: FM-EI-3114
Enter contractors logo here ENTER PROJECT NAME AND OWNER’S NAME HERE Rev. : A
Page 1 of 3
Enter contractor’s name here INSTALLATION OF MOTORS INSPECTION/TEST
Report No.:
NAME
SIGNATURE
DATE
FM-EI-3114, Rev. A Attachment # 7.1 to QCP/ITP for Installation of Low & Medium Voltage Motors
Form No.: FM-EI-3114
Enter contractors logo here ENTER PROJECT NAME AND OWNER’S NAME HERE Rev. : A
Page 2 of 3
Enter contractor’s name here INSTALLATION OF MOTORS INSPECTION/TEST
Report No.:
NAME
SIGNATURE
DATE
FM-EI-3114, Rev. A Attachment # 7.1 to QCP/ITP for Installation of Low & Medium Voltage Motors
Form No.: FM-EI-3114
Enter contractors logo here ENTER PROJECT NAME AND OWNER’S NAME HERE Rev. : A
Page 3 of 3
Enter contractor’s name here INSTALLATION OF MOTORS INSPECTION/TEST
Report No.:
44. Main auxiliary terminal boxes are clean, dry, in good condition and correctly gasketed with
fixing screws / bolts tightened
45. Purge system & associated controls for EX (P) motors wherever applicable
46. CT polarity & connection for differential protection CTs wherever applicable
NAME
SIGNATURE
DATE
FM-EI-3114, Rev. A Attachment # 7.1 to QCP/ITP for Installation of Low & Medium Voltage Motors