You are on page 1of 204

Project

Construction/Widening/Upgrading/Rehabili

Station Limits Sta. 0+000

Location Buguey,

Rate/Hour
Foreman 66.18 per
Skilled 47.89 per
Unskilled 36.91 per

ITEM NO. MATERIALS COST

Embankment

Item 200 432.67 per


Item 300 485.99 per
Fine Aggregates 482.26 per
Coarse aggregates 506.50 per
Item 311
Reinforcing Steel Bar 50.00 per
Curing Compound 60.00 per
Asphalt Sealant 46.00 per
Forms, Steel(Rental) 40.00 per
Sand 482.26 per
Gravel 506.50 per
Cement 230.00 per
Concrete Saw(diamond blade 14") 7,500.00 per
Pipe Sleeve, 2" Ø 97.00 per
Grease/Tar 210.00 per

Item 311(2) Reinforcing Steel Bar 50.00 per


Curing Compound 60.00 per
Asphalt Sealant 44.00 per
Forms, Steel(Rental) 40.00 per
Sand 482.26 per
Gravel 506.50 per
Cement 230.00 per
#16 G.I. Tiewire(2% of RSB) 75.00 per

500-1 Portland Cement 230.00 per


910 dia RC pipe Sand 482.26 per
R.C. Pipes (910 mm dia) 2,200.00 per
Sand Bedding/ Selected Sandy Soil 482.26 per

500-2 Portland Cement 230.00 per


1220 dia RC pipe Sand 482.26 per
R.C. Pipes (1220 mm dia) 3,500.00 per
Sand Bedding/ Selected Sandy Soil 46.00 per

502-3 RSB, Grade 40, (w/ 5% wastage) 50.00 per


# 16 Tie wire 75.00 per
Lumber, Good - 4 uses 45.00 per
Marine Plywood(1/2" x 4' x 8') 750.00 per
Assorted CWN(1kg/100 bd.ft. of Lumber 85.00 per
Cement 230.00 per
Sand 482.26 per
Gravel 506.50 per

603(3)a Cement 230.00


Sand 482.26
Gravel 506.50
Metal Beam Guardrail 1,950.00
Plywood marine, 1/2" thk x 4'x 8' - 4 uses 750.00
Lumber - 4 uses 45.00
Reinforcing Steel bars, Grade 40 50.00
Tie Wire(2% RSB) 75.00
Assorted CWN (1kg/100 bd.ft of Lumber 85.00
Bolt, Nut & Washer 5/8" dia x 9" 101.00
Bolt,Nut & Washer 5/8 " dia x1" 11.25

603-b Metal Guardrail End Piece

Item 605 Portland Cement 230.00 per


Sand 482.26 per
Gravel 506.50 per
Form Lumber, Good 45.00 per
75mmФ G.I. Pipe 400.00 per
G.I . Flat Bar, 1 1/2"x1/8" 530.00 per
G.I. Bolts w/ Nuts & Washer, 5mm Ф 48.00 per
G.I. Bolts w/ Nuts & Washer, 2mm Ф 10.00 per
Sign Face, 3mm thk. Aluminum Sheet 10.00 per
Assorted CWN (1 kg./100 bd. Ft of Lumber) 85.00 per

Item 612-1 Thermoplastic Paint(White) 2,585.00 per


Glass Beads 800.00 per
Primer(white) 150.00 per
LPG(50 kg) 4,150.00 per
LPG(12kg) 996.00 per
Calsumine 25.00 per

Item 612-2 Thermoplastic Paint(Yellow) 2,835.00 per


Glass Beads 800.00 per
Primer(yellow) 175.00 per
LPG(50 kg) 4,150.00 per
LPG(12kg) 996.00 per
Calsumine 25.00 per

505/506 Cement 230.00 per


Sand 482.26 per
Gravel Fill 359.96 per
Weepholes 75mm dia. 145.00 per
Filter Cloth 160.00 per
Boulders(15-25 kg.) 1,072.49 per
on/Widening/Upgrading/Rehabilitation of Access Road, Aparri, Airport, Maura

Sta. 0+000 -Sta. 2+650

Buguey, Cagayan

Rate/Day
529.44
526.79
295.31

UNIT

cu.m
cu.m
cu.m
cu.m

kg
liter
liter
l.m
cu.m
cu.m
bag
pc
pc
liter

kg
liter
liter
l.m
cu.m
cu.m
bag
kg

bag
cu.m
pc
cu.m

bag
cu.m
pc
cu.m

kg
kg
bd.ft
pc
kg
bag
cu.m
cu.m

bag
cu.m
cu.m
ln.m
pc
bd.ft
kg
kg
kg
pc.
pc.

pc

bag
cu.m
cu.m
bd.ft.
ln.m
kg
pc
pc
pc
kg

bag
bag
liter
cyl
cyl
kg

bag
bag
liter
cyl
cyl
kg

bag
cu.m
cu.m
l.m
sq.m
cu.m
Department of Public Works and Highways (DPWH)

CONCRETING OF KATUNGAWAN ROAD

Brgy. Buyun, Sta. Teresita, Cagayan

Project Name and Location

Cagayan First District Engineering Office


Aparri, Cagayan

APPROVED BUDGET FOR THE CONTRACT


Stations : #NAME?
Net Length : - Contract Duration : 179 C.D.
TOTAL MARK-
MARK-UP IN
ESTIMATED PERCENT UP TOTAL INDIRECT
ITEM NO. DESCRIPTION QUANTITY UNIT VAT1 TOTAL COST UNIT COST
DIRECT COST COST
OCM2 PROFIT % VALUE

(9) = (10) (11) (12) (13)


(1) (2) (3) (4) (5) (6) (7) (8)
(5)x(8) 12%[(5)+(9)] (9)+(10) (5)+(11) (12)/(3)
#REF!

#REF! #REF!
#REF! #REF! #REF! 9% 8% 17% #REF! #REF! #REF! #REF! #REF!
#REF! #REF!
#REF! #REF! #REF! 9% 8% 17% #REF! #REF! #REF! #REF! #REF!
#REF! #REF!
#REF! #REF! #REF! 9% 8% 17% #REF! #REF! #REF! #REF! #REF!
#REF! #REF!
#REF! #REF! #REF! 9% 8% 17% #REF! #REF! #REF! #REF! #REF!
#REF! #REF!
#REF! #REF! #REF! 9% 8% 17% #REF! #REF! #REF! #REF! #REF!
#REF! #REF!
#REF! #REF! #REF! 9% 8% 17% #REF! #REF! #REF! #REF! #REF!
#REF!
#REF! #REF! #REF! #REF! #REF!

#REF!

#REF! #REF!
#REF! #REF! #REF! 9% 8% 17% #REF! #REF! #REF! #REF! #REF!
#REF!
#REF! #REF! #REF! #REF! #REF!

Total, Page 1 #REF! #REF! #REF! #REF! #REF!

Submitted by : Checked and Reviewed ( As to Unit Cost) Recommending Approval : Approved :

RUBEN S. SALIGANAN JOSE B. TOBIAS ALEXANDER D. NOLA, CESE MELVIN B. NAVARRO, MNSA, CESO IV
District Engineer Chief, Construction Division OIC-Assistant Regional Director Officer-In- Charge
REPUBLIC OF THE PHILIPPINES

DEPARTMENT OF PUBLIC WORKS AND HIGHWAYS


OFFICE OF THE DISTRICT ENGINEER
Cagayan First District Engineering Office
Aparri, Cagayan

PROGRAM OF WORK/BUDGET COST

Road Upgrading (Gravel to Concrete) along Jct. Gattaran-Cumao-


Project : Capissayan-Sta. Margarita-Bolos Point Road, K0584+200 -K0585+974, Net Length : 2,046 Ln.m
K0585+974 - K0586+245
Location : Baggao, Cagayan Road width : 6.70 m.
Appropriation: Php 50,000,000.00 Thickness : 28 cm thick
Estd. Project Cost : #REF! Starting Date : Upon issuance of NTP
Source of Fund : FY 2014 Regular Infrastructure Project Road Classification : National Secondary
Station Limits: K0584+200-K0585+974 =(STA. 584+200 - STA. 585+956) Total Project Duration : 179 Calendar Days
K0585+974-K0586+245 =(STA. 584+956 - STA. 586+246)

EQUIPMENT
DESCRIPTION OF WORKS TO BE DONE % OF TOTAL
DESCRIPTION REQUIRED
#REF! #REF!
#REF! #REF!
#REF! #REF!
#REF! #REF! Please see Annex "A"
#REF! #REF!
#REF! #REF!
TOTAL #REF!

ESTIMATED COST OF THE PROJECT

D E S C R I P T I O N QTY AMOUNT TOTAL COST

#REF! ( Please see Estimated P #REF!


#REF! Cost of Proposed Work) #REF!
#REF! #REF!
#REF! #REF!
#REF! #REF!
#REF! #REF!
TOTAL P #REF!

BREAKDOWN OF EXPENDITURE :
1. Labor #REF! A. Total Direct Cost #REF!
2. Materials #REF! B. Mark-Up (17%) #REF!
3. Rental of Equipment #REF! C. VAT (12%) #REF!
4. Mob./Demob. #REF! D. Total, A+B+C #REF!
5. Total Direct Cost #REF! E. Cost of Engineering, 3.5% 1,750,000.00
6. OCM & Profit (9% and 8%) #REF! F. Sub-Surface Exploration -
7. VAT (12%) #REF! G. Total Estimated Cost #REF!
8. Cost of Engineering, 3.5% 1,750,000.00
9. Subsurface Exploration -
10. Total #REF!

Submitted by : Checked and Reviewed ( As to Unit Cost)

RUBEN S. SALIGANAN JOSE B. TOBIAS


District Engineer Chief, Construction Division

Recommending Approval : Approved :

ALEXANDER D. NOLA, CESE MELVIN B. NAVARRO, MNSA, CESO IV


OIC-Assistant Regional Director Officer-In-Charge
DETAILED UNIT PRICE ANALYSIS

CONCRETING OF KATUNGAWAN ROAD

Brgy. Buyun, Sta. Teresita, Cagayan

Item No. : 1722 (3) Quantity = #N/A


Description : #N/A Unit = #N/A

Production Output : = 0.88 m/hr.


No. of Hours : = #N/A hours say #N/A hours
No. of Days : = #N/A days

A. Name and Capacity of Equipment (Operated) No. of Units No. of Hours Hourly Rate Total Cost (Pesos)
Factor
Concrete Vibrator 0.1 2.00 #N/A 91.25 #N/A
Bar Cutter, Single Phase 0.1 1.00 #N/A 219.75 #N/A
Bar Bender 0.1 1.00 #N/A 351.50 #N/A
Cutting Outfit 0.1 1.00 #N/A 45.45 #N/A
Minor Tools(10% of Labor) #N/A

A. SUB-TOTAL, EQUIPMENT P #N/A

B. Designation Personnel No. of Men No. of Hours Unit Rate/Hour Total Cost (Pesos)

Foreman 1.00 #N/A P 98.09 P #N/A


Skilled Labor 4.00 #N/A 71.10 #N/A
Unskilled Labor 8.00 #N/A 54.90 #N/A

B. SUB-TOTAL, LABOR P #N/A

C. Name and Description Qty Unit Unit Price Total Cost (Pesos)
Factor
Ready Mix Concrete 0.1170 #N/A cu.m. 4,034.00 #N/A
Reinforcing Steel Bar (Grade 40) 30.4340 #N/A kg. 41.00 #N/A
Plywood 1/2" x 4' x 8'- 3 uses 0.7250 #N/A pc. 750.00 #N/A
Lumber 3 - uses 20.6000 #N/A bd.ft. 44.25 #N/A
Assorted CWN (1 kg/100 bd.ft. of Lumber) 0.2060 #N/A kg. 70.00 #N/A
Tie wire (2% of RSB) 0.6090 #N/A kg. 65.00 #N/A
Oxy/Acetylene (1 set/5000kg. Steel Sheet Pile) 0.006 #N/A set 2,500.00 #N/A

C. SUB-TOTAL, MATERIALS P #N/A

SUMMARY:
A Equipment P #N/A
B Labor #N/A
C Materials #N/A
D TOTAL DIRECT COST P #N/A
DIRECT UNIT COST #N/A
E OCM 15% of D #N/A
F Profit 10% of D #N/A
G VAT 5% of (D+E+F) #N/A
H Total Cost (D+E+F+G) #N/A
I Unit Cost H/Quantity P #N/A
DETAILED UNIT PRICE ANALYSIS

CONCRETING OF KATUNGAWAN ROAD


Brgy. Buyun, Sta. Teresita, Cagayan

Item No. : 1718 (1) Quantity = #N/A


Description : #N/A Unit = #N/A

Production Output : = 2.25 ln.m/hr.


No. of Hours : = #N/A hours say #N/A hours
No. of Days : = #N/A days

A. Name and Capacity of Equipment (Operated) No. of Units No. of Hours Hourly Rate Total Cost (Pesos)
Factor
Backhoe(0.80 cu.m) 0.5 1.00 #N/A P 1,537.00 P #N/A
Plate Compactor (5Hp) 0.5 1.00 #N/A 123.00 #N/A
Minor Tools(10% of Labor) #N/A

A. SUB-TOTAL, EQUIPMENT P #N/A

B. Designation Personnel No. of Men No. of Hours Unit Rate/Hour Total Cost (Pesos)

Foreman 1.00 #N/A P 98.09 P #N/A


Skilled Labor 2.00 #N/A 71.10 #N/A
Unskilled Labor 4.00 #N/A 54.90 #N/A

B. SUB-TOTAL, LABOR P #N/A

C. Name and Description Qty Unit Unit Price Total Cost (Pesos)
Factor
Cement 0.774 #N/A bag 265.00 #N/A
Sand 0.044 #N/A cu.m 858.71 #N/A
RCPC Class II 610mm 1.00 #N/A pc. 1,050.00 #N/A
Sand Bedding / Selected Sandy Soil 0.0880 #N/A cu.m 711.28 #N/A

C. SUB-TOTAL, MATERIALS P #N/A

SUMMARY:
A Equipment P #N/A
B Labor #N/A
C Materials #N/A
D TOTAL DIRECT COST P #N/A
DIRECT UNIT COST #N/A
E OCM 15% of D #N/A
F Profit 10% of D #N/A
G VAT 5% of (D+E+F) #N/A
H Total Cost (D+E+F+G) #N/A
I Unit Cost H/Quantity P #N/A
DETAILED UNIT PRICE ANALYSIS

Item No. : Painting Quantity = #N/A


Description : #N/A Unit = #N/A

Production Output : = 12.00 sq.m/hr.


No. of Hours : = #N/A hours say #N/A hours
No. of Days : = #N/A days

A. Name and Capacity of Equipment (Operated) No. of Units No. of Hours Hourly Rate Total Cost (Pesos)
Factor
Minor Tools (10% of Labor) #N/A

A. SUB-TOTAL, EQUIPMENT P #N/A

B. Designation Personnel No. of Men No. of Hours Unit Rate/Hour Total Cost (Pesos)

Foreman 0.5 1.00 #N/A P 98.09 P #N/A


Skilled Labor 0.5 4.00 #N/A 71.10 #N/A
Unskilled Labor 0.5 2.00 #N/A 54.90 #N/A

B. SUB-TOTAL, LABOR P #N/A

C. Name and Description Qty Unit Unit Price Total Cost (Pesos)
Factor
Paint Metal Epoxy 0.035 #N/A gal 265.00 #N/A
Paint Aluminum 0.069 #N/A gal 761.73 #N/A

C. SUB-TOTAL, MATERIALS P #N/A

SUMMARY:
A Equipment P #N/A
B Labor #N/A
C Materials #N/A
D TOTAL DIRECT COST P #N/A
DIRECT UNIT COST #N/A
E OCM 15% of D #N/A
F Profit 10% of D #N/A
G VAT 5% of (D+E+F) #N/A
H Total Cost (D+E+F+G) #N/A
I Unit Cost H/Quantity P #N/A
Cagayan First District Engineering Office
FORM POW-2015-01-00
PROGRAM OF WORK/BUDGET COST

Project : CONCRETING OF KATUNGAWAN ROAD Net Length : (a) Road 2.20Lane Km (1.10 Km)

(b) Bridge

Project ID : (c) Others Width = 6.70 m., Thickness = 0.28 m.


Project Component ID :
Project Location : Brgy. Buyun, Sta. Teresita, Cagayan Target Start Date :
Work Location : Sta 0+000 - Sta 1+100 Total Project Duration :
Appropriation : PHP 25,597,966.00 No. of Pre-determined :
Source of Fund : 0 Unworkable Days :
Contract Duration : 180 C.D.
AS SUBMITTED AS EVALUATED
DESCRIPTION OF WORKS TO BE DONE QUANTITY UNIT
% TOTAL TOTAL DIRECT COST % TOTAL TOTAL DIRECT COST
Part A:Facilities for the Engineer
B:Other General Requirements
C:Earthworks
D:Subbase and Base Course (PLS. SEE FORM POW-2015-01C-00)
E:Surface Courses
F:Bridge Construction
G:Drainage and Slope Protection Structures
H:Miscellaneous Sructures

Total - - -
EQUIPMENT: BREAKDOWN OF EXPENDITURES:
DESCRIPTION REQUIRED AS SUBMITTED AS EVALUATED AS SUBMITTED AS EVALUATED
1. Labor 1,123,446.56 A. Total Direct Cost 20,317,702.61
2. Materials 16,315,067.76 B. OCM and Profit 4,033,091.38
3. Rental of Equipment 2,879,188.30 C. Value Added Tax 1,247,171.19
4. Provisional Sum - D. Total Construction Cost 25,597,965.19
5. Daywork - E. Eng'g & Administrative Overhead, % -
(PLS. SEE FORM POW-2015-01B-00) 6. OCM and Profit 4,033,091.38 F. Payment for Tree Planting -
7. Value Added Tax 1,247,171.19 G. Physical Reserved (Contingency) -
8. Eng'g & Administrative Overhead, % -
9. RROW Acquisition -
10. Physical Reserved (Contingency) -
11. TOTAL ESTIMATED COST 25,597,965.19 H. TOTAL ESTIMATED COST 25,597,965.19

Preparation and Submission: Evaluation: Approval:

Prepared by: Checked/Reviewed by: Recommending Approval: Approved:

GIRLIE P. UY FELISA M. SALVADOR PEDRITO R. BAUTISTA ROSAURO R. GUERRERO


Engineer II Chief,Planning & Design Section OIC-Assistant District Engineer District Engineer
Part B Part C Part D
As of February 6, 2017 As of 4th Quarter 2016
Equipment Rental Rates (Road Construction)
Manpower Hourly Rate Daily Rate CODE Materials Cost Unit
DESCRIPTION MODEL CAPACITY FLYWHEEL HORSEPOWER RENTAL RATE
Foreman Php 98.09 Php 784.68 1 Cement Php 265.00 /bag

Leadman Php 90.28 Php 722.22 1. Earth Moving Equipment 2 Sand / Fine Aggregates Php 858.71 /cu.m.

Heavy Eqmt. Operator Php 82.02 Php 656.17 1.1 Bulldozer D6H SERIES II PSDS/DD 165 Php 3,379.00 3 Gravel / Course Aggregates Php 858.71 /cu.m.

Highly-Skilled Labor Php 82.02 Php 656.17 1.2 Bulldozer w/ Ripper D6H SERIES II PSDS/DD 165 Php 3,885.85 4 Gravel Fill / Aggregate Subbase Course Php 711.28 /cu.m.

Light Skilled Labor Php 76.56 Php 612.49 1.3 Payloader LX80 - 2C 1.50 m³ / 1.95 yd³ 110 Php 1,733.00 5 Boulders Php 947.30 /cu.m.

Driver Php 71.10 Php 568.80 1.4 Motorized Road Grader G710A 140 Php 2,173.00 6 Reinforcing Steel Bar Plain Grade 40 Php 40.00 /kg.

Skilled Labor Php 71.10 Php 568.80 1.5 Road Grader w/ Scarifier G710A 140 Php 2,824.90 7 Reinforcing Steel Bar Plain Grade 60 Php 40.00 /kg.

Semi-Skilled Labor Php 65.82 Php 526.53 2. Compaction Equipment 8 Reinforcing Steel Bar Deformed Grade 40 Php 41.00 /kg.

Unskilled Labor Php 54.90 Php 439.16 2.1 Pneumatic Tire Roller 9-WHL, 9.00X20, 4PR 10 mt 107 Php 561.00 9 Reinforcing Steel Bar Deformed Grade 60 Php 42.00 /kg.

2.2 Vibratory Roller SD100DC 10 mt 125 Php 1,846.00 10 CHB Load Bearing (100mm) Php 19.00 /pc.

2.3 Tandem Steel Roller CC421 10.10 mt 123.4 Php 1,652.00 11 CHB Load Bearing (150mm) Php 22.00 /pc.

2.4 Plate Compactor 400-500 Gasoline Engine 5 Php 123.00 12 CHB Ordinary (100mm) Php 13.50 /pc.
3. Lifting Equipment 13 CHB Ordinary (150mm) Php 18.00 /pc.

3.1 Crawler Crane All Models 36-40 mt 190 Php 1,902.00 14 Marine Plywood (1/4 ") Php 420.00 /pc.

3.2 Truck Mounted Crane All Models 31-35 mt 238 Php 1,861.00 15 Marine Plywood (1/2 ") Php 750.00 /pc.

3.3 Truck Mounted Crane All Models 41-45 mt 246 Php 2,606.00 16 Marine Plywood (3/4 ") Php 1,310.00 /pc.
4. Excavating Equipment 17 Ordinary Plywood (1/4 ") Php 360.00 /pc.

4.1 Backhoe SE 130 LC-2 0.80 m³ / 1.04 yd³ 99 Php 1,537.00 18 Ordinary Plywood (1/2 ") Php 650.00 /pc.

4.2 Backhoe w/ Breaker SE 130 LC-3 0.80 m³ / 1.04 yd³ 99 Php 1,998.10 19 Ordinary Plywood (3/4 ") Php 1,100.00 /pc.

4.3 Backhoe, Wheel Mounted PW60N-1 0.28 m³ / 0.37 yd³ 50 Php 922.00 20 Good Lumber Php 45.00 /bd.ft.
5. Foundation Equipment 21 Coco Lumber Php 15.00 /bd.ft.

5.1 Vibro Hammer DPD600T Hydraulic Pile Driver 60 ton 201 Php 2,123.00 22 GI Tie Wire # 12 Php 65.00 /kg.
6. Foundation Equipment 23 GI Tie Wire # 16 Php 65.00 /kg.

6.1 Asphalt Distributor ROSCO/5 ton 300 USG 100 Php 936.00 24 Concrete Nails Assorted Php 100.00 /kg.

6.2 Asphalt Paver NF220BIIVDM 80 Php 1,833.00 25 Common Nails Assorted Php 70.00 /kg.
7. Concreting Equipment 26 Curing Compound Php 60.00 /ltr.

7.1 Concrete Screeder Wacker Truss Screed 5.5 Php 545.00 27 Steel Forms 15cm width Php 40.00 /ln.m.

7.2 Concrete Paver COMMANDER III, FOUR-TRACK Php 6,765.00 28 Steel Forms 20cm width Php 50.00 /ln.m.

7.3 One Bagger Mixer 4-6 ft³/min Php 172.00 29 Steel Forms 23cm width Php 60.00 /ln.m.

7.4 Transit Mixer All Models 5-6 yd³ 175 Php 1,318.00 30 Steel Forms 25cm width Php 70.00 /ln.m.
8. Hauling Equipment 31 Steel Forms 28cm width Php 80.00 /ln.m.

8.1 Dump Truck All Models 12 yd³ 290 Php 1,420.00 32 Steel Forms 30cm width Php 87.00 /ln.m.

8.2 Cargo/Service Truck All Models 2-5 mt 160 Php 783.00 33 RCPC Class II 300mm Php 400.00 /pc.

8.3 Boom Truck All Models 2-5 mt 160 Php 1,017.90 34 RCPC Class II 460mm Php 650.00 /pc.

8.4 Cargo/Service Truck All Models 9-10 mt 270 Php 1,212.00 35 RCPC Class II 610mm Php 1,050.00 /pc.

8.5 Water Truck/Pump All Makes 1600 L 360 Php 2,450.00 36 RCPC Class II 760mm Php 1,800.00 /pc.
9. Air Equipment 37 RCPC Class II 910mm Php 2,200.00 /pc.

9.1 Air Compressor All Models 356-450 cfm 130 Php 965.00 38 RCPC Class II 1070mm Php 2,500.00 /pc.

9.2 Air Compressor All Models 161-185 cfm 69 Php 502.00 39 RCPC Class II 1220mm Php 3,500.00 /pc.

9.3 Air Compressor All Models 15-35 cfm 20 Php 205.00 40 RCPC Class II 1370mm Php 4,000.00 /pc.

9.4 Diamond Drill CP-8 Php 201.25 41 RCPC Class II 1524mm Php 5,100.00 /pc.

9.5 Jackhammer Php 150.00 42 PVC Pipe (12.7mm) Php 52.00 /pc.

9.6 Pneumatic Drilling Machine Php 170.00 43 PVC Pipe (19mm) Php 90.00 /pc.
10. Pumping Equipment 44 PVC Pipe (25.4mm) Php 103.00 /pc.

10.1 Water Pump, 100 mm suction Ø 2667 50 16 Php 266.25 45 PVC Pipe (38mm) Php 203.00 /pc.
12. Shop Equipment 46 PVC Pipe (50mm) Php 300.00 /pc.

12.1 Welding Machine Gas/Diesel Driven 300 48 Php 371.00 47 PVC Pipe (63mm) Php 330.00 /pc.
13. Special Support Equipment 48 PVC Pipe (76mm) Php 385.00 /pc.

13.1 Chainsaw Php 75.36 49 PVC Pipe (89mm) Php 450.00 /pc.
14. MiscellaneousEquipment 50 PVC Pipe (101mm) Php 505.00 /pc.

14.1 Concrete Vibrator HUSQVARNA 2100 CD with CR22, 7 ft Reach, 9 in Standard Blade Php 91.25 51 Pipe Sleeve, 1" Ø Php 34.33 /ln.m.

14.2 Concrete Saw 14"Blade Ø with 4 3/4"Cutting Depth 7.5 Php 32.63 52 Pipe Sleeve, 1 1/2" Ø Php 67.67 /ln.m.

14.3 Bar Cutter 25 mm Maximum Rebar Ø (Grade 40), Single Phase Php 219.75 53 Pipe Sleeve, 2" Ø Php 97.00 /ln.m.

14.4 Bar Bender 25 mm Maximum Rebar Ø, Three Phase Php 351.50 54 Embankment Php 300.98 /cu.m.
15. Plants
15.1 Asphalt Concrete Plant Php 4,286.63
15.2 Concrete Batch Plant Php 1,759.50
18. Others
18.1 Power Broom, Towed Type With Engine 2 m wide 6-30 km/h Sweeping Capacity Php 130.54
18.2 Hydroseeding Machine Php 952.00
18.3 Applicator Machine Php 93.75
18.4 Kneading Machine Php 187.50
18.5 Drop Hammer Php 200.00
18.6 Cutting Outfit Php 45.45
18.7 Steel Wheel w/ Nylon Rope Php 300.00
18.8 Improvised Bamboo w/ Bucket Php 200.00
18.9 Asphalt Kettle/Drum Php 10.00
Republic of the Philippines
LOCAL GOVERNMENT UNIT
Sta.Teresita, Cagayan

PROGRAM OF WORK/BUDGET COST

Project: CONCRETING OF KATUNGAWAN ROAD

Location : Brgy. Buyun, Sta. Teresita, Cagayan Net Length : 2.20Lane Km (1.10 Km)
Appropriation: Php 25,597,966.00 Classification : Road
Estd. Project Cost : Php 25,597,966.00 Type of Structure :
Source of Fund : :
SARO No.: :
Station Limits: Sta 0+000 - Sta 1+100 Total Project Duration : 180 Calendar Days

EQUIPMENT
DESCRIPTION OF WORKS TO BE DONE % OF TOTAL
DESCRIPTION REQUIRED
PART A - OTHER GENERAL REQUIREMENTS 1.120
PART B- EARTHWORK 6.382
PART C - SUBBASE AND BASE COURSE 12.764
PART D- SURFACE COURSES 40.768
Please see Annex "A"
PART E- ROAD CONSTRUCTION 0.274
PART E- DRAINAGE & SLOPE PROTECTION 38.690

TOTAL 100.00

ESTIMATED COST OF THE PROJECT

D E S C R I P T I O N QTY AMOUNT TOTAL COST

A ( Please see Estimated P 227,653.14


B Cost of Proposed Work) 1,296,719.27
C 2,593,414.31
D 8,283,204.11
E 55,752.01
F 7,860,959.77

TOTAL P 20,317,702.62

BREAKDOWN OF EXPENDITURE :
1. Labor Php 1,123,446.56 A. Total Direct Cost Php 20,317,702.62
2. Materials 16,315,067.76 B. Mark-Up (20%) Php 4,033,091.38
3. Rental of Equipment 2,691,254.99 C. VAT (5%) Php 1,247,171.19
4. Mob./Demob. 187,933.30 D. Total, A+B+C Php 25,597,965.19
5. Total Direct Cost Php 20,317,702.62 E. Cost of Engineering, -
6. OCM & Profit (12% and 8%) 4,033,091.38 F. Payment for Tree Planting
7. VAT (5%) 1,247,171.19 G. Total Estimated Cost Php 25,597,966.00
8. Cost of Engineering, 0.09% -
9. RROW Acquisition Cost -
10. Total Php 25,597,965.19

Prepared by : Checked and Reviewed

JAMES A. ALMONINIA GIRLIE P. UY


Engineering Assistant Engineer II

Recommending Approval : Approved :

PEDRITO R. BAUTISTA ROSAURO R. GUERRERO


OIC - Assistant District Engineer District Engineer
Cagayan First District Engineering Office " Attachment A"
D.O. No. 197, Series of 2016

CONCRETING OF KATUNGAWAN ROAD

Brgy. Buyun, Sta. Teresita, Cagayan

APPROVED BUDGET FOR THE CONTRACT

Stations : Sta. 0+079.40 -Sta. 0+220.00 & Sta. 0+245.62 -Sta. 0+339.02
Length : 2.20Lane Km (1.10 Km) Contract Duration : 180 C.D.
MARK-UPS IN TOTAL MARK-
ESTIMATED DIRECT PERCENT UP TOTAL INDIRECT
ITEM NO. DESCRIPTION QUANTITY UNIT from Ecost VAT 1
from Ecost TOTAL COST from Ecost UNIT COST from Ecost
COST COST
OCM PROFIT % VALUE

(9) = (10) (11) (12) (13)


(1) (2) (3) (4) (5) (6) (7) (8)
(5)x(8) 5%[(5)+(9)] (9)+(10) (5)+(11) (12)/(3)
PART A - FACILITIES FOR THE ENGINEER
0 0 0 0 0 0 0 0 0 0

Err:509 Err:509 Err:509 Err:509 Err:509 0% 8% 8% Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509
TOTAL OF PART A
0 - - Err:509 - - - Err:509 Err:509 Err:509 Err:509 -
PART B - OTHER GENERAL REQUIREMENTS
0 0 0 0 0 0 0 0 0 0 0

B.5 PROJECT BILLBOARD/SIGNBOARD 1.00 EACH 6,319.84 12% 8% 20% 1,263.97 1,263.97 379.19 379.19 1,643.16 7,963.00 7,963.00 7,963.00 3,981.50

B.7 (2) OCCUPATIONAL SAFETY & HEALTH PROGRAM ALL LUMPSUM 31,900.00 0% 8% 8% 2,552.00 2,552.00 1,722.60 1,722.60 4,274.60 36,174.60 36,174.60 36,174.60 36,174.60

B.9 MOBILIZATION/DEMOBILIZATION ALL Lump sum 187,933.30 0% 0% 0% - - 9,396.67 9,396.67 9,396.67 197,329.97 197,329.97 197,329.97 197,329.97

Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509

Err:509 Err:509 Err:509 Err:509 Err:509 0% 8% 8% Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509
TOTAL OF PART B
0 - - Err:509 - - - Err:509 Err:509 Err:509 Err:509 -

Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509

Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509
PART E - SURFACE COURSES
0 0 0 0 0 0 0 0 0 0 0
PORTLAND CEMENT CONCRETE PAVEMENT, UNREINFORCED
311(1)c1 (230mm THK) 5,500.00 Sq.m. 8,283,204.11 12% 8% 20% 1,656,640.82 518,682.86 496,992.25 155,604.86 2,153,633.07 10,436,837.18 3,267,702.03 1,897.61 1,152.63
TOTAL OF PART E
0 - - Err:509 - - - Err:509 Err:509 Err:509 Err:509 -
Err:509
Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509

Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509
Err:509 Err:509
Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509

Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509

Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509

Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509
Err:509
Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509
PART C - EARTHWORK
0 0 0 0 0 0 0 0 0 0 0
Err:509
Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509
Err:509
Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509
103(3)
FOUNDATION FILL 2.00 Cu.m. 2,298.37 12% 8% 20% 459.67 Err:509 137.90 Err:509 597.57 2,895.94 Err:509 1,447.97 Err:509
Err:509
Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509
Err:509
Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509
TOTAL OF PART C
0 - - 898,610.37 - - - 179,722.07 53,916.62 233,638.69 1,132,249.06 -
Err:509 Err:509
Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509
Err:509
Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509
Err:509
Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509
Err:509
Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509
Err:509
Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509
Err:509
Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509
Err:509
Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509
PART G - MISCELLANEOUS STRUCTURES
0 0 0 0 0 0 0 0 0 0 0
Err:509
Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 0.000 Err:509 0.000 Err:509 Err:509 0.000 Err:509 Err:509
Err:509
Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509
Err:509
Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509
TOTAL OF PART H
0 - - Err:509 - - - Err:509 Err:509 Err:509 Err:509 -
Err:509
Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509

0 TOTAL 0 0 Err:509 0 0 0 Err:509 Err:509 Err:509 Err:509 -


FURNISHING OF CRUSHED AGGREGATE
Source of Aggregate = Tuguegarao City
Hauling Distance = 87 km

1. Material Cost:

Crushed Aggregates = 450 /cu.m.

2. HAULING COST
COMPUTATION OF CYCLE TIME DUMP TRUCK
ROAD
Terrain = Flat/Rolling TERRAIN CONDITION TRAVEL SPEED
CONDITION
(KPH)
Road Condition = Paved Loaded Empty
Grade = FLAT Paved 40 60
Unpaved 30 50
ROLLING Paved 30 40
Average Hauling Distance = 80 km Unpaved 25 30
MOUNTAINOUS Paved 25 30
Unpaved 15 20
Loading Time 5 min
Ave Speed, Loaded = 30 kph Unloading Time 3 min
Allowance for Delay 2 min
Ave Speed, Empty = 45 kph

Loading Time = 5.0 min


Travel Time, Loaded
First 200m at 10 kph = 1.2 min
79.6 km @ 30 kph = 159.2 min
Last 200 m at 15 kph = 0.8 min

Unload/Maneuver = 3.0 min

Return Time, Empty


First 200m at 10 kph = 1.2 min
79.6 km @ 45 kph = 106.1 min
Last 200 m at 15 kph = 0.8 min

Allowance for Delay 2.0 min


TOTAL CYCLE TIME 279.3 min

COMPUTATION OF HAULING COST


8 x 60 trips / day/ 10
No. of Trips = = 2
279.3 cu.m. DT

Rental of Dump Truck (10 cu.m.) = P10,816.00 /day

HAULING COST = P10,816.00 = P P540.80 /cu.m.


=
(10 * 2)

3. Excise Tax 3% (1 & 2): = P 0.00 /cu.m.


4. Royalty access rd. Prov'l and brgy. Tax: = P 0.00 /cu.m.
COST OF CRUSHED AGGREGATES = P 990.80 /cu.m.
FURNISHING OF AGGREGATES:
FOR ITEM 200 and 300

Source of Aggregate = Capissayan Gravel Pit


Gattaran, Cagayan
COMPUTATION OF HAULING DISTANCE
Quarry site - beg. Of Proj. = 25 km
Half of Proj. Length = km
Access Road = km
Hauling Distance 25 km

1.. STOCKPILING AND LOADING:

use 1 -Bulldozer, D65A-8, Crawler Mounted, 155 HP, Capacity = 500 cu.m./day
use 1 - Payloader, 2.10 cu.m.,148 HP Capacity = 500 cu.m./day
Unit Cost = P 18,392 + 13,864 /day = P 64.51 /cu.m.
500 cu.m./day

2. HAULING COST
COMPUTATION OF CYCLE TIME DUMP TRUCK
ROAD
Terrain = Flat/Rolling TERRAIN CONDITION
CONDITION
TRAVEL SPEED
(KPH)
Road Condition = Paved/unpaved Loaded Empty
Grade = FLAT Paved 40 60
Unpaved 30 50
ROLLING Paved 30 40
Average Hauling Distance = 25 km Unpaved 25 30
MOUNTAINOUS Paved 25 30
Unpaved 15 20
Loading Time 5 min
Ave Speed, Loaded = 30 kph Unloading Time 3 min
Allowance for Delay 2 min
Ave Speed, Empty = 50 kph

Loading Time = 5.0 min


Travel Time, Loaded
First 200m at 15 kph = 0.8 min
24.6 km @ 30 kph = 49.2 min
Last 200 m at 15 kph = 0.8 min

Unload/Maneuver = 3.0 min

Return Time, Empty


First 200m at 15 kph = 0.8 min
24.6 km @ 50 kph = 29.5 min
Last 200 m at 20 kph = 0.6 min
.
Allowance for Delay 2.0 min
TOTAL CYCLE TIME 91.7 min

COMPUTATION OF HAULING COST


8 x 60 trips / day/ 10
No. of Trips = = 5.23
91.7 cu.m. DT

say 5 trips / day/ 10 cu.m. DT

Rental of Dump Truck (10 cu.m.) = P10,816.00 /day

HAULING COST = P10,816.00 = P P216.32 /cu.m.


=
(10 * 5)

3. Excise Tax 3% (1 & 2): = P 8.42 /cu.m.


4. Royalty access rd. Prov'l and brgy. Tax: = P 15.00 /cu.m.
COST OF AGGREGATES = P 304.25 /cu.m.
PROCESSING : Employing a laborer, Skilled Labor and Loader

1. Fine Aggregates :
Screening = P( 13,864.0 + 383.11 + 295.31 ) = P 72.71 /cu.m.
P 200 cu.m./day
Washing = P( 13,864.0 + 383.11 + 295.31 + 335.00 = P 49.59 /cu.m.
P 300 cu.m./day = P 122.30 /cu.m.

F.A. = P( 304.25 + 122.30 ) /cu.m. = P 426.55 /cu.m.

2. Coarse Aggregates :
Screening = P( 13,864.0 + 383.11 + 295.31 ) = P 96.95 /cu.m.
P 150 cu.m./day
Washing = P( 13,864.0 + 383.11 + 295.31 + 335.00 = P 49.59 /cu.m.
P 300 cu.m./day P 146.54 /cu.m.

C.A. = P( 304.25 + 146.54 ) /cu.m. = P 450.79 /cu.m.

3.Sub-Base Course :
Screening = P 13,864.0 + 383.11 + 295.31 ) = P 72.71 /cu.m.
P 200 cu.m./day

5. Surface Course :
Screening = P( 13,864.0 + 383.11 + 295.31 ) = P 96.95 /cu.m.
P 150 cu.m./day
Blending = P( 13,864.0 + 383.11 + 295.31 ) = P 29.08 /cu.m.
P 500 cu.m./day P 126.03 /cu.m.

Therefore, the unit price derivation of the following are:


Item 200 = cost of aggregates + screening
= P 304.25 + 72.71 = P 376.96 /cu.m.

Item 300 = cost of aggregates + screening + blending


= P 304.25 + 96.95 + 29.08 ) = P 430.28 /cu.m.
FURNISHING OF AGGREGATES:

FOR (311) PCCP and (405) STRUCTURAL CONCRETE AND OTHER CONCRETE WORKS

Source of Aggregate = Pena Este/Capissayan Gravel Pit Quarry Site

COMPUTATION OF HAULING DISTANCE


Quarry site - beg. Of Proj. = 20.77 km
ave. of proj length = 0.57035 km
Access Road = 4 km
Hauling Distance 25 km

1.. STOCKPILING AND LOADING:

use 1 -Bulldozer, D65A-8, Crawler Mounted, 155 HP, Capacity = 500 cu.m./day
use 1 - Payloader, 2.10 cu.m.,148 HP Capacity = 500 cu.m./day
Unit Cost = P 18,392 + 13,864 /day = P 64.51 /cu.m.
500 cu.m./day

2. HAULING COST
COMPUTATION OF CYCLE TIME DUMP TRUCK
ROAD
Terrain = Flat/Rolling TERRAIN CONDITION
CONDITION
TRAVEL SPEED
(KPH)
Road Condition = Paved/unpaved Loaded Empty
Grade = FLAT Paved 40 60
Unpaved 30 50
ROLLING Paved 30 40
Average Hauling Distance = 25 km Unpaved 25 30
MOUNTAINOUS Paved 25 30
Unpaved 15 20
Loading Time 5 min
Ave Speed, Loaded = 25 kph Unloading Time 3 min
Allowance for Delay 2 min
Ave Speed, Empty = 30 kph

Loading Time = 5.0 min


Travel Time, Loaded
First 200m at 15 kph = 0.8 min
24.6 km @ 25 kph = 59.0 min
Last 200 m at 15 kph = 0.8 min

Unload/Maneuver = 3.0 min

Return Time, Empty


First 200m at 15 kph = 0.8 min
24.6 km @ 30 kph = 49.2 min
Last 200 m at 20 kph = 0.6 min
.
Allowance for Delay 2.0 min
TOTAL CYCLE TIME 121.2 min

COMPUTATION OF HAULING COST


8 x 60 trips / day/ 10
No. of Trips = = 3.96
121.2 cu.m. DT

say 4 trips / day/ 10 cu.m. DT

Rental of Dump Truck (10 cu.m.) = P10,816.00 /day

HAULING COST = P10,816.00 = P P270.40 /cu.m.


=
(10 * 4)

3. Excise Tax 3% (1 & 2): = P 10.05 /cu.m.


4. Royalty access rd. Prov'l and brgy. Tax: = P 15.00 /cu.m.
COST OF AGGREGATES = P 359.96 /cu.m.
PROCESSING : Employing a laborer, Skilled Labor and Loader

1. Fine Aggregates :
Screening = P( 13,864.0 + 383.11 + 295.31 ) = P 72.71 /cu.m.
P 200 cu.m./day
Washing = P( 13,864.0 + 383.11 + 295.31 + 335.00 = P 49.59 /cu.m.
P 300 cu.m./day = P 122.30 /cu.m.

F.A. = P( 359.96 + 122.30 ) /cu.m. = P 482.26 /cu.m.

2. Coarse Aggregates :
Screening = P( 13,864.0 + 383.11 + 295.31 ) = P 96.95 /cu.m.
P 150 cu.m./day
Washing = P( 13,864.0 + 383.11 + 295.31 + 335.00 = P 49.59 /cu.m.
P 300 cu.m./day P 146.54 /cu.m.

C.A. = P( 359.96 + 146.54 ) /cu.m. = P 506.50 /cu.m.

3.Sub-Base Course :
Screening = P 13,864.0 + 383.11 + 295.31 ) = P 72.71 /cu.m.
P 200 cu.m./day

5. Surface Course :
Screening = P( 13,864.0 + 383.11 + 295.31 ) = P 96.95 /cu.m.
P 150 cu.m./day
Blending = P( 13,864.0 + 383.11 + 295.31 ) = P 29.08 /cu.m.
P 500 cu.m./day P 126.03 /cu.m.

For structural concrete:


F.A. = cost` of aggregates + cost of screening + cost of washing
= P( 359.96 + 72.71 + 49.59 ) /cu.m. = P 482.26 /cu.m.

C.A. = cost` of aggregates + cost of screening + cost of washing


= P( 359.96 + 96.95 + 49.59 ) /cu.m. = P 506.50 /cu.m.
PROJECT: CONCRETING OF KATUNGAWAN ROAD

LOCATION: Brgy. Buyun, Sta. Teresita, Cagayan

SUMMARY OF QUANTITIES

ITEM NO. DESCRIPTION UNIT COMPUTED NEW PLAN REMARKS

101-2 REMOVAl OF EXISTING STRUCTURE( STONE MASONRY) Cu.m. 108.02 108.02 RCBC
102-2 SURPLUS COMMON EXCAVATION Cu.m. 2,510.00 29,400.00 31,910.00

103-1 STRUCTURE EXCAVATION Cu.m. - 1,904.00 1,904.00

103-3 FOUNDATION FILL Cu.m. - 233.23 233.23

103-6 PIPE CULVERT and DRAIN EXCAVATION Cu.m. - 24.00 24.00

104-1a EMBANKMENT (From Roadway Cut) Cu.m. 276.00 1,520.00 1,796.00

105-1 SUBGRADE PREPARATION (Common Materials) Sq.m. 2,608.00 38,862.00 41,470.00

200 AGGREGATE SUB-BASE COURSE, (35 cm. Thk.) Cu.m. 990.00 7,920.00 8,910.00 COMPACTED VOLUME

300 AGGREGATE SURFACE COURSE, (15cm. Thk.) Cu.m. 105.00 70.00 175.00 COMPACTED VOLUME

311-1a PCCP (Plain) - 23 cm. Thk. Sq.m. 1,569.00 12,885.00 14,454.00 CARRIAGEWAY

311-1b PCCP (Plain) - 15 cm. Thk. Sq.m. 83.00 5,171.00 5,254.00

311-2 PCCP Reinforced - 83.00 83.00

404 REINFORCING STEEL Kgs. 4,044.60 - 4,044.60

405 STRUCTURAL CONCRETE Cu.m. 58.64 2.86 61.50

407-1 LEAN CONCRETE Cu.m. - -

500-1 PIPE CULVERTS - 910 mm Ø Ln.m. - 17.00 17.00

502-3 CATCH BASIN Each - 1.00 1.00

505-1 GROUTED RIPRAP Cu.m. 59.00 26.00 85.00

506 STONE MASONRY Cu.m. 204.00 2,496.00 2,700.00

603-3a METAL GUARDRAIL (METAL BEAM) Ln.m. 20.00 510.54 530.54

603-3b METAL BEAM END Each 2.00 20.00 22.00

REFLECTORIZED THERMOPLASTIC PAVEMENT


612-1 Sq.m. 49.00 469.72 518.72
MARKING (White)

REFLECTORIZED THERMOPLASTIC PAVEMENT


612-2 Sq.m. 45.00 328.00 373.00
MARKING (Yellow)

620 CHEVRON SIGNS Each 8.00 60.00 68.00

NOTE : QUANTITIES OF VARIOUS ITEMS ARE SUBJECT TO DECREASE OR INCREASE AS PER ACTUAL FIELD REQUIREMENT

- TEXT IN BLUE FONT COLOR ----- ITEM OF WORK AND QUANTITY FOR FY2016 (FROM MASTERPLAN AND ADDITIONAL PLAN)
- BOLD TEXT (BLACK)-----PROGRAMMED QUANTITY FOR FY2015 FROM MASTERPLAN
CONCRETING OF KATUNGAWAN ROAD

Brgy. Buyun, Sta. Teresita, Cagayan

ESTIMATED COST OF PROPOSED WORK

ESTIMATED DIRECT COST


ADJUSTED
ITEM NO. DESCRIPTION % QTY. UNIT
UNIT COST
TOTAL (P) UNIT COST

PART A - OTHER GENERAL REQUIREMENTS

B.5 PROJECT BILLBOARD/SIGNBOARD 0.031 1.00 EACH 6,319.84 3,159.92 3,981.50

B.7 (2) OCCUPATIONAL SAFETY & HEALTH PROGRAM 0.157 ALL LUMPSUM 31,900.00 31,900.00 36,174.60

B.9 MOBILIZATION/DEMOBILIZATION 0.925 ALL Lump sum 187,933.30 187,933.30 197,329.97

B.14 ENVIRNMENTAL MANAGEMENT & MONITORING 0.007 6.00 Lump sum 1,500.00 250.00 283.50

TOTAL OF PART A
1.120 227,653.14

PART B- EARTHWORK

101(2) REMOVAL OF ACTUAL STRUCTURES/ OBSTRUCTION (ELECTRICAL POST)


1.781 6.00 Each 361,800.90 60,300.15 79,017.32

103(1)a STRUCTURE EXCAVATION


1.826 1,589.00 Cu.m. 370,952.49 233.45 294.15

103(3) FOUNDATION FILL


0.011 2.00 Cu.m. 2,298.37 1,149.18 1,447.97

103(6)a PIPE CULVERT & DRAIN EXCAVATION


0.006 1.00 Cu.m. 1,166.52 1,166.52 1,469.81

104(1)a EMBANKMENT FROM ROADWAY EXCAVATION (COMMON SOIL)


0.414 360.00 Cu.m. 84,201.99 233.89 294.71

104(2)a EMBANKMENT FROM BORROW (COMMON SOIL)


2.166 930.00 Cu.m. 439,991.01 473.11 620.96

105(1)a SUBGRADE PREPARATION (COMMON SOIL)


0.179 2,192.00 Sq.m. 36,308.00 16.56 20.87

TOTAL OF PART B
6.382 1,296,719.271

PART C - SUBBASE AND BASE COURSE

200(1) AGGREGATE SUB-BASE COURSE, (0.00-0.25m THK) 12.764 2,835.00 Cu.m. 2,593,414.31 914.78 1,152.63

TOTAL OF PART C
12.764 2,593,414.31

PART D - SURFACE COURSES

PORTLAND CEMENT CONCRETE PAVEMENT,


311(1)c1 UNREINFORCED (230mm THK) 40.768 5,500.00 Sq.m. 8,283,204.11 1,506.04 1,897.61

TOTAL OF PART D
40.768 8,283,204.11

PART E- ROAD CONTRUCTION

404(1)b REINFORCING STEEL 0.144 575.00 Kgs. 29,277.36 50.92 64.16

405(1)a3 STRUCTURAL CONCRETE 0.130 4.00 Cu.m. 26,474.65 6,618.66 8,339.52

TOTAL OF PART E
0.274 55,752.01

PART F- DRAINAGE & SLOPE PROTECTION STRUCTURE

500(1)a1 PIPE CULVERT (610mm Ø) 0.037 4.00 Cu.m. 7,500.72 1,875.18 2,362.73

500(1)a3 PIPE CULVERT (910mm Ø) 0.047 2.00 Sq.m. 9,525.11 4,762.56 6,000.82

505(2) GROUTED RIPRAP (APRON) 0.085 6.00 Cu.m. 17,223.03 2,870.51 3,616.84

506(1) STONE MASONRY 38.522 2,235.00 Cu.m. 7,826,710.91 3,501.88 4,412.37

TOTAL OF PART F
38.690 7,860,959.77
GRAND TOTAL 100.00 20,317,702.61
FURNISHING OF AGGREGATES

Project: : CONCRETING OF KATUNGAWAN ROAD

Location: : Brgy. Buyun, Sta. Teresita, Caga


Source: : Peña Este Gravel Pit

Hauling Distance 60.000


say = 60.000 KM

1.. STOCKPILING AND LOADING:

use 1 -Bulldozer, D65A-8, Crawler Mounted, 155 HP, Capacity = 500 cu.m./day
use 1 - Payloader,1.50 cu.m.,148 HP Capacity = 500 cu.m./day
Unit Cost = P 27,032.00 + 13,864.00 /day = P 81.79 /cu.m.
500.00 cu.m./day
ROAD DUMP TRUCK TRAVEL
TERRAIN SPEED (km/h)
2. HAULING COST SURFACE
CONDITION
COMPUTATION OF CYCLE TIME CONDITION LOADED EMPTY
Terrain = Flat/Rolling Paved 35 55
FLAT
Road Condition = Paved/Unpaved Unpaved 30 45
Grade = Paved 30 40
ROLLING
Unpaved 25 35
Paved 20 30
MOUNTAINOUS
Unpaved 15 25
Average Hauling Distance = 60.00 km LOADING TIME (min) 3
UNLOADING TIME (min) 2
ALLOWANCE FOR DELAY (min) 10% of Cycle Time
Ave Speed, Loaded = 35.00 kph
Ave Speed, Empty = 55.00 kph

Loading Time = 3.00 min


Travel Time, Loaded
First 200m at 20.00 kph = 0.60 min
59.6 km @ 35.00 kph = 102.20 min
Last 200 m at 20.00 kph = 0.60 min

Unload/Maneuver = 2.00 min

Return Time, Empty


First 200m at 30.00 kph = 0.40 min
59.6 km @ 55.00 kph = 65.00 min
Last 200 m at 30.00 kph = 0.40 min
CYCLE TIME 174.20

Allowance for Delay 17.42 min


TOTAL CYCLE TIME 191.62 min

COMPUTATION OF HAULING COST


8 x 60 trips / day/ 10 cu.m.
No. of Trips = = 2.5
191.6 DT
say 2.5 trips / day/ 10 cu.m. DT

Rental of Dump Truck (10 cu.m.) = P11,360.00 /day

HAULING COST = P11,360.00 = P P454.40 /cu.m.


=
(10 * 2.5)

3. Excise Tax 3% (1 & 2): = P 16.09 /cu.m.


4. Royalty access rd. Prov'l and brgy. Tax: = P 15.00 /cu.m.
COST OF AGGREGATES = P 567.28 /cu.m.
PROCESSING : Employing Unskilled laborer, Skilled Laborer and Loader

1. Fine Aggregates :
Screening = P( 13,864.00 + 310.63 + 399.98 ) = P 72.87 /cu.m.
P 200.00 cu.m./day
Washing = P( 13,864.00 + 310.63 + 399.98 + 335.50 = P 49.70 /cu.m.
P 300.00 cu.m./day = P 122.57 /cu.m.

F.A. = P( 567.28 + 122.57 ) /cu.m. = P 689.85 /cu.m.

2. Coarse Aggregates :
Screening = P( 13,864.00 + 310.63 + 399.98 ) = P 97.16 /cu.m.
P 150.00 cu.m./day
Washing = P( 13,864.00 + 310.63 + 399.98 + 335.50 = P 49.70 /cu.m.
P 300.00 cu.m./day P 146.86 /cu.m.

C.A. = P( 567.28 + 146.86 ) /cu.m. = P 714.14 /cu.m.

3.Sub-Base Course :
Screening = P 13,864.00 + 310.63 + 399.98 ) = P 72.87 /cu.m.
P 200.00 cu.m./day

4.Base Course :
Screening = P 13,864.00 + 310.63 + 399.98 ) = P 72.87 /cu.m.
P 200.00 cu.m./day
Blending = P 13,864.00 + 310.63 + 399.98 ) = P 29.15 /cu.m.
P 500.00 cu.m./day P 102.02 /cu.m.

5. Surface Course :
Screening = P 13,864.00 + 310.63 + 399.98 ) = P 97.16 /cu.m.
P 150.00 cu.m./day
Blending = P 13,864.00 + 310.63 + 399.98 ) = P 29.15 /cu.m.
P 500.00 cu.m./day P 126.31 /cu.m.

For structural concrete:

F.A. = cost` of aggregates + cost of screening + cost of washing


= P( 567.28 + 72.87 + 49.70 ) /cu.m. = P 689.85 /cu.m.
Item No. Description Quantity Unit Equipment Labor Material Direct Cost Direct Unit Cost OCM VAT Total Cost Unit Cost No. of Days Mandays
#REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF!
#REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF!
#REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF!
#REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF!
#REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF!
#REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF!

#REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF!
#REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF!
#REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF!
#REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF!
#REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF!
#REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF!
#REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF!
#REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF!
#REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF!
#REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF!
#REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF!
#REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF!

#REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF!
#REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
Department of Public Works and Highways (DPWH)

CONCRETING OF KATUNGAWAN ROAD

Brgy. Buyun, Sta. Teresita, Cagayan

Project Name and Location

Cagayan First District Engineering Office


Aparri, Cagayan

APPROVED BUDGET FOR THE CONTRACT


Stations : #NAME?
Net Length : - Contract Duration : 179 CD
TOTAL MARK-
MARK-UP IN
ESTIMATED PERCENT UP TOTAL INDIRECT
ITEM NO. DESCRIPTION QUANTITY UNIT VAT1 TOTAL COST UNIT COST
DIRECT COST COST
OCM 2
PROFIT % VALUE

(9) = (10) (11) (12) (13)


(1) (2) (3) (4) (5) (6) (7) (8)
(5)x(8) 12%[(5)+(9)] (9)+(10) (5)+(11) (12)/(3)
#REF!

#REF! #REF!
#REF! #REF! #REF! 9% 8% 17% #REF! #REF! #REF! #REF! #REF!
#REF! #REF!
#REF! #REF! #REF! 9% 8% 17% #REF! #REF! #REF! #REF! #REF!
#REF! #REF!
#REF! #REF! #REF! 9% 8% 17% #REF! #REF! #REF! #REF! #REF!
#REF! #REF!
#REF! #REF! #REF! 9% 8% 17% #REF! #REF! #REF! #REF! #REF!
#REF! #REF!
#REF! #REF! #REF! 9% 8% 17% #REF! #REF! #REF! #REF! #REF!
#REF! #REF!
#REF! #REF! #REF! 9% 8% 17% #REF! #REF! #REF! #REF! #REF!
#REF! #REF!
#REF! #REF! #REF! 9% 8% 17% #REF! #REF! #REF! #REF! #REF!
#REF! #REF!
#REF! #REF! #REF! 9% 8% 17% #REF! #REF! #REF! #REF! #REF!
#REF! #REF!
#REF! #REF! #REF! 9% 8% 17% #REF! #REF! #REF! #REF! #REF!

Total Page,1 #REF! #REF! #REF! #REF! #REF!


\
Checked and Reviewed ( As to Unit Cost) Recommending Approval : Approved :

ZOISIMO L. BALISI ALEXANDER D. NOLA, CESE NERIE D. BUENO, CESO IV


Chief, Planning and Design Division Assistant Regional Director OIC-Regional Director
Department of Public Works and Highways (DPWH)

CONCRETING OF KATUNGAWAN ROAD

Brgy. Buyun, Sta. Teresita, Cagayan


Project Name and Location

Cagayan First District Engineering Office


Aparri, Cagayan

APPROVED BUDGET FOR THE CONTRACT


Stations : #NAME?
Net Length : - Contract Duration : 179 CD
TOTAL MARK-
MARK-UP IN
ESTIMATED PERCENT UP TOTAL INDIRECT
ITEM NO. DESCRIPTION QUANTITY UNIT VAT1 TOTAL COST UNIT COST
DIRECT COST COST
OCM
2
PROFIT % VALUE

(9) = (10) (11) (12) (13)


(1) (2) (3) (4) (5) (6) (7) (8)
(5)x(8) 12%[(5)+(9)] (9)+(10) (5)+(11) (12)/(3)

Continuation I. ROAD COMPONENT

#REF! #REF!
#REF! #REF! #REF! 9% 8% 17% #REF! #REF! #REF! #REF! #REF!
#REF! #REF!
#REF! #REF! #REF! 9% 8% 17% #REF! #REF! #REF! #REF! #REF!
#REF! #REF!
#REF! #REF! #REF! 9% 8% 17% #REF! #REF! #REF! #REF! #REF!
#REF! #REF!
#REF! #REF! #REF! 9% 8% 17% #REF! #REF! #REF! #REF! #REF!
#REF! #REF!
#REF! #REF! #REF! 9% 8% 17% #REF! #REF! #REF! #REF! #REF!
#REF! #REF!
#REF! #REF! #REF! 9% 8% 17% #REF! #REF! #REF! #REF! #REF!
#REF! #REF!
#REF! #REF! #REF! 9% 8% 17% #REF! #REF! #REF! #REF! #REF!
#REF! #REF!
#REF! #REF! #REF! 9% 8% 17% #REF! #REF! #REF! #REF! #REF!
#REF! #REF!
#REF! #REF! #REF! 9% 8% 17% #REF! #REF! #REF! #REF! #REF!

Total Page,2 #REF! #REF! #REF! #REF! #REF!

Checked and Reviewed ( As to Unit Cost) Recommending Approval : Approved :

ZOISIMO L. BALISI ALEXANDER D. NOLA, CESE NERIE D. BUENO, CESO IV


Chief, Planning and Design Division Assistant Regional Director OIC-Regional Director
Department of Public Works and Highways (DPWH)

CONCRETING OF KATUNGAWAN ROAD

Brgy. Buyun, Sta. Teresita, Cagayan


Project Name and Location

Cagayan First District Engineering Office


Aparri, Cagayan
APPROVED BUDGET FOR THE CONTRACT

Stations : #NAME?
Net Length : - Contract Duration : 179 CD
TOTAL MARK-
MARK-UP IN
ESTIMATED PERCENT UP TOTAL INDIRECT
ITEM NO. DESCRIPTION QUANTITY UNIT VAT1 TOTAL COST UNIT COST
DIRECT COST COST
OCM 2
PROFIT % VALUE

(9) = (10) (11) (12) (13)


(1) (2) (3) (4) (5) (6) (7) (8)
(5)x(8) 12%[(5)+(9)] (9)+(10) (5)+(11) (12)/(3)
#REF!

#REF! #REF!
#REF! #REF! #REF! 0% 8% 8% #REF! #REF! #REF! #REF! #REF!
#REF! #REF!
#REF! #REF! #REF! 0% 8% 8% #REF! #REF! #REF! #REF! #REF!
#REF! #REF!
#REF! #REF! #REF! 9% 8% 17% #REF! #REF! #REF! #REF! #REF!
#REF! #REF!
#REF! #REF! #REF! 0% 0% 0% #REF! #REF! #REF! #REF! #REF!

Total, Page 3 #REF! #REF! #REF! #REF! #REF!


Department of Public Works and Highways (DPWH)

CONCRETING OF KATUNGAWAN ROAD

Brgy. Buyun, Sta. Teresita, Cagayan

Project Name and Location

Cagayan First District Engineering Office


Aparri, Cagayan

APPROVED BUDGET FOR THE CONTRACT


Stations : #NAME?
Net Length : - Contract Duration : 179 CD
TOTAL MARK-
MARK-UP IN
ESTIMATED DIRECT PERCENT UP TOTAL INDIRECT
ITEM NO. DESCRIPTION QUANTITY UNIT VAT1 TOTAL COST UNIT COST
COST COST
OCM2
PROFIT % VALUE

(9) = (10) (11) (12) (13)


(1) (2) (3) (4) (5) (6) (7) (8)
(5)x(8) 12%[(5)+(9)] (9)+(10) (5)+(11) (12)/(3)

#REF!
#REF! #REF! #REF! #REF! #REF!
#REF!
#REF! #REF! #REF! #REF! #REF!

Total #REF! #REF! #REF! #REF! #REF!

Checked and Reviewed ( As to Unit Cost) Recommending Approval : Approved :

ZOISIMO L. BALISI ALEXANDER D. NOLA, CESE NERIE D. BUENO, CESO IV


Chief, Planning and Design Division Assistant Regional Director OIC-Regional Director
Department of Public Works and Highways (DPWH)

CONCRETING OF KATUNGAWAN ROAD

Brgy. Buyun, Sta. Teresita, Cagayan

Project Name and Location

Cagayan First District Engineering Office


Aparri, Cagayan

APPROVED BUDGET FOR THE CONTRACT


Stations : #NAME?
Net Length : - Contract Duration : 179 CD
TOTAL MARK-
MARK-UP IN
ESTIMATED PERCENT UP TOTAL INDIRECT
ITEM NO. DESCRIPTION QUANTITY UNIT VAT1 TOTAL COST UNIT COST
DIRECT COST COST
OCM 2
PROFIT % VALUE

(9) = (10) (11) (12) (13)


(1) (2) (3) (4) (5) (6) (7) (8)
(5)x(8) 12%[(5)+(9)] (9)+(10) (5)+(11) (12)/(3)

PAGE 01
#REF! #REF! #REF! #REF! #REF!

PAGE 02
#REF! #REF! #REF! #REF! #REF!
PAGE 03
#REF! #REF! #REF! #REF! #REF!

Total #REF! #REF! #REF! #REF! #REF!

Submitted by : Checked and Reviewed ( As to Unit Cost) Recommending Approval : Approved :

RUBEN S. SALIGANAN JOSE B. TOBIAS ALEXANDER D. NOLA, CESE MELVIN B. NAVARRO, MNSA, CESO IV
District Engineer Chief, Construction Division OIC-Assistant Regional Director Officer-In- Charge
CONCRETING OF KATUNGAWAN ROAD
Brgy. Buyun, Sta. Teresita, Cagayan

SCHEDULE OF CONSTRUCTION EQUIPMENT


Minimum Equipment Requirement

Description and Capacity Required Total

Backhoe (0.80 cu.m.) 1 1


Backhoe (wheel type 0.28 cu.m.) 1 1
Boom Truck (2-5 mt) 1 1
Bulldozer, D6H SERIES II PSDS/DD 1 1
Concrete Vibrator 2 2
Bar Cutter, Single Phase 1 1
Concrete Saw, Blade Ø 14" (7.5 Hp) 1 1
Dump truck (12 yd³) 2 2
Motorized Road Grader, 6710 A 1 1
One Bagger Mixer 1 1
Payloader (1.5 cu.m ) 1 1
Vibratory Roller (10 m.t. ), SP56 1 1
Water Truck/Pump (16000 L) 1 1
Plate Compactor (5hp) 1 1
DETAILED UNIT PRICE ANALYSIS

Construction/Widening/Upgrading/Rehabilitation of Access Road, Aparri, Airport, Maura


Sta. 0+000 -Sta. 2+650
Buguey, Cagayan

Item No. : 101-3 Quantity = #REF!


Description : Removal of Existing PCCP Unit = #REF!

Production Output : = 40 sq.m./hr.


No. of Hours : = #REF! hours say #REF! hours
No. of Days : = #REF! days

A. Name and Capacity of Equipment (Operated) No. of Units No. of Hours Hourly Rate Total Cost (Pesos)
Factor
Backhoe with Pavement Breaker 1 1.00 #REF! P 2,074.95 P #REF!
Payloader (1.5 cu.m) 1 1.00 #REF! 1,733.00 #REF!
Dumptruck(10 cu.m) 0.5 1.00 #REF! 1,352.00 #REF!

A. SUB-TOTAL, EQUIPMENT P #REF!

B. Designation Personnel No. of Men No. of Hours Unit Rate/Hour Total Cost (Pesos)

Foreman 1.00 #REF! P 66.18 P #REF!


Unskilled Laborers 2.00 #REF! 36.91 #REF!

B. SUB-TOTAL, LABOR P #REF!

C. Name and Description Qty Unit Unit Price Total Cost (Pesos)

C. SUB-TOTAL, MATERIALS P -

SUMMARY:
A Equipment P #REF!
B Labor #REF!
C Materials -
D TOTAL DIRECT COST P #REF!
DIRECT UNIT COST #REF!
E OCM 9% of D #REF!
F Profit 8% of D #REF!
G VAT 12% of (D+E+F) #REF!
H Total Cost (D+E+F+G) #REF!
I Unit Cost H/Quantity P #REF!
Cagayan First District Engineering Office
FORM POW-2015-01-00
PROGRAM OF WORK/BUDGET COST

Project : CONCRETING OF KATUNGAWAN ROAD Net Length : (a) Road 2.20Lane Km (1.10 Km)
(b) Bridge
Project ID : (c) Others Width = 5.00 m., Thickness = 0.23 m.
Project Component ID :
Project Location : Brgy. Buyun, Sta. Teresita, Cagayan Target Start Date :
Work Location : Sta 0+000 - Sta 1+100 Total Project Duration :
Appropriation : PHP 25,597,966.00 No. of Pre-determined :
Source of Fund : 0 Unworkable Days :
Contract Duration : 180 C.D.
AS SUBMITTED AS EVALUATED
DESCRIPTION OF WORKS TO BE DONE QUANTITY UNIT
% TOTAL TOTAL DIRECT COST % TOTAL TOTAL DIRECT COST
Part A:Facilities for the Engineer Err:509 Err:509
B:Other General Requirements Err:509 Err:509
C:Earthworks Err:509 Err:509
D:Subbase and Base Course (PLS. SEE FORM POW-2015-01C-00) Err:509 2,593,414.31
E:Surface Courses Err:509 Err:509
F:Bridge Construction Err:509 7,843,933.94
G:Miscellaneous Sructures Err:509 Err:509

Total Err:509 Err:509 -


EQUIPMENT: BREAKDOWN OF EXPENDITURES:
DESCRIPTION REQUIRED AS SUBMITTED AS EVALUATED AS SUBMITTED AS EVALUATED
1. Labor 1,123,446.56 A. Total Direct Cost 20,317,702.61
2. Materials 16,315,067.76 B. OCM and Profit 4,033,091.38
3. Rental of Equipment 2,879,188.30 C. Value Added Tax 1,247,171.19
4. Provisional Sum - D. Total Construction Cost 25,597,965.19
5. Daywork - E. Eng'g & Administrative Overhead, % 258,565.30
(PLS. SEE FORM POW-2015-01B-00) 6. OCM and Profit 4,033,091.38 F. RROW Acquisition
7. Value Added Tax 1,247,171.19 G. Physical Reserved (Contingency) -
8. Eng'g & Administrative Overhead, % 258,565.30
9. RROW Acquisition -
10. Physical Reserved (Contingency) -
11. TOTAL ESTIMATED COST 25,856,530.49 H. TOTAL ESTIMATED COST 25,856,530.50

Preparation and Submission: Evaluation: Approval:

Prepared by: Checked/Reviewed by: Recommending Approval: Approved:

JAMES A. ALMONINIA GIRLIE P. UY PEDRITO R. BAUTISTA ROSAURO R. GUERRERO


Engineering Assistant Engineer II OIC-Assistant District Engineer District Engineer
CONCRETING OF KATUNGAWAN ROAD
Brgy. Buyun, Sta. Teresita, Cagayan
FORM POW-2015-01A-00
ITEMIZED BREAKDOWN
DIRECT COST TOTAL UNIT COST
QTY % DIRECT COST
ITEM NO. DESCRIPTION UNIT TOTAL UNIT COST (DIRECT+INDIRECT)
AS SUBMITTED AS EVALUATED AS SUBMITTED AS EVALUATED AS SUBMITTED AS EVALUATED AS SUBMITTED AS EVALUATED AS EVALUATED
PART A FACILITIES FOR THE ENGINEER
Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509

TOTAL OF PART A Err:509


PART B OTHER GENERAL REQUIREMENTS
B.5 PROJECT BILLBOARD/SIGNBOARD 1.00 EACH 6,319.84 3,159.92 3,981.50

B.7 (2) OCCUPATIONAL SAFETY & HEALTH PROGRAM ALL LUMPSUM 31,900.00 31,900.00 36,174.60

B.9 MOBILIZATION/DEMOBILIZATION ALL Lump sum 187,933.30 187,933.30 197,329.97

Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509

TOTAL OF PART B Err:509


PART C EARTHWORK
103(1)a STRUCTURE EXCAVATION 1,589.00 Cu.m. 370,952.49 233.45 294.15

103(3) FOUNDATION FILL 2.00 Cu.m. 2,298.37 1,149.18 1,447.97

103(6)a PIPE CULVERT & DRAIN EXCAVATION 1.00 Cu.m. 1,166.52 1,166.52 1,469.81

104(1)a EMBANKMENT FROM ROADWAY EXCAVATION (COMMON SOIL) 360.00 Cu.m. 84,201.99 233.89 294.71

104(2)a EMBANKMENT FROM BORROW (COMMON SOIL) 930.00 Cu.m. 439,991.01 473.11 620.96

TOTAL OF PART C 898,610.37


PART D SUBBASE AND BASE COURSE
200(1) AGGREGATE SUB-BASE COURSE, (0.00-0.25m THK) 2,835.00 Cu.m. 2,593,414.31 914.78 1,152.63

TOTAL OF PART D 2,593,414.31


PART E SURFACE COURSES
Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509

311(1)c1 PORTLAND CEMENT CONCRETE PAVEMENT, UNREINFORCED (230mm THK) 5,500.00 Sq.m. 8,283,204.11 1,506.04 1,897.61

TOTAL OF PART E Err:509


PART F ROAD CONSTRUCTION (RETAINING WALL)
505(2) GROUTED RIPRAP (APRON) 6.00 Cu.m. 17,223.03 2,870.51 3,616.84

506(1) STONE MASONRY 2,235.00 Cu.m. 7,826,710.91 3,501.88 4,412.37

TOTAL OF PART F 7,843,933.94


PART G MISCELLANEOUS STRUCTURES
Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509

Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509

TOTAL OF PART H Err:509

GRAND TOTAL Err:509


CONCRETING OF KATUNGAWAN ROAD

Brgy. Buyun, Sta. Teresita, Cagayan


FORM POW-2015-01B-00
MINIMUM EQUIPMENT REQUIREMENT

Number of Number of
No. Equipment Description Capacity No. Equipment Description Capacity
Equipment Equipment
1 Applicator Machine 1 31
2 Backhoe (0.80 cu.m) 1 32
3 Backhoe (Wheel Type 0.28 cu.m.) 1 33
4 Bar Bender 1 34
5 Bar Cutter, Single Phase 1 35
6 Boom Truck (2-5 mt) 1 36
7 Bulldozer, D6H SERIES II PSDS/DD 1 37
8 Cargo Truck (9-10 mt) 1 38
9 Cargo Truck/Delivery Truck (2-5 mt) 1 39
10 Concrete Batch Plant (30 cu.m.) 1 40
11 Concrete Saw, Blade Ø 14" (7.5 Hp) 1 41
12 Concrete Screeder (5.5 hp) 1 42
13 Concrete Vibrator 2 43
14 Dump Truck (12 cu.yd) 2 44
15 Kneading Machine 1 45
16 Motorized Grader, 6710A 1 46
17 One Bagger Mixer 1 47
18 Payloader (1.50 cu.m.) 1 48
19 Plate Compactor (5 hp) 1 49
20 Transit Mixer (5 cu.m.) 4 50
21 Vibratory Roller(10 m.t.), SD100DC 1 51
22 Water Truck/Pump (16000 L) 1 52
23 53
24 54
25 55
26 56
27 57
28 58
29 59
30 60
SUB-TOTAL 27 SUB-TOTAL 0
TOTAL 27
CONCRETING OF KATUNGAWAN ROAD

Brgy. Buyun, Sta. Teresita, Cagayan


FORM POW-2015-01C-00
DETAILED BREAKDOWN OF COMPONENT FOR EACH ITEM
DIRECT COST TOTAL MARK-UP
ITEM NO. DESCRIPTION % QTY UNIT 5% VAT TOTAL COST
MATERIAL LABOR EQUIPMENT TOTAL % VALUE
PART A FACILITIES FOR THE ENGINEER
AS EVALUATED
Err:509 Err:509
AS SUBMITTED Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 8% Err:509 Err:509 Err:509
AS EVALUATED
TOTAL OF PART A
AS SUBMITTED Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509
PART B OTHER GENERAL REQUIREMENTS
AS EVALUATED
B.5 PROJECT BILLBOARD/SIGNBOARD
AS SUBMITTED Err:509 1.00 EACH 3,136.00 2,894.40 289.44 6,319.84 18% 1,263.97 379.19 7,963.00
AS EVALUATED
B.7 (2) OCCUPATIONAL SAFETY & HEALTH PROGRAM
AS SUBMITTED Err:509 ALL LUMPSUM 19,900.00 12,000.00 - 31,900.00 8% 2,552.00 1,722.60 36,174.60
AS EVALUATED
B.9 MOBILIZATION/DEMOBILIZATION
AS SUBMITTED Err:509 ALL Lump sum - - 187,933.30 187,933.30 0% - 9,396.67 197,329.97
AS EVALUATED
Err:509 Err:509
AS SUBMITTED Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 8% Err:509 Err:509 Err:509
AS EVALUATED
TOTAL OF PART B
AS SUBMITTED Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509
PART C EARTHWORKS
AS EVALUATED
103(1)a STRUCTURE EXCAVATION
AS SUBMITTED Err:509 1,589.00 Cu.m. - 20,891.81 350,060.68 370,952.49 #REF! 74,190.50 22,257.15 467,400.13
AS EVALUATED
103(3) FOUNDATION FILL
AS SUBMITTED Err:509 2.00 Cu.m. 1,422.56 555.96 319.85 2,298.37 #REF! 459.67 137.90 2,895.94
AS EVALUATED
103(6)a PIPE CULVERT & DRAIN EXCAVATION
AS SUBMITTED Err:509 1.00 Cu.m. - 65.70 1,100.82 1,166.52 #REF! 233.30 69.99 1,469.81
AS EVALUATED
Err:509 Err:509
AS SUBMITTED Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 #REF! Err:509 Err:509 Err:509
AS EVALUATED
104(1)a EMBANKMENT FROM ROADWAY EXCAVATION (COMMON SOIL)
AS SUBMITTED Err:509 360.00 Cu.m. - 2,758.70 81,443.29 84,201.99 #REF! 16,840.40 5,052.12 106,094.51
AS EVALUATED
104(2)a EMBANKMENT FROM BORROW (COMMON SOIL)
AS SUBMITTED Err:509 930.00 Cu.m. 349,889.25 3,255.01 86,846.75 439,991.01 #REF! 109,997.75 27,499.44 577,488.20
AS EVALUATED
TOTAL OF PART C
AS SUBMITTED Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509
PART D SUBBASE AND BASE COURSE
AS EVALUATED
200(1) AGGREGATE SUB-BASE COURSE, (0.00-0.25m THK)
AS SUBMITTED Err:509 2,835.00 Cu.m. 2,318,772.80 11,797.76 262,843.75 2,593,414.31 #REF! 518,682.86 155,604.86 3,267,702.03
AS EVALUATED
TOTAL OF PART D
AS SUBMITTED Err:509 2,318,772.80 11,797.76 262,843.75 2,593,414.31 518,682.86 155,604.86 3,267,702.03
PART E SURFACE COURSES
AS EVALUATED
Err:509 Err:509
AS SUBMITTED Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 #REF! Err:509 Err:509 Err:509
AS EVALUATED
311(1)c1 PORTLAND CEMENT CONCRETE PAVEMENT, UNREINFORCED (230mm THK)
AS SUBMITTED Err:509 5,500.00 Sq.m. 6,946,819.86 106,732.23 1,229,652.02 8,283,204.11 #REF! 1,656,640.82 496,992.25 10,436,837.18
AS EVALUATED
TOTAL OF PART E
AS SUBMITTED Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509
CONCRETING OF KATUNGAWAN ROAD

Brgy. Buyun, Sta. Teresita, Cagayan


FORM POW-2015-01C-00
DETAILED BREAKDOWN OF COMPONENT FOR EACH ITEM
DIRECT COST TOTAL MARK-UP
ITEM NO. DESCRIPTION % QTY UNIT 5% VAT TOTAL COST
MATERIAL LABOR EQUIPMENT TOTAL % VALUE
PART F ROAD CONSTRUCTION
AS EVALUATED
505(2) GROUTED RIPRAP (APRON)
AS SUBMITTED Err:509 6.00 Cu.m. 12,183.21 3,397.45 1,642.37 17,223.03 #REF! 3,444.60 1,033.38 21,701.01
AS EVALUATED
506(1) STONE MASONRY
AS SUBMITTED Err:509 2,235.00 Cu.m. 6,242,318.73 949,247.53 635,144.65 7,826,710.91 #REF! 1,565,342.18 469,602.65 9,861,655.74
AS EVALUATED
TOTAL OF PART F
AS SUBMITTED Err:509 6,254,501.94 952,644.98 636,787.02 7,843,933.94 1,568,786.78 470,636.03 9,883,356.75
PART H MISCELLANEOUS STRUCTURES
AS EVALUATED
Err:509 Err:509
AS SUBMITTED Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 #REF! Err:509 Err:509 Err:509
AS EVALUATED
Err:509 Err:509
AS SUBMITTED Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 #REF! Err:509 Err:509 Err:509
AS EVALUATED
TOTAL OF PART H
AS SUBMITTED Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509
AS EVALUATED
GRAND TOTAL
AS SUBMITTED Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509
Cagayan First District Engineering Office

FORM ABC-2015-02-00
CONCRETING OF KATUNGAWAN ROAD

Brgy. Buyun, Sta. Teresita, Cagayan

SUMMARY OF APPROVED BUDGET FOR THE CONTRACT

Contract Duration : 180 C.D.

TOTAL MARK- UP
ITEM NO. DESCRIPTION ESTIMATED DIRECT COST VAT TOTAL INDIRECT COST TOTAL COST
% VALUE

AS EVALUATED
PART A - FACILITIES FOR THE ENGINEER
AS SUBMITTED Err:509 Err:509 Err:509 Err:509 Err:509

AS EVALUATED
PART B - OTHER GENERAL REQUIREMENTS
AS SUBMITTED Err:509 Err:509 Err:509 Err:509 Err:509

AS EVALUATED
PART C - EARTHWORK
AS SUBMITTED 898,610.37 179,722.07 53,916.62 233,638.69 1,132,249.06

AS EVALUATED
PART D - SUBBASE AND BASE COURSE
AS SUBMITTED 2,593,414.31 518,682.86 155,604.86 674,287.72 3,267,702.03

AS EVALUATED
PART E - SURFACE COURSES
AS SUBMITTED Err:509 Err:509 Err:509 Err:509 Err:509

AS EVALUATED
PART F - ROAD CONSTRUCTION
AS SUBMITTED 7,843,933.94 1,568,786.79 470,636.04 2,039,422.83 9,883,356.78

AS EVALUATED
PART G - MISCELLANEOUS STRUCTURES
AS SUBMITTED Err:509 Err:509 Err:509 Err:509 Err:509

AS EVALUATED

TOTAL AS SUBMITTED Err:509 Err:509 Err:509 Err:509 Err:509

Preparation and Submission: Evaluation: Approval:

Prepared by: Checked/Reviewed by: Approved:

JAMES A. ALMONINIA GIRLIE P. UY PEDRITO R. BAUTISTA ROSAURO R. GUERRERO


Engineering Assistant Engineer II OIC - Assistant District Engineer District Engineer
Cagayan First District Engineering Office " Attachment A"
D.O. No. 197, Series of 2016

CONCRETING OF KATUNGAWAN ROAD

Brgy. Buyun, Sta. Teresita, Cagayan

APPROVED BUDGET FOR THE CONTRACT

Stations : Sta 0+000 - Sta 1+100


Length : 2.20Lane Km (1.10 Km) Contract Duration : 180 C.D.
MARK-UPS IN TOTAL MARK-
ESTIMATED DIRECT PERCENT UP TOTAL INDIRECT
ITEM NO. DESCRIPTION QUANTITY UNIT VAT1 TOTAL COST UNIT COST
COST COST
OCM PROFIT % VALUE

(9) = (10) (11) (12) (13)


(1) (2) (3) (4) (5) (6) (7) (8)
(5)x(8) 5%[(5)+(9)] (9)+(10) (5)+(11) (12)/(3)
PART A - FACILITIES FOR THE ENGINEER

Err:509 Err:509 Err:509 Err:509 Err:509 0% 8% 8% Err:509 Err:509 Err:509 Err:509 Err:509

TOTAL OF PART A Err:509 Err:509 Err:509 Err:509 Err:509

PART B - OTHER GENERAL REQUIREMENTS

B.5 PROJECT BILLBOARD/SIGNBOARD 1.00 EACH 6,319.84 12% 8% 20% 1,263.97 379.19 1,643.16 7,963.00 7,963.00

B.7 (2) OCCUPATIONAL SAFETY & HEALTH PROGRAM ALL LUMPSUM 31,900.00 0% 8% 8% 2,552.00 1,722.60 4,274.60 36,174.60 36,174.60

B.9 MOBILIZATION/DEMOBILIZATION ALL Lump sum 187,933.30 0% 0% 0% - 9,396.67 9,396.67 197,329.97 197,329.97

Err:509 Err:509 Err:509 Err:509 Err:509 0% 8% 8% Err:509 Err:509 Err:509 Err:509 Err:509

TOTAL OF PART B Err:509 Err:509 Err:509 Err:509 Err:509

PART C - EARTHWORK

103(1)a STRUCTURE EXCAVATION 1,589.00 Cu.m. 370,952.49 12% 8% 20% 74,190.50 22,257.15 96,447.65 467,400.13 294.15

103(3) FOUNDATION FILL 2.00 Cu.m. 2,298.37 12% 8% 20% 459.67 137.90 597.57 2,895.94 1,447.97

103(6)a PIPE CULVERT & DRAIN EXCAVATION 1.00 Cu.m. 1,166.52 12% 8% 20% 233.30 69.99 303.29 1,469.81 1,469.81

104(1)a EMBANKMENT FROM ROADWAY EXCAVATION (COMMON SOIL) 360.00 Cu.m. 84,201.99 12% 8% 20% 16,840.40 5,052.12 21,892.52 106,094.51 294.71

104(2)a EMBANKMENT FROM BORROW (COMMON SOIL) 930.00 Cu.m. 439,991.01 12% 8% 20% 87,998.20 26,399.46 114,397.66 554,388.67 596.12

TOTAL OF PART C 898,610.37 179,722.07 53,916.62 233,638.69 1,132,249.06

PART D - SUBBASE AND BASE COURSE

200(1) AGGREGATE SUB-BASE COURSE, (0.00-0.25m THK) 2,835.00 Cu.m. 2,593,414.31 12% 8% 20% 518,682.86 155,604.86 674,287.72 3,267,702.03 1,152.63

TOTAL OF PART D 2,593,414.31 518,682.86 155,604.86 674,287.72 3,267,702.03

PART E - SURFACE COURSES

Err:509 Err:509 Err:509 Err:509 Err:509 12% 8% 20% Err:509 Err:509 Err:509 Err:509 Err:509
PORTLAND CEMENT CONCRETE PAVEMENT, UNREINFORCED
311(1)c1 (230mm THK) 5,500.00 Sq.m. 8,283,204.11 12% 8% 20% 1,656,640.82 496,992.25 2,153,633.07 10,436,837.18 1,897.61

TOTAL OF PART E Err:509 Err:509 Err:509 Err:509 Err:509

PART F - ROAD CONSTRUCTION

505(2) GROUTED RIPRAP (APRON) 6.00 Cu.m. 17,223.03 12% 8% 20% 3,444.61 1,033.38 4,477.99 21,701.03 3,616.84
Cagayan First District Engineering Office " Attachment A"
D.O. No. 197, Series of 2016

CONCRETING OF KATUNGAWAN ROAD

Brgy. Buyun, Sta. Teresita, Cagayan

APPROVED BUDGET FOR THE CONTRACT

Stations : Sta 0+000 - Sta 1+100


Length : 2.20Lane Km (1.10 Km) Contract Duration : 180 C.D.
MARK-UPS IN TOTAL MARK-
ESTIMATED DIRECT PERCENT UP TOTAL INDIRECT
ITEM NO. DESCRIPTION QUANTITY UNIT VAT1 TOTAL COST UNIT COST
COST COST
OCM PROFIT % VALUE

(9) = (10) (11) (12) (13)


(1) (2) (3) (4) (5) (6) (7) (8)
(5)x(8) 5%[(5)+(9)] (9)+(10) (5)+(11) (12)/(3)

506(1) STONE MASONRY 2,235.00 Cu.m. 7,826,710.91 12% 8% 20% 1,565,342.18 469,602.65 2,034,944.83 9,861,655.74 4,412.37

TOTAL OF PART F 7,843,933.94 1,568,786.79 470,636.04 2,039,422.83 9,883,356.78

PART G - MISCELLANEOUS STRUCTURES

Err:509 Err:509 Err:509 Err:509 Err:509 12% 8% 20% Err:509 Err:509 Err:509 Err:509 Err:509

Err:509 Err:509 Err:509 Err:509 Err:509 12% 8% 20% Err:509 Err:509 Err:509 Err:509 Err:509

TOTAL OF PART H Err:509 Err:509 Err:509 Err:509 Err:509

TOTAL Err:509 Err:509 Err:509 Err:509 Err:509


DETAILED UNIT PRICE ANALYSIS

Rehabilitation/Improvements of Flood Mitigation Structures and Drainage Systems, Improvements of Flood Control System, Cagayan River
Basin, K0544+557.50 - K0544+832.50, Gattaran Section, Cagayan

Gattaran, Cagayan

Item No. : A.1.3 (1) Quantity = 12.03


Description : Unit = Month
Provision of Field Office Staff for the Assistance to the
Engineer

A. Name and Capacity of Equipment (Operated) No. of Units No. of Months Monthly Rate Total Cost (Pesos)

P P
-

A. SUB-TOTAL, EQUIPMENT P -

B. Designation Personnel No. of Men No. of Hours Unit Rate/Hour Total Cost (Pesos)

Skilled Labor 1.00 2,888.00 58.76 169,698.88

B. SUB-TOTAL, LABOR P 169,698.88

C. Name and Description Qty Unit Unit Price Total Cost (Pesos)

C. SUB-TOTAL, MATERIALS P -

SUMMARY:
A Equipment P -
B Labor 169,698.88
C Materials -
D TOTAL DIRECT COST P 169,698.88
DIRECT UNIT COST 169,698.88
E OCM 0% of D -
F Profit 8% of D 13,575.91
G VAT 5% of (D+E+F) 9,163.74
H Total Cost (D+E+F+G) 192,438.53
I Unit Cost H/Quantity P 192,438.53
DETAILED UNIT PRICE ANALYSIS

Rehabilitation/Improvements of Flood Mitigation Structures and Drainage Systems, Improvements of Flood Control System, Cagayan River Basin,
K0544+557.50 - K0544+832.50, Gattaran Section, Cagayan

Gattaran, Cagayan

Item No. : A.1.4 (1) Quantity = 12.03


Description : Unit = Month
Provision of Progress Photographs (Consumable only)

A. Name and Capacity of Equipment (Operated) No. of Units No. of Months Monthly Rate Total Cost (Pesos)

Digital Camera 1.00 l.s. P 15,000.00 P 15,000.00


14.1 Megapixel
4x Optical Zoom
Smat Auto Shooting Mode
Digi 4 Image Processor
Optical Image Stabilizer

(To be provided during mobilization and to be turned


over to DPWH-Regional Office upon completion of
the project)
-

A. SUB-TOTAL, EQUIPMENT P 15,000.00

B. Designation Personnel No. of Men No. of Hours Unit Rate/Hour Total Cost (Pesos)

B. SUB-TOTAL, LABOR P

C. Name and Description Qty Unit Unit Price Total Cost (Pesos)

Printing(in Photo paper), 5R 500.00 pcs. P 12.00 P 6,000.00


Magic Photo Album 2.00 pcs. 650.00 1,300.00
Note: Photo Albums to be provided during mobilization

C. SUB-TOTAL, MATERIALS P 7,300.00

SUMMARY:
A Equipment P 15,000.00
B Labor -
C Materials 7,300.00
D TOTAL DIRECT COST P 22,300.00
DIRECT UNIT COST 22,300.00
E OCM 0% of D -
F Profit 8% of D 1,784.00
G VAT 5% of (D+E+F) 1,204.20
H Total Cost (D+E+F+G) 25,288.20
I Unit Cost H/Quantity P 25,288.20
DETAILED UNIT PRICE ANALYSIS

Rehabilitation/Improvements of Flood Mitigation Structures and Drainage Systems, Improvements of Flood Control System, Cagayan River
Basin, K0544+557.50 - K0544+832.50, Gattaran Section, Cagayan

Gattaran, Cagayan

Item No. : A.1.1 (11) Quantity = ALL


Description : Unit = L.S.
Provision of Furnitures/Fixtures, Equipment & Appliances
for the Field Office for the Engineer

A. Name and Capacity of Equipment (Operated) No. of Units No. of Months Monthly Rate Total Cost (Pesos)

P P
-

A. SUB-TOTAL, EQUIPMENT P -

B. Designation Personnel No. of Men No. of Hours Unit Rate/Hour Total Cost (Pesos)

B. SUB-TOTAL, LABOR P

C. Name and Description Qty Unit Unit Price Total Cost (Pesos)

Office Table with Chair 1.00 set P 6,000.00 P 6,000.00


4 Seater Plastic Dinning Set 1.00 set 3,500.00 3,500.00
Plastic Chairs 5.00 pcs. 500.00 2,500.00
Double Deck Bed (Solid Wood, fits 36"x 75"mattress) 2.00 set 8,500.00 17,000.00
Mattress Foam ( 4 x 36 x 75 inch.) 4.00 set 3,500.00 14,000.00
Pillows (4 x 12 x 20 inch.) 4.00 pcs. 300.00 1,200.00
Bed Sheets & Blankets 4.00 set 400.00 1,600.00
Aircon, (1.5 HP, Remote) (14.8 x 22 x 25.8 inches) 1.00 set 26,000.00 26,000.00
Water Dispenser (Hot and Cold) 1.00 set 6,000.00 6,000.00
Refrigerator (1.8 cu.ft.) 1.00 set 5,000.00 5,000.00
2 Gas Burners Gas stove (80 x 700 x 370 mm) 1.00 set 3,000.00 3,000.00
Misc. kitchen utensils l.s. 6,000.00 6,000.00

C. SUB-TOTAL, MATERIALS P 91,800.00

SUMMARY:
A Equipment P -
B Labor -
C Materials 91,800.00
D TOTAL DIRECT COST P 91,800.00
DIRECT UNIT COST 91,800.00
E OCM 0% of D -
F Profit 8% of D 7,344.00
G VAT 5% of (D+E+F) 4,957.20
H Total Cost (D+E+F+G) 104,101.20
I Unit Cost H/Quantity P 104,101.20
DETAILED UNIT PRICE ANALYSIS

CONCRETING OF KATUNGAWAN ROAD

Brgy. Buyun, Sta. Teresita, Cagayan

Item No. : A.1.1 (6) Quantity = 6.00


Description : Unit = month
Provision of Combined Field Office, Laboratory and
Living Quarters Building for the Engineer (Rental
Basis)

A. Name and Capacity of Equipment (Operated) No. of Units No. of Months Monthly Rate Total Cost (Pesos)

P P
-

A. SUB-TOTAL, EQUIPMENT P -

B. Designation Personnel No. of Men No. of Hours Unit Rate/Hour Total Cost (Pesos)

B. SUB-TOTAL, LABOR P

C. Name and Description Qty Unit Unit Price Total Cost (Pesos)

House Rental 6.00 month P 2,500.00 P 15,000.00

C. SUB-TOTAL, MATERIALS P 15,000.00

SUMMARY:
A Equipment P -
B Labor -
C Materials 15,000.00
D TOTAL DIRECT COST P 15,000.00
DIRECT UNIT COST 15,000.00
E OCM 0% of D -
F Profit 8% of D 1,200.00
G VAT 5% of (D+E+F) 810.00
H Total Cost (D+E+F+G) 17,010.00
I Unit Cost H/Quantity P 17,010.00
DETAILED UNIT PRICE ANALYSIS

CONCRETING OF KATUNGAWAN ROAD

Brgy. Buyun, Sta. Teresita, Cagayan

Item No. : A.1.1 (11) Quantity = ALL


Description : Unit = L.S.
Provision of Furnitures/Fixtures, Equipment & Appliances
for the Field Office for the Engineer

A. Name and Capacity of Equipment (Operated) No. of Units No. of Months Monthly Rate Total Cost (Pesos)

P P
-

A. SUB-TOTAL, EQUIPMENT P -

B. Designation Personnel No. of Men No. of Hours Unit Rate/Hour Total Cost (Pesos)

B. SUB-TOTAL, LABOR P

C. Name and Description Qty Unit Unit Price Total Cost (Pesos)

Office Table with Chair 2.00 set P 6,000.00 P 12,000.00


4 Seater Plastic Dinning Set 1.00 set 3,500.00 3,500.00
Plastic Chairs 6.00 pcs. 500.00 3,000.00
Double Deck Bed (Solid Wood, fits 36"x 75"mattress) 2.00 set 8,500.00 17,000.00
Mattress Foam ( 4 x 36 x 75 inch.) 2.00 set 3,500.00 7,000.00
Pillows (4 x 12 x 20 inch.) 4.00 pcs. 300.00 1,200.00
Bed Sheets & Blankets 4.00 set 400.00 1,600.00
Aircon, (1.5 HP, Remote) (14.8 x 22 x 25.8 inches) 1.00 set 26,000.00 26,000.00
Water Dispenser (Hot and Cold) 1.00 set 6,000.00 6,000.00
Refrigerator (1.8 cu.ft.) 1.00 set 5,000.00 5,000.00
2 Gas Burners Gas stove (80 x 700 x 370 mm) 1.00 set 3,000.00 3,000.00
Misc. kitchen utensils l.s. 5,000.00 5,000.00

C. SUB-TOTAL, MATERIALS P 90,300.00

SUMMARY:
A Equipment P -
B Labor -
C Materials 90,300.00
D TOTAL DIRECT COST P 90,300.00
DIRECT UNIT COST 90,300.00
E OCM 0% of D -
F Profit 8% of D 7,224.00
G VAT 5% of (D+E+F) 4,876.20
H Total Cost (D+E+F+G) 102,400.20
I Unit Cost H/Quantity P 102,400.20
DETAILED UNIT PRICE ANALYSIS

CONCRETING OF KATUNGAWAN ROAD

Brgy. Buyun, Sta. Teresita, Cagayan

Item No. : A.1.1 (14) Quantity = ALL


Description : PROVISION OF LABORATORY TESTING Unit = LUMPSUM

A. Name and Capacity of Equipment (Operated) No. of Units No. of Months Monthly Rate Total Cost (Pesos)

P P
-

A. SUB-TOTAL, EQUIPMENT P -

B. Designation Personnel No. of Men No. of Hours Unit Rate/Hour Total Cost (Pesos)

B. SUB-TOTAL, LABOR P

C. Name and Description Qty Unit Unit Price Total Cost (Pesos)

MATERIAL TESTING ALL LUMPSUM P 5,359.43 P -


SAMPLING ALL LUMPSUM 2,500.00 -
ACTUAL TESTING ALL LUMPSUM 7,675.22 -

C. SUB-TOTAL, MATERIALS P -

SUMMARY:
A Equipment P -
B Labor -
C Materials -
D TOTAL DIRECT COST P -
DIRECT UNIT COST -
E OCM 0% of D -
F Profit 8% of D -
G VAT 5% of (D+E+F) -
H Total Cost (D+E+F+G) -
I Unit Cost H/Quantity P -
DETAILED UNIT PRICE ANALYSIS

CONCRETING OF KATUNGAWAN ROAD

Brgy. Buyun, Sta. Teresita, Cagayan

Item No. : A.1.1 (15) Quantity = 6.00


Description : Unit = Month
Operation & Maintenance of Field Office, Laboratory and
Living Quarters Building for the Engineer

A. Name and Capacity of Equipment (Operated) No. of Units No. of Months Monthly Rate Total Cost (Pesos)

P P
-

A. SUB-TOTAL, EQUIPMENT P -

B. Designation Personnel No. of Men No. of Hours Unit Rate/Hour Total Cost (Pesos)

B. SUB-TOTAL, LABOR P

C. Name and Description Qty Unit Unit Price Total Cost (Pesos)

Electric Bill 6.00 mo. P 2,000.00 P 12,000.00


Water Bill 6.00 mo. 1,000.00 6,000.00
LPG (11 kgs) 6.00 mo. 600.00 3,600.00

C. SUB-TOTAL, MATERIALS P 21,600.00

SUMMARY:
A Equipment P -
B Labor -
C Materials 21,600.00
D TOTAL DIRECT COST P 21,600.00
DIRECT UNIT COST 21,600.00
E OCM 0% of D -
F Profit 8% of D 1,728.00
G VAT 5% of (D+E+F) 1,166.40
H Total Cost (D+E+F+G) 24,494.40
I Unit Cost H/Quantity P 4,082.40
DETAILED UNIT PRICE ANALYSIS

CONCRETING OF KATUNGAWAN ROAD

Brgy. Buyun, Sta. Teresita, Cagayan

Item No. : A.1.2 (1) Quantity = 2.00


Description : Unit = Each
Provision of 4x4 Pick Up Type Service Vehicle for the
Engineer (Rent-to-own Basis)

A. Name and Capacity of Equipment (Operated) No. of Units No. of Months Monthly Rate Total Cost (Pesos)

4x4 Pick Up Type Service Vehicle 2.00 6.00 P 280,833.33 P 3,370,000.00


( HILUX 2.8 G DSL A/T or its equivalent) -
Rent-to-own Basis
A. SUB-TOTAL, EQUIPMENT P 3,370,000.00

B. Designation Personnel No. of Men No. of Hours Unit Rate/Hour Total Cost (Pesos)

B. SUB-TOTAL, LABOR P

C. Name and Description Qty Unit Unit Price Total Cost (Pesos)

Comprehensive Insurance 2.00 each P 95,000.00 P 190,000.00


LTO Registration 2.00 each 10,500.00 21,000.00

C. SUB-TOTAL, MATERIALS P 211,000.00

SUMMARY:
A Equipment P 3,370,000.00
B Labor -
C Materials 211,000.00
D TOTAL DIRECT COST P 3,581,000.00
DIRECT UNIT COST 3,581,000.00
E OCM 0% of D -
F Profit 0% of D -
G VAT 5% of (D+E+F) 179,050.00
H Total Cost (D+E+F+G) 3,760,050.00
I Unit Cost H/Quantity P 1,880,025.00
DETAILED UNIT PRICE ANALYSIS

CONCRETING OF KATUNGAWAN ROAD

Brgy. Buyun, Sta. Teresita, Cagayan

Item No. : A.1.2 (5) Quantity = 6.00


Description : Unit = Month
Operation and Maintenance of 4x4 Pick Up Type Service
Vehicle for the Engineer

A. Name and Capacity of Equipment (Operated) No. of Units No. of Months Monthly Rate Total Cost (Pesos)

P P
-

A. SUB-TOTAL, EQUIPMENT P -

B. Designation Personnel No. of Men No. of Hours Unit Rate/Hour Total Cost (Pesos)

B. SUB-TOTAL, LABOR P

C. Name and Description Qty Unit Unit Price Total Cost (Pesos)

Fuel, Oil, etc. (for 2 Vehicles) 6.00 month P 13,600.00 P 81,600.00

C. SUB-TOTAL, MATERIALS P 81,600.00

SUMMARY:
A Equipment P -
B Labor -
C Materials 81,600.00
D TOTAL DIRECT COST P 81,600.00
DIRECT UNIT COST 81,600.00
E OCM 0% of D -
F Profit 0% of D -
G VAT 5% of (D+E+F) 4,080.00
H Total Cost (D+E+F+G) 85,680.00
I Unit Cost H/Quantity P 14,280.00
DETAILED UNIT PRICE ANALYSIS

CONCRETING OF KATUNGAWAN ROAD

Brgy. Buyun, Sta. Teresita, Cagayan

Item No. : A.1.3 (1) Quantity = 6.00


Description : Unit = Month
Provision of Field Office Staff for the Assistance to the
Engineer

A. Name and Capacity of Equipment (Operated) No. of Units No. of Months Monthly Rate Total Cost (Pesos)

P P
-

A. SUB-TOTAL, EQUIPMENT P -

B. Designation Personnel No. of Men No. of Hours Unit Rate/Hour Total Cost (Pesos)

Skilled Labor 1.00 1,440.00 71.10 102,384.00

B. SUB-TOTAL, LABOR P 102,384.00

C. Name and Description Qty Unit Unit Price Total Cost (Pesos)

C. SUB-TOTAL, MATERIALS P -

SUMMARY:
A Equipment P -
B Labor 102,384.00
C Materials -
D TOTAL DIRECT COST P 102,384.00
DIRECT UNIT COST 102,384.00
E OCM 0% of D -
F Profit 8% of D 8,190.72
G VAT 5% of (D+E+F) 5,528.74
H Total Cost (D+E+F+G) 116,103.46
I Unit Cost H/Quantity P 19,350.58
DETAILED UNIT PRICE ANALYSIS

CONCRETING OF KATUNGAWAN ROAD

Brgy. Buyun, Sta. Teresita, Cagayan

Item No. : A.1.1 (8) Quantity = 6.00


Provision of Combined Field Office for the Engineer (Rental
Description : Basis) Unit = Month

A. Name and Capacity of Equipment (Operated) No. of Units No. of Months Monthly Rate Total Cost (Pesos)

A. SUB-TOTAL, EQUIPMENT P -

B. Designation Personnel No. of Men No. of Hours Unit Rate/Hour Total Cost (Pesos)

B. SUB-TOTAL, LABOR P -

C. Name and Description Qty Unit Unit Price Total Cost (Pesos)

House Rental 6.00 month P 5,000.00 P 30,000.00

C. SUB-TOTAL, MATERIALS P 30,000.00

SUMMARY:
A Equipment P -
B Labor -
C Materials 30,000.00
D TOTAL DIRECT COST P 30,000.00
DIRECT UNIT COST 5,000.00
E OCM 0% of D -
F Profit 8% of D 2,400.00
G VAT 5% of (D+E+F) 1,620.00
H Total Cost (D+E+F+G) 34,020.00
I Unit Cost H/Quantity P 5,670.00
DETAILED UNIT PRICE ANALYSIS

CONCRETING OF KATUNGAWAN ROAD

Brgy. Buyun, Sta. Teresita, Cagayan

Item No. : A.1.1 (11) Quantity = ALL


Description : Provision of Furnitures/Fixtures, Equipment & Appliances Unit = L.S.
for the Field Office for the Engineer

A. Name and Capacity of Equipment (Operated) No. of Units No. of Months Monthly Rate Total Cost (Pesos)

P P
-

A. SUB-TOTAL, EQUIPMENT P -

B. Designation Personnel No. of Men No. of Hours Unit Rate/Hour Total Cost (Pesos)

B. SUB-TOTAL, LABOR P

C. Name and Description Qty Unit Unit Price Total Cost (Pesos)

Office Table with Chair 1.00 set P 10,000.00 P 10,000.00


Plastic Chairs 6.00 pcs. 300.00 1,800.00
Stand Fan 2.00 set 1,500.00 3,000.00
Water Dispenser (Hot and Cold) 1.00 set 5,000.00 5,000.00
-

(To be provided during mobilization and to be turned over to


DPWH-CFDEO upon completion of the project)

C. SUB-TOTAL, MATERIALS P 19,800.00

SUMMARY:
A Equipment P -
B Labor -
C Materials 19,800.00
D TOTAL DIRECT COST P 19,800.00
DIRECT UNIT COST 19,800.00
E OCM 0% of D -
F Profit 8% of D 1,584.00
G VAT 5% of (D+E+F) 1,069.20
H Total Cost (D+E+F+G) 22,453.20
I Unit Cost H/Quantity P 22,453.20
DETAILED UNIT PRICE ANALYSIS

CONCRETING OF KATUNGAWAN ROAD

Brgy. Buyun, Sta. Teresita, Cagayan

Item No. : A.1.1 (16) Quantity = 6.00


Description : Unit = Month
Operation & Maintenance of Field Office for the Engineer

A. Name and Capacity of Equipment (Operated) No. of Units No. of Months Monthly Rate Total Cost (Pesos)

P P
-

A. SUB-TOTAL, EQUIPMENT P -

B. Designation Personnel No. of Men No. of Hours Unit Rate/Hour Total Cost (Pesos)

B. SUB-TOTAL, LABOR P

C. Name and Description Qty Unit Unit Price Total Cost (Pesos)

Electric Bill 6.00 mo. P 2,000.00 P 12,000.00


Water Bill 6.00 mo. 800.00 4,800.00

C. SUB-TOTAL, MATERIALS P 16,800.00

SUMMARY:
A Equipment P -
B Labor -
C Materials 16,800.00
D TOTAL DIRECT COST P 16,800.00
DIRECT UNIT COST 2,800.00
E OCM 0% of D -
F Profit 8% of D 1,344.00
G VAT 5% of (D+E+F) 907.20
H Total Cost (D+E+F+G) 19,051.20
I Unit Cost H/Quantity P 3,175.20
DETAILED UNIT PRICE ANALYSIS

CONCRETING OF KATUNGAWAN ROAD

Brgy. Buyun, Sta. Teresita, Cagayan

Item No. : A.1.3 (1) Quantity = 6.00


Description : Provision of Field Office Staff for the Assistance to the Unit = Month
Engineer

A. Name and Capacity of Equipment (Operated) No. of Units No. of Months Monthly Rate Total Cost (Pesos)

P P
-

A. SUB-TOTAL, EQUIPMENT P -

B. Designation Personnel No. of Men No. of Hours Unit Rate/Hour Total Cost (Pesos)

Skilled Labor 1.00 560.00 P 58.76 P 32,905.60

B. SUB-TOTAL, LABOR P 32,905.60

C. Name and Description Qty Unit Unit Price Total Cost (Pesos)

P P -

C. SUB-TOTAL, MATERIALS P -

SUMMARY:
A Equipment P -
B Labor 32,905.60
C Materials -
D TOTAL DIRECT COST P 32,905.60
DIRECT UNIT COST 5,484.27
E OCM 0% of D -
F Profit 8% of D 2,632.45
G VAT 5% of (D+E+F) 1,776.90
H Total Cost (D+E+F+G) 37,314.95
I Unit Cost H/Quantity P 6,219.16
DETAILED UNIT PRICE ANALYSIS

CONCRETING OF KATUNGAWAN ROAD

Brgy. Buyun, Sta. Teresita, Cagayan

Item No. : A.1.4 (1) Quantity = Err:509


Description : Provision of Progress Photographs Unit = EACH

A. Name and Capacity of Equipment (Operated) No. of Units No. of Months Monthly Rate Total Cost (Pesos)

1.00 l.s. P P -

A. SUB-TOTAL, EQUIPMENT P -

B. Designation Personnel No. of Men No. of Hours Unit Rate/Hour Total Cost (Pesos)

B. SUB-TOTAL, LABOR P

C. Name and Description Qty Unit Unit Price Total Cost (Pesos)

Printing(in Photo paper), 5R Err:509 pcs. P 12.00 P Err:509


Magic Photo Album 0.00 pcs. 650.00 -
Note: Photo Albums to be provided during mobilization

C. SUB-TOTAL, MATERIALS P Err:509

SUMMARY:
A Equipment P -
B Labor -
C Materials Err:509
D TOTAL DIRECT COST P Err:509
DIRECT UNIT COST Err:509
E OCM 0% of D Err:509
F Profit 8% of D Err:509
G VAT 5% of (D+E+F) Err:509
H Total Cost (D+E+F+G) Err:509
I Unit Cost H/Quantity P Err:509
DETAILED UNIT PRICE ANALYSIS

CONCRETING OF KATUNGAWAN ROAD

Brgy. Buyun, Sta. Teresita, Cagayan

Item No. : B.5 Quantity = 2.00


Description : Project Billboard / Signboard Unit = EACH

A. Name and Capacity of Equipment (Operated) No. of Units No. of Hours Hourly Rate Total Cost (Pesos)

Minor Tools, 10% of Labor P 289.44

A. SUB-TOTAL, EQUIPMENT P 289.44

B. Designation Personnel No. of Men No. of Hours Unit Rate/Hour Total Cost (Pesos)

Skilled Labor 1 16 P 71.10 P 1,137.60


Unskilled Labor 2 16 54.90 1,756.80

B. SUB-TOTAL, LABOR P 2,894.40

C. Name and Description Qty Unit Unit Price Total Cost (Pesos)

Tarpaulin 32.00 sq.ft. 25.00 800.00


Plywood, Marine, 1/2" x 4' x 8' 1.00 pcs. 750.00 750.00
Good Lumber 37.94 bd.ft. 40.00 1,517.60
CWN, Assorted 0.76 kgs. 90.00 68.40

C. SUB-TOTAL, MATERIALS P 3,136.00

SUMMARY:
A Equipment P 289.44
B Labor 2,894.40
C Materials 3,136.00
D TOTAL DIRECT COST P 6,319.84
DIRECT UNIT COST 3,159.92
E OCM 12% of D 758.38
F Profit 8% of D 505.59
G VAT 5% of (D+E+F) 379.19
H Total Cost (D+E+F+G) 7,963.00
I Unit Cost H/Quantity P 3,981.50
DETAILED UNIT PRICE ANALYSIS

CONCRETING OF KATUNGAWAN ROAD

Brgy. Buyun, Sta. Teresita, Cagayan

Item No. : B.7 (2) Quantity = ALL


Description : Occupational Safety & Health Program Unit = LUMPSUM

A. Name and Capacity of Equipment (Operated) No. of Units No. of Hours Hourly Rate Total Cost (Pesos)

A. SUB-TOTAL, EQUIPMENT P -

B. Designation Personnel No. of Men No. of Days Unit Rate/Day Total Cost (Pesos)

First Aider, Part Time 1.00 24.00 P 500.00 P 12,000.00

B. SUB-TOTAL, LABOR P 12,000.00

C. Name and Description Qty Unit Unit Price Total Cost (Pesos)

Basic PPE
Safety Helmet 6.50 8.00 pcs. 500.00 4,000.00
Safety Shoes 6.50 8.00 pair 1,200.00 9,600.00
Safety Gloves (denim) 6.50 8.00 pair 100.00 800.00

Specialized PPE
Rubber Boots 6.50 8.00 pair 350.00 2,800.00
Safety Vest 6.50 8.00 pcs. 150.00 1,200.00

First Aide Kit / Medicine L.S. 1,500.00

C. SUB-TOTAL, MATERIALS P 19,900.00

SUMMARY:
A Equipment P -
B Labor 12,000.00
C Materials 19,900.00
D TOTAL DIRECT COST P 31,900.00
DIRECT UNIT COST 31,900.00
E OCM 0% of D -
F Profit 8% of D 2,552.00
G VAT 5% of (D+E+F) 1,722.60
H Total Cost (D+E+F+G) 36,174.60
I Unit Cost H/Quantity P 36,174.60
DETAILED UNIT PRICE ANALYSIS

CONCRETING OF KATUNGAWAN ROAD

Brgy. Buyun, Sta. Teresita, Cagayan

Item No. : B.8 (2) Quantity = ALL


Description : Traffic Management Unit = LUMPSUM
(Provision of Warning /Traffic Signages and Devices)

A. Name and Capacity of Equipment (Operated) No. of Units No. of Hours Hourly Rate Total Cost (Pesos)

Cargo Truck 1.00 2.00 783.00 1,566.00

A. SUB-TOTAL, EQUIPMENT P 1,566.00

B. Designation Personnel No. of Men No. of Hours Unit Rate/Hour Total Cost (Pesos)

Flagman 2.00 2.00 720.00 54.90 79,056.00

B. SUB-TOTAL, LABOR P 79,056.00

C. Name and Description Qty Unit Unit Price Total Cost (Pesos)
No of Sets

Bollards 2"Ø PE Pipe x 0.75m provided w/ 3 pcs- 2" Reflectorized white 1 20.00 pcs. 150.00 3,000.00
w/ sticker mounted on concrete base) spaced at 5 o.c.

Plastic Strip ( Yellow ) Printed w/ Caution (300m/roll) 0.5 1.00 roll 1,150.00 1,150.00

Plastic Cones w/ Reflectorized White Sticker 2 5.00 pcs. 350.00 1,750.00

Standard Plastic Barrier (Orange) w/ Four (4) Reflectorized Arrow Sign 1 2.00 pcs. 7,500.00 15,000.00

Roadwork Sign ( Aluminum sheet with Frame and Stand ) 1 2.00 pcs. 1,500.00 3,000.00

C. SUB-TOTAL, MATERIALS P 23,900.00

SUMMARY:
A Equipment P 1,566.00
B Labor 79,056.00
C Materials 23,900.00
D TOTAL DIRECT COST P 104,522.00
DIRECT UNIT COST 104,522.00
E OCM 0% of D -
F Profit 8% of D 8,361.76
G VAT 5% of (D+E+F) 5,644.19
H Total Cost (D+E+F+G) 118,527.95
I Unit Cost H/Quantity P 118,527.95
DETAILED UNIT PRICE ANALYSIS

CONCRETING OF KATUNGAWAN ROAD

Brgy. Buyun, Sta. Teresita, Cagayan

Item No. : B.9 Quantity = ALL


Description : Mobilization / Demobilization Unit = LUMPSUM

A. Name and Capacity of Equipment (Operated) No. of Units No. of Hours Hourly Rate Total Cost (Pesos)

1% OF Total Direct Cost of Civil Works 187,933.30

A. SUB-TOTAL, EQUIPMENT P 187,933.30

B. Designation Personnel No. of Men No. of Hours Unit Rate/Hour Total Cost (Pesos)

B. SUB-TOTAL, LABOR P

C. Name and Description Qty Unit Unit Price Total Cost (Pesos)
-
-
C. SUB-TOTAL, MATERIALS P -

SUMMARY:
A Equipment P 187,933.30
B Labor -
C Materials -
D TOTAL DIRECT COST P 187,933.30
DIRECT UNIT COST 187,933.30
E OCM 0% of D -
F Profit 0% of D -
G VAT 5% of (D+E+F) 9,396.67
H Total Cost (D+E+F+G) 197,329.97
I Unit Cost H/Quantity P 197,329.97
DETAILED UNIT PRICE ANALYSIS

CONCRETING OF KATUNGAWAN ROAD

Brgy. Buyun, Sta. Teresita, Cagayan

Item No. : B.13 Quantity = ALL


Description : Additional Geotechnical Investigation Unit = L.S

No. of Boreholes: 1.00 each

A Name and Capacity of Equipment (Operated) No. of Units No. of Hours Unit Rate/Hour Total Cost (Pesos)
A. Equipment

For Ordinary Soil ( N Value is less than 60 blows)


On shore
Total Length : 20.00 ln.m.
Output : 10 m/day
No. Of Hours : 8 hours

Drilling Machine with Accessories 1 8.00 653.25 5,226.00


Split spoon Sampler, Hammer, Water Pump 1 8.00 334.50 2,676.00
Double Tube Core barrel 1
Service Vehicle (for Shipment of Samples) 1 8.00 340.58 2,724.64
Boom Truck 0.5 1 4.00 961.20 3,844.80

For Hard Strata ( N Value is less than 60 blows)


On shore
Total Length : 10.00 ln.m.
Output : 9 m/day
No. Of Hours : 4.445 hours

Drilling Machine with Accessories 1 4.45 653.25 2,903.70


Split spoon sampler, Hammer, Water Pump 1 4.45 334.50 1,486.85
Double Tube Core barrel 1
Service Vehicle (for Shipment of Samples) 1 4.45 340.58 1,513.88

A. SUB-TOTAL , EQUIPMENT P 20,375.87

B Designation of Personnel No. of Men No. of Hours Unit Rate/Hour Total Cost (Pesos)

For Ordinary Soil ( N Value is less than 60 blows)


On shore
Total Length : 20 ln.m.
Output : 10 m/day
No. Of Hours : 8 hours

Geotechnical/Materials Engineer 1 8 1,300.00 10,400.00


Core Driller II 1 8 400.00 3,200.00
Drilling Aides 4 8 320.00 10,240.00

For Hard Strata ( N Value is less than 60 blows)


On shore
Total Length : 10 ln.m.
Output : 9 m/day
No. Of Hours : 4.445 hours

Geotechnical/Materials Engineer 1 4.45 1,300.00 5,778.50


Core Driller II 1 4.45 400.00 1,778.00
Drilling Aides 4 4.45 320.00 5,689.60

B. SUB-TOTAL, LABOR P 37,086.10

C. Name and Description Qty Unit Unit Cost Total Cost (Pesos)

Laboratory Testing and Report Preparation


a. Testing (M.C., Grading, Plasticity, Sp. Gravity, Hydrometer/ 14 set P 2,200.00 P 30,800.00
Grain Size Analysis
b. Triaxial tests (1 Set per BH, includes Consolidated-Undrained 1 set 6,800.00 6,800.00
with Pore Pressure Measurement (PPM) and
Unconsolidated undrained Tests)
c. Geotechnical Analysis with Recommendation L.S. 3,076.06 3,076.06
d. Ring Bounded reports on A4 Bond Paper with attached 1 set 6,800.00 6,800.00
Test reports, Sub-soil Profile and Pictures (With Soft Copy)

C. SUB-TOTAL, MATERIAL P 47,476.06

SUMMARY:
A Equipment P 20,375.87
B Labor 37,086.10
C Materials 47,476.06
D TOTAL ESTIMATED DIRECT COST (A+B+C) 104,938.04
ESTIMATED DIRECT UNIT COST D/Quantity 104,938.04
E OCM 0% of D -
F PROFIT 0% of D -
G VAT 5% (D+E+F) 5,246.90
H Total Cost (D+E+F+G) 110,184.94
I UNIT COST (H/Quantity) P 110,184.94
DETAILED UNIT PRICE ANALYSIS

CONCRETING OF KATUNGAWAN ROAD

Brgy. Buyun, Sta. Teresita, Cagayan

Item No. : B.14 Quantity = 6.00


Description : Environmental Management & Monitoring Unit = MONTH

A. Name and Capacity of Equipment (Operated) No. of Units No. of Hours Hourly Rate Total Cost (Pesos)

A. SUB-TOTAL, EQUIPMENT P -

B. Designation Personnel No. of Men No. of Hours Unit Rate/Hour Total Cost (Pesos)

B. SUB-TOTAL, LABOR P -

C. Name and Description Qty Unit Unit Price Total Cost (Pesos)

For the conduct of Environmental Impact ALL L.S. 1,500.00 1,500.00


Assessment & for the Issuance of Environmental
Certificates - Certificate of Non-Compliance (CNC)
/ Environmental Compliance Certificate (ECC)

C. SUB-TOTAL, MATERIALS P 1,500.00

SUMMARY:
A Equipment P -
B Labor -
C Materials 1,500.00
D TOTAL DIRECT COST P 1,500.00
DIRECT UNIT COST 250.00
E OCM 0% of D -
F Profit 8% of D 120.00
G VAT 5% of (D+E+F) 81.00
H Total Cost (D+E+F+G) 1,701.00
I Unit Cost H/Quantity P 283.50
DETAILED UNIT PRICE ANALYSIS

CONCRETING OF KATUNGAWAN ROAD

Brgy. Buyun, Sta. Teresita, Cagayan

Item No. : 1702 (1) a Quantity = #N/A


Description : Unit = #N/A
#N/A

Production Output : = 0.25 cu.m.-man/hour


Employ : = 30.00 man
No. of Hours : = #N/A hours say #N/A hours
No. of Days : = #N/A days

A. Name and Capacity of Equipment (Operated) No. of Units No. of Hours Hourly Rate Total Cost (Pesos)

Minor Tools, 10% of Labor #N/A

A. SUB-TOTAL, EQUIPMENT P #N/A

B. Designation Personnel No. of Men No. of Hours Unit Rate/Hour Total Cost (Pesos)

Foreman 1.00 #N/A P 98.09 P #N/A


Unskilled Labor 30.00 #N/A 54.90 #N/A

B. SUB-TOTAL, LABOR P #N/A

C. Name and Description Qty Unit Unit Price Total Cost (Pesos)

C. SUB-TOTAL, MATERIALS P

SUMMARY:
A Equipment P #N/A
B Labor #N/A
C Materials -
D TOTAL DIRECT COST P #N/A
DIRECT UNIT COST #N/A
E OCM 15% of D #N/A
F Profit 10% of D #N/A
G VAT 5% of (D+E+F) #N/A
H Total Cost (D+E+F+G) #N/A
I Unit Cost H/Quantity P #N/A
DETAILED UNIT PRICE ANALYSIS

CONCRETING OF KATUNGAWAN ROAD

Brgy. Buyun, Sta. Teresita, Cagayan

Item No. : 1702 (3) Quantity = #N/A


Description : #N/A Unit = #N/A

Production Output : = 1.25 cu.m./hr.


No. of Hours : = #N/A hours say #N/A hours
No. of Days : = #N/A days

A. Name and Capacity of Equipment (Operated) No. of Units No. of Hours Hourly Rate Total Cost (Pesos)
Factor
Plate Compactor (5 hp) 1 1.00 #N/A 123.00 #N/A
Water Truck/Pump (16000 L) 0.01 1.00 #N/A 2,450.00 #N/A
Minor Tools (10% of Labor) #N/A

A. SUB-TOTAL, EQUIPMENT P #N/A

B. Designation Personnel No. of Men No. of Hours Unit Rate/Hour Total Cost (Pesos)

Foreman 1 1.00 #N/A P 98.09 P #N/A


Unskilled Labor 1 4.00 #N/A 54.90 #N/A

B. SUB-TOTAL, LABOR P #N/A

C. Name and Description Qty Unit Unit Price Total Cost (Pesos)
Factor
Filling Materials 1.15 #N/A cu.m 711.28 #N/A

C. SUB-TOTAL, MATERIALS P #N/A

SUMMARY:
A Equipment P #N/A
B Labor #N/A
C Materials #N/A
D TOTAL DIRECT COST P #N/A
DIRECT UNIT COST #N/A
E OCM 15% of D #N/A
F Profit 10% of D #N/A
G VAT 5% of (D+E+F) #N/A
H Total Cost (D+E+F+G) #N/A
I Unit Cost H/Quantity P #N/A
DETAILED UNIT PRICE ANALYSIS

CONCRETING OF KATUNGAWAN ROAD

Brgy. Buyun, Sta. Teresita, Cagayan

Item No. : 1702 (6) Quantity = #N/A


Description : #N/A Unit = #N/A

Production Output : = 20 cu.m./hr.


No. of Hours : = #N/A hours say #N/A hours
No. of Days : = #N/A days

A. Name and Capacity of Equipment (Operated) No. of Units No. of Hours Hourly Rate Total Cost (Pesos)
Factor
Dumptruck(12 yd ) ᵌ 1 2.00 #N/A 1,420.00 #N/A
Backhoe (0.80 cu.m) 1 1.00 #N/A 1,537.00 #N/A
Minor Tools (10% of Labor) #N/A

A. SUB-TOTAL, EQUIPMENT P #N/A

B. Designation Personnel No. of Men No. of Hours Unit Rate/Hour Total Cost (Pesos)

Foreman 1 1.00 #N/A P 98.09 P #N/A


Unskilled Labor 1 3.00 #N/A 54.90 #N/A

B. SUB-TOTAL, LABOR P #N/A

C. Name and Description Qty Unit Unit Price Total Cost (Pesos)

C. SUB-TOTAL, MATERIALS P -

SUMMARY:
A Equipment P #N/A
B Labor #N/A
C Materials -
D TOTAL DIRECT COST P #N/A
DIRECT UNIT COST #N/A
E OCM 15% of D #N/A
F Profit 10% of D #N/A
G VAT 5% of (D+E+F) #N/A
H Total Cost (D+E+F+G) #N/A
I Unit Cost H/Quantity P #N/A
DETAILED UNIT PRICE ANALYSIS

CONCRETING OF KATUNGAWAN ROAD

Brgy. Buyun, Sta. Teresita, Cagayan

Item No. : 1704 (1) Quantity = #N/A


Description : #N/A Unit = #N/A

Production Output : = 50 cu.m./hr.


No. of Hours : = #N/A hours say #N/A hours
No. of Days : = #N/A days

A. Name and Capacity of Equipment (Operated) No. of Units No. of Hours Hourly Rate Total Cost (Pesos)
Factor
Motorized Grader, 6710A 1 1.00 #N/A P 2,173.00 P #N/A
Vibratory Roller(10 m.t.),SP56 1 1.00 #N/A 1,846.00 #N/A
Water Truck (16000 L) 0.25 1.00 #N/A 2,450.00 #N/A

A. SUB-TOTAL, EQUIPMENT P #N/A

B. Designation Personnel No. of Men No. of Hours Unit Rate/Hour Total Cost (Pesos)

Foreman 1.00 #N/A P 98.09 P #N/A


Unskilled Labor 2.00 #N/A 54.90 #N/A

B. SUB-TOTAL, LABOR P #N/A

C. Name and Description Qty Unit Unit Price Total Cost (Pesos)

Granular Fill 1.25 #N/A #N/A 711.28 #N/A


( with 25% Shrinkage Factor)

C. SUB-TOTAL, MATERIALS P #N/A

SUMMARY:
A Equipment P #N/A
B Labor #N/A
C Materials #N/A
D TOTAL DIRECT COST P #N/A
DIRECT UNIT COST #N/A
E OCM 15% of D #N/A
F Profit 10% of D #N/A
G VAT 5% of (D+E+F) #N/A
H Total Cost (D+E+F+G) #N/A
I Unit Cost H/Quantity P #N/A
DETAILED UNIT PRICE ANALYSIS

CONCRETING OF KATUNGAWAN ROAD

Brgy. Buyun, Sta. Teresita, Cagayan

Item No. : 1705 (1) Quantity = #N/A


Description : #N/A Unit = #N/A

Production Output : = 6.25 cu.m./hr. (3.125 cu.m/hr x 2)


Employ: = 20.000 man
No. of Hours : = #N/A hours say #N/A hours
No. of Days : = #N/A days

A. Name and Capacity of Equipment (Operated) No. of Units No. of Hours Hourly Rate Total Cost (Pesos)

Minor Tools, 10% of Labor #N/A

A. SUB-TOTAL, EQUIPMENT P #N/A

B. Designation Personnel No. of Men No. of Hours Unit Rate/Hour Total Cost (Pesos)

Foreman 1.00 #N/A P 98.09 P #N/A


Skilled Labor 4.00 #N/A 71.10 #N/A
Unskilled Labor 16.00 #N/A 54.90 #N/A

B. SUB-TOTAL, LABOR P #N/A

C. Name and Description Qty Unit Unit Price Total Cost (Pesos)

Boulders 1.05 #N/A cu.m. 947.30 #N/A

C. SUB-TOTAL, MATERIALS P #N/A

SUMMARY:
A Equipment P #N/A
B Labor #N/A
C Materials #N/A
D TOTAL DIRECT COST P #N/A
DIRECT UNIT COST #N/A
E OCM 15% of D #N/A
F Profit 10% of D #N/A
G VAT 5% of (D+E+F) #N/A
H Total Cost (D+E+F+G) #N/A
I Unit Cost H/Quantity P #N/A
DETAILED UNIT PRICE ANALYSIS

CONCRETING OF KATUNGAWAN ROAD

Brgy. Buyun, Sta. Teresita, Cagayan

Item No. : 1707 (1) Quantity = #N/A


Description : Unit = #N/A
#N/A
Production Output : = 50 cu.m./hr.
No. of Hours : = #N/A hours say #N/A hours
No. of Days : = #N/A days

A. Name and Capacity of Equipment (Operated) No. of Units No. of Hours Hourly Rate Total Cost (Pesos)
Factor
Motorized Grader, 6710A 1 1.00 #N/A P 2,173.00 P #N/A
Vibratory Roller(10 m.t.),SP56 1 1.00 #N/A 1,846.00 #N/A
Water Truck (16000 L) 0.25 1.00 #N/A 2,450.00 #N/A

A. SUB-TOTAL, EQUIPMENT P #N/A

B. Designation Personnel No. of Men No. of Hours Unit Rate/Hour Total Cost (Pesos)

Foreman 1.00 #N/A P 98.09 P #N/A


Unskilled Labor 2.00 #N/A 54.90 #N/A

B. SUB-TOTAL, LABOR P #N/A

C. Name and Description Qty Unit Unit Price Total Cost (Pesos)
Factor
Aggregate Subbase Course 1.15 #N/A cu.m 711.28 #N/A

C. SUB-TOTAL, MATERIALS P #N/A

SUMMARY:
A Equipment P #N/A
B Labor #N/A
C Materials #N/A
D TOTAL DIRECT COST P #N/A
DIRECT UNIT COST #N/A
E OCM 15% of D #N/A
F Profit 10% of D #N/A
G VAT 5% of (D+E+F) #N/A
H Total Cost (D+E+F+G) #N/A
I Unit Cost H/Quantity P #N/A
DETAILED UNIT PRICE ANALYSIS

CONCRETING OF KATUNGAWAN ROAD

Brgy. Buyun, Sta. Teresita, Cagayan

Item No. : Err:509 Quantity = Err:509

Description : Err:509 Unit = Err:509

Production Output : = 54 sq.m./hr.


No. of Hours : = Err:509 hours say Err:509 hours
No. of Days : = Err:509 days

A. Name and Capacity of Equipment (Operated) No. of Units No. of Hours Hourly Rate Total Cost (Pesos)
Factor
Backhoe w/ Pavement Breaker (0.80 cu.m) 1 1.00 Err:509 P 1,998.10 P Err:509
Payloader (1.50 cu.m.) 1 1.00 Err:509 1,733.00 Err:509
Dump Truck (12 cu.yd) 0.5 1.00 Err:509 1,420.00 Err:509
Minor Tools (10% of Labor) Err:509

A. SUB-TOTAL, EQUIPMENT P Err:509

B. Designation Personnel No. of Men No. of Hours Unit Rate/Hour Total Cost (Pesos)

Foreman 1.00 Err:509 P 98.09 P Err:509


Unskilled Labor 2.00 Err:509 54.90 Err:509

B. SUB-TOTAL, LABOR P Err:509

C. Name and Description Qty Unit Unit Price Total Cost (Pesos)

C. SUB-TOTAL, MATERIALS P -

SUMMARY:
A Equipment P Err:509
B Labor Err:509
C Materials -
D TOTAL DIRECT COST P Err:509
DIRECT UNIT COST Err:509
E OCM 15% of D Err:509
F Profit 10% of D Err:509
G VAT 5% of (D+E+F) Err:509
H Total Cost (D+E+F+G) Err:509
I Unit Cost H/Quantity P Err:509
DETAILED UNIT PRICE ANALYSIS
OO1: Ensure Safe and Reliable National Road System - Network Development - Construction of Missing Links/New Roads -
Construction of Concrete Road, Construction of Road Slope Protection Structure and ROW Acquisition - San Jose Quibal Road,
Cagayan
Brgy. San Jose, Baggao, Cagayan

Item No. : Err:509 Quantity = Err:509

Err:509 Err:509
Description : Unit =

Production Output : = 6.00 m./hr.


No. of Hours : = Err:509 hours say Err:509 hours
No. of Days : = Err:509 days

A. Name and Capacity of Equipment (Operated) No. of Units No. of Hours Hourly Rate Total Cost (Pesos)
Factor
Backhoe (0.80 cu.m) 1 1.00 Err:509 P 1,537.00 P Err:509
Boom Truck (2-5 mt) 0.5 1.00 Err:509 1,017.90 Err:509
Minor Tools (10% of Labor) Err:509

A. SUB-TOTAL, EQUIPMENT P Err:509

B. Designation Personnel No. of Men No. of Hours Unit Rate/Hour Total Cost (Pesos)

Foreman 1 1.00 Err:509 P 98.09 P Err:509


Unskilled Labor 1 2.00 Err:509 54.90 Err:509

B. SUB-TOTAL, LABOR P Err:509

C. Name and Description Qty Unit Unit Price Total Cost (Pesos)

C. SUB-TOTAL, MATERIALS P

SUMMARY:
A Equipment P Err:509
B Labor Err:509
C Materials -
D TOTAL DIRECT COST P Err:509
DIRECT UNIT COST Err:509
E OCM 12% of D Err:509
F Profit 8% of D Err:509
G VAT 5% of (D+E+F) Err:509
H Total Cost (D+E+F+G) Err:509
I Unit Cost H/Quantity P Err:509
DETAILED UNIT PRICE ANALYSIS

CONCRETING OF KATUNGAWAN ROAD

Brgy. Buyun, Sta. Teresita, Cagayan

Item No. : Err:509 Quantity = Err:509


Description : Unit = Err:509
Err:509
Production Output : = 4 ea./hr.
No. of Hours : = Err:509 hours say Err:509 hours
No. of Days : = Err:509 days

A. Name and Capacity of Equipment (Operated) No. of Units No. of Hours Hourly Rate Total Cost (Pesos)
Factor
Backhoe (0.80 cu.m) 1 1.00 Err:509 P 1,537.00 P Err:509
Boom Truck (2-5 mt) 0.5 1.00 Err:509 1,017.90 Err:509
Minor Tools (10% of Labor) Err:509

A. SUB-TOTAL, EQUIPMENT P Err:509

B. Designation Personnel No. of Men No. of Hours Unit Rate/Hour Total Cost (Pesos)

Foreman 1.00 Err:509 P 98.09 P Err:509


Unskilled Labor 2.00 Err:509 54.90 Err:509

B. SUB-TOTAL, LABOR P Err:509

C. Name and Description Qty Unit Unit Price Total Cost (Pesos)

C. SUB-TOTAL, MATERIALS P -

SUMMARY:
A Equipment P Err:509
B Labor Err:509
C Materials -
D TOTAL DIRECT COST P Err:509
DIRECT UNIT COST Err:509
E OCM 12% of D Err:509
F Profit 8% of D Err:509
G VAT 5% of (D+E+F) Err:509
H Total Cost (D+E+F+G) Err:509
I Unit Cost H/Quantity P Err:509
DETAILED UNIT PRICE ANALYSIS

CONCRETING OF KATUNGAWAN ROAD

Brgy. Buyun, Sta. Teresita, Cagayan

Item No. : Err:509 Quantity = Err:509

Description : Err:509 Unit = Err:509

Production Output : = 1 ea./hr.


No. of Hours : = Err:509 hours say Err:509 hours
No. of Days : = Err:509 days

A. Name and Capacity of Equipment (Operated) No. of Units No. of Hours Hourly Rate Total Cost (Pesos)
Factor
Backhoe (0.80 cu.m) 0.25 1.00 Err:509 P 1,537.00 P Err:509
Dump Truck (12 cu.yd) 0.17 1.00 Err:509 1,420.00 Err:509
Chainsaw 0.17 1.00 Err:509 75.36 Err:509
Minor Tools (5% of Labor) Err:509

A. SUB-TOTAL, EQUIPMENT P Err:509

B. Designation Personnel No. of Men No. of Hours Unit Rate/Hour Total Cost (Pesos)

Foreman 0.33 1.00 Err:509 P 98.09 P Err:509


Skilled Labor 0.33 1.00 Err:509 71.10 Err:509
Unskilled Labor 0.33 2.00 Err:509 54.90 Err:509

B. SUB-TOTAL, LABOR P Err:509

C. Name and Description Qty Unit Unit Price Total Cost (Pesos)

Rope, 1" Diameter - 5 Uses 20 Err:509 m 100.00 Err:509

C. SUB-TOTAL, MATERIALS P Err:509

SUMMARY:
A Equipment P Err:509
B Labor Err:509
C Materials Err:509
D TOTAL DIRECT COST P Err:509
DIRECT UNIT COST Err:509
E OCM 12% of D Err:509
F Profit 8% of D Err:509
G VAT 5% of (D+E+F) Err:509
H Total Cost (D+E+F+G) Err:509
I Unit Cost H/Quantity P Err:509
DETAILED UNIT PRICE ANALYSIS

CONCRETING OF KATUNGAWAN ROAD

Brgy. Buyun, Sta. Teresita, Cagayan

Item No. : Err:509 Quantity = Err:509


Description : Err:509 Unit = Err:509

Production Output : = 1 ea./hr.


No. of Hours : = Err:509 hours say Err:509 hours
No. of Days : = Err:509 days

A. Name and Capacity of Equipment (Operated) No. of Units No. of Hours Hourly Rate Total Cost (Pesos)
Factor
Backhoe (0.80 cu.m) 0.5 1.00 Err:509 P 1,537.00 P Err:509
Dump Truck (12 cu.yd) 0.33 1.00 Err:509 1,420.00 Err:509
Chainsaw 0.33 1.00 Err:509 75.36 Err:509
Minor Tools (5% of Labor) Err:509

A. SUB-TOTAL, EQUIPMENT P Err:509

B. Designation Personnel No. of Men No. of Hours Unit Rate/Hour Total Cost (Pesos)

Foreman 0.67 1.00 Err:509 P 98.09 P Err:509


Skilled Labor 0.67 1.00 Err:509 71.10 Err:509
Unskilled Labor 0.67 2.00 Err:509 54.90 Err:509

B. SUB-TOTAL, LABOR P Err:509

C. Name and Description Qty Unit Unit Price Total Cost (Pesos)

Rope, 1" Diameter - 5 Uses 20 Err:509 m 100.00 Err:509

C. SUB-TOTAL, MATERIALS P Err:509

SUMMARY:
A Equipment P Err:509
B Labor Err:509
C Materials Err:509
D TOTAL DIRECT COST P Err:509
DIRECT UNIT COST Err:509
E OCM 12% of D Err:509
F Profit 8% of D Err:509
G VAT 5% of (D+E+F) Err:509
H Total Cost (D+E+F+G) Err:509
I Unit Cost H/Quantity P Err:509
DETAILED UNIT PRICE ANALYSIS

CONCRETING OF KATUNGAWAN ROAD

Brgy. Buyun, Sta. Teresita, Cagayan

Item No. : 103(1)a Quantity = 1,589.00


Description : STRUCTURE EXCAVATION Unit = Cu.m.

Production Output : = 1 ea./hr.


No. of Hours : = 1,589.00 hours say 1589.00 hours
No. of Days : = 198.63 days

A. Name and Capacity of Equipment (Operated) No. of Units No. of Hours Hourly Rate Total Cost (Pesos)
Factor
Backhoe (0.80 cu.m) 2.5 1.00 3,972.50 P 1,537.00 P 6,105,732.50
Dump Truck (12 cu.yd) 1.67 1.00 2,653.63 1,420.00 3,768,154.60
Chainsaw 1.67 1.00 2,653.63 75.36 199,977.56
Minor Tools (10% of Labor) 73,811.97

A. SUB-TOTAL, EQUIPMENT P 10,147,676.63

B. Designation Personnel No. of Men No. of Hours Unit Rate/Hour Total Cost (Pesos)

Foreman 3.33 1.00 5,291.37 P 98.09 P 519,030.48


Skilled Labor 3.33 1.00 5,291.37 71.10 376,216.41
Unskilled Labor 3.33 2.00 5,291.37 54.90 580,992.43

B. SUB-TOTAL, LABOR P 1,476,239.32

C. Name and Description Qty Unit Unit Price Total Cost (Pesos)

Rope, 1" Diameter - 5 Uses 20 6,356.00 m 100.00 635,600.00

C. SUB-TOTAL, MATERIALS P 635,600.00

SUMMARY:
A Equipment P 10,147,676.63
B Labor 1,476,239.32
C Materials 635,600.00
D TOTAL DIRECT COST P 12,259,515.94
DIRECT UNIT COST 7,715.24
E OCM 12% of D 1,471,141.91
F Profit 8% of D 980,761.28
G VAT 5% of (D+E+F) 735,570.96
H Total Cost (D+E+F+G) 15,446,990.09
I Unit Cost H/Quantity P 9,721.20
DETAILED UNIT PRICE ANALYSIS

CONCRETING OF KATUNGAWAN ROAD

Brgy. Buyun, Sta. Teresita, Cagayan

Item No. : Err:509 Quantity = Err:509


Description : Err:509 Unit = Err:509

Production Output : = 1 ea./hr.


No. of Hours : = Err:509 hours say Err:509 hours
No. of Days : = Err:509 days

A. Name and Capacity of Equipment (Operated) No. of Units No. of Hours Hourly Rate Total Cost (Pesos)
Factor
Backhoe (0.80 cu.m) 5 1.00 Err:509 P 1,537.00 P Err:509
Dump Truck (12 cu.yd) 3.33 1.00 Err:509 1,420.00 Err:509
Chainsaw 3.33 1.00 Err:509 75.36 Err:509
Minor Tools (10% of Labor) Err:509

A. SUB-TOTAL, EQUIPMENT P Err:509

B. Designation Personnel No. of Men No. of Hours Unit Rate/Hour Total Cost (Pesos)

Foreman 6.67 1.00 Err:509 P 98.09 P Err:509


Skilled Labor 6.67 1.00 Err:509 71.10 Err:509
Unskilled Labor 6.67 2.00 Err:509 54.90 Err:509

B. SUB-TOTAL, LABOR P Err:509

C. Name and Description Qty Unit Unit Price Total Cost (Pesos)

Rope, 1" Diameter - 5 Uses 20 Err:509 m 100.00 Err:509

C. SUB-TOTAL, MATERIALS P Err:509

SUMMARY:
A Equipment P Err:509
B Labor Err:509
C Materials Err:509
D TOTAL DIRECT COST P Err:509
DIRECT UNIT COST Err:509
E OCM 12% of D Err:509
F Profit 8% of D Err:509
G VAT 5% of (D+E+F) Err:509
H Total Cost (D+E+F+G) Err:509
I Unit Cost H/Quantity P Err:509
DETAILED UNIT PRICE ANALYSIS

CONCRETING OF KATUNGAWAN ROAD

Brgy. Buyun, Sta. Teresita, Cagayan

Item No. : Err:509 Quantity = Err:509


Description : Err:509 Unit = Err:509

Production Output : = 1 ea./hr.


No. of Hours : = Err:509 hours say Err:509 hours
No. of Days : = Err:509 days

A. Name and Capacity of Equipment (Operated) No. of Units No. of Hours Hourly Rate Total Cost (Pesos)
Factor
Backhoe (0.80 cu.m) 0.25 1.00 Err:509 P 1,537.00 P Err:509
Dump Truck (12 cu.yd) 0.17 1.00 Err:509 1,420.00 Err:509
Chainsaw 0.17 1.00 Err:509 75.36 Err:509
Minor Tools (10% of Labor) Err:509

A. SUB-TOTAL, EQUIPMENT P Err:509

B. Designation Personnel No. of Men No. of Hours Unit Rate/Hour Total Cost (Pesos)

Foreman 1.00 Err:509 P 98.09 P Err:509


Skilled Labor 1.00 Err:509 71.10 Err:509
Unskilled Labor 2.00 Err:509 54.90 Err:509

B. SUB-TOTAL, LABOR P Err:509

C. Name and Description Qty Unit Unit Price Total Cost (Pesos)

Rope, 1" Diameter - 5 Uses 20 Err:509 m Err:509

C. SUB-TOTAL, MATERIALS P Err:509

SUMMARY:
A Equipment P Err:509
B Labor Err:509
C Materials Err:509
D TOTAL DIRECT COST P Err:509
DIRECT UNIT COST Err:509
E OCM 12% of D Err:509
F Profit 8% of D Err:509
G VAT 5% of (D+E+F) Err:509
H Total Cost (D+E+F+G) Err:509
I Unit Cost H/Quantity P Err:509
DETAILED UNIT PRICE ANALYSIS

CONCRETING OF KATUNGAWAN ROAD

Brgy. Buyun, Sta. Teresita, Cagayan

Item No. : Err:509 Quantity = Err:509


Description : Err:509 Unit = Err:509

Production Output : = 60 sq.m./hr.


No. of Hours : = Err:509 hours say Err:509 hours
No. of Days : = Err:509 days

A. Name and Capacity of Equipment (Operated) No. of Units No. of Hours Hourly Rate Total Cost (Pesos)
Factor
Motorized Road Grader w/ Scarifier, G710A 0.25 1.00 Err:509 P 2,173.00 P Err:509
Payloader (1.50 cu.m.), LX80-2C 0.17 1.00 Err:509 1,733.00 Err:509
Dump Truck (12 cu.yd.) 0.17 1.00 Err:509 1,420.00 Err:509
Minor Tools (10% of Labor) Err:509

A. SUB-TOTAL, EQUIPMENT P Err:509

B. Designation Personnel No. of Men No. of Hours Unit Rate/Hour Total Cost (Pesos)

Foreman 1.00 Err:509 P 98.09 P Err:509


Skilled Labor 2.00 Err:509 71.10 Err:509

B. SUB-TOTAL, LABOR P Err:509

C. Name and Description Qty Unit Unit Price Total Cost (Pesos)

C. SUB-TOTAL, MATERIALS P -

SUMMARY:
A Equipment P Err:509
B Labor Err:509
C Materials -
D TOTAL DIRECT COST P Err:509
DIRECT UNIT COST Err:509
E OCM 12% of D Err:509
F Profit 8% of D Err:509
G VAT 5% of (D+E+F) Err:509
H Total Cost (D+E+F+G) Err:509
I Unit Cost H/Quantity P Err:509
DETAILED UNIT PRICE ANALYSIS

CONCRETING OF KATUNGAWAN ROAD

Brgy. Buyun, Sta. Teresita, Cagayan

Item No. : Err:509 Quantity = Err:509


Description : Err:509 Unit = Err:509

Production Output : = 40 sq.m../hr.


No. of Hours : = Err:509 hours say Err:509 hours
No. of Days : = Err:509 days

A. Name and Capacity of Equipment (Operated) No. of Units No. of Hours Hourly Rate Total Cost (Pesos)
Factor
Backhoe w/ Pavement Breaker 1 1.00 Err:509 P 1,537.00 P Err:509
Dump Truck (12 cu.yd) 0.5 1.00 Err:509 1,420.00 Err:509
Payloader 1 1.00 Err:509 75.36 Err:509
Minor Tools (10% of Labor) Err:509

A. SUB-TOTAL, EQUIPMENT P Err:509

B. Designation Personnel No. of Men No. of Hours Unit Rate/Hour Total Cost (Pesos)

Foreman 1.00 Err:509 P 98.09 P Err:509


Skilled Labor 1.00 Err:509 71.10 Err:509
Unskilled Labor 2.00 Err:509 54.90 Err:509

B. SUB-TOTAL, LABOR P Err:509

C. Name and Description Qty Unit Unit Price Total Cost (Pesos)

Rope, 1" Diameter - 5 Uses 20 Err:509 m Err:509

C. SUB-TOTAL, MATERIALS P Err:509

SUMMARY:
A Equipment P Err:509
B Labor Err:509
C Materials Err:509
D TOTAL DIRECT COST P Err:509
DIRECT UNIT COST Err:509
E OCM 12% of D Err:509
F Profit 8% of D Err:509
G VAT 5% of (D+E+F) Err:509
H Total Cost (D+E+F+G) Err:509
I Unit Cost H/Quantity P Err:509
DETAILED UNIT PRICE ANALYSIS

CONCRETING OF KATUNGAWAN ROAD

Brgy. Buyun, Sta. Teresita, Cagayan

Item No. : Err:509 Quantity = Err:509


Description : Err:509 Unit = Err:509

Production Output : = 1 ea./hr.


No. of Hours : = Err:509 hours say Err:509 hours
No. of Days : = Err:509 days

A. Name and Capacity of Equipment (Operated) No. of Units No. of Hours Hourly Rate Total Cost (Pesos)
Factor
Backhoe (0.80 cu.m) 0.25 1.00 Err:509 P 1,537.00 P Err:509
Dump Truck (12 cu.yd) 0.17 1.00 Err:509 1,420.00 Err:509
Chainsaw 0.17 1.00 Err:509 75.36 Err:509
Minor Tools (10% of Labor) Err:509

A. SUB-TOTAL, EQUIPMENT P Err:509

B. Designation Personnel No. of Men No. of Hours Unit Rate/Hour Total Cost (Pesos)

Foreman 1.00 Err:509 P 98.09 P Err:509


Skilled Labor 1.00 Err:509 71.10 Err:509
Unskilled Labor 2.00 Err:509 54.90 Err:509

B. SUB-TOTAL, LABOR P Err:509

C. Name and Description Qty Unit Unit Price Total Cost (Pesos)

Rope, 1" Diameter - 5 Uses 20 Err:509 m Err:509

C. SUB-TOTAL, MATERIALS P Err:509

SUMMARY:
A Equipment P Err:509
B Labor Err:509
C Materials Err:509
D TOTAL DIRECT COST P Err:509
DIRECT UNIT COST Err:509
E OCM 12% of D Err:509
F Profit 8% of D Err:509
G VAT 5% of (D+E+F) Err:509
H Total Cost (D+E+F+G) Err:509
I Unit Cost H/Quantity P Err:509
DETAILED UNIT PRICE ANALYSIS

CONCRETING OF KATUNGAWAN ROAD

Brgy. Buyun, Sta. Teresita, Cagayan

Item No. : 103(1)a Quantity = 1,589.00


Description : STRUCTURE EXCAVATION Unit = Cu.m.

Production Output : = 60 cu.m./hr.


No. of Hours : = 26.48 hours say 26.50 hours
No. of Days : = 3.31 days

A. Name and Capacity of Equipment (Operated) No. of Units No. of Hours Hourly Rate Total Cost (Pesos)
Factor
Bulldozer, D6H SERIES II PSDS/DD 1 1.00 26.50 P 3,379.00 P 89,543.50
Payloader (1.50 cu.m.) 1 1.00 26.50 1,733.00 45,924.50
Payloader (1.50 cu.m.) - at disposal area 0.25 1.00 6.63 1,733.00 11,489.79
Dump Truck (12 cu.yd) 1 2.00 26.50 1,420.00 75,260.00

A. SUB-TOTAL, EQUIPMENT P 222,217.79

B. Designation Personnel No. of Men No. of Hours Unit Rate/Hour Total Cost (Pesos)

Foreman 1.00 26.50 P 98.09 P 2,599.39


Unskilled Labor 2.00 26.50 54.90 2,909.70

B. SUB-TOTAL, LABOR P 5,509.09

C. Name and Description Qty Unit Unit Price Total Cost (Pesos)

C. SUB-TOTAL, MATERIALS P -

SUMMARY:
A Equipment P 222,217.79
B Labor 5,509.09
C Materials -
D TOTAL DIRECT COST P 227,726.88
DIRECT UNIT COST 143.31
E OCM 12% of D 27,327.23
F Profit 8% of D 18,218.15
G VAT 5% of (D+E+F) 13,663.61
H Total Cost (D+E+F+G) 286,935.86
I Unit Cost H/Quantity P 180.58
DETAILED UNIT PRICE ANALYSIS

CONCRETING OF KATUNGAWAN ROAD


Brgy. Buyun, Sta. Teresita, Cagayan

Item No. : 101-2 Quantity = 6.00


Description : REMOVAL OF ACTUAL STRUCTURE/ OBSTRUCTION Unit = Each
(ELECTRICAL POST)
Production Output : = 8 each./hr.
No. of Hours : = 0.75 hours say 0.75 hours
No. of Days : = 0.09 days

A. Name and Capacity of Equipment (Operated) No. of Units No. of Hours Hourly Rate Total Cost (Pesos)
Factor
Backhoe with Pavement Breaker 0.5 1.00 0.38 P 2,074.95 P 788.48
Payloader (1.5 cu.m) 0.5 1.00 0.38 1,733.00 658.54
Dumptruck(10 cu.m) 0.125 1.00 0.09 1,352.00 121.68

A. SUB-TOTAL, EQUIPMENT P 1,568.70

B. Designation Personnel No. of Men No. of Hours Unit Rate/Hour Total Cost (Pesos)

Foreman 1.00 0.75 P 66.18 P 49.64


Unskilled Laborers 2.00 0.75 47.89 71.84
Unskilled Laborers 4.00 0.75 36.91 110.73

B. SUB-TOTAL, LABOR P 232.20

C. Name and Description Qty Unit Unit Price Total Cost (Pesos)

Electrical Post 6.00 Each 60,000.00 360,000.00

C. SUB-TOTAL, MATERIALS P 360,000.00

SUMMARY:
A Equipment P 1,568.70
B Labor 232.20
C Materials 360,000.00
D TOTAL DIRECT COST P 361,800.90
DIRECT UNIT COST 60,300.15
E OCM 9% of D 32,562.08
F Profit 8% of D 28,944.07
G VAT 12% of (D+E+F) 50,796.85
H Total Cost (D+E+F+G) 474,103.90
I Unit Cost H/Quantity P 79,017.32
DETAILED UNIT PRICE ANALYSIS

CONCRETING OF KATUNGAWAN ROAD

Brgy. Buyun, Sta. Teresita, Cagayan

Item No. : 103(1)a Quantity = 1,589.00


Description : STRUCTURE EXCAVATION Unit = Cu.m.

Production Output : = 20 cu.m./hr.


No. of Hours : = 79.45 hours say 79.50 hours
No. of Days : = 9.93 days

A. Name and Capacity of Equipment (Operated) No. of Units No. of Hours Hourly Rate Total Cost (Pesos)
Factor
Backhoe (0.80 cu.m) 1 1.00 79.50 P 1,537.00 P 122,191.50
Dump Truck (12 cu.yd) 1 2.00 79.50 1,420.00 225,780.00
Minor Tools (10% of Labor) 2,089.18

A. SUB-TOTAL, EQUIPMENT P 350,060.68

B. Designation Personnel No. of Men No. of Hours Unit Rate/Hour Total Cost (Pesos)

Foreman 1.00 79.50 P 98.09 P 7,798.16


Unskilled Labor 3.00 79.50 54.90 13,093.65

B. SUB-TOTAL, LABOR P 20,891.81

C. Name and Description Qty Unit Unit Price Total Cost (Pesos)

C. SUB-TOTAL, MATERIALS P -

SUMMARY:
A Equipment P 350,060.68
B Labor 20,891.81
C Materials -
D TOTAL DIRECT COST P 370,952.49
DIRECT UNIT COST 233.45
E OCM 12% of D 44,514.30
F Profit 8% of D 29,676.20
G VAT 5% of (D+E+F) 22,257.15
H Total Cost (D+E+F+G) 467,400.13
I Unit Cost H/Quantity P 294.15
DETAILED UNIT PRICE ANALYSIS

CONCRETING OF KATUNGAWAN ROAD

Brgy. Buyun, Sta. Teresita, Cagayan

Item No. : 103(3) Quantity = 2.00


Description : FOUNDATION FILL Unit = Cu.m.

Production Output : = 1.25 cu.m./hr.


No. of Hours : = 1.60 hours say 1.75 hours
No. of Days : = 0.20 days

A. Name and Capacity of Equipment (Operated) No. of Units No. of Hours Hourly Rate Total Cost (Pesos)
Factor
Plate Compactor (5 hp) 1 1.00 1.75 P 123.00 P 215.25
Water Truck/Pump (16000 L) 0.01 1.00 0.02 2,450.00 49.00
Minor Tools (10% of Labor) 55.60

A. SUB-TOTAL, EQUIPMENT P 319.85

B. Designation Personnel No. of Men No. of Hours Unit Rate/Hour Total Cost (Pesos)

Foreman 1.00 1.75 P 98.09 P 171.66


Unskilled Labor 4.00 1.75 54.90 384.30

B. SUB-TOTAL, LABOR P 555.96

C. Name and Description Qty Unit Unit Price Total Cost (Pesos)

Filling Materials 1.15 2.00 cu.m. 711.28 1,422.56

C. SUB-TOTAL, MATERIALS P 1,422.56

SUMMARY:
A Equipment P 319.85
B Labor 555.96
C Materials 1,422.56
D TOTAL DIRECT COST P 2,298.37
DIRECT UNIT COST 1,149.18
E OCM 12% of D 275.80
F Profit 8% of D 183.87
G VAT 5% of (D+E+F) 137.90
H Total Cost (D+E+F+G) 2,895.94
I Unit Cost H/Quantity P 1,447.97
DETAILED UNIT PRICE ANALYSIS

CONCRETING OF KATUNGAWAN ROAD

Brgy. Buyun, Sta. Teresita, Cagayan

Item No. : 103(6)a Quantity = 1.00

Description : PIPE CULVERT & DRAIN EXCAVATION Unit = Cu.m.

Production Output : = 20 cu.m./hr.


No. of Hours : = 0.05 hours say 0.25 hours
No. of Days : = 0.01 days

A. Name and Capacity of Equipment (Operated) No. of Units No. of Hours Hourly Rate Total Cost (Pesos)
Factor
Dump Truck (12 cu.yd) 1 2.00 0.25 P 1,420.00 P 710.00
Backhoe (0.80 cum.) 1 1.00 0.25 1,537.00 384.25
Minor Tools (10% of Labor) 6.57

A. SUB-TOTAL, EQUIPMENT P 1,100.82

B. Designation Personnel No. of Men No. of Hours Unit Rate/Hour Total Cost (Pesos)

Foreman 1.00 0.25 P 98.09 P 24.52


Unskilled Labor 3.00 0.25 54.90 41.18

B. SUB-TOTAL, LABOR P 65.70

C. Name and Description Qty Unit Unit Price Total Cost (Pesos)

C. SUB-TOTAL, MATERIALS P -

SUMMARY:
A Equipment P 1,100.82
B Labor 65.70
C Materials -
D TOTAL DIRECT COST P 1,166.52
DIRECT UNIT COST 1,166.52
E OCM 12% of D 139.98
F Profit 8% of D 93.32
G VAT 5% of (D+E+F) 69.99
H Total Cost (D+E+F+G) 1,469.81
I Unit Cost H/Quantity P 1,469.81
DETAILED UNIT PRICE ANALYSIS

CONCRETING OF KATUNGAWAN ROAD

Brgy. Buyun, Sta. Teresita, Cagayan

Item No. : 104(1)a Quantity = 360.00


Description : EMBANKMENT FROM ROADWAY EXCAVATION Unit = Cu.m.
(COMMON SOIL)

Production Output : = 50 cu.m./hr.


No. of Hours : = 7.20 hours say 7.25 hours
No. of Days : = 0.90 days

A. Name and Capacity of Equipment (Operated) No. of Units No. of Hours Hourly Rate Total Cost (Pesos)
Factor
For Excavation Work
Bulldozer, D6H SERIES II PSDS/DD 0.83 1.00 6.02 3,379.00 P 20,341.58
Payloader(1.50 cu.m) 0.83 1.00 6.02 1,733.00 10,432.66
Dump Truck (12 yd ) ³ 0.83 2.00 6.02 1,420.00 17,096.80

Spreading and Compaction


Motorized Grader, 6710A 1 1.00 7.25 P 2,173.00 P 15,754.25
Vibratory Roller(10 m.t.),SD100DC 1 1.00 7.25 1,846.00 13,383.50
Water Truck/Pump (16000 L) 0.25 1.00 1.81 2,450.00 4,434.50

A. SUB-TOTAL, EQUIPMENT P 81,443.29

B. Designation Personnel No. of Men No. of Hours Unit Rate/Hour Total Cost (Pesos)

For Excavation Work


Foreman 0.83 1.00 6.02 P 98.09 P 590.50
Unskilled Labor 0.83 2.00 6.02 54.90 661.00

Spreading and Compaction


Foreman 1.00 7.25 98.09 711.15
Unskilled Labor 2.00 7.25 54.90 796.05

B. SUB-TOTAL, LABOR P 2,758.70

C. Name and Description Qty Unit Unit Price Total Cost (Pesos)

C. SUB-TOTAL, MATERIALS P

SUMMARY:
A Equipment P 81,443.29
B Labor 2,758.70
C Materials -
D TOTAL DIRECT COST P 84,201.99
DIRECT UNIT COST 233.89
E OCM 12% of D 10,104.24
F Profit 8% of D 6,736.16
G VAT 5% of (D+E+F) 5,052.12
H Total Cost (D+E+F+G) 106,094.51
I Unit Cost H/Quantity P 294.71
DETAILED UNIT PRICE ANALYSIS

CONCRETING OF KATUNGAWAN ROAD

Brgy. Buyun, Sta. Teresita, Cagayan

Item No. : #REF! Quantity = #REF!


Description : Unit = #REF!
#REF!

Production Output : = 50 cu.m./hr.


No. of Hours : = #REF! hours say #REF! hours
No. of Days : = #REF! days

A. Name and Capacity of Equipment (Operated) No. of Units No. of Hours Hourly Rate Total Cost (Pesos)
Factor
For Excavation Work
Bulldozer, D6H SERIES II PSDS/DD 0.83 1.00 #REF! 3,379.00 P #REF!
Payloader(1.50 cu.m) 0.83 1.00 #REF! 1,733.00 #REF!
Dump Truck (12 yd ) ³ 0.83 2.00 #REF! 1,420.00 #REF!

Spreading and Compaction


Motorized Grader, 6710A 1 1.00 #REF! P 2,173.00 P #REF!
Vibratory Roller(10 m.t.),SD100DC 1 1.00 #REF! 1,846.00 #REF!
Water Truck/Pump (16000 L) 0.25 1.00 #REF! 2,450.00 #REF!

A. SUB-TOTAL, EQUIPMENT P #REF!

B. Designation Personnel No. of Men No. of Hours Unit Rate/Hour Total Cost (Pesos)

For Excavation Work


Foreman 0.83 1.00 #REF! P 98.09 P #REF!
Unskilled Labor 0.83 2.00 #REF! 54.90 #REF!

Spreading and Compaction


Foreman 1.00 #REF! 98.09 #REF!
Unskilled Labor 2.00 #REF! 54.90 #REF!

B. SUB-TOTAL, LABOR P #REF!

C. Name and Description Qty Unit Unit Price Total Cost (Pesos)

C. SUB-TOTAL, MATERIALS P

SUMMARY:
A Equipment P #REF!
B Labor #REF!
C Materials -
D TOTAL DIRECT COST P #REF!
DIRECT UNIT COST #REF!
E OCM 12% of D #REF!
F Profit 8% of D #REF!
G VAT 5% of (D+E+F) #REF!
H Total Cost (D+E+F+G) #REF!
I Unit Cost H/Quantity P #REF!
DETAILED UNIT PRICE ANALYSIS

CONCRETING OF KATUNGAWAN ROAD

Brgy. Buyun, Sta. Teresita, Cagayan

Item No. : 104(2)a Quantity = 930.00


Description : EMBANKMENT FROM BORROW (COMMON SOIL) Unit = Cu.m.

Production Output : = 50 cu.m./hr.


No. of Hours : = 18.60 hours say 18.75 hours
No. of Days : = 2.33 days

A. Name and Capacity of Equipment (Operated) No. of Units No. of Hours Hourly Rate Total Cost (Pesos)
Factor
Motorized Grader, 6710A 1 1.00 18.75 P 2,173.00 P 40,743.75
Vibratory Roller(10 m.t.),SP56 1 1.00 18.75 1,846.00 34,612.50
Water Truck/Pump (16000 L) 0.25 1.00 4.69 2,450.00 11,490.50

A. SUB-TOTAL, EQUIPMENT P 86,846.75

B. Designation Personnel No. of Men No. of Hours\s Unit Rate/Hour Total Cost (Pesos)

Construction Foreman 1.00 18.75 83.10 1,558.13


Unskilled Labor 2.00 18.75 45.25 1,696.88

B. SUB-TOTAL, LABOR P 3,255.01

C. Name and Description Qty Unit Unit Price Total Cost (Pesos)

Common Borrow Material (with 25% 1.25 1,162.50 cu.m 300.98 349,889.25
Shrinkage Factor)

C. SUB-TOTAL, MATERIALS P 349,889.25

SUMMARY:
A Equipment P 86,846.75
B Labor 3,255.01
C Materials 349,889.25
D TOTAL DIRECT COST P 439,991.01
DIRECT UNIT COST 473.11
E OCM 15% of D 65,998.65
F Profit 10% of D 43,999.10
G VAT 5% of (D+E+F) 27,499.44
H Total Cost (D+E+F+G) 577,488.20
I Unit Cost H/Quantity P 620.96
DETAILED UNIT PRICE ANALYSIS

CONCRETING OF KATUNGAWAN ROAD

Brgy. Buyun, Sta. Teresita, Cagayan

Item No. : 105(1)a Quantity = 2,192.00


Description : SUBGRADE PREPARATION (COMMON SOIL) Unit = Sq.m.

Production Output : = 300 sq.m./hr.


No. of Hours : = 7.31 hours say 7.50 hours
No. of Days : = 0.91 days

A. Name and Capacity of Equipment (Operated) No. of Units No. of Hours Hourly Rate Total Cost (Pesos)
Factor
Motorized Grader, 6710A 1 1.00 7.50 P 2,173.00 P 16,297.50
Vibratory Roller(10 m.t.), SD100DC 1 1.00 7.50 1,846.00 13,845.00
Water Truck/Pump (16000 L) 0.25 1.00 1.88 2,450.00 4,606.00

A. SUB-TOTAL, EQUIPMENT P 34,748.50

B. Designation Personnel No. of Men No. of Hours Unit Rate/Hour Total Cost (Pesos)

Foreman 1.00 7.50 P 98.09 P 736.00


Unskilled Labor 2.00 7.50 54.90 823.50

B. SUB-TOTAL, LABOR P 1,559.50

C. Name and Description Qty Unit Unit Price Total Cost (Pesos)

C. SUB-TOTAL, MATERIALS P -

SUMMARY:
A Equipment P 34,748.50
B Labor 1,559.50
C Materials -
D TOTAL DIRECT COST P 36,308.00
DIRECT UNIT COST 16.56
E OCM 12% of D 4,356.96
F Profit 8% of D 2,904.64
G VAT 5% of (D+E+F) 2,178.48
H Total Cost (D+E+F+G) 45,748.08
I Unit Cost H/Quantity P 20.87
DETAILED UNIT PRICE ANALYSIS

CONCRETING OF KATUNGAWAN ROAD

Brgy. Buyun, Sta. Teresita, Cagayan

Item No. : 200(1) Quantity = 2,835.00


Description : AGGREGATE SUB-BASE COURSE, (0.00-0.25m THK) Unit = Cu.m.

Production Output : = 50 cu.m./hr.


No. of Hours : = 56.70 hours say 56.75 hours
No. of Days : = 7.09 days

A. Name and Capacity of Equipment (Operated) No. of Units No. of Hours Hourly Rate Total Cost (Pesos)
Factor
Motorized Grader, 6710A 1 1.00 56.75 P 2,173.00 P 123,317.75
Vibratory Roller(10 m.t.),SD100DC 1 1.00 56.75 1,846.00 104,760.50
Water Truck/Pump (16000 L) 0.25 1.00 14.19 2,450.00 34,765.50

A. SUB-TOTAL, EQUIPMENT P 262,843.75

B. Designation Personnel No. of Men No. of Hours Unit Rate/Hour Total Cost (Pesos)

Foreman 1.00 56.75 P 98.09 P 5,566.61


Unskilled Labor 2.00 56.75 54.90 6,231.15

B. SUB-TOTAL, LABOR P 11,797.76

C. Name and Description Qty Unit Unit Price Total Cost (Pesos)
Factor
Aggregate Subbase Course 1.15 3,260.00 cu.m 711.28 2,318,772.80

C. SUB-TOTAL, MATERIALS P 2,318,772.80

SUMMARY:
A Equipment P 262,843.75
B Labor 11,797.76
C Materials 2,318,772.80
D TOTAL DIRECT COST P 2,593,414.31
DIRECT UNIT COST 914.78
E OCM 12% of D 311,209.72
F Profit 8% of D 207,473.14
G VAT 5% of (D+E+F) 155,604.86
H Total Cost (D+E+F+G) 3,267,702.03
I Unit Cost H/Quantity P 1,152.63
DETAILED UNIT PRICE ANALYSIS

CONCRETING OF KATUNGAWAN ROAD

Brgy. Buyun, Sta. Teresita, Cagayan

Item No. : Err:509 Quantity = Err:509


Description : Err:509 Unit = Err:509

Production Output : = 50 cu.m./hr.


No. of Hours : = Err:509 hours say Err:509 hours
No. of Days : = Err:509 days

A. Name and Capacity of Equipment (Operated) No. of Units No. of Hours Hourly Rate Total Cost (Pesos)
Factor
Motorized Grader, 6710A 1 1.00 Err:509 P 2,173.00 P Err:509
Vibratory Roller(10 m.t.),SD100DC 1 1.00 Err:509 1,846.00 Err:509
Water Truck/Pump (16000 L) 0.25 1.00 Err:509 2,450.00 Err:509

A. SUB-TOTAL, EQUIPMENT P Err:509

B. Designation Personnel No. of Men No. of Hours Unit Rate/Hour Total Cost (Pesos)

Foreman 1.00 Err:509 P 98.09 P Err:509


Unskilled Labor 2.00 Err:509 54.90 Err:509

B. SUB-TOTAL, LABOR P Err:509

C. Name and Description Qty Unit Unit Price Total Cost (Pesos)
Factor
Aggregate Subbase Course 1.15 Err:509 cu.m 765.54 Err:509

C. SUB-TOTAL, MATERIALS P Err:509

SUMMARY:
A Equipment P Err:509
B Labor Err:509
C Materials Err:509
D TOTAL DIRECT COST P Err:509
DIRECT UNIT COST Err:509
E OCM 12% of D Err:509
F Profit 8% of D Err:509
G VAT 5% of (D+E+F) Err:509
H Total Cost (D+E+F+G) Err:509
I Unit Cost H/Quantity P Err:509
DETAILED UNIT PRICE ANALYSIS

CONCRETING OF KATUNGAWAN ROAD

Brgy. Buyun, Sta. Teresita, Cagayan

Item No. : 311(1)c1 Quantity = 5,500.00

PORTLAND CEMENT CONCRETE PAVEMENT,


Description : UNREINFORCED (230mm THK) Unit = Sq.m.

Production Output : = 107.33 sq.m/hr.


No. of Hours : = 51.24 hours say 51.25 hours
No. of Days : = 6.41 days

A. Name and Capacity of Equipment (Operated) No. of Units No. of Hours Hourly Rate Total Cost (Pesos)
Factor
Transit Mixer (5 cu.m.) 1 4.00 51.25 1,318.00 270,190.00
Concrete Vibrator 1 2.00 51.25 91.25 9,353.13
Concrete Batch Plant (30 cu.m.) 1 1.00 51.25 1,759.50 90,174.38
Payloader (1.50 cu.m.), LX80-2C 1 1.00 51.25 1,733.00 88,816.25
Concrete Screeder (5.5 hp) 1 1.00 51.25 545.00 27,931.25
Water Truck/Pump (16000 L) 1 1.00 51.25 2,450.00 125,562.50
Concrete Saw, Blade Ø 14" (7.5 Hp) 1 1.00 51.25 32.63 1,672.29
Bar Cutter, Single Phase 0.1 1.00 5.13 219.75 1,127.32
Minor Tools(5% of Labor) 2,668.31

A. SUB-TOTAL, EQUIPMENT P 617,495.42

B. Designation Personnel No. of Men No. of Hours Unit Rate/Hour Total Cost (Pesos)

Foreman 1.00 51.25 P 98.09 P 5,027.11


Skilled Labor 4.00 51.25 71.10 14,575.50
Unskilled Labor 12.00 51.25 54.90 33,763.50

B. SUB-TOTAL, LABOR P 53,366.11

C. Name and Description Qty Unit Unit Price Total Cost (Pesos)
Factor

Reinforcing Steel Bar (Grade 40) 0.3300 1,815.00 kg. 41.00 74,415.00
Curing Compound 0.2900 1,595.00 lit. 60.00 95,700.00
Asphalt Sealant 0.1200 660.00 lit. 55.25 36,465.00
Steel Forms (Rental) - New, 15 cm thick 0.4600 2,530.00 l.m. 40.00 101,200.00
Sand 0.0825 454.00 cu.m. 858.71 389,853.13
Gravel 0.1500 825.00 cu.m. 858.71 708,433.55
Cement 1.4300 7,865.00 bag 270.00 2,123,550.00
Concrete Saw (Diamond blade 14") 0.00015 1.00 pcs. 7,500.00 7,500.00
Pipe Sleeve, 1 " Ø 0.0078 42.90 ln.m. 34.33 1,472.90
Grease/Tar 0.0015 8.25 lit. 210.00 1,732.50

C. SUB-TOTAL, MATERIALS P 3,540,322.08

SUMMARY:
A Equipment P 617,495.42
B Labor 53,366.11
C Materials 3,540,322.08
D TOTAL DIRECT COST P 4,211,183.61
DIRECT UNIT COST 765.67
E OCM 12% of D 505,342.03
F Profit 8% of D 336,894.69
G VAT 5% of (D+E+F) 252,671.02
H Total Cost (D+E+F+G) 5,306,091.35
I Unit Cost H/Quantity P 964.74
DETAILED UNIT PRICE ANALYSIS

Item No. : 500 (1) a1 Quantity = #N/A


Description : #N/A Unit = #N/A

Production Output : = 2.25 m/hr.


No. of Hours : = #N/A hours say #N/A hours
No. of Days : = #N/A days

A. Name and Capacity of Equipment (Operated) No. of Units No. of Hours Hourly Rate Total Cost (Pesos)
Factor
Backhoe (0.80 cu.m) 0.50 1.00 #N/A P 1,537.00 P #N/A
Plate Compactor (5 hp) 0.50 1.00 #N/A 123.00 #N/A
Minor Tools (10% of Labor) #N/A

A. SUB-TOTAL, EQUIPMENT P #N/A

B. Designation Personnel No. of Men No. of Hours Unit Rate/Hour Total Cost (Pesos)

Foreman 1 1.00 #N/A P 98.09 P #N/A


Skilled Labor 1 2.00 #N/A 71.10 #N/A
Unskilled Labor 1 4.00 #N/A 54.90 #N/A

B. SUB-TOTAL, LABOR P #N/A

C. Name and Description Qty Unit Unit Price Total Cost (Pesos)
Factor
Portland Cement 0.774 #N/A bag 265.00 #N/A
Sand 0.044 #N/A cu.m 858.71 #N/A
RC Pipes (610 mm dia.) 1.000 #N/A pc. 1,050.00 #N/A
Sand Bedding/Selected Sandy Soil 0.088 #N/A cu.m 711.28 #N/A

C. SUB-TOTAL, MATERIALS P #N/A

SUMMARY:
A Equipment P #N/A
B Labor #N/A
C Materials #N/A
D TOTAL DIRECT COST P #N/A
DIRECT UNIT COST #N/A
E OCM 15% of D #N/A
F Profit 10% of D #N/A
G VAT 5% of (D+E+F) #N/A
H Total Cost (D+E+F+G) #N/A
I Unit Cost H/Quantity P #N/A
DETAILED UNIT PRICE ANALYSIS

Item No. : 501 (1) a2 Quantity = #N/A


Description : #N/A Unit = #N/A

Production Output : = 2.00 m/hr.


No. of Hours : = #N/A hours say #N/A hours
No. of Days : = #N/A days

A. Name and Capacity of Equipment (Operated) No. of Units No. of Hours Hourly Rate Total Cost (Pesos)
Factor
Backhoe (0.80 cu.m) 0.50 1.00 #N/A P 1,537.00 P #N/A
Plate Compactor (5 hp) 0.50 1.00 #N/A 123.00 #N/A
Minor Tools (10% of Labor) #N/A

A. SUB-TOTAL, EQUIPMENT P #N/A

B. Designation Personnel No. of Men No. of Hours Unit Rate/Hour Total Cost (Pesos)

Foreman 1 1.00 #N/A P 98.09 P #N/A


Skilled Labor 1 2.00 #N/A 71.10 #N/A
Unskilled Labor 1 4.00 #N/A 54.90 #N/A

B. SUB-TOTAL, LABOR P #N/A

C. Name and Description Qty Unit Unit Price Total Cost (Pesos)
Factor
Portland Cement 0.918 #N/A bag 265.00 #N/A
Sand 0.052 #N/A cu.m 858.71 #N/A
RC Pipes (760 mm dia.) 1.000 #N/A pc. 1,800.00 #N/A
Sand Bedding/Selected Sandy Soil 0.108 #N/A cu.m 711.28 #N/A

C. SUB-TOTAL, MATERIALS P #N/A

SUMMARY:
A Equipment P #N/A
B Labor #N/A
C Materials #N/A
D TOTAL DIRECT COST P #N/A
DIRECT UNIT COST #N/A
E OCM 15% of D #N/A
F Profit 10% of D #N/A
G VAT 5% of (D+E+F) #N/A
H Total Cost (D+E+F+G) #N/A
I Unit Cost H/Quantity P #N/A
DETAILED UNIT PRICE ANALYSIS

CONCRETING OF KATUNGAWAN ROAD

Brgy. Buyun, Sta. Teresita, Cagayan

Item No. : 900 (2) c Quantity = #N/A


Description : #N/A Unit = #N/A

For pouring of concrete


Production Output : = 10 cu.m/hr.
No. of Hours : = #N/A hours say #N/A hours
No. of Days : = #N/A days

For installation and removal of forms


Total No. Of Hexapod: = 116 pcs.
Production Output : = 20 pcs. of hexapod / day
No. of Hours : = 46.40 hours say 46.50 hours
No. of Days : = 5.80 days

A. Name and Capacity of Equipment (Operated) No. of Units No. of Hours Hourly Rate Total Cost (Pesos)
Factor
Transit Mixer (5 cu.m) 1 2.00 #N/A P 1,318.00 P #N/A
Concrete Vibrator 1 2.00 #N/A 91.25 #N/A
Batching Plant (30 cu.m) 0.5 1.00 #N/A 1,759.50 #N/A
Payloader(1.5 cu.m),LX80-2C 0.5 1.00 #N/A 1,733.00 #N/A
Water Truck (16000 L) 0.25 1.00 #N/A 2,450.00 #N/A
Crawler Crane (36-40 mt) 1.68 2.00 #N/A 1,902.00 #N/A
Cargo/Service Truck (6-10mt) 1.68 1.00 #N/A 1,212.00 #N/A
Minor Tools (5% of Labor) #N/A

A. SUB-TOTAL, EQUIPMENT P #N/A

B. Designation Personnel No. of Men No. of Hours Unit Rate/Hour Total Cost (Pesos)

Foreman 1.00 #N/A P 98.09 P #N/A


Skilled Labor 4.00 #N/A 71.10 #N/A
Unskilled Labor 8.00 #N/A 54.90 #N/A
Installation & Removal of Forms
Skilled Labor 4.00 46.50 71.10 13,224.60
Unskilled Labor 8.00 46.50 54.90 20,422.80

B. SUB-TOTAL, LABOR P #N/A

C. Name and Description Qty Unit Unit Price Total Cost (Pesos)
Factor
Cement 8.5 #N/A bag 265.00 #N/A
Fine Aggregates 0.5 #N/A cu.m 858.71 #N/A
Coarse Aggregates 1.00 #N/A cu.m 858.71 #N/A
Brand New Steel forms (Rental) ( 3% of Materials) L.S. #N/A

C. SUB-TOTAL, MATERIALS P #N/A

SUMMARY:
A Equipment P #N/A
B Labor #N/A
C Materials #N/A
D TOTAL DIRECT COST P #N/A
DIRECT UNIT COST #N/A
E OCM 15% of D #N/A
F Profit 10% of D #N/A
G VAT 5% of (D+E+F) #N/A
H Total Cost (D+E+F+G) #N/A
I Unit Cost H/Quantity P #N/A
DETAILED UNIT PRICE ANALYSIS

CONCRETING OF KATUNGAWAN ROAD


Brgy. Buyun, Sta. Teresita, Cagayan

Item No. : 902 (1) a1 Quantity = #N/A


Description : Unit = #N/A
#N/A
Production Output : = 180 kgs/hr.
No. of Hours : = #N/A hours say #N/A hours
No. of Days : = #N/A days

for Pile cap (w/ end protection) = 1238.18 kg.


for Hexapod = 1714.94 kg.
2,953.12 say #N/A
A. Name and Capacity of Equipment (Operated) No. of Units No. of Hours Hourly Rate Total Cost (Pesos)
Factor
Cargo Truck (10 T, 270 Hp) 0.15 1.00 #N/A P 1,212.00 P #N/A
Bar Cutter 0.5 1.00 #N/A 219.75 #N/A
Bar Bender 0.5 1.00 #N/A 351.50 #N/A

A. SUB-TOTAL, EQUIPMENT P #N/A

B. Designation Personnel No. of Men No. of Hours Unit Rate/Hour Total Cost (Pesos)

Foreman 1.00 #N/A P 98.09 P #N/A


Skilled Labor 2.00 #N/A 71.10 P #N/A
Unskilled Labor 8.00 #N/A 54.90 #N/A

B. SUB-TOTAL, LABOR P #N/A

C. Name and Description Qty Unit Unit Price Total Cost (Pesos)
Factor
Tie wire (2% of RSB) 0.021 #N/A kg. 65.00 #N/A
Reinforcing Steel Bar, Grade 40 1.05 #N/A kg. 41.00 #N/A
w/ 5% Wastage

C. SUB-TOTAL, MATERIALS P #N/A

SUMMARY:
A Equipment P #N/A
B Labor #N/A
C Materials #N/A
D TOTAL DIRECT COST P #N/A
DIRECT UNIT COST #N/A
E OCM 15% of D #N/A
F Profit 10% of D #N/A
G VAT 5% of (D+E+F) #N/A
H Total Cost (D+E+F+G) #N/A
I Unit Cost H/Quantity P #N/A
DETAILED UNIT PRICE ANALYSIS

CONCRETING OF KATUNGAWAN ROAD

Brgy. Buyun, Sta. Teresita, Cagayan

Item No. : 902 (1) a2 Quantity = #N/A


Description : #N/A Unit = #N/A

Production Output : = 160 kgs/hr.


No. of Hours : = #N/A hours say #N/A hours
No. of Days : = #N/A days

A. Name and Capacity of Equipment (Operated) No. of Units No. of Hours Hourly Rate Total Cost (Pesos)
Factor
Bar Cutter 0.5 1.00 #N/A P 219.75 P #N/A
Bar Bender 0.5 1.00 #N/A 351.50 #N/A
Cargo Truck (10 T, 270 Hp) 0.15 1.00 #N/A 1,212.00 #N/A
Service Crane (25T) 0.15 1.00 #N/A 1,522.00 #N/A

A. SUB-TOTAL, EQUIPMENT P #N/A

B. Designation Personnel No. of Men No. of Hours Unit Rate/Hour Total Cost (Pesos)

Foreman 1.00 #N/A P 98.09 P #N/A


Skilled Labor 2.00 #N/A 71.10 P #N/A
Unskilled Labor 8.00 #N/A 54.90 #N/A

B. SUB-TOTAL, LABOR P #N/A

C. Name and Description Qty Unit Unit Price Total Cost (Pesos)
Factor
Tie wire (2% of RSB) 0.021 #N/A kg. 65.00 #N/A
Reinforcing Steel Bar, Grade 60 1.05 #N/A kg. 42.00 #N/A
w/ 5% Wastage

C. SUB-TOTAL, MATERIALS P #N/A

SUMMARY:
A Equipment P #N/A
B Labor #N/A
C Materials #N/A
D TOTAL DIRECT COST P #N/A
DIRECT UNIT COST #N/A
E OCM 15% of D #N/A
F Profit 10% of D #N/A
G VAT 5% of (D+E+F) #N/A
H Total Cost (D+E+F+G) #N/A
I Unit Cost H/Quantity P #N/A
DETAILED UNIT PRICE ANALYSIS

Rehabilitation/Improvements of Flood Mitigation Structures and Drainage Systems, Improvements of Flood Control System, Cagayan River Basin, K0544+000 -
K0544+446.80, Gattaran Section, Cagayan

Gattaran, Cagayan

Item No. : 1710 (2) a Quantity = #N/A


Description : #N/A Unit = #N/A

Production Output : = 1.25 cu.m/hr.


No. of Hours : = #N/A hours say #N/A hours
No. of Days : = #N/A days

A. Name and Capacity of Equipment (Operated) No. of Units No. of Hours Hourly Rate Total Cost (Pesos)
Factor
One Bagger Mixer 1.00 1.00 #N/A P 172.00 P #N/A
Water Truck/Pump (16000 L) 0.05 1.00 #N/A 2,450.00 #N/A
Minor Tools (5% of Labor) #N/A

A. SUB-TOTAL, EQUIPMENT P #N/A

B. Designation Personnel No. of Men No. of Hours Unit Rate/Hour Total Cost (Pesos)

Foreman 1.00 #N/A P 98.09 P #N/A


Skilled Labor 2.00 #N/A 71.10 #N/A
Unskilled Labor 8.00 #N/A 54.90 #N/A

B. SUB-TOTAL, LABOR P #N/A

C. Name and Description Qty Unit Unit Price Total Cost (Pesos)
Factor
Cement 3 #N/A bag 265.00 #N/A
Sand 0.25 #N/A cu.m 858.71 #N/A
Gravel Fill 0.015 #N/A cu.m 711.28 #N/A
Weepholes (PVC) 76mm dia. 0.3 #N/A ln.m 128.33 #N/A
Filter Cloth 0.015 #N/A sq.m. 160.00 #N/A
Boulders(15-25 kg.) 1.05 #N/A cu.m 947.30 #N/A
#N/A

Miscellaneous(1% of Materials) #N/A

C. SUB-TOTAL, MATERIALS P #N/A

SUMMARY:
A Equipment P #N/A
B Labor #N/A
C Materials #N/A
D TOTAL DIRECT COST P #N/A
DIRECT UNIT COST #N/A
E OCM 15% of D #N/A
F Profit 10% of D #N/A
G VAT 5% of (D+E+F) #N/A
H Total Cost (D+E+F+G) #N/A
I Unit Cost H/Quantity P #N/A
DETAILED UNIT PRICE ANALYSIS

Rehabilitation/Improvements of Flood Mitigation Structures and Drainage Systems, Improvements of Flood Control System, Cagayan River Basin, K0544+000 -
K0544+446.80, Gattaran Section, Cagayan

Gattaran, Cagayan

Item No. : 1711 (1) Quantity = #N/A


Description : #N/A Unit = #N/A

Production Output : = 1.5625 cu.m/hr.


No. of Hours : = #N/A hours say #N/A hours
No. of Days : = #N/A days

A. Name and Capacity of Equipment (Operated) No. of Units No. of Hours Hourly Rate Total Cost (Pesos)
Factor
One Bagger Mixer 1.00 1.00 #N/A P 172.00 P #N/A
Water Truck/Pump (16000 L) 0.05 1.00 #N/A 2,450.00 #N/A
Backhoe (Wheel Type 0.28 cu.m.) 0.10 1.00 #N/A 922.00 #N/A
Minor Tools (10% of Labor) #N/A

A. SUB-TOTAL, EQUIPMENT P #N/A

B. Designation Personnel No. of Men No. of Hours Unit Rate/Hour Total Cost (Pesos)

Foreman 1.00 #N/A P 98.09 P #N/A


Skilled Labor 2.00 #N/A 71.10 #N/A
Unskilled Labor 8.00 #N/A 54.90 #N/A

B. SUB-TOTAL, LABOR P #N/A

C. Name and Description Qty Unit Unit Price Total Cost (Pesos)
Factor
Cement 5.5 #N/A bag 270.00 #N/A
Sand 0.3 #N/A cu.m 456.85 #N/A
Gravel Fill 0.02 #N/A cu.m 406.74 #N/A
Weepholes (PVC) 76mm dia. 0.3 #N/A ln.m 128.33 #N/A
Filter Cloth 0.015 #N/A sq.m. 160.00 #N/A
Boulders(15-25 kg.) 1.05 #N/A cu.m 1,028.25 #N/A
#N/A

Miscellaneous(1% of Materials) #N/A

C. SUB-TOTAL, MATERIALS P #N/A

SUMMARY:
A Equipment P #N/A
B Labor #N/A
C Materials #N/A
D TOTAL DIRECT COST P #N/A
DIRECT UNIT COST #N/A
E OCM 15% of D #N/A
F Profit 10% of D #N/A
G VAT 5% of (D+E+F) #N/A
H Total Cost (D+E+F+G) #N/A
I Unit Cost H/Quantity P #N/A
DETAILED UNIT PRICE ANALYSIS

CONCRETING OF KATUNGAWAN ROAD


Brgy. Buyun, Sta. Teresita, Cagayan

Item No. : 1712 (1) Quantity = #N/A

Description : #N/A Unit = #N/A

Production Output : = 1.25 cu.m/hour


No. of Hours : = #N/A hours say #N/A hours
No. of Days : = #N/A days

A. Name and Capacity of Equipment (Operated) No. of Units No. of Hours Hourly Rate Total Cost (Pesos)
Factor
Plate Compactor 1 1.00 #N/A P 123.00 P #N/A
Water Truck (16000 L) 0.01 1.00 #N/A 2,450.00 #N/A
Minor Tools, 10% of Labor #N/A

A. SUB-TOTAL, EQUIPMENT P #N/A

B. Designation Personnel No. of Men No. of Hours Unit Rate/Hour Total Cost (Pesos)

Foreman 1.00 #N/A P 98.09 P #N/A


Unskilled Labor 4.00 #N/A 54.90 #N/A

B. SUB-TOTAL, LABOR P #N/A

C. Name and Description Qty Unit Unit Price Total Cost (Pesos)

Gravel Fill, Item 200. 1.15 #N/A cu.m. P 711.28 P #N/A

C. SUB-TOTAL, MATERIALS P #N/A

SUMMARY:
A Equipment P #N/A
B Labor #N/A
C Materials #N/A
D TOTAL DIRECT COST P #N/A
DIRECT UNIT COST #N/A
E OCM 15% of D #N/A
F Profit 10% of D #N/A
G VAT 5% of (D+E+F) #N/A
H Total Cost (D+E+F+G) #N/A
I Unit Cost H/Quantity P #N/A
DETAILED UNIT PRICE ANALYSIS

CONCRETING OF KATUNGAWAN ROAD

Brgy. Buyun, Sta. Teresita, Cagayan

Item No. : 1713 (1) Quantity = #N/A


Description : #N/A Unit = #N/A

Production Output : = 1.4 cu.m/hr.


No. of Hours : = #N/A hours say #N/A hours
No. of Days : = #N/A days

A. Name and Capacity of Equipment (Operated) No. of Units No. of Hours Hourly Rate Total Cost (Pesos)
Factor
One Bagger Mixer 1 1.00 #N/A P 172.00 P #N/A
Water Truck (16000 L) 0.05 1.00 #N/A 2,450.00 #N/A
Backhoe (Wheel Type 0.28 cu.m.) 0.1 1.00 #N/A 922.00 #N/A
Minor Tools(10% of Labor) #N/A

A. SUB-TOTAL, EQUIPMENT P #N/A

B. Designation Personnel No. of Men No. of Hours Unit Rate/Hour Total Cost (Pesos)

Foreman 1.00 #N/A P 98.09 P #N/A


Skilled Labor 2.00 #N/A 71.10 #N/A
Unskilled Labor 8.00 #N/A 54.90 #N/A

B. SUB-TOTAL, LABOR P #N/A

C. Name and Description Qty Unit Unit Price Total Cost (Pesos)
Factor
Cement 4.2 #N/A bag 265.00 #N/A
Sand 0.2625 #N/A cu.m 858.71 #N/A
Gravel Fill 0.02 #N/A cu.m 711.28 #N/A
Weepholes (PVC) 76mm dia. 0.3 #N/A ln.m 385.00 #N/A
Filter Cloth 0.015 #N/A sq.m 160.00 #N/A
Boulders(15-25 kg.) 0.63 #N/A cu.m 947.30 #N/A
Gravel 0.525 #N/A cu.m 858.71 #N/A
#N/A

Miscellaneous(2% of Materials) #N/A

C. SUB-TOTAL, MATERIALS P #N/A

SUMMARY:
A Equipment P #N/A
B Labor #N/A
C Materials #N/A
D TOTAL DIRECT COST P #N/A
DIRECT UNIT COST #N/A
E OCM 15% of D #N/A
F Profit 10% of D #N/A
G VAT 5% of (D+E+F) #N/A
H Total Cost (D+E+F+G) #N/A
I Unit Cost H/Quantity P #N/A
DETAILED UNIT PRICE ANALYSIS

CONCRETING OF KATUNGAWAN ROAD


Brgy. Buyun, Sta. Teresita, Cagayan

Item No. : 1714 (1) Quantity = #N/A


Description : #N/A Unit = #N/A

Production Output : = 2.5 cu.m/hr.


No. of Hours : = #N/A hours say #N/A hours
No. of Days : = #N/A days

A. Name and Capacity of Equipment (Operated) No. of Units No. of Hours Hourly Rate Total Cost (Pesos)

P P -

A. SUB-TOTAL, EQUIPMENT P -

B. Designation Personnel No. of Men No. of Hours Unit Rate/Hour Total Cost (Pesos)

Foreman 1.00 #N/A P 98.09 P #N/A


Skilled Labor 2.00 #N/A 71.10 #N/A
Unskilled Labor 8.00 #N/A 54.90 #N/A

B. SUB-TOTAL, LABOR P #N/A

C. Name and Description Qty Unit Unit Price Total Cost (Pesos)
Factor

Gabion Wire Mesh (1m x 1m x 0.5m) with complete 2.00 #N/A pcs. 553.42 #N/A
accessories
Boulders 1.05 #N/A cu.m 947.30 #N/A

C. SUB-TOTAL, MATERIALS P #N/A

SUMMARY:
A Equipment P -
B Labor #N/A
C Materials #N/A
D TOTAL DIRECT COST P #N/A
DIRECT UNIT COST #N/A
E OCM 15% of D #N/A
F Profit 10% of D #N/A
G VAT 5% of (D+E+F) #N/A
H Total Cost (D+E+F+G) #N/A
I Unit Cost H/Quantity P #N/A
DETAILED UNIT PRICE ANALYSIS

CONCRETING OF KATUNGAWAN ROAD

Brgy. Buyun, Sta. Teresita, Cagayan

Item No. : 1716 (6) Quantity = #N/A


Description : #N/A Unit = #N/A

Prodution Output = 48 lin.m. per hour


No. of Hours : = #N/A hours say #N/A hours
No. of Days : = #N/A days

Wt. Of sheet piles/m = 48.00 kg. or 0.0480 ton


Cost of Pile/meter = 48 kg. x 52.00 /kg. = 2,496.00
Handling Cost/meter = 0.048 ton x 350 /ton x2 = 33.60
Hauling Cost = 0.048 ton x 612 km x 5.00 /ton.km. = 58.75
2,588.35

A. Name and Capacity of Equipment (Operated) No. of Units No. of Hours Hourly Rate Total Cost (Pesos)

Crawler Crane (36-40 mt) 1.00 #N/A P 1,902.00 P #N/A

A. SUB-TOTAL, EQUIPMENT P #N/A

B. Designation Personnel No. of Men No. of Hours Unit Rate/Hour Total Cost (Pesos)

P P

B. SUB-TOTAL, LABOR P -

C. Name and Description Qty Unit Unit Price Total Cost (Pesos)

Steel Sheet Piles,, A36 #N/A ln.m 2,588.35 #N/A

Miscellaneous (3% of Materials) #N/A

C. SUB-TOTAL, MATERIALS P #N/A

SUMMARY:
A Equipment P #N/A
B Labor -
C Materials #N/A
D TOTAL DIRECT COST P #N/A
DIRECT UNIT COST #N/A
E OCM 15% of D #N/A
F Profit 10% of D #N/A
G VAT 5% of (D+E+F) #N/A
H Total Cost (D+E+F+G) #N/A
I Unit Cost H/Quantity P #N/A
DETAILED UNIT PRICE ANALYSIS

CONCRETING OF KATUNGAWAN ROAD


Brgy. Buyun, Sta. Teresita, Cagayan

Item No. : 1716 (6) Quantity = #N/A


Description : #N/A Unit = #N/A

Prodution Output = 48 lin.m. per hour


No. of Hours : = #N/A hours say #N/A hours
No. of Days : = #N/A days

Wt. Of sheet piles/m = 48.00 kg. or 0.0480 ton


Cost of Pile/meter = 48 kg. x 68.00 /kg. = 3,264.00
Handling Cost/meter = 0.048 ton x 350 /ton x2 = 33.60
Hauling Cost = 0.048 ton x 612 km x 5.00 /ton.km. = 58.75
3,356.35

A. Name and Capacity of Equipment (Operated) No. of Units No. of Hours Hourly Rate Total Cost (Pesos)

Crawler Crane (36-40 mt) 1.00 #N/A P 1,902.00 P #N/A

A. SUB-TOTAL, EQUIPMENT P #N/A

B. Designation Personnel No. of Men No. of Hours Unit Rate/Hour Total Cost (Pesos)

P P

B. SUB-TOTAL, LABOR P -

C. Name and Description Qty Unit Unit Price Total Cost (Pesos)

Steel Sheet Piles,, A36 #N/A ln.m 3,356.35 #N/A

Miscellaneous (3% of Materials) #N/A

C. SUB-TOTAL, MATERIALS P #N/A

SUMMARY:
A Equipment P #N/A
B Labor -
C Materials #N/A
D TOTAL DIRECT COST P #N/A
DIRECT UNIT COST #N/A
E OCM 15% of D #N/A
F Profit 10% of D #N/A
G VAT 5% of (D+E+F) #N/A
H Total Cost (D+E+F+G) #N/A
I Unit Cost H/Quantity P #N/A
DETAILED UNIT PRICE ANALYSIS

CONCRETING OF KATUNGAWAN ROAD

Brgy. Buyun, Sta. Teresita, Cagayan

Item No. : 1716 (12) Quantity = #N/A


Description : #N/A Unit = #N/A

Production Output : = 10.00 ln.m./hr.


No. of Hours : = #N/A hours say #N/A hours
No. of Days : = #N/A days

A. Name and Capacity of Equipment (Operated) No. of Units No. of Hours Hourly Rate Total Cost (Pesos)
Factor
Truck Mounted Crane (45T) 1.00 1 #N/A P 2,606.00 P #N/A
Vibro Hammer (Hydraulic Power Pack) 1.00 1 #N/A 4,118.00 #N/A
Welding Machine 1.00 1 #N/A 371.00 #N/A
Cuting Outfit 0.50 1 #N/A 45.45 #N/A
Generator Set (876-1000 kva) 1.00 1 #N/A 2,659.44 #N/A
Minor Tools (5% of Labor) #N/A

A. SUB-TOTAL, EQUIPMENT P #N/A

B. Designation Personnel No. of Men No. of Hours Unit Rate/Hour Total Cost (Pesos)

Foreman 1.00 #N/A P 98.09 P #N/A


Skilled Labor 6.00 #N/A 71.10 #N/A
Unskilled Labor 6.00 #N/A 54.90 #N/A

B. SUB-TOTAL, LABOR P #N/A

C. Name and Description Qty Unit Unit Price Total Cost (Pesos)
Factor
Welding rod (1kg./2000kg. Steel Sheet Pile) 0.024 #N/A kg. 70.00 #N/A
Oxy/Acetylene (1 set/5000kg. Steel Sheet Pile) 0.0096 #N/A set 2,500.00 #N/A

Miscellaneous (2% of Materials) #N/A

C. SUB-TOTAL, MATERIALS P #N/A

SUMMARY:
A Equipment P #N/A
B Labor #N/A
C Materials #N/A
D TOTAL DIRECT COST P #N/A
DIRECT UNIT COST #N/A
E OCM 15% of D #N/A
F Profit 10% of D #N/A
G VAT 5% of (D+E+F) #N/A
H Total Cost (D+E+F+G) #N/A
I Unit Cost H/Quantity P #N/A
DETAILED UNIT PRICE ANALYSIS

CONCRETING OF KATUNGAWAN ROAD

Brgy. Buyun, Sta. Teresita, Cagayan

Item No. : 1722 (3) Quantity = #N/A


Description : #N/A Unit = #N/A

Railings (Steel) = #N/A ln.m. (depending on the design)


Production Output : = 10.00 m/hr.
No. of Hours : = #N/A hours say #N/A hours
No. of Days : = #N/A days

Paint (Steel Structures) = #N/A sq.m. 50 mm. dia. GI Pipe


Production Output : = 12.00 sq.m/hr.
No. of Hours : = #N/A hours say #N/A hours
No. of Days : = #N/A days

A. Name and Capacity of Equipment (Operated) No. of Units No. of Hours Hourly Rate Total Cost (Pesos)
Factor
Cargo Truck ( 9-10 mt) 0.1 1.00 #N/A 1,212.00 #N/A
Welding Machine 0.5 1.00 #N/A 371.00 #N/A
Minor Tools(1% of Labor) #N/A

A. SUB-TOTAL, EQUIPMENT P #N/A

B. Designation Personnel No. of Men No. of Hours Unit Rate/Hour Total Cost (Pesos)
Installation of Railings
Foreman 0.5 1.00 #N/A P 98.09 P #N/A
Skilled Labor 0.5 4.00 #N/A 71.10 #N/A
Unskilled Labor 0.5 8.00 #N/A 54.90 #N/A
Paint (Steel Structures)
Foreman 1 1.00 #N/A P 98.09 P #N/A
Skilled Labor 1 4.00 #N/A 71.10 #N/A
Unskilled Labor 1 2.00 #N/A 54.90 #N/A

B. SUB-TOTAL, LABOR P #N/A

C. Name and Description Qty Unit Unit Price Total Cost (Pesos)
Factor
G.I. Pipe (50 mm) #N/A m. 1,357.50 #N/A
Welding Rod 0.1000 #N/A kg. 70.00 #N/A
Reinforcing Steel Bar (Grade 40) 0.7400 #N/A kg. 41.00 #N/A
Paint Metal Epoxy 0.0700 #N/A gal. 620.00 #N/A
Paint Aluminum 0.1380 #N/A gal. 578.00 #N/A
Miscellaneous (1% of Materials) #N/A

C. SUB-TOTAL, MATERIALS P #N/A

SUMMARY:
A Equipment P #N/A
B Labor #N/A
C Materials #N/A
D TOTAL DIRECT COST P #N/A
DIRECT UNIT COST #N/A
E OCM 15% of D #N/A
F Profit 10% of D #N/A
G VAT 5% of (D+E+F) #N/A
H Total Cost (D+E+F+G) #N/A
I Unit Cost H/Quantity P #N/A
DETAILED UNIT PRICE ANALYSIS

Rehabilitation/Improvements of Flood Mitigation Structures and Drainage Systems, Improvements of Flood Control System, Cagayan River
Basin, K0544+277.50 - K0544+557.50, Gattaran Section, Cagayan

Gattaran, Cagayan

Item No. : 624 (1) a3 Quantity = #N/A


Description : Err:509 Unit = #N/A

Production Output : = m/hr.


No. of Hours : = hours say 0.00 hours
No. of Days : = days

A. Name and Capacity of Equipment (Operated) No. of Units No. of Hours Hourly Rate Total Cost (Pesos)
Factor

A. SUB-TOTAL, EQUIPMENT P -

B. Designation Personnel No. of Men No. of Hours Unit Rate/Hour Total Cost (Pesos)

B. SUB-TOTAL, LABOR P -

C. Name and Description Qty Unit Unit Price Total Cost (Pesos)
Factor
#N/A set 140,000.00 #N/A
Installation/construction of 150W SOLAR Streetlights with
panel,charger rectifier and accessories (hardwares, conduit
boxes, fittings, wires and wiring devices)
- with reinforced concrete column

C. SUB-TOTAL, MATERIALS P #N/A

SUMMARY:
A Equipment P -
B Labor -
C Materials #N/A
D TOTAL DIRECT COST P #N/A
DIRECT UNIT COST #N/A
E OCM 10% of D #N/A
F Profit 8% of D #N/A
G VAT 5% of (D+E+F) #N/A
H Total Cost (D+E+F+G) #N/A
I Unit Cost H/Quantity P #N/A
DETAILED UNIT PRICE ANALYSIS

CONCRETING OF KATUNGAWAN ROAD

Brgy. Buyun, Sta. Teresita, Cagayan

Item No. : 311(1)c1 Quantity = 5,500.00


Description : Unit = Sq.m.
PORTLAND CEMENT CONCRETE PAVEMENT,
UNREINFORCED (230mm THK)

Production Output : = 53.67 sq.m/hr.


No. of Hours : = 102.48 hours say 102.50 hours
No. of Days : = 12.81 days

A. Name and Capacity of Equipment (Operated) No. of Units No. of Hours Hourly Rate Total Cost (Pesos)
Factor
Transit Mixer (5 cu.m.) 1 4.00 102.50 1,318.00 540,380.00
Concrete Vibrator 1 2.00 102.50 91.25 18,706.25
Concrete Batch Plant (30 cu.m.) 1 1.00 102.50 1,759.50 180,348.75
Payloader (1.50 cu.m.), LX80-2C 1 1.00 102.50 1,733.00 177,632.50
Concrete Screeder (5.5 hp) 1 1.00 102.50 545.00 55,862.50
Water Truck/Pump (16000 L) 1 1.00 102.50 2,450.00 251,125.00
Concrete Saw, Blade Ø 14" (7.5 Hp) 1 1.00 102.50 32.63 3,344.58
Bar Cutter, Single Phase 0.1 1.00 10.25 219.75 2,252.44
Minor Tools(5% of Labor)

A. SUB-TOTAL, EQUIPMENT P 1,229,652.02

B. Designation Personnel No. of Men No. of Hours Unit Rate/Hour Total Cost (Pesos)

Foreman 1.00 102.50 P 98.09 P 10,054.23


Skilled Labor 4.00 102.50 71.10 29,151.00
Unskilled Labor 12.00 102.50 54.90 67,527.00

B. SUB-TOTAL, LABOR P 106,732.23

C. Name and Description Qty Unit Unit Price Total Cost (Pesos)
Factor

Reinforcing Steel Bar (Grade 40) 0.5500 3,025.00 kg. 41.00 124,025.00
Curing Compound 0.2900 1,595.00 lit. 60.00 95,700.00
Asphalt Sealant 0.1800 990.00 lit. 55.25 54,697.50
Steel Forms (Rental) - New, 23 cm width 0.4600 2,530.00 l.m. 87.00 220,110.00
Sand 0.1650 908.00 cu.m. 858.71 779,706.26
Gravel 0.3000 1,650.00 cu.m. 858.71 1,416,867.10
Cement 2.8500 15,675.00 bag 270.00 4,232,250.00
Concrete Saw (Diamond blade 14") 0.00015 1.00 pcs. 7,500.00 7,500.00
Pipe Sleeve, 2" Ø 0.0094 52.00 ln.m. 97.00 5,044.00
Grease/Tar 0.0094 52.00 lit. 210.00 10,920.00

C. SUB-TOTAL, MATERIALS P 6,946,819.86

SUMMARY:
A Equipment P 1,229,652.02
B Labor 106,732.23
C Materials 6,946,819.86
D TOTAL DIRECT COST P 8,283,204.11
DIRECT UNIT COST 1,506.04
E OCM 12% of D 993,984.49
F Profit 8% of D 662,656.33
G VAT 5% of (D+E+F) 496,992.25
H Total Cost (D+E+F+G) 10,436,837.18
I Unit Cost H/Quantity P 1,897.61
DETAILED UNIT PRICE ANALYSIS

CONCRETING OF KATUNGAWAN ROAD

Brgy. Buyun, Sta. Teresita, Cagayan

Item No. : Err:509 Quantity = Err:509


Description : Unit = Err:509
Err:509

Production Output : = 6.00 sq.m/hr.


No. of Hours : = Err:509 hours say Err:509 hours
No. of Days : = Err:509 days

A. Name and Capacity of Equipment (Operated) No. of Units No. of Hours Hourly Rate Total Cost (Pesos)
Factor
Transit Mixer (5 cu.m.) 0.1 2.00 Err:509 1,318.00 Err:509
Concrete Vibrator 0.1 1.00 Err:509 91.25 Err:509
Concrete Batch Plant (30 cu.m.) 0.1 1.00 Err:509 1,759.50 Err:509
Payloader (1.50 cu.m.), LX80-2C 0.1 1.00 Err:509 1,733.00 Err:509
Concrete Screeder (5.5 hp) 0.1 1.00 Err:509 545.00 Err:509
Water Truck/Pump (16000 L) 0.1 1.00 Err:509 2,450.00 Err:509
Bar Bender 0.25 1.00 Err:509 351.50 Err:509
Bar Cutter, Single Phase 0.25 1.00 Err:509 219.75 Err:509
Minor Tools(5% of Labor)

A. SUB-TOTAL, EQUIPMENT P Err:509

B. Designation Personnel No. of Men No. of Hours Unit Rate/Hour Total Cost (Pesos)

Foreman 1.00 Err:509 P 98.09 P Err:509


Skilled Labor 4.00 Err:509 71.10 Err:509
Unskilled Labor 12.00 Err:509 54.90 Err:509

B. SUB-TOTAL, LABOR P Err:509

C. Name and Description Qty Unit Unit Price Total Cost (Pesos)
Factor

Reinforcing Steel Bar (Grade 40) 54.2100 Err:509 kg. 41.00 Err:509
Curing Compound 0.2900 Err:509 lit. 60.00 Err:509
Asphalt Sealant 0.1800 Err:509 lit. 55.25 Err:509
Steel Forms (Rental) - New, 30 cm width 0.4600 Err:509 l.m. 80.00 Err:509
Sand 0.1650 Err:509 cu.m. 858.71 Err:509
Gravel 0.3000 Err:509 cu.m. 858.71 Err:509
Cement 2.8500 Err:509 bag 265.00 Err:509
#16 GI Tie Wire 1.0840 Err:509 ln.m. 97.00 Err:509

C. SUB-TOTAL, MATERIALS P Err:509

SUMMARY:
A Equipment P Err:509
B Labor Err:509
C Materials Err:509
D TOTAL DIRECT COST P Err:509
DIRECT UNIT COST Err:509
E OCM 12% of D Err:509
F Profit 8% of D Err:509
G VAT 5% of (D+E+F) Err:509
H Total Cost (D+E+F+G) Err:509
I Unit Cost H/Quantity P Err:509
DETAILED UNIT PRICE ANALYSIS

CONCRETING OF KATUNGAWAN ROAD

Brgy. Buyun, Sta. Teresita, Cagayan

Item No. : 404(1)b Quantity = 575.00


Description : REINFORCING STEEL Unit = Kgs.

Production Output : = 180 kgs/hr.


No. of Hours : = 3.19 hours say 3.25 hours
No. of Days : = 0.40 days

A. Name and Capacity of Equipment (Operated) No. of Units No. of Hours Hourly Rate Total Cost (Pesos)
Factor
Bar Cutter 0.5 1.00 1.63 P 219.75 P 358.19
Bar Bender 0.5 1.00 1.63 351.50 572.95
Cargo Truck (9-10 mt) 0.15 1.00 0.49 1,212.00 593.88

A. SUB-TOTAL, EQUIPMENT P 1,525.02

B. Designation Personnel No. of Men No. of Hours Unit Rate/Hour Total Cost (Pesos)

Foreman 1.00 3.25 P 98.09 P 318.79


Skilled Labor 2.00 3.25 71.10 462.15
Unskilled Labor 8.00 3.25 54.90 1,427.40

B. SUB-TOTAL, LABOR P 2,208.34

C. Name and Description Qty Unit Unit Price Total Cost (Pesos)
Factor
Tie Wire (2% of RSB) 0.021 12.00 kg 65.00 780.00
Reinforcing Steel Bar, Grade 40 1.05 604.00 kg 41.00 24,764.00
w/ 5% Wastage

C. SUB-TOTAL, MATERIALS P 25,544.00

SUMMARY:
A Equipment P 1,525.02
B Labor 2,208.34
C Materials 25,544.00
D TOTAL DIRECT COST P 29,277.36
DIRECT UNIT COST 50.92
E OCM 12% of D 3,513.28
F Profit 8% of D 2,342.19
G VAT 5% of (D+E+F) 1,756.64
H Total Cost (D+E+F+G) 36,889.47
I Unit Cost H/Quantity P 64.16
DETAILED UNIT PRICE ANALYSIS

CONCRETING OF KATUNGAWAN ROAD

Brgy. Buyun, Sta. Teresita, Cagayan

Item No. : 505(2) Quantity = 6.00


Description : GROUTED RIPRAP (APRON) Unit = Cu.m.

Production Output : = 180 kgs/hr.


No. of Hours : = 0.03 hours say 0.25 hours
No. of Days : = 0.00 days

A. Name and Capacity of Equipment (Operated) No. of Units No. of Hours Hourly Rate Total Cost (Pesos)
Factor
Bar Cutter 0.5 1.00 0.13 P 219.75 P 28.57
Bar Bender 0.5 1.00 0.13 351.50 45.70
Cargo Truck (9-10 mt) 0.15 1.00 0.04 1,212.00 48.48

A. SUB-TOTAL, EQUIPMENT P 122.75

B. Designation Personnel No. of Men No. of Hours Unit Rate/Hour Total Cost (Pesos)

Foreman 1.00 0.25 P 98.09 P 24.52


Skilled Labor 2.00 0.25 71.10 35.55
Unskilled Labor 8.00 0.25 54.90 109.80

B. SUB-TOTAL, LABOR P 169.87

C. Name and Description Qty Unit Unit Price Total Cost (Pesos)
Factor
Tie Wire (2% of RSB) 0.021 - kg 65.00 -
Reinforcing Steel Bar, Grade 40 1.05 6.00 kg 41.00 246.00
w/ 5% Wastage

C. SUB-TOTAL, MATERIALS P 246.00

SUMMARY:
A Equipment P 122.75
B Labor 169.87
C Materials 246.00
D TOTAL DIRECT COST P 538.62
DIRECT UNIT COST 89.77
E OCM 12% of D 64.63
F Profit 8% of D 43.09
G VAT 5% of (D+E+F) 32.32
H Total Cost (D+E+F+G) 678.66
I Unit Cost H/Quantity P 113.11
DETAILED UNIT PRICE ANALYSIS

CONCRETING OF KATUNGAWAN ROAD

Brgy. Buyun, Sta. Teresita, Cagayan

Item No. : 405(1)a3 Quantity = 4.00


Description : STRUCTURAL CONCRETE Unit = Cu.m.

Production Output : = 1.4 cu.m/hr.


No. of Hours : = 2.86 hours say 3.00 hours
No. of Days : = 0.36 days

A. Name and Capacity of Equipment (Operated) No. of Units No. of Hours Hourly Rate Total Cost (Pesos)
Factor
One Bagger Mixer 1 1.00 3.00 P 172.00 P 516.00
Concrete Vibrator 1 1.00 3.00 91.25 273.75
Water Truck (16000 L) 0.1 1.00 0.30 2,450.00 735.00
Minor Tools (5% of Labor Cost) 231.79

A. SUB-TOTAL, EQUIPMENT P 1,756.54

B. Designation Personnel No. of Men No. of Hours Unit Rate/Hour Total Cost (Pesos)

Foreman 1.00 3.00 P 98.09 P 294.27


Skilled Labor 4.00 3.00 71.10 853.20
Unskilled Labor 8.00 3.00 54.90 1,317.60
Installation & Removal of Formworks
Skilled Labor 4.00 3.00 71.10 853.20
Unskilled Labor 8.00 3.00 54.90 1,317.60

B. SUB-TOTAL, LABOR P 4,635.87

C. Name and Description Qty Unit Unit Price Total Cost (Pesos)
Factor
Lumber, Good - 4uses 70 70.00 bd.ft. 45.00 3,150.00
Marine Plywood, (1/2"x 4' x 8')- 4 uses 1.6 2.00 pcs. 750.00 1,500.00
Assorted CWN ( 1 kg./100 bd.ft. of Lumber) 0.7 3.00 kg. 70.00 210.00
Cement 9.5 38.00 bag 265.00 10,070.00
Sand 0.5 2.00 cu.m 858.71 1,717.41
Gravel 1 4.00 cu.m 858.71 3,434.83

C. SUB-TOTAL, MATERIALS P 20,082.24

SUMMARY:
A Equipment P 1,756.54
B Labor 4,635.87
C Materials 20,082.24
D TOTAL DIRECT COST P 26,474.65
DIRECT UNIT COST 6,618.66
E OCM 12% of D 3,176.96
F Profit 8% of D 2,117.97
G VAT 5% of (D+E+F) 1,588.48
H Total Cost (D+E+F+G) 33,358.06
I Unit Cost H/Quantity P 8,339.52
DETAILED UNIT PRICE ANALYSIS

CONCRETING OF KATUNGAWAN ROAD

Brgy. Buyun, Sta. Teresita, Cagayan

Item No. : Err:509 Quantity = Err:509


Description : Err:509 Unit = Err:509

Production Output : = 1.4 cu.m/hr.


No. of Hours : = Err:509 hours say Err:509 hours
No. of Days : = Err:509 days

A. Name and Capacity of Equipment (Operated) No. of Units No. of Hours Hourly Rate Total Cost (Pesos)
Factor
One Bagger Mixer 1 1.00 Err:509 P 172.00 P Err:509
Concrete Vibrator 1 1.00 Err:509 91.25 Err:509
Water Truck (16000 L) 0.1 1.00 Err:509 2,450.00 Err:509
Minor Tools (5% of Labor Cost) Err:509

A. SUB-TOTAL, EQUIPMENT P Err:509

B. Designation Personnel No. of Men No. of Hours Unit Rate/Hour Total Cost (Pesos)

Foreman 1.00 Err:509 P 98.09 P Err:509


Skilled Labor 4.00 Err:509 71.10 Err:509
Unskilled Labor 8.00 Err:509 54.90 Err:509

B. SUB-TOTAL, LABOR P Err:509

C. Name and Description Qty Unit Unit Price Total Cost (Pesos)
Factor
Cement 8.5 Err:509 bag 265.00 Err:509
Sand 1 Err:509 cu.m 858.71 Err:509
Gravel 0.5 Err:509 cu.m 858.71 Err:509
Formworks 0.46 Err:509 bd.ft. 45.00 Err:509

C. SUB-TOTAL, MATERIALS P Err:509

SUMMARY:
A Equipment P Err:509
B Labor Err:509
C Materials Err:509
D TOTAL DIRECT COST P Err:509
DIRECT UNIT COST Err:509
E OCM 12% of D Err:509
F Profit 8% of D Err:509
G VAT 5% of (D+E+F) Err:509
H Total Cost (D+E+F+G) Err:509
I Unit Cost H/Quantity P Err:509
DETAILED UNIT PRICE ANALYSIS

CONCRETING OF KATUNGAWAN ROAD

Brgy. Buyun, Sta. Teresita, Cagayan

Item No. : 311(1)c1 Quantity = 5,500.00


Description : PORTLAND CEMENT CONCRETE PAVEMENT, UNREINFORCED (230mm Unit = Sq.m.
THK)

Production Output : = 80.50 sq.m/hr.


No. of Hours : = 68.32 hours say 68.50 hours
No. of Days : = 8.54 days

A. Name and Capacity of Equipment (Operated) No. of Units No. of Hours Hourly Rate Total Cost (Pesos)
Factor
Transit Mixer (5 cu.m) 1 4.00 68.50 P 1,318.00 P 361,132.00
Concrete Vibrator (30 cu.m) 1 2.00 68.50 91.25 12,501.25
Concrete Batch Plant 1 1.00 68.50 1,759.50 120,525.75
Payloader (1.5 cu.m),LX80-2C 1 1.00 68.50 1,733.00 118,710.50
Concrete Screeder (5.5 Hp) 1 1.00 68.50 545.00 37,332.50
Water Truck/Pump (16000 L) 1 1.00 68.50 2,450.00 167,825.00
Concrete Saw , Blade Ø 14" (7.5 Hp) 1 1.00 68.50 32.63 2,235.16
Bar Cutter Single Phase 0.1 1.00 6.85 219.75 1,505.29
Minor Tools(5% of Labor) 3,308.52

A. SUB-TOTAL, EQUIPMENT P 825,075.97

B. Designation Personnel No. of Men No. of Hours Unit Rate/Hour Total Cost (Pesos)

Foreman 1.00 68.50 P 91.41 P 6,261.48


Skilled Labor 4.00 68.50 66.06 18,100.62
Unskilled Labor 12.00 68.50 50.86 41,808.28

B. SUB-TOTAL, LABOR P 66,170.38

C. Name and Description Qty Unit Unit Price Total Cost (Pesos)
Factor
Reinforcing Steel Bar 0.39 2,145.00 kg 38.00 81,510.00
Curing Compound 0.29 1,595.00 lit 60.00 95,700.00
Asphalt Sealant 0.12 660.00 lit 55.25 36,465.00
Forms, Steel 20 cm. (rental) 0.46 2,530.00 l.m 40.00 101,200.00
Sand 0.11 605.00 cu.m 858.71 519,517.94
Gravel 0.2 1,100.00 cu.m 858.71 944,578.07
Cement 1.9 10,450.00 bag 270.00 2,821,500.00
Concrete Saw(Diamond blade 14") 0.00015 0.83 pc 7,500.00 6,225.00
Grease/Tar 0.0015 8.25 lit. 210.00 1,732.50

C. SUB-TOTAL, MATERIALS P 4,608,428.51

SUMMARY:
A Equipment P 825,075.97
B Labor 66,170.38
C Materials 4,608,428.51
D TOTAL DIRECT COST P 5,499,674.86
DIRECT UNIT COST 999.94
E OCM 15% of D 824,951.23
F Profit 10% of D 549,967.49
G VAT 5% of (D+E+F) 343,729.68
H Total Cost (D+E+F+G) 7,218,323.26
I Unit Cost H/Quantity P 1,312.42
DETAILED UNIT PRICE ANALYSIS

CONCRETING OF KATUNGAWAN ROAD

Brgy. Buyun, Sta. Teresita, Cagayan

Item No. : Err:509 Quantity = Err:509


Description : Err:509 Unit = Err:509

Production Output : = 1 ln.m/hr.


No. of Hours : = Err:509 hours say Err:509 hours
No. of Days : = Err:509 days

A. Name and Capacity of Equipment (Operated) No. of Units No. of Hours Hourly Rate Total Cost (Pesos)
Factor
Backhoe(0.80 cu.m) 0.29 1.00 Err:509 P 1,537.00 P Err:509
Plate Compactor (5Hp) 0.29 1.00 Err:509 123.00 Err:509
Minor Tools(10% of Labor) Err:509

A. SUB-TOTAL, EQUIPMENT P Err:509

B. Designation Personnel No. of Men No. of Hours Unit Rate/Hour Total Cost (Pesos)

Foreman 0.57 1.00 Err:509 P 98.09 P Err:509


Skilled Labor 0.57 2.00 Err:509 71.10 Err:509
Unskilled Labor 0.57 4.00 Err:509 54.90 Err:509

B. SUB-TOTAL, LABOR P Err:509

C. Name and Description Qty Unit Unit Price Total Cost (Pesos)
Factor
Portland Cement 1.08 Err:509 bag 265.00 Err:509
Sand 0.061 Err:509 cu.m 858.71 Err:509
R.C. Pipes (300 mm dia) 1 Err:509 pc 1,000.00 Err:509
Sand Bedding/ Selected Sandy Soil 0.128 Err:509 cu.m 711.28 Err:509

C. SUB-TOTAL, MATERIALS P Err:509

SUMMARY:
A Equipment P Err:509
B Labor Err:509
C Materials Err:509
D TOTAL DIRECT COST P Err:509
DIRECT UNIT COST Err:509
E OCM 12% of D Err:509
F Profit 8% of D Err:509
G VAT 5% of (D+E+F) Err:509
H Total Cost (D+E+F+G) Err:509
I Unit Cost H/Quantity P Err:509
DETAILED UNIT PRICE ANALYSIS

CONCRETING OF KATUNGAWAN ROAD

Brgy. Buyun, Sta. Teresita, Cagayan

Item No. : Err:509 Quantity = Err:509


Description : Err:509 Unit = Err:509

Foundation Fill = 0.14 cu.m


Production Output : = 1.25 cu.m per hour
No. of Hours : = 0.12 hours say 0.25 hours
No. of Days : = 0.01 days

RSB = 159.48 kg
Production Output : = 180 kg/hr
No. of Hours : = 0.89 hours say 1.00 hours
No. of Days : = 0.11 days

Structural Concrete = 2.64 cu.m


Production Output : = 1.40 cu.m/hr
No. of Hours : = 1.89 hours say 2.00 hours
No. of Days : = 0.24

A. Name and Capacity of Equipment (Operated) No. of Units No. of Hours Hourly Rate Total Cost (Pesos)
Factor
Foundation Fill
Plate Compactor (5Hp) 1 1.00 0.25 P 123.00 P 30.75
Water Truck/Pump (16000 L) 0.01 1.00 0.003 2,450.00 6.13
Minor Tools (10% of Labor) 7.94

RSB
Bar cutter 0.5 1.00 0.50 219.75 109.88
Bar Bender 0.5 1.00 0.50 351.50 175.75
Cargo Truck (10 T, 270 Hp) 0.15 1.00 0.15 1,212.00 181.80

Strucural Concrete

One Bagger Mixer 1 1.00 2.00 172.00 344.00


Concrete Vibrator 1 1.00 2.00 91.25 182.50
Water Truck/Pump (16000 L) 0.1 1.00 0.20 2,450.00 490.00
Minor Tools(5% of labor) 144.72

A. SUB-TOTAL, EQUIPMENT P 1,673.47

B. Designation Personnel No. of Men No. of Hours Unit Rate/Hour Total Cost (Pesos)

Foreman 1.00 3.25 P 98.09 P 318.79

Foundation Fill
Unskilled Labor 4.00 0.25 54.90 54.90

RSB
Skilled Labor 2.00 1.00 71.10 142.20
Unskilled Labor 8.00 1.00 54.90 439.20

Structural Concrete
Skilled Labor 8.00 2.00 71.10 1,137.60
DETAILED UNIT PRICE ANALYSIS

CONCRETING OF KATUNGAWAN ROAD

Brgy. Buyun, Sta. Teresita, Cagayan

Item No. : Err:509 Quantity = Err:509


Description : Err:509 Unit = Err:509

Unskilled Labor 16.00 2.00 54.90 1,756.80

B. SUB-TOTAL, LABOR P 3,849.49


DETAILED UNIT PRICE ANALYSIS

CONCRETING OF KATUNGAWAN ROAD

Brgy. Buyun, Sta. Teresita, Cagayan

Item No. : Err:509 Quantity = Err:509


Description : Err:509 Unit = Err:509

C. Name and Description Qty Unit Unit Price Total Cost (Pesos)
Factor

Filling Materials 1.15 0.17 cu.m 711.28 120.92


RSB, Grade 40, (w/ 5% wastage) 1.05 167.00 kg 41.00 6,847.00
# 16 Tie wire 0.021 3.35 kg 65.00 217.75
Lumber, Good - 4 uses 70 46.00 bd.ft 45.00 2,070.00
Marine Plywood(1/2" x 4' x 8') 1.6 1.00 pc 750.00 750.00
Assorted CWN(1kg/100 bd.ft. of Lumber 0.7 2.00 kg 70.00 140.00
Cement 9.5 25.00 bag 265.00 6,625.00
Sand 0.5 1.00 cu.m 858.71 858.71
Gravel 1 3.00 cu.m 858.71 2,576.12

C. SUB-TOTAL, MATERIALS P 20,084.58

SUMMARY:
A Equipment P 1,673.47
B Labor 3,849.49
C Materials 20,084.58
D TOTAL DIRECT COST P 25,607.54
DIRECT UNIT COST Err:509
E OCM 15% of D 3,841.13
F Profit 10% of D 2,560.75
G VAT 5% of (D+E+F) 1,600.47
H Total Cost (D+E+F+G) 33,609.89
I Unit Cost H/Quantity P Err:509
DETAILED UNIT PRICE ANALYSIS

CONCRETING OF KATUNGAWAN ROAD

Brgy. Buyun, Sta. Teresita, Cagayan

Item No. : Err:509 Quantity = Err:509


Description : Unit = Err:509
Err:509

Production Output : = 1 ln.m/hr.


No. of Hours : = Err:509 hours say Err:509 hours
No. of Days : = Err:509 days

A. Name and Capacity of Equipment (Operated) No. of Units No. of Hours Hourly Rate Total Cost (Pesos)
Factor
Backhoe(0.80 cu.m) 0.17 1.00 Err:509 P 1,537.00 P Err:509
Boom truck 0.17 1.00 Err:509 961.20 Err:509
Water Truck (1000 gal.) 0.08 1.00 Err:509 1,065.00 Err:509
Minor Tools(10% of Labor) Err:509

A. SUB-TOTAL, EQUIPMENT P Err:509

B. Designation Personnel No. of Men No. of Hours Unit Rate/Hour Total Cost (Pesos)

Foreman 1.00 Err:509 P 98.09 P Err:509


Skilled Labor 2.00 Err:509 71.10 Err:509
Unskilled Labor 4.00 Err:509 54.90 Err:509

B. SUB-TOTAL, LABOR P Err:509

C. Name and Description Qty Unit Unit Price Total Cost (Pesos)
Factor

C. SUB-TOTAL, MATERIALS P -

SUMMARY:
A Equipment P Err:509
B Labor Err:509
C Materials -
D TOTAL DIRECT COST P Err:509
DIRECT UNIT COST Err:509
E OCM 15% of D Err:509
F Profit 10% of D Err:509
G VAT 5% of (D+E+F) Err:509
H Total Cost (D+E+F+G) Err:509
I Unit Cost H/Quantity P Err:509
DETAILED UNIT PRICE ANALYSIS

CONCRETING OF KATUNGAWAN ROAD

Brgy. Buyun, Sta. Teresita, Cagayan

Item No. : Err:509 Quantity = Err:509


Description : Err:509 Unit = Err:509

Production Output : = 1 ln.m/hr.


No. of Hours : = Err:509 hours say Err:509 hours
No. of Days : = Err:509 days

A. Name and Capacity of Equipment (Operated) No. of Units No. of Hours Hourly Rate Total Cost (Pesos)
Factor
Backhoe(0.80 cu.m) 0.4 1.00 Err:509 P 1,537.00 P Err:509
Plate Compactor (5Hp) 0.4 1.00 Err:509 123.00 Err:509
Minor Tools(10% of Labor) Err:509

A. SUB-TOTAL, EQUIPMENT P Err:509

B. Designation Personnel No. of Men No. of Hours Unit Rate/Hour Total Cost (Pesos)

Foreman 0.8 1.00 Err:509 P 98.09 P Err:509


Skilled Labor 0.8 2.00 Err:509 71.10 Err:509
Unskilled Labor 0.8 4.00 Err:509 54.90 Err:509

B. SUB-TOTAL, LABOR P Err:509

C. Name and Description Qty Unit Unit Price Total Cost (Pesos)
Factor
Portland Cement 1.404 Err:509 bag 265.00 Err:509
Sand 0.08 Err:509 cu.m 858.71 Err:509
R.C. Pipes (1220 mm dia) 1 Err:509 pc 3,500.00 Err:509
Sand Bedding/ Selected Sandy Soil 0.17 Err:509 cu.m 711.28 Err:509
Err:509

C. SUB-TOTAL, MATERIALS P Err:509

SUMMARY:
A Equipment P Err:509
B Labor Err:509
C Materials Err:509
D TOTAL DIRECT COST P Err:509
DIRECT UNIT COST Err:509
E OCM 12% of D Err:509
F Profit 8% of D Err:509
G VAT 5% of (D+E+F) Err:509
H Total Cost (D+E+F+G) Err:509
I Unit Cost H/Quantity P Err:509
DETAILED UNIT PRICE ANALYSIS

CONCRETING OF KATUNGAWAN ROAD

Brgy. Buyun, Sta. Teresita, Cagayan

Item No. : 500(1)a1 Quantity = 4.00


Description : PIPE CULVERT (610mm Ø) Unit = Cu.m.

Production Output : = 1 ln.m/hr.


No. of Hours : = 4.00 hours say 4.00 hours
No. of Days : = 0.50 days

A. Name and Capacity of Equipment (Operated) No. of Units No. of Hours Hourly Rate Total Cost (Pesos)
Factor
Backhoe(0.80 cu.m) 0.22 1.00 0.88 P 1,537.00 P 1,352.56
Plate Compactor (5Hp) 0.22 1.00 0.88 123.00 108.24
Minor Tools(10% of Labor) 80.94

A. SUB-TOTAL, EQUIPMENT P 1,541.74

B. Designation Personnel No. of Men No. of Hours Unit Rate/Hour Total Cost (Pesos)

Foreman 0.44 1.00 1.76 P 98.09 P 172.64


Skilled Labor 0.44 2.00 1.76 71.10 250.27
Unskilled Labor 0.44 4.00 1.76 54.90 386.50

B. SUB-TOTAL, LABOR P 809.41

C. Name and Description Qty Unit Unit Price Total Cost (Pesos)
Factor
Portland Cement 0.774 3.00 bag 265.00 795.00
Sand 0.044 0.18 cu.m 858.71 154.57
R.C. Pipes (610 mm dia) 1 4.00 pc 1,050.00 4,200.00
Sand Bedding/ Selected Sandy Soil 0.088 - cu.m 711.28 -

C. SUB-TOTAL, MATERIALS P 5,149.57

SUMMARY:
A Equipment P 1,541.74
B Labor 809.41
C Materials 5,149.57
D TOTAL DIRECT COST P 7,500.72
DIRECT UNIT COST 1,875.18
E OCM 12% of D 900.09
F Profit 8% of D 600.06
G VAT 5% of (D+E+F) 450.04
H Total Cost (D+E+F+G) 9,450.91
I Unit Cost H/Quantity P 2,362.73
DETAILED UNIT PRICE ANALYSIS

CONCRETING OF KATUNGAWAN ROAD

Brgy. Buyun, Sta. Teresita, Cagayan

Item No. : 500(1)a3 Quantity = 2.00


Description : PIPE CULVERT (910mm Ø) Unit = Sq.m.

Production Output : = 1 ln.m/hr.


No. of Hours : = 2.00 hours say 2.00 hours
No. of Days : = 0.25 days

A. Name and Capacity of Equipment (Operated) No. of Units No. of Hours Hourly Rate Total Cost (Pesos)
Factor
Backhoe(0.80 cu.m) 0.22 1.00 0.44 P 1,537.00 P 676.28
Plate Compactor (5Hp) 0.22 1.00 0.44 123.00 54.12
Minor Tools(10% of Labor) 40.47

A. SUB-TOTAL, EQUIPMENT P 770.87

B. Designation Personnel No. of Men No. of Hours Unit Rate/Hour Total Cost (Pesos)

Foreman 0.44 1.00 0.88 P 98.09 P 86.32


Skilled Labor 0.44 2.00 0.88 71.10 125.14
Unskilled Labor 0.44 4.00 0.88 54.90 193.25

B. SUB-TOTAL, LABOR P 404.70

C. Name and Description Qty Unit Unit Price Total Cost (Pesos)
Factor
Portland Cement 0.774 2.00 bag 265.00 530.00
Sand 0.044 0.09 cu.m 858.71 77.28
R.C. Pipes (910 mm dia) 1 2.00 pc 3,800.00 7,600.00
Sand Bedding/ Selected Sandy Soil 0.088 0.20 cu.m 711.28 142.26

C. SUB-TOTAL, MATERIALS P 8,349.54

SUMMARY:
A Equipment P 770.87
B Labor 404.70
C Materials 8,349.54
D TOTAL DIRECT COST P 9,525.11
DIRECT UNIT COST 4,762.56
E OCM 12% of D 1,143.01
F Profit 8% of D 762.01
G VAT 5% of (D+E+F) 571.51
H Total Cost (D+E+F+G) 12,001.64
I Unit Cost H/Quantity P 6,000.82
DETAILED UNIT PRICE ANALYSIS

CONCRETING OF KATUNGAWAN ROAD

Brgy. Buyun, Sta. Teresita, Cagayan

Item No. : 505(2) Quantity = 6.00


Description : GROUTED RIPRAP (APRON) Unit = Cu.m.

Production Output : = 1.25 cu.m/hr.


No. of Hours : = 4.80 hours say 5.00 hours
No. of Days : = 0.60 days

A. Name and Capacity of Equipment (Operated) No. of Units No. of Hours Hourly Rate Total Cost (Pesos)
Factor
One Bagger Mixer 1.00 1.00 5.00 P 172.00 P 860.00
Water Truck/Pump (16000 L) 0.05 1.00 0.25 2,450.00 612.50
Minor Tools (5% of Labor) 169.87

A. SUB-TOTAL, EQUIPMENT P 1,642.37

B. Designation Personnel No. of Men No. of Hours Unit Rate/Hour Total Cost (Pesos)

Foreman 1.00 5.00 P 98.09 P 490.45


Skilled Labor 2.00 5.00 71.10 711.00
Unskilled Labor 8.00 5.00 54.90 2,196.00

B. SUB-TOTAL, LABOR P 3,397.45

C. Name and Description Qty Unit Unit Price Total Cost (Pesos)
Factor
Cement 3 18.00 bag 265.00 4,770.00
Sand 0.25 1.50 cu.m 858.71 1,288.06
Gravel Fill 0.015 0.09 cu.m 711.28 64.02
Boulders(15-25 kg.) 1.05 6.00 cu.m 947.30 5,683.83
12,062.58

Miscellaneous(1% of Materials) 120.63

C. SUB-TOTAL, MATERIALS P 12,183.21

SUMMARY:
A Equipment P 1,642.37
B Labor 3,397.45
C Materials 12,183.21
D TOTAL DIRECT COST P 17,223.03
DIRECT UNIT COST 2,870.51
E OCM 12% of D 2,066.76
F Profit 8% of D 1,377.84
G VAT 5% of (D+E+F) 1,033.38
H Total Cost (D+E+F+G) 21,701.01
I Unit Cost H/Quantity P 3,616.84
DETAILED UNIT PRICE ANALYSIS

CONCRETING OF KATUNGAWAN ROAD

Brgy. Buyun, Sta. Teresita, Cagayan

Item No. : 506(1) Quantity = 2,235.00


Description : STONE MASONRY Unit = Cu.m.

Production Output : = 1.6 cu.m/hr.


No. of Hours : = 1,396.88 hours say 1397.00 hours
No. of Days : = 174.61 days

A. Name and Capacity of Equipment (Operated) No. of Units No. of Hours Hourly Rate Total Cost (Pesos)
Factor
One Bagger Mixer 1.00 1.00 1,397.00 P 172.00 P 240,284.00
Water Truck/Pump (16000 L) 0.05 1.00 69.85 2,450.00 171,132.50
Backhoe (Wheel Type 0.28 cu.m.) 0.10 1.00 139.70 922.00 128,803.40
Minor Tools (10% of Labor) 94,924.75

A. SUB-TOTAL, EQUIPMENT P 635,144.65

B. Designation Personnel No. of Men No. of Hours Unit Rate/Hour Total Cost (Pesos)

Foreman 1.00 1,397.00 P 98.09 P 137,031.73


Skilled Labor 2.00 1,397.00 71.10 198,653.40
Unskilled Labor 8.00 1,397.00 54.90 613,562.40

B. SUB-TOTAL, LABOR P 949,247.53

C. Name and Description Qty Unit Unit Price Total Cost (Pesos)
Factor
Cement 5.5 12,292.50 bag 265.00 3,257,512.50
Sand 0.3 671.00 cu.m 858.71 576,192.62
Gravel Fill 0.02 45.00 cu.m 711.28 32,007.60
Weepholes (PVC) 76mm dia. 0.3 671.00 ln.m 128.33 86,111.67
Filter Cloth 0.015 33.53 sq.m. 160.00 5,364.80
Boulders(15-25 kg.) 1.05 2,347.00 cu.m 947.30 2,223,324.40
6,180,513.59

Miscellaneous(1% of Materials) 61,805.14

C. SUB-TOTAL, MATERIALS P 6,242,318.73

SUMMARY:
A Equipment P 635,144.65
B Labor 949,247.53
C Materials 6,242,318.73
D TOTAL DIRECT COST P 7,826,710.91
DIRECT UNIT COST 3,501.88
E OCM 12% of D 939,205.31
F Profit 8% of D 626,136.87
G VAT 5% of (D+E+F) 469,602.65
H Total Cost (D+E+F+G) 9,861,655.74
I Unit Cost H/Quantity P 4,412.37
DETAILED UNIT PRICE ANALYSIS
Construction/Widening/Upgrading/Rehabilitation of Access Road, Aparri, Airport, Maura
Sta. 0+000 -Sta. 2+650

Item No. : Err:509 Quantity = Err:509

Description : Err:509 Unit = Err:509

Production Output : = 17.5 ea./hr.


No. of Hours : = Err:509 hours say Err:509 hours
No. of Days : = Err:509 days

A. Name and Capacity of Equipment (Operated) No. of Units No. of Hours Hourly Rate Total Cost (Pesos)
Factor

One Bagger Mixer 1 1.00 Err:509 172.00 Err:509


Concrete Vibrator 1 1.00 Err:509 91.25 Err:509
Water Truck/Pump (16000 L) 0.05 1.00 Err:509 2,450.00 Err:509
Minor Tools(5% of Labor) Err:509

A. SUB-TOTAL, EQUIPMENT P Err:509

B. Designation Personnel No. of Men No. of Hours Unit Rate/Hour Total Cost (Pesos)

Foreman 1.00 Err:509 P 98.09 P Err:509


Skilled Labor 4.00 Err:509 71.10 Err:509
Unskilled Labor 8.00 Err:509 54.90 Err:509

B. SUB-TOTAL, LABOR P Err:509

C. Name and Description Qty Unit Unit Price Total Cost (Pesos)
Factor
Portland Cement 0.72 Err:509 bag 265.00 Err:509
Sand 0.04 Err:509 cu.m 858.71 Err:509
Gravel 0.080 Err:509 cu.m 858.71 Err:509
Lumber - 4 uses 3.28 Err:509 bd-ft 45.00 Err:509
Reinforcing Steel Bars, Grade 40 0.84 Err:509 kg 41.00 Err:509
Assorted CWN (1 kg./100 bd. Ft of Lumber) 0.03 Err:509 kg 530.00 Err:509

C. SUB-TOTAL, MATERIALS P Err:509

SUMMARY:
A Equipment P Err:509
B Labor Err:509
C Materials Err:509
D TOTAL DIRECT COST P Err:509
DIRECT UNIT COST Err:509
E OCM 12% of D Err:509
F Profit 8% of D Err:509
G VAT 5% of (D+E+F) Err:509
H Total Cost (D+E+F+G) Err:509
I Unit Cost H/Quantity P Err:509
DETAILED UNIT PRICE ANALYSIS

CONCRETING OF KATUNGAWAN ROAD

Brgy. Buyun, Sta. Teresita, Cagayan

Item No. : Err:509 Quantity = Err:509


Description : Err:509 Unit = Err:509

Production Output : = 1.25 cu.m/hr.


No. of Hours : = Err:509 hours say Err:509 hours
No. of Days : = Err:509 days

A. Name and Capacity of Equipment (Operated) No. of Units No. of Hours Hourly Rate Total Cost (Pesos)
Factor
One Bagger Mixer 1.00 1.00 Err:509 P 172.00 P Err:509
Water Truck/Pump (16000 L) 0.05 1.00 Err:509 2,450.00 Err:509
Minor Tools (5% of Labor) Err:509

A. SUB-TOTAL, EQUIPMENT P Err:509

B. Designation Personnel No. of Men No. of Hours Unit Rate/Hour Total Cost (Pesos)

Foreman 1.00 Err:509 P 98.09 P Err:509


Skilled Labor 2.00 Err:509 71.10 Err:509
Unskilled Labor 8.00 Err:509 54.90 Err:509

B. SUB-TOTAL, LABOR P Err:509

C. Name and Description Qty Unit Unit Price Total Cost (Pesos)
Factor
Cement 3 Err:509 bag 265.00 Err:509
Sand 0.25 Err:509 cu.m 858.71 Err:509
Gravel Fill 0.015 Err:509 cu.m 711.28 Err:509
Boulders(15-25 kg.) 1.05 Err:509 cu.m 947.30 Err:509
Err:509

Miscellaneous(1% of Materials) Err:509

C. SUB-TOTAL, MATERIALS P Err:509

SUMMARY:
A Equipment P Err:509
B Labor Err:509
C Materials Err:509
D TOTAL DIRECT COST P Err:509
DIRECT UNIT COST Err:509
E OCM 12% of D Err:509
F Profit 8% of D Err:509
G VAT 5% of (D+E+F) Err:509
H Total Cost (D+E+F+G) Err:509
I Unit Cost H/Quantity P Err:509
DETAILED UNIT PRICE ANALYSIS

CONCRETING OF KATUNGAWAN ROAD

Brgy. Buyun, Sta. Teresita, Cagayan

Item No. : Err:509 Quantity = Err:509


Description : Err:509 Unit = Err:509

Production Output : = 1.4 cu.m/hr.


No. of Hours : = Err:509 hours say Err:509 hours
No. of Days : = Err:509 days

A. Name and Capacity of Equipment (Operated) No. of Units No. of Hours Hourly Rate Total Cost (Pesos)
Factor
One Bagger Mixer 1.00 1.00 Err:509 P 172.00 P Err:509
Water Truck/Pump (16000 L) 0.05 1.00 Err:509 2,450.00 Err:509
Backhoe (Wheel Type 0.28 cu.m.) 0.10 1.00 Err:509 922.00 Err:509
Minor Tools (5% of Labor) Err:509

A. SUB-TOTAL, EQUIPMENT P Err:509

B. Designation Personnel No. of Men No. of Hours Unit Rate/Hour Total Cost (Pesos)

Foreman 1.00 Err:509 P 98.09 P Err:509


Skilled Labor 2.00 Err:509 71.10 Err:509
Unskilled Labor 8.00 Err:509 54.90 Err:509

B. SUB-TOTAL, LABOR P Err:509

C. Name and Description Qty Unit Unit Price Total Cost (Pesos)
Factor
Cement 4.2 Err:509 bag 265.00 Err:509
Sand 0.2625 Err:509 cu.m 858.71 Err:509
Gravel Fill 0.02 Err:509 cu.m 711.28 Err:509
Weepholes (PVC) 76mm dia. 0.3 Err:509 ln.m 128.33 Err:509
Filter Cloth 0.015 Err:509 sq.m. 160.00 Err:509
Boulders 0.63 Err:509 cu.m 947.30 Err:509
Gravel 0.525 Err:509 cu.m 858.71 Err:509
Err:509

Miscellaneous(2% of Materials) Err:509

C. SUB-TOTAL, MATERIALS P Err:509

SUMMARY:
A Equipment P Err:509
B Labor Err:509
C Materials Err:509
D TOTAL DIRECT COST P Err:509
DIRECT UNIT COST Err:509
E OCM 12% of D Err:509
F Profit 8% of D Err:509
G VAT 5% of (D+E+F) Err:509
H Total Cost (D+E+F+G) Err:509
I Unit Cost H/Quantity P Err:509
DETAILED UNIT PRICE ANALYSIS

CONCRETING OF KATUNGAWAN ROAD

Brgy. Buyun, Sta. Teresita, Cagayan

Item No. : Err:509 Quantity = Err:509

Description : Err:509 Unit = Err:509

Production Output : = 4.2 m./hr.


No. of Hours : = Err:509 hours say Err:509 hours
No. of Days : = Err:509 days

A. Name and Capacity of Equipment (Operated) No. of Units No. of Hours Hourly Rate Total Cost (Pesos)
Factor
Cargo Truck (9-10 mt) 0.25 1.00 Err:509 P 1,212.00 Err:509
One Bagger Mixer 0.5 1.00 Err:509 172.00 Err:509
Concrete Vibrator 0.5 1.00 Err:509 91.25 Err:509
Water Truck/Pump (16000 L) 0.05 1.00 Err:509 2,450.00 Err:509
Minor Tools(5% of Labor) Err:509

A. SUB-TOTAL, EQUIPMENT P Err:509

B. Designation Personnel No. of Men No. of Hours Unit Rate/Hour Total Cost (Pesos)

Foreman 1.00 Err:509 P 98.09 P Err:509


Skilled Labor 2.00 Err:509 71.10 Err:509
Unskilled Labor 4.00 Err:509 54.90 Err:509

B. SUB-TOTAL, LABOR P Err:509

C. Name and Description Qty Unit Unit Price Total Cost (Pesos)
Factor
Portland Cement 0.33 Err:509 bag 265.00 Err:509
Sand 0.018 Err:509 cu.m 858.71 Err:509
Gravel 0.036 Err:509 cu.m 858.71 Err:509
Metal Beam Guardrail 1.000 Err:509 m 1,950.00 Err:509
Plywood Marine, 1/2" thk 4' x 8' - 4 uses 0.25 Err:509 pc 750.00 Err:509
Lumber - 4 uses 8 Err:509 bd-ft 45.00 Err:509
Reinforcing Steel Bars, Grade 40 4 Err:509 kg 41.00 Err:509
Tie Wire (2% of SB) 0.08 Err:509 kg 65.00 Err:509
Assorted CWN (1 kg./100 bd. Ft of Lumber) 0.08 Err:509 kg 70.00 Err:509
Bolt, Nuts & Washer, 5/8" Ф x 9" 0.5 Err:509 pc 101.00 Err:509
Bolt, Nuts & Washer, 5/8" Ф x 1" 2 Err:509 pc 11.00 Err:509

C. SUB-TOTAL, MATERIALS P Err:509

SUMMARY:
A Equipment P Err:509
B Labor Err:509
C Materials Err:509
D TOTAL DIRECT COST P Err:509
DIRECT UNIT COST Err:509
E OCM 12% of D Err:509
F Profit 8% of D Err:509
G VAT 5% of (D+E+F) Err:509
H Total Cost (D+E+F+G) Err:509
I Unit Cost H/Quantity P Err:509
DETAILED UNIT PRICE ANALYSIS
Construction/Widening/Upgrading/Rehabilitation of Access Road, Aparri, Airport, Maura
Sta. 0+000 -Sta. 2+650

Item No. : Err:509 Quantity = Err:509

Description : Err:509 Unit = Err:509

Production Output : = 1 ea./hr.


No. of Hours : = Err:509 hours say Err:509 hours
No. of Days : = Err:509 days

A. Name and Capacity of Equipment (Operated) No. of Units No. of Hours Hourly Rate Total Cost (Pesos)
Factor
Cargo Truck (5T) 0.25 1.00 Err:509 P 712.00 Err:509
Minor Tools(5% of Labor) Err:509

A. SUB-TOTAL, EQUIPMENT P Err:509

B. Designation Personnel No. of Men No. of Hours Unit Rate/Hour Total Cost (Pesos)

Foreman 1.00 Err:509 P 98.09 P Err:509


Skilled Labor 1.00 Err:509 71.10 Err:509
Unskilled Laborers 2.00 Err:509 54.90 Err:509

B. SUB-TOTAL, LABOR P Err:509

C. Name and Description Qty Unit Unit Price Total Cost (Pesos)
Factor
Portland Cement 0.48 Err:509 bag 230.00 Err:509
Sand 0.025 Err:509 cu.m 482.26 Err:509
Gravel 0.050 Err:509 cu.m 506.50 Err:509
Form Lumber, Good - 4 Uses 8 Err:509 bd.ft 45.00 Err:509
75mmФ G.I. Pipe 3.25 Err:509 m 400.00 Err:509
G.I . Flat Bar, 1 1/2"x1/8" 5 Err:509 kg 530.00 Err:509
G.I. Bolts w/ Nuts & Washer, 5mm Ф 3 Err:509 pc 48.00 Err:509
G.I. Bolts w/ Nuts & Washer, 2mm Ф 12 Err:509 pc 10.00 Err:509
Sign Face, 3mm thk. Aluminum Sheet 2 Err:509 pc 10.00 Err:509
Assorted CWN (1 kg./100 bd. Ft of Lumber) 0.08 Err:509 kg 85.00 Err:509
Err:509
Miscellaneous(.3% of Materials) Err:509

C. SUB-TOTAL, MATERIALS P Err:509

SUMMARY:
A Equipment P Err:509
B Labor Err:509
C Materials Err:509
D TOTAL DIRECT COST P Err:509
DIRECT UNIT COST Err:509
E OCM 12% of D Err:509
F Profit 8% of D Err:509
G VAT 5% of (D+E+F) Err:509
H Total Cost (D+E+F+G) Err:509
I Unit Cost H/Quantity P Err:509
DETAILED UNIT PRICE ANALYSIS

CONCRETING OF KATUNGAWAN ROAD

Brgy. Buyun, Sta. Teresita, Cagayan

Item No. : Err:509 Quantity = Err:509


Description : Err:509 Unit = Err:509

Production Output : = 6 ea./hr.


No. of Hours : = Err:509 hours say Err:509 hours
No. of Days : = Err:509 days

A. Name and Capacity of Equipment (Operated) No. of Units No. of Hours Hourly Rate Total Cost (Pesos)
Factor
Cargo Truck (9-10 mt) 1 1.00 Err:509 P 1,212.00 Err:509
Minor Tools(5% of Labor) Err:509

A. SUB-TOTAL, EQUIPMENT P Err:509

B. Designation Personnel No. of Men No. of Hours Unit Rate/Hour Total Cost (Pesos)

Foreman 1.00 Err:509 P 98.09 P Err:509


Skilled Labor 1.00 Err:509 71.10 Err:509
Unskilled Labor 2.00 Err:509 54.90 Err:509

B. SUB-TOTAL, LABOR P Err:509

C. Name and Description Qty Unit Unit Price Total Cost (Pesos)
Factor
Metal Guardrail End Piece 1 Err:509 each 1,350.00 Err:509

C. SUB-TOTAL, MATERIALS P Err:509

SUMMARY:
A Equipment P Err:509
B Labor Err:509
C Materials Err:509
D TOTAL DIRECT COST P Err:509
DIRECT UNIT COST Err:509
E OCM 12% of D Err:509
F Profit 8% of D Err:509
G VAT 5% of (D+E+F) Err:509
H Total Cost (D+E+F+G) Err:509
I Unit Cost H/Quantity P Err:509
DETAILED UNIT PRICE ANALYSIS

CONCRETING OF KATUNGAWAN ROAD

Brgy. Buyun, Sta. Teresita, Cagayan

Item No. : Err:509 Quantity = Err:509

Description : Err:509 Unit = Err:509

Production Output : = 1 ea./hr.


No. of Hours : = Err:509 hours say Err:509 hours
No. of Days : = Err:509 days

A. Name and Capacity of Equipment (Operated) No. of Units No. of Hours Hourly Rate Total Cost (Pesos)
Factor
Cargo Truck (2-5 mt) 0.25 1.00 Err:509 P 783.00 Err:509
Minor Tools (10% of Labor) Err:509

A. SUB-TOTAL, EQUIPMENT P Err:509

B. Designation Personnel No. of Men No. of Hours Unit Rate/Hour Total Cost (Pesos)

Foreman 1.00 Err:509 P 98.09 P Err:509


Skilled Labor 1.00 Err:509 71.10 Err:509
Unskilled Labor 2.00 Err:509 54.90 Err:509

B. SUB-TOTAL, LABOR P Err:509

C. Name and Description Qty Unit Unit Price Total Cost (Pesos)
Factor
Portland Cement 1.32 Err:509 bag 265.00 Err:509
Sand 0.073 Err:509 cu.m 858.71 Err:509
Gravel 0.145 Err:509 cu.m 858.71 Err:509
Form Lumber, Good - 4 uses 8 Err:509 bd-ft 45.00 Err:509
3" Dia GI Pipe 3.1 Err:509 m 400.00 Err:509
Plate 2 Err:509 kg 70.00 Err:509
Bolts, 5mm Dia 12 Err:509 pc 11.00 Err:509
Sign Face, 3mm thk Aluminum Sheet 1 Err:509 pc 3,500.00 Err:509
Assorted CWN (1kg/100 bd.ft. of Lumber) 0 Err:509 kg 65.00 Err:509

C. SUB-TOTAL, MATERIALS P Err:509

SUMMARY:
A Equipment P Err:509
B Labor Err:509
C Materials Err:509
D TOTAL DIRECT COST P Err:509
DIRECT UNIT COST Err:509
E OCM 12% of D Err:509
F Profit 8% of D Err:509
G VAT 5% of (D+E+F) Err:509
H Total Cost (D+E+F+G) Err:509
I Unit Cost H/Quantity P Err:509
DETAILED UNIT PRICE ANALYSIS

CONCRETING OF KATUNGAWAN ROAD

Brgy. Buyun, Sta. Teresita, Cagayan

Item No. : Err:509 Quantity = Err:509

Description : Err:509 Unit = Err:509

Production Output : = 4.2 ea./hr.


No. of Hours : = Err:509 hours say Err:509 hours
No. of Days : = Err:509 days

A. Name and Capacity of Equipment (Operated) No. of Units No. of Hours Hourly Rate Total Cost (Pesos)
Factor
Cargo Truck (9-10 mt) 0.25 1.00 Err:509 P 1,212.00 Err:509
One Bagger Mixer 0.5 1.00 Err:509 172.00 Err:509
Concrete Vibrator 0.5 1.00 Err:509 91.25 Err:509
Water Truck/Pump (16000 L) 0.05 1.00 Err:509 2,450.00 Err:509
Minor Tools(5% of Labor) Err:509

A. SUB-TOTAL, EQUIPMENT P Err:509

B. Designation Personnel No. of Men No. of Hours Unit Rate/Hour Total Cost (Pesos)

Foreman 1.00 Err:509 P 98.09 P Err:509


Skilled Labor 2.00 Err:509 71.10 Err:509
Unskilled Labor 4.00 Err:509 54.90 Err:509

B. SUB-TOTAL, LABOR P Err:509

C. Name and Description Qty Unit Unit Price Total Cost (Pesos)
Factor
Portland Cement 0.33 Err:509 bag 265.00 Err:509
Sand 0.018 Err:509 cu.m 858.71 Err:509
Gravel 0.036 Err:509 cu.m 858.71 Err:509
Metal Beam Guardrail 1.000 Err:509 m 1,950.00 Err:509
Plywood Marine, 1/2" thk 4' x 8' - 4 uses 0.25 Err:509 pc 750.00 Err:509
Lumber - 4 uses 8 Err:509 bd-ft 45.00 Err:509
Reinforcing Steel Bars, Grade 40 4 Err:509 kg 41.00 Err:509
Tie Wire (2% of SB) 0.08 Err:509 kg 65.00 Err:509
Assorted CWN (1 kg./100 bd. Ft of Lumber) 0.08 Err:509 kg 530.00 Err:509
Bolt, Nuts & Washer, 5/8" Ф x 9" 0.5 Err:509 pc 101.00 Err:509
Bolt, Nuts & Washer, 5/8" Ф x 1" 2 Err:509 pc 11.00 Err:509

C. SUB-TOTAL, MATERIALS P Err:509

SUMMARY:
A Equipment P Err:509
B Labor Err:509
C Materials Err:509
D TOTAL DIRECT COST P Err:509
DIRECT UNIT COST Err:509
E OCM 12% of D Err:509
F Profit 8% of D Err:509
G VAT 5% of (D+E+F) Err:509
H Total Cost (D+E+F+G) Err:509
I Unit Cost H/Quantity P Err:509
DETAILED UNIT PRICE ANALYSIS

CONCRETING OF KATUNGAWAN ROAD

Brgy. Buyun, Sta. Teresita, Cagayan

Item No. : Err:509 Quantity = Err:509

Description : Err:509 Unit = Err:509

Production Output : = 4.2 m./hr.


No. of Hours : = Err:509 hours say Err:509 hours
No. of Days : = Err:509 days

A. Name and Capacity of Equipment (Operated) No. of Units No. of Hours Hourly Rate Total Cost (Pesos)
Factor
Cargo Truck (9-10 mt) 0.25 1.00 Err:509 P 1,212.00 Err:509
One Bagger Mixer 0.5 1.00 Err:509 172.00 Err:509
Concrete Vibrator 0.5 1.00 Err:509 91.25 Err:509
Water Truck/Pump (16000 L) 0.05 1.00 Err:509 2,450.00 Err:509
Minor Tools(5% of Labor) Err:509

A. SUB-TOTAL, EQUIPMENT P Err:509

B. Designation Personnel No. of Men No. of Hours Unit Rate/Hour Total Cost (Pesos)

Foreman 1.00 Err:509 P 98.09 P Err:509


Skilled Labor 2.00 Err:509 71.10 Err:509
Unskilled Labor 4.00 Err:509 54.90 Err:509

B. SUB-TOTAL, LABOR P Err:509

C. Name and Description Qty Unit Unit Price Total Cost (Pesos)
Factor
Portland Cement 0.33 Err:509 bag 265.00 Err:509
Sand 0.018 Err:509 cu.m 858.71 Err:509
Gravel 0.036 Err:509 cu.m 858.71 Err:509
Metal Beam Guardrail 1.000 Err:509 m 1,950.00 Err:509
Plywood Marine, 1/2" thk 4' x 8' - 4 uses 0.25 Err:509 pc 750.00 Err:509
Lumber - 4 uses 8 Err:509 bd-ft 45.00 Err:509
Reinforcing Steel Bars, Grade 40 4 Err:509 kg 41.00 Err:509
Tie Wire (2% of SB) 0.08 Err:509 kg 65.00 Err:509
Assorted CWN (1 kg./100 bd. Ft of Lumber) 0.08 Err:509 kg 530.00 Err:509
Bolt, Nuts & Washer, 5/8" Ф x 9" 0.5 Err:509 pc 101.00 Err:509
Bolt, Nuts & Washer, 5/8" Ф x 1" 2 Err:509 pc 11.00 Err:509

C. SUB-TOTAL, MATERIALS P Err:509

SUMMARY:
A Equipment P Err:509
B Labor Err:509
C Materials Err:509
D TOTAL DIRECT COST P Err:509
DIRECT UNIT COST Err:509
E OCM 12% of D Err:509
F Profit 8% of D Err:509
G VAT 5% of (D+E+F) Err:509
H Total Cost (D+E+F+G) Err:509
I Unit Cost H/Quantity P Err:509
DETAILED UNIT PRICE ANALYSIS

CONCRETING OF KATUNGAWAN ROAD

Brgy. Buyun, Sta. Teresita, Cagayan

Item No. : Err:509 Quantity = Err:509

Description : Err:509 Unit = Err:509

Production Output : = 1 ea./hr.


No. of Hours : = Err:509 hours say Err:509 hours
No. of Days : = Err:509 days

A. Name and Capacity of Equipment (Operated) No. of Units No. of Hours Hourly Rate Total Cost (Pesos)
Factor
Cargo Truck (2-5 mt) 0.25 1.00 Err:509 P 783.00 Err:509
Minor Tools (10% of Labor) Err:509

A. SUB-TOTAL, EQUIPMENT P Err:509

B. Designation Personnel No. of Men No. of Hours Unit Rate/Hour Total Cost (Pesos)

Foreman 1.00 Err:509 P 98.09 P Err:509


Skilled Labor 1.00 Err:509 71.10 Err:509
Unskilled Labor 2.00 Err:509 54.90 Err:509

B. SUB-TOTAL, LABOR P Err:509

C. Name and Description Qty Unit Unit Price Total Cost (Pesos)
Factor
Portland Cement 1.32 Err:509 bag 265.00 Err:509
Sand 0.073 Err:509 cu.m 858.71 Err:509
Gravel 0.145 Err:509 cu.m 858.71 Err:509
Form Lumber, Good - 4 uses 8 Err:509 bd-ft 45.00 Err:509
3" Dia GI Pipe 3.1 Err:509 m 400.00 Err:509
Plate 2 Err:509 kg 70.00 Err:509
Bolts, 5mm Dia 12 Err:509 pc 11.00 Err:509
Sign Face, 3mm thk Aluminum Sheet 1 Err:509 pc 3,500.00 Err:509
Assorted CWN (1kg/100 bd.ft. of Lumber) 0 Err:509 kg 65.00 Err:509

C. SUB-TOTAL, MATERIALS P Err:509

SUMMARY:
A Equipment P Err:509
B Labor Err:509
C Materials Err:509
D TOTAL DIRECT COST P Err:509
DIRECT UNIT COST Err:509
E OCM 12% of D Err:509
F Profit 8% of D Err:509
G VAT 5% of (D+E+F) Err:509
H Total Cost (D+E+F+G) Err:509
I Unit Cost H/Quantity P Err:509
DETAILED UNIT PRICE ANALYSIS

CONCRETING OF KATUNGAWAN ROAD

Brgy. Buyun, Sta. Teresita, Cagayan

Item No. : Err:509 Quantity = Err:509


Description : Unit = Err:509
Err:509
Production Output : = 25 sq.m../hr.
No. of Hours : = Err:509 hours say Err:509 hours
No. of Days : = Err:509 days

A. Name and Capacity of Equipment (Operated) No. of Units No. of Hours Hourly Rate Total Cost (Pesos)
Factor
Cargo Truck/Delivery Truck (2-5 mt) 1 1.00 Err:509 P 783.00 Err:509
Applicator Machine 1 1.00 Err:509 93.75 Err:509
Kneading Machine 1 1.00 Err:509 187.50 Err:509
Minor Tools(10% of Labor) Err:509

A. SUB-TOTAL, EQUIPMENT P Err:509

B. Designation Personnel No. of Men No. of Hours Unit Rate/Hour Total Cost (Pesos)

Foreman 1.00 Err:509 P 98.09 P Err:509


Skilled Labor 2.00 Err:509 71.10 Err:509
Unskilled Labor 6.00 Err:509 54.90 Err:509

B. SUB-TOTAL, LABOR P Err:509

C. Name and Description Qty Unit Unit Price Total Cost (Pesos)
Factor
Thermoplastic Paint (White) 0.325 Err:509 bag 1,721.50 Err:509
Glass Beads 0.033 Err:509 bag 795.00 Err:509
Primer 0.120 Err:509 L 150.00 Err:509
LPG (50 kg) 0.004 Err:509 cyl 3,100.00 Err:509
LPG (12 kg) 0.002 1.00 cyl 744.00 744.00
Calsumine 0.125 Err:509 kg 25.00 Err:509
Err:509
Miscellaneous(5% of Materials) Err:509

C. SUB-TOTAL, MATERIALS P Err:509

SUMMARY:
A Equipment P Err:509
B Labor Err:509
C Materials Err:509
D TOTAL DIRECT COST P Err:509
DIRECT UNIT COST Err:509
E OCM 12% of D Err:509
F Profit 8% of D Err:509
G VAT 5% of (D+E+F) Err:509
H Total Cost (D+E+F+G) Err:509
I Unit Cost H/Quantity P Err:509
DETAILED UNIT PRICE ANALYSIS

CONCRETING OF KATUNGAWAN ROAD

Brgy. Buyun, Sta. Teresita, Cagayan

Item No. : Err:509 Quantity = Err:509


Description : Unit = Err:509
Err:509
Production Output : = 25 sq.m./hr.
No. of Hours : = Err:509 hours say Err:509 hours
No. of Days : = Err:509 days

A. Name and Capacity of Equipment (Operated) No. of Units No. of Hours Hourly Rate Total Cost (Pesos)
Factor
Cargo Truck/Delivery Truck (2-5 mt) 1 1.00 Err:509 P 783.00 Err:509
Applicator Machine 1 1.00 Err:509 93.75 Err:509
Kneading Machine 1 1.00 Err:509 187.50 Err:509
Minor Tools(10% of Labor) Err:509

A. SUB-TOTAL, EQUIPMENT P Err:509

B. Designation Personnel No. of Men No. of Hours Unit Rate/Hour Total Cost (Pesos)

Foreman 1.00 Err:509 P 98.09 P Err:509


Skilled Labor 2.00 Err:509 71.10 Err:509
Unskilled Labor 6.00 Err:509 54.90 Err:509

B. SUB-TOTAL, LABOR P Err:509

C. Name and Description Qty Unit Unit Price Total Cost (Pesos)
Factor
Thermoplastic Paint (White) 0.325 Err:509 bag 1,958.00 Err:509
Glass Beads 0.033 Err:509 bag 795.00 Err:509
Primer 0.120 Err:509 L 175.00 Err:509
LPG (50 kg) 0.004 1.00 cyl 3,100.00 3,100.00
LPG (12 kg) 0.002 Err:509 cyl 744.00 Err:509
Calsumine 0.125 Err:509 kg 25.00 Err:509
Err:509
Miscellaneous(5% of Materials) Err:509

C. SUB-TOTAL, MATERIALS P Err:509

SUMMARY:
A Equipment P Err:509
B Labor Err:509
C Materials Err:509
D TOTAL DIRECT COST P Err:509
DIRECT UNIT COST Err:509
E OCM 12% of D Err:509
F Profit 8% of D Err:509
G VAT 5% of (D+E+F) Err:509
H Total Cost (D+E+F+G) Err:509
I Unit Cost H/Quantity P Err:509
DETAILED UNIT PRICE ANALYSIS

Convergence and Special Support Program-Construction/Improvement of Access Roads leading to Declared Tourism Destinations -
Construction of Concrete Road/Road Concreting - Poblacion Sta. Ana-Marede-Sta. Clara-Patunungan-Sinago Road leading to Boacag
Falls & Sinago Coves, incl. Bridge, Dungeg, Sta. Ana, Cagayan

Sta. Ana, Cagayan

Item No. : 611(1) Quantity = 11.00


Description : Trees Furnishing and Transplanting Unit = each

Production Output : = 1 each/hr.


No. of Hours : = 11.00 hours say 11.00 hours
No. of Days : = 1.38 days

A. Name and Capacity of Equipment (Operated) No. of Units No. of Hours Hourly Rate Total Cost (Pesos)
Factor
Cargo Truck (9-10 mt) 1 1.00 11.00
Backhoe 1 1.00 11.00
Water Truck 0.5 1.00 5.50
Minor Tools (10% of Labor Cost)

A. SUB-TOTAL, EQUIPMENT P -

B. Designation Personnel No. of Men No. of Hours Unit Rate/Hour Total Cost (Pesos)

B. SUB-TOTAL, LABOR P -

C. Name and Description Qty Unit Unit Price Total Cost (Pesos)

Furnishing of Trees 100 1,100.00 pcs 8.50 9,350.00

Transplanting (1,200 seedlings per hectare) 1.00 ha 6,500.00 6,500.00

C. SUB-TOTAL, MATERIALS P 15,850.00

SUMMARY:
A Equipment P -
B Labor -
C Materials 15,850.00
D TOTAL DIRECT COST P 15,850.00
DIRECT UNIT COST 1,440.91
E OCM 12% of D 1,902.00
F Profit 8% of D 1,268.00
G VAT 5% of (D+E+F) 951.00
H Total Cost (D+E+F+G) 19,971.00
I Unit Cost H/Quantity P 1,815.55
DETAILED UNIT PRICE ANALYSIS

CONCRETING OF KATUNGAWAN ROAD

Brgy. Buyun, Sta. Teresita, Cagayan

Item No. : Err:509 Quantity = Err:509


Description : Err:509 Unit = Err:509

Production Output : = 1 ea./hr.


No. of Hours : = Err:509 hours say Err:509 hours
No. of Days : = Err:509 days

A. Name and Capacity of Equipment (Operated) No. of Units No. of Hours Hourly Rate Total Cost (Pesos)
Factor
Cargo Truck/Delivery Truck (2-5 mt) 0.25 1.00 Err:509 P 783.00 Err:509
Minor Tools (10% of Labor) Err:509

A. SUB-TOTAL, EQUIPMENT P Err:509

B. Designation Personnel No. of Men No. of Hours Unit Rate/Hour Total Cost (Pesos)

Foreman 1.00 Err:509 P 98.09 P Err:509


Skilled Labor 1.00 Err:509 71.10 Err:509
Unskilled Labor 2.00 Err:509 54.90 Err:509

B. SUB-TOTAL, LABOR P Err:509

C. Name and Description Qty Unit Unit Price Total Cost (Pesos)
Factor
Portland Cement 0.48 Err:509 bag 265.00 Err:509
Sand 0.025 Err:509 cu.m 858.71 Err:509
Gravel 0.050 Err:509 cu.m 858.71 Err:509
Form Lumber, Good - 4 Uses 8 Err:509 bd.ft 45.00 Err:509
75mmФ G.I. Pipe 3.25 Err:509 m 400.00 Err:509
G.I . Flat Bar, 1 1/2"x1/8" 5 Err:509 kg 530.00 Err:509
G.I. Bolts w/ Nuts & Washer, 5mm Ф 3 Err:509 pc 48.00 Err:509
G.I. Bolts w/ Nuts & Washer, 2mm Ф 12 Err:509 pc 10.00 Err:509
Sign Face, 3mm thk. Aluminum Sheet 2 Err:509 pc 4,500.00 Err:509
Assorted CWN (1 kg./100 bd. Ft of Lumber) 0.08 Err:509 kg 70.00 Err:509
Err:509
Miscellaneous(0.3% of Materials) Err:509

C. SUB-TOTAL, MATERIALS P Err:509

SUMMARY:
A Equipment P Err:509
B Labor Err:509
C Materials Err:509
D TOTAL DIRECT COST P Err:509
DIRECT UNIT COST Err:509
E OCM 12% of D Err:509
F Profit 8% of D Err:509
G VAT 5% of (D+E+F) Err:509
H Total Cost (D+E+F+G) Err:509
I Unit Cost H/Quantity P Err:509
FURNISHING OF EMBANKMENT MATERIAL

1.. STOCKPILING AND LOADING:

use 1 -Bulldozer, D65A-8, = 500 cu.m./day


use 1 - Payloader, 2.10 cu.m.,148 HP Capacity = 500 cu.m./day
= Unit Cost P 27,032 + 13,864 /day = P 81.79 /cu.m.
500 cu.m./day
DUMP TRUCK TRAVEL
TERRAIN ROAD SURFACE SPEED (km/h)
2. HAULING COST CONDITION CONDITION
COMPUTATION OF CYCLE TIME LOADED EMPTY
Terrain = Flat/Rolling Paved 35 55
FLAT
Road Condition = Paved/unpaved Unpaved 30 45
Grade = Paved 30 40
ROLLING
Unpaved 25 35
Average Hauling Distance = 24.7 km Paved 20 30
MOUNTAINOUS
Unpaved 15 25
LOADING TIME (min) 3
Ave Speed, Loaded = 35 kph UNLOADING TIME (min) 2
Ave Speed, Empty = 55 kph ALLOWANCE FOR DELAY (min) 10% of Cycle Time

Loading Time = 3.0 min


Travel Time, Loaded
First 200m at 20 kph = 0.6 min
24.3 km @ 35 kph = 41.7 min
Last 200 m at 20 kph = 0.6 min

Unload/Maneuver = 2.0 min

Return Time, Empty


First 200m at 30 kph = 0.4 min
24.3 km @ 55 kph = 26.5 min
Last 200 m at 30 kph = 0.4 min
CYCLE TIME 75.2
.
Allowance for Delay 7.5 min
TOTAL CYCLE TIME 82.7 min

COMPUTATION OF HAULING COST


8 x 60
No. of Trips = = 5.8 trips / day/ 10 cu.m. DT
82.7

say 5.8 trips / day/ 10 cu.m. DT

Rental of Dump Truck (10 cu.m.) = P11,360.00 /day

HAULING COST = P11,360.00 = P P195.86 /cu.m.


=
(10 * 5.8)

3. Excise Tax 3% (1 & 2): = P 8.33 /cu.m.


4. Royalty access rd. Prov'l and brgy. Tax: = P 15.00 /cu.m.
COST OF COMMON MATERIAL = P 300.98 /cu.m.
FURNISHING OF AGGREGATES

Project: : CONCRETING OF KATUNGAWAN ROAD

Location: : Brgy. Buyun, Sta. Teresita, Cagayan


Source: : PENA ESTE Gravel Pit

Gravel Pit - Project Site = 60.00 KM


Hauling Distance 60.000
say = 60.000 KM

1.. STOCKPILING AND LOADING:

use 1 -Bulldozer, D65A-8, Crawler Mounted, 155 HP, Capacity = 500 cu.m./day
use 1 - Payloader,1.50 cu.m.,148 HP Capacity = 500 cu.m./day
Unit Cost = P 27,032.00 + 13,864.00 /day = P 81.79 /cu.m.
500.00 cu.m./day
ROAD DUMP TRUCK TRAVEL
TERRAIN SPEED (km/h)
2. HAULING COST SURFACE
CONDITION
COMPUTATION OF CYCLE TIME CONDITION LOADED EMPTY
Terrain = Flat/Rolling Paved 35 55
FLAT
Road Condition = Paved/Unpaved Unpaved 30 45
Grade = Paved 30 40
ROLLING
Unpaved 25 35
Paved 20 30
MOUNTAINOUS
Unpaved 15 25
Average Hauling Distance = 60.00 km LOADING TIME (min) 3
UNLOADING TIME (min) 2
ALLOWANCE FOR DELAY (min) 10% of Cycle Time
Ave Speed, Loaded = 35.00 kph
Ave Speed, Empty = 55.00 kph

Loading Time = 3.00 min


Travel Time, Loaded
First 200m at 20.00 kph = 0.60 min
59.6 km @ 35.00 kph = 102.20 min
Last 200 m at 20.00 kph = 0.60 min

Unload/Maneuver = 2.00 min

Return Time, Empty


First 200m at 30.00 kph = 0.40 min
59.6 km @ 55.00 kph = 65.00 min
Last 200 m at 30.00 kph = 0.40 min
CYCLE TIME 174.20

Allowance for Delay 17.42 min


TOTAL CYCLE TIME 191.62 min

COMPUTATION OF HAULING COST


8 x 60 trips / day/ 10 cu.m.
No. of Trips = = 2.5
191.6 DT
say 2.5 trips / day/ 10 cu.m. DT

Rental of Dump Truck (10 cu.m.) = P11,360.00 /day

HAULING COST = P11,360.00 = P P454.40 /cu.m.


=
(10 * 2.5)

3. Excise Tax 3% (1 & 2): = P 16.09 /cu.m.


4. Royalty access rd. Prov'l and brgy. Tax: = P 15.00 /cu.m.
5. Extraction Fee = P 20.00 /cu.m.
6. Quarry Fee = P 50.00 /cu.m.
COST OF AGGREGATES = P 637.28 /cu.m.
PROCESSING : Employing Unskilled laborer, Skilled Laborer and Loader

1. Fine Aggregates :
Screening = P( 13,864.00 + 406.89 + 528.49 ) = P 74.00 /cu.m.
P 200.00 cu.m./day
Washing = P( 13,864.00 + 406.89 + 528.49 + 335.50 = P 50.45 /cu.m.
P 300.00 cu.m./day = P 124.45 /cu.m.

F.A. = P( 637.28 + 124.45 ) /cu.m. = P 761.73 /cu.m.

2. Coarse Aggregates :
Screening = P( 13,864.00 + 406.89 + 528.49 ) = P 98.66 /cu.m.
P 150.00 cu.m./day
Washing = P( 13,864.00 + 406.89 + 528.49 + 335.50 = P 50.45 /cu.m.
P 300.00 cu.m./day P 149.11 /cu.m.

C.A. = P( 637.28 + 149.11 ) /cu.m. = P 786.39 /cu.m.

3.Sub-Base Course :
Screening = P 13,864.00 + 406.89 + 528.49 ) = P 74.00 /cu.m.
P 200.00 cu.m./day

4.Base Course :
Screening = P 13,864.00 + 406.89 + 528.49 ) = P 74.00 /cu.m.
P 200.00 cu.m./day
Blending = P 13,864.00 + 406.89 + 528.49 ) = P 29.60 /cu.m.
P 500.00 cu.m./day P 103.60 /cu.m.

5. Surface Course :
Screening = P 13,864.00 + 406.89 + 528.49 ) = P 98.66 /cu.m.
P 150.00 cu.m./day
Blending = P 13,864.00 + 406.89 + 528.49 ) = P 29.60 /cu.m.
P 500.00 cu.m./day P 128.26 /cu.m.

Therefore, the unit price derivation of the following are:


Item 200 = cost of aggregates + screening
= P 637.28 + 74.00 = P 711.28 /cu.m.
FURNISHING OF BOULDERS

Project : CONCRETING OF KATUNGAWAN ROAD

Location : Brgy. Buyun, Sta. Teresita, Cagayan

Source: : Maguiling Bridge (Chico River), Tuao, Cagayan

Gravel Pit - Project Site = 25.00 KM


Hauling Distance = 25.00 KM
say = 25.00 KM

1. STOCKPILING :
Capacity/man-day = 2 cu.m./day

Stockpiling Cost = P 406.89 / day = P 203.45 /cu.m.


2 cu.m./day
LOADING AND UNLOADING :

Capacity/man-day to load = 2 cu.m./day at quarry


Capacity/man-day to unload = 3 cu.m./day

Loading & Unloading = P 406.89 / day P 406.89 / day = P 339.08 /cu.m.


+
2 cu.m./day 3 cu.m./day
2. HAULING COST
Hauling Distance = 25.00 km
ROAD DUMP TRUCK TRAVEL SPEED
TERRAIN (km/h)
COMPUTATION OF CYCLE TIME SURFACE
CONDITION
Terrain = Flat CONDITION LOADED EMPTY
Road Condition = Paved Paved 35 55
FLAT
Unpaved 30 45
Paved 30 40
ROLLING
Average Hauling Distance = 25 km Unpaved 25 35
Paved 20 30
MOUNTAINOUS
Unpaved 15 25
Ave Speed, Loaded = 35 kph LOADING TIME (min) 3
Ave Speed, Empty = 55 kph UNLOADING TIME (min) 2
ALLOWANCE FOR DELAY (min) 10% of Cycle Time
Loading Time = 30.0 min
Travel Time, Loaded
First 200m at 20 kph = 0.6 min
24.6 km @ 35 kph = 42.2 min
Last 200 m at 20 kph = 0.6 min

Unload/Maneuver = 30.0 min at site

Return Time, Empty


First 200m at 30 kph = 0.4 min
24.6 km @ 55 kph = 26.8 min
Last 200 m at 30 kph = 0.4 min
CYCLE TIME 131.0
Allowance for Delay 13.1 min
TOTAL CYCLE TIME 144.1 min
COMPUTATION OF HAULING COST
8 x 60
No. of Trips = = 3.33077 trips
144.1
say 3.33 trips
Rental of Cargo Truck (5mt) = P6,264.00 /day

HAULING COST = P6,264.00 = P P376.22 /cu.m.


=
(5 * 3.33)

3. Excise Tax 3% (1 & 2): = P 27.56 /cu.m.


4. Royalty access rd. Prov'l and Brgy. Tax: = P 15.00 /cu.m.
5. Extraction Fee = P 20.00 /cu.m.
6. Quarry Fee = P 50.00 /cu.m.
COST OF BOULDERS = P 1,072.49 /cu.m.
FURNISHING OF AGGREGATES

Source of Aggregate = District Office


Hauling Distance = 24.002 km

1. Material Cost:

ITEM 200 (Aggregate Subbase Course) = 380 /cu.m.

TERRAIN ROAD SURFACE DUMPTRUCK TRAVEL SPEED (km/h)


CONDITION CONDITION LOADED EMPLTY
PAVED 35 55
FLAT
2. HAULING COST UNPAVED 30 45
PAVED 30 40
COMPUTATION OF CYCLE TIME ROLLING
UNPAVED 25 35
Terrain = Flat PAVED 20 30
MOUNTAINOUS
Road Condition = Paved UNPAVED 15 25
LOADING TIME (min) 3
Grade =
UNLOADING TIME (min) 2
ALLOWANCE FOR DELAY(min) 10% of Cycle Time
Average Hauling Distance = 24.002 km

Ave Speed, Loaded = 35 kph


Ave Speed, Empty = 55 kph

Loading Time = 3.0 min


Travel Time, Loaded
First 200m at 10 kph = 1.2 min
23.6 km @ 35 kph = 40.5 min
Last 200 m at 15 kph = 0.8 min

Unload/Maneuver = 2.0 min

Return Time, Empty


First 200m at 10 kph = 1.2 min
23.6 km @ 55 kph = 25.7 min
Last 200 m at 15 kph = 0.8 min
CYCLE TIME 75.2
Allowance for Delay 7.5 min
TOTAL CYCLE TIME 82.7 min

COMPUTATION OF HAULING COST


8 x 60 trips / day/ 10
No. of Trips = = 5.80
82.7 cu.m. DT
trips / day/ 10 cu.m.
say = 5.80
DT
Rental of Dump Truck (10 cu.m.) = P11,360.00 /day

HAULING COST P11,360.00 =P P195.86 /cu.m.


=
(10 * 5.8)

3. Excise Tax 3% (1 & 2): =P 0.00 /cu.m.


4. Royalty access rd. Prov'l and brgy. Tax: =P 0.00 /cu.m.
COST OF ITEM 200 =P 575.86 /cu.m.
FURNISHING OF AGGREGATES

Source of Aggregate = District Office


Hauling Distance = 52 km

1. Material Cost:

ITEM 300 (Aggregate Base Course) = 450 /cu.m.

TERRAIN ROAD SURFACE DUMPTRUCK TRAVEL SPEED (km/h)


CONDITION CONDITION LOADED EMPLTY
PAVED 35 55
FLAT
2. HAULING COST UNPAVED 30 45
PAVED 30 40
COMPUTATION OF CYCLE TIME ROLLING
UNPAVED 25 35
Terrain = Flat/Rolling PAVED 20 30
MOUNTAINOUS
Road Condition = Paved UNPAVED 15 25
LOADING TIME (min) 3
Grade =
UNLOADING TIME (min) 2
ALLOW ANCE FOR DELAY(min) 10% of Cycle Time
Average Hauling Distance = 52 km

Ave Speed, Loaded = 35 kph


Ave Speed, Empty = 55 kph

Loading Time = 3.0 min


Travel Time, Loaded
First 200m at 10 kph = 1.2 min
51.6 km @ 35 kph = 88.5 min
Last 200 m at 15 kph = 0.8 min

Unload/Maneuver = 2.0 min

Return Time, Empty


First 200m at 10 kph = 1.2 min
51.6 km @ 55 kph = 56.3 min
Last 200 m at 15 kph = 0.8 min
CYCLE TIME 153.8
Allowance for Delay 15.4 min
TOTAL CYCLE TIME 169.2 min

COMPUTATION OF HAULING COST


8 x 60 trips / day/ 10
No. of Trips = = 2.84
169.2 cu.m. DT
trips / day/ 10 cu.m.
say = 2.84
DT
Rental of Dump Truck (10 cu.m.) = P11,360.00 /day

HAULING COST P11,360.00 =P P400.00 /cu.m.


=
(10 * 2.84)

3. Excise Tax 3% (1 & 2): =P 0.00 /cu.m.


4. Royalty access rd. Prov'l and brgy. Tax: =P 0.00 /cu.m.
COST OF ITEM 300 =P 850.00 /cu.m.
FURNISHING OF COARSE AGGREGATE

Source of Aggregate = PENA ESTE GRAVEL PIT


Hauling Distance = 60 km

1. Material Cost:

Coarse Aggregates = 400 /cu.m.

TERRAIN ROAD SURFACE DUMPTRUCK TRAVEL SPEED (km/h)


CONDITION CONDITION LOADED EMPLTY
PAVED 35 55
2. HAULING COST FLAT
UNPAVED 30 45
COMPUTATION OF CYCLE TIME PAVED 30 40
ROLLING
Terrain = Flat UNPAVED 25 35

Road Condition = Paved MOUNTAINOUS


PAVED 20 30
UNPAVED 15 25
Grade =
LOADING TIME (min) 3
UNLOADING TIME (min) 2
Average Hauling Distance = 60 km ALLOWANCE FOR DELAY(min) 10% of Cycle Time

Ave Speed, Loaded = 35 kph


Ave Speed, Empty = 55 kph

Loading Time = 3.0 min


Travel Time, Loaded
First 200m at 10 kph = 1.2 min
59.6 km @ 35 kph = 102.2 min
Last 200 m at 15 kph = 0.8 min

Unload/Maneuver = 2.0 min

Return Time, Empty


First 200m at 10 kph = 1.2 min
59.6 km @ 55 kph = 65.0 min
Last 200 m at 15 kph = 0.8 min
CYCLE TIME 176.2
Allowance for Delay 17.6 min
TOTAL CYCLE TIME 193.8 min

COMPUTATION OF HAULING COST


8 x 60 trips / day/ 10
No. of Trips = = 2.47652
193.8 cu.m. DT
trips / day/ 10 cu.m.
say = 2.48
DT
Rental of Dump Truck (10 cu.m.) = P11,360.00 /day

HAULING COST P11,360.00 =P P458.71 /cu.m.


=
(10 * 2.47652461046332)

3. Excise Tax 3% (1 & 2): =P 0.00 /cu.m.


4. Royalty access rd. Prov'l and brgy. Tax: =P 0.00 /cu.m.
COST OF COARSE AGGREGATES = P 858.71 /cu.m.
FURNISHING OF FINE AGGREGATE

Source of Aggregate = PENA ESTE GRAVEL PIT


Hauling Distance = 60 km

1. Material Cost:

Fine Aggregates = 400 /cu.m.

TERRAIN ROAD SURFACE DUMPTRUCK TRAVEL SPEED (km/h)


CONDITION CONDITION LOADED EMPLTY
PAVED 35 55
2. HAULING COST FLAT
UNPAVED 30 45
COMPUTATION OF CYCLE TIME ROLLING
PAVED 30 40

Terrain = Flat UNPAVED 25 35


PAVED 20 30
Road Condition = Paved MOUNTAINOUS
UNPAVED 15 25
Grade = LOADING TIME (min) 3
UNLOADING TIME (min) 2
ALLOWANCE FOR DELAY(min) 10% of Cycle Time
Average Hauling Distance = 60 km

Ave Speed, Loaded = 35 kph


Ave Speed, Empty = 55 kph

Loading Time = 3.0 min


Travel Time, Loaded
First 200m at 10 kph = 1.2 min
59.6 km @ 35 kph = 102.2 min
Last 200 m at 15 kph = 0.8 min

Unload/Maneuver = 2.0 min

Return Time, Empty


First 200m at 10 kph = 1.2 min
59.6 km @ 55 kph = 65.0 min
Last 200 m at 15 kph = 0.8 min
CYCLE TIME 176.2
Allowance for Delay 17.6 min
TOTAL CYCLE TIME 193.8 min

COMPUTATION OF HAULING COST


8 x 60 trips / day/ 10
No. of Trips = = 2.47652
193.8 cu.m. DT
trips / day/ 10 cu.m.
say = 2.48
DT
Rental of Dump Truck (10 cu.m.) = P11,360.00 /day

HAULING COST P11,360.00 =P P458.71 /cu.m.


=
(10 * 2.47652461046332)

3. Excise Tax 3% (1 & 2): =P 0.00 /cu.m.


4. Royalty access rd. Prov'l and brgy. Tax: =P 0.00 /cu.m.
COST OF FINE AGGREGATES =P 858.71 /cu.m.
FURNISHING OF BOULDERS

Source of Aggregate = PENA ESTE GRAVEL PIT


Hauling Distance = 60 km

1. Material Cost:

BOULDERS = 525 /cu.m.

TERRAIN ROAD SURFACE DUMPTRUCK TRAVEL SPEED (km/h)


CONDITION CONDITION LOADED EMPLTY
PAVED 35 55
2. HAULING COST FLAT
UNPAVED 30 45
COMPUTATION OF CYCLE TIME ROLLING
PAVED 30 40

Terrain = Flat UNPAVED 25 35


PAVED 20 30
Road Condition = Paved MOUNTAINOUS
UNPAVED 15 25
Grade = LOADING TIME (min) 3
UNLOADING TIME (min) 2
ALLOW ANCE FOR DELAY(min) 10% of Cycle Time
Average Hauling Distance = 60 km

Ave Speed, Loaded = 35 kph


Ave Speed, Empty = 55 kph

Loading Time = 3.0 min


Travel Time, Loaded
First 200m at 10 kph = 1.2 min
59.6 km @ 35 kph = 102.2 min
Last 200 m at 15 kph = 0.8 min

Unload/Maneuver = 2.0 min

Return Time, Empty


First 200m at 10 kph = 1.2 min
59.6 km @ 55 kph = 65.0 min
Last 200 m at 15 kph = 0.8 min
CYCLE TIME 176.2
Allowance for Delay 2.0 min
TOTAL CYCLE TIME 178.2 min

COMPUTATION OF HAULING COST


8 x 60 trips / day/ 10
No. of Trips = = 2.69
178.2 cu.m. DT
trips / day/ 10 cu.m.
say = 2.69
DT
Rental of Dump Truck (10 cu.m.) = P11,360.00 /day

HAULING COST P11,360.00 =P P422.30 /cu.m.


=
(10 * 2.69)

3. Excise Tax 3% (1 & 2): =P 0.00 /cu.m.


4. Royalty access rd. Prov'l and brgy. Tax: =P 0.00 /cu.m.
COST OF FINE AGGREGATES =P 947.30 /cu.m.
FURNISHING OF FINE AGGREGATE

Source of Aggregate = District Office


Hauling Distance = 55 km

1. Material Cost:

Fine Aggregates = 155 /cu.m.

TERRAIN ROAD SURFACE DUMPTRUCK TRAVEL SPEED (km/h)


CONDITION CONDITION LOADED EMPLTY
PAVED 35 55
2. HAULING COST FLAT
UNPAVED 30 45
COMPUTATION OF CYCLE TIME ROLLING
PAVED 30 40

Terrain = Flat UNPAVED 25 35


PAVED 20 30
Road Condition = Paved MOUNTAINOUS
UNPAVED 15 25
Grade = LOADING TIME (min) 3
UNLOADING TIME (min) 2
ALLOW ANCE FOR DELAY(min) 10% of Cycle Time
Average Hauling Distance = 55 km

Ave Speed, Loaded = 35 kph


Ave Speed, Empty = 55 kph

Loading Time = 3.0 min


Travel Time, Loaded
First 200m at 10 kph = 1.2 min
54.6 km @ 35 kph = 93.6 min
Last 200 m at 15 kph = 0.8 min

Unload/Maneuver = 2.0 min

Return Time, Empty


First 200m at 10 kph = 1.2 min
54.6 km @ 55 kph = 59.6 min
Last 200 m at 15 kph = 0.8 min
CYCLE TIME 162.2
Allowance for Delay 16.2 min
TOTAL CYCLE TIME 178.4 min

COMPUTATION OF HAULING COST


8 x 60 trips / day/ 10
No. of Trips = = 2.69028
178.4 cu.m. DT
trips / day/ 10 cu.m.
say = 41
DT
Rental of Dump Truck (10 cu.m.) = P11,360.00 /day

HAULING COST P11,360.00 =P P422.26 /cu.m.


=
(10 * 2.69028135859209)

3. Excise Tax 3% (1 & 2): =P 0.00 /cu.m.


4. Royalty access rd. Prov'l and brgy. Tax: =P 0.00 /cu.m.
COST OF FINE AGGREGATES =P 577.26 /cu.m.
DETAILED UNIT PRICE ANALYSIS

CONCRETING OF KATUNGAWAN ROAD

Brgy. Buyun, Sta. Teresita, Cagayan

Item No. : #REF! Quantity = #REF!


Description : Unit = #REF!
#REF!

Production Output : = 6 m./hr.


No. of Hours : = #REF! hours say #REF! hours
No. of Days : = #REF! days

A. Name and Capacity of Equipment (Operated) No. of Units No. of Hours Hourly Rate Total Cost (Pesos)
Factor
Backhoe (0.80 cu.m) 1 1.00 #REF! P 1,537.00 P #REF!
Boom Truck (2-5 mt) 0.5 1.00 #REF! 1,017.90 #REF!
Minor Tools (10% of Labor) #REF!

A. SUB-TOTAL, EQUIPMENT P #REF!

B. Designation Personnel No. of Men No. of Hours Unit Rate/Hour Total Cost (Pesos)

Foreman 1 1.00 #REF! P 98.09 P #REF!


Unskilled Labor 1 2.00 #REF! 54.90 #REF!

B. SUB-TOTAL, LABOR P #REF!

C. Name and Description Qty Unit Unit Price Total Cost (Pesos)

C. SUB-TOTAL, MATERIALS P

SUMMARY:
A Equipment P #REF!
B Labor #REF!
C Materials -
D TOTAL DIRECT COST P #REF!
DIRECT UNIT COST #REF!
E OCM 12% of D #REF!
F Profit 8% of D #REF!
G VAT 5% of (D+E+F) #REF!
H Total Cost (D+E+F+G) #REF!
I Unit Cost H/Quantity P #REF!
DETAILED UNIT PRICE ANALYSIS

CONCRETING OF KATUNGAWAN ROAD

Brgy. Buyun, Sta. Teresita, Cagayan

Item No. : #REF! Quantity = #REF!


Description : Unit = #REF!
#REF!

Production Output : = 50 cu.m./hr.


No. of Hours : = #REF! hours say #REF! hours
No. of Days : = #REF! days

A. Name and Capacity of Equipment (Operated) No. of Units No. of Hours Hourly Rate Total Cost (Pesos)
Factor
Motorized Grader, 6710A 1 1.00 #REF! P 2,173.00 P #REF!
Vibratory Roller(10 m.t.),SD100DC 1 1.00 #REF! 1,846.00 #REF!
Water Truck/Pump (16000 L) 0.25 1.00 #REF! 2,450.00 #REF!

A. SUB-TOTAL, EQUIPMENT P #REF!

B. Designation Personnel No. of Men No. of Hours Unit Rate/Hour Total Cost (Pesos)

Foreman 1 1.00 #REF! P 98.09 P #REF!


Unskilled Labor 1 2.00 #REF! 54.90 #REF!

B. SUB-TOTAL, LABOR P #REF!

C. Name and Description Qty Unit Unit Price Total Cost (Pesos)

Common Borrow (w/ 25% shrinkage factor) 1.25 #REF! cu.m. P 300.98 P #REF!

C. SUB-TOTAL, MATERIALS P #REF!

SUMMARY:
A Equipment P #REF!
B Labor #REF!
C Materials #REF!
D TOTAL DIRECT COST P #REF!
DIRECT UNIT COST #REF!
E OCM 12% of D #REF!
F Profit 8% of D #REF!
G VAT 5% of (D+E+F) #REF!
H Total Cost (D+E+F+G) #REF!
I Unit Cost H/Quantity P #REF!
DETAILED UNIT PRICE ANALYSIS

CONCRETING OF KATUNGAWAN ROAD


Brgy. Buyun, Sta. Teresita, Cagayan

Item No. : 311-1a Quantity = #REF!


Description : PCCP (Plain) - 28 cm. thick Unit = #REF!

Production Output : = 57.5 sq.m/hr.


No. of Hours : = #REF! hours say #REF! hours
No. of Days : = #REF! days

A. Name and Capacity of Equipment (Operated) No. of Units No. of Hours Hourly Rate Total Cost (Pesos)
Factor
Transit Mixer (5 cu.m) 1 4.00 #REF! P 1,279.00 P #REF!
Concrete Vibrator 1 2.00 #REF! 148.88 #REF!
Batching Plant (30 cu.m) 1 1.00 #REF! 1,208.03 #REF!
Payloader(1.5 cu.m),LX80-2C 1 1.00 #REF! 1,733.00 #REF!
Concrete Screeder 1 1.00 #REF! 545.00 #REF!
Water Truck (1000 gal) 1 1.00 #REF! 1,065.00 #REF!
Concrete Saw, Blade Ø 14" (7.5 Hp) 1 1.00 #REF! 167.38 #REF!
Bar Cutter, Single Phase 0.1 1.00 #REF! 219.75 #REF!
Minor Tools(5% of Labor) #REF!

A. SUB-TOTAL, EQUIPMENT P #REF!

B. Designation Personnel No. of Men No. of Hours Unit Rate/Hour Total Cost (Pesos)

Foreman 1.00 #REF! P 66.18 P #REF!


Skilled Laborers 4.00 #REF! 47.89 #REF!
Unskilled Laborers 12.00 #REF! 36.91 #REF!

B. SUB-TOTAL, LABOR P #REF!

C. Name and Description Qty Unit Unit Price Total Cost (Pesos)
Factor
Reinforcing Steel Bar 0.5 #REF! kg 38.00 #REF!
Curing Compound 0.29 #REF! lit 60.00 #REF!
Asphalt Sealant 0.17 #REF! lit 55.25 #REF!
Forms, Steel(Rental) 28cm width 0.46 #REF! l.m 83.00 #REF!
Sand 0.154 #REF! cu.m 689.85 #REF!
Gravel 0.28 #REF! cu.m 714.14 #REF!
Cement 2.66 #REF! bag 245.00 #REF!
Concrete Saw(Diamond blade 14") 0.00015 #REF! pc 7,500.00 #REF!
Pipe Sleeve, 2" Ø 0.0078 #REF! ln.m 100.00 #REF!
Grease/Tar 0.0078 #REF! lit 210.00 #REF!

C. SUB-TOTAL, MATERIALS P #REF!

SUMMARY:
A Equipment P #REF!
B Labor #REF!
C Materials #REF!
D TOTAL DIRECT COST P #REF!
DIRECT UNIT COST #REF!
E OCM 9% of D #REF!
F Profit 8% of D #REF!
G VAT 12% of (D+E+F) #REF!
H Total Cost (D+E+F+G) #REF!
I Unit Cost H/Quantity P #REF!
DETAILED UNIT PRICE ANALYSIS

Construction/Widening/Upgrading/Rehabilitation of Access Road, Aparri, Airport, Maura


Sta. 0+000 -Sta. 2+650
Buguey, Cagayan

Item No. : 311-2 Quantity = #REF!


Description : PCCP (Reinforced) - 23 cm. thick Unit = sq.m

Production Output : = 6 sq.m/hr.


No. of Hours : = #REF! hours say #REF! hours
No. of Days : = #REF! days

A. Name and Capacity of Equipment (Operated) No. of Units No. of Hours Hourly Rate Total Cost (Pesos)
Factor
Transit Mixer (5 cu.m) 0.1 3.00 #REF! P 1,279.00 P #REF!
Concrete Vibrator 0.1 2.00 #REF! 148.88 #REF!
Batching Plant (30 cu.m) 0.1 1.00 #REF! 1,208.03 #REF!
Payloader(1.5 cu.m),LX80-2C 0.1 1.00 #REF! 1,733.00 #REF!
Concrete Screeder 0.1 1.00 #REF! 545.00 #REF!
Water Truck (1000 gal) 0.1 1.00 #REF! 1,065.00 #REF!
Bar Bender 0.25 1.00 #REF! 351.50 #REF!
Bar Cutter, Single Phase 0.25 1.00 #REF! 219.75 #REF!
Minor Tools(5% of Labor) #REF!

A. SUB-TOTAL, EQUIPMENT P #REF!

B. Designation Personnel No. of Men No. of Hours Unit Rate/Hour Total Cost (Pesos)

Foreman 1.00 #REF! P 66.18 P #REF!


Skilled Laborers 4.00 #REF! 47.89 #REF!
Unskilled Laborers 12.00 #REF! 36.91 #REF!

B. SUB-TOTAL, LABOR P #REF!

C. Name and Description Qty Unit Unit Price Total Cost (Pesos)
Factor
Reinforcing Steel Bar 40.86 #REF! kg 50.00 #REF!
Curing Compound 0.29 #REF! lit 60.00 #REF!
Asphalt Sealant 0.12 #REF! lit 44.00 #REF!
Forms, Steel(Rental) 0.46 #REF! l.m 40.00 #REF!
Sand 0.1265 #REF! cu.m 482.26 #REF!
Gravel 0.23 #REF! cu.m 506.50 #REF!
Cement 2.19 #REF! bag 230.00 #REF!
#16 G.I. Tiewire(2% of RSB) 0.81700 #REF! kg. 75.00 #REF!

C. SUB-TOTAL, MATERIALS P #REF!

SUMMARY:
A Equipment P #REF!
B Labor #REF!
C Materials #REF!
D TOTAL DIRECT COST P #REF!
DIRECT UNIT COST #REF!
E OCM 9% of D #REF!
F Profit 8% of D #REF!
G VAT 12% of (D+E+F) #REF!
H Total Cost (D+E+F+G) #REF!
I Unit Cost H/Quantity P #REF!
DETAILED UNIT PRICE ANALYSIS

Construction/Widening/Upgrading/Rehabilitation of Access Road, Aparri, Airport, Maura


Sta. 0+000 -Sta. 2+650
Buguey, Cagayan

Item No. : 500-2 Quantity = #REF!


Description : Pipe Culverts -1220 mmØ Unit = #REF!

Production Output : = 1.25 ln.m/hr.


No. of Hours : = #REF! hours say #REF! hours
No. of Days : = #REF! days

A. Name and Capacity of Equipment (Operated) No. of Units No. of Hours Hourly Rate Total Cost (Pesos)
Factor
Backhoe(0.80 cu.m) 0.5 1.00 #REF! P 172.00 P #REF!
Plate Compactor (5Hp) 0.5 1.00 #REF! 1,065.00 #REF!
Minor Tools(10% of Labor) #REF!

A. SUB-TOTAL, EQUIPMENT P #REF!

B. Designation Personnel No. of Men No. of Hours Unit Rate/Hour Total Cost (Pesos)

Foreman 1.00 #REF! P 66.18 P #REF!


Skilled Laborers 2.00 #REF! 47.89 #REF!
Unskilled 4.00 #REF! 36.91 #REF!

B. SUB-TOTAL, LABOR P #REF!

C. Name and Description Qty Unit Unit Price Total Cost (Pesos)
Factor
Portland Cement 1.404 #REF! bag 230.00 #REF!
Sand 0.08 #REF! cu.m 482.26 #REF!
R.C. Pipes (1220 mm dia) 1 #REF! pc 3,500.00 #REF!
Sand Bedding/ Selected Sandy Soil 0.17 #REF! cu.m 46.00 #REF!

C. SUB-TOTAL, MATERIALS P #REF!

SUMMARY:
A Equipment P #REF!
B Labor #REF!
C Materials #REF!
D TOTAL DIRECT COST P #REF!
DIRECT UNIT COST #REF!
E OCM 9% of D #REF!
F Profit 8% of D #REF!
G VAT 12% of (D+E+F) #REF!
H Total Cost (D+E+F+G) #REF!
I Unit Cost H/Quantity P #REF!
DETAILED UNIT PRICE ANALYSIS

CONCRETING OF KATUNGAWAN ROAD


Brgy. Buyun, Sta. Teresita, Cagayan

Item No. : 311-2 Quantity = #REF!


Description : PCCP (Reinforced) - 28 cm. thick Unit = #REF!

Production Output : = 4.7 sq.m/hr.


No. of Hours : = #REF! hours say #REF! hours
No. of Days : = #REF! days

A. Name and Capacity of Equipment (Operated) No. of Units No. of Hours Hourly Rate Total Cost (Pesos)
Factor
Transit Mixer (5 cu.m) 0.1 3.00 #REF! P 1,279.00 P #REF!
Concrete Vibrator 0.1 2.00 #REF! 148.88 #REF!
Batching Plant (30 cu.m) 0.1 1.00 #REF! 1,208.03 #REF!
Payloader(1.5 cu.m),LX80-2C 0.1 1.00 #REF! 1,733.00 #REF!
Concrete Screeder 0.1 1.00 #REF! 545.00 #REF!
Water Truck (1000 gal) 0.1 1.00 #REF! 1,065.00 #REF!
Concrete Saw, Blade Ø 14" (7.5 Hp) 0.1 1.00 #REF! 167.38 #REF!
Bar Cutter, Single Phase 0.25 1.00 #REF! 219.75 #REF!
Bar Bender 0.25 1.00 #REF! 351.50 #REF!
Minor Tools(5% of Labor) #REF!

A. SUB-TOTAL, EQUIPMENT P #REF!

B. Designation Personnel No. of Men No. of Hours Unit Rate/Hour Total Cost (Pesos)

Foreman 1.00 #REF! P 66.18 P #REF!


Skilled Laborers 4.00 #REF! 47.89 #REF!
Unskilled Laborers 12.00 #REF! 36.91 #REF!

B. SUB-TOTAL, LABOR P #REF!

C. Name and Description Qty Unit Unit Price Total Cost (Pesos)
Factor
Reinforcing Steel Bar (grade 40) 2,512.00 kg 38.00 95,456.00
(grade 60) 2,572.00 kg 40.00 102,880.00
Curing Compound 0.29 #REF! lit 60.00 #REF!
Asphalt Sealant 0.17 #REF! lit 55.25 #REF!
Forms, Steel(Rental) 28cm width 0.46 #REF! l.m 83.00 #REF!
Sand 0.154 #REF! cu.m 689.85 #REF!
Gravel 0.28 #REF! cu.m 714.14 #REF!
Cement 2.66 #REF! bag 245.00 #REF!
# 16 GI Tie Wire (2% of RSB) 102.00 kg. 70.00 7,140.00

C. SUB-TOTAL, MATERIALS P #REF!

SUMMARY:
A Equipment P #REF!
B Labor #REF!
C Materials #REF!
D TOTAL DIRECT COST P #REF!
DIRECT UNIT COST #REF!
E OCM 9% of D #REF!
F Profit 8% of D #REF!
G VAT 12% of (D+E+F) #REF!
H Total Cost (D+E+F+G) #REF!
I Unit Cost H/Quantity P #REF!
DETAILED UNIT PRICE ANALYSIS

CONCRETING OF KATUNGAWAN ROAD


Brgy. Buyun, Sta. Teresita, Cagayan

Item No. : 407 Quantity = #REF!


Description : Lean Concrete Unit = #REF!

Production Output : = 1.40 cu.m/hr.


No. of Hours : = #REF! hours say #REF! hours
No. of Days : = #REF! days

A. Name and Capacity of Equipment (Operated) No. of Units No. of Hours Hourly Rate Total Cost (Pesos)
Factor
One Bagger Mixer 1 1.00 #REF! P 172.00 P #REF!
Water Truck (1000 gal.) 0.1 1.00 #REF! 1,065.00 #REF!
Concrete Vibrator,57-60mm withy Gasoline Drive 1 1.00 #REF! 148.88 #REF!
Minor Tools(5% of Labor) #REF!

A. SUB-TOTAL, EQUIPMENT P #REF!

B. Designation Personnel No. of Men No. of Hours Unit Rate/Hour Total Cost (Pesos)

Foreman 1.00 #REF! P 69.17 P #REF!


Skilled Laborers 4.00 #REF! 50.00 #REF!
Unskilled Laborers 8.00 #REF! 38.83 #REF!

B. SUB-TOTAL, LABOR P #REF!

C. Name and Description Qty Unit Unit Price Total Cost (Pesos)
Factor
Portland Cement 8.5 #REF! bag 245.00 #REF!
Coarse Aggregate 1 #REF! cu.m 714.14 #REF!
Fine Aggregate 0.5 #REF! cu.m #REF! #REF!
Formworks 0.46 #REF! bd.ft. 45.00 #REF!

C. SUB-TOTAL, MATERIALS P #REF!

SUMMARY:
A Equipment P #REF!
B Labor #REF!
C Materials #REF!
D TOTAL DIRECT COST P #REF!
DIRECT UNIT COST #REF!
E OCM 9% of D #REF!
F Profit 8% of D #REF!
G VAT 5% of (D+E+F) #REF!
H Total Cost (D+E+F+G) #REF!
I Unit Cost H/Quantity P #REF!
DETAILED UNIT PRICE ANALYSIS

CONCRETING OF KATUNGAWAN ROAD


Brgy. Buyun, Sta. Teresita, Cagayan

Item No. : 504-1 Quantity = #REF!


Description : Removal of Existing Culvert Pipe(610 mm Dia.) Unit = #REF!

Production Output : = 3 ln.m/hr.


No. of Hours : = #REF! hours say #REF! hours
No. of Days : = #REF! days

A. Name and Capacity of Equipment (Operated) No. of Units No. of Hours Hourly Rate Total Cost (Pesos)
Factor
Backhoe(0.80 cu.m) 0.5 1.00 #REF! P 1,537.00 P #REF!
Boom truck 0.5 1.00 #REF! 961.20 #REF!
Water Truck (1000 gal.) 0.25 1.00 #REF! 1,065.00 #REF!
Minor Tools(10% of Labor) #REF!

A. SUB-TOTAL, EQUIPMENT P #REF!

B. Designation Personnel No. of Men No. of Hours Unit Rate/Hour Total Cost (Pesos)

Foreman 1.00 #REF! P 66.18 P #REF!


Skilled Laborers 2.00 #REF! 47.89 #REF!
Unskilled 4.00 #REF! 36.91 #REF!

B. SUB-TOTAL, LABOR P #REF!

C. Name and Description Qty Unit Unit Price Total Cost (Pesos)
Factor

C. SUB-TOTAL, MATERIALS P -

SUMMARY:
A Equipment P #REF!
B Labor #REF!
C Materials -
D TOTAL DIRECT COST P #REF!
DIRECT UNIT COST #REF!
E OCM 9% of D #REF!
F Profit 8% of D #REF!
G VAT 12% of (D+E+F) #REF!
H Total Cost (D+E+F+G) #REF!
I Unit Cost H/Quantity P #REF!
DETAILED UNIT PRICE ANALYSIS

Construction/Widening/Upgrading/Rehabilitation of Access Road, Aparri, Airport, Maura


Sta. 0+000 -Sta. 2+650
Buguey, Cagayan

Item No. : 504-1b Quantity = #REF!


Description : Removal of Existing Culvert Pipe(610 mm Dia.) Unit = #REF!

Production Output : = 3 ln.m/hr.


No. of Hours : = #REF! hours say #REF! hours
No. of Days : = #REF! days

A. Name and Capacity of Equipment (Operated) No. of Units No. of Hours Hourly Rate Total Cost (Pesos)
Factor
Backhoe(0.80 cu.m) 0.5 1.00 #REF! P 1,537.00 P #REF!
Boom truck 0.5 1.00 #REF! 961.20 #REF!
Water Truck (1000 gal.) 0.25 1.00 #REF! 1,065.00 #REF!
Minor Tools(10% of Labor) #REF!

A. SUB-TOTAL, EQUIPMENT P #REF!

B. Designation Personnel No. of Men No. of Hours Unit Rate/Hour Total Cost (Pesos)

Foreman 1.00 #REF! P 66.18 P #REF!


Skilled Laborers 2.00 #REF! 47.89 #REF!
Unskilled 4.00 #REF! 36.91 #REF!

B. SUB-TOTAL, LABOR P #REF!

C. Name and Description Qty Unit Unit Price Total Cost (Pesos)
Factor

C. SUB-TOTAL, MATERIALS P -

SUMMARY:
A Equipment P #REF!
B Labor #REF!
C Materials -
D TOTAL DIRECT COST P #REF!
DIRECT UNIT COST #REF!
E OCM 9% of D #REF!
F Profit 8% of D #REF!
G VAT 12% of (D+E+F) #REF!
H Total Cost (D+E+F+G) #REF!
I Unit Cost H/Quantity P #REF!
DETAILED UNIT PRICE ANALYSIS

CONCRETING OF KATUNGAWAN ROAD


Brgy. Buyun, Sta. Teresita, Cagayan
Buguey, Cagayan

Item No. : 504-1 Quantity = #REF!


Description : Removing, Cleaning, Stockpiling of Culvert Pipe(610m Unit = #REF!

Production Output : = 3 ln.m./hr.


No. of Hours : = #REF! hours say #REF! hours
No. of Days : = #REF! days

A. Name and Capacity of Equipment (Operated) No. of Units No. of Hours Hourly Rate Total Cost (Pesos)
Factor

Backhoe(.80cu.m) 0.5 1.00 #REF! 1,537.00 #REF!


Boom Truck 0.5 1.00 #REF! 961.20 #REF!
Water Truck 0.25 1.00 #REF! 1,065.00 #REF!
Minor Tools(10% of Labor) #REF!

A. SUB-TOTAL, EQUIPMENT P #REF!

B. Designation Personnel No. of Men No. of Hours Unit Rate/Hour Total Cost (Pesos)

Foreman 1.00 #REF! P 66.18 P #REF!


skilled Worker 2.00 #REF! 47.89 #REF!
Unskilled Laborers 4.00 #REF! 36.91 #REF!

B. SUB-TOTAL, LABOR P #REF!

C. Name and Description Qty Unit Unit Price Total Cost (Pesos)

C. SUB-TOTAL, MATERIALS P -

SUMMARY:
A Equipment P #REF!
B Labor #REF!
C Materials -
D TOTAL DIRECT COST P #REF!
DIRECT UNIT COST #REF!
E OCM 9% of D #REF!
F Profit 8% of D #REF!
G VAT 12% of (D+E+F) #REF!
H Total Cost (D+E+F+G) #REF!
I Unit Cost H/Quantity P #REF!
DETAILED UNIT PRICE ANALYSIS

Construction/Widening/Upgrading/Rehabilitation of Access Road, Aparri, Airport, Maura


Sta. 0+000 -Sta. 2+650
Buguey, Cagayan

Item No. : SPL-1 Quantity = #REF!


Description : Lined Canal(CHB) Unit = #REF!

Excavation: = 4,507.81 cu.m


Production Output : = 25.00 sq.m/hr.
No. of Hours : = #REF! hours say #REF! hours
No. of Days : = #REF! days

Foundation Fill: = 166.67 cu.m


Production Output : = 1.25 cu.m/hr.
No. of Hours : = 133.34 hours say 133.50 hours
No. of Days : = 16.67 days

RSB: 33,853.63 kgs.


Production Output : = 180.00 kgs./hr.
No. of Hours : = 188.08 hours say 188.25 hours
No. of Days : = 23.51 days

Structural Concrete = 374.73 cu.m


Production Output : = 1.40 cu.m/hr.
No. of Hours : = 267.66 hours say 267.75 hours
No. of Days : = 33.46 days

Masonry Works (CHB)


Production Output : = 1.91 sq.m/hr.
No. of Hours : = - hours say 0.00 hours
No. of Days : = - days

A. Name and Capacity of Equipment (Operated) No. of Units No. of Hours Hourly Rate Total Cost (Pesos)
Factor
Excavation:
DumpTruck (10 cu.m) 1 2.00 #REF! 712.00 #REF!
Backhoe (.80cu.m) 1 1.00 #REF! 712.00 #REF!

Foundation Fill:
Plate Compactor 1 1.00 133.50 123.00 16,420.50
Water Truck(1000 gal.) 0.01 1.00 1.34 1,065.00 1,427.10

RSB
B ar Cutter 0.5 1.00 94.13 219.75 20,685.07
Bar Bender 0.5 1.00 94.13 351.50 33,086.70
CargoTruck(10T,270 Hp) 0.15 1.00 28.24 1,102.00 31,120.48

Structural Concrete
One Bagger Mixer 1 1.00 267.75 172.00 46,053.00
Concrete Vibrator 1 1.00 267.75 148.88 39,862.62
Water Truck(1000 gal.) 0.1 0.10 26.78 1,065.00 2,852.07

Masonry Works (CHB) ; manual

A. SUB-TOTAL, EQUIPMENT P #REF!


DETAILED UNIT PRICE ANALYSIS

Construction/Widening/Upgrading/Rehabilitation of Access Road, Aparri, Airport, Maura


Sta. 0+000 -Sta. 2+650
Buguey, Cagayan

Item No. : SPL-1 Quantity = #REF!


Description : Lined Canal(CHB) Unit = #REF!

B. Designation Personnel No. of Men No. of Hours Unit Rate/Hour Total Cost (Pesos)

Foreman 1.00 267.75 66.18 17,719.70

Excavation:
Skilled Laborers 1.00 #REF! 47.89 #REF!
Unskilled Laborers 3.00 #REF! 36.91 #REF!

Foundation Fill:
Skilled Laborers 1.00 133.50 47.89 6,393.32
Unskilled Laborers 4.00 133.50 36.91 19,709.94

RSB
Skilled Laborers 2.00 94.13 47.89 9,015.77
Unskilled Laborers 8.00 94.13 36.91 27,794.71
Structural Concrete
Skilled Laborers 4.00 267.75 47.89 51,290.19
Unskilled Laborers 8.00 267.75 36.91 79,061.22

Masonry Works (CHB)


Skilled Laborers 2.00 267.75 47.89 25,645.10
Unskilled Laborers 1.00 267.75 36.91 9,882.65

B. SUB-TOTAL, LABOR P #REF!

C. Name and Description Qty Unit Unit Price Total Cost (Pesos)
Factor #REF!
Filling Materials 1.15 192.00 cu.m -
Reinforcing Steel Bars 1.05 35,546.00 kgs -
Tie Wire(2% of RSB) 0.021 711.00 kgs #REF!
Lumber, Good - 4 uses - bd.ft -
Marine Plywood(1/2"x4"x8')- 4 uses - pc. -
Assorted CWN(1kg/1000 bd.ft of Lumber) - kg. #REF!
Cement - bag. -
Sand - cu.m -
Gravel cu.m #REF!
-
C. SUB-TOTAL, MATERIALS P -

SUMMARY:
A Equipment P #REF!
B Labor #REF!
C Materials -
D TOTAL DIRECT COST P #REF!
DIRECT UNIT COST #REF!
E OCM 0.09 of D #REF!
F Profit 0.08 of D #REF!
G VAT 0.12 of (D+E+F) #REF!
H Total Cost (D+E+F+G) #REF!
I Unit Cost H/Quantity P #REF!
DETAILED UNIT PRICE ANALYSIS

CONCRETING OF KATUNGAWAN ROAD


Brgy. Buyun, Sta. Teresita, Cagayan

Item No. : SPL-1 Quantity = #REF!


Description : CHB Lined Canal Unit = #REF!

Excavation = 918.87 cu.m


Production Output : = 6 cu.m per hour
No. of Hours : = #REF! hours say #REF! hours
No. of Days : = #REF! days
RSB = 7,062.87 kg
Production Output : = 180 kg/hr
No. of Hours : = 39.24 hours say 39.25 hours
No. of Days : = 4.90 days

Structural Concrete = 95.77 cu.m


Production Output : = 1.40 cu.m/hr
No. of Hours : = 68.41 hours say 68.50 hours
No. of Days : = 8.55 days

Masonry Works (6"CHB) = 607.70 sq.m. plastering 820.40


Production Output : = 5.69 sq.m/hr
No. of Hours : = 106.80 hours say 107.00 hours
No. of Days : = 13.35 days

A. Name and Capacity of Equipment (Operated) No. of Units No. of Hours Hourly Rate Total Cost (Pesos)
Factor
Excavation: Manual

RSB
Bar cutter 0.5 1.00 19.63 219.75 4,313.69
Bar Bender 0.5 1.00 19.63 351.50 6,899.95
Cargo Truck (10 T), 270 Hp 0.15 1.00 5.89 1,102.00 6,490.78

Structural Concrete

One Bagger Mixer 1 1.00 68.50 P 172.00 P 11,782.00


Concrete Vibrator 1 1.00 68.50 148.88 10,198.28
Water Truck(1000 gal.) 0.1 1.00 6.85 1,065.00 7,295.25
Minor Tools(5% of labor) #REF!

A. SUB-TOTAL, EQUIPMENT P #REF!

B. Designation Personnel No. of Men No. of Hours Unit Rate/Hour Total Cost (Pesos)

Foreman 1.00 214.75 66.18 14,212.16

Excavation
Skilled Laborers
Unskilled 8.00 #REF! 36.91 #REF!

RSB
Skilled Laborers 2.00 39.25 47.89 3,759.37
DETAILED UNIT PRICE ANALYSIS

CONCRETING OF KATUNGAWAN ROAD


Brgy. Buyun, Sta. Teresita, Cagayan

Item No. : SPL-1 Quantity = #REF!


Description : CHB Lined Canal Unit = #REF!

Unskilled 8.00 39.25 36.91 11,589.74


DETAILED UNIT PRICE ANALYSIS

CONCRETING OF KATUNGAWAN ROAD


Brgy. Buyun, Sta. Teresita, Cagayan

Item No. : SPL-1 Quantity = #REF!


Description : CHB Lined Canal Unit = #REF!

Structural Concrete
Skilled Laborers 8.00 68.50 47.89 26,243.72
Unskilled 16.00 68.50 36.91 40,453.36

Installation of CHB & Plastering


Skilled Laborers 1.00 107.00 47.89 5,124.23
Unskilled 2.00 107.00 36.91 7,898.74

B. SUB-TOTAL, LABOR P #REF!

C. Name and Description Qty Unit Unit Price Total Cost (Pesos)
Factor
RSB, Grade 40, (w/ 5% wastage) 1.05 7,416.00 kg 38.00 281,808.00
# 16 Tie wire 0.021 148.00 kg 75.00 11,100.00
Lumber, Good - 4 uses 30 718.00 bd.ft 45.00 32,310.00
Marine Plywood(1/2" x 4' x 8') - 4 uses 1.6 38.00 pc 700.00 26,600.00
Assorted CWN(1kg/100 bd.ft. of Lumber 0.3 29.00 bd.ft 80.00 2,320.00
Cement 9.5 910.00 bag 245.00 222,950.00
Sand 0.5 48.00 cu.m 689.85 33,112.80
Gravel 1 96.00 cu.m 714.14 68,557.44

for Masonry Workschb mortar & plastering


CHB (6") 12.5 7,596.00 pcs 14.00 106,344.00
for inst. Of CHB for plastering
Cement 1.013 0.1125 708.00 bag 245.00 173,460.00
Sand 0.08438 0.01875 67.00 cu.m 689.85 46,219.95

C. SUB-TOTAL, MATERIALS P 1,004,782.19

SUMMARY:
A Equipment P #REF!
B Labor #REF!
C Materials 1,004,782.19
D TOTAL DIRECT COST P #REF!
DIRECT UNIT COST #REF!
E OCM 9% of D #REF!
F Profit 8% of D #REF!
G VAT 12% of (D+E+F) #REF!
H Total Cost (D+E+F+G) #REF!
I Unit Cost H/Quantity P #REF!
DETAILED UNIT PRICE ANALYSIS

CONCRETING OF KATUNGAWAN ROAD


Brgy. Buyun, Sta. Teresita, Cagayan

Item No. : SPL-2 Quantity = #REF!


Description : Reinforced Concrete Box Culvert Unit = #REF!
(1- 3.00 m. x 3.00 m. x 9.70 m.)

RSB = 5,931.00 kg
Production Output : = 180 kg/hr
No. of Hours : = 32.95 hours say 33.00 hours
No. of Days : = 4.12 days

Structural Concrete = 61.00 cu.m


Production Output : = 1.40 cu.m/hr
No. of Hours : = 43.57 hours say 43.75 hours
No. of Days : = 5.45 days

Lean Concrete = 4.77 cu.m


Production Output : = 1.40 cu.m/hr
No. of Hours : = 3.41 hours say 3.50 hours
No. of Days : = 0.43 days

A. Name and Capacity of Equipment (Operated) No. of Units No. of Hours Hourly Rate Total Cost (Pesos)
Factor

RSB
Bar cutter 0.5 1.00 16.50 219.75 3,625.88
Bar Bender 0.5 1.00 16.50 351.50 5,799.75
Cargo Truck (10 T), 270 Hp 0.15 1.00 4.95 1,102.00 5,454.90

Structural Concrete & Lean Concrete

One Bagger Mixer 1 1.00 47.25 P 172.00 P 8,127.00


Concrete Vibrator 1 1.00 47.25 148.88 7,034.58
Water Truck(1000 gal.) 0.1 1.00 4.73 1,065.00 5,037.45
Minor Tools(5% of labor) 3,125.92

A. SUB-TOTAL, EQUIPMENT P 38,205.47

B. Designation Personnel No. of Men No. of Hours Unit Rate/Hour Total Cost (Pesos)

Foreman 1.00 80.25 66.18 5,310.95

RSB
Skilled Laborers 2.00 33.00 47.89 3,160.74
Unskilled 8.00 33.00 36.91 9,744.24

Structural Concrete
Skilled Laborers 8.00 43.75 47.89 16,761.50
Unskilled 16.00 43.75 36.91 25,837.00

Lean Concrete
Skilled Laborers 4.00 3.50 47.89 670.46
Unskilled 8.00 3.50 36.91 1,033.48
DETAILED UNIT PRICE ANALYSIS

CONCRETING OF KATUNGAWAN ROAD


Brgy. Buyun, Sta. Teresita, Cagayan

Item No. : SPL-2 Quantity = #REF!


Description : Reinforced Concrete Box Culvert Unit = #REF!
(1- 3.00 m. x 3.00 m. x 9.70 m.)

B. SUB-TOTAL, LABOR P 62,518.37


DETAILED UNIT PRICE ANALYSIS

CONCRETING OF KATUNGAWAN ROAD


Brgy. Buyun, Sta. Teresita, Cagayan

Item No. : SPL-2 Quantity = #REF!


Description : Reinforced Concrete Box Culvert Unit = #REF!
(1- 3.00 m. x 3.00 m. x 9.70 m.)

C. Name and Description Qty Unit Unit Price Total Cost (Pesos)
Factor
RSB, Grade 40, (w/ 5% wastage) 1.05 6,228.00 kg 50.00 311,400.00
# 16 Tie wire 0.021 125.00 kg 75.00 9,375.00
Lumber, Good - 4 uses 4-uses 70 1,068.00 bd.ft 45.00 48,060.00
Marine Plywood(1/2" x 4' x 8') 1.6 24.00 pc 750.00 18,000.00
Assorted CWN(1kg/100 bd.ft. of Lumber 0.7 43.00 kg 85.00 3,655.00
Cement 9.5 580.00 bag 250.00 145,000.00
Sand 0.5 30.50 cu.m 482.26 14,708.93
Gravel 1 61.00 cu.m 506.50 30,896.50
for lean concrete
Cement 8.5 41.00 bag 245.00 10,045.00
Sand 0.5 2.00 cu.m 482.26 964.52
Gravel 1.00 5.00 cu.m 506.50 2,532.50

C. SUB-TOTAL, MATERIALS P 594,637.45

SUMMARY:
A Equipment P 38,205.47
B Labor 62,518.37
C Materials 594,637.45
D TOTAL DIRECT COST P 695,361.29
DIRECT UNIT COST #REF!
E OCM 9% of D 62,582.52
F Profit 8% of D 55,628.90
G VAT 12% of (D+E+F) 97,628.73
H Total Cost (D+E+F+G) 911,201.44
I Unit Cost H/Quantity P #REF!
DETAILED UNIT PRICE ANALYSIS

CONCRETING OF KATUNGAWAN ROAD


Brgy. Buyun, Sta. Teresita, Cagayan

Item No. : SPL-1 Quantity = ALL


Description : Safety & Health Program Unit = L.S.

A. Name and Capacity of Equipment (Operated) No. of Units No. of Hours Hourly Rate Total Cost (Pesos)

A. SUB-TOTAL, EQUIPMENT P -

B. Designation Personnel No. of Men No. of Hours Unit Rate/Hour Total Cost (Pesos)

B. SUB-TOTAL, LABOR P -

C. Name and Description Qty Unit Unit Price Total Cost (Pesos)

BASIC PPE
Safety Helmet #REF! M-H 0.08 #REF!
Safety Shoes #REF! M-H 0.48 #REF!
Safety Gloves (Denim) #REF! M-H 1.46 #REF!

SPECIALIZED PPE
Rubber Boots #REF! M-H 0.17 #REF!

First aide/Medicine Kit 4,972.67

C. SUB-TOTAL, MATERIALS P #REF!

SUMMARY:
A Equipment P -
B Labor -
C Materials #REF!
D TOTAL DIRECT COST P #REF!
DIRECT UNIT COST #REF!
E OCM 0% of D #REF!
F Profit 8% of D #REF!
G VAT 5% of (D+E+F) #REF!
H Total Cost (D+E+F+G) #REF!
I Unit Cost H/Quantity P #REF!
DETAILED UNIT PRICE ANALYSIS

Project: Construction/Widening/Upgrading/Rehabilitation of Access Road, Aparri, Airport, Maura

Sta. 0+000 -Sta. 2+650


Location: Buguey, Cagayan

Item No. : SPL-18 Quantity = All


Description : Mobilization/Demobilization Unit = L.S.

A. Name and Capacity of Equipment (Operated) No. of Units No. of Days Unit Rate/Day Total Cost (Pesos)

A. SUB-TOTAL , EQUIPMENT P -

B. Designation of Personnel No. of Men No. of Days Unit Rate/Day Total Cost (Pesos)

B. SUB-TOTAL, LABOR P -

C. Material Name and Description Qty Unit Unit Cost Total Cost (Pesos)

C. SUB-TOTAL, MATERIAL P -

SUMMARY
A Equipment P -
B Labor -
C Materials -
D TOTAL DIRECT COST (A+B+C) -
DIRECT UNIT COST D/Quantity -

E OCM/Profit 0% of D -
-
F VAT 12% (D+E) -
G Total Cost (D+E+F) -
H UNIT COST (G/Quantity) P -
DETAILED UNIT PRICE ANALYSIS
Rehabilitation/Reconstruction of National Roads with Slips, Slope Collapse, and Landslide - Secondary Roads
Baybayog-Baggao-Dalin-Sta. Margarita Road - K0536+642 - K0536+724
Baggao, Cagayan

SPL-9 Provide Field Camp Office (1-CL Standard School Bldg 7m x 9m) ALL
1
Item No. : 803 Quantity = 40.00
Description : STRUCTURE EXCAVATION
Unit = cu.m.

Production Output: 0.500 cu.m. per hour


No. of Hours: 80.00 hour(s) say 80 hour(s)
No. of Days: 10 days

Designation of Personnel No. of Person No. of Hours Hourly Rate Total Cost (Pesos)

Laborer 1 4 80 36.91 11,811.20


SUB-TOTAL, LABOR 320.00 man-hour 295.28 P 11,811.20

2
Item No. : 804(a) Quantity = 13.50
Description : BACKFILLING OF EXCAVATED MATERIALS
Unit = cu.m.

Production Output: 1.040 cu.m. per hour


No. of Hours: 12.98 hour(s) say 13 hour(s)
No. of Days: 1.62 days

Designation of Personnel No. of Person No. of Hours Hourly Rate Total Cost (Pesos)

Laborer 1 1 13 36.91 479.83

SUB-TOTAL, LABOR 13.00 man-hour 12.00 P 479.83

Name and Description Qty Unit Unit Cost Total Cost (Pesos)

Fill Materials (Item 200) 1.150 16.00 cu.m. 711.18 11,378.88

SUB-TOTAL, MATERIAL 284.47 P 11,378.88

3
Item No. : 1000a Quantity = 95.00
Description : SOIL POISONING
Unit = sq.m.

Production Output: 1.350 sq.m. per hour


No. of Hours: 70.37 hour(s) say 70.5 hour(s)
No. of Days: 8.8 days

Designation of Personnel No. of Person No. of Hours Hourly Rate Total Cost (Pesos)

Unskilled Laborer 1 1 70.5 36.91 2,602.16

SUB-TOTAL, LABOR - man-hour 65.05 P 2,602.16

Name and Description Qty Unit Unit Cost Total Cost (Pesos)

Pesticide (Soil Poisoning) 0.157 15.00 liters 330.00 4,950.00

SUB-TOTAL, MATERIAL 123.75 P 4,950.00


4
Item No. : 200(b) Quantity = 3.82
Description : R.C. WALL FOOTING
Unit = cu.m.

Production Output: 0.205 cu.m. per hour


No. of Hours: 18.63 hour(s) say 18.75 hour(s)
No. of Days: 2.33 days

Designation of Personnel No. of Person No. of Hours Hourly Rate Total Cost (Pesos)

Leadman 1 1 18.75 66.18 1,240.88


Mason 1 2 18.75 47.89 1,795.88
Laborer 1 2 18.75 36.91 1,384.13

SUB-TOTAL, LABOR 93.75 man-hour 110.52 P 4,420.89

Name and Description Qty Unit Unit Cost Total Cost (Pesos)

Portland Cement 10.760 41.00 bags 245.00 10,045.00


Sand 0.420 2.00 cu.m. 761.10 1,522.20
Gravel 0.85 3.00 cu.m. 785.34 2,356.02

SUB-TOTAL, MATERIAL 348.08 P 13,923.22

5
Item No. : 506(1) Quantity = 125.75
Description : MASONRY WORKS (CHB)
Unit = sq.m.

Production Output: 1.910 sq.m. per hour


No. of Hours: 65.84 hour(s) say 66 hour(s)
No. of Days: 8.23 days

Designation of Personnel No. of Person No. of Hours Hourly Rate Total Cost (Pesos)

Mason 1 2 66 47.89 6,321.48


Laborer 1 1 66 36.91 2,436.06

SUB-TOTAL, LABOR 198.00 man-hour 218.94 P 8,757.54

Name and Description Qty Unit Unit Cost Total Cost (Pesos)

CHB 4"x6"x16" 12.500 1,572.00 pcs. 14.00 22,008.00


Portland Cement 0.525 66.00 bags 245.00 16,170.00
Washed Sand 0.011 1.00 cu.m. 761.10 761.10
Screened Gravel 0.033 4.00 cu.m. 785.34 3,141.36
92 - 10mm dia x 6m 340.00 kgs. 38.00 12,920.00
#16 G.I. Tie Wire 9.00 kgs. 70.00 630.00

SUB-TOTAL, MATERIAL 1,390.76 P 55,630.46

6
Item No. : 1027 Quantity = 225.50
Description : CEMENT PLASTER FINISH
Unit = sq.m.

Production Output: 4.750 sq.m. per hour


No. of Hours: 47.47 hour(s) say 47.5 hour(s)
No. of Days: 5.93 days

Designation of Personnel No. of Person No. of Hours Hourly Rate Total Cost (Pesos)

Mason 1 2 47.5 47.89 4,549.55


Laborer 1 2 47.5 36.91 3,506.45

SUB-TOTAL, LABOR 190.00 man-hour 201.40 P 8,056.00

Name and Description Qty Unit Unit Cost Total Cost (Pesos)

Portland Cement 0.328 74.00 bags 245.00 18,130.00


Washed Sand 0.027 6.00 cu.m. 761.10 4,566.60

SUB-TOTAL, MATERIAL 567.42 P 22,696.60


7
Item No. : 900(a) Quantity = 20.00
Description : STRUCTURAL CONCRETE
Unit = cu.m.

Production Output: 0.100 cu.m. per hour


No. of Hours: 200.00 hour(s) say 200 hour(s)
No. of Days: 25 days

Designation of Personnel No. of Person No. of Hours Hourly Rate Total Cost (Pesos)

Leadman 1 1 200 66.18 13,236.00


Mason 1 1 200 47.89 9,578.00
Carpenter 1 2 200 47.89 19,156.00
Laborer 1 2 200 36.91 14,764.00

SUB-TOTAL, LABOR 1,200.00 man-hour 1,418.35 P 56,734.00

Name and Description Qty Unit Unit Cost Total Cost (Pesos)

Portland Cement 10.959 219.00 bags 245.00 53,655.00


Sand 0.425 8.00 cu.m. 761.10 6,088.80
Gravel 0.849 17.00 cu.m. 785.34 13,350.78
Coco Lumber 75.000 1,500.00 bd.ft 18.00 27,000.00
Assorted CWN 1.500 30.00 kgs. 80.00 2,400.00
1/4" x 4' x 8' Ordinary Plywood 3.333 67.00 pcs. 320.00 21,440.00

SUB-TOTAL, MATERIAL 3,098.36 P 123,934.58

8
Item No. : 900(b) Quantity = 1,587.00
Description : REINFORCING STEEL
Unit = kgs.

Production Output: 14.040 kgs. per hour


No. of Hours: 113.03 hour(s) say 113.25 hour(s)
No. of Days: 14.13 days

Designation of Personnel No. of Person No. of Hours Hourly Rate Total Cost (Pesos)

Steelman 1 2 113.25 47.89 10,847.09

SUB-TOTAL, LABOR 226.50 man-hour 271.18 P 10,847.09

Name and Description Qty Unit Unit Cost Total Cost (Pesos)

59 - 16mm dia. X 6m RSB 558.970 559.00 kgs 38.00 21,242.00


8 - 12mm dia. X 10.5m RSB 74.590 75.00 kgs 38.00 2,850.00
9 - 12mm dia. X 9m RSB 71.930 72.00 kgs 38.00 2,736.00
4 - 12mm dia. X 7.5m RSB 26.640 27.00 kgs 38.00 1,026.00
11 - 10mm dia. X 12m RSB 81.310 81.00 kgs 38.00 3,078.00
4 - 10mm dia. X 10.5m RSB 25.870 26.00 kgs 38.00 988.00
23 - 10mm dia. X 9m RSB 127.510 128.00 kgs 38.00 4,864.00
22 - 10mm dia. X 7.5m RSB 101.640 102.00 kgs 38.00 3,876.00
140 - 10mm dia. X 6m RSB 517.440 517.00 kgs 38.00 19,646.00
#16 Tie Wire (2% of RSB) 0.020 32.00 kgs 70.00 2,240.00

SUB-TOTAL, MATERIAL 1,563.65 P 62,546.00


9
Item No. : 1012 Quantity = 15.00
Description : PLUMBING WORKS
Unit = ln.m.

Production Output: 0.750 ln.m. per hour


No. of Hours: 20.00 hour(s) say 20 hour(s)
No. of Days: 2.5 days

Designation of Personnel No. of Person No. of Hours Hourly Rate Total Cost (Pesos)

Leadman 1 1 20 66.18 1,323.60


Plumber 1 2 20 47.89 1,915.60
Laborer 1 2 20 36.91 1,476.40

SUB-TOTAL, LABOR 100.00 man-hour 117.89 P 4,715.60

Name and Description Qty Unit Unit Cost Total Cost (Pesos)

75 mm dia x 3.0 PVC Pipe 2.00 pc. 440.00 880.00


75 mm dia. Elbow 45⁰ 1.00 pc. 75.00 75.00
75 mm dia. Elbow 90⁰ 2.00 pc. 75.00 150.00
75 mm dia. Clean out 3.00 pc. 36.00 108.00
solvent cement (1000 ml can) 1.00 can 193.00 193.00
75 mm dia x 75 mm dia Tee 3.00 pc. 101.00 303.00
75 mm dia x 75 mm dia Wye 2.00 pc. 85.00 170.00
75 mm dia x 50 mm dia Wye 1.00 pc. 83.00 83.00
50 mm dia P-Trap 1.00 pc. 107.00 107.00
50 mm dia x 3.0 PVC Pipe 2.00 pc. 300.00 600.00
50 mm dia. Clean out 1.00 pc. 21.00 21.00

Fixtures :
Water Closet 1.00 set 6,850.00 6,850.00
Lavatory 1.00 set 6,500.00 6,500.00
Stainless Floor Drain, 4" x 4" 1.00 pc. 280.00 280.00
Soap Holder 1.00 pc. 340.00 340.00
Tissue Holder 1.00 pc. 260.00 260.00

SUB-TOTAL, MATERIAL 423.00 P 16,920.00

10
Item No. : 1003 Quantity = 141.00
Description : CARPENTRY WORKS (CEILING BOARDS, JOISTS AND HANGERS)
and PARTITIONS) Unit sq.m.

Production Output: 2.360 sq.m. per hour


No. of Hours: 59.75 hour(s) say 59.75 hour(s)
No. of Days: 7.47 days

Designation of Personnel No. of Person No. of Hours Hourly Rate Total Cost (Pesos)

Carpenter 1 3 59.75 47.89 8,584.28


Laborer 1 2 59.75 36.91 4,410.75

SUB-TOTAL, LABOR 298.75 man-hour 324.88 P 12,995.03

Name and Description Qty Unit Unit Cost Total Cost (Pesos)
Ceiling Boards, Joists and Hangers:
6mm x 4' x 8' Marine Plywood 41.00 pcs. 350.00 14,350.00
2" x 2" Good Lumber 1,092.00 bd.ft. 45.00 49,140.00
C.W. Nails 30.00 kgs. 80.00 2,400.00
Concrete Nail 4.00 kgs. 120.00 480.00
Partition:
2" x 2" Good Lumber 920.00 bd.ft. 45.00 41,400.00
12.7mm x 4' x 8' Marine Plywood 9.00 kgs 700.00 6,300.00

SUB-TOTAL, MATERIAL 2,851.75 P 114,070.00


11
Item No. : 1000b Quantity = 141.00
Description : WOOD PRESERVATION
Unit = sq.m.

Production Output: 2.550 sq.m. per hour


No. of Hours: 55.29 hour(s) say 55.5 hour(s)
No. of Days: 6.91 days

Designation of Personnel No. of Person No. of Hours Hourly Rate Total Cost (Pesos)

Unskilled Laborer 1 1 55.5 36.91 2,048.51

SUB-TOTAL, LABOR 55.50 man-hour 51.21 P 2,048.51

Name and Description Qty Unit Unit Cost Total Cost (Pesos)

Solignum (Termite Control) 0.157 22.00 liters 250.00 5,500.00

SUB-TOTAL, MATERIAL 137.50 P 5,500.00

12
Item No. : 1014 Quantity = 110.00
Description : PRE-PAINTED METAL SHEETS
Unit = sq.m.

Production Output: 1.86 sq.m. per hour


No. of Hours: 59.14 hour(s) say 59.25 hour(s)
No. of Days: 7.39 days

Designation of Personnel No. of Person No. of Hours Hourly Rate Total Cost (Pesos)

Leadman 1 1 59.25 66.18 3,921.17


Carpenter 1 2 59.25 47.89 5,674.97
Laborer 1 1 59.25 36.91 2,186.92

SUB-TOTAL, LABOR 237.00 man-hour 294.58 P 11,783.06

Name and Description Qty Unit Unit Cost Total Cost (Pesos)

0.4mm x 1.22m x 5.0 rib type pre-painted metal sheets 10.00 pc P 1,925.00 P 19,250.00
0.4mm x 1.22m x 5.316 rib type pre-painted metal sheets 12.00 pc 2,046.66 24,559.92
0.4mm x 2.40m pre-painted flashing 10.00 pc 375.76 3,757.60
0.4mm x 2.40m pre-painted ridge roll 5.00 pc 375.76 1,878.80
12mm x 300mm x 2.40m Hardi-Senepa 19.00 pc 750.00 14,250.00
Self Drilling Metal Screw 250.00 pc 3.50 875.00
8mm dia. x 20mm dia. log with nut and washer 155.00 pc 6.50 1,007.50
Bind Rivets 85.00 pc 2.50 212.50
Vulca Seal 1.00 gal 1,450.00 1,450.00
Aerosol Touch Up Paint 4.00 tube 300.00 1,200.00

SUB-TOTAL, MATERIAL 1,711.03 P 68,441.32

13
Item No. : 1005 Quantity = 5.00
Description : STEEL WINDOWS
Unit = sets

Production Output: 0.680 sets per hour


No. of Hours: 7.35 hour(s) say 7.5 hour(s)
No. of Days: 0.92 days

Designation of Personnel No. of Person No. of Hours Hourly Rate Total Cost (Pesos)

Installer 1 2 7.5 47.89 718.35

SUB-TOTAL, LABOR 15.00 man-hour 17.96 P 718.35

Name and Description Qty Unit Unit Cost Total Cost (Pesos)

2 sets 2500 x 1600 jalousie w/ clear glass blades 8.00 sq.m. 650.00 5,200.00
2 sets 1228 x 1600 jalousie w/ clear glass blades 3.93 sq.m. 650.00 2,554.50
1 sets 1260 x 574 jalousie w/ clear glass blades 0.72 sq.m. 650.00 468.00
SUB-TOTAL, MATERIAL 205.56 P 8,222.50
14
Item No. : 1010 Quantity = 5.00
Description : DOORS AND ACCESSORIES
Unit = sets

Production Output: 0.140 sets per hour


No. of Hours: 35.71 hour(s) say 35.75 hour(s)
No. of Days: 4.46 days

Designation of Personnel No. of Person No. of Hours Hourly Rate Total Cost (Pesos)

Carpenter 1 1 35.75 47.89 1,712.07

SUB-TOTAL, LABOR - man-hour 42.80 P 1,712.07

Name and Description Qty Unit Unit Cost Total Cost (Pesos)

D-1, Narra Panel Door 900 x 2100mm w/ door jamb 2.00 set 5,200.00 10,400.00
D-2, Flush Door Hollow Core 900 x 2100 w/ door jam 3.00 set 890.00 2,670.00
Locksets 1.000 5.00 set 580.00 2,900.00
3 1/2" x 3 1/2" Hinges 4.000 20.00 pcs. 65.00 1,300.00

SUB-TOTAL, MATERIAL 431.75 P 17,270.00

15
Item No. : 403 Quantity = 797.35
Description : STRUCTURAL STEEL
Unit = kgs.

Production Output: 18.030 kgs. per hour


No. of Hours: 44.22 hour(s) say 44.25 hour(s)
No. of Days: 5.53 days

Name and Capacity of Equipment (Operated) No. of Units No. of Hours Hourly Rate Total Cost (Pesos)

Welding Machine 1.00 2 44.25 61.25 5,420.63

SUB-TOTAL , EQUIPMENT 135.52 P 5,420.63

Designation of Personnel No. of Person No. of Hours Hourly Rate Total Cost (Pesos)

Welder 1 4 44.25 47.89 8,476.53


Laborer 1 2 44.25 36.91 3,266.54

SUB-TOTAL, LABOR 265.50 man-hour 293.58 P 11,743.07

Name and Description Qty Unit Unit Cost Total Cost (Pesos)
cross-sectional area
14 pcs - LC 150 x 65 x 20mm x 3mm x 6m 0.0009 594.00 kgs 70.00 41,580.00
27 pcs - LC 100 x 50 x 15mm x 2mm x 6m 0.0004 509.00 kgs 70.00 35,630.00
1 pc - 50m x 50mm x 5mm x 6.0m clip angle 0.0005 24.00 kgs 70.00 1,680.00
15-25m x 25mm x 3mm x 6.0m angle bar 0.0001 71.00 kgs 70.00 4,970.00
2-25mm x 3mm x 6m flat bar 8.00 kgs 70.00 560.00
8-0.30 x 0.15 x 10mm thick base plate 29.00 kgs 70.00 2,030.00
1-0.12 x 0.24 x 10mm thick plate 3.00 kgs 70.00 210.00
16mm dia x 300mm long anchor bolt w/ nut & washer 36.00 pcs. 280.00 10,080.00
10mm dia x 250mm long machine bolt w/ nut & washer 126.00 pcs. 200.00 25,200.00
10mm dia x 7.5m sag rod 3.00 pcs. 350.00 1,050.00
Oxygen/Acetylene 2.00 set 2,500.00 5,000.00
Welding Rod 10.00 kgs 110.00 1,100.00
Epoxy Primer 10.00 gal 620.00 6,200.00
Rust Converter 3.00 gal 550.00 1,650.00
Paint Brush, 4" 6.00 pcs. 60.00 360.00
Sand Paper 125.00 pcs. 25.00 3,125.00

SUB-TOTAL, MATERIAL 3,510.63 P 140,425.00


16
Item No. : 1100 Quantity = 65.00
Description : CONDUIT WORKS
Unit = ln.m.

Production Output: 4.368 ln.m. per hour


No. of Hours: 14.88 hour(s) say 15 hour(s)
No. of Days: 1.86 days

Designation of Personnel No. of Person No. of Hours Hourly Rate Total Cost (Pesos)

Electrician 1 2 15 47.89 1,436.70

SUB-TOTAL, LABOR 30.00 man-hour 35.92 P 1,436.70

Name and Description Qty Unit Unit Cost Total Cost (Pesos)

Rigid PVC conduit pipe, 20mm dia x 3m 28.00 length 92.00 2,576.00
20mm dia x 90°, PVC Elbow 10.00 pcs 20.00 200.00
20mm dia, conduit clamp 45.00 pcs 3.00 135.00
20mm dia, PVC entrance cap 1.00 pcs 45.00 45.00
PVC conduit connector with locknut, 20mm dia. 38.00 prs 14.00 532.00
PVC Solvent cement, 400cc 1.00 cans 185.00 185.00
Utility Box, metal, deep type 5.00 pcs 30.00 150.00
Octagonal Junction Box, Metal 10.00 pcs 31.00 310.00
Electric Wire 3.5mm² THHN 210.00 mts. 24.00 5,040.00
Flush type single pole tumbler switch 5.00 pcs 60.00 300.00
Flush type two gang switch plate 1.00 pcs 95.00 95.00
Flush type three gang switch plate 1.00 pcs 125.00 125.00
Flush type duplex convenience receptacle with plate 2.00 sets 1,250.00 2,500.00
Ceiling Fan with control switch 1.00 set 1,250.00 1,250.00
Enclosed air circuit breaker, 50 AF, 2P, 220V, 20 AT 1.00 set 550.00 550.00
Electrical vinyl tape 2.00 rolls 45.00 90.00
Electrical rubberized tape 1.00 rolls 135.00 135.00
Surface mounted fluorescent lighting fixtures, "Box Type" with 4.00 sets 1,250.00 5,000.00
two(2) - 36W, 220V Lamp
18W, 220V PLC Lamp mounted on a keyless medium base 3.00 sets 230.00 690.00
porcelain lamp receptacle
KW-HR meter, CL100, single phase, 2W, 60HZ 1.00 set 2,100.00 2,100.00
SUB-TOTAL, MATERIAL 550.20 P 22,008.00

17
Item No. : SPL-1 Quantity = 1.00
Description : SITE PREPARATION
Unit = LOT

Name and Description Qty Unit Unit Cost Total Cost (Pesos)

Site Preparation 1.00 Lot 25,000.00 25,000.00

SUB-TOTAL, MATERIAL 625.00 P 25,000.00

SUMMARY:
A Equipment P 5,420.63
B Labor 150,861.10
C Materials 712,916.56
D TOTAL DIRECT COST 869,198.29
DIRECT UNIT COST 869,198.29
E OCM/Profit 17% of D 143,513.71

F VAT 12% of (D+E+F) 121,525.44


G Total Cost (D+E+F+G) 1,134,237.44
H Unit Cost H/Quantity P 1,134,237.44
DETAILED UNIT PRICE ANALYSIS

CONCRETING OF KATUNGAWAN ROAD


Brgy. Buyun, Sta. Teresita, Cagayan

Item No. : SPL-2 Quantity = 5.97


Description : Rental and Maintenance of Field Office Unit = mos

A. Name and Capacity of Equipment (Operated) No. of Units No. of Hours Hourly Rate Total Cost (Pesos)
House Rental 5.97 mos P 2,200.00 13,134.00
Electric Bill 5.97 mos 900.00 5,373.00
water Bill 5.97 mos 300.00 1,791.00

A. SUB-TOTAL, EQUIPMENT P 20,298.00

B. Designation Personnel No. of Men No. of Hours Unit Rate/Day Total Cost (Pesos)

B. SUB-TOTAL, LABOR P -

C. Name and Description Qty Unit Unit Price Total Cost (Pesos)

-
C. SUB-TOTAL, MATERIALS P -

SUMMARY:
A Equipment P 20,298.00
B Labor -
C Materials -
D TOTAL DIRECT COST P 20,298.00
DIRECT UNIT COST 3,400.00
E OCM 0% of D -
F Profit 8% of D 1,623.84
G VAT 5% of (D+E+F) 1,096.09
H Total Cost (D+E+F+G) 23,017.93
I Unit Cost H/Quantity P 3,855.60
DETAILED UNIT PRICE ANALYSIS

CONCRETING OF KATUNGAWAN ROAD


Brgy. Buyun, Sta. Teresita, Cagayan

Item No. : SPL-4 Quantity = All


Description : Furnishing of Testing Equipment Unit = L.s

A. Name and Capacity of Equipment (Operated) No. of Units No. of Hours Hourly Rate Total Cost (Pesos)

A. SUB-TOTAL, EQUIPMENT P -

B. Designation Personnel No. of Men No. of Hours Unit Rate/Day Total Cost (Pesos)

B. SUB-TOTAL, LABOR P -

C. Name and Description Qty Unit Unit Price Total Cost (Pesos)

Autoclave cement for Expansion of Cement 1.00 Unit 616,800.00 616,800.00


62-L0032/A Controls
Vicat Test Set with needle 63-L0028/A Controls 1.00 Unit 25,900.00 25,900.00

C. SUB-TOTAL, MATERIALS P 642,700.00

SUMMARY:
A Equipment P -
B Labor -
C Materials 642,700.00
D TOTAL DIRECT COST P 642,700.00
DIRECT UNIT COST 642,700.00
E OCM 0% of D -
F Profit 8% of D 51,416.00
G VAT 12% of (D+E+F) 83,293.92
H Total Cost (D+E+F+G) 777,409.92
I Unit Cost H/Quantity P 777,409.92
DETAILED UNIT PRICE ANALYSIS
Project: CONCRETING OF KATUNGAWAN ROAD

Location Brgy. Buyun, Sta. Teresita, Cagayan

Item No. : SPL-4 Quantity = All


Description : Provide Survey Instrument and Testing Equipment Unit = L.S.
for the Assistance of the Engineer

A. Name and Capacity of Equipment (Operated) No. of Units No. of Days Unit Rate/Day Total Cost (Pesos)

P P

A. SUB-TOTAL , EQUIPMENT P -

B. Designation of Personnel No. of Men No. of Mos. Unit Rate/Day Total Cost (Pesos)

B. SUB-TOTAL, LABOR P -

C. Material Name and Description Qty Unit Unit Cost Total Cost (Pesos)

Autoclave cement for Expansion of Cement 1.00 Unit 616,800.00 616,800.00


62-L0032/A Controls
Vicat Test Set with needle 63-L0028/A Controls 1.00 Unit 25,900.00 25,900.00

YAESU Two-way radio or its equivalent 2.00 set 7,500.00 15,000.00


Total Station: 1.00 set P 235,000.00 P 235,000.00
Sokkia SET-60 series, Model
SET-65 Total Station. Original
with Standard Accessories
1 pc. Single Prism
1 pc. Prism Holder
1 pc. Range Pole and Leveling Bubble
1 pc. Battey Pack
1 pc. Battery Charger
1 pc. Carrying Case
1 pc. Instruction Manual
1 pc. Heavy Duty Double-Lock Tripod
1 pc. A Set of Tools

C. SUB-TOTAL, MATERIAL P 892,700.00

SUMMARY
A Equipment P -
B Labor -
C Materials 892,700.00
D TOTAL DIRECT COST (A+B+C) 892,700.00
DIRECT UNIT COST D/Quantity 892,700.00

E Profit 8% of D 71,416.00

F VAT 12% (D+E) 115,693.92


G Total Cost (D+E+F) 1,079,809.92
H UNIT COST (G/Quantity) P 1,079,809.92
MATRIX FOR CONSTRUCTION SAFETY AND HEALTH

Working Rubber
Item No. Description Man-Hours Helmet Safety Shoes
Gloves Boots
#REF!
#REF! #REF! #REF!
#REF! #REF! #REF! #REF! #REF!
#REF! #REF! #REF! #REF! #REF!
#REF! #REF! #REF! #REF! #REF!
#REF! #REF! #REF! #REF! #REF!
#REF! #REF! #REF! #REF! #REF!
#REF! #REF! #REF! #REF! #REF!
#REF! #REF! #REF! #REF! #REF!
#REF! #REF! #REF! #REF! #REF! #REF! #REF!
#REF! #REF! #REF! #REF! #REF! #REF! #REF!
#REF! #REF! #REF! #REF! #REF!
#REF! #REF! #REF! #REF! #REF!
#REF! #REF! #REF! #REF! #REF!
#REF! #REF! #REF! #REF! #REF!
#REF! #REF! #REF! #REF! #REF!
#REF! #REF! #REF! #REF! #REF!
#REF! #REF! #REF! #REF! #REF!
#REF! #REF! #REF! #REF! #REF!

#REF! #REF! #REF! #REF! #REF!


SERVICE LIFE IN HOURS 5,840.00 2,920.00 24.00 2,920.00
UNIT PRICE IN PESO 450.00 1,400.00 35.00 500.00
UNIT PRICE PER MAN-HOURS 0.08 0.48 1.46 0.17
TOTAL COST
DETAILED UNIT PRICE ANALYSIS

CONCRETING OF KATUNGAWAN ROAD


Brgy. Buyun, Sta. Teresita, Cagayan

Item No. : SPL-5 Quantity = ALL


Description : Furnishing of Generator Set Unit = L.S.

A. Name and Capacity of Equipment (Operated) No. of Units No. of Hours Hourly Rate Total Cost (Pesos)

A. SUB-TOTAL, EQUIPMENT P -

B. Designation Personnel No. of Men No. of Hours Unit Rate/Day Total Cost (Pesos)

B. SUB-TOTAL, LABOR P -

C. Name and Description Qty Unit Unit Price Total Cost (Pesos)

Generator set 100 KVA 1.00 lot 945,000.00 945,000.00


ATS 400 amp 1.00 lot 187,934.00 187,934.00

C. SUB-TOTAL, MATERIALS P 1,132,934.00

SUMMARY:
A Equipment P -
B Labor -
C Materials 1,132,934.00
D TOTAL DIRECT COST P 1,132,934.00
DIRECT UNIT COST 1,132,934.00
E OCM 0% of D -
F Profit 8% of D 90,634.72
G VAT 12% of (D+E+F) 146,828.25
H Total Cost (D+E+F+G) 1,370,396.97
I Unit Cost H/Quantity P 1,370,396.97
DETAILED UNIT PRICE ANALYSIS

Project : CONCRETING OF KATUNGAWAN ROAD


Location : Brgy. Buyun, Sta. Teresita, Cagayan

Item No. : SPL-5 Quantity = 4.83


Description : Provide 1-Unit Service Vehicle for the Engineer Unit = veh-mos
Rent to own

A. Name and Capacity of Equipment (Operated) No. of Units No. of Months Monthly Rate Total Cost (Pesos)

Chevrolet Trailblazer 4x4 LTZ 2.8 6AT 1.00 4.83 358,983.0228 1,733,888.00
or its Equivalent

Insurance 1.00 48,000.00 48,000.00


LTO Registration 3 years 1.00 12,000.00 12,000.00

A. SUB-TOTAL, EQUIPMENT P 1,793,888.00

B. Designation Personnel No. of Men No. of Days Unit Rate/Day Total Cost (Pesos)

Driver 1.00 145.00 P 383.12 P 55,552.40

B. SUB-TOTAL, LABOR P 55,552.40

C. Name and Description Qty Unit Unit Price Total Cost (Pesos)

Fuel, Oil, Spare Parts, Tires, etc. L.s 128,000.00 128,000.00

C. SUB-TOTAL, MATERIALS P 128,000.00

SUMMARY:
A Equipment P 1,793,888.00
B Labor 55,552.40
C Materials 128,000.00
D TOTAL DIRECT COST P 1,977,440.40
DIRECT UNIT COST 1,977,440.40
E OCM 0% of D -
F Profit 0% of D -
G VAT 12% of (D+E+F) 237,292.85
H Total Cost (D+E+F+G) 2,214,733.25
I Unit Cost H/Quantity P 458,536.90
DETAILED UNIT PRICE ANALYSIS

Project : CONCRETING OF KATUNGAWAN ROAD


Location : Alcala, Cagayan

Item No. : SPL-5 Quantity = 6.00


Description : Provide 1-Unit Service Vehicle for the Engineer Unit = veh-mos
Rental Basis

A. Name and Capacity of Equipment (Operated) No. of Units No. of Hours Hourly Rate Total Cost (Pesos)

Hilux Pick-up 4x4 LT, 3.0Liter Diesel Engine 6.00 mos 63,394.00 380,364.00
4-Door, 5 seater or its Equivalent

A. SUB-TOTAL, EQUIPMENT P 380,364.00

B. Designation Personnel No. of Men No. of Days Unit Rate/Day Total Cost (Pesos)

Driver 1.00 180.00 P 383.12 P 68,961.60

B. SUB-TOTAL, LABOR P 68,961.60

C. Name and Description Qty Unit Unit Price Total Cost (Pesos)

Fuel, Oil, Spare Parts, Tires, etc. L.s 125,000.00 125,000.00

C. SUB-TOTAL, MATERIALS P 125,000.00

SUMMARY:
A Equipment P 380,364.00
B Labor 68,961.60
C Materials 125,000.00
D TOTAL DIRECT COST P 574,325.60
DIRECT UNIT COST 574,325.60
E OCM 0% of D -
F Profit 0% of D -
G VAT 12% of (D+E+F) 68,919.07
H Total Cost (D+E+F+G) 643,244.67
I Unit Cost H/Quantity P 107,207.45
DETAILED UNIT PRICE ANALYSIS

CONCRETING OF KATUNGAWAN ROAD


Brgy. Buyun, Sta. Teresita, Cagayan

Item No. : SPL-6 Quantity = ALL


Description : Provide Furnishing of Office Equipment Unit = L.S.
for the Engineers

A. Name and Capacity of Equipment (Operated) No. of Units No. of Hours Hourly Rate Total Cost (Pesos)

A. SUB-TOTAL, EQUIPMENT P -

B. Designation Personnel No. of Men No. of Hours Unit Rate/Day Total Cost (Pesos)

B. SUB-TOTAL, LABOR P -

C. Name and Description Qty Unit Unit Price Total Cost (Pesos)

Hp Desktop (HP Envy Phoenix H9-1390D Core i7- 3.00 unit 59,988.00 179,964.00
3770 3.4Ghz,6GB,1TB HDD,3GB Graphics, Win8 64bit,
with X2301 23-inch) or its equivalent

C. SUB-TOTAL, MATERIALS P 179,964.00

SUMMARY:
A Equipment P -
B Labor -
C Materials 179,964.00
D TOTAL DIRECT COST P 179,964.00
DIRECT UNIT COST 179,964.00
E OCM 0% of D -
F Profit 8% of D 14,397.12
G VAT 12% of (D+E+F) 23,323.33
H Total Cost (D+E+F+G) 217,684.45
I Unit Cost H/Quantity P 217,684.45
DETAILED UNIT PRICE ANALYSIS

CONCRETING OF KATUNGAWAN ROAD


Brgy. Buyun, Sta. Teresita, Cagayan

Item No. : SPL-7 Quantity = ALL


Description : Provide Survey Instrument for the Unit = L.S.
Assistance of the Engineer

A. Name and Capacity of Equipment (Operated) No. of Units


No. of Hours Hourly Rate Total Cost (Pesos)

A. SUB-TOTAL, EQUIPMENT P -

B. Designation Personnel No. of Men


No. of Hours Unit Rate/Day Total Cost (Pesos)

B. SUB-TOTAL, LABOR P -

C. Name and Description Qty Unit Unit Price Total Cost (Pesos)

Total Station latest model with 1.00 set 280,000.00 280,000.00


complete accessories

Additional Battery Pack for total Station 1.00 units 15,000.00 15,000.00
Additional Prism with pole 2.00 each 7,000.00 14,000.00
Stadia Road 2.00 units 1,500.00 3,000.00

50m Vinyl Tape 1.00 pc 3,500.00 3,500.00


100m Vinyl Tape 2.00 pc 8,000.00 16,000.00

two way radio 2.00 sets 7,800.00 15,600.00

C. SUB-TOTAL, MATERIALS P 347,100.00

SUMMARY:
A Equipment P -
B Labor -
C Materials 347,100.00
D TOTAL DIRECT COST P 347,100.00
DIRECT UNIT COST 347,100.00
E OCM 0% of D -
F Profit 8% of D 27,768.00
G VAT 12% of (D+E+F) 44,984.16
H Total Cost (D+E+F+G) 419,852.16
I Unit Cost H/Quantity P 419,852.16