Professional Documents
Culture Documents
Page 1
Conc-Fm-Rf Work
18,751.33
O.H & proffit 0.00 0.00
Page 2
Conc-Fm-Rf Work
Page 3
Conc-Fm-Rf Work
Page 4
Conc-Fm-Rf Work
Page 5
Conc-Fm-Rf Work
Page 6
Conc-Fm-Rf Work
Page 7
Conc-Fm-Rf Work
Page 8
Conc-Fm-Rf Work
Page 9
Conc-Fm-Rf Work
Page 10
Conc-Fm-Rf Work
Page 11
Conc-Fm-Rf Work
Page 12
Conc-Fm-Rf Work
Page 13
Conc-Fm-Rf Work
Page 14
Conc-Fm-Rf Work
94.48
MAKING MOULD
Materials
1" thick class II timber m2 0.45 540.00 243.00
2"x 2" class II timber in yokes m 1.30 51.00 66.30
2"x 1" class II timber battens m 1.25 20.00 25.00
wire nails. kg 0.40 45.00 18.00
2) Fabricating
carpenter Day 0.13 500.00 62.50
U/SK labourer Day 0.13 300.00 37.50
Add 5% for tools 5.00
Total Cost 457.30
Allowing 4 uses cost of mould per use 114.33
b) Assembling (per use)
Materials
16mm 18" long bolts (20 uses) Nos 0.60 75.00 2.25
mould oil Ltrs 0.50 75.00 37.50
4"x 2" props (10 uses) m 1.10 80.00 8.80
Labour :
Carpenter Day 0.25 500.00 125.00
U/SK labourer Day 0.25 300.00 75.00
Add 5% for tools 10.00
Cost of Assembling per use 258.55
c) Dismantling cleaning & repairing
(per use)
Page 15
Conc-Fm-Rf Work
Labour :
Carpenter Day 0.25 500.00 125.00
U/SK labourer Day 0.25 300.00 75.00
Add 5% for tools 10.00
Cost of dismantling per use 210.00
B) Assembling
Materials
a) 4" x 2" vertical props. m 6.20 80.00 496.00
b) 2" X 2" bracing to mould and props m 7.30 38.00 277.40
d) 1" timber base plate to props m 0.10 447.00 44.70
e) mould oil ltr 4.31 75.00 323.25
f) nails kg 0.25 45.00 11.25
g) wedges 81.81
Page 16
Conc-Fm-Rf Work
Page 17
excavation
Page 18
excavation
DISPOSAL=100 PER M3
565.37
09. Benching rock in foundation in 3"- 6" steps
(Blasting Prohibited)
Page 19
excavation
Page 20
excavation
Page 21
Plastering
Per square
Materials:
cement Cwt 2.25 485.00 1,091.25
sand Cube 0.11 5,000.00 550.00
bitumen Gals 1.50 76.27 114.41
Fire wood lbs 10.00 1.79 17.86
Water Gals 10.00 1.00 10.00
Labour
mason Days 1.25 650.00 812.50
U/Sk labourer Days 2.50 400.00 1,000.00
3,596.02
O/H & Proffits 0.00 0.00
Rate per square 3,596.02
386.93
99. 5/8" thick plastering to wall in lime
and sand 2:5 including floating with
lime putty.
Per Square
Materials:
slaked lime Cwt 1.30 425.00 552.50
sand Cubes 0.07 5,000.00 350.00
Water Gals 10.00 1.00 10.00
Labour
mason Days 1.00 650.00 650.00
U/SK labourer Days 1.75 400.00 700.00
Scaffolding - Add 3% 40.50
2,303.00
O/H & Proffits 0.00 0.00
Rate per square 2,303.00
247.80
100. 5/8" thick plastering to wall in
cement sand 1:3 including cement
floating
Per square
Materials:
cement ( 50 kg bags) Cwt 1.40 485.00 679.00
sand Cubes 0.06 5,000.00 300.00
Water Gals 10.00 1.00 10.00
Labour
mason Days 1.00 650.00 650.00
U/SK labourer Days 1.25 400.00 500.00
Scaffolding - Add 3% 34.50
2,173.50
O/H & proffits 0.00 0.00
Rate per square 2,173.50
233.87
101. 3/8" thick plastering to soffit slab
in cement sand 1:3 including floating
with lime putty
Per square
Materials:
cement ( 50 kg bags) Cwt 0.08 485.00 38.80
slaked lime Cwt 0.16 425.00 68.00
sand Cubes 0.05 5,000.00 250.00
Water Gals 5.00 1.00 5.00
Labour
mason Days 2.50 650.00 1,625.00
U/SK labourer Days 2.50 400.00 1,000.00
Scaffolding - Add 3% 78.75
3,065.55
O/H & Proffits 0.00 0.00
Rate per square 3,065.55
329.85
102. 3/8" thick plastering to sides and
soffit of beams in cement sand 1:3
including floating with lime putty.
Materials:
cement ( 50 kg bags) Cwt 0.08 485.00 38.80
slaked lime Cwt 0.16 425.00 68.00
sand Cubes 0.05 5,000.00 250.00
Water Gals 5.00 1.00 5.00
Labour
mason Days 2.00 650.00 1,300.00
U/SK labourer Days 2.00 400.00 800.00
Scaffolding - Add 3% 63.00
Page 22
Plastering
2,524.80
O/H & Proffits 0.00 0.00
Rate per square 2,524.80
271.67
103. 5/8" thick to wall in lime cement and
sand 1:1:5 finished semi - rough with
wooden float.
Per square
Materials:
cement ( 50 kg bags) Cwt 0.80 485.00 388.00
slaked lime Cwt 0.40 425.00 170.00
sand Cubes 0.07 5,000.00 350.00
Water Gals 10.00 1.00 10.00
Labour
mason Days 1.00 650.00 650.00
U/SK labourer Days 1.25 400.00 500.00
Scaffolding - Add 3% 34.50
2,102.50
O/H & Proffits 0.00 0.00
Rate per square 2,102.50
226.23
104. 5/8" thick plastering to wall in lime
cement and sand 1:1:5 finished smooth
with lime putty floating.
Materials:
cement ( 50 kg bags) Cwt 0.80 485.00 388.00
slaked lime Cwt 0.60 425.00 255.00
sand Cubes 0.07 5,000.00 350.00
Water Gals 10.00 1.00 10.00
Labour
mason Days 1.50 650.00 975.00
U/SK labourer Days 1.50 400.00 600.00
Scaffolding - Add 3% 47.25
2,625.25
O/H & Proffits 0.00 0.00
Rate per square 2,625.25
282.48
105. 1/2" thick rendering in cement and
sand 1:3 finished smooth
Per Square
Materials:
cement ( 50 kg bags) Cwt 1.07 485.00 518.95
sand Cubes 0.05 5,000.00 250.00
Water Gals 10.00 1.00 10.00
Labour
mason Days 1.00 650.00 650.00
U/SK labourer (curing) Days 1.50 400.00 600.00
2,028.95
O/H & Proffits 0.00 0.00
Rate per square 2,028.95
218.40
106. 1/2" thick rendering in cement and
sand 1:2 in floors, finished smooth
Per square
Materials:
cement ( 50 kg bags) Cwt 1.50 485.00 727.50
sand Cubes 0.05 5,000.00 250.00
Water Gals 10.00 1.00 10.00
Labour
mason Days 1.00 650.00 650.00
U/SK labourer Days 1.50 400.00 600.00
U/SK labourer (curing) Days 0.25 400.00 100.00
2,337.50
O/H & Proffits 0.00 0.00
Rate per square 2,337.50
251.52
107. 3/4" thick rendering in cement and
sand 1:3 finished smooth
Per square
Materials:
cement ( 50 kg bags) Cwt 1.75 485.00 848.75
sand Cubes 0.08 5,000.00 400.00
Water Gals 10.00 1.00 10.00
Labour
mason Days 1.25 650.00 812.50
U/SK labourer Days 2.00 400.00 800.00
U/SK labourer (curing) Days 0.25 400.00 100.00
2,971.25
O/H & Proffits 0.00 0.00
Rate per square 2,971.25
319.71
108. 3/4" thick rendering in cement and
sand 1:2 in floors finished smooth.
Page 23
Plastering
Per square
Materials:
cement ( 50 kg bags) Cwt 2.25 485.00 1,091.25
sand Cubes 0.08 5,000.00 400.00
Water Gals 10.00 1.00 10.00
Labour
mason Days 1.25 650.00 812.50
U/SK labourer Days 2.00 400.00 800.00
U/SK labourer (curing) Days 0.25 400.00 100.00
3,213.75
O/H & Proffits 0.00 0.00
Rate per square 3,213.75
345.80
109. 3/4" thick rendering in cement and
sand 1:2 in coloured cement floors
Finished smooth
Per square
Materials:
2.25 cwt cement ( 50 kg bags) Cwt 2.25 485.00 1,091.25
0.08 cubes sand cubes 0.08 5,000.00 400.00
5 lbs powered pigment lbs 5.00 54.00 270.00
Water 10 gals Gals 10.00 1.00 10.00
Labour
mason Days 1.25 650.00 812.50
U/SK labourer Days 2.00 400.00 800.00
U/SK labourer (curing) Days 0.25 400.00 100.00
3,483.75
O/H & Proffits 0.00 0.00
Rate per square 3,483.75
374.85
110. 1/2"x 6" skirting in cement and sand
1:3 projected or flush to walls finished
with floating including forming grove.
Labour
mason Days 0.38 650.00 243.75
U/SK labourer Days 0.31 400.00 125.00
Total per 10 L.ft 445.75
O/H & Proffits 0.00 0.00
Rate per L.ft 44.58
146.21
Note:
Where coloured skirting is not required,
delete provision for powered pigment
Page 24
Plastering
Page 25
Plastering
98
1.75 257
99
100
1.4
15.875
1.25984
1 440
4734.4
473.44
16.909
15.625
9.375
101
102
Page 26
Plastering
103
15.625
15.875
19.05
1.2
104
30
47.36276
1420.883
71.04413
105
106
107 18.75
1631.9
489.57
2121.4
228.36
108
Page 27
Plastering
109
110
0.01
0.05
Page 28
Plastering
SCAFFOLDING
U/SK LABOUR
SLAKED LIME
FIRE WOOD
BITUMEN
AMOUNT
CEMENT
MASON
WATER
SAND
O/H
### 550.00 114.41 17.86 10.00 750.00 ### 1,060.05 4,593.57
Page 29
Painter
Per square
Materials
wood preservative (oil type) Ltr. 2.75 125.00 343.75
3" brush (1/10 use) No 0.10 335.00 33.50
Labour
painter Days 0.75 600.00 450.00
U/Sk labourer Days 0.50 400.00 200.00
1,027.25
O/H & Proffits 0.00 0.00
Rate per square 1,027.25
110.58
112. Prepare surface of steel truss and
apply two coats of anti-corrosive
primer.
Labour
painter Days 1.50 600.00 900.00
U/Sk labourer Days 1.50 400.00 600.00
3,008.25
O/H & Proffits 0.00 0.00
Rate per square 3,008.25
Page 30
Painter
Labour
Painter Days 2.50 600.00 1,500.00
U/Sk labourer Days 1.00 400.00 400.00
Scaffolding - Add 3% 57.00
2,966.33
O/H & Proffits 0.00 0.00
Rate per square 2,966.33
Consider 50 sq.ft
Materials
anti-corrosive primer Ltrs 1.50 600.00 900.00
enamal paint Ltrs 0.67 610.00 406.67
mineral turpentine or thinner Ltrs 0.20 155.00 31.00
wire brush No 0.50 60.00 30.00
2" brush (1/5 use) No 0.20 165.00 33.00
Labour
Painter Days 0.50 600.00 300.00
U/Sk labourer Days 0.75 400.00 300.00
Total per 50 sq.ft 2,000.67
O/H & Proffits 0.00 0.00
Rate per squre 2,000.67
Per square
Materials
anti-corrosive paint Ltrs 1.50 440.00 660.00
2" brush (1/5 use) No 0.20 165.00 33.00
Labour
Painter Days 1.50 600.00 900.00
1,593.00
O/H & proffits 0.00 0.00
Rate per square 1,593.00
Per square
Materials
wood preservative ltr 2.27 125.00 283.75
Page 31
Painter
Labour
Painter Days 0.50 600.00 300.00
616.75
O/H & Proffits 0.00 0.00
Rate per square 616.75
66.39
117. Preparing and painting wood work
with primer and 2 coats of enamal
Per square
Materials
Primer Ltrs 0.75 455.00 341.25
Enamel paint (2 coats) Ltrs 1.50 630.00 945.00
Sand papers Nos 2.00 30.00 60.00
3" brush ( 1/8 use) No 0.13 335.00 41.88
Labour
Painter Days 1.50 600.00 900.00
U/Sk labourer Days 0.50 400.00 200.00
2,488.13
O/H & Proffits 0.00 0.00
Rate per square 2,488.13
267.83
118. White or colour washing two coats in
single storey
Per 10 square
Materials
boiled lime Cwt 0.50 350.00 175.00
salt Lbs 2.00 5.00 10.00
yellow ochre Lbs 0.50 60.00 30.00
blue ozs 2.00 2,000.00 4,000.00
8" brush (1/3 use) No 0.33 675.00 225.00
Water Gals 10.00 1.00 10.00
Labour
Painter Days 2.50 600.00 1,500.00
U/sk Labour Days 2.50 400.00 1,000.00
Scaffolding - Add 3% 75.00
7,025.00
O/H & Proffits 0.30 2,107.50
Rate per square 913.25
Per 10 sqrs.
(as per above) 7,025.00
Add.
Page 32
Painter
Per square
Materials
primer Ltrs 0.90 345.00 310.50
emulision paint Ltrs 1.40 485.00 679.00
Water Gals 0.10 1.00 0.10
6" brush (1/10 use) Nos 0.10 530.00 53.00
sand papers Nos 2.00 30.00 60.00
Labour
painter Days 1.25 600.00 750.00
Scaffolding - Add 3% 22.50
1,875.10
O/H & Proffits 0.00 0.00
Rate per square 1,875.10
201.76
prepare and apply one coat of alkali
resistant primer and two coarts of
W/shield emulision paint to walls.
Per square
Materials
primer Ltrs 0.90 345.00 310.50
W/shield emulision paint Ltrs 1.40 585.00 819.00
Water Gals 0.10 1.00 0.10
6" brush (1/10 use) Nos 0.10 530.00 53.00
sand papers Nos 2.00 30.00 60.00
Labour
painter Days 1.25 600.00 750.00
Scaffolding - Add 3% 22.50
2,015.10
O/H & Proffits 0.00 0.00
Rate per square 2,015.10
216.82
121. Cement washing to walls of single
storeyed building 2 coats
Per 10 square
Materials
Page 33
Painter
Labour
painter Days 2.00 600.00 1,200.00
U/Sk labourer Days 2.00 400.00 800.00
Scaffolding - Add 3% 60.00
Total 2,618.13
O/H & Proffits 0.00 0.00
Rate per square 261.81
Per square
1st coat - emulsion paint ltr 0.76 410.00 310.23
2nd coat - emulsion paint ltr 0.65 410.00 265.91
6" brush - (1/10 use) No 0.10 530.00 53.00
0.10 gals water Gal 0.10 1.00 0.10
Labour
Painter Days 0.75 600.00 450.00
Scaffolding - Add 3% 13.50
1,092.75
O/H & Proffits 0.00 0.00
Rate per square 1,092.75
117.63
123. Prepare and apply one coat alkali
resistant primer and two coats of
emulsion paint to soffit of slabs.
Labour
painter Days 1.75 600.00 1,050.00
Scaffolding - Add 3% 31.50
2,060.00
O/H & Proffits 0.00 0.00
Rate per square 2,060.00
221.74
124. Varnishing two coats with copal
varnish after sand papering.
Per square
varnish ltr 1.82 540.00 980.64
Page 34
Painter
Labour
painter Days 1.25 600.00 750.00
U/Sk labourer Days 0.75 400.00 300.00
2,072.52
O/H & Proffits 0.00 0.00
Rate per square 2,072.52
223.09
125. Wax polishing to timber in panels &
floors
Per square
Materials
wax polish Lb 0.75 370.00 277.50
sand papers No 6.00 30.00 180.00
1/10 floor brush No 0.10 225.00 22.50
flannel cloth Yards 0.50 55.00 27.50
Labour
U/Sk labourer Days 0.38 400.00 150.00
657.50
O/H & Proffits 0.00 0.00
Rate per square 657.50
Page 35
Painter
323.815931
Page 36
Painter
319.303911
215.357015
Page 37
Painter
216.677419
Page 38
Painter
893.14
311.89
Page 39
Painter
0.5
0.5
112.5
10
150.00
272.5
354.25
Page 40
Door Window
Page 41
Door Window
Page 42
Door Window
IRON MONGARY
Page 43
Door Window
Page 44
Door Window
Page 45
Door Window
Page 46
Door Window
Page 47
Door Window
Page 48
Door Window
90,000.00
22,200.00
67,800.00
1422.4 1.22
0 1.815848 2
Page 49
Roof Plumb
Labour
plumber Days 0.50 650.00 325.00
U/Sk labourer Days 0.50 400.00 200.00
Scaffolding - Add 5% 26.25
Total 636.37
O/H & Proffits 0.00 0.00
Rate per L.ft 26.52
Materials
PVC gutter head Nos 1.00 0.00 0.00
gutter joiners Nos 2.00 0.00 0.00
gutter brackets Nos 2.00 0.00 0.00
solvent cement Grms 12.00 0.86 10.27
3/4" brass screws Nos 4.00 2.00 8.00
Labour
plumber Days 0.13 650.00 81.25
U/Sk labourer Days 0.13 400.00 50.00
Scaffolding - Add 5% 6.56
156.09
O/H & Proffits 0.00 0.00
Rate per No 156.09
Materials
Page 50
Roof Plumb
Labour
plumber Days 0.13 650.00 81.25
U/Sk labourer Days 0.13 400.00 50.00
Scaffolding - Add 5% 6.56
156.09
O/H & Proffits 0.00 0.00
Rate per No 156.09
Materials
1 No end cap No 1.00 0.00 0.00
solvent cement Grms 12.00 0.86 10.27
Labour
plumber Days 0.06 650.00 40.63
U/Sk labourer Days 0.06 400.00 25.00
Scaffolding - Add 5% 3.28
79.18
O/H & Proffits 0.00 0.00
Rate per No 79.18
Materials
3 1/2" dia pipe length lft 24.00 0.00 0.00
3 1/2 joiner Nos 1.00 0.00 0.00
PVC straps Nos 4.00 0.00 0.00
brass screws 1" long Nos 1.00 2.50 2.50
solvent cement Grms 30.00 0.86 25.69
Labour
plumber Days 0.33 650.00 216.67
U/Sk labourer Days 0.33 400.00 133.33
Scaffolding - Add 5% 17.50
Total per 24.0 L.ft 395.69
O/H & Proffits 0.00 0.00
Rate per L.ft 16.49
Page 51
Roof Plumb
Page 52
Roof Plumb
86.9711133 /m
Page 53
Roof Plumb
54.0770867 /m
Page 54
Tiler
Per square
Materials
Pressed tiles 8" x 8" Nos 225.00 40.00 9,000.00
Add 5% for wastage 450.00
Cement (50 kg bags) Cwt 1.25 485.00 606.25
Sand Cubes 0.07 5,000.00 350.00
Wax polish Lb 0.25 140.00 35.00
Coloured pigment Lb 0.25 270.00 67.50
Cotton waste Lb 2.00 8.00 16.00
Labour
Mason Days 4.00 650.00 2,600.00
U/SK labourer Days 4.00 400.00 1,600.00
U/SK labourer for polishing Days 0.50 400.00 200.00
14,924.75
O/H & Proffits 0.00 0.00
Rate per square 14,924.75
1605.90
64. Glazed tiles fixed to walls including
bedding in cement mortar 1:2 and
raking in ground floor.
(Specials measured seperatly)
Per square
Materials
glazed tiles 4"x 4" Nos 900.00 35.00 31,500.00
Add 10% for wastage on cutting 3,150.00
cement sand (50 Kg bags) Cwt 2.50 485.00 1,212.50
sand Cubes 0.11 5,000.00 550.00
white cement Lb 1.00 9.92 9.92
Labour
mason Days 4.00 650.00 2,600.00
U/SK labourer Days 4.00 400.00 1,600.00
U/SK labourer for cleaning Days 0.25 400.00 100.00
40,722.42
O/H & Proffits 0.00 0.00
Rate per square 40722.42
4381.73
Page 55
Tiler
GRANITE-5900 PER M2
64. Glazed tiles fixed to walls including
bedding in cement mortar 1:2 and
raking in ground floor.
(Specials measured seperatly)
Per square
Materials
glazed tiles 6"x 6" ft 100.00 2,016.00 201,600.00
Add 10% for wastage on cutting 20,160.00
cement sand (50 Kg bags) Cwt 2.50 750.00 1,875.00
sand Cubes 0.11 8,000.00 880.00
white cement Lb 1.00 9.92 9.92
Labour
mason Days 4.00 1,100.00 4,400.00
U/SK labourer Days 4.00 850.00 3,400.00
U/SK labourer for cleaning Days 0.25 850.00 212.50
232,537.42
O/H & Proffits 16% 37205.99
Rate per square 269743.41
29024.39
65. Terrazzo floor tiles on 1/2" thick
cement and sand 1:2 in ground floor
Per square
Materials
12"x 12" terrazzo tiles Nos 100.00 0.00 0.00
Add 5% for wastage 0.00
cement (50 kg bags) Cwt 1.25 485.00 606.25
sand Cubes 0.07 5,000.00 350.00
Coloured pigment Lb 2.00 270.00 540.00
wax polish Lb 0.50 140.00 70.00
cotton waste Lb 2.00 8.00 16.00
Labour
mason Days 3.00 650.00 1,950.00
U/SK labourer Days 3.00 400.00 1,200.00
U/SK labourer for polishing Days 0.50 400.00 200.00
4,932.25
O/H & Proffits 0.00 0.00
Rate per square 4,932.25
530.71
65a. Ceramic floor tiles on 1/2" thick
cement and sand 1:2 in ground floor
Per square
Materials
12"x 12" Ceramic tiles Nos 100.00 95.00 9,500.00
Add 5% for wastage 0.00
Page 56
Tiler
Labour
mason Days 3.00 650.00 1,950.00
U/SK labourer Days 3.00 400.00 1,200.00
U/SK labourer for Cleaning Days 0.50 400.00 200.00
14,432.25
O/H & Proffits 0.00 0.00
Rate per square 14,432.25
1552.91
65b. Ceramic floor tiles bedded in 1/2"
cement mortar 1:2 and pointing in
neat cement in ground floor
Per square
Materials
Ceramic tiles 8" x 8" Nos 225.00 30.00 6,750.00
Add 10% for wastage 675.00
Cement (50 kg bags) Cwt 1.25 485.00 606.25
Sand Cubes 0.07 5,000.00 350.00
Wax polish Lb 0.25 140.00 35.00
Coloured pigment Lb 0.25 270.00 67.50
Cotton waste Lb 2.00 8.00 16.00
Labour
Mason Days 4.00 650.00 2,600.00
U/SK labourer Days 4.00 400.00 1,600.00
U/SK labourer for cleaning Days 0.50 400.00 200.00
12,899.75
O/H & Proffits 0.00 0.00
Rate per square 12,899.75
1388.01
INSITU TERRAZO WORK
Note:-
Our sub contractors current labour rate
per sq.ft is Rs.14/=
Per square
Materials
Cement Cwt 2.00 485.00 970.00
Dolomite Cwt 2.00 0.00 0.00
Milk White chips kg 25.00 0.00 0.00
Page 57
Tiler
Labour
Sk/Labour Day 4.00 600.00 2,400.00
U/sk Labour Day 3.20 400.00 1,280.00
4,955.60
O/H & Proffits 0.00 0.00
Rate per square 4,955.60
533.43
65d. Laying in situ Terrazo White colour.
(Levelling floor with concrete measured
seperately)
Per square
Materials
White Cement Cwt 2.00 0.00 0.00
Dolomite Cwt 2.00 0.00 0.00
Milk White chips kg 25.00 0.00 0.00
Black chips kg 25.00 0.00 0.00
3/4"x 4' 0" long aluminium strips No 20.00 0.00 0.00
Add 5% wastage 0.00
Wax lbs 0.88 140.00 123.48
Thinner ltr 1.82 73.58 133.62
Cutting stone (medium) No 1.00 0.00 0.00
Cutting stone (rough) No 1.00 0.00 0.00
Cutting stone (fine) No 1.00 0.00 0.00
Hire of terrazo cutting machine Day 1.00 0.00 0.00
Labour
Sk/Labour Day 4.00 600.00 2,400.00
U/sk Labour Day 3.20 400.00 1,280.00
3,937.10
O/H & Proffits 0.00 0.00
Rate per square 3,937.10
423.80
65e. Laying in situ Terrazo Red colour.
(Levelling floor with concrete measured
seperately)
Per square
Materials
Cement Cwt 2.00 485.00 970.00
Page 58
Tiler
Labour
Sk/Labour Day 4.00 600.00 2,400.00
U/sk Labour Day 3.20 400.00 1,280.00
4,955.60
O/H & Proffits 0.00 0.00
Rate per square 4,955.60
533.43
Page 59
Tiler
2697.43408
Page 60
Plumbing
Per 10 L.ft
Materials
1/2" dia. pipes L.ft 13.00 4.96 64.45
Clips & nails Nos 3.00 4.40 13.21
Solvent cement Grams 2.00 0.86 1.71
Labour
Plumber Day 0.13 650.00 81.25
U/Sk labourer Day 0.13 400.00 50.00
Total per 10 L.ft 210.62
O/H & Proffits 0.00 0.00
Rate per L.ft 21.06
127. 3/4" dia PVC pipes fixed to walls ( special paid seperatly)
per 10 l.ft
3/4" dia. pipes L.ft 13.00 9.48 123.27
Clips & nails Nos 3.00 4.40 13.21
Solvant cement Grams 3.00 0.86 2.57
Labour
Plumber Day 0.13 650.00 81.25
U/Sk labourer Day 0.13 400.00 50.00
Total per 10 L.ft 270.30
O/H & Proffits 0.00 0.00
Rate per L.ft 27.03
88.66
128. 1" dia PVC pipes fixed to walls.
(specials paid seperatly)
Labour
Page 61
Plumbing
Labour
3/4 day plumber Days 0.75 650.00 487.50
3/4 day U/Sk labourer Days 0.75 400.00 300.00
Total per 100 l.ft 3,445.68
O/H & Proffits 0.00 0.00
Rate per L.ft 34.46
Labour
3/4 day plumber Days 0.75 650.00 487.50
3/4 day U/Sk labourer Days 0.75 400.00 300.00
Total per 100 l.ft 4,715.41
O/H & Proffits 0.00 0.00
Rate per L.ft 47.15
Page 62
Plumbing
Labour
3/4 day plumber Days 0.75 650.00 487.50
3/4 day U/Sk labourer Days 0.75 400.00 300.00
Total per 100 l.ft 7,243.64
O/H & Proffits 0.00 0.00
Rate per L.ft 72.44
Labour
1 day plumber Days 1.00 650.00 650.00
1 day U/Sk labourer Days 1.00 400.00 400.00
Total per 100 l.ft 14,722.68
O/H & Proffits 0.00 0.00
Rate per L.ft 147.23
Labour
Mason Days 3.00 650.00 1,950.00
U/Sk labour Days 3.00 400.00 1,200.00
Total per 100 l.ft 3,248.50
O/H & Proffits 0.00 0.00
Page 63
Plumbing
Labour
Mason Days 3.50 650.00 2,275.00
U/Sk labourer Days 3.50 400.00 1,400.00
Total per 100 l.ft 3,922.00
O/H & Proffits 0.00 0.00
Rate per L.ft 39.22
Labour
Plumber Day 0.25 650.00 162.50
Total per 10 nos 266.55
O/H & Proffits 0.00 0.00
Rate per No 26.65
Labour
Plumber Day 0.25 650.00 162.50
Total per 10 Nos 336.09
O/H & Proffits 0.00 0.00
Rate per No 33.61
Page 64
Plumbing
Labour
Plumber Day 0.25 650.00 162.50
Total per 10 Nos 429.77
O/H & Proffits 0.00 0.00
Rate per No 42.98
Labour
Plumber Day 0.25 650.00 162.50
Total per 10 Nos 213.87
O/H & Proffits 0.00 0.00
Rate per No 21.39
Labour
Plumber Day 0.50 650.00 325.00
Total per 10 Nos specials 376.37
O/H & Proffits 0.00 0.00
Rate per No 37.64
Labour
Plumber Day 0.50 650.00 325.00
Page 65
Plumbing
Labour
Plumber Day 0.50 650.00 325.00
Total per 10 Nos specials 496.24
O/H & Proffits 0.00 0.00
Rate per No 49.62
Labour
Plumber Day 0.50 650.00 325.00
Total per 10 Nos specials 530.49
O/H & Proffits 0.00 0.00
Rate per No 53.05
Labour
Plumber Day 0.50 650.00 325.00
Total per 10 Nos Tees 350.69
0.00 0.00
Rate per No 35.07
Page 66
Plumbing
Labour
Plumber Day 0.50 650.00 325.00
Total per 10 Nos Tees 363.53
O/H & Proffits 0.00 0.00
Rate per No 36.35
Labour
1/2 day Plumber Day 0.50 650.00 325.00
Total per 10 Nos Tees 376.37
O/H & Proffits 0.00 0.00
Rate per No 37.64
Per 10 Tees
Materials
1-1/4" Dia tees Nos 10.00 0.00 0.00
Solvent cement Grms 90.00 0.86 77.06
Labour
Plumber Day 0.50 650.00 325.00
Total per 10 Nos Tees 402.06
O/H & Proffits 0.00 0.00
Rate per No 40.21
Per 10 Tees
Materials
1-1/2" Dia tees Nos 10.00 0.00 0.00
Solvent cement Grms 120.00 0.86 102.74
Labour
Plumber Days 1.00 650.00 650.00
Total per 10 Nos Tees 752.74
O/H & Proffits 0.00 0.00
Rate per No 75.27
Per 10 Tees
Page 67
Plumbing
Materials
2" Dia tees Nos 10.00 0.00 0.00
Solvent cement Grms 210.00 0.86 179.80
Labour
Plumber Days 1.00 650.00 650.00
Total per 10 Nos Tees 829.80
O/H & Proffits 0.00 0.00
Rate per No 82.98
Per 10 Tees
Materials
2-1/2" Dia tees Nos 10.00 0.00 0.00
Solvent cement Grms 300.00 0.86 256.86
Labour
Plumber Days 1.50 650.00 975.00
Total per 10 Nos Tees 1,231.86
O/H & Proffits 0.00 0.00
Rate per No 123.19
Per 10 Tees
Materials
3" Dia tees Nos 10.00 0.00 0.00
Solvent cement Grms 360.00 0.86 308.23
Labour
Plumber Days 1.50 650.00 975.00
Total per 10 Nos Tees 1,283.23
O/H & Proffits 0.00 0.00
Rate per No 128.32
Per No.
Materials
wash basin complete with brackets Nos 1.00 0.00 0.00
1/2" tap Nos 1.00 0.00 0.00
Waste plug and chain Nos 1.00 0.00 0.00
wooden plugs Nos 4.00 0.00 0.00
Page 68
Plumbing
Labour
mason Days 0.50 650.00 325.00
U/Sk labour Days 1.00 400.00 400.00
754.80
O/H & Proffits 0.00 0.00
Rate per No 754.80
Per No.
Materials
wash basin pedestal, tap & waste Nos 1.00 0.00 0.00
wooden plugs Nos 4.00 0.00 0.00
1-1/2" brass screws Nos 6.00 3.50 21.00
Cement cwt 0.02 485.00 8.80
Labour
mason Days 0.50 650.00 325.00
U/Sk labour Days 1.00 400.00 400.00
754.80
O/H & Proffits 0.00 0.00
Rate per No 754.80
Per No.
Materials
sink 24"x 15"x 7" Nos 1.00 0.00 0.00
L iron brackets Nos 2.00 0.00 0.00
cement cwt 0.02 485.00 8.80
tapered wooden block 2" thick Nos 2.00 0.00 0.00
1-1/2" dia brass screws Nos 8.00 3.50 28.00
Labour
mason Days 0.50 650.00 325.00
Page 69
Plumbing
Per No:
Materials
Low level suite complete Nos 1.00 0.00 0.00
1/2" dia stop cock Nos 1.00 0.00 0.00
Cement cwt 0.02 485.00 8.80
Sand Cu.ft 0.25 5,000.00 1,250.00
1-1/2" brass screws Nos 2.00 3.50 7.00
Labour
Mason Days 0.25 650.00 162.50
Plumber Days 1.00 650.00 650.00
U/Sk labourer Days 1.00 400.00 400.00
2,478.30
O/H & Proffits 0.00 0.00
Rate per No 2,478.30
Per No:
Materials
Squatting pan with trap Nos 1.00 0.00 0.00
C.I cistern with 1 1/4" flush pipe, chain and
overflow pipe Nos 1.00 0.00 0.00
Clip Nos 2.00 5.29 10.58
Wooden plugs Nos 5.00 0.00 0.00
1-1/2" brass screws Nos 12.00 3.50 42.00
1/2" stop cock Nos 1.00 0.00 0.00
Cement Cwt 0.25 485.00 121.25
3/4" Metal Cube 0.01 3,600.00 18.00
Sand Cu.ft 0.25 5,000.00 1,250.00
Labour
Mason Days 0.50 650.00 325.00
Plumber Days 1.00 650.00 650.00
U/Sk labourer Days 1.00 400.00 400.00
2,816.83
Page 70
Plumbing
Per No:
Materials
Bidet Nos 1.00 0.00 0.00
Labour
Plumber Days 1.00 650.00 650.00
U/Sk labourer Days 1.00 400.00 400.00
1,050.00
O/H & Proffits 0.00 0.00
Rate per No 1,050.00
Materials
Urinal Bowls Nos 4.00 0.00 0.00
2 gal. cistern Nos 1.00 0.00 0.00
Rawl plug Nos 8.00 0.00 0.00
Spreador Nos 1.00 0.00 0.00
Wooden plugs (for cistern) Nos 4.00 0.00 0.00
1-1/2" brass screws Nos 4.00 3.50 14.00
Cement cwt 0.04 485.00 17.60
Sand Cu.ft 0.13 5,000.00 625.00
Labour
Mason Days 0.25 650.00 162.50
Plumber Days 1.00 650.00 650.00
U/Sk labourer Days 1.00 400.00 400.00
Total per 4 Nos 1,869.10
O/H & Proffits 0.00 0.00
Rate per No 467.27
Page 71
Roof & Ceiling
Labour
Carpentor Days 7.00 600.00 4,200.00
U/SK labourer Days 8.00 400.00 3,200.00
53,987.63
O/H & Proffits 0.00 -
Total per 6.00 squares. 53,987.63
Labour
carpenter Days 3.00 600.00 1,800.00
U/SK labourer Days 3.00 400.00 1,200.00
21,750.00
O/H & Proffits 0.00 -
Total per 6.00 squares. 21,750.00
Page 72
Roof & Ceiling
building
Labour
carpenter Days 2.50 600.00 1,500.00
U/SK labourer Days 3.00 400.00 1,200.00
17,716.67
O/H & Proffits 0.00 -
Total per 3.60 squares. 17,716.67
Labour
carpenter Days 1.00 650.00 650.00
U/SK labourer Days 2.00 400.00 800.00
117,922.00
Mark Up 30% 0.00 -
Total per 3.60 squares. 117,922.00
Per square
Materials
half round clay tiles Nos 650.00 14.00 9,100.00
Labour
U/SK labourer Days 2.00 400.00 800.00
9,900.00
O/H & Proffits 0.00 -
Rate per square 9,900.00
1,065.24
71. Asbestos close fittings ridging fixed
Page 73
Roof & Ceiling
Labour
carpenter Days 0.25 650.00 162.50
U/SK labourer Days 0.25 400.00 100.00
1,823.42
O/H & Proffits 0.00 -
Per 13' 1" ridging 1,823.42
Labour
carpenter Days 0.25 650.00 162.50
U/SK labourer Days 0.25 400.00 100.00
1,340.25
O/H & Proffits 0.00 -
Per 12 L.ft ridging 1,340.25
Labour
Carpenter Days 3.00 650.00 1,950.00
Page 74
Roof & Ceiling
Labour
carpenter Days 3.00 650.00 1,950.00
U/SK labourer Days 3.00 400.00 1,200.00
Scaffolding - Add 5% 157.50
14,411.07
O/H & Proffits 0.00 -
Total per 100 L.ft 14,411.07
Labour:
a) Fixing boarding and applying woood
preservative
carpenter Days 1.00 650.00 650.00
U/Sk labourer Days 1.00 400.00 400.00
Page 75
Roof & Ceiling
c) Building Sides
Mason Days 0.25 650.00 162.50
U/Sk labourer Days 0.50 400.00 200.00
10,519.40
O/H & Proffits 0.00 -
Total Per 15.00 L.ft 10,519.40
Labour
Cutting bending, soldering & fixing
tinker Days 0.50 625.00 312.50
mason (caulking) Days 0.13 650.00 81.25
U/SK labourer Days 0.75 400.00 300.00
2,518.00
O/H & Proffits 0.00 -
Total per 15.00 L.ft 2,518.00
77. Timber frame work for 4' 0" x 4' 0" flat
asbestos ceiling ( sheet measured
seperatly) Comprising of 4" x 2" joists
and 2" x 2" bearers in class 1 timber
Page 76
Roof & Ceiling
Labour
carpenter Days 2.50 650.00 1,625.00
mason Days 0.50 650.00 325.00
U/SK labourer Days 1.50 400.00 600.00
Add 3% for scaffolding 76.50
11,202.28
O/H & Proffits 0.00 -
Total per 1.95 sqrs 11,202.28
Labour
1 1/2 days carpenter Days 1.50 650.00 975.00
2 day U/SK labourer Days 2.00 400.00 800.00
Add 3% for scaffolding 53.25
40,182.53
O/H & Proffits 0.00 -
Total for 1.95 squares 40,182.53
Page 77
Roof & Ceiling
Materials
4"x 2" timber joists L.ft 115.00 55.00 6,325.00
6"x 3/4" Lunumidella ceiling planks Sq.ft 215.00 45.00 9,675.00
cement cwt 0.03 485.00 13.20
sand Cube 0.04 5000.00 200.00
1 1/2" brass nails Kg 4.00 425.00 1,700.00
Labour
Making holes, fixing joists & making good
mason Days 1.00 650.00 650.00
carpenter Days 1.00 650.00 650.00
U/SK labourer Days 3.00 400.00 1,200.00
Labour
carpenter Days 3.00 650.00 1,950.00
U/SK labourer Days 6.00 400.00 2,400.00
Scaffolding - Add 3% 130.50
4,480.50
O/H & Proffits 0.00 -
Total for 1.95 squares 4,480.50
Page 78
Roof & Ceiling
15016.67
448.53
2700.00
80.65
Page 79
Roof & Ceiling
1560.92
393.83
262.50
66.23
1077.75
271.92
262.50
66.23
Page 80
Roof & Ceiling
8594.40
1879.31
Page 81
Roof & Ceiling
1925.00
420.93
Page 82
Roof & Ceiling
8575.78
2626.50
2835.39
26351.19
Page 83
Rate of pvc&plywood door
Page 84
Rate of pvc&plywood door
Page 85
Brick Works
Page 86
Brick Works
Page 87
Brick Works
Page 88
Brick Works
Page 89
Brick Works
Page 90
Brick Works
Page 91
Brick Works
Page 92
Brick Works
1659.41873
1225.65371
5382.56773
803.926265 /m2
Page 93
Brick Works
1,083.86
3780.91547
1243.72443 /m2
1937.71798 /m2
Page 94
Brick Works
1275.96071 /m2
1517.30355 /m2
2957.79064 /m2
2957.79064 /m2
Page 95
Brick Works
4255.35522 /m2
536.8676 /m2
Page 96
Brick Works
525.026911 /m2
5590.76 /m
9034.76 /m
Page 97
Brick Works
0 /m
0 /m2
0 /m2
Page 98
Brick Works
0 /m2
3777.38516 /m3
2850
4792.13781 /m2
Page 99
CONCRETE WORK
HIRE OF MIXER
3/4" METAL
CEMENT
WATER
SAND
PRICE Rs. 485.00 5,000.00 3,600.00 3,250.00 1.00
Page 100
U/SK LABOUR
SCAFFOLDING
S/K LABOUR
SUB TOTAL
RATE
O/H
600.00 400.00 -
Page 101
Data
Page 102
Data
Page 103
Data
Page 104
Data
Page 105
Data
Page 106
Data
Page 107
Data
Dolomite Cwt
Milk White chips kg
Black chips kg
White Cement Cwt -
Red Cement kg
3/4"x 4' 0" long aluminium strips No
Cutting stone (medium) No
Cutting stone (rough) No
Cutting stone (fine) No
Hire of terrazo cutting machine Day
Page 108
Preliminaries
Page 109