Location / Area :
Verification Sign
S. No. Activities / Items to be Inspected
of Engineer
Check the installed pumps and accessories have
1.
approved submittals
Ensure the drawings used for installation are latest
2.
and approved
Verify the pumps and accessories are as per approved
3.
submittals.
Check the plinths and ensure the same is as per
4.
manufacturer’s requirements / approved drawings.
Installation of equipment and accessories is as per
5.
approved drawings.
Check and ensure water meter is installed as per
6.
approved drawings.
Ensure installation complies with manufacturer’s
7.
instructions.
Check all nuts, bolts, clamps etc., are fixed and
8.
secured.
Check the installation of piping is completed as per
9.
approved drawings.
Check the control panels are installed as per
10.
drawings.
Location / Area :
Verification Sign
S. No. Activities / Items to be Inspected
of Engineer
Check all cable and wiring is completed and
11.
terminated.
Check and ensure adequate access available for
12. maintenance and service including removal of
components.
Check and ensure the installation complies with
13.
NFPA 20
Check the identification labels / tags are provided as
14.
per the requirement.
Ensure the equipment is cleaned and free from dust
15.
and debris.
ETA QC ENGINEER