You are on page 1of 2

SAUDI ARAMCO ID/PIEU-30-Nov-2018 - Rev. 2018.11.00 (Standards Cutoff - Nov 30,2018) Rev.2018.11.

00 30-Nov-18
SATR NUMBER DATE APPROVED QR NUMBER
SAUDI ARAMCO TEST REPORT
In-Process Inspection of FBE Powder Coating Application
SATR-H-2005 27-Jan-19 MECH
on Field Girth Welds
PROJECT TITLE WBS / BI / JO NUMBER CONTRACTOR / SUBCONTRACTOR

EQUIPMENT ID NUMBER(S) EQUIPMENT DESCRIPTION EQPT CODE SYSTEM ID. PLANT NO.

LAYOUT DRAWING NUMBER REV. NO. PURCHASE ORDER NUMBER EC / PMCC / MCC NO.

SCHEDULED TEST DATE & TIME ACTUAL TEST DATE & TIME QUANTITY INSP. MH's SPENT TRAVEL TIME
SAUDI ARAMCO USE ONLY
SAUDI ARAMCO TIP NUMBER SAUDI ARAMCO ACTIVITY NUMBER WORK PERMIT REQUIRED?

SAUDI ARAMCO INSPECTION LEVEL CONTRACTOR INSPECTION LEVEL

A. SURFACE CONDITIONS CHECK

Crew
START MID-POINT OTHERS QC Insp. SA
Supvr.
Time

Steel Surface Temp

Dew Point Temperature

Blasting Nozzle Pressure

Air Quality/Blotter Test

B. TEST EQUIPMENT AND MATERIALS CRITERIA

WELD JOINT NUMBER RESULT


Crew SA
QC Insp.
Supvr. In.
Acc N/A

I. SURFACE PREPARATION
A. Chemical cleaning required?
( Yes / No / N.A )

1. Solvent Clean (TYPE: _________)

2. Detergent Wash

3. Steam Clean

B. Grinding required and accepted ?

C. Abrasive Blasting

1. Anchor Pattern

2. Degree of Cleanliness

3. Chloride Tests (Max=40 mg/sqm)

II. Heating of Pipe Surface


1. Steel Surface Temperature
(Required Temp: ________ )

III. Powder Application

A. Pipe Surface Free of Flash Rusting

B. Powder Applied at Uniform Rate

Saudi Aramco: Company General Use


SAUDI ARAMCO ID/PIEU-30-Nov-2018 - Rev. 2018.11.00 (Standards Cutoff - Nov 30,2018) Rev.2018.11.00 30-Nov-18
SATR NUMBER DATE APPROVED QR NUMBER
SAUDI ARAMCO TEST REPORT
In-Process Inspection of FBE Powder Coating Application
SATR-H-2005 27-Jan-19 MECH
on Field Girth Welds
PROJECT TITLE WBS / BI / JO NUMBER CONTRACTOR / SUBCONTRACTOR

RESULT Crew Super- SA


IV. Visual Inspection WELD JOINT NUMBER visor
QC Inspector
Inspec-tor
Rej. N/A

A. Finished coating have uniform,


glossy appearance

B. Free of visible holidays, fish eyes,


lumps, sags & runs
C. Points of DFT Readings: Pt. A-1
Notes:
a. Min. Reqd. DFT=625 µm Pt. A-2
b. Minimum of 6 locations
Pt. A-3

Pt. B-1

Pt. B-2
Flow
A- Upstream side of weld jt.
Pt. B-3
B- Weld Joint
C- Downstream side of weld
Pt. C-1
joint
Pt. C-2

Pt. C-3

REMARKS:

REFERENCE DOCUMENTS:
1. SAES-H-001 Coating selection and application Requirements for industrial plant equipments (21 February 2018)
2. SAES-H-002, Internal and External Coatings for steel pipeline and piping, (02 June 2012).
3. SSPC, Steel Structures Painting Council, (Latest Edition)
3. SAES-H-201, General Specification for Over-the-Ditch External FBE Coating of Field Girth Welds, (7 February 2017)

Contractor / Third-Party Saudi Aramco


Technician Performing Test* PMT Representative
Name, Title, Department, Test Performed Successfully and Results are Acceptable: T&I Witnessed QC Record Reviewed Work Verified
Name, Initials and Date:
Company, Initials and Date:

QC Inspector PID Representative


Witnessed Test Work / Rework May Proceed T&I Witnessed QC Record Reviewed Work Verified
Name, Initials and Date: Name, Initials and Date:

QC Supervisor Proponent and Others


Quality Record Approved: Name, Organization, T&I Witnessed QC Record Reviewed Work Verified
Name, Sign and Date:
Initials and Date:

*Person Responsible for Implementation of Test and Analysis of Results Y = YES N = NO F = FAILED

Saudi Aramco: Company General Use

You might also like