELCB /
RCCB / FP Isolator as incomer and 10kA SP MCBs
as outing going including internal connection and
labour charges for surface / flush mounting etc.,
complete.

A 40A FP Isolator - 1 No for incomer, 10kA-6-32A


SP MCBs - 12Nos for outgoing.
Taking Output = each
a) Material
4way TPN, D.B with IP-42 Protection (MD) suitable each 1
for 3 phase ELCB / RCCB/ FP Isolator as incommer.

40A, 4 Pole Isolator / ELCB / RCCB each 1


10kA - 6-32A range SP MCBs each 12
b) Labour charges :
Skilled Electrician day 0.5
Semi Skilled Electrician day 1
Helpers day 1
Sundries such as TW Plugs, Screws Cement etc, LS

Rate per each


Note : Labour Charges considered for 2 jobs / day
B 63A FP Isolator - 1 No for incomer, 10kA-6-32A
SP MCBs - 12Nos for outgoing.
Taking Output = each
a) Material
4way TPN, D.B with IP-42 Protection (MD) suitable each 1
for 3 phase ELCB / RCCB/ FP Isolator as incommer.

63A, 4 Pole Isolator / ELCB / RCCB each 1


10kA - 6-32A range SP MCBs each 12
b) Labour charges :
Skilled Electrician day 0.5
Semi Skilled Electrician day 1
Helpers day 1
Sundries such as TW Plugs, Screws Cement etc, LS

Rate per each


Note : Labour Charges considered for 2 jobs / day
C 80A FP Isolator - 1 No for incomer, 6-32A SP
MCBs - 18Nos for outgoing.
Taking Output = each
a) Material
6 way TPN, D.B with IP-42 Protection (MD) suitable each 1
for 3 phase ELCB / RCCB/ FP Isolator as incommer.

80A, 4 Pole Isolator / ELCB / RCCB each 1


10kA - 6-32A range SP MCBs each 18
b) Labour charges :
Skilled Electrician day 0.5
Semi Skilled Electrician day 1
Helpers day 1
Sundries such as TW Plugs, Screws Cement etc, LS

Rate per each


Note : Labour Charges considered for 2 jobs / day
4.4.5 Supply and fixing TPN - Vertical type Distribution
board with IP - 20 Protection suitable for 3 phase
ELCB / RCCB / FP Isolator as incomer and 10 kA
TP / SP MCBs as outing going including internal
connection and labour charges for surface / flush
mounting etc., complete.

A Incomer : 63A FP Isolator / ELCB / RCCB


Outgoing : 32A TP MCBs 2 Nos and 6-32A SP
MCBs 6 Nos
a) Material
4way TPN - Vertical type DB with IP-20 protection Nos 1
suitable for 3 Phase ELCB / RCCB / 4 Pole Isolator
as in commer and TP / SP MCBs as outgoing with
Bus-bar arrangment etc.,

63Apms, 4 Pole Isolator / ELCB / RCCB Nos 1


32A TP MCBs Nos 2
10kA -6-32A SP MCBs Nos 6
b) Labour charges :
Skilled Electrician day 0.5
Semi Skilled Electrician day 1
Helpers day 1
Sundries, suchas T.W plugs, Screws, Cement etc, LS

Rate per each


Note : Labour Charges considered for 2 jobs / day
B Incomer : 80A FP Isolator / ELCB / RCCB
Outgoing : 32A TP MCBs 4 Nos and 6-32A SP
MCBs 12Nos
a) Material
8way TPN - Vertical type DB with IP-20 protection Nos 1
suitable for 3 Phase ELCB / RCCB / 4 Pole Isolator
as in commer and TP / SP MCBs as outgoing with
Bus-bar arrangment etc.,

80 Apms, 4 Pole Isolator / ELCB / RCCB Nos 1


32A TP MCBs Nos 4
10kA -6-32A SP MCBs Nos 8
b) Labour charges :
Skilled Electrician day 0.5
Semi Skilled Electrician day 1
Helpers day 1
Sundries, suchas T.W plugs, Screws, Cement etc, LS

Rate per each


Note : Labour Charges considered for 2 jobs / day
4.4.6 Supply and fixing TPN - Vertical type Distribution
board with IP - 42 Protection (Metal Door) suitable
for 3 phase ELCB / RCCB / FP Isolator as incomer
and 10 kA TP / SP MCBs as outing going including
internal connection and labour charges for surface /
flush mounting etc., complete.
A Incomer : 63A FP Isolator/ ELCB / RCCB
Outgoing : 32A TP MCBs 2 Nos and 6-32A SP
MCBs 6 Nos
a) Material
4way TPN - Vertical type DB with IP-42 (Metal Nos 1
Door) protection suitable for 3 Phase ELCB /
RCCB / 4 Pole Isolator as in commer and TP / SP
MCBs as outgoing with Bus-bar arrangment etc.,

63Apms, 4 Pole Isolator / ELCB / RCCB Nos 1


32A TP MCBs Nos 2
10kA -6-32A SP MCBs Nos 6
b) Labour charges :
Skilled Electrician day 0.5
Semi Skilled Electrician day 1
Helpers day 1
Sundries, suchas T.W plugs, Screws, Cement etc, LS

Rate per each


Note : Labour Charges considered for 2 jobs / day
B Incomer : 80A FP Isolator/ ELCB / RCCB
Outgoing : 32A TP MCBs 4 Nos and 6-32A SP
MCBs 12 Nos
a) Material
8way TPN - Vertical type DB with IP-42 (MD) Nos 1
protection suitable for 3 Phase ELCB / RCCB / 4
Pole Isolator as in commer and TP / SP MCBs as
outgoing with Bus-bar arrangment etc.,

80 Apms, 4 Pole Isolator / ELCB / RCCB Nos 1


32A TP MCBs Nos 4
10kA -6-32A SP MCBs Nos 8
b) Labour charges :
Skilled Electrician day 0.5
Semi Skilled Electrician day 1
Helpers day 1
Sundries, suchas T.W plugs, Screws, Cement etc, LS

Rate per each


Note : Labour Charges considered for 2 jobs / day
4.4.7 Supply and fixing 7 Segment, TPN Distribution
board with IP-42 Protection (Metal door) with phase
segregation and separation between incoming and
outgoing suitable for 3 Phase ELCB / RCCB / FP
Isolator as incomer and DP Isolator / RCCB for
phase control with 10kA SP MCCB as outgoing
including internal connection and labour charges for
surface / flush mounting etc., complete.

A Incomer : 63A FP Isolator/ ELCB / RCCB


Phase Control : 40A DP Isolator 3 Nos
Outgoing : 10kA 6-32A SP MCBs 12 Nos

a) Material
7 Segment, TPN Distribution 4Way DB with IP-42 Nos 1
(Metal Door) protection with phase segregation and
seperation between incomming an outgoing.

63A, 4 Pole Isolator / ELCB / RCCB . Nos 1


40A DP Isolator Nos 3
6-32 Amps range SP MCBs. Nos 12
b) Labour charges :
Skilled Electrician day 0.5
Semi Skilled Electrician day 1
Helpers day 1
Sundries such as T.W. Plugs, Screws, Cement etc., LS

Rate per each


Note : Labour Charges considered for 2 jobs / day
B Incomer : 80A FP Isolator/ ELCB / RCCB
Phase Control : 63A DP Isolator 3 Nos
Outgoing : 10kA-6-32A SP MCBs 24 Nos

a) Material
7 Segment, TPN Distribution 8 Way DB with IP-42 Nos 1
(Metal Door) protection with phase segregation and
seperation between incomming an outgoing.

80A, 4 Pole Isolator / ELCB / RCCB . Nos 1


63A DP Isolator Nos 3
6-32 Amps range SP MCBs. Nos 12
b) Labour charges :
Skilled Electrician day 1
Semi Skilled Electrician day 1
Helpers day 1
Sundries such as T.W. Plugs, Screws, Cement etc., LS

Rate per each


Note : Labour Charges considered for 2 jobs / day
4.4.8 Supply and fixing TPN - Vertical type Distribution
board with IP -42 Protection (Metal Door) with 125A,
4Pole 25 kA MCCB as incomer with 4Nos 32A TP
MCBs and 12 Nos. 10 kA SPMCBs as outgoing
including internal connection and labour charges for
surface / flush mounting etc., complete.

a) Material
8 Way TPN Vertical DB with IP -42 (Metal door) Nos 1
protection suitable for 125A, 4 Pole, 16kA MCCB as
incomer.
125 Amps, 4 Pole , 25 kA MCCB Nos 1
10 kA, 32A TP MCBs: Nos 4
10kA, 6 to 32A SP MCBs: Rs.119 / Each Nos 12
b) Labour charges :
Skilled Electrician day 1
Semi Skilled Electrician day 1
Helpers day 1
Sundries such as T.W. Plugs, Screws, Cement etc., LS
Rate per each
Note : 1. Labour Charges considered for 2 jobs / day
2. If the Distribution Boards from Item No. 4.4.1 to 4.4.8
proposed
a 1No. for concealing,
Semi add the following:
skilled mason
b 1/4 bag cement
4.4.9 Supply and fixing Distribution board with 20A single
phase plug and Socket, in sheet steel enclosure with
10/16/20A SP MCB including internal connection
and labour charges for surface / flush mounting etc.,
complete

a) Material
1 Phase Distribution board with 20A plug and Nos 1
socket.
10/16/20A SP MCB Nos 1
b) Labour charges :
Skilled Electrician Nos 0.25
Semi skilled Electrician Nos 0.25
Helpers Nos 0.25
Sundries such as Cement, Sand, T.W. Plugs, LS
Screws etc.,
Rate per each
Note : 1. Labour Charges considered for 4 jobs / day
2. For concealing, add the following:
a 1No. Semi skilled mason
b 1/4 bag cement
4.4.10 Supply and fixing Distribution board with 20A 3
phase plug and Socket, in sheet steel enclosure with
16/20A TP MCB including internal connection and
labour charges for surface / flush mounting etc.,
complete.

a) Material
Distribution board with 3 Ph. 20A Plug and Socket . Each 1

32A TP MCB, 10 kA Each 1


b) Labour charges :
Skilled Electrician Nos 0.33
Semi skilled Electrician Nos 0.33
Helpers Nos 0.33
Sundries such as Cement, T.W. Plugs, Screws etc.,

Rate per each


Note : 1. Labour Charges considered for 3 jobs / day
2. For concealing, add the following:
a 1No. Semi skilled mason
b 1/4 bag cement
5 EARTHING
5.1 EARTHING
5.1.1 Providing independent earthling by excavating a
trench to a depth of 2.1 M in all soils, as per size
specified in the Data, using 40mm dia 'B' class GI
pipe of 2.5 Mtrs length with necessary accessories
with hume pipe ring duly providing staggered holes
including filling with equal proportion of Salt and
Charcoal in layers and all labour charges etc.,
complete for small quarters.

a) Material
Earth Work Excavation of Hard gravel Soil with small cum 0.85
boulder for trench 1st step of size 1.5 x 0.6 x 0.9 m
(5'x2'x3')
Excavation of Hard disteggrated rocks and boulders cum 0.9
for trench 2nd Step of size 1.2 x 0.6 x 1.2 m (Civil
SSR) (4'x2'x4')
25% extra for narrow trench & pit and back filling
with Sand, Coke, Salt etc., and leveling
40mm dia 'B' Class G.I pipe Mtr 2.5
25 x 6 mm (1"X 1/4") G.I Flat duly drilled 12mm Each 1
holes (4 Nos) of 200 mm (8") length
Drilling of 16 Nos through holes of 12mm dia to G.I pipe Each 16

G.I Nuts, Bolts an Washers Set 4


18" dia hume pipe ring Each 1
Hard Coke Kg 40
Salt Kg 20
b) labour charges for fixing pipe ring and Each
connections
Semi skilled Electrician Nos 0.5
Helpers Nos 0.5
Sundries
Rate per each
5.1.2 Providing independent earthing for Important
equipment with 40mm dia 'B' class 2.5m long G.I
pipe and 19mm dia 'B' class G.I pipe of 0.3mtr. long
connected with reducer providing G.I funnel with
mesh enclosed in C.C.Chamber of 400m x 400m x
400mm with R.C.C. Slab cover duly providing
staggered holes filling with salt and charcoal from
the bottom of the pipe giving earth connection from
electrode through G.I strip of 25 x 6mm x 200mm
length with all accessories and labour charges
complete, as per IS specifications 732/1982 (Part II)

a) Material
Earth work excavation of hard gravel soil with small cum 1.27
boulders for trench 1st step of size 1.5 x 0.9 x 0.9 m
(5'x3'x3')
Earth work hard disintegrated rock and boulders for cum 1.87
trench 2nd Step of size 1.2 x 0.9 x 1.65 m (Civil
SSR-16) (4'x3'x5.5')
25% extra for trenches and narrow Pit, back filling
and blending.
Laying C.C bed in Cement mortar with 1: 2:4 with 20 cum 0.9
mm HBG Stone Metal (Civil SSR).
Masonary through with brick Masonry with CM 1:3 cum 0.23

Cement plastering inside through with 1:3 Cement sqm 2.09


mortar, 12 mm thick (Civil SSR).
40mm dia G.I pipe Class 'B' (Civil SSR) Mtr 2.5
19mm dia G.I pipe Mtr 0.3
40mm x 19mm reducer Each 1
G.I Funel covered with wire mesh Each 1
25mm x 6mm x 200 mm length G.I Strip (Flat) with 4 Each 1
Nos. Holes of 12mm dia.
Drilling of staggered holes of 12mm dia to G.I pipe. Each 16

G.I Bolts, Nuts and Washers. Set 4


Hard Coke. kg 4
Salt. kg 20
Cost Iron cover 400 mm x 400mm x 50mm. L.S
b) labour charges for fixing pipe
Skilled Electrician Nos 1
Sundries such as Lugs and Saddles
Rate per each
5.1.3 Providing independent earthing for Sophisticated
Electronic equipment with 600mm x 600mm x
3.15mm thick copper plate rigidly fixed to 40mm dia
G.I Pipe of 0.3mtr. length connected with reducer
providing G.I funnel with wiremesh as per National
Electric Code including C.C.Chamber of size 400m
x 400m x 400mm covered with R.C.C. Slab filling
with salt and charcoal giving earth connection from
electrode G.I strip of 25mm x 6mm x 200mm length
with all accessories and labour charges complete as
per IS specification 732/1982 (Part II).

a) Material
Earth work excavation of hard gravel soil with small cum 1.27
boulders for trench 1st step of size 1.5 x 0.9 x 0.9 m
(5'x3'x3')
Earth work hard disintegrated rock and boulders for cum 1.87
trench 2nd Step of size 1.2 x 0.9 x 1.65 m (Civil
SSR-16) (4'x3'x5.5')
25% extra for trenches and narrow Pit, back filling
and blending.
Laying C.C bed in Cement mortar with 1: 2:4 with 20 cum 0.9
mm HBG Stone Metal (Civil SSR).
Masonary through with brick Masonry with CM 1:3 cum 0.23

Cement plastering inside through with 1:3 Cement mortar, sqm 2.09
12 mm thick (Civil SSR).
40mm dia G.I pipe Class 'B' (Civil SSR) Mtr 2.5
19mm dia G.I pipe Mtr 0.3
40mm x 19mm reducer Each 1
G.I Funel covered with wire mesh Each 1
25mm x 6mm x 200 mm length G.I Strip (Flat) with 4 Nos. Each 1
Holes of 12mm dia.
600mm x600mm x 3.15mm thick copper plate kg 10.00
Drilling of staggered holes of 12mm dia to G.I pipe. Each 16

G.I Bolts, Nuts and Washers. Set 4


Hard Coke. kg 4
Salt. kg 20
Cost Iron cover 400 mm x 400mm x 50mm. L.S
b) labour charges for fixing pipe
Skilled Electrician Nos 1
Sundries such as Lugs and Saddles
Rate per each
5.2 G.I Wire and Strip
5.2.1 Supply and Run of No.8 SWG G.I wire including
cost of all accessories and labour charges etc.,
complete.
a) Material
No.8 SWG G.I wire 100 M Length (0.104 Kg / Mtr) 10.4
Kg
U' Nails 100Nos 1.5
b) labour charges
Helpers day 2
Sundries.
C) Cost for 100 M
Rate per mtr c/100
5.2.2 Supply and Run of No.10 SWG G.I wire including
cost of all accessories and labour charges etc.,
complete.
a) Material
No.10 SWG G.I wire 100 M Length (0.067 Kg / Mtr) 6.7
Kg
U' Nails 100Nos 1.5
b) labour charges
Helpers day 2
Sundries.
C) Cost for 100 M
Rate per mtr c/100
5.2.3 Supply and Run of No.12 SWG G.I wire including
cost of all accessories and labour charges etc.,
complete.
a) Material
No.12 SWG G.I wire 100 M Length (0.044 Kg / Mtr) 4.4
Kg
U' Nails 100Nos 1.5
b) labour charges
Helpers day 2
Sundries.
C) Cost for 100 M
Rate per mtr c/100
5.2.4 Supply and Run of No.14 SWG G.I wire including
cost of all accessories and labour charges etc.,
complete.
a) Material
No.14 SWG G.I wire 100 M Length (0.026 Kg / Mtr) 2.6
Kg
U' Nails 100Nos 1.5
b) labour charges
Helpers day 2
Sundries.
C) Cost for 100 M
Rate per mtr c/100
5.2.5 Supply and Run of 25mm x 6mm G.I Strip including
cost of all accessories and labour charges etc.,
complete.
a) Material
25mm x 6mm G.I Strip 100 M Length (1.18 Kg / Mtr) kg 118

b) labour charges
Skilled Electrician Nos 2
Helper Nos 2
Sundries such as T&P.
C) Cost for 100 M
Rate per mtr c/100
5.2.6 Supply and Run of 40mm x 6mm G.I Strip including
cost of all accessories and labour charges etc.,
complete
a) Material
40mm x 6mm G.I Strip 100 M Length (1.88 Kg / Mtr) kg 188

b) labour charges
Skilled Electrician Nos 2
Helper Nos 2
Sundries such as T&P.
C) Cost for 100 M
Rate per mtr c/100
5.2.7 Supply and Run of 50mm x 6mm G.I Strip including cost of
all accessories and labour charges etc., complete.

a) Material
50mm x 6mm G.I Strip 100 M Length (2.36 Kg / Mtr) kg 236

b) labour charges
Skilled Electrician Nos 2
Helper Nos 2
Sundries such as T&P.
C) Cost for 100 M
Rate per mtr c/100
5.3 Copper wire and Strip
5.3.1 Supply and Run of Zero gauge copper wire including cost
of all accessories and labour charges etc., complete

a) Material
O' SWG Copper wire (0.455 Kg/Mtr.) 100 M Length Kg 45.5

b) labour charges
Skilled Electrician Nos 1
Semi skilled Electrician Nos 1
Helper Nos 1
Sundries such as T&P and rounding off
C) Cost for 100 M
Rate per mtr c/100
5.3.2 Supply and Run of No. 8 SWG copper wire including cost
of all accessories and labour charges etc., complete.

a) Material
8 SWG Copper wire (0.1155 Kg/Mtr.) 100 M Length Kg 11.55

b) labour charges
Skilled Electrician Nos 1
Semi skilled Electrician Nos 1
Helper Nos 1
Sundries such as T&P and rounding off
C) Cost for 100 M
Rate per mtr c/100
5.3.3 Supply and Run of No. 14 SWG copper wire
including cost of all accessories and labour charges
etc., complete
a) Material
14 SWG Copper wire (0.028 Kg/Mtr.) 100 M Length Kg 2.8

b) labour charges
Skilled Electrician Nos 1
Semi skilled Electrician Nos 1
Helper Nos 1
Sundries such as T&P and rounding off
C) Cost for 100 M
Rate per mtr c/100
5.3.4 Supply and Run of 25mm x 3mm copper strip including cost
of all accessories and labour charges etc., complete.

a) Material
25mmx 3mm Copper strip (0.663 Kg / Mtr) 100 M Length Kg 66.3

b) labour charges
Skilled Electrician Nos 2
Helper Nos 2
Sundries and rounding off
C) Cost for 100 M
Rate per mtr c/100
5.3.5 Supply and Run of 32mm x 6mm copper strip including LS
cost of all accessories and labour charges etc., complete.

a) Material
32mmx 6mm Copper strip (1.697 Kg / Mtr) 100 M Length Kg 169.7

b) labour charges
Skilled Electrician Nos 2
Helper Nos 2
Sundries and rounding off
C) Cost for 100 M
Rate per mtr c/100
6 SERVICE MAINS
6.1 WPSC (Weather Prrof Single Core) (PVC Cleats)
6.1.1 Supply and Run of 2 of 2.5 Sq.mm WPSC (Whether Proof
Single Core) Aluminium cable along with No.10 SWG G.I
bearer wire through PVC cleats with all accessories
including labour charges etc., complete for service mains.

a) Material
2.5 Sq.mm WPSC Aluminium cable 100 M 2
No.10 SWG G.I wire. (0.026 Kg / Mtr) Length 100 kg 6.7
RM
PVC Cleats 100 Nos 1
b) labour charges
Skilled Electrician day 1
Semi skilled day 1
Helper day 1
Sundries such as insulation tapes and rounding off

C) Cost for 100 M


Rate per mtr c/100
6.1.2 Supply and Run of 2 of 6 Sq.mm WPSC Aluminium cable
along with No.10 SWG G.I bearer wire through PVC cleats
with all accessories including labour charges etc., complete
for service mains.

a) Material
6 Sq.mm WPSC Aluminium cable 100 M 2
No.10 SWG G.I wire. (0.026 Kg / Mtr) Length 100 kg 6.7
RM
PVC Cleats 100 Nos 1
b) labour charges
Skilled Electrician day 1
Semi skilled day 1
Helper day 1
Sundries such as insulation tapes and rounding off

C) Cost for 100 M


Rate per mtr c/100
6.1.3 Supply and Run of 2 of 10 Sq.mm WPSC Aluminium
cable along with No.10 SWG G.I bearer wire through
PVC cleats with all accessories including labour
charges etc., complete for service mains.

a) Material
168 10 Sq.mm WPSC Aluminium cable 100 M 2
No.10 SWG G.I wire. (0.026 Kg / Mtr )Length 100 kg 6.7
RM
PVC Cleats 100 Nos 1
b) labour charges
Skilled Electrician day 1
Semi skilled day 1
Helper day 1
Sundries such as insulation tapes and rounding off

C) Cost for 100 M


Rate per mtr c/100
6.1.4 Supply and Run of 4 of 6 Sq.mm WPSC Aluminium
cable along with No.10 SWG G.I bearer wire on both
sides through PVC cleats with all accessories
including labour charges etc., complete for service
mains.

a) Material
6 Sq.mm WPSC Aluminium cable 100 M 4
No.10 SWG GI Wire (6.7kg x 2) Length 200 RM kg 13.4
Binding wire kg 0.25
PVC Cleats / Separters 4 W. 100 Nos 1
b) labour charges
Skilled Electrician day 2
Semi skilled day 2
Helper day 2
Sundries such as insulation tapes and rounding off

C) Cost for 100 M


Rate per mtr c/100
6.1.5 Supply and Run of 4 of 10 Sq.mm WPSC Aluminium
cable along with No.10 SWG G.I bearer wire on
both sides through PVC cleats with all accessories
including labour charges etc., complete for service
mains.

a) Material
10 Sq.mm WPSC Aluminium cable 100 M 4
No.10 SWG GI Wire (6.7kg x 2) Length 200 RM kg 13.4
Binding wire kg 0.25
PVC Cleats / Separters 4 W. 100 Nos 1
b) labour charges
Skilled Electrician day 2
Semi skilled day 2
Helper day 2
Sundries such as insulation tapes and rounding off

C) Cost for 100 M


Rate per mtr c/100
6.1.6 Supply and Run of 4 of 16 Sq.mm WPSC Aluminium
cable along with No.10 SWG G.I bearer wire through
PVC cleats with all accessories including labour
charges etc., complete for service mains.

a) Material
16 Sq.mm WPSC Aluminium cable 100 M 4
No.10 SWG GI Wire (6.7kg x 2) Length 200 RM kg 13.4
Binding wire kg 0.25
PVC Cleats / Separters 4 W. 100 Nos 1
b) labour charges
Skilled Electrician day 2
Semi skilled day 2
Helper day 2
Sundries such as insulation tapes and rounding off

C) Cost for 100 M


Rate per mtr c/100
6.2 WPTC (Weather Prrof Twin Core) Cable
6.2.1 Supply and Run of 1 of 6 Sq.mm WPTC Aluminium
cable along with No.10 SWG G.I bearer wire through
PVC cleats with all accessories including labour
charges etc., complete.

a) Material
6 Sq.mm (7/18) wptc Aluminium cable 100 M 1
No.10 G.I wire. Length 100 RM kg 6.7
Insulation tapes each 2
Aluminium link clips box 2
b) labour charges
Skilled Electrician day 1
Semi skilled day 1
Helper day 1
Sundries and rounding off
C) Cost for 100 M
Rate per mtr c/100
6.2.2 Supply and Run of 1 of 10 Sq.mm WPTC Aluminium
cable along with No.10 SWG G.I bearer wire through
PVC cleats with all accessories including labour
charges etc., complete.

a) Material
10 Sq.mm (7/18) wptc Aluminium cable 100 M 1
No.10 G.I wire. Length 100 RM kg 6.7
Insulation tapes each 2
Aluminium link clips box 2
b) labour charges
Skilled Electrician day 1
Semi skilled day 1
Helper day 1
Sundries and rounding off
C) Cost for 100 M
Rate per mtr c/100
6.2.3 Supply and Run of 2 of 6 Sq.mm WPTC Aluminium
cable along with No.10 SWG G.I bearer wire through
PVC cleats with all accessories including labour
charges etc., complete.

a) Material
6 Sq.mm (7/18) wptc Aluminium cable 100 M 2
No.10 G.I wire. Length 100 RM kg 6.7
PVC insulation tapes each 4
Link clips box 2
b) labour charges
Skilled Electrician day 1
Semi skilled day 1
Helper day 1
Sundries and rounding off
C) Cost for 100 M
Rate per mtr c/100
6.2.4 Supply and Run of 2 of 10 Sq.mm WPTC Aluminium
cable along with No.10 SWG G.I bearer wire through
PVC cleats with all accessories including labour
charges etc., complete

a) Material
10 Sq.mm (7/18) wptc Aluminium cable 100 M 2
No.10 G.I wire. Length 100 RM kg 6.7
PVC insulation tapes each 4
Link clips box 2
b) labour charges
Skilled Electrician day 1
Semi skilled day 1
Helper day 1
Sundries and rounding off
C) Cost for 100 M
Rate per mtr c/100
6.2.5 Supply and Run of 2 of 16 Sq.mm WPTC Aluminium
cable along with No.10 SWG G.I bearer wire through
PVC cleats with all accessories including labour
charges etc., complete.

a) Material
16 Sq.mm (7/18) wptc Aluminium cable 100 M 2
No.10 G.I wire. Length 100 RM kg 6.7
PVC insulation tapes each 4
Link clips box 2
b) labour charges
Skilled Electrician day 1
Semi skilled day 1
Helper day 1
Sundries and rounding off
C) Cost for 100 M
Rate per mtr c/100
6.3 L.T.O.H. Lines
6.3.1 Supply and fixing of 3 phase, 4 wire angle iron
cross arm with 3 Nos shackle / pin insulators for
phases and C.I knob for neutral including cost and
conveyance of all materials.
a) Material
Angle Iron 38 x 38 x 6 mm (1.5"x1.5"x1/4") kg 4.27
Drilling Holes each 6
M.S Clamp 25mm x 6mm with bolts and nuts each 1
Pin insulators 100 x 80 mm (4"x3 1/2") each 3
C.I Nob each 1
Cutting of angle Iron and Welding including cost of LS
flat Iron etc.,
b) labour charges
Skilled Electrician day 0.125
Semi skilled day 0.125
Rate per Each
Note : 1. Labour Charges considered for 8 jobs / day
6.3.1 Supply and fixing of 3 phase, 5 wire angle iron
cross arm with 4 Nos shackle / pin insulators for
phases and C.I knob for neutral including cost and
conveyance of all materials.
a) Material
Angle Iron 38 x 38 x 6 mm (1.5"x1.5"x1/4") kg 4.27 55 234.85
Drilling Holes each 6 5 30
M.S Clamp 25mm x 6mm with bolts and nuts each 1 50 50
Pin insulators 100 x 80 mm (4"x3 1/2") each 4 90 360
C.I Nob each 1 12 12
Cutting of angle Iron and Welding including cost of LS
flat Iron etc.,
b) labour charges
Skilled Electrician day 0.125 355 44.375
Semi skilled day 0.125 285 35.625
Rate per Each 766.85
Note : 1. Labour Charges considered for 8 jobs / day

6.3.2 Supply and fixing of single phase, 2 wire angle iron


cross arm with 1 Nos shackle / pin insulators for
phases and C.I knob for neutral including cost and
conveyance of all materials.
a) Material
Angle Iron 38 x 38 x 6 mm (1.5"x1.5"x1/4" (0.61 mt)) kg 2.13

Drilling Holes each 4


M.S Clamp 25mm x 6mm with bolts and nuts each 1
Pin insulators 100 x 80 mm (4"x3 1/2") each 1
C.I Knob each 1
Cutting of angle Iron and Welding including cost of LS
flat Iron sundires.
b) labour charges
Skilled Electrician day 0.1
Semi skilled day 0.1
Rate per Each
Note : 1. Labour Charges considered for 10 jobs / day
6.3.3 Supply and fixing of stayset with 7/8 SWG (10to 15m
long) guy insulator with concreting 1:3:6 incluidng
excavation of pit and back filling including cost and
conveyance of all materials and labolur charges etc.,
complete.

a) Material
Stay rod of 16mm dia (7/8 SWG) 1560mm length each 1
with bolts and nuts with switch plate. 450.00 450
Stay tight set (Jum Bracket 300mm) pair 1 275.00 275
Stay wire 7/20 weighing 4kgs each 1 42.00 42
Cement Concrete 1:3:6 (As per Civil SSR) cum 0.142 1502.00 213.284
Excavation of pit and back filling 1.5 x 0.75 x 0.6 m cum 0.675
(5'x2.5'x2') 200.00 135
Stay clamp with bolts and nuts set 1 176.00 176
L.T guy insulator each 1 45.50 45.5
b) labour charges 0
Skilled Electrician. day 0.5 355 177.5
Man Mazdoor day 1 285 285
Rate per Each 1799.284
Note : 1. Labour Charges considered for 2 jobs / day
6.3.4 Supply and fixing of over head line horizontal type safety
device with angle iron cross arm of size 50 x 50 x 6 mm,
1.52m length projection from pole with 38 x 38 x 6 mm (1
1/2"x1 1/2" x 1/4") angle iron arm including G.I wire for
earth continuity and cost of all accessories labour charges
etc., complete.

a) Material
50 x 50 x 6 mm (2"x2"x1/4") Angle Iron of 1.52 Mtr length kg 5.32

38 x 38 x 6 mm (1.5"x1.5"x1/4") Angle Iron of 0.45 kg 1.57


Mtr
Special Flat Iron Clamp 25x6mm with bolts and nuts each 1

No.8 SWG G.I wire 8m Length kg 0.8


b) labour charges
Skilled Electrician day 0.25
Semi skilled day 0.25
Helper day 0.5
Sundires such as bolts, nuts including soldering.

Rate per Each


Note : 1. Labour Charges considered for 4 jobs / day
6.3.5 OH Conductors
6.3.5 Supply and erecting 7/2.00 AAAC (All Aluminium Annealed
(a) Conductor) / Squirrel (20 Sq.mm) conductor for Overhead
line with stringing, binding and suitable size of clamps for
Jumpering etc., complete

a) Material
7/2.0 AAAC (Squirrel) km 1
7/2.0 AAAC for binding and Jumpering. km 0.1
Aluminium Clamps each 10
b) labour charges
Skilled Electrician day 2
Helper day 8
For special T&P LS
Sundires and rounding off
Rate per km
6.3.5 Supply and erecting 7/2.50 AAAC / Weasel (34 Sq.mm)
(b) conductor for Overhead line with stringing, binding and
suitable size of clamps for Jumpering etc., complete.

a) Material
7/2.5 AAAC / Weasel (34 Sq.mm) km 1 15,383.00 15383
7/2.5 AAAC for binding and Jumpering. km 0.1 15,383.00 1538.3
Aluminium Clamps each 10 50 500
b) labour charges
Skilled Electrician day 2 400 800
Helper day 8 320 2560
For special T&P LS 67.2 67.2
Sundires and rounding off
Rate per km 20848.5
6.3.5 Supply and erecting 7/3.15 AAAC / Rabbit (55 Sq.mm)
(c) conductor for Overhead line with stringing, binding and
suitable size of clamps for Jumpering etc., complete.

a) Material
7/3.15 AAAC / Rabbit (55 Sq.mm) km 1 25013 25013
7/3.15 AAAC for binding and Jumpering. km 0.1 25013 2501.3
Aluminium Clamps each 10 50 500
b) labour charges
Skilled Electrician day 2 400 800
Helper day 8 320 2560
For special T&P LS 67.2 67.2
Sundires and rounding off
Rate per km 31441.5
6.3.6 Supply and erecting of fibre / PVC spacers for L.T
Overhead line of 3 to 5 conductors.
a) Material
PVC spacer suitable for 3 to 5 conductos. each 1
b) labour charges
Helper day 0.2
Special T&P. LS
Rate per km
Note : 1. Labour Charges considered for 5 jobs / day
6.3.7 Excavation of hard rock or Bituminous road (BT) by
chiselling for preparing pit for poles / stay / earth
plates / laying pipes, including clearing the site by
removing debris and making the site to original
position.

a) Material
Cutting B.T road surface (As per Civil SSR) cum 1
Excavation of WBM under B.T cum 1

Note : Rate shall be as per Civil SSR


6.3.8 Brick Masonry in CM (1:6) with country Bricks
(a) traditional size 23 x 11 x 7 cms
Unit = 1cum
a) Material
Bricks traditional size 23 x 11 x 7 cms 2nd class Nos 512

Cement Mortar 1:6 cum 0.20


b) labour charges
Mason 1st class day 0.24
Mason 2 class
nd day 0.56
Mazdoor (unskilled) day 1.88
Scaffolding charges
Add 25% extra on labour for isolated work
Rate per cum
6.3.8 Plastering with CM (1:5), 12 mm thick
(b)
Unit = 10 sqm
a) Material
Cement Mortor (1:5) cum 0.15
b) labour charges
Mason 1st class day 0.6
Mazdoor (unskilled) day 0.96
Rate per cum
6.3.8 CRS Masonry in CM (1:6) 2nd Sort
(c)
Unit = 1cum
a) Material
Coursed Rubble Stone cum 0.94
Bond Stones 7Nos 0.24 x 0.24 x 0.39 = 0.16cum cum 0.16

Cement Mortar 1:6 cum 0.32


b) labour charges
Mason 1st class day 0.45
Mason 2nd class day 1.05
Mazdoor (unskilled) day 2.32
Add 25% extra on labour for isolated work
Rate per cum
6.3.9 Supply Transportation and unloading the 9.1mtr long
(a) PSCC poles with 300kg working load at site in good
condition for H.T. / L.T. lines support including cost
and conveyance of all materials and labour charges
etc., complete.

a) Material
9.1 Mtr PSCC pole of 300 Kg working load each 1
Transportation Charges @ 5% of Cost
Helper for Unloading day 0.5
Rate per each
Note : 1. Unloading Charges considered for 12 jobs / 6 Helpers / day
6.3.9 Supply Transportation and unloading the 9.1mtr long
(b) PSCC poles with 280kg working load at site in good
condition for H.T. / L.T. lines support including cost
and conveyance of all materials and labour charges
etc., complete.

a) Material
9.1 Mtr PSCC pole of 280 Kg working load each 1
Transportation Charges @ 5% of Cost
Helper for Unloading day 0.5
Rate per each
Note : 1. Unloading Charges considered for 12 jobs / 6 Helpers / day
6.3.9 Supply Transportation and unloading the 8.0mtr long
(c) PSCC poles with 200kg working load at site in good
condition for H.T. / L.T. lines support including cost
and conveyance of all materials and labour charges
etc., complete.

a) Material
8 Mtr PSCC pole of 200 Kg working load each 1
Transportation Charges @ 5% of Cost
Helper for Unloading day 0.5
Rate per each
Note : 1. Unloading Charges considered for 12 jobs / 6 Helpers / day
6.3.9 Supply, Transportation and unloading the 8.0mtr
(d) long PSCC poles with 140kg working load at site in
good condition for H.T. / L.T. lines support including
cost and conveyance of all materials and labour
charges etc., complete.

a) Material
1299 8 Mtr PSCC pole of 140 Kg working load each 1 1664.3 1664.3
Transportation Charges @ 5% of Cost 83.215
Helper for Unloading day 0.5 285 142.5
Rate per each 1890.015
Note : 1. Unloading Charges considered for 12 jobs / 6 Helpers / day
6.3.10 Supply Transportation and unloading the RS Joist of
(a) 9.0 mtr long 175mm x 85mm size at site in good
condition for H.T. / L.T. lines support including cost
and conveyance of all materials and labour charges
etc., complete.

a) Material
175mm x 85mm, 9.0 Mtr long R.S.Joist (1mt = 19.6 Kg) kg 176.4
Transportation Charges @ 5% of Cost
Helper for Unloading day 0.33
Rate per each
Note : 1. Unloading Charges considered for 20 jobs / 6 Helpers / day
6.3.10 Supply Transportation and unloading the RS Joist of 8.0
(b) mtr long 150mm x 75mm size at site in good condition for
H.T. / L.T. lines support including cost and conveyance of
all materials and labour charges etc., complete.

a) Material
150mm x 75mm, 8.0 Mtr long R.S.Joist (1mt = 15.0 Kg) kg 120
Transportation Charges @ 5% of Cost
Helper for Unloading day 0.33
Rate per each
Note : 1. Unloading Charges considered for 20 jobs / 6 Helpers / day
7 LUMINAIRE
7.1 FLOURESCENT LUMINAIRE
7.1.1 Supply of 1x40W weatherproof flourescent streetlight fitting
comprising canopy of sheet Aluminium in stove enamel
finish with copper / VPIT ballast, capacitor, tube and starter
etc., complete.

a) Material
1x40W WP flourscent street light fitting. each 1
Lamp cost of 40W each 1
Sundries and rounding off
Rate per each
7.1.2 Supply of 2x11W CFL (Compacted Flourescent Lamp),
Street light fitting with all standard accessories and 2 Nos
11W CFL, Lamp etc., complete.

a) Material
2x11W CFL street light fitting. each 1
Cost of 11W CFL each 1
Sundries and rounding off
Rate per each
7.1.3 Supply of 1x18W CFL, Street light fitting with all
standard accessories and 1 No 18W CFL lamp etc.,
complete.
a) Material
1x18W CFL street light flourscent fitting. each 1
Lamp cost of 1x18W CFL each 1
Sundries and rounding off
Rate per each
7.2 Mercury Vapour (M.V.) LUMINAIRE
7.2.1 Supply of single piece die cast Aluminium body with
80W mercury vapour luminaire with copper wound
ballast and capacitor including 80W M.V.Lamp etc.,
complete.
a) Material
80W MV Lamp fitting single piece die cast each 1
Aluminium body with copper wound ballast and
capacitor
80W MV lamp each 1
Sundries and rounding off
Rate per each
7.2.2 Supply of single piece die cast Aluminium body with
125W M.V. luminaire with copper wound ballast and
capacitor including 125W HPMV lamp etc.,
complete.
a) Material
125W MV Lamp fitting single piece die cast each 1
Aluminium body with copper wound ballast and
capacitor
125W MV lamp each 1
Sundries and rounding off
Rate per each
7.3 High Pressure Sodium Vapour (S.V.) LUMINAIRE

7.3.1 Supply of Integral street light luminaire of 70W HPSV lamp


fitting comprises of single piece die cast Aluminium body
with copper wound ballast and capacitor, Ignitor, with pot
optics including 70W HPSV lamp etc., complete.

a) Material
70W HPSV Lamp fitting single piece die cast each 1
Aluminium body with copper wound ballast and
capacitor, Ignitor, with pot optics
70W HPSV lamp each 1
Sundries and rounding off
Rate per each
7.3.2 Supply of Integral street light luminaire of 150W
HPSV lamp fitting comprises of single piece die cast
Aluminium body with copper wound ballast and
capacitor, Ignitor, with pot optics including 150W
HPSV lamp etc., complete.

a) Material
150W HPSV Lamp fitting single piece die cast each 1
Aluminium body with copper wound ballast and
capacitor, Ignitor, with pot optics
156W HPSV lamp each 1
Sundries and rounding off
Rate per each
7.3.3 Supply of Integral street light luminaire of 250W HPSV
lamp fitting comprises of single piece die cast Aluminium
body with copper wound ballast and capacitor, Ignitor, with
pot optics including 250W HPSV lamp etc., complete.

a) Material
250W HPSV Lamp fitting single piece die cast each 1
Aluminium body with copper wound ballast and
capacitor, Ignitor, with pot optics
250W HPSV lamp each 1
Sundries and rounding off
Rate per each
7.4 METAL HALIDE LUMINAIRE
7.4.1 Supply of Integral street light luminaire of 70W MH lamp
fitting comprises of single piece die cast Aluminium body
with copper wound ballast and capacitor, Ignitor, with pot
optics including 70W MH lamp etc., complete

a) Material
70W MH Lamp fitting single piece die cast each 1
Aluminium body with copper wound ballast and
capacitor, Ignitor, with pot optics
70W MH lamp each 1
Sundries and rounding off
Rate per each
7.4.2 Supply of Integral street light luminaire of 150W MH lamp
fitting comprises of single piece die cast Aluminium body
with copper wound ballast and capacitor, Ignitor, with pot
optics including 150W MH lamp etc., complete.

a) Material
150W MH Lamp fitting single piece die cast Aluminium each 1
body with copper wound ballast and capacitor, Ignitor, with
pot optics

150W MH lamp each 1


Sundries and rounding off
Rate per each
7.4.3 Supply of Integral street light luminaire of 250W MH lamp
fitting comprises of single piece die cast Aluminium body
with copper wound ballast and capacitor, Ignitor, with pot
optics including 250W MH lamp etc., complete.

a) Material
250W MH Lamp fitting single piece die cast each 1
Aluminium body with copper wound ballast and
capacitor, Ignitor, with pot optics
250W MH lamp each 1
Sundries and rounding off
Rate per each
7.4.4 Supply of integral street light luminaire of 250W MH with IP-
65 protection, POT optics comprises of single piece die
cast Aluminium body with copper wound ballast and
capacitor with 250W MH lamp etc., complete.

a) Material
250W IP-65 MH Lamp fitting single piece die cast each 1
Aluminium body with copper wound ballast and
capacitor
Lamp cost of 250W MH lamp each 1
Sundries and rounding off
Rate per each
7.5 POST TOP LUMINAIRE
7.5.1 Supply of post top luminaire of mushroom type with clear
acrylic cover and comprises of control gear capsule die
cast Aluminium alloy with VPIT / copper ballast suitable for
9/11/13W CFL with lamp etc., complete.

a) Material
1X9/11/13W CFL Lamp fitting each 1
1X9/11/13W CFL Lamp each 1
Sundries and rounding off
Rate per each
7.5.2 Supply of 125W HPMV integral post top luminaire with
Aluminium canopy and acrylic diffuser with all standard
accessories and 125W HPMV lamp etc., complete.

a) Material
125W HPMV post top Lamp fitting each 1
Cost of 125W HPMV post top LAMP each 1
Sundries and rounding off
Rate per each
7.5.3 Supply of 70W HPSV integral post top luminaire with
Aluminium canopy and acrylic diffuser with all standard
accessories and 70W HPSV lamp etc., complete.

a) Material
70W HPSV post top Lamp fitting each 1
Cost of 70W HPSV post top lamp each 1
Sundries and rounding off
Rate per each
7.5.4 Supply of diamond / sphere type 80W HPMV post
top lantern luminaire with all standard accessories
including 80W M.V. lamp etc., complete

a) Material
80W HPMV post top diamond / sphere type Lamp fitting each 1

80W HPMV post top diamond / sphere type Lamp each 1

Sundries and rounding off


Rate per each
7.5.6 Supply of diamond / sphere type 125W HPMV post
top lantern luminaire with all standard accessories
including 125W M.V. lamp etc., complete.

a) Material
125W HPMV post top Lamp fitting each 1
125W HPMV post top Lamp each 1
Sundries and rounding off
Rate per each
7.5.7 Supply of diamond / sphere type 70W HPSV post
top lantern luminaire with all standard accessories
including 70W S.V. lamp etc., complete.

a) Material
70W HPSV diamond / sphere post top Lamp fitting each 1

70W HPSV diamond / sphere post top Lamp each 1


Sundries and rounding off
Rate per each
7.6 Well Glass Luminaires
7.6.1 Supply of 80W M.V integral wellglass luminaries with
all standard accessories and 80W MV lamp etc.,
complete.
a) Material
80W MV wellglass luminaries each 1
80W MV wellglass luminaries lamp each 1
Sundries and rounding off
Rate per each
7.6.2 Supply of 70W S.V. integral wellglass luminaries
with all standard accessories and 70W S.V. lamp
etc., complete.
a) Material
70W SV wellglass luminaires each 1
70W SV wellglass luminaries. each 1
Sundries and rounding off
Rate per each
7.7 Flood Light Luminaires
7.7.1 Supply of 500W Halogen fitting with all accessories
including 500W Halogen lamp etc., complete.

a) Material
500W halogen lamp fitting. each 1
500W halogen lamp each 1
Sundries and rounding off
Rate per each
7.7.2 Supply of 1000W Halogen fitting with all
accessories including 1000W Halogen lamp etc.,
complete.
a) Material
1000W halogen lamp fitting. each 1
1000W halogen lamp each 1
Sundries and rounding off
Rate per each
7.7.3 Supply of integral type flood light metal halide
luminaire of 250W comprising of die cast Aluminium
housing and a heat resistant toughned glass firmly
fixed by means of gasket and toggles with IP-65
protection incluidng control gear housing and all
accessories with 250W MH-T lamp etc., complete.

a) Material
250W MH flood light fitting each 1
250W MH lamp. each 1
Sundries and rounding off
Rate per each
7.7.4 Supply of integral type flood light metal halide
luminaire of 400W comprising of die cast Aluminium
housing and a heat resistant toughned glass firmly
fixed by means of gasket and toggles with IP-65
protection incluidng control gear housing and all
accessories with 400W MH-T lamp etc., complete.
a) Material
400W MH flood light fitting each 1
400W MH flood light lamps each 1
Sundries and rounding off
Rate per each
7.8 Labour Charges

7.8.1 Fixing of CFL luminaire (Down lights / Mirror optic /


Ornamental type fitting with all necessary
accessories in false ceiling / on wall including giving
connections and all labour charges etc., complete.

a) Material
23/0060 twin core flexible copper cable M 1
screws with rawal plugs each 2
Aluminium flat / cement and sand etc., labour charges. LS

b) Labour charges.
Skilled Electrician/carpenter day 0.066
Semi skilled Electrician / Helper day 0.066
Rate per each
Note : Labour Charges considered for15 fixtures / day .
7.9.2 Fixing of 70W MH down light and control gear box
with necessary accessories in false ceiling including
giving connections and all labour charges etc.,
complete.
a) Material
23/0060 twin core flexible copper cable M 1
screws with rawal plugs each 2
Aluminium flat / cement and sand etc., labour charges. LS

b) Labour charges
Skilled Electrician/carpenter day 0.125
Semi skilled Electrician / Helper day 0.125
Rate per each
Note : Labour Charges considered for 8 fixtures /
day .
7.9.3 Fixing of 40W tube light luminaire on wall / Ceiling with /
TW round blocks with all accessories including giving
connections and all labour charges etc., complete.

a) Material
23/0060 twin core flexible copper cable M 1
screws with rawal plugs each 2
T.W round blocks each 2
Cement and sand etc., LS
b) Labour charges
Skilled Electrician/carpenter day 0.1
Semi skilled Electrician / Helper day 0.1
Rate per each
Note : Labour Charges considered for 10 fixtures / day .
7.9.4 Fixing of 40W tube lights with 1/2 Mtr conduit suspension
arrangements from ceiling with hooks etc., including giving
connections and all labour charges etc., complete.
a) Material
1 20mm dia No.16 gauge conduit pipe . M 1
173 23/0060 twin core flexible copper cable each 1
Anchor screws / Hooks / Sockets & Check each 2
b) Labour charges
Skilled Electrician/carpenter day 0.166
Semi skilled Electrician / Helper day 0.166
Rate per each
Rate per each
7.9.5 Fixing of 40W street light luminaire to the wall with 1.0 Mtr.,
25mm dia GI pipe bracket and anti tilting MS flat etc.,
including giving connections and labour charges etc.,
complete.

a) Material
25mm dia G.I pipe M 1
23/0060 twin core flexible copper cable M 2
Pipe bending charges LS
M.S flat and welding charges LS
b) Labour charges
Skilled Electrician/carpenter day 0.2
Mason day 0.2
Semi skilled Electrician / Helper day 0.2
Rate per each
Note : Labour Charges considered for 5 fixtures /
day .
7.9.6 Fixing of CFL street light luminary with 1.0 Mtr., 25mm dia
GI pipe bracket and anti tilting MS flat etc., including giving
connections and labour charges etc., complete.

a) Material
25mm dia G.I pipe M 1
23/0060 twin core flexible copper cable M 2
Pipe bending charges LS
M.S flat and welding charges LS
b) Labour charges
Skilled Electrician/carpenter day 0.125
Mason day 0.125
Helper day 0.125
Rate per each
Note : Labour Charges considered for 8 fixtures /
day .
7.9.7 Fixing of mirror optic tube light luminaire in false
ceiling / pop with necessary arrangment including
giving connections and all labour charges etc.,
complete.
a) Material
28/0060 twin core flexible copper cable M 1
Aluminium flat (as per requirment) LS
b) Labour charges for cutting P.O.P / false
ceiling and Fixing MOT
Skilled Electrician day 0.125
Carpenter day 0.125
Semi skilled Electrician / Helper day 0.125
Rate per each
Note : Labour Charges considered for 8 Nos MOT lights in a day
7.9.8 Fixing of MV / SV/MH luminaire on wall with 1.0mt
40mm dia GI pipe bracket and anti-tilting MS flat, 2.5
Sq.mm flexible copper cable etc.,including all labour
charges for mason work and giving connections etc.,
complete.

a) Material
40mm G.I pipe for Bracket M 1
2.5 Sq.mm flexible copper cable M 4
Pipe bending charges LS
b) Labour charges for Antitiling MS flat / welding
charges & fixing
Skilled Electrician day 0.25
Carpenter day 0.25
Helper day 0.25
Welder day 0.25
Rate per each
Note : Labour Charges considered for 4Nos MV / SV / MH in a day
8 INTERNAL LUMINAIRE
8.1.1 Supply and fixing of single fancy bracket with glass
shade and bulb of approved colour and quality etc.,
by field officers
a) Material
Single Fancy bracket each 1
60W Bulb each 1
b) Labour charges
Skilled Electrician day 0.04
Helper day 0.04
Sundires LS
Rate per each
Note : Labour Charges considered for 25Jobs per Day
8.1.2 Supply and fixing of double fancy bracket with glass
shade and bulb of approved colour and quality etc.,
by field officers.
a) Material
Double Fancy bracket each 1
60W Bulb each 2
b) Labour charges
Skilled Electrician day 0.05
Helper day 0.05
Sundires
Rate per each
Note : Labour Charges considered for 20Jobs /Day

8.1.3 Supply and fixing 10" ceiling fittings with glass doom
and bulb apporved by dept., officers including giving
connection etc., complete.
a) Material
10" Ceiling fitting with glass doom each 1
60W Bulb each 1
b) Labour charges
Skilled Electrician day 0.05
Helper day 0.05
Sundires
Rate per each
Note : Labour Charges considered for 20 Jobs / Day

8.1.4 Supply and fixing of Bulk head fitting with cast


Aluminium enamel painted body with water tight,
clear glass with wire guard hinged with lock and key
arrangements etc., complete with lamp.

a) Material
1245 Bulkhead fitting each 1
767 60W Bulb each 1
b) Labour charges
1317 Skilled Electrician day 0.083
1322 Helper day 0.083
Sundires such as TW block / screws, cement etc.,

Rate per each


Note : Labour Charges considered for 12 Jobs / Day

8.2 Flourescent Luminaire


8.2.1 Supply and transportation of 1x11 W mirror light with
all standard accessories diffuser and 1No 11W CFL
lamp etc., complete
a) Material
1x11W M.O. fitting each 1
Cost of C.F.L. each 1
Sundries and rounding off
Rate per each
8.2.2 Supply and Transportation of 1x36/40W box type
tube light luminaire with copper / VPIT Choke,
condensor, starters etc., and 1No 36/40W tube etc.,
complete.
a) Material
1x40/36 box type T.L fitting each 1
36/40 Tube each 1
Sundries and rounding off
Rate per each
8.2.3 Supply and transportation of 2x36/40W box type
tube light luminaire with 2Nos copper / VPIT chokes,
starters, with condensor and 2Nos 36/40W tube etc.,
complete.
a) Material
680 2x40/36 box type T.L fitting each 1
782 36/40 FTL each 2
Sundries and rounding off
Rate per each
8.2.4 Supply and Transportation of 1x40W patty type tube light
luminaire with copper choke, starter etc., including 1No
40W tube etc., complete.

a) Material
1x40 patty type T.L. fitting each 1
40W FTL each 1
Sundires and rounding off
Rate per each
8.3 INDUSTRIAL luminaire
8.3.1 Supply and Transportation of white vitreous 1x36 / 40W
industrial box type luminaire with Copper / VPIT Choke,
Condensor, Starters etc., with reflector including 1No 40W
tube etc., complete.

a) Material
1x36/40W Industrial box type T.L. fitting each 1
36/40W FTL each 1
Sundries and rounding off
Rate per each
8.3.2 Supply and Transportation of white vitreous 2x36 / 40W
industrial box type luminaire with 2Nos Copper / VPIT
Choke, Condensor, Starters etc.,complete with reflector
including 2Nos 40W tube etc., complete.

a) Material
2x36/40W Industrial box type T.L. fitting each 1
36/40W FTL each 2
Sundries and rounding off
Rate per each
8.4 MIRROR OPTIC luminaire
8.4.1 Supply and Transportation of 2x36 / 40W surface mounting
mirror optic luminaire with powder coated CRCA sheet
steel housing with Aluminium mirror reflectors with VPIT
chokes, Starters, Condensor etc., complete with 2Nos
36/40W tubes etc.,complete.

a) Material
2x36/40 Surface M.O.L fitting each 1
40/36 FTL each 2
Sundries and rounding off
Rate per each
8.4.2 Supply and transportation of 2x36/40W recessed mounting
mirror optic (darklite) luminaire with powder coated CRCA
sheet steel housing with Aluminium mirror reflector with
VPIT Chokes, Starter, Condensor etc., complete with 2Nos
36/40W tubes etc., complete.

a) Material
695 2x36/40 Recessed M.O. L fitting each 1
782 36/40 FTL each 2
Sundries and rounding off
Rate per each
8.4.3 Supply and transportation of 2x11W surface mounting
mirror optic luminaire with powder coated CRCA sheet
steel housing with Aluminium mirror refector with VPIT
Chokes and 2Nos 11W CFL lamps etc., complete.

a) Material
2x11W CFL surface M.O.L fitting each 1
11W CFL each 2
Sundries and rounding off
Rate per each
8.4.4 Supply and transportation of 2x11W Recessed type
luminaire with powder coated CRCA sheet steel
housing with Aluminium mirror refector with VPIT
Chokes and 2Nos 11W CFL lamps etc., complete.

a) Material
2x11W CFL recessed M.O.L fitting each 1
11W cfl each 2
Sundries and rounding off
Rate per each
8.4.5 Supply and transportation of 2x36w CFL paralite
louvre (P5) recessed low glare mirror optic luminaire
comprising bright anodised Aluminium reflector with
VPIT Chokes and 36w CFL lamps.

a) Material
2x36 CFL PS paralite Louvars fitting each 1
36w CFL each 2
Sundries and rounding off
Rate per each
8.4.6 Supply and transportation of 3x36w CFL paralite
louvre (P5) recessed low glare mirror optic luminaire
comprising bright anodised Aluminium reflector with
VPIT Chokes and 3x36w CFL lamps.

a) Material
3x36 CFL PS paralite Louvars fitting each 1
36w CFL each 3
Sundries and rounding off
Rate per each
8.5 T- 5 Luminaires.
8.5.1 Supply and transportation of 1X28W surface
pendant mounting T- 5 extruded Aluminium with
Aluminium reflector luminaire with all standard
accessories and connections etc., complete with 1
No. 28 W tube

a) Material
1x28w pendant T5 lugs fitting each 1
28w T5 FTL each 1
Sundries and rounding off
Rate per each
8.5.2 Supply and transportation of 2X28W recessed With
2 Nos. pendant mounting low glare T- 5 mirror optic
luminaire with electronic Ballasts etc., complete 28w
tubes.
a) Material
2x28w T5 M.O. fitting each 1
28w T5 FTL each 2
Sundries and rounding off
Rate per each
8.6 C.F.L. Down Lights
8.6.1 Supply and transportation of recessed mounting
1x13W CFL down light with all standard accessories
with 1No. 13W CFL lamp (D type) etc., complete.

a) Material
1x13W CFL Down light fitting each 1
13W CFL each 1
Sundries and rounding off
Rate per each
8.6.2 Supply and transportation of recessed mounting
2x13W CFL down light with all standard accessories
with 2No. 13W CFL lamp etc., complete.

a) Material
2x13W CFL Down light fitting each 1
13W CFL each 2
Sundries and rounding off
Rate per each
8.6.3 Supply and transportation of recessed mounting
1x18W CFL down light with all standard accessories
with 1No. 18W CFL lamp etc., complete.

a) Material
1x18W CFL Down light fitting each 1
18W CFL each 1
Sundries and rounding off
Rate per each
8.6.4 Supply and transportation of recessed mounting
2x18W CFL down light with all standard accessories
with 2No. 18W CFL lamp etc., complete.

a) Material
2x18W CFL Down light fitting each 1
18W CFL each 2
Sundries and rounding off
Rate per each
8.6.5 Supply and Transportation recess mounting 70W
metal hallide down lighter with control gear and 1No
70W M.H lamp etc., complete.
a) Material
70W M.H down light fitting each 1
70W M.H lamp each 1
Sundries and rounding off
Rate per each
8.6.6 Supply and Transportation of Ceiling / Wall mounted
Circular 1x13W luminaire with decorative acrylic
diffuser and 1 No. 13W CFL lamp (circular type) etc.,
complete.
a) Material
1x13W Circular CFL fitting each 1
13W CFL each 1
Sundries and rounding off
Rate per each
8.6.7 Supply and Transportation of Ceiling / Wall mounted
Circular 2x13W luminaire with decorative acrylic
diffuser and 2 No. 13W CFL lamp (circular type) etc.,
complete.
a) Material
2x13W Circular CFL fitting each 1
13W CFL each 2
Sundries and rounding off
Rate per each
8.7 HALOGEN DOWN LIGHTERS
8.7.1 Supply and Transportation of recess mounting 12v,
50w adjustable halogen down light with white /
colour Shade including transformer and 1No 50w
halogen lamp etc., complete.
a) Material
50w Halogen recessed mounting each 1
50w Halogen bulb each 1
Sundries and rounding off
Rate per each
8.7.2 Supply and Transportation of recess mounting 12v,
50w Zoom type halogen down light with white /
colour Shade including transformer and 1No 50w
halogen lamp etc., complete.
a) Material
50w Halogen zoom type down light. each 1
50w Halogen bulb each 1
Sundries and rounding off
Rate per each
9 AIR CONDITIONING & REFRIGERATION
9.1 Air-Conditioners
9.1.1(a) Supply and Transportation of Window mounted type, Room
Air-Conditioner 1.5 Ton confirming to IS : 1391, Suitable
for operation on 230V + 10% 50 Hz.., Single phase, A.C.
Supply capable for performing Cooling, Dehumidifying, Air
Circulating, Filtering and Ventilation etc., complete.

a) Material
1.5 Ton A.C Unit
ADD : Duties & Taxes as applicable
Transportation on Material 2%
Rate per each
9.1.1(b) Supply and Transportation of Window mounted type, Room
Air-Conditioner 2.0 Ton confirming to IS : 1391, Suitable
for operation on 230V + 10% 50 Hz.., Single phase, A.C.
Supply capable for performing Cooling, Dehumidifying, Air
Circulating, Filtering and Ventilation etc., complete.

a) Material
2.0 Ton A.C Unit
ADD : Duties & Taxes as applicable
Transportation on Material 2%
Rate per each
9.1.2 Supply and Transportation of 1.5 Ton Split type Air-
(a) Conditiner, fitted with Hermetically sealed compressor,
Operating on refrigerant R-22 / Non - CFC High wall
mounting confirming to IS : 1391, suitable for operation on
230V, 50 Hz.., Single phase, A.C Supply capable of
performing Cooling, Dehumidifying, Air Circulating,
Filtering with cooling and condensing units, with 5 Mtr of
required size of copper piping duly insulated and 3 core
copper flexible chord of required length etc., complete.

a) Material
1.5 Ton Split A.C Unit ABS (Plastic Cabin)
ADD : Duties & Taxes as applicable
Transportation on Material 2%
Rate per Each
9.1.2 Supply and Transportation of 2.0 Ton Split type Air-
(b) Conditiner, fitted with Hermetically sealed compressor,
Operating on refrigerant R-22 / Non - CFC High wall
mounting confirming to IS : 1391, suitable for operation on
230V, 50 Hz.., Single phase, A.C Supply capable of
performing Cooling, Dehumidifying, Air Circulating, Filtering
with cooling and condensing units, with 5 Mtr of required
size of copper piping duly insulated and 3 core copper
flexible chord of required length etc., complete.

a) Material
2.0 Ton Split ABS Plastic Cabin A.C Unit
ADD : Duties & Taxes as applicable
Transportation on Material 2%
Rate per Each
9.1.3 Installation Charges for 1/0 / 1.5 / 2.0 Ton Window type
room Air-Conditioner with insulating foam, testing and
commissioning etc., complete.

a) Material
Installation Charges of Window type A.C.Unit. (as
per observed Data)
Rate per Each
9.1.4 Installation Charges for 1.5 / 2.0 Ton Split Air-Conditioner
with foam, insulation for copper pipings connected for the
Indoor and outdoor unit including testing and
commissioning etc., complete.

a) Material
Installation Charges of 1/5 / 2.0 Ton Split A.C.Unit.
(As per observed Data )
Rate per Each
9.1.5 Supply, Fabrication and installation of well seasoned T.W.
frame of size 685 x 483 mm (27" x 19") ( with section size
of 75 x 100 mm (3" x 4" T.W.)) for 1.0 / 1.5 / 2.0 Ton
Window A.C.Unit duly making necessary provision in the
wall / Window with cost and conveyance of all materials
etc., complete

a) Material
Well seasoned wooden frame for Window A.C Units cum 0.018

b) Labour charges for fabrication & Fixing


Carpenter day 0.5
Mason day 0.5
Helper day 0.5
Making necessary provision in wall / window with LS
Hardware
Rate per Each
Note : Labour is Considered for 2 jobs / day
9.1.6 Supply, Fabrication and installation of 38 x 38 x 6 mm (1.5"
x 1 1/2" x 1/4") M.S. angle Iron frame suitable for
condensing Unit for Split A.C including 2 Coats of Red
oxide the followed by 2 coats enamel paint etc., complete.

a) Material
38 x 38 x 6 mm (1.5" x 1 /12" x 1/4") angle iron kg 10.5
frame, 13 M length (1 Mtr = 3.5 Kgs)
Fabrication charges including Painting kg 10.5
b) Labour charges for Fixing
Carpenter day 0.25
Mason day 0.25
Helper day 0.25
Sundires such as cement etc. LS
Rate per Each
Note : Labour is Considered for 4 jobs / day
9.1.7 Supply and Installation of copper tubing between indoor
and outdoor unit for split Air-Conditioner including foaming
etc., complete.

a) Material
Copper tubing between indoor and outdoor units inlcuding
foaming
b) Labour charges for cutting, bending, welding
etc.,
Welder day 0.04
Helper day 0.04
Rate per Metre
Note : Labour is Considered for 25 M / day
9.2 REPAIRS TO AIR - CONDITIONERS
9.2.1 Replacement of defective compressor by supply of 1.0 / 1.5
Ton brand new sealed compressor ISI Mark
a) Material
Supply of brand new.1/ 1.5 Ton compressor ISI Mark each 1
b) Labour charges
Skilled Electrician day 0.5
Helper day 0.5
Transportation on Material 2%
Rate per Each
Note : Labour is Considered for 2 jobs / day
9.2.2 Replacement of defective compressor by supply of 2.0 Ton
brand new sealed compressor ISI Mark
a) Material
Supply of brand new 2.0 Ton compressor by brand new ISI each 1
Mark
b) Labour charges
Skilled Electrician day 0.5
Helper day 0.5
Transportation on Material 2%
Rate per Each
Note : Labour is Considered for 2 jobs / day
9.2.3 Replacement of old and Unserviceable Fan Motor by
supply and Installation of new 1/6th H.P multi speed Fan
Motor suitable for 1.0 / 1.5 / 2.0 Ton Window A.C.Unit.

a) Material
Supply of 1/6th H.P multispeed Fan Motor for 1.0 / 1.5 / 2.0 each 1
T A.C.Unit.
b) Labour charges
Skilled Electrician day 0.5
Helper day 0.5
Rate per Each
Note : Labour is Considered for 2 jobs / day
9.2.5 Replacement of Unserviceable fan motor capacitor 6
mfd by new capacitor for A.C machine of 1.0 1.5 /
Ton Capacity.
a) Material
6 MFD motor capacitor each 1
b) Labour charges for removing old one & fixing

Semi skilled Electrician day 0.2


Rate per Each
Note : Labour is Considered for 5 jobs / day
9.2.6 Replacement of Unserviceable Thermostat switch by
supply and installation of new thermostat switch
suitable for 1.0 / 1.5 / 2.0 Ton A.C.Unit.

a) Material
Thermostat switch for 1.0 / 1.5 / 2.0 Ton A.C.Unit. each 1

b) Labour charges for removing old one & fixing

Semi skilled Electrician day 0.2


Rate per Each
Note : Labour is Considered for 5 jobs / day
9.2.7 Replacement of Unserviceable starting capacitor of
80 to 120 mfd. By new approved make capacitor
suitable for compressor motor of 1.0 / 1.5 Ton A.C.
Unit.
a) Material
Starting capacitor of 80 to 120 mfd. each 1
b) Labour charges for removing old one & fixing

Semi skilled Electrician day 0.2


Rate per Each
Note : Labour is Considered for 5 jobs / day
9.2.8 Replacement of unserviceable running capacitor of
36 mfd by new approved make capacitor suitable for
compressor motor of 1.0 / 1.5 Ton A.C.Unit.

a) Material
Running capacitor 36 mfd each 1
b) Labour charges for removing old one & fixing

Semi skilled Electrician day 0.2


Rate per Each
Note : Labour is Considered for 5 jobs / day
9.2.9 Replacement of Unserviceable relay by new
approved make having pickup voltage 220 Volts and
dropout voltage 120 Volts suitable for 1.0 / 1.50 Ton
A.C. Unit.
a) Material
Relay having pickup 220V and dropout voltage 120V each 1

b) Labour charges for removing old one & fixing

Semi skilled Electrician day 0.2


Rate per Each
Note : Labour is Considered for 5 jobs / day
9.2.10 Replacement of Unserviceable filter and capillary
tube by supply and installation of new filter and
capillary tube including welding et., complete for
1.0 / 1.5 / 2.0 Ton A.C.Unit.
a) Material
Filter and capillary tube for 1.0 / 1.5/2.0 Ton A.C.Unit each 1

b) Labour charges for removing old one & fixing

Semi skilled Electrician day 0.2


Rate per Each
Note : Labour is Considered for 5 jobs / day
9.2.11 Replacement of Unserviceable air filter by new air
filter suitable for 1.50 Ton A.C.Unit P.V.C. / NYLON
for Window A.C.
a) Material
PVC / Nylon Air Filter for Window type A.C.Unit. each 1
b) Labour charges for removing old one & fixing

Semi skilled Electrician day 0.2


Rate per Each
Note : Labour is Considered for 5 jobs / day
9.2.11( Replacement of Unserviceable air filter by new air
a) filter suitable for 1.50 Ton A.C.Unit P.V.C. / NYLON
for Split A.C.
a) Material
PVC / Nylon Air Filter for Split type A.C.Unit. each 1
b) Labour charges for removing old one & fixing

Semi skilled Electrician day 0.2


Rate per Each
Note : Labour is Considered for 5 jobs / day
9.3 Refrigerators
9.3.1 Supply Refrigerator domestic type approved make
165 to 310 Ltrs. Storage capacity, suitable for
operation on 230 /250 Volts 50 Hz.. complete with
automatic temparture control confirming to IS
specifications No. 1476 / 79 with one year guarantee
for seale unit in refrigeration system including cost
and conveyance of all materials and labour charges
etc., complete.

a) Material
----- capacity refrigerator cost each 1
Transportation @ 2% of Unit Cost 2%
Loading, Unloading & Instalation @ 2% of Unit Cost 2%

Rate per Each


9.6 Stabilizers
9.6.1 Supply and erecting fully automatic line voltage
stabilizer for operation on input voltage 200 to
250V. rated for 0.5 KVA maximum load and time
delay model with Volt meter, selector switch, 6A /
16A flush type, 5 pin socket for out put and with 3
core flexible chord and 3 pin 6/16A plug top suitable
for refrigerator for continuous operation including
cost and conveyance of all mateials and all labour
charges etc., complete.

a) Material
0.5 KVA Stabilizer each 1
b) Labour Charges
Semi skilled Electrician day 0.044
Helper day 0.044
Transportation Charges on Unit Cost 2%
Rate per Each
Note : Labour is Considered for 23 jobs / day
9.6.2 Supply and erecting fully automatic line voltage
stabilizer for operation on input voltage 200 to 250V.
rated for 1 KVA maximum load and time delay
model with Volt meter, selector switch, 6A / 16A
flush type, 5 pin socket for out put and with 3 core
flexible chord and 3 pin 6/16A plug top suitable for
refrigerator for continuous operation including cost
and conveyance of all mateials and all labour
charges etc., complete.

a) Material
1 KVA Stabilizer each 1
b) Labour Charges
Semi skilled Electrician day 0.044
Helper day 0.044
Transportation Charges on Unit Cost 2%
Rate per Each
Note : Labour is Considered for 23 jobs / day
9.6.3 Supply and erecting fully automatic line voltage
stabilizer for operation on input voltage 200 to 250V.
rated for 3 KVA / 4 KVA / 5 KVA maximum load and
time delay model with Volt meter, selector switch,
6A / 16A flush type, 5 pin socket for out put and with
3 core flexible chord and 3 pin 6/16A plug top
suitable for refrigerator for continuous operation
including cost and conveyance of all mateials and all
labour charges etc., complete.

a) Material
3 KVA / 4 KVA / 5 KVA Stabilizer each 1
b) Labour Charges
Skilled Electrician day 0.1
Helper day 0.1
Transportation Charges on Unit Cost 2%
Rate per Each
Note : Labour is Considered for 10 jobs / day
9.7 Fans
9.7.2 Supply of 900 mm (36") / 1200 mm (48") / 1400 mm
(56") sweep 230V, A.C 50 Hz.Ceiling fan with 3
Blades and double ball bearings with all standard
accessories.
a) Material
900 mm (36") / 1200 mm (48") / 1400 mm (56") each 1
Ceiling Fan
Transportation Charges on Unit Cost 1%
Rate per Each
9.7.7 Supply and erecting wall mounting fan 400mm
(16") / 450 mm (18") sweep A.C. 50Hz.. 1350 r.p.m
oscillating type with regulator.
a) Material
400mm (16") / 450 mm (18") wall mounting Fan each 1

b) Labour Charges
Semi Skilled Electrician day 0.1
Helper day 0.1
Rate per Each
Note : Labour is Considered for 10 jobs / day
9.7.10 Supply of pedastal fan (16") 400mm, 250 Volts,
50Hz. oscillating type complete with all standard
accessories.
a) Material
400mm (16") Pedastal Fan each 1
Transportation Charges on Unit Cost 2%
Rate per Each
9.7.16 EXHAUST FANS
Supply of fresh air exhaust fan of light duty 250V
A.C.50Hz.. 225 mm (9") / 300mm size (12") 1350
R.P.M Metallic body plastic blades, wire mesh, etc.,
complete.
a) Material
225 mm (9") / 300mm (12") L.D. Exhaust Fan each 1
Transportation Charges on Unit Cost 1%
Rate per Each
9.7.18 Supply of fresh air exhaust fan of Heavy duty 250V
A.C.50Hz.. 300mm size (12") / 375 mm (15") 900
R.P.M etc., complete.
a) Material
300mm (12") / 375 mm (15") H.D. Exhaust Fan each 1
Transportation Charges on Unit Cost 1%
Rate per Each
9.7.24 Supply and erecting fan hook of 12/15mm dia M.S.
rod / bar grouted in RCC slab with making the slab
as original.
a) Material
12/15mm plain M.S rod for Fan hook each 1
Cement, Sand and Rounding off LS
b) Labour charges for grouting in RCC slab,
Fixing of Fan hook with masonary work.
Mason day 0.166
Helper day 0.166
Rate per Each
Note : Labour is Considered for 6 jobs / day
9.7.25 Supply and erecting 19/20mm steel tube down rod
of one meter length with bolts & nuts duly painted
with matching colour of fan complete
a) Material
19/20mm steel tube down rod with bolts & nuts for M 1
fan with maching colour.
b) Labour charges for Fixing
Helper day 0.1
Rate per Each
Note : Labour is Considered for 10 jobs / day
9.7.26 Supply and erecting resistance type regulator for
ceiling fans 900/1200/1400mm sweep complete
erected on existing board.
a) Material
Resistance type Regulator M 1
b) Labour charges.
Semi skilled Electrician day 0.1
Rate per Each
Note : Labour is Considered for 10 jobs / day
9.7.33 Cleaning of Ceiling fan in existing position .
Labour charges for cleaning greasing /
oilingoverhauling
Helper day 0.2
Rate per Each
Note : Labour is Considered for 10 jobs / day by 2 helpers
9.7.34 Removing the ceiling fan and refixing after
overhauling and greasing the bearings and
replacement of wire leads etc complete
a) Material
173 23/0060 twin core wire M 1
b) Labour charges.
Removing and refixing of ceiling fan after
overhauling
Semi skilled Electrician day 0.166
Helper day 0.166
sundries LS
Rate per Each
Note : Labour is Considered for 6 jobs / day
9.7.35 Labour Charges
Labour charges for Fixing of Ceiling fan and
regulator including transportation and giving
connections with twin core wire etc., complete.
a) Material
23/0060 Twin Core wire M 1
Unforseen item works, such as painting to down rod, LS
screws etc.,
b) Labour charges.
Skilled Electrician day 0.125
Helper day 0.125
Rate per Each
Note : Labour is Considered for 8 fans / day
9.7.36 Labour charges for fixing of Exhaust fan in wall with
necessary connections and masonary work of
making hole, finishing etc., complete
a) Material
23/0060 Twin flat wire M 1
Cement kg 25
b) Labour charges.
Skilled Electrician day 0.25
Helper day 0.25
Mason day 0.25
Sundries such as Sand, Bolt, Nuts etc., LS
Rate per Each
Note :1. Labour is Considered for 6 jobs / day
2. Cost of louver shutter may be added if required.

3. If hole is already made available, labour charges


of Mason shall be deleted.
10 WATER HEATERS
10.1.2 Supply and Transportation of stove enamelled storage /
pressure type vertical / Horizontal water heater with copper
tank 25 / 35 / 50 Ltrs. Capacity with non return valve on
inlet side and dead weight pressure reducing valve on
outlet side 230/ 250V, single phase 2000 watts heating
element, thermostat control, fusible plug, pilot lamp etc.,
erected and tested complete with ISI specifications etc.,
including all materials, transportation, and labour charges
complete.

a) Material
25 / 35 / 50 Ltrs. Water Heater each 1
Transportation Charges on Unit Cost 2%
Rate per Each
10.1.5 Labour charges for erection of storage water heater with
2Nos Nylon / PVC / Metalic hose pipe etc., on wall duly
making necessary fixing arrangments including connections
etc., complete.

a) Material
Flexible Nylon / PVC / Metallic hose pipe each 2
50 / 100 mm (2" / 4") long bolt and nut with washers each 4

Towards wooden plugs, cement etc., LS


b) Labour charges.
Skilled Electrician day 0.25
Helper day 0.5
Semi skilled Mason day 0.25
Rate per Each
Note : Labour is Considered for 4 jobs / day
10.2 INSTANT WATER HEATERS
10.2.1 Supply and erecting ISI Mark 3KW Instant Water
heater with multiple safety system, rust free ABS
plastic body, 230V, 50Hz.., A.C. supply with inlet
and outlet connections with pvc/ nylon / metallic
hose pipe, thermostat control and thermal cutoff with
3 core P.V.C. flexible wire leads duly tested
including cost of all materials and all labour charges
etc., complete.

a) Material
3KW Instant Water Heater each 1
Transportation Charges on Unit Cost 2%
Hose pipe PVC/ Nylon each 2
T.W getting Bolt / Nuts, Cement, Sand etc. LS
b) Labour charges.
Skilled Electrician day 0.25
Helper day 0.25
Rate per Each
Note : Labour is Considered for 4 jobs / day
10.4 REPAIRS TO WATER HEATERS.
10.4.1 Replacement of unserviceable heating element by
new one for 1.5 / 2.0 / 3.0 Kw water heater
a) Material
2/3 KW heating Element each 1
b) Labour charges.
Skilled Electrician day 0.2
Sundries and rounding off LS
Rate per Each
Note : Labour is Considered for 5 jobs / day
10.4.2 Replacement of Unserviceable thermostat by new
thermostat with range 30 to 90 C. adjustable and
suitable for 25 to 50 Ltrs. Capacity.

a) Material
Thermostat range 30-90 Degree suitable for 25 to 50 Ltrs. each 1

b) Labour charges.
Skilled Electrician day 0.2
Sundries and rounding off LS
Rate per Each
10.4.5 Replacing unserviceable pressure release valve by
new water heater of 15 to 50 Ltrs.capacity.

a) Material
Pressure release valve for 25 to 50 Ltrs water heater each 1

b) Labour charges.
Skilled Electrician day 0.2
Sundries and rounding off LS
Rate per Each
11 WATER PUMPS
11.1 Mono-Block Pumps
11.1.1 Supply and erecting approved make centrifugal water pump
with impeller, priming funnel cork, companion metallic
flanges, with bolts and nuts and mounted on a common
shaft of high efficient squirrel cage Induction motor totally
enclosed and fan cooled type suitable to operate on 230V,
Single phase, 50Hz.. 1440 RPM A.C.Supply of 0.5HP
exculding suction / delivery pipe with nuts duly grouted on
existing C.C foundation and bolts, spring washers of
requisite size for monoblock motor and pump (IS : 9079).

a) Material
0.5HP, 230V, single phase A.C 50Hz. 1440 RPM each 1
with all accessories. Including all taxes
Transportation Charges on Unit Cost 2%
b) Labour charges for erection of pump set
including pipe connection for suction & delivery
Skilled Fitter day 0.5
Helper day 1
Plumber day 0.5
Sundries and rounding off LS
Rate per Each
Note : Labour is Considered for 2 jobs / day
11.1.2 Supply and erecting approved make centrifugal water pump
with impeller, priming funnel cork, companion metallic
flanges, with bolts and nuts and mounted on a common
shaft of high efficient squirrel cage Induction motor totally
enclosed and fan cooled type suitable to operate on 230V,
Single phase, 50Hz.. 1440 RPM A.C.Supply of 1HP
exculding suction / delivery pipe with nuts duly grouted on
existing C.C foundation and bolts, spring washers of
requisite size for monoblock motor and pump (IS : 9079).

a) Material
1 HP, 230V, single phase A.C 50Hz. 1440 RPM with each 1
all accessories. Including all taxes
Transportation Charges on Unit Cost 2%
b) Labour charges for erection of pump set
including pipe connection for suction & delivery

Skilled Fitter day 0.5


Helper day 1
Plumber day 0.5
Sundries and rounding off LS
Rate per Each
11.1.3 Supply and erecting approved make centrifugal water pump
with impeller, priming funnel cork, companion metallic
flanges, with bolts and nuts and mounted on a common
shaft of high efficient squirrel cage Induction motor totally
enclosed and fan cooled type suitable to operate on 230V,
Single phase, 50Hz.. 1440 RPM A.C.Supply of 1.5 HP
exculding suction / delivery pipe with nuts duly grouted on
existing C.C foundation and bolts, spring washers of
requisite size for monoblock motor and pump (IS : 9079).

a) Material
1.5 HP, 230V, single phase A.C 50Hz. 1440 RPM with all each 1
accessories. Including all taxes
Transportation Charges on Unit Cost 2%
b) Labour charges.
Skilled Fitter day 0.5
Helper day 1
Plumber day 0.5
Sundries and rounding off LS
Rate per Each
11.1.4 Supply and erecting approved make centrifugal water pump
with impeller, priming funnel cork, companion metallic
flanges, with bolts and nuts and mounted on a common
shaft of high efficient squirrel cage Induction motor totally
enclosed and fan cooled type suitable to operate on 230V,
Single phase, 50Hz.. 1440 RPM A.C.Supply of 2.0 HP
exculding suction / delivery pipe with nuts duly grouted on
existing C.C foundation and bolts, spring washers of
requisite size for monoblock motor and pump (IS : 9079).

a) Material
2 HP, 230V, single phase A.C 50Hz. 1440 RPM with each 1
all accessories. Including all taxes
Transportation Charges on Unit Cost 2%
b) Labour charges for erection of pump set
including pipe connection for suction & delivery

Skilled Fitter day 0.5


Helper day 1
Plumber day 0.5
Sundries and rounding off LS
Rate per Each
11.1.5 Supply and erecting approved make centrifugal water pump
with impeller, priming funnel cork, companion metallic
flanges, with bolts and nuts and mounted on a common
shaft of high efficient squirrel cage Induction motor totally
enclosed and fan cooled type suitable to operate on 415V,
3 phase, 50Hz.. 2880 RPM A.C.Supply of 3.0HP exculding
suction / delivery pipe with nuts duly grouted on existing
C.C foundation and bolts, spring washers of requisite size
for monoblock motor and pump (IS : 9079).

a) Material
3 phase, 3 HP, 415V, 50Hz., 2880 RPM centrifugal each 1
Water pump with all taxes
Transportation Charges on Unit Cost 2%
b) Labour charges for erection of pump set
including pipe connection for suction & delivery

Skilled Fitter day 1


Helper day 1
Plumber day 1
Sundries and rounding off LS
Rate per Each
11.1.6 Supply and erecting approved make centrifugal water pump
with impeller, priming funnel cork, companion metallic
flanges, with bolts and nuts and mounted on a common
shaft of high efficient squirrel cage Induction motor totally
enclosed and fan cooled type suitable to operate on 415V,
3 phase, 50Hz.. 2880 RPM A.C.Supply of 5HP exculding
suction / delivery pipe with nuts duly grouted on existing
C.C foundation and bolts, spring washers of requisite size
for monoblock motor and pump (IS : 9079).

a) Material
3 phase, 5 HP, 415V, 50Hz., 2880 RPM centrifugal each 1
Water pump with all taxes
Transportation Charges on Unit Cost 2%
b) Labour charges for erection of pump set
including pipe connection for suction & delivery

Skilled Fitter day 1


Helper day 1
Plumber day 1
Sundries and rounding off LS
Rate per Each
11.1.7 Supply and erecting approved make centrifugal
water pump with impeller, priming funnel cork,
companion metallic flanges, with bolts and nuts and
mounted on a common shaft of high efficient squirrel
cage Induction motor totally enclosed and fan cooled
type suitable to operate on 415V, 3 phase, 50Hz..
2880 RPM A.C.Supply of 7.5HP exculding suction /
delivery pipe with nuts duly grouted on existing C.C
foundation and bolts, spring washers of requisite
size for monoblock motor and pump (IS : 9079).

a) Material
3 phase, 7.5 HP, 415V, 50Hz., 2880 RPM each 1
centrifugal mono block pump with all taxes
Transportation Charges on Unit Cost 2%
b) Labour charges for erection of pump set
including pipe connection for suction & delivery

Skilled Fitter day 1


Helper day 1
Plumber day 1
Sundries and rounding off LS
Rate per Each
11.1.8 Supply and erecting approved make centrifugal water pump
with impeller, priming funnel cork, companion metallic
flanges, with bolts and nuts and mounted on a common
shaft of high efficient squirrel cage Induction motor totally
enclosed and fan cooled type suitable to operate on 415V,
3 phase, 50Hz.. 2880 RPM A.C.Supply of 10HP exculding
suction / delivery pipe with nuts duly grouted on existing
C.C foundation and bolts, spring washers of requisite size
for monoblock motor and pump (IS : 9079).

a) Material
3 phase, 10 HP, 415V, 50Hz., 2880 RPM centrifugal each 1
mono block pump with all taxes
Transportation Charges on Unit Cost 2%
b) Labour charges for erection of pump set
including pipe connection for suction & delivery

Skilled Fitter day 1


Helper day 1
Plumber day 1
Sundries and rounding off LS
Rate per Each
11.1.9 Supply and erecting approved make centrifugal
water pump with impeller, priming funnel cork,
companion metallic flanges, with bolts and nuts and
mounted on a common shaft of high efficient squirrel
cage Induction motor totally enclosed and fan cooled
type suitable to operate on 415V, 3 phase, 50Hz..
2880 RPM A.C.Supply of 15HP exculding suction /
delivery pipe with nuts duly grouted on existing C.C
foundation and bolts, spring washers of requisite
size for monoblock motor and pump (IS : 9079).

a) Material
3 phase, 15 HP, 415V, 50Hz., 2880 RPM centrifugal each 1
Water pump with all taxes
Transportation Charges on Unit Cost 2%
b) Labour charges for erection of pump set
including pipe connection for suction & delivery

Skilled Fitter day 1


Helper day 3
Plumber day 1
Sundries and rounding off LS
Rate per Each
11.2 EJECTO PUMPS
11.2.1 Supply and erecting Ejecto type water pump single
phase, 0.5HP single stage with brass venturi and
having suction pipe 40mm dia, pressure pipe 32mm
dia and delivery pipe 32mm dia, with maximum
discharge head of 80 feet including transportation of
all materials and labour charges etc., complete.

a) Material
0.5 HP, single phase, 230V, 50Hz. Ejecto type pump each 1
set. Including all taxes
M.S clamps suitable for 40mmx32mm pipes with each 2
nuts and bolts.
Transportation Charges on Unit Cost 2%
b) Labour charges for erection of pump set
including pipe connection for suction & delivery

Skilled Electrician day 0.5


Helper day 1
Fitter day 0.5
Sundries and rouding off LS
Rate per Each
Note : Labour is Considered for 2 jobs / day
11.2.2 Supply and erecting Ejecto type water pump single
phase, 1.0HP single stage with brass venturi and
having suction pipe 40mm dia, pressure pipe 32mm
dia and delivery pipe 32mm dia, with maximum
discharge head of 80feet including transportation of
all materials and labour charges etc., complete.

a) Material
1.0 HP, single phase, 230V, 50Hz. Ejecto type pump each 1
set. Including all taxes
M.S clamps suitable for 40mmx32mm pipes with each 2
nuts and bolts.
Transportation Charges on Unit Cost 2%
b) Labour charges for erection of pump set
including pipe connection for suction & delivery

Skilled Electrician day 0.5


Helper day 1
Fitter day 0.5
Sundries and rouding off LS
Rate per Each
Note : Labour is Considered for 2 jobs / day
11.2.3 Supply and erecting Ejecto type water pump single phase,
1.5HP single stage with brass venturi and having suction
pipe 40mm dia, pressure pipe 32mm dia and delivery pipe
32mm dia, with maximum discharge head of 80 feet
including transportation of all materials and labour charges
etc., complete.

a) Material
1.5 HP, single phase, 230V, 50Hz. Ejecto type pump each 1
set. Including all taxes
M.S clamps suitable for 40mmx32mm pipes with each 2
nuts and bolts.
Transportation Charges on Unit Cost 2%
b) Labour charges for erection of pump set
including pipe connection for suction & delivery

Skilled Electrician day 0.5


Helper day 1
Fitter day 0.5
Sundries and rouding off LS
Rate per Each
Note : Labour is Considered for 2 jobs / day
11.2.4 Supply and erecting Ejecto type water pump single phase,
2.0HP single stage with brass venturi and having suction
pipe 40mm dia, pressure pipe 32mm dia and delivery pipe
32mm dia, with maximum discharge head of 80 feet
including transportation of all materials and labour charges
etc., complete.

a) Material
2.0 HP, single phase, 230V, 50Hz. Ejecto type pump each 1
set. Including all taxes
M.S clamps suitable for 40mmx32mm pipes with each 2
nuts and bolts.
Transportation Charges on Unit Cost 2%
b) Labour charges for erection of pump set
including pipe connection for suction & delivery

Skilled Electrician day 0.5


Helper day 1
Fitter day 0.5
Sundries and rouding off LS
Rate per Each
Note : Labour is Considered for 2 jobs / day
11.2.6 Supply and erecting Ejecto type water pump 3 phase, 3 HP
single stage with brass venturi and having suction pipe,
pressure pipe and delivery pipe, with maximum discharge
head of 80 feet , including transportation, and all materials
all labour charges etc., complete.

a) Material
3.0 HP, single phase, 230V, 50Hz. Ejecto type pump each 1
set. Including all taxes
M.S clamps suitable for 40mmx32mm pipes with each 2
nuts and bolts.
Transportation Charges on Unit Cost 2%
b) Labour charges for erection of pump set
including pipe connection for suction & delivery

Skilled Electrician day 0.5


Helper day 1
Fitter day 0.5
Sundries and rouding off LS
Rate per Each
Note : Labour is Considered for 2 jobs / day
11.2.7 Supply and erecting Ejecto type water pump 3
phase, 5 HP single stage with brass venturi and
having suction pipe, pressure pipe and delivery pipe,
with maximum discharge head of 80', including
transportation, and all materials all labour charges
etc., complete.

a) Material
3Ph, 5 HP 415V, 50Hz. Ejecto pump set with all each 1
taxes
M.S clamps suitable for Air and delivery pipes with each 2
nuts and bolts.
Transportation Charges on Unit Cost 2%
b) Labour charges for erection of pump set
including pipe connection for suction & delivery

Skilled Fitter day 0.5


Helper day 1.5
Plumber day 0.5
Sundries and rouding off LS
Rate per Each
Note : Labour is Considered for 2 jobs / day
11.3 SUBMERSIBLE PUMPS (Bore well type)
11.3.1 Supply and erecting, ISI mark submersible 1.0
(a) HP,Single Phase 18stages pumpset suitable for
106 / 156mm dia borewell with high quality water
resistant and dynamically balanced bronze impeller
with stainless steel shaft sleeves, pump coupling
and pivot of Single phase 250V, 50Hz.. A.C. power
supply copper winding with water proof insulation
and high precision strength not to be effected by
chemical in water and suitable bronze bearings with
nut and bolts etc., with necessary H-type clamp of
suitable size and strength.

a) Material
1HP, Single Phase 18 stage submerisible pump set each 1
including all taxes
Special M.S. clamps with bolts and nuts each 2
Transportation Charges on Unit Cost 2%
b) Labour charges for erection of pump set
including pipe connection for suction & delivery

Skilled Fitter day 0.5


Helper day 1
Plumber day 0.5
Sundries and rouding off LS
Rate per Each
Note : Labour is Considered for 2 jobs / day
11.3.1 Supply and erecting, ISI mark submersible 1.5 HP,
(b) Single Phase 20 stages pumpset suitable for 106 /
156mm dia borewell with high quality water resistant
and dynamically balanced bronze impeller with
stainless steel shaft sleeves, pump coupling and
pivot of Single phase 250V , 50Hz.. A.C. power
supply copper winding with water proof insulation
and high precision strength not to be effected by
chemical in water and suitable bronze bearings with
nut and bolts etc., with necessary H-type clamp of
suitable size and strength.

a) Material
1.5HP, Single Phase 20 stage submerisible pump each 1
set including all taxes
Special M.S. clamps with bolts and nuts each 2
Transportation Charges on Unit Cost 2%
b) Labour charges for erection of pump set
including pipe connection for suction & delivery

Skilled Fitter day 0.5


Helper day 1
Plumber day 0.5
Sundries and rouding off LS
Rate per Each
Note : Labour is Considered for 2 jobs / day
11.3.1 Supply and erecting, ISI mark submersible 2.0 HP,
(c) Single Phase 30 stages pumpset suitable for 106 /
156mm dia borewell with high quality water resistant
and dynamically balanced bronze impeller with
stainless steel shaft sleeves, pump coupling and
pivot of Single phase 250V , 50Hz.. A.C. power
supply copper winding with water proof insulation
and high precision strength not to be effected by
chemical in water and suitable bronze bearings with
nut and bolts etc., with necessary H-type clamp of
suitable size and strength.

a) Material
2HP, Single Phase 30 stage submerisible pump set each 1
including all taxes
Special M.S. clamps with bolts and nuts each 2
Transportation Charges on Unit Cost 2%
b) Labour charges for erection of pump set
including pipe connection for suction & delivery

Skilled Fitter day 0.5


Helper day 1
Plumber day 0.5
Sundries and rouding off LS
Rate per Each
Note : Labour is Considered for 2 jobs / day
11.3.2 Supply and erecting, ISI mark submersible 2.0 HP, 3
Phase, 3 stages pumpset suitable for 156mm dia
borewell with high quality water resistant and
dynamically balanced bronze impeller with stainless
steel shaft sleeves, pump coupling and pivot of 3
phase 415V , 50Hz.. A.C. power supply copper
winding with water proof insulation and high
precision strength not to be effected by chemical in
water and suitable bronze bearings with nut and
bolts etc., with necessary H-type clamp of suitable
size and strength.

a) Material
2HP, 3 Ph 3 stage submerisible pump set including all each 1
taxes
Special M.S. clamps with bolts and nuts each 2
Transportation Charges on Unit Cost 2%
b) Labour charges for erection of pump set
including pipe connection for suction & delivery

Skilled Fitter day 1


Helper day 2
Plumber day 1
Hire charges of tripod with winch 50% of Labour charges

Sundries and rouding off LS


Rate per Each
11.3.3 Supply and erecting, ISI mark submersible 3.0 HP,3
Phase, 4 stages pumpset suitable for 156mm dia
borewell with high quality wear resistance and
dynamically balanced bronze impeller with stainless
steel shaft sleeves, pump coupling and pivot of 3
phase 415V , 50Hz.. A.C. power supply copper
winding with water proof insulation and high
precision strength not to be effected by chemical in
water and suitable bronze bearings with nut and
bolts etc., with necessary H-type clamp of suitable
size and strength.

a) Material
3HP, 3 Ph 4 stage submerisible pump set. each 1
Including all taxes
Special M.S. clamps with bolts and nuts each 2
Transportation Charges on Unit Cost 2%
b) Labour charges for erection of pump set
including pipe connection for suction & delivery

Skilled Fitter day 1


Helper day 2
Plumber day 1
Hire charges of tripod with winch 50% of Labour charges

Sundries and rouding off LS


Rate per Each
11.3.4 Supply and erecting, ISI mark submersible 3 HP, 3
Phase, 6 stages pumpset suitable for 156mm dia
borewell with high quality wear resistance and
dynamically balanced bronze impeller with stainless
steel shaft sleeves, pump coupling and pivot of 3
phase 415V , 50Hz.. A.C. power supply copper
winding with water proof insulation and high
precision strength not to be effected by chemical in
water and suitable bronze bearings with nut and
bolts etc., with necessary H-type clamp of suitable
size and strength.

a) Material
3HP, 3 Ph 6 stage submerisible pump set. each 1
Including all taxes
Special M.S. clamps with bolts and nuts each 2
Transportation Charges on Unit Cost 2%
b) Labour charges for erection of pump set
including pipe connection for suction & delivery

Skilled Fitter day 1


Helper day 2
Plumber day 1
Hire charges of tripod with winch 50% of Labour charges

Sundries and rouding off LS


Rate per Each
11.3.5 Supply and erecting, ISI mark submersible 3 HP, 3
Phase, 8 stages pumpset suitable for 156mm dia
borewell with high quality wear resistance and
dynamically balanced bronze impeller with stainless
steel shaft sleeves, pump coupling and pivot of 3
phase 415V , 50Hz.. A.C. power supply copper
winding with water proof insulation and high
precision strength not to be effected by chemical in
water and suitable bronze bearings with nut and
bolts etc., with necessary H-type clamp of suitable
size and strength.

a) Material
3HP, 3 Ph 6 stage submerisible pump set. Including each 1
all taxes
Special M.S. clamps with bolts and nuts each 2
Transportation Charges on Unit Cost 2%
b) Labour charges for erection of pump set
including pipe connection for suction & delivery

Skilled Fitter day 1


Helper day 2
Plumber day 1
Hire charges of tripod with winch 50% of Labour
charges
Sundries and rouding off LS
Rate per Each
11.3.6 Supply and erecting, ISI mark submersible 3 HP, 3
Phase, 9 stages pumpset suitable for 156mm dia
borewell with high quality wear resistance and
dynamically balanced bronze impeller with stainless
steel shaft sleeves, pump coupling and pivot of 3
phase 415V , 50Hz.. A.C. power supply copper
winding with water proof insulation and high
precision strength not to be effected by chemical in
water and suitable bronze bearings with nut and
bolts etc., with necessary H-type clamp of suitable
size and strength.

a) Material
3HP, 3 Ph 6 stage submerisible pump set Including all each 1
taxes
Special M.S. clamps with bolts and nuts each 2
Transportation Charges on Unit Cost 2%
b) Labour charges for erection of pump set
including pipe connection for suction & delivery

Skilled Fitter day 1


Helper day 2
Plumber day 1
Hire charges of tripod with winch 50% of Labour charges

Sundries and rouding off LS


Rate per Each
11.3.7 Supply and erecting, ISI mark submersible 4 HP, 3
Phase, 6 stages pumpset suitable for 156mm dia
borewell with high quality wear resistance and
dynamically balanced bronze impeller with stainless
steel shaft sleeves, pump coupling and pivot of 3
phase 415V, 50Hz.. A.C. power supply copper
winding with water proof insulation and high
precision strength not to be effected by chemical in
water and suitable bronze bearings with nut and
bolts etc., with necessary H-type clamp of suitable
size and strength.

a) Material
4HP, 3 Ph 6 stage submerisible pump set including all each 1
taxes
Special M.S. clamps with bolts and nuts each 2
Transportation Charges on Unit Cost 2%
b) Labour charges for erection of pump set
including pipe connection for suction & delivery

Skilled Fitter day 1


Helper day 2
Plumber day 1
Hire charges of tripod with winch 50% of Labour charges

Sundries and rouding off LS


Rate per Each
11.3.8 Supply and erecting, ISI mark submersible 4 HP, 3
Phase, 12 stages pumpset suitable for 156mm dia
borewell with high quality wear resistance and
dynamically balanced bronze impeller with stainless
steel shaft sleeves, pump coupling and pivot of 3
phase 415V, 50Hz.. A.C. power supply copper
winding with water proof insulation and high
precision strength not to be effected by chemical in
water and suitable bronze bearings with nut and
bolts etc., with necessary H-type clamp of suitable
size and strength.

a) Material
4HP, 3 Ph 12 stages submerisible pump set each 1
Including all taxes
Special M.S. clamps with bolts and nuts each 2
Transportation Charges on Unit Cost 2%
b) Labour charges for erection of pump set
including pipe connection for suction & delivery

Skilled Fitter day 1


Helper day 2
Plumber day 1
Hire charges of tripod with winch 50% of Labour charges

Sundries and rouding off LS


Rate per Each
11.3.10 Supply and erecting, ISI mark submersible 5 HP, 3
Phase, 8 stages pumpset suitable for 156mm dia
borewell with high quality wear resistance and
dynamically balanced bronze impeller with stainless
steel shaft sleeves, pump coupling and pivot of 3
phase 415V, 50Hz.. A.C. power supply copper
winding with water proof insulation and high
precision strength not to be effected by chemical in
water and suitable bronze bearings with nut and
bolts etc., with necessary H-type clamp of suitable
size and strength.

a) Material
Cost of 3 Ph, 5 HP, 8 St. S.M pumpset each 1
Special Clamps with Bolts & Nuts each 2
Transportation Charges on Unit Cost 2%
b) Labour charges for erection of pump set including
pipe connection for suction & delivery
Skilled Fitter day 2
Helper day 3
Plumber day 1
Hire charges of tripod with winch 50% of Labour charges

Sundries and rouding off LS


Rate per Each
11.3.11 Supply and erecting, ISI mark submersible 5 HP, 3
Phase, 13 stages pumpset suitable for 156mm dia
borewell with high quality wear resistance and
dynamically balanced bronze impeller with stainless
steel shaft sleeves, pump coupling and pivot of 3
phase 415V , 50Hz.. A.C. power supply copper
winding with water proof insulation and high
precision strength not to be effected by chemical in
water and suitable bronze bearings with nut and
bolts etc., with necessary H-type clamp of suitable
size and strength.

a) Material
Cost of 3 Ph, 5 HP, 8 St. S.M pumpset each 1
Special Clamps with Bolts & Nuts each 2
Transportation Charges on Unit Cost 2%
b) Labour charges for erection of pump set
including pipe connection for suction & delivery

Skilled Fitter day 2


Helper day 3
Plumber day 1
Hire charges of tripod with winch 50% of Labour charges

Sundries and rouding off LS


Rate per Each
11.3.12 Supply and erecting, ISI mark submersible 7.5 HP,3
Phase, 6 stages pumpset suitable for 156mm dia
borewell with high quality wear resistance and
dynamically balanced bronze impeller with stainless
steel shaft sleeves, pump coupling and pivot of 3
phase 415V, 50Hz.. A.C. power supply copper
winding with water proof insulation and high
precision strength not to be effected by chemical in
water and suitable bronze bearings with nut and
bolts etc., with necessary H-type clamp of suitable
size and strength.

a) Material
3 Ph, 7.5 HP, 6 St. S.M pumpset each 1
Special Clamps with Bolts & Nuts each 2
Transportation Charges on Unit Cost 2%
b) Labour charges for erection of pump set
including pipe connection for suction & delivery

Skilled Fitter day 2


Helper day 3
Plumber day 1
Hire charges of tripod with winch 50% of Labour charges

Sundries and rouding off LS


Rate per Each
11.3.13 Supply and erecting, ISI mark submersible 7.5 HP, 3
Phase, 12 stages pumpset suitable for 156mm dia
borewell with high quality wear resistance and
dynamically balanced bronze impeller with stainless
steel shaft sleeves, pump coupling and pivot of 3
phase 415V , 50Hz.. A.C. power supply copper
winding with water proof insulation and high
precision strength not to be effected by chemical in
water and suitable bronze bearings with nut and
bolts etc., with necessary H-type clamp of suitable
size and strength.

a) Material
3 Ph, 7.5 HP, 12 St. S.M pumpset each 1
Special Clamps with Bolts & Nuts each 2
Transportation Charges on Unit Cost 2%
b) Labour charges for erection of pump set
including pipe connection for suction & delivery

Skilled Fitter day 2


Helper day 3
Plumber day 1
Hire charges of tripod with winch 50% of Labour charges

Sundries and rouding off LS


Rate per Each
11.3.15 Supply and erecting, ISI mark submersible 10 HP,3
Phase, 12 stages pumpset suitable for 156mm dia
borewell with high quality wear resistance and
dynamically balanced bronze impeller with stainless
steel shaft sleeves, pump coupling and pivot of 3
phase 415V, 50Hz.. A.C. power supply copper
winding with water proof insulation and high
precision strength not to be effected by chemical in
water and suitable bronze bearings with nut and
bolts etc., with necessary H-type clamp of suitable
size and strength.

a) Material
Cost of 3 Ph,10 H.P 12St. S.M pumpset each 1
Special Clamps with Bolts & Nuts each 2
Transportation Charges on Unit Cost 2%
b) Labour charges for erection of pump set
including pipe connection for suction & delivery

Skilled Fitter day 2


Helper day 3
Plumber day 1
Hire charges of tripod with winch 50% of Labour charges

Sundries and rouding off LS


Rate per Each
11.3.16 Supply and erecting, ISI mark submersible 10 HP,3
Phase,16 stages pumpset suitable for 156mm dia
borewell with high quality wear resistance and
dynamically balanced bronze impeller with stainless
steel shaft sleeves, pump coupling and pivot of 3
phase 415V, 50Hz.. A.C. power supply copper
winding with water proof insulation and high
precision strength not to be effected by chemical in
water and suitable bronze bearings with nut and
bolts etc., with necessary H-type clamp of suitable
size and strength.

a) Material
Cost of 3 Ph,10 H.P 16 St. S.M pumpset each 1
Special Clamps with Bolts & Nuts each 2
Transportation Charges on Unit Cost 2%
b) Labour charges for erection of pump set
including pipe connection for suction & delivery

Skilled Fitter day 2


Helper day 3
Plumber day 1
Hire charges of tripod with winch 50% of Labour charges

Sundries and rouding off LS


Rate per Each
11.3.17 Supply and erecting, ISI mark submersible 15 HP, 3
Phase, 15 stages pumpset suitable for 156mm dia
borewell with high quality wear resistance and
dynamically balanced bronze impeller with stainless
steel shaft sleeves, pump coupling and pivot of 3
phase 415V, 50Hz.. A.C. power supply copper
winding with water proof insulation and high
precision strength not to be effected by chemical in
water and suitable bronze bearings with nut and
bolts etc., with necessary H-type clamp of suitable
size and strength.

a) Material
Cost of 3 Ph,15 H.P 15 St. S.M pumpset each 1
Special Clamps with Bolts & Nuts each 2
Transportation Charges on Unit Cost 2%
b) Labour charges for erection of pump set
including pipe connection for suction & delivery

Skilled Fitter day 2


Helper day 4
Plumber day 1
Hire charges of tripod with winch 50% of Labour charges

Sundries and rouding off LS


Rate per Each
11.4 SUB MERSIBLE PUMPS (OPEN WELL)
11.4.1 Supply and erecting ISI make submersible pumpset
suitable for erection in open well with water resistant
dynamically balanced impeller with stainless steel
shaft sleeves, pump coupling and pivot with squirrel
cage Induction Motor of 3 phase, 415V, 50Hz..,
A.C.Supply, heavy copper windings with water proof
insulation and high precision strength not to be
effected by chemicals in water with suitable bronze
bearings, 3 HP pump erected with necessary H-
type clamps of suitable size and strength including
cost of all materials, Transportation and labour
charges etc., complete.

a) Material
3 Ph, 3HP Submersible motor each 1
Special clamps with nut and bolis each 2
MS Girders across the open well to support delivery
pipe clamps (as per requirement)
Transportation Charges on Unit Cost 2%
b) Labour charges for erection of pump set
including pipe connection for suction & delivery

Skilled Fitter day 1


Helper day 2
Plumber day 1
Hire charges of tripod with winch 50% of Labour charges

Sundries and rouding off LS


Rate per Each
11.4.2 Supply and erecting ISI make submersible pumpset
suitable for erection in open well with water resistant
dynamically balanced impeller with stainless steel
shaft sleeves, pump coupling and pivot with squirrel
cage Induction Motor of 3 phase, 415V, 50Hz..,
A.C.Supply, heavy copper windings with water proof
insulation and high precision strength not to be
effected by chemicals in water with suitable bronze
bearings, 5 HP pump erected with necessary H-
type clamps of suitable size and strength including
cost of all materials, Transportation and labour
charges etc., complete.

a) Material
3 Ph, 5HP Submersible motor each 1
Special clamps with nut and bolis each 2
MS Girders across the open well to support delivery
pipe clamps (as per requirement)
Transportation Charges on Unit Cost 2%
b) Labour charges for erection of pump set
including pipe connection for suction & delivery

Skilled Fitter day 1


Helper day 2
Plumber day 1
Hire charges of tripod with winch 50% of Labour charges

Sundries and rouding off LS


Rate per Each
11.4.3 Supply and erecting ISI make submersible pumpset
suitable for erection in open well with water resistant
dynamically balanced impeller with stainless steel
shaft sleeves, pump coupling and pivot with squirrel
cage Induction Motor of 3 phase, 415V, 50Hz..,
A.C.Supply, heavy copper windings with water proof
insulation and high precision strength not to be
effected by chemicals in water with suitable bronze
bearings, 7.5 HP pump erected with necessary H-
type clamps of suitable size and strength including
cost of all materials, Transportation and labour
charges etc., complete.

a) Material
3 Ph, 7.5HP Submersible motor each 1
Special clamps with nut and bolis each 2
MS Girders across the open well to support delivery
pipe clamps (as per requirement)
Transportation Charges on Unit Cost 2%
b) Labour charges for erection of pump set
including pipe connection for suction & delivery

Skilled Fitter day 1


Helper day 2
Plumber day 1
Hire charges of tripod with winch 50% of Labour charges

Sundries and rouding off LS


Rate per Each
11.4.4 Supply and erecting ISI make submersible pumpset
suitable for erection in open well with water resistant
dynamically balanced impeller with stainless steel
shaft sleeves, pump coupling and pivot with squirrel
cage Induction Motor of 3 phase, 415V, 50Hz..,
A.C.Supply, heavy copper windings with water proof
insulation and high precision strength not to be
effected by chemicals in water with suitable bronze
bearings, 10 HP pump erected with necessary H-
type clamps of suitable size and strength including
cost of all materials, Transportation and labour
charges etc., complete.

a) Material
3 Ph, 10 HP Submersible motor each 1
Special clamps with nut and bolis each 2
MS Girders across the open well to support delivery
pipe clamps (as per requirement)
Transportation Charges on Unit Cost 2%
b) Labour charges for erection of pump set
including pipe connection for suction & delivery

Skilled Fitter day 1


Helper day 3
Plumber day 1
Hire charges of tripod with winch 50% of Labour charges

Sundries and rouding off LS


Rate per Each
Note:- Above rates of pumpsets are exculding suction &
11.5 delivery pipes
ACCESSORIES
11.5.1 Providing cement concrete with 1:2:4 foundation for
pump and motor with required size and length of
foundation bolts and nuts including cost and
conveyance of all materials and labour charges etc.,
complete.

a) Material
Rate as per Civil SSR, since it is a Civil item.
11.5.2 Supplying and erecting D.O.L Starter 250V, Single
phase, 50Hz. With SS enclouser comprising of
contactor with bi-metalic relay with necessary push
buttons, transportation and all labour charges etc.,
complete .

a) Material
D.O.L. Starter 1Ph, 250V each 1
b) Labour charges for fixing and giving
connections.
Skilled Electrician day 0.33
Helper day 0.33
Sunries such, as bolts, nuts and rounding off
Rate per Each
Note : Labour is Considered for 3 jobs / day
11.5.2( Supplying and erecting D.O.L Starter 400V, 3
a) phase, 50Hz. enclosed with no volt coil and overload
protection with necessary materials, transportation
and all labour charges etc., complete suitable upto
3/4/5 HP.

a) Material
D.O.L. Starter 3Ph, 415V upto 3/4/5HP each 1
b) Labour charges for fixing and giving
connections.
Skilled Electrician day 0.33
Helper day 0.33
Sunries such, as bolts, nuts and rounding off
Rate per Each
Note : Labour is Considered for 3 jobs / day
11.5.3 Supply and fixing of approved make semi automatic
hand operated 3ph, 415V star - delta started suitable
from 7.5 HP upto 15 HP motor totally enclosed with
over load protection and No-volt relay etc., to
complete including Transportation and all labour
charges.

a) Material
Semi automatic 3Ph, Induction motor with enclosure each 1
(Including of all taxes with Transportation)

b) Labour charges for fixing and giving


connections.
Skilled Electrician day 0.5
Helper day 0.5
Sunries such, as bolts, nuts and rounding off
Rate per Each
Note : Labour is Considered for 2 jobs / day
11.5.4 Supply and fixing of approved make semi automatic hand
operated 3ph, 415V star - delta started suitable upto 15 to
25 HP motor totally enclosed with over load protection and
No-volt relay etc., to complete including Transportation and
all labour charges.

a) Material
Deduct
Cost of semi Automatic star - Delta starter each 1
Semi automatic 3Ph, Induction motor with enclosure each 1
(Including of all taxes with Transportation)

b) Labour charges.
Skilled Electrician day 0.5
Helper day 0.5
Sunries such, as bolts, nuts and rounding off
Rate per Each
Note : Labour is Considered for 2 jobs / day
11.5.5 Supply and fixing of approved make automatic operated
3ph, 415V star - delta started suitable 10 to 12.5 HP
automatic star delta starter motor totally enclosed with over
load protection and No-volt relay to complete including
Transportation and all labour charges .

a) Material
Cost of semi Automatic star - Delta starter each 1
Semi automatic 3Ph, Induction motor with enclosure each 1
(Including of all taxes with Transportation)
b) Labour charges.
Skilled Electrician day 0.5
Helper day 0.5
Sunries such, as bolts, nuts and rounding off
Rate per Each
Note : Labour is Considered for 2 jobs / day
11.5.6 Supply and fixing of approved make semi automatic hand
operated 3ph, 415V star - delta started suitable for 15 HP
fully automatic star delta motor totally enclosed with over
load protection and No-volt relay to complete including
Transportation and all labour charges.

a) Material
Cost of semi Automatic star - Delta starter each 1
Semi automatic 3Ph, Induction motor with enclosure each 1
(Including of all taxes with Transportation)
b) Labour charges.
Skilled Electrician day 0.5
Helper day 0.5
Sunries such, as bolts, nuts and rounding off
Rate per Each
Note : Labour is Considered for 2 jobs / day
11.5.7 Supply and erecting directly operated single phasing
preventer connected to A.C. supply upto 45A range with
guarantee to operate on single phase for one Year.

a) Material
Single phase parameter upto 45A (Including all taxes and each 1
Transportation)
b) Labour charges.
Skilled Electrician day 0.2
Helper day 0.2
Rate per Each
Note : Labour is Considered for 5 jobs / day
12 Bus Bars
For details, Please see after Chapter 20.
13 SWAGED POLES (Confirming to IS 2713 / 1980).

13.1 Fabrication, supply and transportation of swaged


poles up to site confirming to IS 2713 / 1980
specifications. The pole should be painted with
primary coat of red oxide and black bituminous paint
up to ground level with base plate, including cost of
all materials etc., complete.

a) Material
Cost of swaged pole
Add: Labour for handling
Transportation charges, loading unloading as per Common
SSR taking 250Km as average load considering fabrication
point at hyd and Visakhapatnam.

Transportation charges upto 250Km Breakup.


P.No. 156 of Common SSR (Civil)
Upto 20 Km 163.80 /
Tonne
Upto 50 Km 3.40 x 10
Upto 80 Km 2.80 x 50
Beyond 106 Km 2.20 x 156
Loading 15.50 / Tonne
Unloading 12.00 / Tonne
Stacking 7.00 / Tonne
Rate per Kg

D A T A F O R M . S S W A G E D P O L E S C O N F I R M I N G TO I.S : 2713 /1980


this page contains in side sheet

13.2 Garden Posts


13.2.1 Fabrication and Supply of M.S. Poles for garden posts with
'B' class 4mtrs long 60.25mm outer dia with base plate and
suitable pole cap including cost and conveyance of all
material including fixing of luminaire and labour charges
etc., complete.

a) Material
4Mtrs 'B' Class M.S. pipe of 60.25mm dia with base Kg 24.8
plate and suitable pole cap
Rate per Each
13.2.2 Fabrication and Supply of M.S. Poles for garden posts with
'B' class 6 mtrs long 60.25mm outer dia with base plate and
suitable pole cap including cost and conveyance of all
material including fixing of luminaire and labour charges
etc., complete.

a) Material
6Mtrs 'B' Class M.S. pipe of 60.25mm dia with base Kg 37.2
plate and suitable pole cap
Rate per Each
13.3 Brackets
13.3.1 Supply and fixing of 50mm dia 0.5 mtrs single arm M.S.
pipe bracket with sleeve and fasteners with necessary
angle including painting etc., complete on existing pole
including fixing of luminaire.

a) Material
0.5Mtr length 50mm 'B' class pipe. Kg 2.55
45cm length , 10cm dia and cap. Kg 5.4
Painting with red oxid and enamel paint. job 1
b) Labour charges for fixing with Spl. T & P
Skilled Electrician day 0.2
Fitter day 0.2
Rate per Each
Note : Labour is Considered for 5 jobs / day
13.3.2 Supply and fixing of 50mm dia 0.5 mtrs double arm M.S.
pipe bracket with sleeve and fasteners with necessary
angle including painting etc., complete on existing pole
including fixing of luminaire

a) Material
2 x 0.5Mtr length 50mm 'B' class pipe. Kg 5.1
45cm length , 10cm dia and cap. Kg 5.4
Painting with red oxid and enamel paint. job 1
b) Labour charges for fixing with Spl. T & P
Skilled Electrician day 0.33
Fitter day 0.33
Rate per Each
Note : Labour is Considered for 3 jobs / day
13.3.3 Supply and fixing of 50mm dia 0.5 mtrs triple arm M.S.
pipe bracket with sleeve and fasteners with necessary
angle including painting etc., complete on existing pole
including fixing of luminaire.

a) Material
3 x 0.5Mtr length 50mm 'B' class pipe. Kg 7.65
45cm length , 10cm dia and cap. Kg 5.4
Painting with red oxid and enamel paint. job 1
b) Labour charges for fixing with Spl. T & P
Skilled Electrician day 0.5
Fitter day 0.5
Rate per Each
Note : Labour is Considered for 2 jobs / day
13.3.4 Supply and fixing of 50mm dia 1 mtrs single arm
M.S. pipe bracket with sleeve and fasteners with
necessary angle including painting etc., complete on
existing pole including fixing of luminaire

a) Material
1Mtr length 50mm 'B' class M.S pipe. Kg 5.1
45cm length , 10cm dia and cap. Kg 5.4
Painting with red oxid and anamel paint. job 1
b) Labour charges for fixing with Spl. T & P
Skilled Electrician day 0.2
Fitter day 0.2
Rate per Each
Note : Labour is Considered for 5 jobs / day
13.3.5 Supply and fixing of 50mm dia 1 mtrs double arm
M.S. pipe bracket with sleeve and fasteners with
necessary angle including painting etc., complete on
existing pole including fixing of luminaire.

a) Material
2 x 1Mtr length 50mm 'B' class M.S pipe. Kg 10.2
45cm length , 10cm dia and cap. Kg 5.4
Painting with red oxid and anamel paint. job 1
b) Labour charges for fixing with Spl. T & P
Skilled Electrician day 0.33
Helper day 0.33
Rate per Each
Note : Labour is Considered for 3 jobs / day
13.3.6 Supply and fixing of 50mm dia 1 mtrs triple arm
M.S. pipe bracket with sleeve and fasteners with
necessary angle including painting etc., complete on
existing pole including fixing of luminaire.

a) Material
3 x 1Mtr length 50mm 'B' class M.S pipe. Kg 15.3
45cm length , 10cm dia and cap. Kg 5.4
Painting with red oxid and anamel paint. job 1
b) Labour charges for fixing with Spl. T & P
Skilled Electrician day 0.5
Helper day 0.5
Rate per Each
Note : Labour is Considered for 2 jobs / day
13.3.7 Supply and fixing of 50mm dia 1.5 mtrs single arm
M.S. pipe bracket with sleeve and fasteners with
necessary angle including painting etc., complete on
existing pole including fixing of luminaire.

a) Material
1.5 Mtr length 50mm 'B' class M.S pipe. Kg 7.65
45cm length , 10cm dia and cap. Kg 5.4
Painting with red oxid and anamel paint. job 1
b) Labour charges for fixing with Spl. T & P
Skilled Electrician day 0.2
Helper day 0.2
Rate per Each
Note : Labour is Considered for 5 jobs / day
13.3.8 Supply and fixing of 50mm dia 1.5 mtrs double arm
M.S. pipe bracket with sleeve and fasteners with
necessary angle including painting etc., complete on
existing pole including fixing of luminaire.

a) Material
2 x 1.5Mtr length 50mm 'B' class M.S pipe. Kg 15.3
45cm length , 10cm dia and cap. Kg 5.4
Painting with red oxid and anamel paint. job 1
b) Labour charges for fixing with Spl. T & P
Skilled Electrician day 0.33
Helper day 0.33
Rate per Each
Note : Labour is Considered for 3 jobs / day
13.3.9 Supply and fixing of 50mm dia 1.5 mtrs triple arm
M.S. pipe bracket with sleeve and fasteners with
necessary angle including painting etc., complete on
existing pole including fixing of luminaire.

a) Material
3 x 1.5Mtr length 50mm 'B' class M.S pipe. Kg 22.95
45cm length , 10cm dia and cap. Kg 5.4
Painting with red oxid and anamel paint. job 1
b) Labour charges for fixing with Spl. T & P
Skilled Electrician day 0.5
Helper day 0.5
Rate per Each
Note : Labour is Considered for 2 jobs / day
13.3.10 Supply and fixing of 50mm dia 1.5 mtrs curved
single arm M.S. pipe bracket with sleeve and
fasteners with necessary angle including painting
etc., complete on existing pole including fixing of
luminaire.

a) Material
1.5 Mtr length 50mm 'B' class M.S pipe. Kg 7.65
45cm length , 10cm dia and cap. Kg 5.4
Painting with red oxid and anamel paint. job 1
b) Labour charges for fixing with Spl. T & P
Skilled Electrician day 0.2
Helper day 0.2
For Moulding & making Suitable curve on length job 1

Rate per Each


Note : Labour is Considered for 5 jobs / day
13.3.11 Supply and fixing of 50mm dia 1.5 mtrs curved
double arm M.S. pipe bracket with sleeve and
fasteners with necessary angle including painting
etc., complete on existing pole including fixing of
luminaire.

a) Material
2 x 1.5 Mtr length 50mm 'B' class M.S pipe. Kg 15.3
45cm length , 10cm dia and cap. Kg 5.4
Painting with red oxid and anamel paint. job 1
b) Labour charges for fixing with Spl. T & P
Skilled Electrician day 0.33
Helper day 0.33
For Moulding & making Suitable curve on length job 1

Rate per Each


Note : Labour is Considered for 3 jobs / day
13.3.12 Supply and fixing of 50mm dia 1.5 mtrs curved triple
arm M.S. pipe bracket with sleeve and fasteners
with necessary angle including painting etc.,
complete on existing pole including fixing of
luminaire.

a) Material
3 x 1.5 Mtr length 50mm 'B' class M.S pipe. Kg 22.95
45cm length , 10cm dia and cap. Kg 5.4
Painting with red oxid and anamel paint. job 1
b) Labour charges for fixing with Spl. T & P
Skilled Electrician day 0.5
Helper day 0.5
For Moulding & making Suitable curve on length job 1

Rate per Each


Note : Labour is Considered for 2 jobs / day
13.4 Erection Charges for Swaged Poles
13.4.1 Erection charges for 7 mtrs. to 8 mts long swaged
pole including excavation of pit, coil earthing, hire
charges of special T&P painting of Pole CC 1:3:6
upto ground and 1:2:4 for Couping work, including
labour and transportation charges etc., complete

a) Material
Pit excavation 156 Cmx 60Cmx60cm.(Civil SSR) cum 0.54
200 108
C.C.work for pit 1:3:6 (Civil SSR) cum 0.54 3500 1890
Couping 1:2:4 (Civil SSR) cum 0.054 200 10.8
Painting with red oxid and enamel paint. M 6.2 50 310
Coil earthing each 1 60 60
b) Labour charges
Skilled Electrician day 0.33 355 117.15
Helper day 2.67 285 760.95
Mason day 0.33 285 94.05
Hire charges for Spl.T&P 40% on labour cost 388.86 388.86
Rate per Each 3739.81
Note : Labour is Considered for 3 jobs / day
13.4.2( Erection charges for 9 mtrs to 11 mtrs long swaged
a) pole including excavation of pit, coil earthing, hire
charges of special T&P painting of Pole CC 1:3:6
upto ground and 1:2:4 for Couping work, including
labour and transportation charges etc., complete.

a) Material
Pit excavation 156 Cmx 60Cmx60cm.(Civil SSR) cum 0.72

C.C.work for pit 1:3:6 (Civil SSR) cum 0.72


Couping 1:2:4 (Civil SSR) cum 0.054
Painting with red oxid and enamel paint. M 8.35
Coil earthing each 1
b) Labour charges
Skilled Electrician day 0.33
Helper day 2.67
Mason day 0.33
Hire charges for Spl.T&P 40% on labour cost
Rate per Each
Note : Labour is Considered for 3 jobs / day
13.4.2( Erection charges for 12 Mts to 14Mts long swaged
b) pole including excavation of pit, coil earthing, hire
charges of special T&P (Crane)painting of Pole CC
1:3:6 upto ground and 1:2:4 for Couping work,
including labour and transportation charges etc.,
complete.

a) Material
Pit excavation 2.0x1.0x1.0Mtr cum 2
1:3:6 CC Work cum 2
couping 1:2:4 cum 0.054
Painting with red oxid and alluminum paint. M 12
Coil earthing each 1
b) Labour charges
Skilled Electrician day 0.5
Helper day 4
Mason day 0.5
Hire charges for Spl.T&P 20% on labour cost
Rate per Each
Note : Labour is Considered for 2 jobs / day
13.4.3 Erection charges for 16Mts long swaged pole
including excavation of pit, coil earthing, hire
charges of special T&P (Crane)painting of Pole CC
1:3:6 upto ground and 1:2:4 for Couping work,
including labour and transportation charges etc.,
complete.

a) Material
Pit excavation 2.30x1.0x1.0Mtr cum 2.3
1:3:6 CC Work cum 2.3
couping 1:2:4 cum 0.054
Painting with red oxid and alluminum paint. M 14
Coil earthing each 1
b) Labour charges
Skilled Electrician day 0.5
Helper day 4
Mason day 0.5
Hire charges for Spl.T&P 20% on labour cost
Rate per Each
Note : Labour is Considered for 2 jobs / day
13.4.4 Erection charges for 7to 9Mts long swaged pole on
bridge kerb portion ( R.C.C. work with V.C.C. M.15
concrete with 3 Nos 25x6 mm MS Special clamps
bolts with nuts and locking nuts etc.including cost
and con veyance of all material and all labour
charges etc. complete with painting.

a) Material
Painting with red oxid and enamel paint. M 6.2
Coil earthing each 1
3 Nos, 25 x 6 mm MS Special Clamps of 1 M Length Kg 3.54
each @ 1.18 Kg
VCC M 15 Concrete 0.5 x 0.3 x 0.9 cum 0.135
b) Labour charges
Skilled Electrician day 0.33
Helper day 2.67
Mason day 0.33
Fanrication of clamps kgs 3.54
Hire charges for Spl.T&P 20% on labour cost
Rate per Each
Note : Labour is Considered for 3 jobs / day
13.4.5 Erection charges for 4 Mtrs. Long MS / GI Garden post
including excavation of pit, concreting 1:3:6 and painting
including cost and conveyance of all materials including
fixing of luminaire and labour charges etc., complete.

a) Material
Pit excavation (0.4x0.4x1.0 mtr) cum 0.16
Painting with red oxide and enamel paint. M 2.5
1:3:6 C.C work. cum 0.16
b) Labour charges
Mason day 0.2
Helper day 0.4
Rate per Each
Note : Labour is Considered for 5 jobs / day
13.4.6 Erection charges for 6Mtrs. Long MS / GI Garden post
including excavation of pit, concreting 1:3:6 and painting
including cost and conveyance of all materials including
fixing of luminaire and labour charges etc., complete.

a) Material
Pit excavation ( 0.45x0.45x1.25) cum 0.25
1: 3: 6 C.C. work cum 0.25
Painting with red oxide and enamel paint M 4.75
b) Labour charges
Mason day 0.2
Helper day 0.4
Rate per Each
Note : Labour is Considered for 5 jobs / day
13.4.7 Fabrication, supply and fixing of luminaire carriage,
made with 50mm dia M.S. 'B' class pipe, moulded to
6 feet dia ring wheel, and 40mm dia M.S support
pieces on 4 sides inside the wheel and necessary
size of M.S pole cap for fixing the ring wheel on the
156mm dia M.S. pole for fixing floodlight and gear
box with suitable nut & bolts and painted with Red
Oxide and Aluminium paint including cost &
conveyance of all materials etc., complete.

a) Material
50mm 'B' class MS pipe of 5.7mts (1Mt=5.106Kgs) Kg 29.07

40mm 'B' glass pipe MS pipe of 3.6Mtr Kg 13


(1Mt=3.61Kgs)
200mm MS pipe for pole cap.C-Class (heavy) Kg 13
0.3Mts (1Mt=31Kgs)
Special bolts and nuts 6" length. each 12
Painting with red oxide and enamel paint etc., Job 1
b) Labour charges
Fitter day 0.5
Helper day 4
Rate per Each
Note : Labour is Considered for 2 jobs / day
13.5 Accessories
13.5.1 Supply and fixing of 300mm x 260mm x 140mm
No.16 gauge CRCA sheet box with hinged door and
locking arrangements and din channel for fixing
2Nos MCBs duly powder coated with matching
colour of poles including fixing with necessary
arrangments etc., complete.

a) Material
300x260x140mm 16 guage CRCA box finished of sqm 0.35
item(as per 14.1.2)
Sundries as rounding off
Rate per Each
13.5.2 Supply and fixing of 300mm x 180mm x 140mm
No.16 gauge CRCA sheet box with hinged door and
locking arrangements and din channel for fixing
2Nos MCBs duly powder coated with matching
colour of poles including fixing with necessary
arrangments etc., complete.

a) Material
300x180x140mm 16 guage CRCA sheet box as per 14.1.2 sqm 0.29

Sundries as rounding off


Rate per Each
13.5.3 Supply and fixing of 1 No.10A SP MCB in existing
M.S. box with Din channel, 4way 63A connector
including cost & conveyance of all materials and
labour charges etc., complete.
a) Material
10A SP MCB each 1
4Way connector. each 1
b) Labour charges
Skilled Electrician day 0.066
Rate per Each
Note : Labour is Considered for 15 jobs / day
13.5.4 Supply and fixing of 2 Nos 10A SP MCBs in existing
M.S box with Din channel, 4way 63A connector
including cost & conveyance of all materials and
labour charges etc., complete.
a) Material
10A SP MCB each 2
4Way connector. each 1
b) Labour charges
Skilled Electrician day 0.066
Sundries such as screws, tape
Rate per Each
14 CONTROL PANEL AND METERING EQUIPMENT
14.1 CONTROL PANEL
14.1.1 Supply, Transportation, fabrication and erection of
following guage CRCA sheet steel enclosure for
power control cubicle panel / boxes etc., including
cutting, bending drilling, welding and reveting etc.,
complete with cleaning with 7 tank process and
painting with powder coating including cost and
conveyance of all materials and labour charges.

1) 14 SWG CRCA sheet steel enclosure


a) Material
14 SWG (2mm) CRCA sheet - 1 sft (Wt of 8 x 4 feet kg 1.56
sheet, 50Kg)
Transportation charges on Material cost 2%
Fabrication including cutting, bending, drilling and 30%
Dust proof arrnagments etc.,
Cleaning of cubicals in seven tank process 40%
Painting with powder coating. 40%
Erection charges 30%
Sundires such as hardware etc.,
Rate per sft
Rate per sqm
14.1.2 16 SWG CRCA sheet steel enclosure
a) Material
16 SWG (2mm) CRCA sheet - 1sft (Wt of 8 x 4 feet kg 1.218
sheet, 39Kg)
Transportation charges 2%
Fabrication including cutting, bending, drilling and 30%
Dust proof arrnagments etc.,
Cleaning of cubicals in seven tank process 40%
Painting with powder coating. 40%
Erection charges 30%
Sundires such as hardware etc.,
Rate per sft
Rate per sqm
14.1.3 18 SWG CRCA sheet steel enclosure
a) Material
18 SWG (2mm) CRCA sheet - 1 sft (Wt of 8 x 4 feet kg 0.937
sheet, 30Kg)
Transportation charges 2%
Fabrication including cutting, bending, drilling and 30%
Dust proof arrnagments etc.,
Cleaning of cubicals in seven tank process 40%
Painting with powder coating. 40%
Erection charges 30%
Sundires such as hardware etc.,
Rate per sft
Rate per sqm
14.2 METERING EQUIPMENT
14.2.1 Supply and erection of 0-500V volt meter of size 96x96mm
on exisiting box / panel board including connections etc.,
complete.

a) Material
0-500 Voltmeter Analog / Degital inclusive of all each 1
Taxes.
b) Labour charges for fixing & Connections
Skilled Electrician day 0.2
Rate per Each
Note : Labour is Considered for 5 jobs / day
14.2.2 Supply and erection of 0-100 / 200 / 400 / 600 /1000 - 5A
CT Ammeter of size 96x96mm on existing box / panel
board including connections etc., complete.

a) Material
96 x 96mm size Ammeter Analog / Degital inclusive each 1
of all Taxes
b) Labour charges for fixing and connections.
Skilled Electrician day 0.2
Rate per Each
14.2.3 Supply and erection of frequency meter of size 96x96mm
on existing box / panel board including connections etc.,
complete.

a) Material
Frequency meter Analog / Degital inclusive of all Taxes. each 1

b) Labour charges for fixing and connections.


Skilled Electrician day 0.2
Rate per Each
14.2.4 Supply and erection of power factor meter, 3 phase, 4 wire
balanced or unbalanced load 5A, 415V of size 96x96mm on
existing box / panel board including connections etc.,
complete.

a) Material
Power Factor meter Analog / Degital inclusive of all Taxes. each 1

b) Labour charges for fixing and connections.


Skilled Electrician day 0.2
Rate per Each
14.2.5 Supply and erection of L.T. 3phase multifunction energy
meter with 3 lines LCD display of size 96x96mm for
measuring all the parameters (voltage / Current / Power /
frequency / power factor / KW / KWH / KVAR/ KVARH) on
existing box panel board including connections etc.,
complete.

a) Material
L.T. 3 Ph. Multifunction energy meter Analog / each 1
Degital inclusive of all Taxes.
b) Labour charges for fixing and connections.
Skilled Electrician day 0.33
Rate per Each
Note : Labour is Considered for 3 jobs / day
14.2.6 Supply and erection of selector switch for voltmeter /
Ammeter on the existing box / panel including connections
etc., complete.

a) Material
Selector switch for Ammeter / Voltmeter. each 1
b) Labour charges for fixing and connections.
Skilled Electrician day 0.2
Rate per Each
Note : Labour is Considered for 5 jobs / day
14.2.7 Supply and erection of LED indicator lamps on the
existing box / panel board.
a) Material
LED indicator lamp Analog each 1
b) Labour charges for fixing and connections.
Skilled Electrician day 0.1
Rate per Each
Note : Labour is Considered for 10 jobs / day
14.2.8 Supply and erection of LT current transformer with
bar primary 100/5A to 1000 / 5A ratio in the existing
box / panel including connections etc., complete.

a) Material
L.T. C.T with bar primary 100 / 5A to 1000 / 5A each 1
b) Labour charges for fixing and connections.
Skilled Electrician day 0.1
Rate per Each
Note : Labour is Considered for 10 jobs / day
14.2.9 Supply and fixing of single phase energy
Meter,240V AC,50 HZ as per IS13010 with 2.5-5 /5-
10/10-20 Amps range with 200% over load capacity
complete with connections etc., complete on the
existing board.

a) Material
cost of single phase energy meter each 1
b) Labour charges for fixing and connections.
Skilled Electrician day 0.33
sunderies
Rate per Each
Note : Labour is Considered for 3 jobs / day
14.2.10 Supply and fixing of three phase energy Meter,415V
AC,50 HZ as per IS13010 with 2.5-5 /5-10/10-20
Amps range with 200% over load capacity complete
with connections etc., complete on the existing
board.

a) Material
Cost of three phase energy meter each 1
b) Labour charges for fixing and connections.
Skilled Electrician day 0.33
sunderies
Rate per Each
Note : Labour is Considered for 3 jobs / day
15 CABLES / CABLE GLANDS / LUGS
15.3 CABLE GLANDS
15.3.1 Supply and Fixing of heavy duty flange type brass
cable glands for 2 to 4 core, 2.5 Sq.mm to 6 Sq.mm
PVC armoured cable with brass washers complete.

a) Material
Brass cable gland for 2-4 core, 2.5 Sqmm to 6 each 1
Sq.mm armoured cable
b) Labour charges for fixing glands.
Semi skilled Electrician day 0.066
Sundireis and Rounding off
Rate per Each
Note : Labour is Considered for 15 jobs / day
15.3.2 Supply and Fixing of heavy duty flange type brass
cable glands for 2 to 4 core, 10 Sq.mm PVC
armoured cable with brass washers complete.

a) Material
Brass cable gland for 2-4 core, 10 Sqmm armoured cable each 1

b) Labour charges for fixing glands.


Semi skilled Electrician day 0.066
Sundireis and Rounding off
Rate per Each
Note : Labour is Considered for 15 jobs / day
15.3.3 Supply and Fixing of heavy duty flange type brass
cable glands for 4 core, 16 Sq.mm / 3.5 core
25Sq.mm PVC armoured cable with brass washers
complete.
a) Material
Brass cable gland suitabtle for 4core 16 Sq.mm / each 1
3.5 core 25 Sq.mm armoured cable
b) Labour charges for fixing glands.
Skilled Electrician day 0.066
Sundireis and Rounding off
Rate per Each
15.3.4 Supply and Fixing of heavy duty flange type brass
cable glands for 3.5 core, 35 Sq.mm / 3.0 core
50Sq.mm PVC armoured cable with brass washers
complete.
a) Material
Brass cable gland suitabtle for 3.5core 35 Sq.mm / each 1
3 core 50 Sq.mm armoured cable
b) Labour charges for fixing glands.
Skilled Electrician day 0.066
Sundireis and Rounding off
Rate per Each
Note : Labour is Considered for 15 jobs / day
15.3.5 Supply and Fixing of heavy duty flange type brass
cable glands for 3.5 core, 50 Sq.mm PVC armoured
cable with brass washers complete.

a) Material
Brass cable gland suitabtle for 3.5core 50 Sq.mm each 1
armoured cable
b) Labour charges for fixing glands.
Skilled Electrician day 0.066
Sundireis and Rounding off
Rate per Each
Note : Labour is Considered for 15 jobs / day
15.3.6 Supply and Fixing of heavy duty flange type brass
cable glands for 3.5 core, 70 Sq.mm PVC armoured
cable with brass washers complete.

a) Material
Brass cable gland suitabtle for 3.5core 70Sq.mm each 1
armoured cable
b) Labour charges for fixing glands.
Skilled Electrician day 0.066
Helper day 0.066
Sundireis and Rounding off
Rate per Each
Note : Labour is Considered for 15 jobs / day
15.3.7 Supply and Fixing of heavy duty flange type brass
cable glands for 3.5 core, 95 Sq.mm PVC armoured
cable with brass washers complete.

a) Material
Brass cable gland suitabtle for 3.5core 95 Sq.mm each 1
armoured cable
b) Labour charges for fixing glands.
Skilled Electrician day 0.066
Helper day 0.066
Sundireis and Rounding off
Rate per Each
Note : Labour is Considered for 15 jobs / day
15.3.8 Supply and Fixing of heavy duty flange type brass
cable glands for 3.5 core, 120 Sq.mm PVC
armoured cable with brass washers complete.

a) Material
Brass cable gland suitabtle for 3.5core 120 Sq.mm each 1
armoured cable
b) Labour charges for fixing glands.
Skilled Electrician day 0.066
Helper day 0.066
Sundireis and Rounding off
Rate per Each
Note : Labour is Considered for 15 jobs / day
15.3.9 Supply and Fixing of heavy duty flange type brass
cable glands for 3.5 core, 150 Sq.mm PVC
armoured cable with brass washers complete.

a) Material
Brass cable gland suitabtle for 3.5core 150 Sq.mm each 1
armoured cable
b) Labour charges for fixing glands.
Skilled Electrician day 0.083
Helper day 0.083
Sundireis and Rounding off
Rate per Each
Note : Labour is Considered for 12 jobs / day
15.3.10 Supply and Fixing of heavy duty flange type brass cable
glands for 3.5 core, 185 Sq.mm PVC armoured cable with
brass washers complete.

a) Material
Brass cable gland suitabtle for 3.5core 185 Sq.mm each 1
armoured cable
b) Labour charges for fixing glands.
Skilled Electrician day 0.083
Helper day 0.083
Sundireis and Rounding off
Rate per Each
Note : Labour is Considered for 12 jobs / day
15.3.11 Supply and Fixing of heavy duty flange type brass cable
glands for 3.5 core, 240 Sq.mm PVC armoured cable with
brass washers complete.

a) Material
Brass cable gland suitabtle for 3.5core 240 Sq.mm each 1
armoured cable
b) Labour charges for fixing glands.
Skilled Electrician day 0.083
Helper day 0.083
Sundireis and Rounding off
Rate per Each
Note : Labour is Considered for 12 jobs / day
15.3.12 Supply and Fixing of heavy duty flange type brass cable
glands for 3.5 core, 300 Sq.mm PVC armoured cable with
brass washers complete.

a) Material
Brass cable gland suitabtle for 3.5core 300 Sq.mm each 1
armoured cable
b) Labour charges for fixing glands.
Skilled Electrician day 0.1
Helper day 0.1
Sundries, such as insulated tape.
Rate per Each
Note : Labour is Considered for 10 jobs / day
15.3.13 Supply and Fixing of heavy duty flange type brass cable
glands for 3.5 core, 400 Sq.mm PVC armoured cable with
brass washers complete.

a) Material
Brass cable gland suitabtle for 3.5core 400 Sq.mm each 1
armoured cable
b) Labour charges for fixing glands.
Skilled Electrician day 0.1
Helper day 0.1
Sundries, such as insulated tape.
Rate per Each
Note : Labour is Considered for 10 jobs / day
15.4 CABLE LUGS:
15.4.1 Supply and fixing of crimping type copper lugs confirming to
I.S specifications for cable upto 16 Sq.mm including nuts
and bolts with connections.

a) Material
Copper Lugs upto 16 Sq.mm. each 1
b) Labour charges for crimping
Semi Skilled Electrician day 0.01
Helper day 0.01
Sundries such as bolts and nuts.
Rate per Each
Note : Labour is Considered for 100 jobs / day
15.4.2 Supply and fixing of crimping type copper lugs
confirming to I.S specifications for cable of 25
Sq.mm including nuts and bolts with connections.

a) Material
Copper Lugs upto 25 Sq.mm. each 1
b) Labour charges for crimping
Semi Skilled Electrician day 0.01
Helper day 0.01
Sundries such as bolts and nuts.
Rate per Each
Note : Labour is Considered for 100 jobs / day
15.4.3 Supply and fixing of crimping type copper lugs
confirming to I.S specifications for cable of 35
Sq.mm including nuts and bolts with connections.

a) Material
Copper Lugs up to 35 sqmm each 1
b) Labour charges for crimping
Semi Skilled Electrician day 0.013
Helper day 0.013
Sundries such as bolts and nuts.
Rate per Each
Note : Labour is Considered for 75 jobs / day
15.4.4 Supply and fixing of crimping type copper lugs
confirming to I.S specifications for cable of 50
Sq.mm including nuts and bolts with connections.

a) Material
Copper Lugs upto 50 Sq.mm. each 1
b) Labour charges for crimping
Semi Skilled Electrician day 0.013
Helper day 0.013
Sundries such as bolts and nuts.
Rate per Each
Note : Labour is Considered for 75 jobs / day
15.4.5 Supply and fixing of crimping type copper lugs
confirming to I.S specifications for cable of 70Sq.mm
including nuts and bolts with connections.

a) Material
Copper Lugs upto 70 Sq.mm. each 1
b) Labour charges for crimping
Semi Skilled Electrician day 0.013
Helper day 0.013
Sundries such as bolts and nuts.
Rate per Each
Note : Labour is Considered for 75 jobs / day
15.4.6 Supply and fixing of crimping type copper lugs
confirming to I.S specifications for cable of 95
Sq.mm including nuts and bolts with connections.

a) Material
Copper Lugs up to 95 sqmm each 1
b) Labour charges for crimping
Semi Skilled Electrician day 0.016
Helper day 0.016
Sundries such as bolts and nuts.
Rate per Each
Note : Labour is Considered for 60 jobs / day
15.4.7 Supply and fixing of crimping type copper lugs
confirming to I.S specifications for cable of 120
Sq.mm including nuts and bolts with connections.

a) Material
Copper Lugs up to 120 sqmm each 1
b) Labour charges for crimping
Semi Skilled Electrician day 0.02
Helper day 0.02
Sundries such as bolts and nuts.
Rate per Each
Note : Labour is Considered for 50 jobs / day
15.4.8 Supply and fixing of crimping type copper lugs
confirming to I.S specifications for cable of 150
Sq.mm including nuts and bolts with connections.

a) Material
Copper Lugs up to 150 sqmm each 1
b) Labour charges for crimping
Semi Skilled Electrician day 0.033
Helper day 0.033
Sundries such as bolts and nuts.
Rate per Each
Note : Labour is Considered for 30 jobs / day
15.4.9 Supply and fixing of crimping type copper lugs
confirming to I.S specifications for cable of 185
Sq.mm including nuts and bolts with connections.

a) Material
Copper Lugs up to 185 sqmm each 1
b) Labour charges for crimping
Semi Skilled Electrician day 0.033
Helper day 0.033
Sundries such as bolts and nuts.
Rate per Each
Note : Labour is Considered for 30 jobs / day
15.4.11 Supply and fixing of crimping type copper lugs
confirming to I.S specifications for cable of 240
Sq.mm including nuts and bolts with connections.

a) Material
Copper Lugs up to 240 sqmm each 1
b) Labour charges for crimping
Semi Skilled Electrician day 0.04
Helper day 0.04
Sundries such as bolts and nuts.
Rate per Each
Note : Labour is Considered for 25 jobs / day
15.4.12 Supply and fixing of crimping type copper lugs
confirming to I.S specifications for cable of 300
Sq.mm including nuts and bolts with connections.

a) Material
Copper Lugs up to 300 sqmm each 1
b) Labour charges for crimping
Semi Skilled Electrician day 0.05
Helper day 0.05
Sundries such as bolts and nuts.
Rate per Each
Note : Labour is Considered for 20 jobs / day
15.4.13 Supply and fixing of crimping type copper lugs confirming to
I.S specifications for cable of 400 Sq.mm including nuts and
bolts with connections.

a) Material
Copper Lugs up to 400 sqmm each 1
b) Labour charges for crimping
Semi Skilled Electrician day 0.062
Helper day 0.062
Sundries such as bolts and nuts.
Rate per Each
Note : Labour is Considered for 16 jobs / day
15.4.14 Supply and fixing of crimping type Aluminium lugs
confirming to I.S specifications for cables upto 16
Sq.mm including nuts and bolts with connections.

a) Material
Aluminium Lugs up to 16 sqmm each 1
b) Labour charges for crimping
Semi Skilled Electrician day 0.01
Helper day 0.01
Sundries such as bolts and nuts.
Rate per Each
Note : Labour is Considered for 100 jobs / day
15.4.15 Supply and fixing of crimping type Aluminium lugs
confirming to I.S specifications for cable of 25
Sq.mm including nuts and bolts with connections.

a) Material
Aluminium Lugs up to 25 sqmm each 1
b) Labour charges for crimping
Semi Skilled Electrician day 0.01
Helper day 0.01
Sundries such as bolts and nuts.
Rate per Each
Note : Labour is Considered for 100 jobs / day
15.4.16 Supply and fixing of crimping type Aluminium lugs
confirming to I.S specifications for cable of 35
Sq.mm including nuts and bolts with connections.

a) Material
Aluminium Lugs up to 35 sqmm each 1
b) Labour charges for crimping
Semi Skilled Electrician day 0.013
Helper day 0.013
Sundries such as bolts and nuts.
Rate per Each
Note : Labour is Considered for 75 jobs / day
15.4.17 Supply and fixing of crimping type Aluminium lugs
confirming to I.S specifications for cable of 50
Sq.mm including nuts and bolts with connections.

a) Material
Aluminium Lugs up to 50 sqmm each 1
b) Labour charges for crimping
Semi Skilled Electrician day 0.013
Helper day 0.013
Sundries such as bolts and nuts.
Rate per Each
Note : Labour is Considered for 75 jobs / day
15.4.18 Supply and fixing of crimping type aluminium lugs
confirming to I.S specifications for cable of 70
Sq.mm including nuts and bolts with connections.

a) Material
Aluminium Lugs up to 70 sqmm each 1
b) Labour charges for crimping
Semi Skilled Electrician day 0.013
Helper day 0.013
Sundries such as bolts and nuts.
Rate per Each
Note : Labour is Considered for 75 jobs / day
15.4.19 Supply and fixing of crimping type aluminium lugs
confirming to I.S specifications for cable of 95
Sq.mm including nuts and bolts with connections.

a) Material
Aluminium Lugs up to 95 sqmm each 1
b) Labour charges for crimping
Semi Skilled Electrician day 0.016
Helper day 0.016
Sundries such as bolts and nuts.
Rate per Each
Note : Labour is Considered for 60 jobs / day
15.4.20 Supply and fixing of crimping type aluminium lugs
confirming to I.S specifications for cable of 120
Sq.mm including nuts and bolts with connections.

a) Material
Aluminium Lugs up to 120 sqmm each 1
b) Labour charges for crimping
Semi Skilled Electrician day 0.02
Helper day 0.02
Sundries such as bolts and nuts.
Rate per Each
Note : Labour is Considered for 50 jobs / day
15.4.21 Supply and fixing of crimping type aluminium lugs
confirming to I.S specifications for cable of 150
Sq.mm including nuts and bolts with connections.

a) Material
Aluminium Lugs up to 150 sqmm each 1
b) Labour charges for crimping
Semi Skilled Electrician day 0.04
Helper day 0.04
Sundries such as bolts and nuts.
Rate per Each
Note : Labour is Considered for 25 jobs / day
15.4.22 Supply and fixing of crimping type aluminium lugs
confirming to I.S specifications for cable of 185
Sq.mm including nuts and bolts with connections.

a) Material
Aluminium Lugs up to 185 sqmm each 1
b) Labour charges for crimping
Semi Skilled Electrician day 0.04
Helper day 0.04
Sundries such as bolts and nuts.
Rate per Each
Note : Labour is Considered for 25 jobs / day
15.4.24 Supply and fixing of crimping type aluminium lugs
confirming to I.S specifications for cable of 240 Sq.mm
including nuts and bolts with connections.

a) Material
Aluminium Lugs up to 240 sqmm each 1
b) Labour charges for crimping
Semi Skilled Electrician day 0.04
Helper day 0.04
Sundries such as bolts and nuts.
Rate per Each
Note : Labour is Considered for 25 jobs / day
15.4.25 Supply and fixing of crimping type aluminium lugs
confirming to I.S specifications for cable of 300 Sq.mm
including nuts and bolts with connections.

a) Material
Aluminium Lugs up to 300 sqmm each 1
b) Labour charges for crimping
Semi Skilled Electrician day 0.05
Helper day 0.05
Sundries such as bolts and nuts.
Rate per Each
Note : Labour is Considered for 20 jobs / day
15.4.26 Supply and fixing of crimping type aluminium lugs
confirming to I.S specifications for cable of 400 Sq.mm
including nuts and bolts with connections.

a) Material
Aluminium Lugs up to 400 sqmm each 1
b) Labour charges for crimping
Semi Skilled Electrician day 0.062
Helper day 0.062
Sundries such as bolts and nuts.
Rate per Each
Note : Labour is Considered for 16 jobs / day
15.5 CABLE JOINTS
15.5.1 Providing and erecting epoxy staight through joint out door /
indoor for L.T, PVC Armoured cable 1100V grade
complete with ferrule, bushings, accessories and suitable
clamps duly erected and connected to the supply for the
following multi core cables including cost and conveyance
of materials and all labour charges etc., complete.

(a) 2.5 Sq.mm to 16 Sq.mm


a) Material
Epoxy straight joint 2.5 to 16 Sq.mm with accessories each 1
b) Labour charges
Skilled Electrician day 0.5
Helper day 0.5
Sundries
Rate per Each
Note : Labour is Considered for 2 jobs / day
(b) 25 Sq.mm to 50 Sq.mm
a) Material
Epoxy straight joint 25 to 50 Sq.mm with each 1
accessories
b) Labour charges
Semi Skilled Electrician day 0.5
Helper day 0.5
Sundries
Rate per Each
Note : Labour is Considered for 2 jobs / day
(c ) 70 Sq.mm to 95 Sq.mm
a) Material
Epoxy straight joint 70 to 95 Sq.mm with each 1
accessories
b) Labour charges
Semi Skilled Electrician day 0.5
Helper day 0.5
Sundries
Rate per Each
Note : Labour is Considered for 2 jobs / day
(d) 120 Sq.mm to 185 Sq.mm
a) Material
Epoxy straight joint 120 to 185 Sq.mm with accessories each 1

b) Labour charges
Semi Skilled Electrician day 0.5
Helper day 0.5
Sundries
Rate per Each
Note : Labour is Considered for 2 jobs / day
(e) 240 Sq.mm
a) Material
Epoxy straight joint 240 Sq.mm with accessories each 1

b) Labour charges
Skilled Electrician day 1
Helper day 1
Sundries
Rate per Each
(f) 300 Sq.mm
a) Material
Epoxy straight joint 300 Sq.mm with accessories each 1

b) Labour charges
Skilled Electrician day 1
Helper day 1
Sundries
Rate per Each
(g) 400 Sq.mm
a) Material
Epoxy straight joint 400 Sq.mm with accessories each 1

b) Labour charges
Skilled Electrician day 1
Helper day 1
Sundries
Rate per Each
15.6 Labour Charges Laying of Cable including cost of all Materials other than Cable

15.6.1 Earth work excavation of Trench in hard ground soil, laying of U.G cables upto 50 Sq,mm on sand cushion covering the cable with br

a) Material
Excavation of earth 100 x 0.3 X 0.9 m cum 27
Cost of bricks (Civil SSR) 1000 Nos 0.92
Cost of sand (Civil SSR) cum 6
Cement (Civil SSR) Kg 25
Cost of cable route indicator each 12
Transportation charges of bricks and sand LS
b) Labour charges for laying cable.
Man Mazdoor for spreading the sand and back filling each 2.5
the excavated soil.
Skilled Electrician day 1
Helper day 2
Man Mazdoor for concreting and embedding of cable wayday
indicators 2

Sundires and Rounding off


Rate per 100mts
Note : Labour Charges Considered for 100 Mts / day

15.6.2 Earth work excavation of Trench in hard ground soil, laying of U.G cables from 70 sqmm to 400 Sq,mm on sand cushion covering the

a) Material
Excavation of earth 100 x 0.3 X 0.9 m cum 27
Cost of bricks (Civil SSR) 1000 Nos 0.92
Cost of sand (Civil SSR) cum 6
Cement (Civil SSR) Kg 25
Cost of cable route indicator each 12
Transportation charges of bricks and sand LS
b) Labour charges for laying cable.
Man Mazdoor for spreading the sand and back filling the each 2.5
excavated soil.
Skilled Electrician day 1.6
Helper day 3.3
Man Mazdoor for concreting and embedding of cable way day 2
indicators
Sundires and Rounding off
Rate per 60mts
Note :1. Labour Charges Considered for 60 Mts / day
2. Cables shall be at a depth of not less than 600 mm in a trench. Sand filling shall be provided at the bottom of trench
before laying the cable. Bricks shall be provided on either side of the laid cable. Sand filling shall be done to cover the
3. Only the cost of cables may be added for finished item.
15.6.3 Labour charges for run of U.G cable on wall /
existing pipe with necessary fixing arrangments such
as saddles, clamps,wooden separators etc., (as
directed by departmental official) with No.10 SWG
G.I wire for eath connections for the cables.

a) Material
Wooden separators each 200
saddles of required size 100 nos 2
12mm screws 100 nos 4
No.10 SWG GI wire kg 7
b) Labour charges
Skilled Electrician day 1
Helper day 4
Sundires such as Cement, Sand etc.,
Rate per Each
Note : Labour Charges Considered for 100 Mts /
day
15.6.4 Supply and laying of one number double walled corrugated
(DWC) HDPE pipe of following sizes having corrugation on
the outer wall and plain surface inner wall confirming to IS :
14930 Part - I and II complete with necessary HDPE fittings
for protection of 1.1 KV grade U.G cable directly in ground
at a depth of 60Cms including excavation and refilling the
trench as required.

a) 50mm outer dia nominal size


b) 78mm outer dia nominal size
c) 90mm outer dia nominal size
d) 120mm outer dia nominal size
a) Material
Double wall corrugated HDPE pipe confirming to IS : 14930.
RM 6

Snap-fit coupler each 1


Excavation of earth work & Refilling for a size of 1.0x0.3x0.6Mtr.
cum 0.18

Rate per Metre


16 TEMPORARY ILLUMINATION
data shown seperately at the end.
17 GENERATORS AND TRANSFORMERS
Supply, Transportation, erection and commissioning of following specifications of D.G. Set consists of Engine
A and alternator
Alternator which are / directly
: KIRLOSKAR STAMFORD coupled by means ofonflexible
/ CROMPTON D.G.S cooping with guard
& D approved make.andThemounted
alternatoronofathe
common
output
B rating
Diesel Engine : KIRLOSKAR / GREAVES / CUMMINS / ASHOK LEY LAND or DGS&D approved. Dieselexcited,
shall be 1 Ph / 3 Ph, 240V / 415V, 50 Hz., A.C., 0.8 P.f lagging at 1500 RPM. The alternator is self Engine
C start, developing
Control suitable
Panel : Control BHPshall
Panel output
be at 1500 RPM
fabricated withwith class CRCA
16 SWG A2 Governing so asThe
sheet steel. to enable
control the alternator
panel shall betototally
give
enclosed,
1. Voltmeter dust
withand vermin
selector proof, floor mounted2./ Ammeter
switch wall mounted type and
with Selector shall be comprising the following
Switch
3. MCCB / MCB incomer of suitable rating 4. P.F. Meter and frequency Meter
5. Indication Lamp Set 6. KWH Meter of required rating
7. Instrument and control fuses.
ACOUSTIC ENCLOSURE
Supply & providing & installation of acoustic enclosure (sound proof enclosure cum container) for the above
Genset with the: The
Construction following
panelspecification.
of acoustic enclosure shall consists of self supporting frame work put together with help
17.1 of fasteners,Sets
Generating which is for assembling and dismantling. The vertical and Horizontal structure 8is to be fabricated
17.1.3 Supply, Transportation, erection of 3 Ph Air-Cooled 20KVA,
(a) D.G.Set with alternator, Diesel Engine, Control panel etc.,
as per specifications mentioned above.

a) Material
20KVA Air Cooled, 3Ph, 451V, 50Hz., D.G.Set. each 1
Erection and commissioning charges @ 10% of the 10%
cost of the set.
Transportation at 2% on unit cost 2%
Sundires and Rounding off
Rate per Each
17.1.3 Supply, Transportation, erection of 3 Ph Air-Cooled 20KVA,
(b) D.G.Set with alternator, Diesel Engine, Control panel etc.,
with acoustic enclosure as per specifications mentioned
above.

a) Material
20KVA Air Cooled, 3Ph, 451V, 50Hz., D.G.Set each 1
cost of acoustic enclosure each 1
Erection and commissioning charges :
the cost of the DG set. 10%
cost of acoustic enclosure 5%
Transportation at 2% on unit cost 2%
Sundires and Rounding off
Rate per Each
17.1.3 Supply, Transportation, erection of 3 Ph Air-Cooled 25KVA,
(c) D.G.Set with alternator, Diesel Engine, Control panel etc.,
as per specifications mentioned above.

a) Material
3Ph, 415V, 50Hz., 25 KVA Air Cooled D.G.Set each 1
Erection and commissioning charges @ 10% of the cost of 10%
the set.
Transportation at 2% on unit cost 2%
Sundires and Rounding off
Rate per Each
17.1.3 Supply, Transportation , erection of 3 Ph Air-Cooled
(d) 25KVA, D.G.Set with alternator, Diesel Engine, Control
panel etc., with acoustic enclosure as per specifications
mentioned above.

a) Material
3Ph, 415V, 50Hz., 25 KVA Air Cooled D.G.Set each 1
Cost of Acoustic enclosure each 1
Erection and commissioning charges :
the cost of the DG set. 10%
cost of acoustic enclosure 5%
Transportation at 2% on unit cost 2%
Sundires and Rounding off
Rate per Each
17.1.3 Supply, Transportation, erection of 3 Ph Air-Cooled 40KVA, D.G.Set with alternator, Diesel Engine, Control panel etc., as per specifications mentioned
(e)

a) Material
40KVA, 3Ph,415V,D.G.Set each 1
Erection and commissioning charges @ 10% of the 10%
cost of the set.
Transportation at 2% on unit cost 2%
Sundires and Rounding off
Rate per Each
17.1.3 Supply, Transportation, erection of 3 Ph Air-Cooled
(f) 40KVA, D.G.Set with alternator, Diesel Engine,
Control panel etc., with acoustic enclosure as per
specifications mentioned above.

a) Material
40KVA, 3Ph,415V,D.G.Set each 1
Cost of Acoustic enclosure each 1
Erection and commissioning charges :
the cost of the 10%
DG set.
cost of 5%
acoustic enclosure
Transportation at 2% 2%
Sundires and Rounding off
Rate per Each
17.1.3 Supply, Transportation , erection of 3 Phase Water
(g) cooled / Air Cooled 63KVA, D.G.Set with alternator,
Diesel Engine, Control panel etc., as per
specifications mentioned above.
a) Material
63KVA, 3Ph, 415V, D.G Set each 1
Erection and commissioning charges @ 10% of the cost of the set. 10%

Transportation at 2% 2%
Sundires and Rounding off
Rate per Each
17.1.3 Supply, Transportation , erection of 3 Phase Water
(h) Cooled / Air-Cooled 63KVA, D.G.Set with alternator,
Diesel Engine, Control panel etc., with acoustic
enclosure as per specifications mentioned above.

a) Material
63KVA, 3Ph, 415V, D.G Set each 1
Cost of Acoustic enclosure each 1
Erection and commissioning charges :
the cost of the DG set. 10%
cost of acoustic enclosure 5%
Transportation at 2% 2%
Sundires and Rounding off
Rate per Each
17.1.3 Supply, Transportation , erection of 3 Phase Water
(i) cooled 125 KVA, D.G.Set with alternator, Diesel
Engine, Control panel etc., as per specifications
mentioned above.
a) Material
125KVA, Water Cooled, 3Ph, 415V D.G.Set. each 1
Erection and commissioning charges @ 10% of the 10%
cost of the set.
Transportation at 2% 2%
Sundires and Rounding off
Rate per Each
17.1.3 Supply, Transportation, erection of 3 Phase Water-
(j) Cooled 125KVA, D.G.Set with alternator, Diesel
Engine, Control panel etc., with acoustic enclosure
as per specifications mentioned above.

a) Material
125KVA, Water Cooled, 3Ph, 415V D.G.Set. each 1
Cost of Acoustic enclosure each 1
Erection and commissioning charges :
the cost of the DG set. 10%
cost of acoustic enclosure 5%
Transportation at 2% 2%
Sundires and Rounding off
Rate per Each
17.2 Transformers
17.2.1 Supply, transportation, erection and commissioning
of following specifications of 3 Phase, 50 Hz., Oil
immersed and naturally cooled, out door / Indoor
type copper wound transformer connected delta on
H.V. side and star on L.V side with additional neutral
brought out on load side, rating 11000 / 433 volts
with HV tapping + 2.5% cotinuously rated for full
load and temparature rise not exceeding 450 C by
thermometer in oil and 500 C by the resistance of
the winding after continuous run on full load rating
complete with the following standard mounting.

(a) 63 KVA, 3Ph, aluminium wound Tansformer,


CSP type (Core Self Protection)
a) Material
63KVA Aluminium wound CSP type Transformer each 1

Transportation including loading and unloading 2%


(b) Labour charges for erection and 10%
commissioning.
Rate per Each
(b) 100 KVA, 3Ph, aluminium wound Tansformer,
CSP type
a) Material
100 KVA Aluminium wound CSP type Transformer each 1

Transportation including loading and unloading 2%


(b) Labour charges for erection and 10%
commissioning.
Rate per Each
(c ) 100 KVA, 3Ph, copper wound Tansformer
a) Material
100 KVA Copper wound Transformer each 1

Transportation including loading and unloading 2%


(b) Labour charges for erection and 10%
commissioning.
Rate per Each
(d ) 160 KVA, 3Ph, copper wound Tansformer
a) Material
160 KVA Copper wound Transformer each 1

Transportation including loading and unloading 2%


(b) Labour charges for erection and 10%
commissioning.
Rate per Each
(e) 200 KVA, 3Ph, copper wound Tansformer
a) Material
200 KVA Copper wound Transformer each 1

Transportation including loading and unloading 2%


(b) Labour charges for erection and 10%
commissioning.
Rate per Each
(f) 250 KVA, 3Ph, copper wound Tansformer
a) Material
250 KVA Copper wound Transformer each 1

Transportation including loading and unloading 2%


(b) Labour charges for erection and 10%
commissioning.
Rate per Each
(g) 315 KVA, 3Ph, copper wound Tansformer
a) Material
315 KVA Copper wound Transformer each 1

Transportation including loading and unloading 2%


(b) Labour charges for erection and 10%
commissioning.
Rate per Each
(h) 500 KVA, 3Ph, copper wound Tansformer
a) Material
500 KVA Copper wound Transformer each 1

Transportation including loading and unloading 2%


(b) Labour charges for erection and 10%
commissioning.
Rate per Each
(i) 630 KVA, 3Ph, copper wound Tansformer
a) Material
630 KVA Copper wound Transformer each 1

Transportation including loading and unloading 2%


(b) Labour charges for erection and 10%
commissioning.
Rate per Each
(j) 1000 KVA, 3Ph, copper wound Tansformer
a) Material
1000 KVA Copper wound Transformer each 1

Transportation including loading and unloading 2%


(b) Labour charges for erection and 10%
commissioning.
Rate per Each
17.3 CIRCUIT BREAKER
17.3.7 Supply and errecting Air circuit Breaker (ACB) manually
operated non drawout type with 6 way secondary isolating
contacts necessary micro switches for over load and short
circuit indicator, door interlocking, shunt release, under
voltage release as well as 10%-20% earth fault release
suitable for operational voltage 415V, 630A, erected in
position on provided panel boards in an approved manner
with necessary material complete

a) Material
630A, 415V Fixed type 3 pole ACB each 1
Shunt release each 1
U/V release each 1
Earth fault release each 1
Transportation @ 2% on Unit Cost 2%
b) Labour charges for installation @ 5% 5%
Rate per Each
17.3.8 Supply and errecting Air circuit Breaker (ACB)
manually operated non drawout type with 6 way
secondary isolating contacts necessary micro
switches for over load and short circuit indicator,
door interlocking, shunt release, under voltage
release as well as 10%-20% earth fault release
suitable for operational voltage 415V, 800A, erected
in position on provided panel boards in an approved
manner with necessary material complete.

a) Material
800A, 415V Fixed type 3 pole ACB each 1
Shunt release Coil. each 1
U/V release Coil. each 1
Earth fault release each 1
Transportation @ 2% on Unit Cost 2%
b) Labour charges for installation @ 5% 5%
Rate per Each
17.3.9 Supply and errecting Air circuit Breaker (ACB) manually
operated non drawout type with 6 way secondary isolating
contacts necessary micro switches for over load and short
circuit indicator, door interlocking, shunt release, under
voltage release as well as 10%-20% earth fault release
suitable for operational voltage 415V, 1000A, erected in
position on provided panel boards in an approved manner
with necessary material complete.

a) Material
1000A, 415V, Fixed type 3 pole ACB. each 1
Shunt release each 1
U/V release each 1
Earth fault release each 1
Transportation @ 2% on Unit Cost 2%
b) Labour charges for installation @ 5% 5%
Rate per Each
17.4 SUB - STATION EQUIPMENT
17.4.1 Supply and fixing printed instructions chart both in
English and Telugu and duly framed with front glass
for treatment of person suffering from Electric shock.

a) Material
Printed insturction chart both of size 0.9 x 0.6 M in each 1
English and Telugu.
Towards making wooden frame with front glass 150%
including cost of material and labour on unti cost of
Item 1.
Rate per Each
17.4.2 Supply of pair of rubber hand gloves suitable for
working 11/22 KV supply.
a) Material
Rubber hand gloves suitable for working on 11/22 KV each 1
supply
Rate per Each Pair
17.4.3 Supply of 11KV, ISI, approved rubber mat of
thickness, required length and breadth.
a) Material
6mm thick, ISI make Rubber mat suitable for each 1
working on 11/22 KV
Sundries and rounding off
Rate per sqmt
17.4.4 Supply of standard 18"x12"x8" first aid box with all
standard contents.
a) Material
18" x 12" x 8" size First Aid box. each 1
Set of Cotton, band aid cloth Antiseptic cream etc., set 1

Rate per Each


17.4.5 Supply of G.I sheet bucket of round bottom of 13
Ltrs. Capacity with printed letters and filled with sand
and arranged to existing stand or hook.

a) Material
13 Ltrs. Capacity G.I. bucket. each 1
Painting with 2 coats of red color enamell paint on out side.
sqm 0.5

Cost of sand cum 0.13


Sundires for printing letter etc.,
Rate per Each
17.4.6 Supply of Tranformer oil tested and having good
resistance to high electric stress di-electric strength
50KV, low viscocity, low pour point, high flash point
and excellent thermal properties for efficient heat
transfer and cooling as per IS 335-1972.

a) Material
Transformer Oil having Dielectric strength of 50 KV L 1

Sundries and rounding off


Rate per Lt
17.4.7 Providing floor mounting stand for keeping 4Nos of
bucket 1500mm length, 900mm height made out of
40x40x6mm angle iron welded with 4 hooks and
duly painted with one coat of red lead and two coats
of enamel paint.

a) Material
1500mm length, 900mm height Floor mounting stand kg 17.5
fabricated with 40x40x6mm angle iron welded with 4 Nos
Hooks. (1Mtr = 3.5Kg) (5x3.5Kgs = 17.5Kgs) 55 962.5
Fabrication cost of hooks including painting (on cost 50%
of material) 481.25
Sundries and rounding off
Rate per Each 1443.75
17.4.8 Supply and erecting ABC Powder (stored pressure
type) fire extinguisher 5kg conforming to IS 2171-85
with necessary clamps made from 50x6mm MS flat
with nuts & bolts grouted in wall complete.

a) Material
ABC Powder Stored pressure type fire extengensher each 1
of 5 Kg capacity .
50 x6mm M.S Apl. Clamps with bolt & nut. each 1
(b) Labour charges for erection.
Helper day 0.2
Sundires and Rounding off
Rate per Each
Note : Labour is considered for 5 jobs / day
17.4.9 Supply and erecting ABC Powder (stored pressure
type) fire extinguisher 10kg conforming to IS 2171-
85 with necessary clamps made from 50x6mm MS
flat with nuts & bolts grouted in wall complete.

a) Material
ABC Powder Stored pressure type fire extengensher each 1
of 10 Kg capacity .
50 x6mm M.S Apl. Clamps with bolt & nut. each 1
(b) Labour charges for erection.
Helper day 0.2
Sundires and Rounding off
Rate per Each
Note : Labour is considered for 5 jobs / day
17.4.10 Supply and erecting fencing of section having size
2450 mm in height from ground level and 1200mm
width by using angle iron size 50x50x6mm erected
in CC foundation 15x15x40cms deep. The section
of the frame shall be fitted with flat iron supports of
size 25x6mm on top, bottom and middle and chain
link jali of 8 SWG G.I to the angle iron at every
distance of 30 cms by iron studs complete duly
painted with one coat of red oxide and two coats of
aluminium paint.

a) Material
50x50x6mm Angle Iron (1 Mt. = 4.37 Kg) 4.8 m Length kg 20.97
25x6mm M.S Flat (1 Mt. 1.18 Kg) 3.6 M length kg 4.25
Chain link Mesh (Civil SSR) sqm 2.4
Fabrication of Frame with angles, Flat and chain link mesh kg 25.22

C.C.Work M 15 using 20 mm metal (15 x 15 x 40) x cum 0.018


2 As per Civil SSR
Painting with one coat of red oxide and two coat of sqm 5.88
alluminium paint.
Sundires and Rounding off
Rate per Each
17.4.11 Supply and erecting 50x50x6mm angle iron as
corner support to be fixed away from the fence
support fixed at the middle of the fencing frame and
the other side in CC foundation of 15x15x40 cms
complete duly painted with one coat of red oxide and
two coats of aluminium paint.

a) Material
50x50x6mm Angle. (1 mt. 4.37 Kg) 2m Length kg 8.74
C.C.Work M 15 using 20 mm metal (15 x 15 x 40) x cum 0.018
2 As per Civil SSR
Painting with one coat of red oxide and two coats of 10%
Aluminium paint (on cost of Item 1)
Sundires and Rounding off
Rate per Each
17.4.12 Supply and erecting double leaf hinged door each 150cms
width x 185cms height using 38.1 mm dia B grade ISI
marked G.I pipe from all four sides with necessary bends
with cross supports of angle iron 40 x 40 x 6mm with the
door leaf covered with chain link mesh of No. 8 SWG G.I
wire with necessary flat iron covering all around frame. The
door shall have heavy latches, and side channels of
100x50x5mm locking arrangement with lock of medium
size with duplicate keys, the fencing completely erected
with anti corrosive red oxide paint and two coats of
prescribed enamel paint / silver paint. The channel iron of
size 100x50mm x 2.5Mtr. length shall be provided and
erected at both sides of gate with C.C work

a) Material
38.1mm dia B Class G.I pipe. RM 14
(1.85 x 4 Nos + 1.5x 4Nos = 13.4 Mt or say 14 Mtrs.)
( civil SSR)
25x6mm M.S. Flat (1.18 Kgs / Mt) 17 M length kg 20.06
1000x50mm Channle (1mt = 8.74 Kg) 5 M length kg 43.7

4 Nos x 2.38M Length, 40 x 40 x 6 mm M.S. Angle kg 33.32


Iron ( 1 Mtr = 3.5 Kg) 9.52 M length
Steel Aldrop with bolts and Nuts. each 1
Chain link mesh of 8 SWg G.I (Civil SSR) sqm 5.55
Medium size lock and Key each 1
Fabrication charges including welding etc., kg 118
complete.
Painting Charges sqm
b) Labour charges for erection including cost of 5%
hinges on items 1-6.
Sundireis and Rounding off
Rate per Each
17.5 SUB-STATION MAINTENANCE
17.5.1 Filteration of transformer oil as per ISS for removal
(a) of moisture, carbon slurry etc. by means of
circulating oil through vaccum pump from heating
elements and filters to withstand the dielectric
strength of the oil above 40KV beyond one minute
tested in oil testing Kit.

On site.
a) Material
Labour charges for filterations at site
Rate per Each
17.5.1 Filteration of transformer oil as per ISS for removal of
(b) moisture, carbon slurry etc. by means of circulating oil
through vaccum pump from heating elements and filters to
withstand the dielectric strength of the oil above 40KV
beyond one minute tested in oil testing Kit.

At Factory.
a) Material
Labour charges for filterations at site
Rate per Each
17.5.3 Carryout routine maintenance, servicing and testing of
630A to 1000A L.T.ACB by cleaning fixed contacts, moving
contacts and arcchutes including servicing and putting the
ACB in perfect working condition after detting all relay and
ON, OFF mechanism etc.

a) Material
Removing the existing ACB and servicing and
testing of 630A to 1000A L.T.ACB.
Clearing of fixed contacts, moving contacts and
arcchutes
Refix the ACB inposition and testing and
commissioning charges.
b) Labour charges for entire job
Skilled Electrician day 3
Semi Skilled Electrician day 3
Helper day 6
Sundries and Rounding
Rate per Each
Note :Job requires 3 days. Keeping this labour arrived.
17.5.4 Carryout routine maintenance and servicing of LT.Cubical
panel board having approximately 15 to 22 Nos of switches
by cleaning with power blower and servicing the contacts,
tightning the connection of incoming and outgoing cables,
and clicking the operating mechanism for smooth
functioning of switches and putting them in smooth working
condition.

a) Material
Removing all the doors of switches, busbar chamber
and back doors.
Clearing by using power blower.
Tightening all the terminations and cleaning and
servicing the contacts of switches.
b) Labour charges for entire job
Skilled Electrician day 2
Semi Skilled Electrician day 1
Helper day 2
Sundries and Rounding
Rate per Each
Note :Job requires 3 days. Keeping this labour arrived.
17.6 PROTECTIVE GEAR
17.6.1 Supply and erecting approved make 11KV, 5KA
metal oxide lightning arrestors suitable for 11 KV
supply with necessary materials on existing cross
arm.
a) Material
Cost of 11 KV 5KA metal oxide lighting arrester. each 1
b) Labour charges for erection.
Skilled Electrician day 0.33
Helper day 0.33
Sundries
Rate per Each
Note : Labour is considered for 3 jobs / day
17.6.3 Supply and erecting porcelain disc type insulator suitable
for 11KV line with suitable hardware on existing cross
arms.

a) Material
Cost of porcelain disc type insulator suitable for 11 KV each 1

b) Labour charges for erection.


Skilled Electrician day 0.125
Helper day 0.25
Sundries
Rate per Each
Note : Labour is considered for 8 jobs / day
17.6.5 Supply and erecting porcelain pin type insulator suitable
for 11KV line with suitable hardware on existing cross
arms.

a) Material
Cost of porcelain pin type insulator suitable for 11 KV each 1

b) Labour charges for erection.


Skilled Electrician day 0.125
Helper day 0.25
Sundries
Rate per Each
Note : Labour is considered for 8 jobs / day
17.6.6 Supply and erecting porcelain post type insulator suitable
for 11KV line with suitable hardware on existing cross
arms.

a) Material
Cost of porcelain post type insulator suitable for 11 KV each 1

b) Labour charges for erection.


Skilled Electrician day 0.125
Helper day 0.25
Sundries
Rate per Each
Note : Labour is considered for 8 jobs / day
17.6.8 Supply and fixing of lightning protective system conforming
to IS : 2309 with all standard accessories such as metal
globe finials on the top of the builiding with 25.4 mm dia 3.0
mtrs. Length of 'B' class G.I pipe etc., complete without
down conductors and earthing

a) Material
Lightning protective system with all standard each 1
accessories such as metallic globe, finials etc.,
25.4 mm B Class GI Pipe, ISI Mark M 3
b) Labour charges
i) for fixing the System on G.I pipe.
ii) for fixing on top of the building with C.C work /
Clamping arrangement.
Skilled Electrician day 1
Helper day 1
Sundries and Rounding off
Rate per Each
17.6.10 Supply and erecting approved made 11KV, 400A A.B
switch with all standard accessories etc., complelte with
cost and conveyance of all materials and labour charges.

a) Material
Cost of 11KV, 400A A.B switch wth all standard each 1
accessories.
b) Labour charges for erection.
Skilled Electrician day 1
Semi Skilled Electrician day 1
Helper day 1
Sundries and Rounding off
Rate per Each
17.6.11 Supply and erecting approved made 11KV, 200A
A.B switch with all standard accessories etc.,
complelte with cost and conveyance of all materials
and labour charges.
a) Material
Cost of 11KV, 200A A.B switch wth all standard each 1
accessories.
b) Labour charges for erection.
Skilled Electrician day 1
Semi Skilled Electrician day 1
Helper day 1
Sundries and Rounding off
Rate per Each
17.6.12 Supply and erecting approved made 11KV, 200A
(Tilting) A.B switch with all standard accessories
etc., complelte with cost and conveyance of all
materials and labour charges.

a) Material
Cost of 11kV, 200A (Tilting) A.B switch wth all each 1
standard accessories.
b) Labour charges for erection.
Skilled Electrician day 1
Semi Skilled Electrician day 1
Helper day 1
Sundries and Rounding off
Rate per Each
17.6.13 Supply and erecting 11KV, H.G (Horn Gap) fuse set
including all standard accessories etc., complete
with cost and conveyance of all materials and labour
charges.
a) Material
Cost of 11KV, H.G. fuse set wth all standard each 1
accessories.
b) Labour charges for erection.
Skilled Electrician day 1
Helper day 1
Sundries and Rounding off
Rate per Each
17.6.14 Supply and erecting of bank of metalised
polypropylene condensors with the standard
capacities of 2,3,5,7,10,12.5 and 15 KVAR units for
PF correction for operation on 3 phase 50 Cycles
400 / 440V (+10%) with externally discharging
resistances, earthig terminals etc., complete.

a) Material
Cost of MPP capacitor operation on 3 Ph. 415V. Kvar 1
b) Labour charges for erection.
Skilled Electrician day 0.04
Helper day 0.08
Sundries and Rounding off
Rate per Kvar
Note : Labour considered for 25 jobs / day
17.6.15 Supply and erecting of bank of mixdielectric
condensors with the standard capacities of
2,3,5,7,10,12.5 and 15 KVAR units for PF correction
for operation on 3 phase 50 cycles 400/440V (+10%)
with externally discharging resistances, earthing
terminals etc., complete.

a) Material
Cost of of mixed Dielectric capacitor operation on 3 Kvar 1
Ph. 415V.
b) Labour charges for erection.
Skilled Electrician day 0.04
Helper day 0.08
Sundries and Rounding off
Rate per Kvar
Note : Labour considered for 25 jobs / day
18 Repairs to Motors and Rewinding
Datas of 11.6.1 to 11.6.4 are hold good and be
adopted.
18.1.1 Rewinding the motor of the table / pedestal / cabin
fan of all types, and makes and overhauling
including minor repairs, testing for the original speed
and consumption with guarantee for one year
including tansporation from site and back.

a) Material
Copper enamelled winding wire of fine quality. kg 0.3
Labour charges towards removing unserviceable 50%
winding wire and cleaning. (on cost of winding wire)

Labour charges towards rewinding the coils 100%


complete with connections etc., complete.(on cost of
winding wire)
Sundries such as sleeves cotton tape, minolex 40%
paper, solution etc., with transportion charges.
Less cost towards old winding wire kg 0.3
Rate per Each
18.1.2 Rewinding the motor of the ceiling fan of 1200mm /
1400mm of all types and makes and over hauling
including minor repairs and testing for original speed
and consumption
a) Material
1282 35 / 36 Copper enamelled winding wire of fine kg 0.2
quality.
Labour charges towards removing unserviceable 50%
winding wire and cleaning. (on cost of winding wire)

Labour charges towards rewinding the coils 100%


complete with connections etc., complete.(on cost of
winding wire)
Sundries such as sleeves cotton tape, minolex 40%
paper, solution etc., with transportion charges.
Less cost towards old winding wire kg 0.2
Rate per Each
18.1.3 Rewinding the motor of the exhaust fan of light duty
225/300mm of 900/1400 RPM of all types and
makes and over hauling including minor repairs and
testing for original speed and consumption

a) Material
23 / 24 / 28 Copper enamelled winding wire of fine kg 0.05
quality.
Labour charges towards removing unserviceable 50%
winding wire and cleaning. (on cost of winding wire)
Labour charges towards rewinding the coils 100%
complete with connections etc., complete.(on cost of
winding wire)
Sundries such as sleeves cotton tape, minolex 40%
paper, solution etc., with transportion charges.
Less cost towards old winding wire kg 0.05
Rate per Each
18.1.4 Rewinding the motor of the exhaust fan of heavy
duty 375mm of 900/1400 RPM of all types and
makes and over hauling including minor repairs and
testing for original speed and consumption

a) Material
23 / 24 / 28 Copper enamelled winding wire of fine kg 0.45
quality.
Labour charges towards removing unserviceable 50%
winding wire and cleaning. (on cost of winding wire)

Labour charges towards rewinding the coils 100%


complete with connections etc., complete.(on cost of
winding wire)
Sundries such as sleeves cotton tape, minolex 40%
paper, solution etc., with transportion charges.
Less cost towards old winding wire kg 0.45
Rate per Each
18.1.5 Rewinding of electric motor upto 1 HP single phase
upto 1400 RPM of all types and makes with copper
wire, overhauling with minor repairs, testing for the
original speed and no load consumption .

a) Material
Suitable guage copper winding wire fine quality kg 2.7
Labour charges towards removing of old 5%
unserviceable winding wire.(on cost of winding wire)

Labour charges towards rewinding copper coils 12%


complete with connections.(on cost of winding wire)

Sundries such as sleeves, cotton tape, minolex 2%


paper solution etc., with transportation.
Less cost towards old winding wire kg 2.7
Rate per Each
18.1.6 Rewinding of electric motor 2 HP single phase 1400 RPM
of all types and makes with copper wire, overhauling with
minor repairs, testing for the original speed and no load
consumption.

a) Material
Suitable guage copper winding wire fine quality kg 3.2
Labour charges towards removing of old unserviceable 5%
winding wire.(on cost of winding wire)

Labour charges towards rewinding copper coils complete 12%


with connections.(on cost of winding wire)
Sundries such as sleeves, cotton tape, minolex paper 2%
solution etc., with transportation.
Less cost towards old winding wire kg 3.2
Rate per Each
18.1.7 Rewinding of electric motor 3 HP three phase 1400 RPM
of all types and makes with copper wire, overhauling with
minor repairs, testing for the original speed and no load
consumption .

a) Material
Suitable guage copper winding wire fine quality kg 4.5
Labour charges towards removing of old unserviceable 5%
winding wire.(on cost of winding wire)

Labour charges towards rewinding copper coils complete 12%


with connections.(on cost of winding wire)
Sundries such as sleeves, cotton tape, minolex paper 2%
solution etc., with transportation.
Less cost towards old winding wire kg 4.5
Rate per Each
18.1.8 Rewinding of electric motor 5 HP three phase 1400 RPM
of all types and makes with copper wire, overhauling with
minor repairs, testing for the original speed and no load
consumption .

a) Material
Suitable guage copper winding wire fine quality kg 5.7
Labour charges towards removing of old unserviceable 5%
winding wire.(on cost of winding wire)

Labour charges towards rewinding copper coils complete 12%


with connections.(on cost of winding wire)
Sundries such as sleeves, cotton tape, minolex paper 2%
solution etc., with transportation.
Less cost towards old winding wire kg 5.7
Rate per Each
18.1.9 Rewinding of electric motor 7.5 HP three phase 1400
RPM of all types and makes with copper wire, overhauling
with minor repairs, testing for the original speed and no
load consumption .

a) Material
Suitable guage copper winding wire fine quality kg 6.5
Labour charges towards removing of old unserviceable 5%
winding wire.(on cost of winding wire)

Labour charges towards rewinding copper coils complete 12%


with connections.(on cost of winding wire)
Sundries such as sleeves, cotton tape, minolex paper 2%
solution etc., with transportation.
Less cost towards old winding wire kg 6.5
Rate per Each
18.1.10 Rewinding of electric motor 10 HP three phase
1400 RPM of all types and makes with copper wire,
overhauling with minor repairs, testing for the
original speed and no load consumption .
a) Material
Suitable guage copper winding wire fine quality kg 10
Labour charges towards removing of old 5%
unserviceable winding wire.(on cost of winding wire)

Labour charges towards rewinding copper coils 12%


complete with connections.(on cost of winding wire)
Sundries such as sleeves, cotton tape, minolex 2%
paper solution etc., with transportation.
Less cost towards old winding wire kg 10
Rate per Each
18.1.11 Rewinding of electric motor 12.50 HP three phase
1400 RPM of all types and makes with copper wire,
overhauling with minor repairs, testing for the
original speed and no load consumption .

a) Material
Suitable guage copper winding wire fine quality kg 12
Labour charges towards removing of old 5%
unserviceable winding wire.(on cost of winding wire)

Labour charges towards rewinding copper coils 12%


complete with connections.(on cost of winding wire)

Sundries such as sleeves, cotton tape, minolex 2%


paper solution etc., with transportation.
Less cost towards old winding wire kg 12
Rate per Each
18.1.12 Rewinding of electric motor 15 HP three phase
1400 RPM of all types and makes with copper wire,
overhauling with minor repairs, testing for the
original speed and no load consumption .

a) Material
Suitable guage copper winding wire fine quality kg 15
Labour charges towards removing of old 5%
unserviceable winding wire.(on cost of winding wire)

Labour charges towards rewinding copper coils 12%


complete with connections.(on cost of winding wire)

Sundries such as sleeves, cotton tape, minolex 2%


paper solution etc., with transportation.
Less cost towards old winding wire kg 15
Rate per Each
18.1.13 Rewinding of electric motor 20 HP three phase
1400 RPM of all types and makes with copper wire,
overhauling with minor repairs, testing for the
original speed and no load consumption.

a) Material
Suitable guage copper winding wire fine quality kg 18
Labour charges towards removing of old 5%
unserviceable winding wire.(on cost of winding wire)

Labour charges towards rewinding copper coils 12%


complete with connections.(on cost of winding wire)

Sundries such as sleeves, cotton tape, minolex 2%


paper solution etc., with transportation.
Less cost towards old winding wire kg 18
Rate per Each
18.1.14 Rewinding of submersible motor upto 15 HP three
phase of all types and makes with copper wire,
overhauling with minor repairs, testing for the
original speed and no load consumption .

a) Material
PVC insulated copper winding wire of suitable kg 18
guage.
Labour charges towards removing of old 10%
unserviceable winding wire.(on cost of winding wire)

Labour charges towards rewinding copper coils 15%


complete with connections.(on cost of winding wire)

Sundries such as sleeves, cotton tape, minolex 5%


paper solution etc., with transportation.
Less cost for winding wire kg 18
Rate per Each
18.2 Bearings
18.2.1 Replacing the existing bearing of approved make for
electric motor single phase / 3 phase AC upto 1 HP
of all types with due alignment of the shaft and
tested.
a) Material
Ball Bearings suitable for 1 HP Motor inclusive of taxes each 1

Labour charges for removing the existing 50%


unserviceable bearing and fixing the new ball
bearing with special T&P. (on cost of Ball Bearing)

Transportation and Rounding off


Rate per Each
18.2.2 Replacing the existing bearing of approved make for
electric motor single phase / 3 phase AC upto 2 to 3
HP of all types with due alignment of the shaft and
tested.
a) Material
Ball Bearings suitable for 2 to 3 HP Motor inclusive of taxes each 1

Labour charges for removing the existing unserviceable 50%


bearing and fixing the new ball bearing with special T&P.
(on cost of Ball Bearing)

Transportation and Rounding off


Rate per Each
18.2.3 Replacing the existing bearing of approved make for
electric motor single phase / 3 phase AC upto 5 to 7.5 HP
of all types with due alignment of the shaft and tested.

a) Material
Ball Bearings suitable for 5 to 7.5 HP Motor inclusive each 1
of taxes
Labour charges for removing the existing unserviceable 50%
bearing and fixing the new ball bearing with special T&P.
(on cost of Ball Bearing)

Transportation and Rounding off


Rate per Each
18.2.4 Replacing the existing bearing of approved make for
electric motor single phase / 3 phase AC upto 10 to 12.5
HP of all types with due alignment of the shaft and tested.

a) Material
Ball Bearings suitable for 5 to 7.5 HP Motor inclusive each 1
of taxes
Labour charges for removing the existing unserviceable 50%
bearing and fixing the new ball bearing with special T&P.
(on cost of Ball Bearing)

Transportation and Rounding off


Rate per Each
18.2.5 Replacing the existing bearing of approved make for
electric motor single phase / 3 phase AC upto 15 to 20 HP
of all types with due alignment of the shaft and tested.

a) Material
Ball Bearings suitable for 5 to 7.5 HP Motor inclusive each 1
of taxes
Labour charges for removing the existing unserviceable 50%
bearing and fixing the new ball bearing with special T&P.
(on cost of Ball Bearing)

Transportation and Rounding off


Rate per Each
18.2.6 Replacing the ball bearing of table / cabin / pedestal /
ceiling / exhaust fan complete with alignment of shaft and
tested.

a) Material
Ball Bearings suitable for table / cabin / ceiling / each 1
Exhaust Fan inclusive of taxes
Labour charges for removing the existing unserviceable 50%
bearing and fixing the new ball bearing with special T&P.
(on cost of Ball Bearing)

Transportation and Rounding off


Rate per Each
18.2.7 Replacing the ball bearing of bush / rubber / ring washers
for fan mortar complete with alignment of shaft and tested.

a) Material
Cost of GM / Bush / Rubber / Ring washer etc., each 1
Labour charges for removing the existing unserviceable 50%
bush/ ring washer and fixing the new with special T&P.(on
cost of material)

Rounding Off
Rate per Each
18.2.8 Replacing the existing capacitor of table / cabin /
pedestal / ceiling / exhaust fan complete with wiring.

a) Material
Cost of 2.5 / 3.5 mfd condensor suitable for ceiling / each 1
pedastal Exhaust Fan
b) Labour charges for removing and refixing
Semi Skilled Electrician day 0.1
Rounding Off
Rate per Each
Note : Labour considered for 10 jobs / day
Remarks

Note for All


Items for
Coduit
Laying
Note for All
Items for
Wiring
The R&B
Department
Proposed
Labour, for
both piping &
wiring
considering
40% Labour,
for Wire
draw.
Keeping this,
the labour is
proposed for
wiring 100
100A

6190 6190

355 59.285
285 47.595
285 94.905
3
6395
2.1.5
GI strip
6136
880
Data shall
be arrived
based on
observed
Data

Data shall
be arrived
based on
observed
Data
0.23 0.3 0.42 0.02898
0.23 0.3 0.84 0.05796
0.23 0.3 0.94 0.06486
0.23 0.3 0.91 0.06279
0.23 0.3 0.82 0.05658
0.23 0.3 0.83 0.05727
0.23 0.3 1 0.069
0.23 0.3 0.92 0.06348
0.23 0.3 1.1 0.0759
0.23 0.3 1.2 0.0828
0.23 0.3 1.15 0.07935
0.23 0.3 1.05 0.07245
0.23 0.3 1.06 0.07314
0.23 0.3 0.95 0.06555
0.23 0.3 1 0.069
0.23 0.3 0.85 0.05865
0.23 0.3 0.94 0.06486 0.67
0.23 0.3 0.67 0.04623 0.72
0.23 0.3 0.72 0.04968
0.23 0.3
0.23 0.3
1.19853

You might also like