OVERVIEW OF NUSA DUA ESTUARY DAM

Introduction Location
Nusa Dua Estuary Dam was built in 1993, which is located in Badung
River estuary. The construction of the dam is based on several
things, which are as follows : Badung River
Watershed
1. High rate of population growth in Badung Regency.
2. High demand of raw water as population growth increases.
3. The change of land use causes the catchment area to reduce its
effectivity which subsequently results in water not flowing into
the ground and floods.
4. Lack of public awareness in terms of maintaining the cleanliness Located in Badung River Estuary Jalan By
of rivers results in a lot of garbage floating on the sea surface Pass Ngurah Rai, Suwung subdistrict,
which subsequently ruins the marine life and mangroves. Denpasar city)

Basic Data Information Advantages


Construction : 1993-1996 1. As a Flood Control System in Badung River.
Raw Water supply capacity : 500 lps 2. As Sediment Control System (Mud and Garbage)
• Catchment Area : 40,95 Km2 to prevent damage to the mangrove area.
• Reservoir Surface Area : 35 Ha
3. As the main source of raw water supply to some
• Total Storage : 770 x 103 m3
• Effective storage : 595 x 103 m3 areas in Kuta, Nusa Dua and Tanjung Benoa
• Type : Earthfill managed by the PDAM Badung Regency.
• Height of Dyke : 2,85 m
• Effective depth : 1,7 m 4. As an Environmental Conservation.
BADUNG WATERSHED CONDITION

Badung U 1 2 3
2 1
watershed
scheme
3

4 5 6
A 4

1 5
6 7 A B
7
B
C
D C D E
E

Information
Length Length NO Weir and Dam
No River Name NO River Name
(KM) (KM)
A Mertagangga weir
1 Badung River 19,60 5 Guming River 5,45 Intake Batannyuh
B
2 Langan River 5,14 6 Ketapian River 2,29 C Intake Mergaya

3 Medih River 3,50 7 Kelandis River 2,1 D Buagan weir

4 Jurang River 9,89 E Nusa Dua Estuary Dam


PROBLEM OF NUSA DUA ESTUARY DAM

Garbage

PROBLEM
Sedimentaion

1. SEDIMENTATION Raw Water


The current amount of sediment in the Nusa Dua Estuary Dam is 360,303 m3. Due to Demand
that condition, dredging has to be conducted in order to restore the effective storage of the
Nusa Dua Estuary Dam.
2. GARBAGE
The amount of solid waste in the Nusa Dua Estuary Dam during the dry season is 6-12
m3/day dominated by waste from households disposal.
3. RAW WATER DEMAND
The demand of raw water elevates as a result of the increasing number of residents in
Badung Regency.
FOLLOW UP THE PROBLEM

Sediment handling as much as 60,100 m3 in Nusa Dua


Estuary Dam was carried out in 2016. The remaining
sediment after the handling was 360,303 m3. In order
to restore the effective storage of the estuary reservoir,
the next dredging was then resumed from 2017 to
2019, through which the total amount of sediment
removed is around 245,000 m3.

1. The solution is performed by making a sediment


diversion channel equipped with a trash rack to lift
the trash from the bottom to the water surface,
which is then followed by collecting and disposing it
by using a garbage truck.
2. Operation and Routine Maintenance of Nusa Dua
Estuary DAM (Clearing the surroundings of The
Reservoirs area

Dredging Sediment diversion channel Dredging is conducted to restore the reservoir storage
which allows The PDAM of Badung Regency to increase
their production to 500 lps.

Trash Rack
REHABILITATION, IMPROVEMENT AND ARRANGEMENT OF THE NUSA DUA ESTUARY DAM
(2017-2019)

Objectives

1. To restore the reservoir storage capacity to its effective storage state.


2. To Increase the raw water supply (Providing raw water supply for PDAM Badung Regency as much
as 500 lps based on the plan).
3. To separate the sediment paths (mud and garbage) in order to prevent the sediment from
entering the reservoir.
4. To facilitate the operation and maintenance of the reservoir.
5. To make an efficient way to pick up the garbage through the trash rack on the sediment diversion
channel to protect mangrove forests from garbage.

Dredging Arrangement
To maintain the base level of Performing the arrangement in the Nusa Dua
the reservoir, 245,000 m3 of Estuary Dam by dividing it into 2 zones,
sediment was dredged to namely the deposition zone (as sediment
restore the effective storage management and waste control with a
of the estuary reservoir. storage volume of ± 41,538 m3) and the
utilization zone (water utilization for raw
water.

DEPOSITION ZONE

UTILIZATION ZONE

Dredging documentation
SEDIMENT DIVERSION
CHANNEL
REHABILITATION OF NUSA DUA ESTUARY DAM DOCUMENTATION
(2017-2019)

Reservoir Sludge Drying Area Kist Dam Groundsill and Reservoir Watergate
embankment
improvement Groundsill Pneumatic Crest
Gate

Dredging

DEPOSITION ZONE
UTILIZATION ZONE

Dock

SEDIMENT DIVERSION
CHANNEL

Drainage Channel Trashrack Pneumatic Crest


Inspection road Bridge Gate

Sediment Diversion Channel


OPERATION AND MAINTENANCE OF NUSA DUA ESTUARY DAM

ROUTINE MAINTENANCE

Picking up garbage by Transferring the


Sediment and Cleaning Estuary Dam Area
using garbage from
garbage dredging
maintenance boat reservoir to dump
using excavator
in reservoir areas truck using excavator
PROPOSED FURTHER ACTIVITIES IN NUSA DUA ESTUARY DAM

The construction which Urgent requirements


need to improve as which have not been
follows: accommodated in the
previous contracts as
• Work replacement in a rubber
weir on the downstream of the
follows :
reservoir; • Cross-bridge working for operations
• Electrical and mechanical on sediment diversion channel;
repair work on the radial gate; • Roof working for trash rack;
• Lift bar screen work at • Temporary garbage collection work;
Pneumatic Crest Gate • Equipment warehouse work;
Groundsill. • Trash boom on trash channel;
• Guardrail work;
• Work of Garbage Lifting Clamp Shell
on sediment diversion channel.

Rubber Dam Pneumatic Crest Gate Bridge Trash Rack


NUSA DUA ESTUARY DAM TOURISM AREA ARRANGEMENT (1)

To organize Nusa Dua Estuary Dam as one of


Masterplan Concept public green open spaces in Southern Bali

Sidewalk arrangement

N Gazebo per 100 m

W E Culinary
Culinary
Green Open Space S
Arrangement Toilet

Park bench per 100 m

Gazebo per 100 m


water gallery

Park bench per 100 m

Gazebo per 100 m Gazebo per 100 m

Culinary Culinary

Toilet

Green Open Space Arrangement

management building

Visitor vehicles circulation area


A. PARKING AREA G. FOUNTAIN ATTRACTION
PDAM vehicle circulation area
B. MAINTENANCE BULDING H. FOUNTAIN ATTRACTION
Visitor circulation area
C. DOCK I. CHILDREN PLAYGROUND
D. FISHING AREA J. ELDER GARDEN
E. SELFIE AREA K. TEENAGE GARDEN Source:
F. DRAGON STATUE L. PDAM OFFICE DED of Nusa Dua Estuary Dam Area Arrangement, 2020
NUSA DUA ESTUARY DAM TOURISM AREA ARRANGEMENT (2)

CONCEPTUAL ARCHITECTURE
DESIGN OF BUILDING AND
LANDSCAPE
BUILDING DESIGN

1. Security Homebase
2. Culinary Area
OUTDOOR DESIGN
3. Gazebo
4. Fishing Area
1. Parking Area 5. Restroom
2. Access road 6. Water Gallery
BRIDGE DESIGN
3. Thematic 7. 12 Shios Statue
Garden 8. Stalls Area
1. PDAM Wall 4. Vegetation and
MAIN GATE AND WALL 2. Trace Rack 9. Panel Building
Garden Refunctioning
DESIGN Bridge 5. Tower Base
1. Main Entrance 3. PDAM Pipe 10. Dock Renovation
Area 11. Dragon Statue and
2. Service Bridge 6. Street Furniture
Entrance Water Fountain
12. Selfie Area
13. Fish Fountain

Source: DED of Nusa Dua Estuary Dam Area Arrangement, 2020


CONCLUSION

Nusa Dua Estuary Dam has some functions such as as a flood control,
conservation and raw water supply for Badung Regency

Nusa Dua Estuary Dam also has a function as a public green open
spaces which is used as a local tourism

We hope that all stakeholders will protect the environment around


the river from upstream to downstream area
SHORT VIDEO OF NUSA DUA ESTUARY DAM

Enjoy the video


bws bali penida
@bwsbalipenid
a
bwsbalipenida
Thank You

You might also like