You are on page 1of 1

Notes

- THIS DRAWING IS A COPYRIGHT AND PROPERTY OF THE ARCHITECT,


IS NOT TO BE PRODUCED, COPIED, HANDED OVER TO THIRD PARTY
OR USED FOR ANY OTHER PURPOSE OTHER THAN FOR WHICH IT IS INTENDED.

SILVER JUBILEE PARK MASTER PLAN


15 W
00 C
X1
80
0
LA
DIE 15 WC
00
71 S T X1
55 80
X3 OIL 0
04 ET
0
15 W
00 C
X1
80
0
N - ALL DIMENSIONS ARE IN MILLIMETER
20 15
00
W
X1
C

26
80
0

04
15 WC
00

0
X1
80
0
GE 15
00 C
W
N

- ALL DIMENSIONS SHALL BE VERIFIED ON SITE PRIOR TO START OF WORK


X1
71 TS T 80
0 UR
55 IN
X3 OILE
AL
S
04 T
0

ANY DISCREPANCY SHALL BE BROUGHT TO THE NOTICE OF THE ARCHITECT.

- THE CONTRACTOR/PROJECT MANAGER MUST CHECK ALL DIMENSIONS AND


222 DETAILS AND BE RESPONSIBLE FOR THE SAME. ANY DISCREPANCY SHALL

5
69

18
BE BROUGHT TO THE NOTICE OF THE ARCHITECT.

43
- THIS DRAWING IS TO BE READ AND NOT SCALED.
- THIS DRAWING SHALL BE READ IN CONJUNCTION WITH ALL RELEVANT
ARCHITECTURAL, INTERIOR, STRUCTURAL AND SERVICES DRAWINGS.
DISCREPANCY IF ANY NOTICED BY THE CONTRACTOR SHALL BE BROUGHT
TO THE ATTENTION OF THE ARCHITECT AND GOT RESOLVED WITHIN SEVEN
(7) WORKING DAYS OF ISSUE OF THIS DRAWING OR PRIOR TO PROCUREMENT
44
48 / EXECUTION OF WORKS AT SITE WHICHEVER IS EARLIER
9
- DRAWING APPROVAL IS FOR THE CONFIRMITY WITH OUTLINE DESIGN
INTENT AND DOES NOT RELIEVE THE CONTRACTOR/SUBCONTRACTOR FROM
FULL RESPONSIBILITY FOR THE ACCURACY, INTEGRATION AND FITNESS FOR

- THE ABOVE NOTES FORM THE ESSENTIAL INSTRUCTIONS TO INFORMATION


PROVIDED IN THIS DRAWING. THE NON CONFORMITY TO THESE WOULD
CONSTITUTE TO THE CONSTRUCTION NOT BEING CARRIED OUT AS PER
24
36
5 THE ARCHITECTURAL INTENT. THE ARCHITECT IS AT LIBERTY TO INSTRUCT
THE CONTRACTORS TO DEMOLISH ALL SUCH CONSTRUCTION AND REBUILD
AS PER ARCHITECTURAL DRAWINGS.

03

10
11 38
16 75
05 7

12 39
2

337
11 57

LOCK
ERS

LOCK
ERS

97
Ch
an
4200 ging
1200 WC
X1200

x 57 Room 1200 WC

08
00 X1200

01
PLA Cha
TFO Roo nging
RM m
Cha
Roo nging
m

UP
Cha
Roo nging
m

+45
0

07

38
21
9
88
33
0

N
RAI
D
E R
AT
W
R M
15
O

210
ST

16
N G
TI 03
IS

7
34

32
32

EX

00
30

53
56
3
00
30
10
13

00
30
00
30
15
266
1 33
13 81
1

09

1614
7

02
7112

5512
01&
Area-4.10 acers
14
Client

4662
CNNL.

13 Project Name
59
5

HASSAN LAKE REDEVELOPMENT PROJECT

Date Scale Revision

Drawing Number
Drawing Title

SILVER JUBILEE MASTER PLAN

You might also like