PART 1 - GENERAL
1.1 SUMMARY
A. The tables in this section provide the information that represents Electrical loads to be
installed in each block.
B. The values represent the upper limit of Electrical loads that can be installed in each building
zones.
C. This document shall be read in conjunction with the layouts and the schedule of equipment.
D. The procured equipment shall maintain the same or more efficient performance than the
described values below throughout the life cycle of the equipment.
E. Refer to the Final Baseline Energy Model Report for operation schedules related to each load.
PART 2 - PRODUCTS
2.1 GENERAL
A. The products shall be designed, procured, installed, and tested in a manner that their energy
consumption shall not exceed the values listed in the following tables:
1. Table A- Electrical Loads
2. Table B- FFE (Furniture and Fixed Equipment)
3. Table C- ICT (Information and Communication Technology)
4. Table D- LPD (Lighting Power Density).
PART 3 - EXECUTION
A. Refer to sections 26 00 00 & 26 00 01.
The tables below provides information that represents for Electrical loads to be installed in each block .The values below represent the upper limit of Electrical loads that can be installed in each
building zones. This document shall be read in conjunction with the layouts and the schedule of equipment. The procured equipment shall maintain the same or more efficient performance than
the described values below throughout the life cycle of the equipment. Refer to the Final Baseline energy Model Report for operation schedules related to each load.
T05-28
Elec Lighting control system
Panels Wi-Fi Disabled alarm active components
Space Name and TAG as per Architecture and Access Fire Alarm MA TV Public Address Elevators system active (occupancy sensors,
DB’s Points components photocells, motion
Level Sr. No Load detectors etc.)
Name TAG watt watt watt watt watt watts watts watt
1 GF-01-classroom3 classroom3-GF120
2 GF-02-supervisor supervisor-GF119
3 GF-03-clinic clinic-GF117
4 GF-04-principal Principal+principal toilet-GF116+GF118
5 GF-05-classroom2 classroom2-GF115
6 GF-0-GFS07-MS MS-GFS07
7 GF-15-Commomn Area Right Side corridor+entrance+toilet+stair
8 GF-0-GFS08-EC EC-GFS08
9 GF-13-Store room Store room-GF122
10 GF-06-assistant principal assistant principal-GF113
Ground
11 GF-07-reading room reading rm-GF112
Floor
12 GF-14-Common Area Left Side corrEnterToiletST-GF102 57.5
13 GF-08-classroom1 classroom1-GF110
14 GF-09-laboratory1 laboratory1-GF109
15 GF-0-GFS02-elevator elevator-GFS02
16 GF-0-GFS03-MS MS-GFS03
17 GF-0-GFS04-MS MS-GFS04
18 GF-11-preparatory preparatory-GF107 NA 215.3 203.0 556.0 7000.0 9.2
19 GF-10-electrical room electrical rm-GF108 3000
20 GF-0-GFS01-MS MS-GFS01
21 GF-12-main telecom room main telecom rm-GF104 3500
1 L1-01-classroom10 L1-1-classroom10-L1115
2 L1-02-classroom9 L1-2-classroom9-L1114
3 L1-03-classroom8 L1-3-classroom8-L1113
4 L1-04-staff room L1-4-staff rm-L1112
5 L1-0-L1S07-MS L1-0-MS-L1S07
6 L1-05-staff kitchen L1-5-kitchen
1st 7 L1-06-activity room L1-6-activity rm-L1110
Floor 8 L1-07-classroom7 L1-7-classroom7-L1109
9 L1-14-Common Area Left Side L1-14-corr+ST+toilet-L1101/L1104 57.5
10 L1-15-Common Area Right Side L1-15-Corr+ST-L1101/L1116
11 L1-0-L1S08-EC L1-0-EC-L1S08
12 L1-13-Boilogy lab L1-13-Boilogy lab-L1117
13 L1-12-physics lab L1-12-physics lab-L1118
14 L1-0-L1S01-MS L1-0-MS-L1S01
Performance Specifications – Electrical Load
The tables below provides information that represents for Electrical loads to be installed in each block .The values below represent the upper limit of Electrical loads that can be installed in each
building zones. This document shall be read in conjunction with the layouts and the schedule of equipment. The procured equipment shall maintain the same or more efficient performance than
the described values below throughout the life cycle of the equipment. Refer to the Final Baseline energy Model Report for operation schedules related to each load.
The tables below provides information that represents for Electrical loads to be installed in each block .The values below represent the upper limit of Electrical loads that can be installed in each
building zones. This document shall be read in conjunction with the layouts and the schedule of equipment. The procured equipment shall maintain the same or more efficient performance than
the described values below throughout the life cycle of the equipment. Refer to the Final Baseline energy Model Report for operation schedules related to each load.
T05-30
Elec Panels Lighting control system active
and DB’s Disabled alarm
Wi-Fi Access Public components (occupancy
Space Name and TAG as per Architecture Load Fire Alarm MA TV Elevators system active
Points Address sensors, photocells, motion
components
Level Sr. No detectors etc.)
Name TAG watt watt watt watt watt watt watt watt
1 GF-01-classroom3 classroom3-GF120
2 GF-02-supervisor supervisor-GF119
3 GF-03-clinic clinic-GF117
Principal+principal toilet-
4 GF-04-principal
GF116+GF118
5 GF-05-classroom2 classroom2-GF115
6 GF-15-Commomn Area Right Side corr+enter+toilet+Stair
7 GF-13-Store room Store room-GF122
Ground 8 GF-06-assistant principal assistant principal-GF113
Floor
9 GF-07-reading room reading rm-GF112
10 GF-14-Common Area Left Side Corr+EntanceToilet+stair-GF102 57.5
11 GF-08-classroom1 classroom1-GF110
12 GF-09-laboratory1 laboratory1-GF109
NA 215.3 203.0 556.0 7000.0 9.2
13 GF-0-GFS02-elevator elevator-GFS02
14 GF-11-preparatory preparatory-GF107
15 GF-10-electrical room electrical rm-GF108 3000
16 GF-12-main telecom room main telecom rm-GF104 3500
1 L1-01-classroom10 L1-1-classroom10-L1115
2 L1-02-classroom9 L1-2-classroom9-L1114
3 L1-03-classroom8 L1-3-classroom8-L1113
4 L1-04-staff room L1-4-staff rm-L1112
1st Floor 5 L1-05-staff kitchen L1-5-kitchen
6 L1-06-activity room L1-6-activity rm-L1110
7 L1-07-classroom7 L1-7-classroom7-L1109
L1-14-corr+Stair+toilet-
L1-14-Common Area Left Side 57.5
8 L1101/L1104
Performance Specifications – Electrical Load
The tables below provides information that represents for Electrical loads to be installed in each block .The values below represent the upper limit of Electrical loads that can be installed in each
building zones. This document shall be read in conjunction with the layouts and the schedule of equipment. The procured equipment shall maintain the same or more efficient performance than
the described values below throughout the life cycle of the equipment. Refer to the Final Baseline energy Model Report for operation schedules related to each load.
L1-15-Corridor+Stair-
L1-15-Common Area Right Side
9 L1101/L1116
10 L1-13-classroom11 L1-13-classroom11-L1117
11 L1-12-classroom12 L1-12-classroom12-L1118
12 L1-11-server room L1-11-server rm-L1102 1500
13 L1-0r-L1S02-elevator L1-0-elevator-L1S02
14 L1-10-Classroom4 L1-10-Classroom4-L1105
15 L1-09-classroom5 L1-9-classroom5-L1106
16 L1-08-classroom6 L1-8-classroom6-L1107
1 L2-01-classroom20 L2-1-classroom20-L2115
2 L2-02-classroom19 L2-2-classroom19-L2114
3 L2-03-classroom18 L2-3-classroom18-L2113
4 L2-04-staff room L2-4-staff rm-L2112
L2-14-corr+Stair+toilet-
L2-14-Common Area Right Side
5 L2101/L2116
L2-13-Corr+Stair+toilet-
L2-13-Common Area Left Side 57.5
6 L2101/L2104
2nd 7 L2-05-classroom17 L2-5-classroom17-L2110
Floor L2-06-classroom16 L2-6-classroom16-L2109
8
9 L2-07-classroom15 L2-7-classroom15-L2107
10 L2-08-classroom14 L2-8-classroom14-L2106
11 L2-09-classroom13 L2-9-classroom13-L2105
12 L2-0-L2S02-elevator L2-0-elevator-L2S02
13 L2-10-telecom room L2-10-telecom rm-L2102 1500
14 L2-12-Classroom21 L2-12-Classroom21-L2117
15 L2-11-classroom22 L2-11-classroom22-L2118
1 L3-01-classroom30 L3-1-classroom30-L3115
2 L3-02-classroom29 L3-2-classroom29-L3114
3 L3-03-classroom28 L3-3-classroom28-L3113
4 L3-04-staff room L3-4-staff rm-L3112
L3-14-corr+ST+toilet-
L3-15-Common Area Right Side
5 L3101/L3116
L3-13-corr+ST+toilet-
L3-14-Common Area Left Side 57.5
6 L3101/L3103
3rd 7 L3-05-classroom27 L3-5-classroom27-L3110
Floor 8 L3-06-classroom26 L3-6-classroom26-L3109
9 L3-09-classroom23 L3-16-classroom23-L3105
10 L3-08-classroom24 L3-8-classroom24-L3106
11 L3-07-classroom25 L3-7--classroom25-L3107
12 L3-0-elevator-L3S02 L3-0-elevator-L3S02
13 L3-10-main telecom room L3-9-main telecom rm-L3102 1500
14 L3-13-IT room L3-12-IT rm-L3119
15 L3-11-computer room L3-10-computer rm-L3118
16 L3-12-multipurpose room L3-11-multipurpose rm-L3117
1 RF-2-stair1-RF101 RF-2-stair1-RF101
Performance Specifications – Electrical Load
The tables below provides information that represents for Electrical loads to be installed in each block .The values below represent the upper limit of Electrical loads that can be installed in each
building zones. This document shall be read in conjunction with the layouts and the schedule of equipment. The procured equipment shall maintain the same or more efficient performance than
the described values below throughout the life cycle of the equipment. Refer to the Final Baseline energy Model Report for operation schedules related to each load.
Roof 2000
RF-1-elec rm-RF102 RF-1-elec rm-RF102
Floor 2
HOK-JD
Lighting control system
Elec Panels Wi-Fi Disabled alarm active components
Space Name and TAG as per Architecture and DB’s Access Fire Alarm MA TV Public Address Elevators system active (occupancy sensors,
Sr. Load Points components photocells, motion
Level detectors..etc)
No
Name Tag number watt watt watt watt watt watt watt watt
1 GF-08-Classroom1 GF002
2 GF-12-IT area GF042
3 GF-GFS08-MS GFS08
4 GF-45-Lower Circulation1 GF029+GF039+GF038+GF037+GF036
5 GF-14-Nurse Clinic GF035
6 GF-15-Supervisor GF033
7 GF034-EC GF034 2300
8 GF-13-Server room GF040 4000
9 GFS07-MS GFS07
10 GF-17-Classroom8 GF032
11 GF-18-Classroom7 GF031
12 GF-19-Classroom6 GF030
13 GFS11-Lift1 GFS11
14 GF-20-Principal Office GF027+GF026
Ground Floor NA 213.96 304 1275 7000 15.41
15 GFS05-EC GFS05 1500
16 GF-21-Entrance
17 GF-28-Reception GF021+GF026
18 GF-27-Assistant Principal GF025
19 GF-26-Assistant Principal GF024
20 GF-25-Admin Staff GF023+GF022
21 GF-23-Computer Room GF020
22 GF-24-Servery GF019
23 GF-07-Classroom2 GF004
24 GF-06-Classroom3 GF005
25 GF-29-LC GF009 1500
26 GF-GF010-EC GF010
27 GF-05-Classroom4 GF011
28 GF-04-Classromm5 GF012
Performance Specifications – Electrical Load
The tables below provides information that represents for Electrical loads to be installed in each block .The values below represent the upper limit of Electrical loads that can be installed in each
building zones. This document shall be read in conjunction with the layouts and the schedule of equipment. The procured equipment shall maintain the same or more efficient performance than
the described values below throughout the life cycle of the equipment. Refer to the Final Baseline energy Model Report for operation schedules related to each load.
The tables below provides information that represents for Electrical loads to be installed in each block .The values below represent the upper limit of Electrical loads that can be installed in each
building zones. This document shall be read in conjunction with the layouts and the schedule of equipment. The procured equipment shall maintain the same or more efficient performance than
the described values below throughout the life cycle of the equipment. Refer to the Final Baseline energy Model Report for operation schedules related to each load.
1 L2-08-Classroom17 L2002
2 L2-11-Upper Circulation3 L2001+L2008+L2006+L2007+L2003 57.5
3 L2-07-Classroom18 L2004
4 L2-06-Classroom19 L2005
5 L2-23-LC L2009 1500
6 L2010-EC L2010
7 L2-05-Classroom20 L2011
8 L2-04-Classroom21 L2012
9 L2-03-Teacher Room L2013
10 L2-02-Biology Lab L2015
11 L2-01-Preparatory L2016
12 L2-09-Upper Circulation2 L2001
13 L2-10-Upper Circulation1 L2108+L2017+L2014
14 L2-12-IT Area L2033
15 L2S08-Services L2S08
2nd Floor 16 L2-16-Lower Circulation L2022+L2028+L2029+L2030+L2031
17 L2-0-MS
18 L213-Server room L2032 1500
19 L2-14-Advisor L2027
20 L2-15-Supervisor L2026
21 L2-17-Classroom24 L2025
22 L2-18-Classroom23 L2024
23 L2-19-Classroom22 L2023
24 L2S09-Lift L2S09
25 L2S05-MS L2S05
26 L2S04-EC L2S04
27 L2-20-Staff Rest Room L2021
28 L2-22-Acticity Room L2019
29 L2-21-Art Studio L2020
30 L2-24-Upper Circulation4
31 L2-IT area L2034
1 RF-01-Outdoor Play Hall
2 RF-02-Stairs
Roof Floor 3 RF001-05-stair1 RF001
4 RF-03-Elec Room RF004 2000
5 RF-04-Stairs3
GF+1st Floor GF/L1-37-MPH
GF120
MPH 1 Multipurpose
1 GFS09-EC GFS09
2 GF-39-Storage GF118
3 GF-36-MPH-Mat Store GF119
GF-Guard
Accommodation 4 GF-40-MPH-Corridor GF107+GF109+GF108
GF-42-MPH-Students
GF110
5 Lockers
6 GF111-JC GF111
Performance Specifications – Electrical Load
The tables below provides information that represents for Electrical loads to be installed in each block .The values below represent the upper limit of Electrical loads that can be installed in each
building zones. This document shall be read in conjunction with the layouts and the schedule of equipment. The procured equipment shall maintain the same or more efficient performance than
the described values below throughout the life cycle of the equipment. Refer to the Final Baseline energy Model Report for operation schedules related to each load.
HOK-MK
Elec Panels
and DB’s Disabled Lighting control system active
Load Wi-Fi Access alarm system components (occupancy
Space Name and TAG as per Architecture Fire Alarm MA TV Public Address Elevators
Points active sensors, photocells, motion
Sr. components detectors etc.)
Level
No
Name Tag number watt watt watt watt watt watt watt watt
1 GF-08-Classroom1 GF002
2 GF-12-IT area GF042
3 GF-GFS08-MS GFS08
GF-45-Lower
4 GF029+GF039+GF038+GF037+GF036
Circulation1
5 GF-14-Nurse Clinic GF035
6 GF-15-Supervisor GF033
Ground Floor 7 GF034-EC GF034 2300 NA 213.96 304 1275 7000 15.41
8 GF-13-Server room GF040 3500
9 GFS07-MS GFS07
10 GF-17-Classroom8 GF032
11 GF-18-Classroom7 GF031
12 GF-19-Classroom6 GF030
13 GFS11-Lift1 GFS11
14 GF-20-Principal Office GF027+GF026
Performance Specifications – Electrical Load
The tables below provides information that represents for Electrical loads to be installed in each block .The values below represent the upper limit of Electrical loads that can be installed in each
building zones. This document shall be read in conjunction with the layouts and the schedule of equipment. The procured equipment shall maintain the same or more efficient performance than
the described values below throughout the life cycle of the equipment. Refer to the Final Baseline energy Model Report for operation schedules related to each load.
The tables below provides information that represents for Electrical loads to be installed in each block .The values below represent the upper limit of Electrical loads that can be installed in each
building zones. This document shall be read in conjunction with the layouts and the schedule of equipment. The procured equipment shall maintain the same or more efficient performance than
the described values below throughout the life cycle of the equipment. Refer to the Final Baseline energy Model Report for operation schedules related to each load.
18 L1-05-Classroom12 L1011
19 L1-04-Classroom13 L1012
L1-27-Upper
20 Circulation4
L1-10-Upper
L1001
21 Circulation2
22 L1-26-MultiPurpose L1019
23 L1-25-Reading Room L1020
24 L1-Entrance
25 L1S09-Lift L1S09
26 L1S05-MS L1S05
27 L1-23-Lobby L1021
28 L1S04-EC L1S04
29 L1-20-Office L1024
30 L1-21-Office L1023
31 L1-22-Conference L1022
32 L1-03-Teacher Room L1013
L1-09-Upper
L1018+L1014+L1017
33 Circulation1
34 L1-02-Physics Lab L1015
35 L1-01- Preparatory L1016
1 L2-08-Classroom17 L2002
L2-11-Upper
L2001+L2008+L2006+L2007+L2003 57.5
2 Circulation3
3 L2-07-Classroom18 L2004
4 L2-06-Classroom19 L2005
5 L2-23-LC L2009 1500
6 L2010-EC L2010
7 L2-05-Classroom20 L2011
8 L2-04-Classroom21 L2012
9 L2-03-Teacher Room L2013
10 L2-02-Biology Lab L2015
11 L2-01- Preparatory L2016
2nd Floor L2-09-Upper
L2001
12 Circulation2
L2-10-Upper
L2108+L2017+L2014
13 Circulation1
14 L2-12-IT Area L2033
15 L2S08-Services L2S08
16 L2-16-Lower Circulation L2022+L2028+L2029+L2030+L2031
17 L2-0-MS
18 L213-Server room L2032 1500
19 L2-14-Advisor L2027
20 L2-15-Supervisor L2026
21 L2-17-Classroom24 L2025
22 L2-18-Classroom23 L2024
Performance Specifications – Electrical Load
The tables below provides information that represents for Electrical loads to be installed in each block .The values below represent the upper limit of Electrical loads that can be installed in each
building zones. This document shall be read in conjunction with the layouts and the schedule of equipment. The procured equipment shall maintain the same or more efficient performance than
the described values below throughout the life cycle of the equipment. Refer to the Final Baseline energy Model Report for operation schedules related to each load.
23 L2-19-Classroom22 L2023
24 L2S09-Lift L2S09
25 L2S05-MS L2S05
26 L2S04-EC L2S04
27 L2-20-Staff Rest Room L2021
28 L2-22-Acticity Room L2019
29 L2-21-Art Studio L2020
L2-24-Upper
30 Circulation4
31 L2-IT area L2034
1 RF-01-Outdoor Play Hall
2 RF-02-DStairs
Roof Floor 3 RF001-05-stair1 RF001
4 RF-03-Elec Room RF004 2000
5 RF-04-Stairs3
GF/L1-37-MPH
GF+1st Floor MPH GF120
1 Multipurpose
1 GFS09-EC GFS09
2 GF-39-Storage GF118
3 GF-36-MPH-Mat Store GF119
4 GF-40-MPH-Corridor GF107+GF109+GF108
GF-42-MPH-Students
GF110
5 Lockers
6 GF111-JC GF111
GF-Guard 7 GF-44-GH Stairs GF102
Accommodation 8 GF-43-GH Guard GF103+GF104
GF-30-External Waiting
GF101
9 Area
10 GF-31-LV Room GF105 4500
11 GF-34-Substation GF106
GF-38-MPH-Students
GF115+GF113+GF114+GF112
12 Shower/Changing
GF-41-MPH-
GF116+GF117 57.5
13 Showers/Lockers
1 L1-36-GH Bedroom L1103
2 L1-34-GH Bedroom L1102
1st Floor - Guard L1-33-GH
L1101+L1105
Accommodation 3 Accommodation
4 L1-35-GH Bedroom L1104
5 L1-32-GH Stairs
2nd +Roof Floor+
L2/RF-IT Area
Entrance 1
Performance Specifications – Electrical Load
The tables below provides information that represents for Electrical loads to be installed in each block .The values below represent the upper limit of Electrical loads that can be installed in each
building zones. This document shall be read in conjunction with the layouts and the schedule of equipment. The procured equipment shall maintain the same or more efficient performance than
the described values below throughout the life cycle of the equipment. Refer to the Final Baseline energy Model Report for operation schedules related to each load.
MPH
1 Toilet+Locker+Lobby-GF107/106/105
2 Multi-Purpose Storage-GF104
Ground Floor 215.256 201 1.15
3 Canteen-GF103
4 PlayHall+Stage-GF101+102
Canteen
Space Name and TAG as per Architecture Fire Alarm
Level Sr. No
Name watt
1 EL1 -G-1-kitchen
Ground Floor 215.25
2 EL1 -G-2-storage
Gate-P1
Space Name and TAG as per Architecture Fire Alarm
Level Sr. No
Name (watt)
1 GF-1-Guard Pantry+Toilet-GF102+103+104
Ground Floor 215.256
2 EL1 -G-2
Performance Specifications – Electrical Load
The tables below provides information that represents for Electrical loads to be installed in each block .The values below represent the upper limit of Electrical loads that can be installed in each
building zones. This document shall be read in conjunction with the layouts and the schedule of equipment. The procured equipment shall maintain the same or more efficient performance than
the described values below throughout the life cycle of the equipment. Refer to the Final Baseline energy Model Report for operation schedules related to each load.
Gate-P2
Space Name and TAG as per Architecture Fire Alarm
Level Sr. No
Name watt
1 GF-1-Guard Pantry+Toilet-GF102+103+104
Ground Floor 2 GF-0-Tank Access-GF105 215.256
3 GF-0-Holding Tank
GH-P1
Space Name and TAG as per Architecture Fire Alarm MA TV
Level SR .No
Name watt watt
1 GF-3-Bedroom-GF108
2 GF-2-kitchen-GF107
Ground Floor 3 GF-1-Menst+Lobby+Toilet-GF103+104+105 215.256 36
4 GF-5-Hall+Toilet-GF102
5 GF-4-Bedroom-GF111
GH-P2
1 GF-1-Bedroom1-GF102
Ground Floor 2 GF-2-Sitting+Toilet+Pantry-GF103GF104 215.256 51
3 GF-3-Bedroom2-GF106
Table B- FFE (Furniture and Fixed Equipment)
The tables below provides information that represents for FFE loads to be installed in each block .The values below represent the upper limit of FFE loads that can be installed in each building
zones. This document shall be read in conjunction with the layouts and the schedule of equipment. The procured equipment shall maintain the same or more efficient performance than the
described values below throughout the life cycle of the equipment. Refer to the Final Baseline energy Model Report for operation schedules related to each load.
T05-30
Free
Drinking Mounted Coffee Swing Water Steam Photocopy
Space Name and TAG as per Architecture Standing Cookers Microwaves Printers
Fountains Ovens Machines Machine Dispenser Iron Machines
Level Sr. No Fridge
Name of the zone (As per model) TAG watt watt watt watt watts watts watts watt watts watts watt
1 GF-01-classroom3 classroom3-GF120
2 GF-02-supervisor supervisor-GF119
3 GF-03-clinic clinic-GF117
4 GF-04-principal principal+Principal toilet-GF116+GF118 900
5 GF-05-classroom2 classroom2-GF115
6 GF-15-Commomn Area Right Side corr+enter+toilet+ST
7 GF-13-Store room Store room-GF122
Ground 8 GF-06-assistant principal assistant principal-GF113
Floor 9 GF-07-reading room reading room-GF112
10 GF-14-Common Area Left Side corrEnterToiletST-GF102 600.0
11 GF-08-classroom1 classroom1-GF110
12 GF-09-laboratory1 laboratory1-GF109
13 GF-0-GFS02-elevator elevator-GFS02
14 GF-11-preparatory preparatory-GF107 150
15 GF-10-electrical room electrical room-GF108
16 GF-12-main telecom room main telecom room-GF104
1 L1-01-classroom10 L1-1-classroom10-L1115
2 L1-02-classroom9 L1-2-classroom9-L1114
3 L1-03-classroom8 L1-3-classroom8-L1113
4 L1-04-staff room L1-4-staff room-L1112 900 1600
5 L1-05-staff kitchen L1-5-kitchen 150 4600 1150 620
6 L1-06-activity room L1-6-activity room-L1110 150 4600 5760 1150 84 2500
7 L1-07-classroom7 L1-7-classroom7-L1109
8 L1-14-Common Area Left Side L1-14-corr+ST+toilet-L1101/L1104 400.0
1st Floor
9 L1-15-Common Area Right Side L1-15-Corr+ST-L1101/L1116
10 L1-13-classroom11 L1-13-classroom11-L1117
11 L1-12-classroom12 L1-12-classroom12-L1118
12 L1-11-server room L1-11-server room-L1102
13 L1-0r-L1S02-elevator L1-0-elevator-L1S02
14 L1-10-Classroom4 L1-10-Classroom4-L1105
15 L1-09-classroom5 L1-9-classroom5-L1106
16 L1-08-classroom6 L1-8-classroom6-L1107
1 L2-01-classroom20 L2-1-classroom20-L2115
2 L2-02-classroom19 L2-2-classroom19-L2114
3 L2-03-classroom18 L2-3-classroom18-L2113
2nd
4 L2-04-staff room L2-4-staff room-L2112 900 1600
Floor
5 L2-14-Common Area Right Side L2-14-corr+ST+toilet-L2101/L2116
6 L2-13-Common Area Left Side L2-13-Corr+ST+toilet-L2101/L2104 400.0
7 L2-05-classroom17 L2-5-classroom17-L2110
Performance Specifications – FFE Equipment
The tables below provides information that represents for FFE loads to be installed in each block .The values below represent the upper limit of FFE loads that can be installed in each building
zones. This document shall be read in conjunction with the layouts and the schedule of equipment. The procured equipment shall maintain the same or more efficient performance than the
described values below throughout the life cycle of the equipment. Refer to the Final Baseline energy Model Report for operation schedules related to each load.
8 L2-06-classroom16 L2-6-classroom16-L2109
9 L2-07-classroom15 L2-7-classroom15-L2107
10 L2-08-classroom14 L2-8-classroom14-L2106
11 L2-09-classroom13 L2-9-classroom13-L2105
12 L2-0-L2S02-elevator L2-0-elevator-L2S02
13 L2-10-telecom room L2-10-telecom room-L2102
14 L2-12-Classroom21 L2-12-Classroom21-L2117
15 L2-11-classroom22 L2-11-classroom22-L2118
1 L3-01-classroom30 L3-1-classroom30-L3115
2 L3-02-classroom29 L3-2-classroom29-L3114
3 L3-03-classroom28 L3-3-classroom28-L3113
4 L3-04-staff room L3-4-staff room-L3112 900 1600
5 L3-15-Common Area Right Side L3-14-corr+ST+toilet-L3101/L3116
6 L3-14-Common Area Left Side L3-13-corr+ST+toilet-L3101/L3103 400.0
7 L3-05-classroom27 L3-5-classroom27-L3110
8 L3-06-classroom26 L3-6-classroom26-L3109
3rd Floor
9 L3-09-classroom23 L3-16-classroom23-L3105
10 L3-08-classroom24 L3-8-classroom24-L3106
11 L3-07-classroom25 L3-7--classroom25-L3107
12 L3-0-elevator-L3S02 L3-0-elevator-L3S02
13 L3-10-main telecom room L3-9-main telecom room-L3102
14 L3-13-IT room L3-12-IT room-L3119
15 L3-11-computer room L3-10-computer room-L3118 100
16 L3-12-multipurpose room L3-11-multipurpose room-L3117
Roof 1 RF-2-stair1-RF101 RF-2-stair1-RF101
Floor 2 RF-1-elec room-RF102 RF-1-elec room-RF102
Performance Specifications – FFE Equipment
The tables below provides information that represents for FFE loads to be installed in each block .The values below represent the upper limit of FFE loads that can be installed in each building
zones. This document shall be read in conjunction with the layouts and the schedule of equipment. The procured equipment shall maintain the same or more efficient performance than the
described values below throughout the life cycle of the equipment. Refer to the Final Baseline energy Model Report for operation schedules related to each load.
T05-28
Free Fume Hood for
Drinking Mounted Coffee Swing Water Steam Photocopy
Space Name and TAG as per Architecture Standing Cookers Microwaves Printers Preparation /
Level Sr. No Fountains Ovens Machines Machine Dispenser Iron Machines
Fridge Demonstration
Name TAG watt watt watt watt watts watts watts watt watts watt watts watt
1 GF-01-classroom3 classroom3-GF120
2 GF-02-supervisor supervisor-GF119
3 GF-03-clinic clinic-GF117
4 GF-04-principal principal+Principal toilet-GF116+GF118 900
5 GF-05-classroom2 classroom2-GF115
6 GF-0-GFS07-MS MS-GFS07
7 GF-15-Commomn Area Right Side corr+enter+toilet+ST
8 GF-0-GFS08-EC EC-GFS08
9 GF-13-Store room Store room-GF122
10 GF-06-assistant principal assistant principal-GF113
Ground
11 GF-07-reading room reading rm-GF112
Floor
12 GF-14-Common Area Left Side corrEnterToiletST-GF102 600
13 GF-08-classroom1 classroom1-GF110
14 GF-09-laboratory1 laboratory1-GF109 400
15 GF-0-GFS02-elevator elevator-GFS02
16 GF-0-GFS03-MS MS-GFS03
17 GF-0-GFS04-MS MS-GFS04
18 GF-11-preparatory preparatory-GF107 150
19 GF-10-electrical room electrical rm-GF108
20 GF-0-GFS01-MS MS-GFS01
21 GF-12-main telecom room main telecom rm-GF104
1 L1-01-classroom10 L1-1-classroom10-L1115
2 L1-02-classroom9 L1-2-classroom9-L1114
3 L1-03-classroom8 L1-3-classroom8-L1113
4 L1-04-staff room L1-4-staff rm-L1112 900 1600
5 L1-0-L1S07-MS L1-0-MS-L1S07
6 L1-05-staff kitchen L1-5-kitchen 150 4600 620
7 L1-06-activity room L1-6-activity rm-L1110 150 4600 5760 1150 84 2500
8 L1-07-classroom7 L1-7-classroom7-L1109
1st
9 L1-14-Common Area Left Side L1-14-corr+ST+toilet-L1101/L1104 400
Floor
10 L1-15-Common Area Right Side L1-15-Corr+ST-L1101/L1116
11 L1-0-L1S08-EC L1-0-EC-L1S08
12 L1-13-Boilogy lab L1-13-Boilogy lab-L1117 400
13 L1-12-physics lab L1-12-physics lab-L1118 400
14 L1-0-L1S01-MS L1-0-MS-L1S01
15 L1-11-server room L1-11-server rm-L1102
16 L1-0r-L1S02-elevator L1-0-elevator-L1S02
17 L1-0-L1S03-MS L1-0-MS-L1S03
Performance Specifications – FFE Equipment
The tables below provides information that represents for FFE loads to be installed in each block .The values below represent the upper limit of FFE loads that can be installed in each building
zones. This document shall be read in conjunction with the layouts and the schedule of equipment. The procured equipment shall maintain the same or more efficient performance than the
described values below throughout the life cycle of the equipment. Refer to the Final Baseline energy Model Report for operation schedules related to each load.
18 L1-0-L1S04-MS L1-0-MS-L1S04
19 L1-10-Classroom4 L1-10-Classroom4-L1105
20 L1-09-classroom5 L1-9-classroom5-L1106
21 L1-08-classroom6 L1-8-classroom6-L1107
1 L2-01-classroom20 L2-1-classroom20-L2115
2 L2-02-classroom19 L2-2-classroom19-L2114
3 L2-03-classroom18 L2-3-classroom18-L2113
4 L2-04-staff room L2-4-staff rm-L2112 900 1600
5 L2-0-L2S07-MS L2-0-MS-L2S07
6 L2-14-Common Area Right Side L2-14-corr+ST+toilet-L2101/L2116
7 L2-13-Common Area Left Side L2-13-Corr+ST+toilet-L2101/L2104 400
8 L2-05-classroom17 L2-5-classroom17-L2110
9 L2-06-classroom16 L2-6-classroom16-L2109
2nd 10 L2-07-classroom15 L2-7-classroom15-L2107
Floor 11 L2-08-classroom14 L2-8-classroom14-L2106
12 L2-09-classroom13 L2-9-classroom13-L2105
13 L2-0-L2S02-elevator L2-0-elevator-L2S02
14 L2-0-L2S03-MS L2-0-MS-L2S03
15 L2-0-L2S04-MS L2-0-MS-L2S04
16 L2-0-L2S01-MS L2-0-MS-L2S01
17 L2-10-telecom room L2-10-telecom rm-L2102
18 L2-0-L2S08-EC L2-0-EC-L2S08
19 L2-12-calssroom11 L2-12-calssroom11
20 L2-11-calssroom12 L2-11-classroom12
1 L3-01-classroom28 L3-1-classroom30-L3115
2 L3-02-classroom27 L3-2-classroom29-L3114
3 L3-03-classroom26 L3-3-classroom28-L3113
4 L3-04-staff room L3-4-staff rm-L3112 900 1600
5 L3-15-Common Area Right Side L3-14-corr+ST+toilet-L3101/L3116
6 L3-0-MS-L3S07 L3-0-MS-L3S07
7 L3-14-Common Area Left Side L3-13-corr+ST+toilet-L3101/L3103 400
8 L3-05-classroom25 L3-5-classroom27-L3110
9 L3-06-classroom24 L3-6-classroom26-L3109
3rd 10 L3-09-classroom21 L3-16-classroom23-L3105
Floor 11 L3-08-classroom22 L3-8-classroom24-L3106
12 L3-07-classroom23 L3-7--classroom25-L3107
13 L3-0-elevator-L3S02 L3-0-elevator-L3S02
14 L3-0-MS-L3S03 L3-0-MS-L3S03
15 L3-0-MS-L3S04 L3-0-MS-L3S04
16 L3-0-MS-L3S01 L3-0-MS-L3S01
17 L3-10-main telecom room L3-9-main telecom rm-L3102
18 L3-13-IT room L3-12-IT rm-L3119
19 L3-11-computer room L3-10-computer rm-L3118 100
20 L3-12-multipurpose room L3-11-multipurpose rm-L3117
Performance Specifications – FFE Equipment
The tables below provides information that represents for FFE loads to be installed in each block .The values below represent the upper limit of FFE loads that can be installed in each building
zones. This document shall be read in conjunction with the layouts and the schedule of equipment. The procured equipment shall maintain the same or more efficient performance than the
described values below throughout the life cycle of the equipment. Refer to the Final Baseline energy Model Report for operation schedules related to each load.
21 L3-0-EC L3-0-EC
Roof 1 RF-2-stair1-RF101 RF-2-stair1-RF101
Floor 2 RF-1-elec rm-RF102 RF-1-elec rm-RF102
HOK JD
Floor
Free Fume Hood for
Drinking Coffee Water Vacuum Photocopy Catering
Space Name and TAG as per Architecture Standing Cookers Microwaves Printers Preparation /
Level Sr. No Fountains Machines Dispenser Cleaning Machines
Fridge Demonstration
Machine
Name Tag number watt watt watt watt watt watt watt watt watt watt watt
1 GF-08-Classroom1 GF002
2 GF-12-IT area GF042 400
3 GF-GFS08-MS GFS08
4 GF-45-Lower Circulation1 GF029+GF039+GF038+GF037+GF036 1380
5 GF-14-Nurse Clinic GF035
6 GF-15-Supervisor GF033
7 GF034-EC GF034
8 GF-13-Server room GF040
9 GFS07-MS GFS07
10 GF-17-Classroom8 GF032
11 GF-18-Classroom7 GF031
12 GF-19-Classroom6 GF030
13 GFS11-Lift1 GFS11
14 GF-20-Principal Office GF027+GF026 900
15 GFS05-EC GFS05
16 GF-21-Entrance
17 GF-28-Reception GF021+GF026
Ground Floor
18 GF-27-Assistant Principal GF025
19 GF-26-Assistant Principal GF024
20 GF-25-Admin Staff GF023+GF022 900 1600
21 GF-23-Computer Room GF020 100
22 GF-24-Servery GF019 13560
23 GF-07-Classroom2 GF004
24 GF-06-Classroom3 GF005
25 GF-29-LC GF009
26 GF-GF010-EC GF010
27 GF-05-Classroom4 GF011
28 GF-04-Classromm5 GF012
29 GF-03-Teachers Room GF013
30 GF-02-Chemistry Lab GF015 400
31 GF-01-Prep GF016 150
32 GF-09-Upper Circulation1 GF018+GF014+GF017
33 GF-46-Upper Circulation3 GF003+GF008+GF007+GF006 400
34 GF-10-Upper Circulation2
Performance Specifications – FFE Equipment
The tables below provides information that represents for FFE loads to be installed in each block .The values below represent the upper limit of FFE loads that can be installed in each building
zones. This document shall be read in conjunction with the layouts and the schedule of equipment. The procured equipment shall maintain the same or more efficient performance than the
described values below throughout the life cycle of the equipment. Refer to the Final Baseline energy Model Report for operation schedules related to each load.
The tables below provides information that represents for FFE loads to be installed in each block .The values below represent the upper limit of FFE loads that can be installed in each building
zones. This document shall be read in conjunction with the layouts and the schedule of equipment. The procured equipment shall maintain the same or more efficient performance than the
described values below throughout the life cycle of the equipment. Refer to the Final Baseline energy Model Report for operation schedules related to each load.
7 L2-05-Classroom20 L2011
8 L2-04-Classroom21 L2012
9 L2-03-Teacher Room L2013
10 L2-02-Biology Lab L2015 400
11 L2-01-Prep L2016 150
12 L2-09-Upper Circulation2 L2001
13 L2-10-Upper Circulation1 L2108+L2017+L2014
14 L2-12-IT Area L2033 400
15 L2S08-Services L2S08
16 L2-16-Lower Circulation L2022+L2028+L2029+L2030+L2031 1380
17 L2-0-MS
18 L213-Server room L2032
19 L2-14-Advisor L2027
20 L2-15-Supervisor L2026
21 L2-17-Classroom24 L2025
22 L2-18-Classroom23 L2024
23 L2-19-Classroom22 L2023
24 L2S09-Lift L2S09
25 L2S05-MS L2S05
26 L2S04-EC L2S04
27 L2-20-Staff Rest L2021 150 4600 1150 620
28 L2-22-Acticity Room L2019
29 L2-21-Art Studio L2020
30 L2-24-Upper Circulation4
31 L2-IT area L2034
1 RF-01-Outdoor Play Hall
2 RF-02-DStairs
Roof flr 3 RF001-05-stair1 RF001
4 RF-03-Elec Room RF004
5 RF-04-Stairs3
1 GF-11-Atrium-Up
GF-Atrium GF001
2 GF-16-Atrium-Down
1 L1-29-Atrium Up
1st Flr Atrium
2 L1-30-Atrium Down
1 L2-Atrium UP
2nd Flr Atrium
2 L2-Atrium Down
Roof flr Atrium 1 RF-Atrium
GF+1st Flr MPH 1 GF/L1-37-MPH Multipurpose GF120
1 GFS09-EC GFS09
2 GF-39-Storage GF118
GF-Guard 3 GF-36-MPH-Mat Store GF119
Accommodation 4 GF-40-MPH-Corridor GF107+GF109+GF108
5 GF-42-MPH-Students Lockers GF110
6 GF111-JC GF111 1380
Performance Specifications – FFE Equipment
The tables below provides information that represents for FFE loads to be installed in each block .The values below represent the upper limit of FFE loads that can be installed in each building
zones. This document shall be read in conjunction with the layouts and the schedule of equipment. The procured equipment shall maintain the same or more efficient performance than the
described values below throughout the life cycle of the equipment. Refer to the Final Baseline energy Model Report for operation schedules related to each load.
HOK MK
Floor
Free Fume Hood for
Drinking Coffee Water Vacuum Photocopy Catering
Sr. Space Name and TAG as per Architecture Standing Cookers Microwaves Printers Preparation /
Level Fountains Machines Dispenser Cleaning Machines
No Fridge Demonstration
Machine
Name Tag number watt watt watt watt watt watt watt watt watt watt watt
1 GF-08-Classroom1 GF002
2 GF-12-IT area GF042 400
3 GF-GFS08-MS GFS08
GF029+GF039+GF038+GF037+GF03
4 GF-45-Lower Circulation1 1380
6
5 GF-14-Nurse Clinic GF035
6 GF-15-Supervisor GF033
7 GF034-EC GF034
8 GF-13-Server room GF040
9 GFS07-MS GFS07
10 GF-17-Classroom8 GF032
Ground Floor
11 GF-18-Classroom7 GF031
12 GF-19-Classroom6 GF030
13 GFS11-Lift1 GFS11
14 GF-20-Principal Office GF027+GF026 900
15 GFS05-EC GFS05
16 GF-21-Entrance
17 GF-28-Reception GF021+GF026
18 GF-27-Assistant Principal GF025
19 GF-26-Assistant Principal GF024
20 GF-25-Admin Staff GF023+GF022 900 1600
21 GF-23-Computer Room GF020 100
Performance Specifications – FFE Equipment
The tables below provides information that represents for FFE loads to be installed in each block .The values below represent the upper limit of FFE loads that can be installed in each building
zones. This document shall be read in conjunction with the layouts and the schedule of equipment. The procured equipment shall maintain the same or more efficient performance than the
described values below throughout the life cycle of the equipment. Refer to the Final Baseline energy Model Report for operation schedules related to each load.
22 GF-24-Servery GF019
23 GF-07-Classroom2 GF004
24 GF-06-Classroom3 GF005
25 GF-29-LC GF009
26 GF-GF010-EC GF010
27 GF-05-Classroom4 GF011
28 GF-04-Classromm5 GF012
29 GF-03-Teachers Room GF013
30 GF-02-Chemistry Lab GF015 400
31 GF-01-Prep GF016 150
32 GF-09-Upper Circulation1 GF018+GF014+GF017
33 GF-46-Upper Circulation3 GF003+GF008+GF007+GF006 400
34 GF-10-Upper Circulation2
35 GF-35-Gas Room GF201
36 GF-33-Hazardous Waste GF203
37 GF-32-Garbage Room GF202
1 L1-08-Classroom9 L1002
2 L1-12-IT Area L1036 400
3 L1S08-MS L1S08
4 L1-16-Lower Circulation1 L1025+L1032+L1033+L1034+L1035 1380
5 L1S07-MS L1S07
6 L1-13-Server Room L1031
7 L1-14-Advisor L1030
8 L1-15-Supervisor L1029
9 L1-17-Classroom16 L1028
10 L1-18-Classroom15 L1027
11 L1-19-Classroom14 L1026
12 L1-28-Stage
13 L1-11-Upper Circulation3 L1001+L1003+L1007+L1008 400
14 L1-07-Classroom10 L1004
1st Floor
15 L1-06-Classroom11 L1005
16 L1-31-LC L009
17 L1010-EC L1010
18 L1-05-Classroom12 L1011
19 L1-04-Classroom13 L1012
20 L1-27-Upper Circulation4
21 L1-10-Upper Circulation2 L1001
22 L1-26-MultiPurpose L1019
23 L1-25-Reading Room L1020
24 L1-Entrance
25 L1S09-Lift L1S09
26 L1S05-MS L1S05
27 L1-23-Lobby L1021
28 L1S04-EC L1S04
Performance Specifications – FFE Equipment
The tables below provides information that represents for FFE loads to be installed in each block .The values below represent the upper limit of FFE loads that can be installed in each building
zones. This document shall be read in conjunction with the layouts and the schedule of equipment. The procured equipment shall maintain the same or more efficient performance than the
described values below throughout the life cycle of the equipment. Refer to the Final Baseline energy Model Report for operation schedules related to each load.
29 L1-20-Office L1024
30 L1-21-Office L1023
31 L1-22-Conference L1022
32 L1-03-Teacher Room L1013
33 L1-09-Upper Circulation1 L1018+L1014+L1017
34 L1-02-Physics Lab L1015 400
35 L1-01-Prep L1016 150
1 L2-08-Classroom17 L2002
2 L2-11-Upper Circulation3 L2001+L2008+L2006+L2007+L2003 400
3 L2-07-Classroom18 L2004
4 L2-06-Classroom19 L2005
5 L2-23-LC L2009
6 L2010-EC L2010
7 L2-05-Classroom20 L2011
8 L2-04-Classroom21 L2012
9 L2-03-Teacher Room L2013
10 L2-02-Biology Lab L2015 400
11 L2-01-Prep L2016 150
12 L2-09-Upper Circulation2 L2001
13 L2-10-Upper Circulation1 L2108+L2017+L2014
14 L2-12-IT Area L2033 400
15 L2S08-Services L2S08
2nd Floor 16 L2-16-Lower Circulation L2022+L2028+L2029+L2030+L2031 1380
17 L2-0-MS
18 L213-Server room L2032
19 L2-14-Advisor L2027
20 L2-15-Supervisor L2026
21 L2-17-Classroom24 L2025
22 L2-18-Classroom23 L2024
23 L2-19-Classroom22 L2023
24 L2S09-Lift L2S09
25 L2S05-MS L2S05
26 L2S04-EC L2S04
27 L2-20-Staff Rest L2021 150 4600 1150 620
28 L2-22-Acticity Room L2019
29 L2-21-Art Studio L2020
30 L2-24-Upper Circulation4
31 L2-IT area L2034
1 RF-01-Outdoor Play Hall
2 RF-02-DStairs
Roof flr 3 RF001-05-stair1 RF001
4 RF-03-Elec Room RF004
5 RF-04-Stairs3
GF-Atrium 1 GF-11-Atrium-Up GF001
Performance Specifications – FFE Equipment
The tables below provides information that represents for FFE loads to be installed in each block .The values below represent the upper limit of FFE loads that can be installed in each building
zones. This document shall be read in conjunction with the layouts and the schedule of equipment. The procured equipment shall maintain the same or more efficient performance than the
described values below throughout the life cycle of the equipment. Refer to the Final Baseline energy Model Report for operation schedules related to each load.
2 GF-16-Atrium-Down
1 L1-29-Atrium Up
1st Flr Atrium
2 L1-30-Atrium Down
1 L2-Atrium UP
2nd Flr Atrium
2 L2-Atrium Down
Roof flr Atrium 1 RF-Atrium
GF+1st Flr MPH 1 GF/L1-37-MPH Multipurpose GF120
1 GFS09-EC GFS09
2 GF-39-Storage GF118
3 GF-36-MPH-Mat Store GF119
4 GF-40-MPH-Corridor GF107+GF109+GF108
5 GF-42-MPH-Students Lockers GF110
6 GF111-JC GF111 1380
GF-Guard
7 GF-44-GH Stairs GF102
Accommodatio
n 8 GF-43-GH Guard GF103+GF104
9 GF-30-External Waiting Area GF101
10 GF-31-LV Room GF105
11 GF-34-Substation GF106
GF-38-MPH-Students
GF115+GF113+GF114+GF112
12 Shower/Changi
13 GF-41-MPH-Showers/Lockers GF116+GF117 1200
1 L1-36-GH Bedroom L1103
1st flr - Guard 2 L1-34-GH Bedroom L1102
Accommodatio 3 L1-33-GH Accommodation L1101+L1105
n 4 L1-35-GH Bedroom L1104
5 L1-32-GH Stairs
2nd +Rf
L2/RF-IT Area
Entrance 1
Performance Specifications – FFE Equipment
The tables below provides information that represents for FFE loads to be installed in each block .The values below represent the upper limit of FFE loads that can be installed in each building
zones. This document shall be read in conjunction with the layouts and the schedule of equipment. The procured equipment shall maintain the same or more efficient performance than the
described values below throughout the life cycle of the equipment. Refer to the Final Baseline energy Model Report for operation schedules related to each load.
Canteen
Space Name and TAG as per Architecture Energy Budget
Level Sr. No
Name Kwh
1 EL1 -G-1-kitchen
Ground Floor 4,950
2 EL1 -G-2-storage
Guard House 1
Space Name and TAG Free Standing Mounted Washing
SR. Cookers Microwaves Steam Iron
Level as per Architecture Fridge Ovens Machine
No
Name watt watt watt watt watt watt
1 GF-3-Bedroom-GF108
2 GF-2-kitchen-GF107 150 4600 5760 1150 2050 2500
Ground GF-1-Menst+Loby+TL-
3
Floor GF103+104+105
4 GF-5-Hall+TL-GF102
5 GF-4-Bedroom-GF111
Guard Room
Space Name and TAG as per Architecture Water Dispenser
Sr.
Level
No
Name watts
MPH
1 TL+Lokcer+Loby-GF107/106/105
2 MultiPurposeStorage-GF104
Ground Floor
3 Canteen-GF103 4950
4 PlayHall+Stage-GF101+102
Table C- ICT (Information and Communication Technology)
The tables below provides information that represents for ICT loads to be installed in each block .The values below represent the upper limit of ICT loads that can be installed in each building
zones. This document shall be read in conjunction with the layouts and the schedule of equipment. The procured equipment shall maintain the same or more efficient performance than the
described values below throughout the life cycle of the equipment. Refer to the Final Baseline energy Model Report for operation schedules related to each load.
T05-30
Televisions
Notebooks Desktop-Workstations Monitor-Workstations (reading,multipurpose,princip
Space Name and TAG as per Smartboards Monitor-Computer
(teachers,supervisor,princupa (physics, Biology & (physics, Biology & Desktop-Computer Labs Student tablets Charging Stations al,Ass Switches & PABX
Sr Architecture (classrooms) Labs
l,Asst principal,Advisor) chemistry Lab) chemistry Lab) principal,supervisor,advisor,g
. uard house)
Level
N
o
Name of Tota Tota Tota Tota
Total Total Total Total
thte zone Quanti Wat l Total Quanti Wat l Quanti Wat l Quanti Wat Quanti Wat l Quanti Wat Quanti Watt Total Quanti Watt
TAG Quantity Watts Watt Watt Watt Quantity Watts Watt
(As per ty ts Wat Watts ty ts Wat ty ts Wat ty ts ty ts Wat ty ts ty s Watts ty s
s s s s
model) ts ts ts ts
GF-01-
classroom3- 390. 1440. 1350. 1350.
1 classroom 1 390 32.0 45.0 1.0
GF120 0 0 0 0
3
GF-02- supervisor-
2 1.0 45.0 45.0 1.0 31.0 31.0
supervisor GF119
GF-03-
3 clinic-GF117
clinic
principal+Princip
GF-04-
4 al toilet- 1.0 45.0 45.0 1.0 31.0 31.0
principal
GF116+GF118
GF-05-
classroom2- 390. 1440. 1350. 1350.
5 classroom 1 390 32.0 45.0 1.0
GF115 0 0 0 0
2
GF-15-
Commomn corr+enter+toile
6
Area Right t+ST
Side
GF-13-
Store room-
7 Store
GF122
room
GF-06-
assistant
8 assistant 1.0 45.0 45.0 1.0 31.0 31.0
principal-GF113
principal
Groun
GF-07- reading rm-
d 9 1.0 75.0 75.0
reading rm GF112
Floor
GF-14-
1 Common corrEnterToiletS
0 Area Left T-GF102
Side
GF-08-
1 classroom1- 390. 1440. 1350. 1350.
classroom 1 390 32.0 45.0 1.0
1 GF110 0 0 0 0
1
GF-09-
1 laboratory1- 390. 135. 135.
laboratory 1 390 1.0 1.0 19.5 19.5
2 GF109 0 0 0
1
GF-0-
1
GFS02- elevator-GFS02
3
elevator
GF-11-
1 preparatory-
preparator
4 GF107
y
GF-10-
1 electrical rm-
electrical
5 GF108
rm
GF-12-
1 main main telecom 2160. 2160.
1.0
6 telecom rm-GF104 0 0
rm
L1-01- L1-1-
390. 1440. 1350. 1350.
1 classroom classroom10- 1 390 32.0 45.0 1.0
0 0 0 0
1st 10 L1115
Floor L1-02-
L1-2-classroom9- 390. 1440. 1350. 1350.
2 classroom 1 390 32.0 45.0 1.0
L1114 0 0 0 0
9
Performance Specifications – ICT Equipment
The tables below provides information that represents for ICT loads to be installed in each block .The values below represent the upper limit of ICT loads that can be installed in each building
zones. This document shall be read in conjunction with the layouts and the schedule of equipment. The procured equipment shall maintain the same or more efficient performance than the
described values below throughout the life cycle of the equipment. Refer to the Final Baseline energy Model Report for operation schedules related to each load.
L1-03-
L1-3-classroom8- 390. 1440. 1350. 1350.
3 classroom 1 390 32.0 45.0 1.0
L1113 0 0 0 0
8
L1-04-staff L1-4-staff rm-
4 12.0 65.0 780.0
rm L1112
L1-05-staff
5 L1-5-kitchen
kitchen
L1-06- L1-6-activity rm- 390.
6 1 390
activity rm L1110 0
L1-07-
L1-7-classroom7- 390. 1440. 1350. 1350.
7 classroom 1 390 32.0 45.0 1.0
L1109 0 0 0 0
7
L1-14-
L1-14-
Common
8 corr+ST+toilet-
Area Left
L1101/L1104
Side
L1-15-
Common L1-15-Corr+ST-
9
Area Right L1101/L1116
Side
L1-13- L1-13-
1 390. 1440. 1350. 1350.
classroom classroom11- 1 390 32.0 45.0 1.0
0 0 0 0 0
11 L1117
L1-12- L1-12-
1 390. 1440. 1350. 1350.
classroom classroom12- 1 390 32.0 45.0 1.0
1 0 0 0 0
12 L1118
1 L1-11- L1-11-server rm- 1440. 1440.
1.0
2 server rm L1102 0 0
L1-0r-
1 L1-0-elevator-
L1S02-
3 L1S02
elevator
L1-10- L1-10-
1 390. 1440. 1350. 1350.
Classroom Classroom4- 1 390 32.0 45.0 1.0
4 0 0 0 0
4 L1105
L1-09-
1 L1-9-classroom5- 390. 1440. 1350. 1350.
classroom 1 390 32.0 45.0 1.0
5 L1106 0 0 0 0
5
L1-08-
1 L1-8-classroom6- 390. 1440. 1350. 1350.
classroom 1 390 32.0 45.0 1.0
6 L1107 0 0 0 0
6
L2-01- L2-1-
390. 1440. 1350. 1350.
1 classroom classroom20- 1 390 32.0 45.0 1.0
0 0 0 0
20 L2115
L2-02- L2-2-
390. 1440. 1350. 1350.
2 classroom classroom19- 1 390 32.0 45.0 1.0
0 0 0 0
19 L2114
L2-03- L2-3-
390. 1440. 1350. 1350.
3 classroom classroom18- 1 390 32.0 45.0 1.0
0 0 0 0
18 L2113
L2-04-staff L2-4-staff rm-
4 12.0 65.0 780.0
rm L2112
L2-14-
L2-14-
Common
5 corr+ST+toilet-
2nd Area Right
L2101/L2116
Floor Side
L2-13-
L2-13-
Common
6 Corr+ST+toilet-
Area Left
L2101/L2104
Side
L2-05- L2-5-
390. 1440. 1350. 1350.
7 classroom classroom17- 1 390 32.0 45.0 1.0
0 0 0 0
17 L2110
L2-06- L2-6-
390. 1440. 1350. 1350.
8 classroom classroom16- 1 390 32.0 45.0 1.0
0 0 0 0
16 L2109
L2-07- L2-7-
390. 1440. 1350. 1350.
9 classroom classroom15- 1 390 32.0 45.0 1.0
0 0 0 0
15 L2107
Performance Specifications – ICT Equipment
The tables below provides information that represents for ICT loads to be installed in each block .The values below represent the upper limit of ICT loads that can be installed in each building
zones. This document shall be read in conjunction with the layouts and the schedule of equipment. The procured equipment shall maintain the same or more efficient performance than the
described values below throughout the life cycle of the equipment. Refer to the Final Baseline energy Model Report for operation schedules related to each load.
L2-08- L2-8-
1 390. 1440. 1350. 1350.
classroom classroom14- 1 390 32.0 45.0 1.0
0 0 0 0 0
14 L2106
L2-09- L2-9-
1 390. 1440. 1350. 1350.
classroom classroom13- 1 390 32.0 45.0 1.0
1 0 0 0 0
13 L2105
L2-0-
1 L2-0-elevator-
L2S02-
2 L2S02
elevator
L2-10-
1 L2-10-telecom 1440. 1440.
telecom 1.0
3 rm-L2102 0 0
rm
L2-12- L2-12-
1 390. 1440. 1350. 1350.
Classroom Classroom21- 1 390 32.0 45.0 1.0
4 0 0 0 0
21 L2117
L2-11- L2-11-
1 390. 1440. 1350. 1350.
classroom classroom22- 1 390 32.0 45.0 1.0
5 0 0 0 0
22 L2118
L3-01- L3-1-
390. 1440. 1350. 1350.
1 classroom classroom30- 1 390 32.0 45.0 1.0
0 0 0 0
30 L3115
L3-02- L3-2-
390. 1440. 1350. 1350.
2 classroom classroom29- 1 390 32.0 45.0 1.0
0 0 0 0
29 L3114
L3-03- L3-3-
390. 1440. 1350. 1350.
3 classroom classroom28- 1 390 32.0 45.0 1.0
0 0 0 0
28 L3113
L3-04-staff L3-4-staff rm-
4 12.0 65.0 780.0
rm L3112
L3-15-
L3-14-
Common
5 corr+ST+toilet-
Area Right
L3101/L3116
Side
L3-14-
L3-13-
Common
6 corr+ST+toilet-
Area Left
L3101/L3103
Side
L3-05- L3-5-
390. 1440. 1350. 1350.
7 classroom classroom27- 1 390 32.0 45.0 1.0
0 0 0 0
27 L3110
L3-06- L3-6-
390. 1440. 1350. 1350.
8 classroom classroom26- 1 390 32.0 45.0 1.0
3rd 0 0 0 0
26 L3109
Floor
L3-09- L3-16-
390. 1440. 1350. 1350.
9 classroom classroom23- 1 390 32.0 45.0 1.0
0 0 0 0
23 L3105
L3-08- L3-8-
1 390. 1440. 1350. 1350.
classroom classroom24- 1 390 32.0 45.0 1.0
0 0 0 0 0
24 L3106
L3-07- L3-7--
1 390. 1440. 1350. 1350.
classroom classroom25- 1 390 32.0 45.0 1.0
1 0 0 0 0
25 L3107
L3-0-
1 L3-0-elevator-
elevator-
2 L3S02
L3S02
L3-10-
L3-9-main
1 main 1920. 1920.
telecom rm- 1.0
3 telecom 0 0
L3102
rm
1 L3-13-IT L3-12-IT rm-
4 rm L3119
L3-11-
1 L3-10-computer 390. 135. 2160. 334.
computer 1 390 16.0 16.0 20.9
5 rm-L3118 0 0 0 4
rm
L3-12- L3-11-
1 390.
multipurp multipurpose 1 390 1.0 75.0 75.0
6 0
ose rm rm-L3117
Performance Specifications – ICT Equipment
The tables below provides information that represents for ICT loads to be installed in each block .The values below represent the upper limit of ICT loads that can be installed in each building
zones. This document shall be read in conjunction with the layouts and the schedule of equipment. The procured equipment shall maintain the same or more efficient performance than the
described values below throughout the life cycle of the equipment. Refer to the Final Baseline energy Model Report for operation schedules related to each load.
RF-2-
RF-2-stair1-
1 stair1-
Roof RF101
RF101
Floor
RF-1-elec RF-1-elec rm-
2 0.0
rm-RF102 RF102
T05-28
Space Name and TAG as per Smartboards Desktops- Monitors- Desktops-Computer Monitors-Computer NTP Servers for IP
Notebooks Student tablets Charging Station Televisions Switches & PABX
Sr Architecture (classrooms) Workstations Workstations Labs Labs Clock
.
Level
N
o
Tota Tota Tota Tota Tota Tota Tota
Total Total Total Total
Quanti Wat l Quanti Wa l Quanti Wat l Quanti Wa l Quanti Wat Quanti Wa l Quanti Wa Quanti Quanti Wa l Quanti Wat l Quanti Watt
Name TAG Watt Watt Watt Watt Watt
ty t Wat ty tt Wat ty t Wat ty tt Wat ty t ty tt Wat ty tt ty ty tt Wat ty t Wat ty s
s s s s
ts ts ts ts ts ts ts
GF-01-
classroom3- 390. 390. 45. 1440 1350 1350
1 classroom 1 32.0 1.0
GF120 0 0 0 .0 .0 .0
3
GF-02- supervisor- 45. 31.
2 1.0 45.0 1.0 31.0
supervisor GF119 0 0
GF-03-
3 clinic-GF117
clinic
principal+Princi
GF-04- 45. 31.
4 pal toilet- 1.0 45.0 1.0 31.0
principal 0 0
GF116+GF118
GF-05-
classroom2- 390. 390. 45. 1440 1350 1350
5 classroom 1 32.0 1.0
GF115 0 0 0 .0 .0 .0
2
GF-0-
6 MS-GFS07
GFS07-MS
GF-15-
Commom corr+enter+toile
7
n Area t+ST
Right Side
GF-0-
8 EC-GFS08
GFS08-EC
Grou GF-13-
Store room-
nd 9 Store
GF122
Floor room
GF-06-
1 assistant 31.
assistant 45. 45.0 1.0 31.0
0 principal-GF113 0
principal 1.0 0
GF-07-
1 reading rm- 75.
reading 1.0 75.0
1 GF112 0
rm
GF-14-
1 Common corrEnterToiletS
2 Area Left T-GF102
Side
GF-08-
1 classroom1- 390. 1350
classroom 1 390. 45. 1440 1350
3 GF110 0 .0
1 0 32.0 0 .0 1.0 .0
GF-09-
1 laboratory1-
laboratory 1 390. 390. 135. 135. 19.
4 GF109
1 0 0 1.0 0 0 1.0 5 19.5
GF-0-
1
GFS02- elevator-GFS02
5
elevator
1 GF-0-
MS-GFS03
6 GFS03-MS
Performance Specifications – ICT Equipment
The tables below provides information that represents for ICT loads to be installed in each block .The values below represent the upper limit of ICT loads that can be installed in each building
zones. This document shall be read in conjunction with the layouts and the schedule of equipment. The procured equipment shall maintain the same or more efficient performance than the
described values below throughout the life cycle of the equipment. Refer to the Final Baseline energy Model Report for operation schedules related to each load.
1 GF-0-
MS-GFS04
7 GFS04-MS
GF-11-
1 preparatory-
preparato
8 GF107
ry
GF-10-
1 electrical rm-
electrical
9 GF108
rm
2 GF-0-
MS-GFS01
0 GFS01-MS
GF-12-
2 main main telecom
1 telecom rm-GF104 200. 200. 2160 2160
rm 1.0 0 0 1.0 .0 .0
L1-01- L1-1-
390. 1350
1 classroom classroom10- 1 390. 45. 1440 1350
0 .0
10 L1115 0 32.0 0 .0 1.0 .0
L1-02- L1-2-
390. 1350
classroom classroom9- 1 390. 45. 1440 1350
0 .0
2 9 L1114 0 32.0 0 .0 1.0 .0
L1-03- L1-3-
390. 1350
classroom classroom8- 1 390. 45. 1440 1350
0 .0
3 8 L1113 0 32.0 0 .0 1.0 .0
L1-04- L1-4-staff rm- 65. 780.
4 staff rm L1112 12.0 0 0
L1-0-
L1-0-MS-L1S07
5 L1S07-MS
L1-05-
staff L1-5-kitchen
6 kitchen
L1-06- L1-6-activity rm- 390. 390.
1
7 activity rm L1110 0 0
L1-07- L1-7-
390. 1350
classroom classroom7- 1 390. 45. 1440 1350
0 .0
8 7 L1109 0 32.0 0 .0 1.0 .0
L1-14-
L1-14-
Common
corr+ST+toilet-
Area Left
L1101/L1104
9 Side
L1-15-
1st Common L1-15-Corr+ST-
Floor 1 Area Right L1101/L1116
0 Side
1 L1-0-
L1-0-EC-L1S08
1 L1S08-EC
L1-13-
L1-13-Boilogy 390.
1 Boilogy 1 390.
lab-L1117 0
2 lab 0
L1-12-
L1-12-physics 390.
1 physics 1 390.
lab-L1118 0
3 lab 0
1 L1-0-
L1-0-MS-L1S01
4 L1S01-MS
1 L1-11- L1-11-server 1920 1920
5 server rm rm-L1102 1.0 .0 .0
L1-0r-
L1-0-elevator-
1 L1S02-
L1S02
6 elevator
1 L1-0-
L1-0-MS-L1S03
7 L1S03-MS
1 L1-0-
L1-0-MS-L1S04
8 L1S04-MS
L1-10- L1-10-
390. 1350
1 Classroom Classroom4- 1 390. 45. 1440 1350
0 .0
9 4 L1105 0 32.0 0 .0 1.0 .0
L1-09- L1-9-
390. 1350
2 classroom classroom5- 1 390. 45. 1440 1350
0 .0
0 5 L1106 0 32.0 0 .0 1.0 .0
Performance Specifications – ICT Equipment
The tables below provides information that represents for ICT loads to be installed in each block .The values below represent the upper limit of ICT loads that can be installed in each building
zones. This document shall be read in conjunction with the layouts and the schedule of equipment. The procured equipment shall maintain the same or more efficient performance than the
described values below throughout the life cycle of the equipment. Refer to the Final Baseline energy Model Report for operation schedules related to each load.
L1-08- L1-8-
390. 1350
2 classroom classroom6- 1 390. 45. 1440 1350
0 .0
1 6 L1107 0 32.0 0 .0 1.0 .0
L2-01- L2-1-
390. 1350
classroom classroom20- 1 390. 45. 1440 1350
0 .0
1 20 L2115 0 32.0 0 .0 1.0 .0
L2-02- L2-2-
390. 1350
classroom classroom19- 1 390. 45. 1440 1350
0 .0
2 19 L2114 0 32.0 0 .0 1.0 .0
L2-03- L2-3-
390. 1350
classroom classroom18- 1 390. 45. 1440 1350
0 .0
3 18 L2113 0 32.0 0 .0 1.0 .0
L2-04- L2-4-staff rm- 65. 780.
4 staff rm L2112 12.0 0 0
L2-0-
L2-0-MS-L2S07
5 L2S07-MS
L2-14-
L2-14-
Common
corr+ST+toilet-
Area Right
L2101/L2116
6 Side
L2-13-
L2-13-
Common
Corr+ST+toilet-
Area Left
L2101/L2104
7 Side
L2-05- L2-5-
390. 1350
classroom classroom17- 1 390. 45. 1440 1350
0 .0
8 17 L2110 0 32.0 0 .0 1.0 .0
L2-06- L2-6-
390. 1350
classroom classroom16- 1 390. 45. 1440 1350
0 .0
9 16 L2109 0 32.0 0 .0 1.0 .0
2nd L2-07- L2-7-
390. 1350
Floor 1 classroom classroom15- 1 390. 45. 1440 1350
0 .0
0 15 L2107 0 32.0 0 .0 1.0 .0
L2-08- L2-8-
390. 1350
1 classroom classroom14- 1 390. 45. 1440 1350
0 .0
1 14 L2106 0 32.0 0 .0 1.0 .0
L2-09- L2-9-
390. 1350
1 classroom classroom13- 1 390. 45. 1440 1350
0 .0
2 13 L2105 0 32.0 0 .0 1.0 .0
L2-0-
L2-0-elevator-
1 L2S02-
L2S02
3 elevator
1 L2-0-
L2-0-MS-L2S03
4 L2S03-MS
1 L2-0-
L2-0-MS-L2S04
5 L2S04-MS
1 L2-0-
L2-0-MS-L2S01
6 L2S01-MS
L2-10-
L2-10-telecom
1 telecom 1440 1440
rm-L2102
7 rm 1.0 .0 .0
1 L2-0-
L2-0-EC-L2S08
8 L2S08-EC
L2-12-
L2-12- 1350
1 calssroom 1 390. 390. 45. 1440 1350
calssroom11 .0
9 11 0 0 32.0 0 .0 1.0 .0
L2-11-
L2-11- 1350
2 calssroom 1 390. 390. 45. 1440 1350
classroom12 .0
0 12 0 0 32.0 0 .0 1.0 .0
L3-01- L3-1-
390. 1350
classroom classroom30- 1 390. 45. 1440 1350
0 .0
1 28 L3115 0 32.0 0 .0 1.0 .0
L3-02- L3-2-
3rd 390. 1350
classroom classroom29- 1 390. 45. 1440 1350
Floor 0 .0
2 27 L3114 0 32.0 0 .0 1.0 .0
L3-03- L3-3-
390. 1350
classroom classroom28- 1 390. 45. 1440 1350
0 .0
3 26 L3113 0 32.0 0 .0 1.0 .0
Performance Specifications – ICT Equipment
The tables below provides information that represents for ICT loads to be installed in each block .The values below represent the upper limit of ICT loads that can be installed in each building
zones. This document shall be read in conjunction with the layouts and the schedule of equipment. The procured equipment shall maintain the same or more efficient performance than the
described values below throughout the life cycle of the equipment. Refer to the Final Baseline energy Model Report for operation schedules related to each load.
L3-04- L3-4-staff rm- 65. 780.
4 staff rm L3112 12.0 0 0
L3-15-
L3-14-
Common
corr+ST+toilet-
Area Right
L3101/L3116
5 Side
L3-0-MS-
L3-0-MS-L3S07
6 L3S07
L3-14-
L3-13-
Common
corr+ST+toilet-
Area Left
L3101/L3103
7 Side
L3-05- L3-5-
390. 1350
classroom classroom27- 1 390. 45. 1440 1350
0 .0
8 25 L3110 0 32.0 0 .0 1.0 .0
L3-06- L3-6-
390. 1350
classroom classroom26- 1 390. 45. 1440 1350
0 .0
9 24 L3109 0 32.0 0 .0 1.0 .0
L3-09- L3-16-
390. 1350
1 classroom classroom23- 1 390. 45. 1440 1350
0 .0
0 21 L3105 0 32.0 0 .0 1.0 .0
L3-08- L3-8-
390. 1350
1 classroom classroom24- 1 390. 45. 1440 1350
0 .0
1 22 L3106 0 32.0 0 .0 1.0 .0
L3-07- L3-7--
390. 1350
1 classroom classroom25- 1 390. 45. 1440 1350
0 .0
2 23 L3107 0 32.0 0 .0 1.0 .0
L3-0-
L3-0-elevator-
1 elevator-
L3S02
3 L3S02
1 L3-0-MS-
L3-0-MS-L3S03
4 L3S03
1 L3-0-MS-
L3-0-MS-L3S04
5 L3S04
1 L3-0-MS-
L3-0-MS-L3S01
6 L3S01
L3-10-
L3-9-main
main
telecom rm-
1 telecom 1920 1920
L3102
7 rm 1.0 .0 .0
1 L3-13-IT L3-12-IT rm-
8 rm L3119
L3-11-
L3-10-computer
1 computer 1 390. 390. 135. 2160 20. 334.
rm-L3118
9 rm 0 0 16.0 0 .0 16.0 9 4
L3-12- L3-11-
75.
2 multipurp multipurpose 1 390. 390. 1.0 75.0
0
0 ose rm rm-L3117 0 0
2
L3-0-EC L3-0-EC
1
RF-2-
RF-2-stair1-
stair1-
Roof RF101
1 RF101
Floor
RF-1-elec RF-1-elec rm-
2 rm-RF102 RF102
Performance Specifications – ICT Equipment
The tables below provides information that represents for ICT loads to be installed in each block .The values below represent the upper limit of ICT loads that can be installed in each building
zones. This document shall be read in conjunction with the layouts and the schedule of equipment. The procured equipment shall maintain the same or more efficient performance than the
described values below throughout the life cycle of the equipment. Refer to the Final Baseline energy Model Report for operation schedules related to each load.
HOK JD
Space Name and TAG as per Smartboards Desktop- Monitor- Desktop-Computer Monitor-Computer NTP Servers for IP
Notebooks Student tablets Charging Station Televisions Attendnce System Switches & PABX
S Architecture (classrooms) Workstations Workstations Labs Labs Clock
r.
Level
N
o
Tot Tot Tot Tot Tot Tot Tot Tot Tot Tot Tot Tot
Quan Wa al Quan Wa al Quan Wa al Quan Wa al Quan Wa al Quan Wa al Quan Wa al Quan Wat al Quan Wa al Quan Wa al Quan Wa al Quan Wat al
Name Tag number
tity tts Wa tity tts Wa tity tts Wat tity tts Wat tity tts Wat tity tts Wa tity tts Wat tity ts Wat tity tts Wa tity tts Wa tity tts Wa tity ts Wat
tts tts ts ts ts tts ts ts tts tts tts ts
GF-08-
390 45. 144 135 135
1 Classroom GF002 1 390 32.0 1.0
.0 0 0.0 0.0 0.0
1
GF-12-IT 135 162 19. 234
2 GF042 12.0 12.0
area .0 0.0 5 .0
GF-GFS08-
3 GFS08
MS
GF-45-
Lower GF029+GF039+GF038+
4
Circulatio GF037+GF036
n1
GF-14-
5 Nurse GF035
Clinic
GF-15- 45. 45. 31. 31.
6 GF033 1.0 1.0
Supervisor 0 0 0 0
7 GF034-EC GF034
GF-13-
200 200 304 304
8 Server GF040 1.0 1.0
.0 .0 0.0 0.0
room
9 GFS07-MS GFS07
GF-17-
1 390 45. 144 135 135
Classroom GF032 1 390 32.0 1.0
0 .0 0 0.0 0.0 0.0
8
GF-18-
1 390 45. 144 135 135
Ground Classroom GF031 1 390 32.0 1.0
1 .0 0 0.0 0.0 0.0
Floor 7
GF-19-
1 390 45. 144 135 135
Classroom GF030 1 390 32.0 1.0
2 .0 0 0.0 0.0 0.0
6
1 GFS11-
GFS11
3 Lift1
GF-20-
1 45. 45. 31. 31.
Principal GF027+GF026 1.0 1.0
4 0 0 0 0
Office
1
GFS05-EC GFS05
5
1 GF-21- 60. 120
2.0
6 Entrance 0 .0
1 GF-28-
GF021+GF026
7 Reception
GF-27-
1 45. 45. 31. 31.
Assistant GF025 1.0 1.0
8 0 0 0 0
Principal
GF-26-
1 45. 45. 31. 31.
Assistant GF024 1.0 1.0
9 0 0 0 0
Principal
GF-25-
2
Admin GF023+GF022
0
Staff
GF-23-
2 390
Computer GF020 1 390 135 216 20. 334
1 .0
Room 16.0 .0 0.0 16.0 9 .4
Performance Specifications – ICT Equipment
The tables below provides information that represents for ICT loads to be installed in each block .The values below represent the upper limit of ICT loads that can be installed in each building
zones. This document shall be read in conjunction with the layouts and the schedule of equipment. The procured equipment shall maintain the same or more efficient performance than the
described values below throughout the life cycle of the equipment. Refer to the Final Baseline energy Model Report for operation schedules related to each load.
2 GF-24-
GF019
2 Servery
GF-07-
2 390 45. 144 135 135
Classroom GF004 1 390 32.0 1.0
3 .0 0 0.0 0.0 0.0
2
GF-06-
2 390 45. 144 135 135
Classroom GF005 1 390 32.0 1.0
4 .0 0 0.0 0.0 0.0
3
2 144 144
GF-29-LC GF009 1.0
5 0.0 0.0
2 GF-GF010-
GF010
6 EC
GF-05-
2 390 45. 144 135 135
Classroom GF011 1 390 32.0 1.0
7 .0 0 0.0 0.0 0.0
4
GF-04-
2 390 45. 144 135 135
Classrom GF012 1 390 32.0 1.0
8 .0 0 0.0 0.0 0.0
m5
GF-03-
2 65. 585
Teachers GF013 9.0
9 0 .0
Room
GF-02-
3 390
Chemistry GF015 1 390 135 135 19. 19.
0 .0
Lab 1.0 .0 .0 1.0 5 5
3 GF-01-
GF016
1 Prep
GF-09-
3 Upper
GF018+GF014+GF017
2 Circulatio
n1
GF-46-
3 Upper GF003+GF008+GF007+
3 Circulatio GF006
n3
GF-10-
3 Upper
4 Circulatio
n2
3 GF-35-Gas
GF201
5 Room
GF-33-
3
Hazardous GF203
6
Waste
GF-32-
3
Garbage GF202
7
Room
L1-08-
390 45. 144 135 135
Classroom L1002 1 390 32.0 1.0
.0 0 0.0 0.0 0.0
1 9
L1-12-IT 135 162 135 162
L1036 12.0 12.0
2 Area .0 0.0 .0 0.0
3 L1S08-MS L1S08
L1-16-
Lower L1025+L1032+L1033+L
Circulatio 1034+L1035
4 n1
1st Floor L1S07-MS L1S07
5
L1-13-
144 144
Server L1031 1.0
0.0 0.0
6 Room
L1-14- 45. 45. 31. 31.
L1030 1.0 1.0
7 Advisor 0 0 0 0
L1-15- 45. 45. 31. 31.
L1029 1.0 1.0
8 Supervisor 0 0 0 0
L1-17-
390 45. 144 135 135
Classroom L1028 1 390 32.0 1.0
.0 0 0.0 0.0 0.0
9 16
Performance Specifications – ICT Equipment
The tables below provides information that represents for ICT loads to be installed in each block .The values below represent the upper limit of ICT loads that can be installed in each building
zones. This document shall be read in conjunction with the layouts and the schedule of equipment. The procured equipment shall maintain the same or more efficient performance than the
described values below throughout the life cycle of the equipment. Refer to the Final Baseline energy Model Report for operation schedules related to each load.
L1-18-
390 45. 144 135 135
1 Classroom L1027 1 390 32.0 1.0
.0 0 0.0 0.0 0.0
0 15
L1-19-
390 45. 144 135 135
1 Classroom L1026 1 390 32.0 1.0
.0 0 0.0 0.0 0.0
1 14
1 L1-28-
2 Stage
L1-11-
Upper L1001+L1003+L1007+L
1 Circulatio 1008
3 n3
L1-07-
390 45. 144 135 135
1 Classroom L1004 1 390 32.0 1.0
.0 0 0.0 0.0 0.0
4 10
L1-06-
390 45. 144 135 135
1 Classroom L1005 1 390 32.0 1.0
.0 0 0.0 0.0 0.0
5 11
1 144 144
L1-31-LC L009 1.0
6 0.0 0.0
1
L1010-EC L1010
7
L1-05-
390 45. 144 135 135
1 Classroom L1011 1 390 32.0 1.0
.0 0 0.0 0.0 0.0
8 12
L1-04-
390 45. 144 135 135
1 Classroom L1012 1 390 32.0 1.0
.0 0 0.0 0.0 0.0
9 13
L1-27-
Upper
2 Circulatio
0 n4
L1-10-
Upper
L1001
2 Circulatio
1 n2
L1-26-
390 75. 75.
2 MultiPurp L1019 1 390 1.0
.0 0 0
2 ose
L1-25-
75. 75.
2 Reading L1020 1.0
0 0
3 Room
2 L1-
4 Entrance
2
L1S09-Lift L1S09
5
2
L1S05-MS L1S05
6
2 L1-23-
L1021
7 Lobby
2
L1S04-EC L1S04
8
2 L1-20-
L1024
9 Office
3 L1-21-
L1023
0 Office
L1-22-
135 540 19. 78.
3 Conferenc L1022 4.0 4.0
.0 .0 5 0
1 e
L1-03-
65. 585
3 Teacher L1013 9.0
0 .0
2 Room
L1-09-
Upper
L1018+L1014+L1017
3 Circulatio
3 n1
L1-02-
390
3 Physics L1015 1 390 135 135 19. 19.
.0
4 Lab 1.0 .0 .0 1.0 5 5
Performance Specifications – ICT Equipment
The tables below provides information that represents for ICT loads to be installed in each block .The values below represent the upper limit of ICT loads that can be installed in each building
zones. This document shall be read in conjunction with the layouts and the schedule of equipment. The procured equipment shall maintain the same or more efficient performance than the
described values below throughout the life cycle of the equipment. Refer to the Final Baseline energy Model Report for operation schedules related to each load.
3 L1-01-
L1016
5 Prep
L2-08-
390 45. 144 135 135
Classroom L2002 1 390 32.0 1.0
.0 0 0.0 0.0 0.0
1 17
L2-11-
Upper L2001+L2008+L2006+L
Circulatio 2007+L2003
2 n3
L2-07-
390 45. 144 135 135
Classroom L2004 1 390 32.0 1.0
.0 0 0.0 0.0 0.0
3 18
L2-06-
390 45. 144 135 135
Classroom L2005 1 390 32.0 1.0
.0 0 0.0 0.0 0.0
4 19
144 144
L2-23-LC L2009 1.0
5 0.0 0.0
6 L2010-EC L2010
L2-05-
390 45. 144 135 135
Classroom L2011 1 390 32.0 1.0
.0 0 0.0 0.0 0.0
7 20
L2-04-
390 45. 144 135 135
Classroom L2012 1 390 32.0 1.0
.0 0 0.0 0.0 0.0
8 21
L2-03-
65. 585
Teacher L2013 9.0
0 .0
9 Room
L2-02-
390
1 Biology L2015 1 390 135 135 19. 19.
.0
0 Lab 1.0 .0 .0 1.0 5 5
1 L2-01-
L2016
1 Prep
L2-09-
Upper
2nd L2001
1 Circulatio
Floor 2 n2
L2-10-
Upper
L2108+L2017+L2014
1 Circulatio
3 n1
1 L2-12-IT 135 162 135 162
L2033 12.0 12.0
4 Area .0 0.0 .0 0.0
1 L2S08-
L2S08
5 Services
L2-16-
Lower L2022+L2028+L2029+L
1 Circulatio 2030+L2031
6 n
1
L2-0-MS
7
L213-
144 144
1 Server L2032 1.0
0.0 0.0
8 room
1 L2-14- 45. 45. 31. 31.
L2027 1.0 1.0
9 Advisor 0 0 0 0
2 L2-15- 45. 45. 31. 31.
L2026 1.0 1.0
0 Supervisor 0 0 0 0
L2-17-
390 45. 144 135 135
2 Classroom L2025 1 390 32.0 1.0
.0 0 0.0 0.0 0.0
1 24
L2-18-
390 45. 144 135 135
2 Classroom L2024 1 390 32.0 1.0
.0 0 0.0 0.0 0.0
2 23
L2-19-
390 45. 144 135 135
2 Classroom L2023 1 390 32.0 1.0
.0 0 0.0 0.0 0.0
3 22
2
L2S09-Lift L2S09
4
Performance Specifications – ICT Equipment
The tables below provides information that represents for ICT loads to be installed in each block .The values below represent the upper limit of ICT loads that can be installed in each building
zones. This document shall be read in conjunction with the layouts and the schedule of equipment. The procured equipment shall maintain the same or more efficient performance than the
described values below throughout the life cycle of the equipment. Refer to the Final Baseline energy Model Report for operation schedules related to each load.
2
L2S05-MS L2S05
5
2
L2S04-EC L2S04
6
2 L2-20-
L2021
7 Staff Rest
L2-22-
390
2 Acticity L2019 1 390 135 202 20. 313
.0
8 Room 15.0 .0 5.0 15.0 9 .5
2 L2-21-Art 390
L2020 1 390
9 Studio .0
L2-24-
Upper
3 Circulatio
0 n4
3 135 162 135 162
L2-IT area L2034 12.0 12.0
1 .0 0.0 .0 0.0
RF-01-
Outdoor
1 Play Hall
RF-02-
2 DStairs
Roof flr RF001-05-
RF001
3 stair1
RF-03-Elec
RF004
4 Room
RF-04-
5 Stairs3
GF/L1-37-
GF+1st MPH
GF120
Flr MPH Multipurp 480 480
1 ose 1.0 .0 .0
1 GFS09-EC GFS09
GF-39-
GF118
2 Storage
GF-36-
MPH-Mat GF119
3 Store
GF-40-
MPH- GF107+GF109+GF108
4 Corridor
GF-42-
MPH-
GF110
Students
5 Lockers
6 GF111-JC GF111
GF-44-GH
GF102
GF- 7 Stairs
Guard GF-43-GH 31. 31.
GF103+GF104
Accomo 8 Guard 1.0 0 0
dation GF-30-
External
GF101
Waiting
9 Area
1 GF-31-LV
GF105
0 Room
1 GF-34-
GF106
1 Substation
GF-38-
MPH-
GF115+GF113+GF114+
Students
GF112
1 Shower/C
2 hangi
GF-41-
MPH-
GF116+GF117
1 Showers/L
3 ockers
Performance Specifications – ICT Equipment
The tables below provides information that represents for ICT loads to be installed in each block .The values below represent the upper limit of ICT loads that can be installed in each building
zones. This document shall be read in conjunction with the layouts and the schedule of equipment. The procured equipment shall maintain the same or more efficient performance than the
described values below throughout the life cycle of the equipment. Refer to the Final Baseline energy Model Report for operation schedules related to each load.
L1-36-GH
L1103
1 Bedroom
L1-34-GH
L1102
2 Bedroom
1st flr -
L1-33-GH
Guard
Accomada L1101+L1105
Accomo
3 tion
dation
L1-35-GH
L1104
4 Bedroom
L1-32-GH
5 Stairs
2nd +Rf L2/RF-IT Double Voume of area
Entrance 1 Area (L2-IT area)
HOK MK
Space Name and TAG as per Smartboards Desktop- Monitor- Desktop-Computer Monitor-Computer NTP Servers for IP
Notebooks Student tablets Charging Stations Televisions Attendnce System Switches & PABX
S Architecture (classrooms) Workstations Workstations Labs Labs Clock
r.
Level
N
o
Tot Tot Tot Tot Tot Tot Tot Tot Tot Tot Tot Tot
Quan Wa al Quan Wa al Quan Wa al Quan Wa al Quan Wa al Quan Wa al Quan Wa al Quan Wat al Quan Wa al Quan Wa al Quan Wa al Quan Wat al
Name Tag number
tity tts Wa tity tts Wa tity tts Wat tity tts Wat tity tts Wat tity tts Wa tity tts Wat tity ts Wat tity tts Wa tity tts Wa tity tts Wa tity ts Wat
tts tts ts ts ts tts ts ts tts tts tts ts
GF-08-
390 45. 144 135 135
1 Classroom GF002 1 390 32.0 1.0
.0 0 0.0 0.0 0.0
1
GF-12-IT 135 162 19. 234
2 GF042 12.0 12.0
area .0 0.0 5 .0
GF-GFS08-
3 GFS08
MS
GF-45-
Lower GF029+GF039+GF038+
4
Circulatio GF037+GF036
n1
GF-14-
5 Nurse GF035
Clinic
GF-15- 45. 45. 31. 31.
6 GF033 1.0 1.0
Supervisor 0 0 0 0
7 GF034-EC GF034
GF-13-
Ground 200 200 304 304
8 Server GF040 1.0 1.0
Floor .0 .0 0.0 0.0
room
9 GFS07-MS GFS07
GF-17-
1 390 45. 144 135 135
Classroom GF032 1 390 32.0 1.0
0 .0 0 0.0 0.0 0.0
8
GF-18-
1 390 45. 144 135 135
Classroom GF031 1 390 32.0 1.0
1 .0 0 0.0 0.0 0.0
7
GF-19-
1 390 45. 144 135 135
Classroom GF030 1 390 32.0 1.0
2 .0 0 0.0 0.0 0.0
6
1 GFS11-
GFS11
3 Lift1
GF-20-
1 45. 45. 31. 31.
Principal GF027+GF026 1.0 1.0
4 0 0 0 0
Office
1
GFS05-EC GFS05
5
Performance Specifications – ICT Equipment
The tables below provides information that represents for ICT loads to be installed in each block .The values below represent the upper limit of ICT loads that can be installed in each building
zones. This document shall be read in conjunction with the layouts and the schedule of equipment. The procured equipment shall maintain the same or more efficient performance than the
described values below throughout the life cycle of the equipment. Refer to the Final Baseline energy Model Report for operation schedules related to each load.
1 GF-21- 60. 120
2.0
6 Entrance 0 .0
1 GF-28-
GF021+GF026
7 Reception
GF-27-
1 45. 45. 31. 31.
Assistant GF025 1.0 1.0
8 0 0 0 0
Principal
GF-26-
1 45. 45. 31. 31.
Assistant GF024 1.0 1.0
9 0 0 0 0
Principal
GF-25-
2
Admin GF023+GF022
0
Staff
GF-23-
2 390
Computer GF020 1 390 135 216 20. 334
1 .0
Room 16.0 .0 0.0 16.0 9 .4
2 GF-24-
GF019
2 Servery
GF-07-
2 390 45. 144 135 135
Classroom GF004 1 390 32.0 1.0
3 .0 0 0.0 0.0 0.0
2
GF-06-
2 390 45. 144 135 135
Classroom GF005 1 390 32.0 1.0
4 .0 0 0.0 0.0 0.0
3
2 144 144
GF-29-LC GF009 1.0
5 0.0 0.0
2 GF-GF010-
GF010
6 EC
GF-05-
2 390 45. 144 135 135
Classroom GF011 1 390 32.0 1.0
7 .0 0 0.0 0.0 0.0
4
GF-04-
2 390 45. 144 135 135
Classrom GF012 1 390 32.0 1.0
8 .0 0 0.0 0.0 0.0
m5
GF-03-
2 65. 585
Teachers GF013 9.0
9 0 .0
Room
GF-02-
3 390
Chemistry GF015 1 390 135 135 19. 19.
0 .0
Lab 1.0 .0 .0 1.0 5 5
3 GF-01-
GF016
1 Prep
GF-09-
3 Upper
GF018+GF014+GF017
2 Circulatio
n1
GF-46-
3 Upper GF003+GF008+GF007+
3 Circulatio GF006
n3
GF-10-
3 Upper
4 Circulatio
n2
3 GF-35-Gas
GF201
5 Room
GF-33-
3
Hazardous GF203
6
Waste
GF-32-
3
Garbage GF202
7
Room
L1-08-
390 45. 144 135 135
Classroom L1002 1 390 32.0 1.0
.0 0 0.0 0.0 0.0
1 9
1st Floor L1-12-IT 135 162 135 162
L1036 12.0 12.0
2 Area .0 0.0 .0 0.0
3 L1S08-MS L1S08
Performance Specifications – ICT Equipment
The tables below provides information that represents for ICT loads to be installed in each block .The values below represent the upper limit of ICT loads that can be installed in each building
zones. This document shall be read in conjunction with the layouts and the schedule of equipment. The procured equipment shall maintain the same or more efficient performance than the
described values below throughout the life cycle of the equipment. Refer to the Final Baseline energy Model Report for operation schedules related to each load.
L1-16-
Lower L1025+L1032+L1033+L
Circulatio 1034+L1035
4 n1
5 L1S07-MS L1S07
L1-13-
144 144
Server L1031 1.0
0.0 0.0
6 Room
L1-14- 45. 45. 31. 31.
L1030 1.0 1.0
7 Advisor 0 0 0 0
L1-15- 45. 45. 31. 31.
L1029 1.0 1.0
8 Supervisor 0 0 0 0
L1-17-
390 45. 144 135 135
Classroom L1028 1 390 32.0 1.0
.0 0 0.0 0.0 0.0
9 16
L1-18-
390 45. 144 135 135
1 Classroom L1027 1 390 32.0 1.0
.0 0 0.0 0.0 0.0
0 15
L1-19-
390 45. 144 135 135
1 Classroom L1026 1 390 32.0 1.0
.0 0 0.0 0.0 0.0
1 14
1 L1-28-
2 Stage
L1-11-
Upper L1001+L1003+L1007+L
1 Circulatio 1008
3 n3
L1-07-
390 45. 144 135 135
1 Classroom L1004 1 390 32.0 1.0
.0 0 0.0 0.0 0.0
4 10
L1-06-
390 45. 144 135 135
1 Classroom L1005 1 390 32.0 1.0
.0 0 0.0 0.0 0.0
5 11
1 144 144
L1-31-LC L009 1.0
6 0.0 0.0
1
L1010-EC L1010
7
L1-05-
390 45. 144 135 135
1 Classroom L1011 1 390 32.0 1.0
.0 0 0.0 0.0 0.0
8 12
L1-04-
390 45. 144 135 135
1 Classroom L1012 1 390 32.0 1.0
.0 0 0.0 0.0 0.0
9 13
L1-27-
Upper
2 Circulatio
0 n4
L1-10-
Upper
L1001
2 Circulatio
1 n2
L1-26-
390 75. 75.
2 MultiPurp L1019 1 390 1.0
.0 0 0
2 ose
L1-25-
75. 75.
2 Reading L1020 1.0
0 0
3 Room
2 L1-
4 Entrance
2
L1S09-Lift L1S09
5
2
L1S05-MS L1S05
6
2 L1-23-
L1021
7 Lobby
2
L1S04-EC L1S04
8
2 L1-20-
L1024
9 Office
Performance Specifications – ICT Equipment
The tables below provides information that represents for ICT loads to be installed in each block .The values below represent the upper limit of ICT loads that can be installed in each building
zones. This document shall be read in conjunction with the layouts and the schedule of equipment. The procured equipment shall maintain the same or more efficient performance than the
described values below throughout the life cycle of the equipment. Refer to the Final Baseline energy Model Report for operation schedules related to each load.
3 L1-21-
L1023
0 Office
L1-22-
135 540 19. 78.
3 Conferenc L1022 4.0 4.0
.0 .0 5 0
1 e
L1-03-
65. 585
3 Teacher L1013 9.0
0 .0
2 Room
L1-09-
Upper
L1018+L1014+L1017
3 Circulatio
3 n1
L1-02-
390
3 Physics L1015 1 390 135 135 19. 19.
.0
4 Lab 1.0 .0 .0 1.0 5 5
3 L1-01-
L1016
5 Prep
L2-08-
390 45. 144 135 135
Classroom L2002 1 390 32.0 1.0
.0 0 0.0 0.0 0.0
1 17
L2-11-
Upper L2001+L2008+L2006+L
Circulatio 2007+L2003
2 n3
L2-07-
390 45. 144 135 135
Classroom L2004 1 390 32.0 1.0
.0 0 0.0 0.0 0.0
3 18
L2-06-
390 45. 144 135 135
Classroom L2005 1 390 32.0 1.0
.0 0 0.0 0.0 0.0
4 19
144 144
L2-23-LC L2009 1.0
5 0.0 0.0
6 L2010-EC L2010
L2-05-
390 45. 144 135 135
Classroom L2011 1 390 32.0 1.0
.0 0 0.0 0.0 0.0
7 20
L2-04-
390 45. 144 135 135
Classroom L2012 1 390 32.0 1.0
.0 0 0.0 0.0 0.0
8 21
L2-03-
65. 585
Teacher L2013 9.0
0 .0
2nd 9 Room
Floor L2-02-
390
1 Biology L2015 1 390 135 135 19. 19.
.0
0 Lab 1.0 .0 .0 1.0 5 5
1 L2-01-
L2016
1 Prep
L2-09-
Upper
L2001
1 Circulatio
2 n2
L2-10-
Upper
L2108+L2017+L2014
1 Circulatio
3 n1
1 L2-12-IT 135 162 135 162
L2033 12.0 12.0
4 Area .0 0.0 .0 0.0
1 L2S08-
L2S08
5 Services
L2-16-
Lower L2022+L2028+L2029+L
1 Circulatio 2030+L2031
6 n
1
L2-0-MS
7
L213-
144 144
1 Server L2032 1.0
0.0 0.0
8 room
Performance Specifications – ICT Equipment
The tables below provides information that represents for ICT loads to be installed in each block .The values below represent the upper limit of ICT loads that can be installed in each building
zones. This document shall be read in conjunction with the layouts and the schedule of equipment. The procured equipment shall maintain the same or more efficient performance than the
described values below throughout the life cycle of the equipment. Refer to the Final Baseline energy Model Report for operation schedules related to each load.
1 L2-14- 45. 45. 31. 31.
L2027 1.0 1.0
9 Advisor 0 0 0 0
2 L2-15- 45. 45. 31. 31.
L2026 1.0 1.0
0 Supervisor 0 0 0 0
L2-17-
390 45. 144 135 135
2 Classroom L2025 1 390 32.0 1.0
.0 0 0.0 0.0 0.0
1 24
L2-18-
390 45. 144 135 135
2 Classroom L2024 1 390 32.0 1.0
.0 0 0.0 0.0 0.0
2 23
L2-19-
390 45. 144 135 135
2 Classroom L2023 1 390 32.0 1.0
.0 0 0.0 0.0 0.0
3 22
2
L2S09-Lift L2S09
4
2
L2S05-MS L2S05
5
2
L2S04-EC L2S04
6
2 L2-20-
L2021
7 Staff Rest
L2-22-
390
2 Activity L2019 1 390 135 202 20. 313
.0
8 Room 15.0 .0 5.0 15.0 9 .5
2 L2-21-Art 390
L2020 1 390
9 Studio .0
L2-24-
Upper
3 Circulatio
0 n4
3 135 162 135 162
L2-IT area L2034 12.0 12.0
1 .0 0.0 .0 0.0
RF-01-
Outdoor
1 Play Hall
RF-02-
2 DStairs
Roof flr RF001-05-
RF001
3 stair1
RF-03-Elec
RF004
4 Room
RF-04-
5 Stairs3
GF/L1-37-
GF+1st MPH
GF120
Flr MPH Multipurp 480 480
1 ose 1.0 .0 .0
1 GFS09-EC GFS09
GF-39-
GF118
2 Storage
GF-36-
MPH-Mat GF119
3 Store
GF-40-
MPH- GF107+GF109+GF108
GF- 4 Corridor
Guard GF-42-
Accomo MPH-
GF110
dation Students
5 Lockers
6 GF111-JC GF111
GF-44-GH
GF102
7 Stairs
GF-43-GH 31. 31.
GF103+GF104
8 Guard 1.0 0 0
GF-30-
GF101
9 External
Performance Specifications – ICT Equipment
The tables below provides information that represents for ICT loads to be installed in each block .The values below represent the upper limit of ICT loads that can be installed in each building
zones. This document shall be read in conjunction with the layouts and the schedule of equipment. The procured equipment shall maintain the same or more efficient performance than the
described values below throughout the life cycle of the equipment. Refer to the Final Baseline energy Model Report for operation schedules related to each load.
Waiting
Area
1 GF-31-LV
GF105
0 Room
1 GF-34-
GF106
1 Substation
GF-38-
MPH-
GF115+GF113+GF114+
Students
GF112
1 Shower/C
2 hangi
GF-41-
MPH-
GF116+GF117
1 Showers/L
3 ockers
L1-36-GH
L1103
1 Bedroom
L1-34-GH
L1102
2 Bedroom
1st flr -
L1-33-GH
Guard
Accomada L1101+L1105
Accomo
3 tion
dation
L1-35-GH
L1104
4 Bedroom
L1-32-GH
5 Stairs
2nd +Rf L2/RF-IT Double Voume of area
Entrance 1 Area (L2-IT area)
MPH
1 TL+Lokcer+Loby-GF107/106/105
2 MultiPurposeStorage-GF104
Ground Floor
3 Canteen-GF103
4 PlayHall+Stage-GF101+102 1 480 480
Performance Specifications – ICT Equipment
The tables below provides information that represents for ICT loads to be installed in each block .The values below represent the upper limit of ICT loads that can be installed in each building
zones. This document shall be read in conjunction with the layouts and the schedule of equipment. The procured equipment shall maintain the same or more efficient performance than the
described values below throughout the life cycle of the equipment. Refer to the Final Baseline energy Model Report for operation schedules related to each load.
GUARD House 1
1 GF-3-Bedroom-GF108 0 31 31
2 GF-2-kitchen-GF107 0 31 31
Ground Floor 3 GF-1-Menst+Loby+TL-GF103+104+105 1 31 31
4 GF-5-Hall+TL-GF102 0 31 31
5 GF-4-Bedroom-GF111 0 31 31
GUARD House 2
1 GF-1-Bedroom1-GF102 0 31 31
Ground Floor 2 GF-2-SittingTL+Pantry-GF103GF104 1 31 31
3 GF-3-Bedroom2-GF106 0 31 31
Table D- LPD (Lighting Power Density).
The tables below provides information that represents for Lighting loads to be installed in each block .The values below represent the upper limit of Lighting loads that can be installed in each
building zones. This document shall be read in conjunction with the layouts and the schedule of equipment. The procured equipment shall maintain the same or more efficient performance than
the described values below throughout the life cycle of the equipment. Refer to the Final Baseline energy Model Report for operation schedules related to each load.
T05-28
Area Room Code Space Area (m2) Lighting Specification Total Area (m2) Total Watts Total LPD
The tables below provides information that represents for Lighting loads to be installed in each block .The values below represent the upper limit of Lighting loads that can be installed in each
building zones. This document shall be read in conjunction with the layouts and the schedule of equipment. The procured equipment shall maintain the same or more efficient performance than
the described values below throughout the life cycle of the equipment. Refer to the Final Baseline energy Model Report for operation schedules related to each load.
The tables below provides information that represents for Lighting loads to be installed in each block .The values below represent the upper limit of Lighting loads that can be installed in each
building zones. This document shall be read in conjunction with the layouts and the schedule of equipment. The procured equipment shall maintain the same or more efficient performance than
the described values below throughout the life cycle of the equipment. Refer to the Final Baseline energy Model Report for operation schedules related to each load.
T05-30
Area Room Code Space Area (m2) Lighting Specification Total Area (m2) Total watts Total LPD
The tables below provides information that represents for Lighting loads to be installed in each block .The values below represent the upper limit of Lighting loads that can be installed in each
building zones. This document shall be read in conjunction with the layouts and the schedule of equipment. The procured equipment shall maintain the same or more efficient performance than
the described values below throughout the life cycle of the equipment. Refer to the Final Baseline energy Model Report for operation schedules related to each load.
The tables below provides information that represents for Lighting loads to be installed in each block .The values below represent the upper limit of Lighting loads that can be installed in each
building zones. This document shall be read in conjunction with the layouts and the schedule of equipment. The procured equipment shall maintain the same or more efficient performance than
the described values below throughout the life cycle of the equipment. Refer to the Final Baseline energy Model Report for operation schedules related to each load.
HOK JD
Area Room Code Space Area (m2) Lighting Type Total Area (m2) Total Watts Total LPD
The tables below provides information that represents for Lighting loads to be installed in each block .The values below represent the upper limit of Lighting loads that can be installed in each
building zones. This document shall be read in conjunction with the layouts and the schedule of equipment. The procured equipment shall maintain the same or more efficient performance than
the described values below throughout the life cycle of the equipment. Refer to the Final Baseline energy Model Report for operation schedules related to each load.
The tables below provides information that represents for Lighting loads to be installed in each block .The values below represent the upper limit of Lighting loads that can be installed in each
building zones. This document shall be read in conjunction with the layouts and the schedule of equipment. The procured equipment shall maintain the same or more efficient performance than
the described values below throughout the life cycle of the equipment. Refer to the Final Baseline energy Model Report for operation schedules related to each load.
The tables below provides information that represents for Lighting loads to be installed in each block .The values below represent the upper limit of Lighting loads that can be installed in each
building zones. This document shall be read in conjunction with the layouts and the schedule of equipment. The procured equipment shall maintain the same or more efficient performance than
the described values below throughout the life cycle of the equipment. Refer to the Final Baseline energy Model Report for operation schedules related to each load.
The tables below provides information that represents for Lighting loads to be installed in each block .The values below represent the upper limit of Lighting loads that can be installed in each
building zones. This document shall be read in conjunction with the layouts and the schedule of equipment. The procured equipment shall maintain the same or more efficient performance than
the described values below throughout the life cycle of the equipment. Refer to the Final Baseline energy Model Report for operation schedules related to each load.
HOK-MK
Area Room Code Space Area (m2) Lighting Type Total Area (m2) Total Watt Total LPD
The tables below provides information that represents for Lighting loads to be installed in each block .The values below represent the upper limit of Lighting loads that can be installed in each
building zones. This document shall be read in conjunction with the layouts and the schedule of equipment. The procured equipment shall maintain the same or more efficient performance than
the described values below throughout the life cycle of the equipment. Refer to the Final Baseline energy Model Report for operation schedules related to each load.
The tables below provides information that represents for Lighting loads to be installed in each block .The values below represent the upper limit of Lighting loads that can be installed in each
building zones. This document shall be read in conjunction with the layouts and the schedule of equipment. The procured equipment shall maintain the same or more efficient performance than
the described values below throughout the life cycle of the equipment. Refer to the Final Baseline energy Model Report for operation schedules related to each load.
The tables below provides information that represents for Lighting loads to be installed in each block .The values below represent the upper limit of Lighting loads that can be installed in each
building zones. This document shall be read in conjunction with the layouts and the schedule of equipment. The procured equipment shall maintain the same or more efficient performance than
the described values below throughout the life cycle of the equipment. Refer to the Final Baseline energy Model Report for operation schedules related to each load.
The tables below provides information that represents for Lighting loads to be installed in each block .The values below represent the upper limit of Lighting loads that can be installed in each
building zones. This document shall be read in conjunction with the layouts and the schedule of equipment. The procured equipment shall maintain the same or more efficient performance than
the described values below throughout the life cycle of the equipment. Refer to the Final Baseline energy Model Report for operation schedules related to each load.
MPH
Area Room Code Space Area (m2) Lighting Type Total Area (m2) Total Watts Total LPD
Canteen
Area Room Code Space Area (m2) Lighting Type Total Area (m2) Total Watts Total LPD
GF102 STORAGE 18 LED
Storage/Food Preparation 55 171.3 3.11
GF101 CANTEEN 37 LED
GH-P1
Area Room Code Space Area (m2) Lighting Type Total Area (m2) Total Watts Total LPD
Kitchens GF107 KITCHEN 12.1 LED 12.1 57.1 4.72
21.4 LED
GF102 HALL
Corridor/Transition 3.2 LED 27.1 168 6.20
GF104 LOBBY 2.5 LED
GF108 BEDROOM-1 13.9 LED
Accommodation GF111 BEDROOM-2 13.4 LED 48.4 228.4 4.72
GF103 MEN SITTING 21.1 LED
GF105 TL. 3.4 LED
Restrooms 7.7 70 9.09
GF109 TL. 4.3 LED
OPEN COURT 21.6 LED
Outdoor 41 115 2.80
FENCE 8 LED
Performance Specifications – Lighting Load
The tables below provides information that represents for Lighting loads to be installed in each block .The values below represent the upper limit of Lighting loads that can be installed in each
building zones. This document shall be read in conjunction with the layouts and the schedule of equipment. The procured equipment shall maintain the same or more efficient performance than
the described values below throughout the life cycle of the equipment. Refer to the Final Baseline energy Model Report for operation schedules related to each load.
GH-P2
Area Room Code Space Area (m2) Lighting Type Total Area (m2) Total Watts Total LPD
Gate-P1
Area Room Code Space Area (m2) Lighting Type Total Area (m2) Total Watts Total LPD
Gate-P2
Area Room Code Space Area (m2) Lighting Type Total Area (m2) Total Watts Total LPD
The tables below provides information that represents for Lighting loads to be installed in each block .The values below represent the upper limit of Lighting loads that can be installed in each
building zones. This document shall be read in conjunction with the layouts and the schedule of equipment. The procured equipment shall maintain the same or more efficient performance than
the described values below throughout the life cycle of the equipment. Refer to the Final Baseline energy Model Report for operation schedules related to each load.
Pump Room 2
Area Room Code Space Area (m2) Lighting Type Total Area (m2) Total Watts Total LPD
Pump Room 3
Area Room Code Space Area (m2) Lighting Type Total Area (m2) Total Watts Total LPD
Electrical Room
Area Room Code Space Area (m2) Lighting Type Total Area (m2) Total Watts Total LPD
Site Layout
Area Room Code Space Area (m2) Lighting Type Total Area (m2) Total Watts Total LPD