Laporan Reliability PLTD Suppa - April 2021
Laporan Reliability PLTD Suppa - April 2021
01
SIAP INTEGRATED MANAGEMENT SYSTEM Tgl Terbit 8/1/2017
Revisi 00
RESUME PKU DAN CHRONIC PROBLEM UNIT PLTD SUPPA
Halaman 01
Status PKU Inputan Tindak Lanjut Keterangan
KKS 2021 Work Order (WO) PLO Action Plan PIC Time
No Equipment Identifikasi Prioritas
Keterangan WO No Status PdM LK3 Keterangan MWH Loss
Jan Feb Mar Apr Mei Jun
REKONDISI ON GOING
REKONDISI CYLINDER HEAD EX OVERHAUL 72000 JAM 3757 OPEN MEK 21/2/2020
Main Diesel Engine Stationary Unit 1 SP10MJA01HA001 4 4 4 4 5435 OPEN - - - - CM NI SERVICE INST 25/4/2021 ON GOING
SENSOR FAULT ALARM MV SWITCHGEAR BUSBAR #1
Main Diesel Engine Rotary Unit 1 SP10MJA01HB001 5 5 5 5 CYLINDER HEAD B7 KONDISI BOCOR (LEAKING) 5354 CLOSED - - - - CM NI SERVICE MEK 12/4/2021 SELESAI / 13 - 4 - 2021
1. EXHAUST GAS BELLOW A9 MESIN #4 5155 CLOSED SERVICE MEK 2/2/2021 SELESAI 2/4/2021
2. AUTOMATIC FILTER FUEL MESIN 1, 3, 4, 5, 6 5176 CLOSED SERVICE MEK 2/4/2021 SELESAI 2/8/2021
Main Diesel Engine Bearing Assembly Unit 1 SP10MJA01HD001 5 5 5 5 - - - - CM NI
3. PRINTER L360 SUPERVISOR COMPUTER TIDAK BISA NGEPRINT 5178 CLOSED SERVICE INST 2/4/2021 SELESAI 3/9/2021
4. HANDEL VALVE CONTROL AIR INDIKASI GEAR MULAI AUS 5347 CLOSED SERVICE MEK 8/4/2021 SELESAI 8/4/2021
High Temperature Cooling Water Pump 1 SP10MJA01AP001 5 5 5 5 COULING HT MESIN KONDISI COOLING WATER EMENETS DI AREA CLAMP 5361 CLOED - - - - CM NI SERVICE MEK 13/4/2021 SELESAI / 13 - 4 - 2021
Turbocharger Engine 1 SP10MJA01AN001 5 5 5 5 FLEXIBLE CONNECTION MESIN #1 BANK B KONDISI SOBEK 5215 CLOSED - - - - CM NI SERVICE MEK 16/2/2021 SELESAI / 17 - 2 - 2021
BAP 011 Central Control Panel Genset Unit 1 SP10MKY01GH002 5 5 5 5 LAMPU INDIKASI PANEL BAP 011 - 061 PADAM TIDAK BERFUNGSI 5242 CLOSED - - - - CM NI SERVICE ELEK CLOSED SELESAI / 3 - 3 - 2021
Generator Exciter Unit 1 SP10MKC01 5 5 5 5
Generator Exciter Cubicle Unit 1 SP10MKC01GU001 5 5 5 5
1. ELECTRICAL ANNEX MESIN #4 INDIKASI ABNORMAL SOUND 5175 CLOSED SERVICE ELEK 2/4/2021 SELESAI 2/4/2021
Main Diesel Engine Bearing Assembly Unit 4 SP40MJA01HD001 5 4 4 4 2. REPAINITNG PEREMAJAAN PEWARNAAN DI MAIN ENGINE 5194 OPEN - - - - CM NI REPAINTING MEK 2/8/2021 ON GOING
3. RCFA MESIN #4 TRIP AKIBAT WATER INLET HIGH TEMPERATURE 5196 CLOSED PEMBUATAN LAPORAN ENG 2/9/2021 SELESAI / 29/2021
1. SELENOID FLUSHING MESIN #5 5177 CLOSED SERVICE INST 2/4/2021 SELESAI / 8 - 2 - 2021
Main Diesel Engine Bearing Assembly Unit 5 SP50MJA01HD001 5 5 5 5 2. D/G #5 KONDISI TIDAK BISA SINKRON 5319 CLOSED - - - - CM NI SERVICE INST 31/3/2021 SELESAI / 31 - 3 - 2021
3. RADIATOR MESIN 5 E511-B KONDISI MCB RUSAK HANGUS TRIP 5381 CLOSED SERVICE ELEK 15/4/2021 SELESAI / 15 - 4 - 2021
Main Diesel Engine Stationary Unit 6 SP60MJA01HA001 5 5 5 5 OIL MIST CONCENTRATION HIGH UNIT TRIP AKIBAT KONTAMINASI MINYAK PELUMAS 5339 CLOSED - - - - CM NI SERVICE INSTRUMENT 6/4/2021 CLOSED / 6 - 4 - 2021
400 VAC Distribution Panel (NE1 + NE1 + NE2) for Switchyard SP00BAY08GH001 5 5 5 5
Light Fuel Oil Day / Storage Tank No 2 SP00EGB13BB002 4 4 4 4 LIGHTING AERESTERS AREA STORAGE TANK B TERPUTUS 4635 OPEN - - - - CM NI SERVICE ELEK 10/9/2020 ON GOING
Hydrophore Pump P.347 No 2 SP00PAC16AP002 4 4 4 4 1. LINE HYDROPHORE KEROPOS DAN BOCOR PERLU DILAKUKAN PERBAIKAN 2879 CLOSED - - - - CM NI SERVICE MEK 26 - 7 - 2019 ON GOING
PROSES REPAINTING
J.Control Box J.347 SP00PAC16GH001 5 5 5 5 FLEXIBLE COUPLING HT - CW AREA RADIATOR 5247 CLOSED - - - - CM NI SERVICE MEK 4/3/2021 SELESAI / 6 - 3 - 2021
Reverse Ormosis System (E.G. For Carbonate Hardness Removal) SP00GBF 1 1 1 1 SUDAH TIDAK DIGUNAKAN
Starting Air Compressor No 1 SP00QEA10AN001 5 5 5 5 LINE CONTROL AIR AREA POWER HOUSE BOCOR 4810 CLOSED - - - - CM NI SERVICE / PABRIKASI MEK 20/10/2020 SELESAI / 27 - 10 - 2020
Screw Compressor P.873 SP00QEA40 5 5 5 5 PERALATAN SCREW AIR COMPRESSOR U/M DIPERKIRAKAN ADA KEBOCORAN PADA HIGH PRESSUE HOSE 4443 CLOSED - - - - CM NI SEVICE MEK 27/7/2020 SELESAI / 12 - 8 - 2020
Feedwater tank SP00QHE10BB001 5 5 5 5 FAN PANEL LFO BOILER UNIT TERLEPAS DARI SUPPORT FAN BLADE 5290 CLOSED - - - - CM NI SERVICE INST 17/3/2021 SELESAI / 17 - 3 - 2021
Light Fuel Oil Fired Boiler System (Auxiliary Boiler) SP00QHA50 1 1 1 1 KERUSAKAN PLC LFO BOILER PADA SEMESTER 1 2018
FAN DALAM PANEL 02/03 KONDISI MATI 5300 OPEN SERVICE INST 22/3/2021 ON GOING
Separator Tank V.114 SP00GMB20BB001 5 5 4 4 - - - - CM NI
POMPA DIAGFRAGMA PUMP AREA FOPX FUEL TREATMENT 5379 CLOSED SERVICE MEK 14/4/2021 SELESAI / 14 - 4 - 2021
1. LINE PIPE STEAM DRUM AREA SAMPING LAPANGAN BOCOR 5170 CLOSED MEK SERVICE 2/3/2021 SELESAI 2/4/2021
Sludge transfer Pump P.123 SP00GMB81AP002 5 5 5 5 - - - - CM NI
2. PIPA STEAM BOCOR 5181 CLOSED MEK SERVICE 2/8/2021 'SELESAI 2/8/2021
Fire Fighting Pump (Diesel Driven) P.432-1 SP00SGA11AP001 5 5 5 5 BATTERY CHARGER DIESEL FIRE FIGHTING TIDAK BERFUNGSI DENGAN NORMAL 5231 CLOSED - - - - CM NI SERVICE INST 24/2/2021 SELESAI / 28 - 2 - 2021
5 5 5 5
Fire Fighting Jockey Pump Suction Strainer S.432-2 SP00SGA11AT003
Very Early Smoke Detector Alarm (VESDA) System in MV & LV cubicles, SP00SGA21CD001 5 5 5 5
DG Control Panel & Iine underground cable trenches in control building SP00SGA21CD002 5 5 5 5
Emergency Generator G.323 SP00XJA10AG001 5 5 5 5 KIPAS PENDINGIN BLACK START UNIT RUSAK 5168 CLOSED - - - - CM NI SERVICE INST 2/2/2021 3/2/2021
Emergency Switchboard J.323 SP00XJA10GS001 5 5 5 5
Low Voltage Station Switchgear (Power House) SP00ANE10GS001 5 5 4 4 FAN DALAM PANEL CIRCULATION PUMP KONDISI MATI 5299 OPEN - - - - CM NI SERVICE INST 22/3/2021 ON GOING
5 5 5 5
150kV Metering Panel A (E00+X2 & E00+X3) SP00AQA01GH001
Multi-function Electronic Meter No 1 SP00AQA01GK001 5 5 5 5
Multi-function Electronic Meter No 2 SP00AQA01GK002 5 5 5 5
CB's; door switches SP00AQA01GS001 5 5 5 5
UPS No 1 SP00AQA01GY001 5 5 5 5
CCTV MESIN #1 KONDISI BLANK TIDAK BISA MONITOR PARAMETER DI MESIN '5227 OPEN SERVICE INST 19/2/2021 ON GOING
Power Line Carrier System ESB 2000i SP00AYB01EB001 5 4 4 4 CCCTV MESIN #5 KONDISI BLANK TIDAK BISA MONITOR PARAMETER DI MESIN 5230 CLOSED - - - - CM NI SERVICE INST 22/2/2021 SELESAI / 22 - 2 - 2021
LAMPU INDIKASI CONTROL PANEL BAP 011 MENYALA SECARA BERSAMAAN INDIKASI KORSLET 5345 CLOSED SERVICE INST 8/4/2021 SELESAI / 16 - 4 - 2021
Structures SP00U 5 5 5 5
Structures Of Grid And Distribution Systems Electrical System High Voltage SP00UA 5 5 5 5
High Voltage Switchyard SP00UAA 5 5 5 5
Transformer Bay E01 SP00UAA01 5 5 5 5
Three phase bus sections SP00UAA01GD001 5 5 5 5
Three phase bus disconnectors SP00UAA01GD002 5 5 5 5
Three phase circuit breakers gas type SP00UAA01GS001 5 5 5 5
Three phase surge arresters SP00UAA01GZ001 5 5 5 5
Three phase current and voltage transformers SP00UAA01GT001 5 5 5 5
for protection and measurement
Three phase current and voltage transformers for protection and measurment SP00UAA04GT001 5 5 5 5
Line traps fitted on voltage transformer for plc communication. SP00UAA04GC001 5 5 5 5
1. LAMPU PENERANGAN DI PLTD SUPPA AGAR KIRANYA LAMPU PENERNAGAN DI GANTI SESUAI 3546 OPEN SERVICE 2/1/2020 ON GOING
5212 ELEK
2. PC WOIS CCR TIDAK BISA MEMONIT AKIBATBACK UP UPS RUSAK OPEN SERVICE 15/2/2021 ON GOING
Supervision Computer & Acessories No 1 SP00ZAA01KB001 4 4 4 4 3. MONITOR SPM TURBOCHARGING TIDAK BISA MEMONITOR TRENDING GRAFIK VIBRASI 5213 CLOSED - - - - CM NI SERVICE INST 15/2/2021 SELESAI / 26 - 2 - 2021
4. MONITORING OPERATOR CCR WOIS KONDISI BLANK 5214 CLOSED SERVICE INST 15/2/2021 SELESAI / 18 - 3 - 2021
5308 INST
5. PEMASANGAN AC SPLIT DI RUANGAN OFFICE 8 PEACES OPEN PEMASANGAN AC UMUM 26/3/2021 ON GOING
Reporting Computer SP00ZAA01KB003 5 5 5 5 1. PEMBUATAN RCFA DAN TINDAK LANJUT PEMASANGAN AC SPLIT DI RUANGAN OFFICE PLTD SUPPA 5088 CLOSED - - - - CM NI PEMBUATAN DOKUMEN ENJ 8/1/2021 SELESAI / 10 - 1 - 2021
2. TELEPHONE DI JETTY TIDAK MEMILIKI JARINGAN 5246 CLOSED SERVICE INST 4/3/2021 SELESAI / 6 - 3 - 2021
UNIT 2
JUMLAH
STATUS
JAN FEB MAR APR MEI JUN
1 BREAKDOWN 2 2 2 2 0 0
2 STANDBY 0 0 0 0 0 0
3 FAULT 0 0 0 0 0 0
4 ALARM 0 0 0 0 0 0
5 NORMAL 85 85 85 85 0 0
UNIT 3
JUMLAH
STATUS
JAN FEB MAR APR MEI JUN
1 BREAKDOWN 0 0 0 0 0 0
2 STANDBY 0 0 0 0 0 0
3 FAULT 0 0 0 0 0 0
4 ALARM 0 1 1 2 0 0
5 NORMAL 85 84 84 83 0 0
UNIT 4
JUMLAH
STATUS
JAN FEB MAR APR MEI JUN
1 BREAKDOWN 0 0 0 0 0 0
2 STANDBY 0 0 0 0 0 0
3 FAULT 0 0 0 0 0 0
4 ALARM 0 1 1 2 0 0
5 NORMAL 82 81 81 80 0 0
UNIT 5
JUMLAH
STATUS
JAN FEB MAR APR MEI JUN
1 BREAKDOWN 0 0 0 0 0 0
2 STANDBY 0 0 0 0 0 0
3 FAULT 0 0 0 0 0 0
4 ALARM 0 0 0 1 0 0
5 NORMAL 85 85 85 84 0 0
UNIT 6
JUMLAH
STATUS
JAN FEB MAR APR MEI JUN
1 BREAKDOWN 0 0 0 0 0 0
2 STANDBY 0 0 0 0 0 0
3 FAULT 0 0 0 0 0 0
4 ALARM 0 0 0 0 0 0
5 NORMAL 85 85 85 85 0 0
UNIT COMMON
JUMLAH
STATUS
JAN FEB MAR APR MEI JUN
1 BREAKDOWN 24 24 24 24 0 0
2 STANDBY 0 0 0 0 0 0
3 FAULT 0 0 0 0 0 0
4 ALARM 7 10 11 12 0 0
5 NORMAL 681 678 677 676 0 0
PT PEMBANGKITAN JAWA BAL
SIAP INTEGRATED MANAGEME
MONITORING REKOMENDA
DGA
DGA Normal
Status Jumlah Prosentase Normal
Alarm
Normal 3 75% 25%
25% High Alert
Alarm
Alarm 1 25% Breakdown
75%
75% High Alert
High Alert 0 0%
Breakdown 0 0% Breakdown
Total 4 100%
Transformator
Thermography -
MCA -
Operasi 4 Kondisi Normal
1.Nilai TDCG kondisi 1 (normal)
2.Rasio CO2/CO masih normal 4.8
DGA 3
3. Gas CO masuk kondisi 3 dan gas
Auxilary Transformer No.2 CO2 masuk kondisi 3
4
T.322
Thermography -
MCA -
Operasi 4 Kondisi Normal
Main Diesel Engine
Vibrasi
1. Dilakukan pengambilan data
tekanan pembakaran atau peak
1. Pressure
pressure sesuai dengan firing order
2. Exhasut Gas 4
2. Pengambilan data di saluran buang
Manifold
exhaust gas manifold setiap cylinder
5 Main Diesel Engine #1 head
Oil Analysis
Vibrasi
1. Dilakukan pengambilan data
tekanan pembakaran atau peak
1. Pressure
pressure sesuai dengan firing order
2. Exhasut Gas 4
2. Pengambilan data di saluran buang
Manifold
exhaust gas manifold setiap cylinder
head
Vibrasi
1. Dilakukan pengambilan data
tekanan pembakaran atau peak
1. Pressure
pressure sesuai dengan firing order
2. Exhasut Gas 4
2. Pengambilan data di saluran buang
Manifold
exhaust gas manifold setiap cylinder
head
Oil Analysis
Vibrasi
Oil Analysis
Turbocharger
Vibrasi
11 Turbocharger Bank A #1 Oil Analysis
Operasi
Vibrasi
12 Turbocharger Bank B #1 Oil Analysis
Operasi
Vibrasi
13 Turbocharger Bank A #2 Oil Analysis
Operasi
Kerusakan Komponen Peralatan
Vibrasi 1
ABB Turbocharger
14 Turbocharger Bank B #2 Oil Analysis 1 Kerusakan Komponen Peralatan
ABB Turbocharger
Kerusakan Komponen Peralatan
Operasi 1
ABB Turbocharger
Vibrasi
15 Turbocharger Bank A #3 Oil Analysis
Operasi
Vibrasi
16 Turbocharger Bank B #3 Oil Analysis
Operasi
Vibrasi
17 Turbocharger Bank A #4 Oil Analysis
Operasi
Vibrasi
18 Turbocharger Bank B #4 Oil Analysis
Operasi
Vibrasi
19 Turbocharger Bank A #5 Oil Analysis
Operasi
Vibrasi
20 Turbocharger Bank B #5 Oil Analysis
Operasi
Vibrasi
21 Turbocharger Bank A #6 Oil Analysis
Operasi
Vibrasi
22 Turbocharger Bank B #6 Oil Analysis
Operasi
Compressed Air System
Vibrasi
Starting Air Compressor Thermography
23
No.1 MCA
Operasi
Vibrasi
Starting Air Compressor Thermography
24
No.2 MCA
Operasi
Vibrasi
Thermography
25 Working Air Compressor
MCA
Operasi
Vibrasi
Thermography
26 Control Air Compressor
MCA
Operasi
Vibrasi
Thermography
27 Screw Air Compressor
MCA
Operasi
Fuel System
LFO Unloading Unit
Vibrasi
Thermography
28 LFO Unloading Pump No.1
MCA
Operasi
Vibrasi
Thermography
29 LFO Unloading Pump No.2
MCA
Operasi
LFO Feeder Unit
Vibrasi
Thermography
30 LFO Feeder Pump No.1
MCA
Operasi
Vibrasi
Thermography
31 LFO Feeder Pump No.2
MCA
Operasi
HFO Unloading Unit
Vibrasi
Thermography
32 HFO Unloading Pump No.1
MCA
Operasi
Vibrasi
Thermography
33 HFO Unloading Pump No.2
MCA
Operasi
HFO Transfer Unit
Vibrasi
Thermography
34 HFO Transfer Pump No. 1
MCA
Operasi
Vibrasi
Thermography
35 HFO Transfer Pump No. 2
MCA
Operasi
HFO Feeder Unit
Vibrasi
Thermography
36 HFO Feeder Pump No.1
MCA
Operasi
Vibrasi
Thermography
37 HFO Feeder Pump No.2
MCA
Operasi
Fuel Oil Booster Unit
Vibrasi
Fuel Oil Booster Circulation Thermography
38
Pump No.1 #1 MCA
Operasi
Vibrasi
Fuel Oil Booster Circulation Thermography
39
Pump No.2 #1 MCA
Operasi
Vibrasi
Fuel Oil Booster Circulation Thermography
40
Pump No.1 #2 MCA
Operasi
Vibrasi
Fuel Oil Booster Circulation Thermography
41
Pump No.2 #2 MCA
Operasi
Vibrasi
Fuel Oil Booster Circulation Thermography
42
Pump No.1 #3 MCA
Operasi
Vibrasi
Fuel Oil Booster Circulation Thermography
43
Pump No.2 #3 MCA
Operasi
Vibrasi
Fuel Oil Booster Circulation Thermography
44
Pump No.1 #4 MCA
Operasi
Vibrasi
Fuel Oil Booster Circulation Thermography
45
Pump No.2 #4 MCA
Operasi
Vibrasi
Fuel Oil Booster Circulation Thermography
46
Pump No.1 #5 MCA
Operasi
Vibrasi
Fuel Oil Booster Circulation Thermography
47
Pump No.2 #5 MCA
Operasi
Vibrasi
Fuel Oil Booster Circulation Thermography
48
Pump No.1 #6 MCA
Operasi
Vibrasi
Fuel Oil Booster Circulation Thermography
49
Pump No.2 #6 MCA
Operasi
Main Fuel Oil Unit
Vibrasi
High Temperature Pre- Thermography
50
Heating Pump MCA
Operasi
Vibrasi
Fuel Oil Leakage Transfer Thermography
51
Pump No.1 MCA
Operasi
Vibrasi
Fuel Oil Leakage Transfer Thermography
52
Pump No.2 MCA
Operasi
HFO Separator Unit
Vibrasi
Thermography
53 FOPX Supply Pump #1
MCA
Operasi
Vibrasi
Thermography
54 FOPX Motor Separator #1
MCA
Operasi
Vibrasi
Thermography
55 FOPX Supply Pump #2
MCA
Operasi
Vibrasi
Thermography
56 FOPX Motor Separator #2
MCA
Operasi
Vibrasi
Thermography
57 FOPX Supply Pump #3
MCA
Operasi
Vibrasi
Thermography
58 FOPX Motor Separator #3
MCA
Operasi
Lube Oil System
Lube Oil Separator Unit
Vibrasi
Thermography
59 LOP Supply Pump #1
MCA
Operasi
Vibrasi
Thermography
60 FOPX Motor Separator #1
MCA
Operasi
Vibrasi
Thermography
61 LOP Supply Pump #2
MCA
Operasi
Vibrasi
Thermography
62 FOPX Motor Separator #2
MCA
Operasi
Vibrasi
Thermography
63 LOP Supply Pump #3
MCA
Operasi
Vibrasi
Thermography
64 FOPX Motor Separator #3
MCA
Operasi
Vibrasi
Thermography
65 LOP Supply Pump #4
65 LOP Supply Pump #4
MCA
Operasi
Vibrasi
Thermography
66 FOPX Motor Separator #4
MCA
Operasi
Vibrasi
Thermography
67 LOP Supply Pump #5
MCA
Operasi
Vibrasi
Thermography
68 FOPX Motor Separator #5
MCA
Operasi
Vibrasi
Thermography
69 LOP Supply Pump #6
MCA
Operasi
Vibrasi
Thermography
70 FOPX Motor Separator #5
MCA
Operasi
Lube Oil Unloading Unit
Vibrasi
Thermography
71 LO Unloading Pump
MCA
Operasi
Fresh Lube Oil Transfer
Unit
Vibrasi
Fresh Lube Oil Transfer Thermography
72
Pump MCA
Operasi
Used Lube Oil Transfer Unit
Vibrasi
Used Lube Oil Transfer Thermography
73
Pump MCA
Operasi
Lube Oil Maintenance Unit
Vibrasi
Lube Oil Maintenance Thermography
74
Pump MCA
Operasi
Main Lube Oil Unit
Vibrasi
Thermography
75 Pre Lube Oil Pump #1
MCA
Operasi
Vibrasi
Thermography
76 Pre Lube Oil Pump #2
MCA
76 Pre Lube Oil Pump #2
Operasi
Vibrasi
Thermography
77 Pre Lube Oil Pump #3
MCA
Operasi
Vibrasi
Thermography
78 Pre Lube Oil Pump #4
MCA
Operasi
Vibrasi
Thermography
79 Pre Lube Oil Pump #5
MCA
Operasi
Vibrasi
Thermography
80 Pre Lube Oil Pump #6
MCA
Operasi
PT PEMBANGKITAN JAWA BALI SERVICES No. Dokumen : FM-SP-4.2.3.01
SIAP INTEGRATED MANAGEMENT SYSTEM Tgl Terbit : 06/04/2018
Revisi : 00
MONITORING REKOMENDASI PDM
Halaman : 01
A
Normal
Normal
Alarm
High Alert
Alarm
Breakdown
High Alert
Breakdown
: 01
Evaluation
Kondisi
2Nd Overall
Month
4
4
4
4
4
1
4
4
4
4
4
4
4
4
4
4
4
No WO No KKS
1 00005323 SP00SGA16BR002
2 00005324 SP00PAC15BB004
3 00005325 SP00EGA07AP001
4 00005326 SP00EGA07AP002
5 00005327 SP00XJA10AV001
6 00005328 SP00XJA
7 00005329 SP00SAA10GH001
8 00005330 SP00SAA10GH002
9 00005331 SP00SAA10GH003
10 00005332 SP00SAA10GH004
11 00005333 SP00SAA10GH005
12 00005334 SP00SAA10GH006
13 00005335 SP50EGA08AA002
14 00005336 SP60EGY10GH001
15 00005337 SP40EGA08AA002
16 00005338 SP30EGA08AA002
17 00005339 SP60MJA01HA001
18 00005340 SP10MJA01HB001
19 SP30MJA01HB001
20 SP40MJA01HB001
21 SP50MJA01HB001
22 SP60MJA01HB001
23 00005341 SP00QHA20AT001
24 00005342 SP30MJV01BB001
25 00005343 SP00QEA40
26 00005344 SP00QHE10BB001
27 00005345 SP00AYB01EB001
28 00005346 SP00PAC15BB004
29 00005347 SP10MJA01HD001
30 00005348 SP00QEA10AN001
31 SP00QEA10AN002
32 SP00QEA10AN001
33 SP00QEA10AN002
34 00005349 SP00QHA10AP002
35 00005350 SP40MJA01AN001
36 00005351 SP10MJA01HB001
37 SP30MJA01HB001
38 SP40MJA01HB001
39 SP50MJA01HB001
40 SP60MJA01HB001
41 00005352 SP50EGA10BY001
42 00005353 SP00QEA50AT005
43 00005354 SP10MJA01HB001
44 00005355 SP10MKY01GH001
45 00005356 SP20MKY01GH001
46 00005357 SP20MKY01GH001
47 00005358 SP30MKY01GH001
48 00005359 SP40MKY01GH001
49 00005360 SP50MKY01GH001
50 00005361 SP10MJA01AP001
51
52 00005362 SP10MJA01HA001
53 00005363 SP20MJA01HA001
54 00005364 SP30MJA01HA001
55 00005365 SP40MJA01HA001
56 00005366 SP50MJA01HA001
57 00005367 SP60MJA01HA001
58 00005368 SP00ANE11GS003
59 00005369 SP50MJA01HA001
60 00005370 SP00GMB82
61 00005371 SP10EGA12AT002
62 00005372 SP20EGA12AT002
63 00005373 SP30EGA12AT002
64 00005374 SP40EGA12AT002
65 00005375 SP50EGA12AT002
66 00005376 SP60EGA12AT002
67 00005377 SP00PAC16AP004
68 00005378 SP00EGA04
69 00005379 SP00GMB20BB001
70 00005380 SP00GMB40AP001
71 00005381 SP50MJA01HD001
72 00005382 SP00UAA
73 00005383 SP00QEA10AN001
74 00005384 SP00QEA10AN002
75 00005385 SP00QFA20AN001
76 00005386 SP00GMB10AP001
77 00005387 SP00GMB10AP002
78 00005388 SP00BTX02GW001
79 00005389 SP00BTX02GW002
80 00005390 SP00BTX03GW002
81 00005391 SP00BTX05GW001
82 00005392 SP00SMB10AE001
83 00005393 SP00SMC10AE001
84 00005394 SP00SME10AE001
85 00005395 SP10EGA10
86 00005396 SP20EGA10
87 00005397 SP30EGA10
88 00005398 SP40EGA10
89 00005399 SP50EGA10
90 00005400 SP60EGA10
91 00005401 SP00QHE10BB001
92 00005402 SP00EGA03AP001
93 00005403 SP00EGA03AP002
94 00005404 SP00EGA03AP003
95
96 00005405 SP00BAT01GT001
97 00005406 SP00GMB12AP001
98 00005407
99 00005408 SP00QHA30AP001
147
100%
Lampu Indikasi Control Panel BAP 011 Korslet Corrective Maintenance Normal 1
Sirkulasi Bahan Bakar Bio Solar B30 First Line Maintenance Normal 1
Sirkulasi Bahan Bakar Bio Solar B30 First Line Maintenance Normal 1
Enjiniring Pengambila data bulanan vibrasi valve pada Get Data Vibration
compressor system
Pengambila data bulanan vibrasi valve pada
Enjiniring compressor system Get Data Vibration
Flushing Of Operation
Mekanik
Inspect Coupling Friction Pad
Closed Selesai
Open Authorized
Closed Selesai
Closed Selesai
Closed Selesai
Closed Selesai
Closed Selesai
Closed Selesai
Closed Selesai
Closed Selesai
Closed Selesai
Closed Selesai
Open Authorized
Closed Selesai
Open Authorized
Open Authorized
Closed Selesai
Closed Selesai
Closed Selesai
Closed Selesai
Closed Selesai
Closed Selesai
Closed Selesai
Closed Selesai
Closed Selesai
Closed Selesai
Closed Selesai
Closed Selesai
Closed Selesai
Closed Selesai
Closed Selesai
Closed Selesai
Closed Selesai
Closed Selesai
Closed Selesai
Closed Selesai
Closed Selesai
Closed Selesai
Closed Selesai
Closed Selesai
Closed Selesai
Closed Selesai
Closed Selesai
Closed Selesai
Closed Selesai
Closed Selesai
Closed Selesai
Closed Selesai
Closed Selesai
Closed Selesai
Closed Selesai
Closed Selesai
Closed Selesai
Closed Selesai
Closed Selesai
Closed Selesai
Closed Selesai
Closed Selesai
Closed Selesai
Closed Selesai
Closed Selesai
Closed Selesai
Closed Selesai
Closed Selesai
Closed Selesai
Closed Selesai
Closed Selesai
Closed Selesai
Closed Selesai
Closed Selesai
Closed Authorized
Closed Selesai
Closed Selesai
Closed Selesai
Closed Selesai
Closed Selesai
Closed Selesai
Closed Selesai
Closed Selesai
Closed Selesai
Closed Selesai
Closed Selesai
Closed Selesai
Closed Selesai
Closed Selesai
Closed Selesai
Closed Selesai
Closed Selesai
Closed Selesai
Closed Selesai
Closed Selesai
Closed Selesai
Closed Selesai
Closed Selesai
Closed Selesai
Closed Selesai
Closed Selesai
Closed Selesai
Closed Selesai
Closed Selesai
Closed Selesai
Closed Selesai
Closed Selesai
Closed Selesai
Closed Selesai
Closed Selesai
Closed Selesai
Closed Selesai
Closed Selesai
Closed Selesai
Closed Selesai
Closed Selesai
Closed Closed
Closed Closed
Closed Selesai
Closed Selesai
Closed Selesai
Closed Selesai
Closed Selesai
Closed Selesai
Closed Selesai
Closed Selesai
Closed Selesai
Closed Selesai
Closed Selesai
Open Authorized
Closed Selesai
Closed Selesai
Closed Selesai
Closed Selesai
Closed Selesai
Closed Selesai
Closed Selesai
Closed Selesai
Closed Selesai
Closed Selesai
Closed Selesai
Closed Selesai
Closed Selesai
Closed Selesai
Closed Selesai
Closed Selesai
Closed Selesai
Closed Selesai
Closed Selesai
Closed Selesai
Closed Selesai
Closed Selesai
Closed Selesai
Closed Selesai
Closed Selesai
P
S
LAPORAN REL
Monitoring Kon
Kondisi
No Location System / Equipment Dampak
Keterangan Status
Aset rusak berat
- APAR ada (powder dan foam)
Generator Extreme Risk (tidak dapat
- Hydrant ada (Hose Reel)
digunakan lagi)
Power House
Kerusakan aset
dapat diperbaiki
Auxilary - APAR ada (powder) Low Risk
dengan FLM dan
PM
Power House - APAR ada (powder) Kerusakan aset
Radiator Moderate
- Smoke Detector ada moderate
Kerusakan aset
dapat diperbaiki
Depan Powerhouse - Fire Cabinet ada Low Risk
dengan FLM dan
PM
Kerusakan aset
dapat diperbaiki
Belakang Powerhouse - Fire Cabinet ada Low Risk
dengan FLM dan
PM
Kerusakan aset
- Vesda Alarm MV
dapat diperbaiki
Koridor - Vesda Alarm CR Low Risk
dengan FLM dan
- Vesda Alarm LV
PM
Kerusakan aset
dapat diperbaiki
Under Koridor Low Risk
dengan FLM dan
PM
- Smoke Detector ada
Kerusakan aset
- Hydrant ada (Hose Reel) dapat diperbaiki
Main Exit Low Risk
- Exit Lamp ada dengan FLM dan
PM
Kerusakan aset
dapat diperbaiki
Gudang Logistik Luar - APAR ada (powder) Low Risk
dengan FLM dan
PM
Kerusakan aset
- APAR ada (powder)
dapat diperbaiki
Gudang Sparepart I - Smoke Detector ada Low Risk
dengan FLM dan
- Manual Call Point ada PM
Kerusakan aset
- APAR ada (powder)
dapat diperbaiki
Gudang Sparepart II - Smoke Detector ada Low Risk
dengan FLM dan
- Manual Call Point ada
PM
Kerusakan aset
Gudang Sparepart - APAR ada (CO2) Low Risk dapat diperbaiki
Elektrik - Smoke Detector ada dengan FLM dan
PM
Kerusakan aset
dapat diperbaiki
Fast Moving Warehouse - Hydrant ada (Hose Reel) Low Risk
dengan FLM dan
PM
Kerusakan aset
dapat diperbaiki
Grinding Machine - APAR ada (powder) Low Risk
dengan FLM dan
PM
Kerusakan aset
dapat diperbaiki
Tool Keeper Room - Smoke Detector ada Low Risk
dengan FLM dan
PM
Kerusakan aset
dapat diperbaiki
Special Tool Room - Smoke Detector ada Low Risk dengan FLM dan
PM
Kerusakan aset
dapat diperbaiki
Supervisor Room - Smoke Detector ada Low Risk
dengan FLM dan
PM
Kerusakan aset
dapat diperbaiki
Instrument Room - Smoke Detector ada Low Risk
dengan FLM dan
PM
Kerusakan aset
Locker Room - Smoke Detector ada Low Risk dapat diperbaiki
- Manual Call Point Ada dengan FLM dan
PM
Kerusakan aset
Washing Machine - Smoke Detector ada Moderate
moderate
Kerusakan aset
dapat diperbaiki
Archive Room - Smoke Detector ada Low Risk
dengan FLM dan
PM
Kerusakan aset
Meeting Room - Smoke Detector ada Low Risk dapat diperbaiki
dengan FLM dan
PM
Kerusakan aset
dapat diperbaiki
Manager Room - Smoke Detector ada Low Risk dengan FLM dan
PM
Kerusakan aset
Office Operation and dapat diperbaiki
Maintenance Room - Smoke Detector ada Low Risk dengan FLM dan
PM
Kerusakan aset
dapat diperbaiki
Admin Room - Smoke Detector ada Low Risk
dengan FLM dan
PM
Kerusakan aset
- Smoke Detector ada dapat diperbaiki
Kitchen Low Risk
- Manual Call Point ada dengan FLM dan
PM
Kerusakan aset
- APAR ada (foam) dapat diperbaiki
Emergency Exit Area Low Risk
- Exit Lamp ada dengan FLM dan
PM
Kerusakan aset
Loading - Unloading dapat diperbaiki
- APAR ada (powder) Low Risk
Area dengan FLM dan
PM
Kerusakan aset
dapat diperbaiki
TPS LB3 - APAR ada (powder) Low Risk
dengan FLM dan
PM
56%
13%
Status
PT PEMBANGKITAN
SIAP INTEGRATED M
MONITORING RCFA DA
Awal kerusakan LFO Boiler pada Tanggal 13 April 2018 dan dilakukan
Pengecekan dari Tim PJBS Unit Kendari untuk Inspeksi dan awal analisa SP00QHA50
pada Sistem PLC Instrument LFO Fired Boiler
Perbaikan CBA dan Review untuk RCFA Kerusakan PLC pada SP00QHA50
LFO Auxiliarry Fired Boiler Unit Sejak dari Tahun 2018
* Dilakukan pengelasan
pada tanki dengan
menggunakan filler
Indikasi Kerusakan disebabkan elektroda yang sesuai
karena tanki hot whell sudah mulai dengan materila yaitu cast * selesai
kropos iron
* Tim Instrument
Melakukan Perbaikan pada
Peralatan diantaranya Relay
K.10 yang merupakan AC
Indikasi Kerusakan pada Saat Full Speed No auaxiliarry Contactor, MCB
Load atau Idle Test Tegangan Tidak (F.25) pada Panel BAC 011 * selesai
Terbaca Pada HMI atau Voltmeter untuk
Tegangan di Panel BAP 061
* Tim Instrument
Melakukan Penggantian
Push Button S.10 Sehari
Setelah dilakukan Line
Charging dan Pada Saat
Indikasi Kerusakan pada Saat full speed No Pengujian Baru Bisa
Load atau Idle Test Dilakukan Pembacaan Dilaksanakan Pada Hari
Normal pada HMI Namun Rabu tanggal 21 Oktober
pada Saat Mesin Sudah Mulai Normal dan 2020 dan berhasil sinkron * selesai
Akan Dilakukan Sinkron namun Pushbutton dengan Menggunakan
S.10 Tidak dapat Merespon Sehingga Mesin #6 metode melepas tegangan
Tidak Bisa Sinkron sebelum trafo tegangan 11
kV
* Reparasi turbocharger
Bank A Unit #4 SM 1 2018 selesai
* Penggantian turbin blade
Selesai
* akan dilakukan
Penarikan/Unduh ulang
Sistem Logic pada PLC tetapi
Terkendala pada Mother
Board Jika tidak berhasil
dipertimbangkan untuk SM 1 2018 Selesai
Penggantian / Pembelian
PLC
*Repair / perbaikan
kebocoran pada SF6
trafo #2 atau penggunaan
special tools apabila level
gas berkurang kembali
SM 1 2019 Selesai
MONITORING CHRON
Beban pada blok 1 tidak bisa Kapasitas Trafo #1 tidak sesuai dengan daya
Main Transformer #1
maksimal mampu mesin pada blok 1
Pembacaan KWh net lebih besar Kesalahan pembacaan pada KWh meter
KWh Meter
daripada gross transaksi
Gedung LFO Boiler Gedung LFO Boiler Kelembapan Suhu Ruangan, Pengaruh
Mengalami Keretakan Cuaca
Bangunan yang berada di tepi Pantai (Area
Jetty)
PLC LFO Fired Boiler indikasi PLC tidak bisa menerima perintah Logic
LFO Fired Boiler Tidak bisa Run untuk Perintah sehingga indikasi yang terbaca Press Reset
Logic pada Panel
Kerusakan Pada
Starting Air Compressor Tidak Bisa Indikasi Kerusakan Peralatan Life Time
Peralatan Starting Air
Digunakan Peralatan
Compressor #2
PT PEMBANGKITAN JAWA BALI SERVICES
SIAP INTEGRATED MANAGEMENT SYSTEM
Dampak Tindak La
Keterangan (MWH Loss, Ketaatan Regulasi,
Safety) Penanganan
Terjadi kerusakan pada trafo #1
dan diganti dengan trafo Pengadaan trafo baru
dengan kapasitas 27 MVA
Jangka Pendek
Kalibrasi
Jangka Panjang
Pengadaan KWh meter baru
Peralatan Critical Berada di Jangka Pendek
dalam Bangunan Pembaruan Cat Pelamor Untuk
(LFO Boiler, Chimical Dosing Menghilangkan Keretakan
Unit dan FOPX Separator)
Jangka Panjang
Menambakan Besi Beton dan ditarik
Kedalam untuk Memperkuat Bangunan.
Jangka Pendek :
Dilakukan pegisian Gas SF6 Trafo #2 jika
terjadi penurunan level dan dibuatkan
kajian RCFA dari Enjiniring Unit untuk
Kekurangan level Gas SF 6
Mengetahui Akar Permasalahannya
Trafo #2 PLTD Suppa, dan bisa
Membahayakan Kondisi
Jangka Panjang :
Peralatan
Sudah dibuatkan Spesifikasi Pembelian
Gas SF 6 dan Special tools Berupa
Regulator untuk proses Top Up Gas SF 6
Trafo #2 yang Bocor
Jangka Pendek :
Memindahkan CVT dari Line Pare II Phasa
R (Kondisi PMT Line II Pare di GI Pare
Penyaluran Hanya dilakaukan Bocor) Agar Line Pare I Bisa Beroperasi
pada PMS Line II arah
Parepare Jangka Panjang :
Pengadaan Baru CVT (On Progress)
Jangka Pendek :
Udara Starting atau Udara Bertekanan
Untuk Startup Diesel Generator Set Hanya
disupplai dari Startign Air Compressor No.
Udara Bertekanan Berkurang #1
Untuk Penggunaan Start Diesel
Generatoe Set Jangka Panjang :
Akan dilakukan Perbaikan peralatan
secepatnya di Semester 1 TW 1 Oleh Tim
PLTD Suppa
No.Doc : FM-KP-4.1.5.04
Tgl.Berlaku : 25-05-2015
No.Revisi : 01
Halaman :1
Tindak Lanjut
Status
Schedule Hasil Akhir PIC
Selesai
Pekerjaan Selesai (kWh meter baru sudah
2018 PJB
Tahun 2018 dipasang di CCR PT.
Arlisco)
Pembuatan
2018 RCFA / untuk Saran Enjiniring PJBS Unit On Progress
Penggantian Kendari
Gagal Pengadaan
Unit PLTD Suppa
2019 Terkendala Anggaran Batal
PT.PJB / PT. PJBS
pada Tahun 2019
Menunggu Koordinasi
Unit PLTD Suppa
2019 dengan Kantor Pusat PT. On Progress
PT.PJB / PT. PJBS
PJB dan PT. PJB Services
OH Selesai Penyusunan
4 PMS 72K Mesin Unit #3 & #4 (Pembuatan Final Keselurahan OH #3 &
Report) #4
Revisi Pembuatan TOR untuk pengerjaan Pembuatan TOR dan Salah Satu Temuan dari
7 dan pembaharuan rockwool dan isolasi line pencarian pihak ke 2 Tim SMK3 pada saat
pipe steam atau kontaktor Assesment
Pengajuan dan pengadaan material spare Pembuatan TOR dan Kurangnya sparepart
10 part rekondisi cylinder head dan governor pencarian supplier / untuk status rekondisi
drive TOR dibuat dari bidang enjiniring Vendor peralatan
Peninjauan Ulang
Pembuatan Tor dan Kontrak dengan Pihak
Pengajuan dan Pengaadaan Jasa Untuk
12 jenis pekerjaan untuk pelaksana untuk
Pekerjaan Pest and Rodent Control Services
pembasmian hama Pekerjaan Pest and
Rodent Control Services
Adanya Indikasi
Pengajuan dan Pembuatan Spesifikasi Kebocoran ada Seal
Pembelian untuk Gas SF 6 dan Special Pembuatan Spesifikasi Circuit Breaker Trafo #2
22
Tools untuk Proses Top Up Gas SF 6 Trafo Pembelian PLTD Suppa Sehingga
#2 PLTD Suppa Level Gas SF 6
Berkurang
Dibutuhkan gudang
terbuka untuk
Pengajuan dan pembuatan TOR lengkap
menyimpan beberapa
dengan gamber teknik dan spesifikasi untuk Pembuatan TOR dan
32 sparepart bekas dan
rak container dan atap rak container gudang gambar spesifikasi
pekerjaan hot work di
terbuka
lakukan di area gudang
terbuka
Pembuatan TOR dan
perjanjian pekerjaan AVR DECS 125 - 15 tiba
Pengajuan dan pembuatan TOR untuk
33 yang akan dilakukan tiba trip yang berada di
rencana jasa service AVR DECS 125 - 15
oleh pelaksana mesin #5
pekerjaan
sudah dilakukan
pembuatan TOR untuk
Adanya beberapa
pencarian spesifikasi
Pembuatan TOR untuk pembelian exhaust exhaust fan unit yang
34 teknik yang sesuai
fan unit sudah rusak dan type 1
dengan exhaust fan
phasa dan 3 phasa
yang akan digunakan
diunit
Pembuatan spesifikasi
Membuat spesifikasi pembelian / pekerjaan pembelian membuat rekomendasi untuk
37 Penambahan rak kontainer di gudang gambar / modelling dan diadakan gudang
terbuka PLTD Suppa menentukan material terbuka di PLTD Suppa
yang akan digunakan
Rekomendasi untuk
Pembuatan spesifikasi
pembuatan handreal
Membuat spesifikasi pembelian / pekerjaan pembelian membuat
dan perbaikan drain pit
38 pembuatan handreal dan perbaikan drain pit gambar / modelling dan
instrument workshop
instrument workshop menentukan material
merupakan temuan
yang akan digunakan
P2K3 PLTD Suppa
Pembuatan spesfikasi
pembelian untuk Rekomendasi untuk
Membuat spesifikasi pembelian / pekerjaan
menentukan titik pekerjaan merupakan
39 penambahan lampu penerangan dia cooling
penerangan dan temuan P2K3 PLTD
water radiator PLTD Suppa
material yang akan Suppa
digunakan
Dilakukan pembuatan
Pengajuan dan pembuatan TOR untuk jasa Battery charger sudah
TOR sesuai dengan
40 pengadaan battery charger untuk peralatan tidak berfungsi atau
spesifikasi teknik yang
switchyard PLTD Suppa dalam keadaan rusak
sesuai
Dilakukan pengecekan
ukuran dimensi yang Panel jetty sudah mulai
Membuat spesifikasi pembelian / untuk panel
41 sesuai dengan housing kropos dan salah satu
housing di jetty PLTD Suppa
panel di jetty PLTD temuan dari tim P2K3
Suppa
bergabungnya limbah
Dilakukan pengukuran
Review TOR untuk pembuatan pemisahan domestic grey water dan
42 ulang dan design yang
limbah domestic IPLC black waste PLTD
sesuai
Suppa
Jadwal di trending
Pembuatan trending penambahan gas SF6 Berkurangnya gas SF6
43 sesuai dengan
CB breaker trafo di CB breaker trafo #2
penambahan gas SF6
Pembuatan TOR untuk rencana pekerjaan Pembuatan TOR dan Peningkatan keamanan
46 pembuatan bilik sanitizer spray di PLTD Tindak Lanjut sehubungan dengan
Suppa Pekerjaan siaga virus corona
Pembuatan TOR untuk rencana pekerjaan Pembuatan TOR dan Peningkatan keamanan
47 pembuatan alata sterilisasi dengan Tindak Lanjut sehubungan dengan
menggunakan lampu ultraviolet Pekerjaan siaga virus corona
Menormalkan kembali
Pembuatan TOR untuk pengadaan jasa Pembuatan TOR dan
fungsi peralatan pada
48 perbaikan PLC Card Annunciator Fire Tindak Lanjut
panel Annunciator Fire
Fighting Panel LE13 Nomor #3 & #4 Pekerjaan
Fighting
Pembuatan TOR untuk jasa perbaikan Pembuatan TOR dan Menormalkan kembali
49 Rectifier Battery Diesel Fire Fighing PLTD Tindak Lanjut fungsi peralatan pada
Suppa Pekerjaan diesel fire fighting
Menormalkan kembali
Pembuatan TOR dan
Pembuatan TOR unutk Jasa Perbaikan Main fungsi peralatan pada
50 Tindak Lanjut
Alarm Annunciator Fie Fighting GE Card panel Annunciator Fire
Pekerjaan
Fighting
Mernormalkan Kondisi
Review Pembuatan TOR Untuk Jasa Pembuatan TOR dan
Peralatan Untuk
51 Perbaikan Mechanical Annex dan Electrical Tindak Lanjut
Pendingin Mesin dan
Annex Pekerjaan
Auxiliarry
Mengifsienkan Kondisi
Pembuatan TOR dan
Review TOR Jasa Perbaiakan Rockwool Steam Agar
52 Tindak Lanjut
Pipa Steam PLTD Suppa Temperature / Panas
Pekerjaan
Tetap Stabil
Memberikan Informasi
Terhadap Pelaksana
Pembuatan TOR dan Pekerjaan Mengenaik
Membuat TOR Standarisasi Pengisian
55 Rindak Lanjut Jenis APAR yang
Tabung APAR Unit
Pekerjaan digunakan dan Media
Apa Saja Untuk
Persayaratnnya
Memberikan Informasi
Terhadap Pelaksana
Pekerjaan Mengenaik
Membuat TOR Standarisasi Pengisian Revisi Dokumen dan
61 Jenis APAR yang
Tabung APAR Unit Tanggal Terbit
digunakan dan Media
Apa Saja Untuk
Persayaratnnya
Pembuatan TOR
sesuai dengan Jumlah
APAR (Alat Pemadam
Membuat TOR Pembelian APAR (Alat Order dan Jenis APAR
62 Api Ringan) Sudah
Pemadam Api Ringan) (Alat Pemadam Api
dalam Keadaan Expired
Ringan) yang
diinginkan
dilaksanakan
Adanya Beberapa Meeting oleh Tim PT. Jasuma Austindo
penyebab Lagging UJP PJBS dan Tim May-18 O/M PLTD Suppa
(Spare part dan Jam Proyek Setiap Sore UJP PJBS
Kerja) untuk Membahas
Proggress harian
Dilakukan
Untuk dijadikan pengecekan
evidence Risk Survei perbandingan ke Flir KP PJBS Fire engineer
2019
2018 dari PT . dan perhitungan / LK3 PLTD Suppa
Endurra untuk modifikasi
yang dilakukan Unit
Untuk dijadikan
Dalam proses TOR
evidence Risk Survei KP PJBS Fire engineer
sudah diserahkan ke 2019
2018 dari PT . / LK3 PLTD Suppa
bidang Pengadaan
Endurra
segala perihal
Kerusakan pada tiang
pengerjaan sudah Engineering PLTD
penyangga dan warna 2018
dituangkan dalam Suppa
yang sudah pudar
TOR
Kropos pada lantai TOR sudah dibuat
Engineering PLTD
dan kerusakan pada (Progress 2018
Suppa
filter draining pengesahan)
tidak adanya
kesiapan spare part
TOR sudah dibuat
stand by untuk Engineering PLTD
(Progress 2018
pengerjaan rekondisi Suppa
pengesahan)
cylinder head dan
governor drive
Pembahasan Kontrak
TOR sudah dibuat Engineering PLTD
dengan Pihak
(Progress 2018 Suppa / Umum dan
Pelaksana dan durasi
pengesahan) Pengadaan
kerja salama 1 bulan
Dibuatkan
Spesifikasi
Pembelian untuk Engineering /
Indikasi Kebocoran
Gas SF 6 dan 2019 Pengadaan PLTD
Pada Peralatan
Special Tools untuk Suppa
Proses Top Up Gas
SF 6
Pembuatan TOR
saluran domestic
sudah dibuat perlu Engineering
water belum diketahui
dikoordinasikan 2019 Pengadaan
apakah tercampur
dengan top manajer Umum PLTD Suppa
atau tidak
di unit PLTD Suppa
Idnetifikasi Lokasi
Temuan dari Tim Risk
dan TOR di Buat Enjiniring KP/ Fire
Manajeme PT. 2020
Oleh Tim Kantor Enjiniring KP
Endurra
Pusat
Idnetifikasi Lokasi
Temuan dari Tim Risk
dan TOR di Buat Enjiniring KP/ Fire
Manajeme PT. 2020
Oleh Tim Kantor Enjiniring KP
Endurra
Pusat
Dilakukan
Umur Sparepart yang Perbaiakan dan
SCM / Enjiniring PLTD
terpasang di Rencana pembelian 2019
Suppa
peralatan Sparepart yang
Sesuai
Gambar pekerjaan
adanya beberapa sudah ada
Enjiniring PLTD Suppa
sparepart tidak diutamakan untuk 2019
/ Pemeliharaan
memiliki penyimpanan rak container gudang
terbuka
TOR sduah dibuat
Masa waktu peralatan
dan akan diserahkan
dan AVR tersebu Enjiniring
ke pihak pengadaan
diperkirakan sudah 2019 SCM
untuk proses
dalam keadaan Pemeliharaan
pencarian pihak
absolute
pelaksana pekerjaan
Penambahan rak
Spesifikasi
bertujuan untuk bisa Enjiniring
pembelian
menyimpan sparepart 2019 SCM
diserahkan kebidang
dengan ukuran yang
pengadaan
kecil
Pekerjaan dilakukan
Spesifikasi
untuk mengamankan Enjiniring
pembelian
dan memperbaiki 2019 SCM
diserahkan kebidang
kondisi peralatan
pengadaan
untuk saat ini
Enjiniring
TOR sudah dibuat
Tidak adanya LK3
dan diajukan ke 2019
pemisahan SCM
pengadaan
Akan dilakukan
Kondisi Operator Fuel Pengadaan Jasa
Enjiniring
Treatment dalam Pembauatan Bilik
2020 Operasi
Kondisi Unsafety Operator Fuel
Pengadaan
Condition Treatment PLTD
Suppa
Akan dilakukan
Lighitng Aerester di Enjiniring
Pembuatan Tools
Tangki B Storage Elektrik
Untuk Pekerjaan 2020
Indikasi Korosif dan LK3
Jika disepakati dari
Putus Pengadaan
Hasil Meeting
Setiap Pengisian
APAR pihak
Pelaksana
Ada beberapa APAR Enjiniring
Pekerjaan Akan
yang sudah Keadaan 2020 LK3
Memsatikan
Tidak optimal Pengadaan
Kesesuain dengan
Standar yang Sudah
dibuat
Akan Dilakukan
Tidak ada Akses Enjiniring
Pembuatan Anak
Jalan Menuju Ke 2020 LK3
Tangga atau Akses
Lokasi Tersebut Pengadaan
yang Sesuai
Pembuatan
Spesifikasi
Enjiniring
Pembelian dan
Terpakai 2020 Mekanik
Pencarian Supplier
Pengadaan
dari Pihak
Pengadaan
Pengecekan Tabung
Waktu Terlalu Enjiniring
dan Perhitungan
Rendah Untuk 2020 LK3
Lama Pemakaian
Digunakan Pengadaan
Tabung SCBA
Membuat Water
Bump dan Drainpit
Jika Terjadi Hujan Oli Enjiniring
dan disalurkan
yang Mengendap 2020 LK3
Menuju saluran Gray
Terbawah Air Hujan Pengadaan
Waste Unit PLTD
Suppa
Manajer Unit
Gelas Duga Bocor Revisi Tanggal
DM OP/HAR
Terjadi Kontaminasi Dokumen untuk 2021
Enjiniring
Air Minyak Peralatan Pengajuan Dokumen
Pengadaan
Pembuatan Sesuai
Ada beberapa APAR Enjiniring
dengan Tanggal
yang sudah Keadaan 2021 LK3
Terbit DPR dari
Tidak optimal Pengadaan
Bidang LK3 Unit
Enjiniring
Pembuatan DMR
Mekanik
Wire Rope Mulai untuk Pengajuan
2021 Elektrik
dalam Kondisi Korosif Pekerjaan Special
LK3
Tools
Pengadaan