1.GENERAL
2. SCOPE OF WORK
3. PROGRAMME OF INVESTIGATION
One boring unit with all necessary equipment along with a team of technical personal with
skilled labourers where mobilised at the work site. Three 150 mm diameter boreholes were
taken at the site. The borehole was extended by rotary drilling as per IS:1892-1972. In the
hard/ soft rock stratum consisting of intact or jointed rock mass or boulders, the borehole was
advanced by rotary drilling with NX size diamond coring bit. Standard Penetration Tests
(SPT) was carried out in the boreholes as per provisions contained in Indian Standard Code
IS 2131-1981. Representative samples were collected at every 1.50 m interval depth or
change of strata, whichever is earlier. The samples obtained from split spoon sampler were
used for visual description, identification, relevant laboratory tests and classification.
Maximum depths achieved in the boreholes and the depths of water table are given in the
Table 1.
A preliminary visual examination of the soil and rock samples was initially made.
Laboratory tests conducted on soil samples included grain size analysis and moisture content
determination wherever found necessary.
Dr. K. BALAN Sameeram
Geotechnical/Geosynthetic Engineering Consultant Kunnumpuram Road
Former Professor in Civil Engineering Chellamangalam
College of Engineering Trivandrum Chempazhanthy P O
Mob:9497265869; Email: drkbalan@gmail.com Thiruvananthapuram 695587
Three Bore holes were taken at the proposed retaining wall at Chainage 2/390 (BH1), Culvert at
Chainage 1/558.05 (BH2) and Culvert at Chainage 1/962.20 (BH3). Ground water table was met
with at very shallow depth of 0.70 m, 0.5 m and 0.2 m respectively in BH1, 2 and 3.
Filled soil is available at this location upto 0.75 m. It is followed by very soft or loose sandy clay/
clayey sand upto 3.70 m with an average N value of 6. From 3.70 m to 5.60 m sandy clay with an
N value of 25 is available. Sandy clay with gravel exists from 5.60 m 7.30 m with an N value of 4.
Since the soil is very loose, it is recommended to drive coconut pile having a length of 4.00 m, at
1.20 m centre to centre beneath the culvert area. One additional layer of coconut pile may be
driven outside the culvert base area on all sides. A safe bearing capacity of 12 t/m2 can be adopted
above the coconut pile treated soil. Foundation may be placed at a depth of 0.75 m below the
ground level. The above safe bearing capacity can be assessed through a plate load test above the
coconut pile treated soil.
Culvert can be placed at a depth of 3.00 m from original ground level. A safe bearing capacity of
10 t/m2 can be taken at this location. Since water table at this location is at 0.20 m, driving of
sand pile having 20 cm diameter upto a depth of 6.00 m is recommended. Sand pile should be
driven at a distance of 1.00 m centre to centre below the base of the culvert. One layer of sand pile
should be driven outside the base area all along the sides. Foundation should be placed at a depth
of 0.80 m below the existing ground level. A safe bearing capacity of 16 t/m2 can be taken for
foundation design. It will be ideal to conduct a standard penetration test to ascertain the N value
on the sand pile treated soil and thereby the above safe bearing capacity can be physically
ascertained.
Dr. K. Balan
15-09-2021.
APPENDIX A
BORE LOGS
THE URALUNGAL LABOUR CONTRACT AND CO-OPERATIVE SOCIETY Ltd.
Madapally College (PO), Vatakara
ORGANIZATION
START
17/08/2021
DATE
SITE PERAMBRA
9.00 3 5 9 14
Silty Sandy Clay (White & Grey) 3.80
10.50 4 10 15 25
11.20
12.00 9 15 25 40
Clayey Sand (Grey) 2.75
13.50 6 10 15 25
13.95
BOREHOLE TERMINATED
Sd/-
Geotechnical Engineer
THE URALUNGAL LABOUR CONTRACT AND CO-OPERATIVE SOCIETY Ltd.
Madapally College (PO), Vatakara
ORGANIZATION
START
24/08/2021
DATE
SITE PERAMBRA
Sd/-
Geotechnical Engineer
THE URALUNGAL LABOUR CONTRACT AND CO-OPERATIVE SOCIETY Ltd.
Madapally College (PO), Vatakara
ORGANIZATION
START
27/08/2021
DATE
SITE PERAMBRA
10.50 3 5 8 13
Clayey Sand (Brown & Grey) 4.35
12.00 5 8 13 21
13.35
Silty sand with white rock 13.50 7 31 >50 >50 Rebounded
0.70
14.05 pieces(Red,Brown&Yellow) balance = 14cm
Hard rock 0.20
14.25
BOREHOLE TERMINATED
Sd/-
Geotechnical Engineer
APPENDIX B
LABORATORY TEST RESULTS
THE URALUNGAL LABOUR CONTRACT AND CO-OPERATIVE SOCIETY Ltd.
Madapally College (PO), Vatakara