In 2019, Colombia carried out its second renewable energy auction in which
2021 AUCTION 9 generation projects, including wind and solar, were selected. As a result, more
than 1,300 MW of installed capacity were awarded, creating more than 6,000 jobs, and
BACKGROUND attracting around USD $2 billion in investment. This auction closed at competitive prices for the
Colombian market, at approximately 28 USD/MWh.
NE W AUC TIO N
How does What is the Which generation
it work? product of the projects can
auction? participate?
It is a two-sided sealed bid auction, The National Government provides the It is exclusive for Non-conventional
with voluntary participation for buyers Draft of the Contract to be signed by renewable energy generation
and sellers. the buyers and sellers as well as the projects.**
values related to payment and
The goal is to maximize the consumer’s performance guarantees. The capacity of these projects must be
benefit through better public electricity equal to or greater than 5 MW.
service. Take or pay - contract with hourly price Projects between 5 MW and 20 MW
equal to the sale price, with a 15 years must adhere to centralized dispatch.
Buyers bid a maximum amount of term.
energy for one day in MWh-day and Non-Conventional Energy Sources
commit to paying for the contracted Denomination in COP, indexed with generation projects that have previous
energy regardless of its consumption the Producer Price Index (PPI). obligations in other auctions can bid
level. only in intraday block 3.
Energy supply obligations will start on
Sellers bid an equal amount of energy January 1, 2023. Projects must be currently registered
in MWh for the time periods of each of before UPME in Phases 1 or 2.
the three defined intraday blocks (Block The seller has the obligation to
1: 0:00-7:00 hours; Block 2: constitute a collateral to guarantee Projects must have a favorable
7:00-17:00 hours; Block 3: date of entry of operation, which can connection concept from the Mining
17:00-24:00 hours) and are under the be extended for up to two (2) years and Energy Planning Unit - UPME.
obligation to supply the contracted after the beginning of the contract’s
energy. supply obligations. The project’s operational start-up date
must be after the awarding auction
date.
Which commercial
agents can
participate?
This auction is open to any commercial
agent from the wholesale energy
market, whether it serves the regulated
market, the unregulated market, or
both.
May June
By means of Resolution MME 40141 of Call for the auction:
May 7, 2021, the Ministry of Mines and officially published by Resolution MME 40179 of
Energy introduced modifications to the auction June 9, 2021.
rules. The compiled version of the auction rules
can be found at: Auctioneer Designation:
SCHEDULE
the Ministry of Mines and Energy designates XM
(the system electric system operator or “ASIC” by
click here its Spanish acronym), as auctioneer through an
October July
* E x c l u d i n g h y d r o p o w e r.
** Excluding large-scale hydropower projects
We i n v i t e y o u t o v i s i t t h e w e b s i t e s e t b y t h e M i n i s t r y o f M i n e s a n d E n e r g y
f o r t h e t h i r d r e n e w a b l e e n e r g y a u c t i o n , w h e r e b y t h o s e i n t e r e s t e d c a n fi n d r e l a t e d
information and the latest advances in the schedule.