LOCATION
The location of this project are several rivers and canals that affect the Jakarta – Bandung high-speed
railway line. The conditions of the DK 72+00, DK 73+500, DK 75+300 are lowland area that tributary of
Citarum main river and DK 115+800, 120+500, DK 122+300 and DK 122+600 are small rivers/ drainage
city
Table 2. 1 Location of Study/ Project relocation of the rivers
Jakarta
DK 72+00, DK 73+500
and DK 75+300
DK 120+500, DK 122+300
Bandung and DK 122+600
DK 115+800
2.1.1 Intersection/ Crossing river at DK 072 + 000, DK 073 + 800, and DK 075 + 300
The locations of the meeting of this river is in the lowland area which is a tributary of the main river
Citarum. The width of the river of the three locations is around 10 - 12 m with a slope of the riverbed
around 0.5 -1% and the depth of them is about 0,5 – 1 m in baseflow condition. Situation of the river
see figure below:
Project :
“HYDROLOGY STUDY AND DESIGN FOR 7 (SEVEN) RIVERS
RELOCATION OF JAKARTA-BANDUNG HIGH-SPEED RAILWAY”
Gedung B ITB, Jl. Ganeca No.15-B, Lb. Siliwangi,
Date |
Coblong, Kota Bandung, Jawa Barat 40132
HYDROLOGY REPORT
P a g e | 2-3
These three relocation sites have no pavement (in the form of land).
2.1.2 Intersection/ Crossing river at DK 115 + 800, DK 120 + 500, DK 122 + 300, and DK 122 +
600
The four locations of river / channel relocation are small rivers / canals which have functions as urban
drainage. With a width of around 4 - 7 m with a slope of the riverbed 0.2 - 0.3%. The image of the four
work locations can be seen in the following picture:
CLIMATE CONDITION
Rainfall data obtained from Cisomang Station is daily data for 15 years in DPS Cisomang Purwakarta
and 14 years in DPS Dago Pakar Bandung. For the needs of hydrological analysis for the needs of this
study in the form of maximum daily data every year.
Project :
“HYDROLOGY STUDY AND DESIGN FOR 7 (SEVEN) RIVERS
RELOCATION OF JAKARTA-BANDUNG HIGH-SPEED RAILWAY”
Gedung B ITB, Jl. Ganeca No.15-B, Lb. Siliwangi,
Date |
Coblong, Kota Bandung, Jawa Barat 40132
HYDROLOGY REPORT
P a g e | 2-6
Figure 2.10 Maximum daily rainfall data DPS Dago Pakar Bandung
LAND USES
Land use data obtained from Rupa Bumi Indonesia (RBI). All the watershed covered to the railway
areas with the above. The information from maps can be used to predicted coefficient in discharge
calculation, in table below shown coefficient run off.
Project :
“HYDROLOGY STUDY AND DESIGN FOR 7 (SEVEN) RIVERS
RELOCATION OF JAKARTA-BANDUNG HIGH-SPEED RAILWAY”
Gedung B ITB, Jl. Ganeca No.15-B, Lb. Siliwangi,
Date |
Coblong, Kota Bandung, Jawa Barat 40132
HYDROLOGY REPORT
P a g e | 2-7
Lawns:
Agricultural land:
And the Visual Earth map (RBI) for the Purwakarta area see Figure below:
Figure 2.11 Earth Visual (RBI ) Purwakarta Area (1) DK 72+00, (2) DK 73+500 and (3) DK 75+300
3
3
6
7
Project :
“HYDROLOGY STUDY AND DESIGN FOR 7 (SEVEN) RIVERS
RELOCATION OF JAKARTA-BANDUNG HIGH-SPEED RAILWAY”
Gedung B ITB, Jl. Ganeca No.15-B, Lb. Siliwangi,
Date |
Coblong, Kota Bandung, Jawa Barat 40132
HYDROLOGY REPORT
P a g e | 2-9
Figure 2.12 Earth Visual (RBI ) Bandung Area (4) DK 115+800, (5) DK 120+500, (6) DK 122+300 and
(7) DK 122+600
The most of the conditions in the catchment area of the study area were dominated by forests,
plantations / fields, rice fields, and its percentage as below:
Table 2.3 Area of Land Use in DK 72+00
Cx%
Luas
No Penggunaan Lahan % Luas C Luas
(ha)
(%)
1 Kebun/Hutan 1097,22 60,51 0,3 18,15
2 Pemukiman 129,777 7,16 0,7 5,01
3 Sawah 586,402 32,34 0,5 14,55
1813,4 100,00 37,71
3
Project :
“HYDROLOGY STUDY AND DESIGN FOR 7 (SEVEN) RIVERS
RELOCATION OF JAKARTA-BANDUNG HIGH-SPEED RAILWAY”
Gedung B ITB, Jl. Ganeca No.15-B, Lb. Siliwangi,
Date |
Coblong, Kota Bandung, Jawa Barat 40132
HYDROLOGY REPORT
P a g e | 2-11
Figure 2.13 Catchment Area location Project at 1. DK 72+00, 2. DK 73+500 & 3. DK 75+300
Project :
“HYDROLOGY STUDY AND DESIGN FOR 7 (SEVEN) RIVERS
RELOCATION OF JAKARTA-BANDUNG HIGH-SPEED RAILWAY”
Gedung B ITB, Jl. Ganeca No.15-B, Lb. Siliwangi,
Date |
Coblong, Kota Bandung, Jawa Barat 40132
HYDROLOGY REPORT
P a g e | 2-12
Figure 2.15 Catchment Area location Project at (5) DK 120+500, (6) DK 122+300 & (7) DK 122+600