Professional Documents
Culture Documents
Attriction Escheme:
Section: 5 Inde
x
Initial Review: H. Parra Day: 09/11/ Rev: A
21
Last Reviewl: H. Parra Day: 09/11/ Rev: 0
21
ATTRITION
SCRUBBER Uni Nomi Desi Sourc
DATA t nal gn e
Tons per hour T/h 24.57 22.60 E
F100 mm 9.52 10 E
Pulp Volume m3/h 17.64 16 E
Solids Percentage % 75 75 E
Metodo
For the selection of this equipment, it is necessary the tons per hour and volume of the pulp,
this data is provided to the supplier or is searched with the help of catalogs.
EQUIPMENT SELECTION
GRINDING MILL-BALL
METHOD
The method used is that of Bond, where by means of correction factors in the Wi and corrections
in the required power, as well as the efficiency, it gives us an empirical result for the choice
of the mill.
𝑊𝑖𝑐𝑜𝑟𝑟 = 𝑊𝑖 ∗ 𝐹1*𝐹2*𝐹3*𝐹4*𝐹5*𝐹6*𝐹7
11
𝑊 = 10 ∗ 𝑊𝑖 𝑐𝑜𝑟𝑟 ∗ 𝐻𝑝 𝑚𝑜𝑡𝑜𝑟 = 𝐿 ∗ 𝐴 ∗ 𝐵 ∗ 𝐶
−
𝑃80𝐹80
Where:
RESULTS
Rr - 25. 25. E
F1 - 12 12 E
F2 - 1 1 E
F3 - 1 1 E
F4 - 1 1 E
F5 - 1.0 1.0 E
6 6
F6 - E
1 1
F7 - E
1 1
Wi corrected Kw- E
1 1
Diameter h/t E
ft 11. 10.
Length 05 17 E
Factor A ft E
10. 10
Factor B - 87 E
15
Factor C - 16. E
56.
- 3 15
Hp Motor E
Hp 61. 4.9
Hp Motor Shaft 03 E
Hp 75
EQUIPMENT SELECTION
Model NORBERG
Diameter ft HD10X15 D
Length ft 10.5 10.5 D
Power Motor Hp 15 15 D
%Cs % 750 750 E
Operation Speed RPM 73.9 73.9 E
18 18
MAINT PLANTA BALANCE Document: A
Grinding Escheme:
Section: 6 Inde
x
Initial Review: H. Parra Day: 09/11/ Rev: A
21
Last Reviewl: H. Parra Day: 09/11/ Rev: 0
21
METHOD
According to the method described in Norberg, it tells us how to find the maximum ball size in the
mill
𝐹 ∗ 𝑊𝑖 𝑆
𝑀=
𝐾 ∗ 𝐶𝑠 𝐷
Donde:
M: Diameter in inches
Wi: Work Index
F80: Percent pass
K: Constant
Cs: Critical Speed
S: Specific Gravity
D: Mill Diameter
7460 ∗ 10.172.67
𝑀=
200 ∗ 68 10
𝑀 = 2.26 𝑝𝑢𝑙𝑔.
DISTRIBUTION SIZE
METHOD
The method used according to the Norberg manual indicates that the distribution of balls is found
by means of the maximum ball size and a distribution box.
𝑀 = 2.26 𝑝𝑢𝑙𝑔.
MAINT PLANTA BALANCE Document: A
Grinding Escheme:
Section: 6 Inde
x
Initial Review: H. Parra Day: 09/11/ Rev: A
21
Last Reviewl: H. Parra Day: 09/11/ Rev: 0
21
Ball
Diamet Ball Size Distribution for Startup Charge(%weight) , Topsize in
er inches(M)
(inch
es)
5 4 4 3 3 2 2 1 1
1/ 1 1/ 1/
2 / 2 2
2
5 17
4 1/2 25 1
6
4 20 3 2
0 0
3 1/2 15 2 3 2
1 2 2
.
5
3 10 1 2 3 2
4 1 5 6
2 1/2 6.4 9. 1 1 3 3
5 2 9 7 2
. .
8 8
2 3.8 5. 8. 1 2 4 3
8 9 5 3 2 8
. . .
3 4 2
1 1/2 2.8 2. 3. 6 1 1 4 5
8 7 0 9 5 6
. . .
6 7 3
1 0. 1. 1. 3 6. 1 4 100
4 6 9 1 6 4
.
7
Tamaño de %distribuc
bolas ion
2 1/2 32
2 42.2
1 1/2 19.7
1 6.1
HYDROCYCLONE
METHOD
The Krebs method was used to calculate the dimensions of the hydrocyclone, as well as the
number of hydrocyclones and the diameter of the apex.
𝑃𝑢𝑙𝑝(𝑔𝑝𝑚)
𝐷50 aplicado=D50 base*C1*C2*C3 𝑁=
𝑄(𝑔𝑝𝑚)
𝐷50 base=2.84*𝐷0.66
16.43 𝑈
𝑆 = 4.16 + 1.10 ∗ 𝐿𝑛( )
𝑟 𝑟
− (2.65 − 𝑟 + 100)
𝑃𝑢
Donde:
D: Diameter of the Hydrocyclone
S: Apex diameter
Ci: Correction factors
r: Specific Gravity
U: Weight of solids in Underflow
Pu:% Solids in the discharge
Q: Hydrocyclone Flow
P: Pressure Increase
N: Number of Hydrocyclones
EQUIPMENT
SELECTION
EQUIPMENT
SELECTION NAIPU NP-
X660 D
10 10 D
3-0.3
Model 0.03-0.3
20 D
Max. Particle Size
0 D
Feed pressure 0.0
Separation Size
Weight
mm
MPa
um
kg
MAINT PLANTA BALANCE Document: A
Serpar Magnet Escheme:
Section: 7 Inde
x
Initial Review: H. Parra Day: 09/11/ Rev: A
21
Last Reviewl: H. Parra Day: 09/11/ Rev: 0
21
SEPARATION MAGNETIC
METHOD
The selection of the magnetic separation equipment was based on the wet separation after
grinding and the magnetic minerals associated with the silica.
EQUIPMENT SELECTION
Model 911MPECTB902
Length mm 4 D
Diameter mm 2400 2400 D
Rotation Speed rpm 900 900 D
Capacity t/h <28 <28 0 D
Power Motor Kw 45-70 D
Field intensity G D
45-7
MAINT PLANTA BALANCE Document: A
Flotation Escheme:
Section: 8 Inde
x
Initial Review: H. Parra Day: 09/11/ Rev: A
21
Last Reviewl: H. Parra Day: 09/11/ Rev: 0
21
FLOTATION
ROUGHER STAGE
Unit Nominal Design Source
Data
m3/d 570 524 A
Dry tons ia .4
35 A
Percentage of solids % 35
85. A
Unit pulp volume ft3 6 78. A
Pulp flow gpm 454 75
METHOD
The method used was extracted from the book on metallurgical engineering by Ivan Quiroz,
which helps us find the number of cells and the effective volume of cells.
𝑇𝑝𝑑 ∗ 𝑡 ∗ 𝑑
𝑁=
∗ 1440 ∗ 𝑉𝑜
where:
524.4 ∗ 5 ∗
𝑁= 78.75
∗ 1440 ∗ 24.7
𝑁 = 5.8 → 𝑁 = 6
RESULT
S
CELDAS BANCOS
6 1
3 2
MAINT PLANTA BALANCE Document: A
Flotation Escheme:
Section: 8 Inde
x
Initial Review: H. Parra Day: 09/11/ Rev: A
21
Last Reviewl: H. Parra Day: 09/11/ Rev: 0
21
EQUIPMENT SELECTION
ESPESADOR DE RELAVE
SiO2 Unit Nominal Design Source
21.56
35
Feed Solids flow
% 62
%S at feed
% 1000.0
%S at discharge 0
kg/
Liquid density m3 0.52
Sedimentation velocity m/h
23.43 1.5
Security factor 35
62
1000.0
0
0.52
1.5
Where
E
E
B
C
D
C
D: Discharge dilution
F: Feed dilution
𝜌: Liquid density(kg/m3)
Vs: Sedimentation velocity(m/h)
tn: Feed Solids flow(T/h)
Au: Unit area(m2/T/h)
Di: thickener diameter(m)
MAINT PLANTA BALANCE Document: A
Thickener Escheme:
Section: 9 Inde
x
Initial Review: H. Parra Day: 09/11/ Rev: A
21
Last Reviewl: H. Parra Day: 09/11/ Rev: 0
21
Example
RESULT
EQUIPMENT SELECTION
Model
THICKENER JINPENGMACHINE NG-15
Diameter 15 m 15 D
Diameter 49.20 ft 49. D
Height m 3.50 20 D
Capacity m2 3.5 D
255 0
Rake speed tn/d 390 D
255
Motor power ia D
5.5 390
Thickener Area Kw D
176.6 5.5
m2
MAINT PLANTA BALANCE Document: A
Thickener Escheme:
Section: 9 Inde
x
Initial Review: H. Parra Day: 09/11/ Rev: A
21
Last Reviewl: H. Parra Day: 09/11/ Rev: 0
21
TAILINGS
Unit Nomi Desig Source
Feed Solids flow - nal n
0.95 1.03 E
%S at feed %
% 10 10 E
%S at discharge
kg/m3 62 62 B
Liquid density
1000.0 1000.0 C
Sedimentation velocity m/h
0 0
Security factor - 0.52 D
0.52
METHOD
The method consisted of obtaining the ore settling velocity, percentages of solids in the feed and
discharge, the maximum unit area will be calculated using the Coe-Clevenger method and the
dimensions of the thickener will be obtained from the suppliers' catalogs.
Where
D: Discharge dilution
F: Feed dilution
𝜌: Liquid density(kg/m3)
Vs: Sedimentation velocity(m/h)
tn: Feed Solids flow(T/h)
Au: Unit area(m2/T/h)
Di: thickener diameter(m)
MAINT PLANTA BALANCE Document: A
Thickener Escheme:
Section: 9 Inde
x
Initial Review: H. Parra Day: 09/11/ Rev: A
21
Last Reviewl: H. Parra Day: 09/11/ Rev: 0
21
CALCULATION
RESULT
EQUIPMENT SELECTION
Model THICKENER
Diameter m JINPENG D
Diameter ft 6 6 D
Height m 19.68 19. D
68
Height ft D
3.00 3.0
Capacity m2 0 D
Rake speed tn/d 9.84 10 D
Motor power ay D
60.00 60.
Thickener Area RP 00 D
M
MAINT PLANTA BALANCE Document: A
Thickener Escheme:
Section: 9 Inde
x
Initial Review: H. Parra Day: 09/11/ Rev: A
21
Last Reviewl: H. Parra Day: 09/11/ Rev: 0
21
FILTRACION
Data Unit Nomi Desig Sour
Food T/h nal n ce
Specific gravity m3/h 19.84 21.56 E
Cake density kg/d 2.72 2.72 E
Cycle time m3 1.64 1.64 D
min 8 8 D
METHOD
The method for sizing the filter was carried out using the steps indicated in the supplier's manual,
which consisted of finding the value of the filter volume for a certain mineral as a function of the
number of cycles per minute, cake density and the solids flow rate of the cake.
Where :
V: cake solids flow rate(m3/h).
tn: feed Solids flow(T/h)
𝜌𝑐𝑎𝑘𝑒:density of cake(Kg/dm3)
t: cycle duration time(min)
Vf: filter volume(m3)
CALCULATION
Applying the above equations we have:
RESULT
Solids flow rate m3 12.0946 13.1463 E
Number of cycles per hour /h 3 4 E
Filter volume - 6.9 7.5 E
m3 1612.61 1752.84
MAINT PLANTA BALANCE Document: A
Thickener Escheme:
Section: 9 Inde
x
Initial Review: H. Parra Day: 09/11/ Rev: A
21
Last Reviewl: H. Parra Day: 09/11/ Rev: 0
21
EQUIPMENT
SELECTION
Model FILTER METSO VPA 1530- D
36
D
Cameras calculated - 29. 31.
32 87 D
Certain cameras - 30 32 D
TAILING
FILTRACION Unit
Nominal Design Sourc
Data T/h 0.95 1.033 e
Food m3/h 1.01 1.01 E
Pulp flow kg/d 2.17 2.17 E
Cake density m3 8 8 D
Cycle time min D
METHOD
The method for sizing the filter was carried out using the steps indicated in the
supplier's manual, which consisted of finding the value of the filter volume for a certain
mineral as a function of the number of cycles per minute, cake density and the solids
flow rate of the cake.
Where :
V: cake solids flow rate(m3/h).
tn: feed Solids flow(T/h)
𝜌𝑐𝑎𝑘𝑒:density of cake(Kg/dm3)
t: cycle duration time(min)
Vf: filter volume(m3)
MAINT PLANTA BALANCE Document: A
Thickener Escheme:
Section: 9 Inde
x
Initial Review: H. Parra Day: 09/11/ Rev: A
21
Last Reviewl: H. Parra Day: 09/11/ Rev: 0
21
CALCULATION
Applying the above equations we have:
RESULT
EQUIPMENT
SELECTION
FILTERModel
METSO VPA 1030-12
Cameras calculated 2.92 - 3. D
Certain cameras - 3 17 D
Chamber depth mm 4 D
32
Chamber volume lt 32 D
20
20
CONDITIONER SILICA
1. 1. A
Impeller 00 00 C
Dimensions 91 91 C
Impeller number 5 5
C
Diameter m 6 6
m
Motor blades
No
Power per day
k
Tank dimensions
1.00 1. A
Number of tanks 2 00 E
m 2 2 E
Diameter
m 5.7 2 E
Height
m 5.
Tank volume
3
CONDITIONER
TAILING
METHOD
The method for calculating the conditioner is considered Basic Manual in Mineral Processing -
Metso
V=
Q*t
Where:
V: Required volume (m3)
Q: Flow (m3 / h)
t: Residence time (min)
CALCULAT
pie E 24.96 27.13 E
Volume tank
TANK
m3 DIMENSIONS 1.0 1.0 A
Number of tanks 0 0
Tank volume ft 0.7 0.7 E
Tank volume 3 1 7
E
Height ft 24. 27.
96 13 E
Diameter ft
IMPELLER
DIMENSIONS 1. 1.00 D
Impeller number m 00 610 D
Diameter m 61 3 D
Motor blades No 0 1.1 D
Power per day k 3
TANK DIMENSIONS
Number of tanks 1. 1. D
Diameter m 00 00 D
Height m 1. 1. D
25 25
Tank volume m D
3 1. 1.