Boq Template (1-Ex Low Tension)
Boq Template (1-Ex Low Tension)
LOT 20024, KAMPUNG NYIOR SEBATANG, LAHAR YOOI, MUKIM 11, DAERAH S.P.U., PULAU
PINANG
RATE AMOUNT
ITEM DESCRIPTION UNIT QTY.
RM RM
(ALL ELECTRICAL INSTALLATION WORKS SHALL BE REFER TO
ENGINEER'S INSTRUCTION AND DETAIL DRAWING)
Cabling
4 x 150 mm² XLPE/PVC cable from Main Switch Board to Essential
4 Lot 1 250 250
Main Switch Board.
Earthing
Complete earthing system for main switchboard (MSB) and Essential
5 Lot 1 250 250
Main Switchboard (EMSB) with concrete earthing chamber.
B/ELT/1 GROUP 4
CADANGAN MEMBINA 1 UNIT RUMAH KEDIAMAN SESEBUAH SETINGKAT DI ATAS SEBAHAGIAN
LOT 20024, KAMPUNG NYIOR SEBATANG, LAHAR YOOI, MUKIM 11, DAERAH S.P.U., PULAU
PINANG
RATE AMOUNT
ITEM DESCRIPTION UNIT QTY.
RM RM
Testing & Commissioning
Testing & Commissioning as per engineer's specification and drawing
for the item no. 1 & no. 2 installations. The price must includes:-
6 i) To provide every equipment test required. Lot 1 250 250
ii) To provide minimum two (2) competent workers at site during testing
7 Lot 1 250 250
& commisioning.
23 To supply and install all plinth and cable entry for all feeder pillars clw Item 1 1,500 1500
accessories.
D DISTRIBUTION BOARDS
24 To supply and install all Distribution Boards for all Blocks as Lot 1 1,000 1000
perdrawings and specification.
(END OF EXTERNAL LOW TENSION ELECTRICAL INSTALLATION
WORKS)
To Collection ( RM ) 19550
B/ELT/2 GROUP 4
CADANGAN MEMBINA 1 UNIT RUMAH KEDIAMAN SESEBUAH SETINGKAT DI ATAS SEBAHAGIAN
LOT 20024, KAMPUNG NYIOR SEBATANG, LAHAR YOOI, MUKIM 11, DAERAH S.P.U., PULAU
PINANG
AMOUNT
ITEM COLLECTION
RM
2300
1 B/ELT/1
2 B/ELT/2 19550
To Summary ( RM ) 21850
B/ELT/3 GROUP 4