Total Wind Power Consultancy


Capability Statement 2012
Grontmij and Wind Energy

Grontmij is a leading European design, engineering Owner’s Engineering


Services
We turn ideas into reality
and management consultancy, employing over
Our full range of services as the Owner’s
11,000 experts. We have more than 20 years of Engineer ensures that wind turbines
and wind farms meet the expectations
of investors and operators. We support
consultancy experience in the onshore and large owners with initial feasibility studies, but
we go beyond the desk studies by sup-
scale offshore wind industry. We provide our clients porting you throughout the planning,
design, tendering, implementation and
commissioning phases.
second to none services in all project phases ranging
Environmental Impact Assessments
Geotechnical investigations
from initial analysis, planning and investigation to Wind resources
Wind farm layout
implementation and operation. Foundation concept studies
Detailed design of complete
wind farms
Our services draw upon the vast expe- addressing the various risks throughout Drafting of technical specifications
rience accumulated in Denmark, the the project lifecycle. We provide added Preparation of tender documents
world leader in wind energy develop- value to our customers through all Management of tender procedures
ment and innovation, and we have project phases from initial analysis, plan- Drafting of contracts
transferred this knowledge to the rest ning and investigation to implemen- Contract management &
of the world. Today we implement wind tation and operation. We focus on the administration
projects worldwide – onshore as well essential elements of quality, time and Site supervision during construction
as offshore. We have a full project cycle cost as well as project sustainability with Manufacturing supervision
approach to wind energy projects and respect to society, environment and the Support during commissioning
invest our resources in identifying and economy. Investor assessment
Due Diligence

Minimising Risk in All Your Project Phases

Planning Project Operation and


Design Tendering Construction
and Licensing Development Maintenance
Planning and Licensing

Planning Due Diligence Assessment of energy yield predic-


Your Project Success Your Guarantee of a Professional tion, incl. wind estimation risk
Assessment Project site and layout assessment,
In order to ensure that a wind farm turbine suitability review, civil/
project is viable (and in order to obtain Grontmij establishes a solid base for geotechnical review, evaluation of
licences and permits) a thorough your decision-making by providing infrastructure, balance of plant review,
planning process must be carried out. top quality professional assessment of civil woks and logistics
Grontmij has unparalleled expertise in liability and compliance risks within the Financial Performance/Profitability,
wind assessment and resource planning, often limited time available. Our areas CAPEX & OPEX calculations, foreca-
assessment of the energy infrastructure of expertise encompass technical, com- sting, financial modelling, and scena-
and of market /demand forecasting, mercial, legal, environmental and social rio development
conceptual design, available infrastruc- aspects. Certification, permits and licenses,
ture and logistics analysis. We draft evaluation of the legal framework,
the pre-decision basis in the form of Our team, in addition to engineers, compliance with national and interna-
preliminary financial estimates and a includes economists, legal experts, geo- tional legislation, Equator Principles
CDM opportunity assessment. logists, biologists, computer scientists and investor’s/lender’s policies
and other specialists. As a world leader, Key agreements, incl. EPC, O&M and
our corporate knowledge base in wind related contracts, grid connection,
Authorities & Licensing due diligence is based on extensive Power Purchase Agreements, credits,
Your Liaison with Authorities number of projects we had carried out subsidy schemes and taxation
around the world. Environmental issues and potential
We have extensive experience in work- social conflicts, Corporate & Social
ing with authorities, including licensing Our due diligence package covers, but is Responsibility
processes. Our scope of services covers not limited to: Interconnection to the national grid,
assistance in license procedures for additional grid code requirements
construction, cabling, connection to the and risk interfaces
grid and electricity production. We pro- Plant expansion opportunities
vide continuous and dynamic contact
with national and regional authorities.

Project Financing Support


Finding the Best Options

Grontmij provides support in prepa-


ration of bankable wind projects. Our
experts are ready to help you in iden-
tification of the best financing option
and provide professional assistance in
structuring of a lending consortium.
Project Development

Feasibility Studies Our extensive experience in implemen- Visualisation


Decisions Require Professional ting a full EIA for both onshore and offs- Securing Your Vision
Back-Up hore wind farms (incl. marine flora and
fauna, visual impact, noise parameters, Visualisation is the stakeholder’s
We provide a well-considered service in etc) is demonstrated by unique solutions instrument to assess the wind farm’s
the form of a detailed feasibility study, that cannot be found elsewhere. We visual appearance and impact on the
report assessing, wind data and energy have world leading expertise in noise surrounding area.
production estimates, environmental evaluation, shade flickering, advanced
impact assessment (EIA), type of founda- laser and radar studies of migrating The visualisation process helps to decide
tions, met masts solutions, substation, birds, marine flora and fauna assess- on the optimal siting of the wind farm
grid interconnection opportunities, ments – particularly of fish, mammals, taking into consideration all aspects
logistical challenges, investigation of benthic fauna in relation to both short from visual impact to cost. Grontmij has
geotechnical parameters, foundation, and long term effects. extensive experience in comprehensive
installation, harbour assessment, micro- visualisation programmes.
siting and wind farm layout, financing,
legal and economic issues. Geotechnical
investigations
Our feasibility study will equip you with Ground Work Done Right
thorough understanding of the conditi-
ons and terms, to confirm the viability of Grontmij has an in-depth knowledge,
the wind farm development. experience & the latest technology on
support structure engineering and soil
mechanics. Our topographical surveys
Environmental Impact are based on remote sensing using a
Assessment unique system which is very cost ef-
We Give You the Industry Standard fective and flexible. We use helicopters &
power gliders, making our services very
By undertaking a high quality EIA study, attractive even for small-scale projects.
we provide you with a proper basis for Our extensive experience covers plan-
decision making, based upon the indu- ning, procurement and supervision of
stry standard. Our starting point is the geotechnical and geophysical investiga-
EIA Report Manual that we drafted for tions, second opinion on data repor-
the Danish Energy Authority. ting and recommendations, planning
and procurement, analysing the data,
recommendations as to the type and
structure of foundations, supervision
and monitoring during implementation.
design andinformation,
geotechnical certification wind, of onshore waves, and sign which
ndation, is in theprocesses,
production comfort zone for the
logistics, wind farms or single turbines in remote
offshore foundations.
ice, water levels and other site conditi- We
periods and increased We provide
focus on consul-
QA. contractors,
quality control and transportation toana-
we support adapted
you through to the
power operating
grid the areas, we analyse hybrid systems and off-
ons. ting
Our in
take allthe
costs
experiencedentire
factorsdesignintoprocess
team optimize – from
consideration, and conditions
lysis, including
construction of the
site. wind
power turbines
quality andand stability grid solutions.
i- geotechnical
identify layout recommendations
opportunities
evaluate on these parameters, taking and to ensure
soil based
analysis,onload
bestflowavailable and known
calculations and short tech-
ors
into analysis
the mostand
account the cost toefficient
the design
requirements powerand certification
inproduction
the nologies as well asas
circuit calculations optimised
required.foundation
es. of the foundation
without compromising design.requirements. concepts, site assessment and layout.
be
standards and guidelines. We provide Foundations
We provide consultancy and design
Tender Design
you with a Site Assessment ready for Latest Technology to your Get the Right Bids
We have
have the leading developers,
supported expert knowledge manu-for support for cabling and grid connection
nd
certification.
both
facturersshallow andand deep water
operators installations,
in identifying
Advantage
Innovation
for the onshore wind farm site, subsea
We inspire contractors to optimise the
e
are including evaluation ofregarding
areas for optimisation the (often critical)
off Intelligent
cabling, internal Solutions
cabling, and shore to
Ourshore
teamlinkage.
has extensive
We haveexperience
experiencein inthe price and quality through a tender de-

Design
ed effect
shore of windcyclic loads from
turbines and wind in combi-
farms. We
. Design
nation
have created Basis
with current,
integrated tides,solutions
waves and forice. design and
transformer
Design certification of onshore
stations, switchboards,
and manufacturing of wind and sign which is in the comfort zone for the
BestWe Available
wind use thelayout,
farm Methods
latest computer
foundation, technology
materials offshore foundations.
monitoring
turbines, and control
foundations, Weand provide
systems,
blades consul-
load and
calls contractors, adapted to the operating
with
(and Finite
costs)Element
for tower, Method
bladesmodelling
and fou- to ting in
power
for the entire
newquality design process
analysisinnovation
approaches, – from
etc. For small-scale
and conditions of the wind turbines and
and
es, The Design
include Basis
ndation,non-linear outlines
production effects all of
assumpti-
processes, cracked con-
logistics, geotechnical
wind farms recommendations
rethinking or the
of single turbines in
structures. to soil
remote
Increased based on best available and known tech-
or
- ons, crete
specifications
quality and evaluation
control and methodologies
of Eigen frequencies.
and transportation to the analysis
areas,
size ofand
we to theturbines,
analyse
offshore design
hybrid andsystems certification
and off-
in particular, nologies as well as optimised foundation
and for the design of the
construction site.primary structures. of the
gridfoundation
solutions.
challenges design.designs and engi-
traditional concepts, site assessment and layout.
The design basis defines how the Site neering to be adapted to deeper and
Assessment parameters are to be ap- Wemore
havestrenuous
the leading expert
waves and knowledge
harsher wind for
n
e pliedGrid
Foundations
Site Connection
in theAssessment
design of wind turbines and Tender
both shallow
conditions. Design
andWe deep
have water
a well
periods and increased focus on QA. We installations,
proven track Innovation
we support you through power grid ana-
and
Latest
foundations.
Optimised Electrical
Technology
Since Input Power
the first tolarge-scale
your Get
take the
record
including allof Right
supporting
evaluation
costs Bids
factors manufacturers
of into
the (often critical)
consideration, and Intelligent Solutions
lysis, including power quality and stability
Management
Advantage
offshore wind farm, we have developed wind
effect of developers
cyclic loads with
from the
wind
identify layout opportunities and ensureutilisation
in combi- of analysis, load flow calculations and short
Power
leading to to
theConnect
Priorexperience design in the
of thedetermina-
structures for new
We
nation materials,
the inspire
with
most current,
cost optimisation
contractors to
tides,power
efficient waves ofproduction
optimise struc-
and the
ice. Design and manufacturing
circuit calculations as required. of wind
- tion Our
the onshore wind farm,experience
of team
loads has
and extensive
load combinations.
the physical in the Wetures,
price
use new
and
the innovative
quality
latest through
computer
without compromising requirements.designs,
a tender
technologytransfer
de- turbines, foundations, and blades calls
Our
design
By choosing experienced
conditions andintelligent team
certification
on the selected is
methodsready
of onshore to
siteand back
and
must be you of knowledge is infrom
the other
with Finite Element Method modelling the
sign which comfort engineering
zone for to for
Wenew approaches,
provide consultancy innovation
and design and
up through
offshore
specifications,
assessed aswe the
foundations.
well process
minimise We of
as the effects grid
provide
your riskconnection
consul-
and
on the sectors,
contractors,
include
We have new
non-linear principles
adapted
supported effectsto for
of the
thecracked
developers, construc-
operating con-
manu- rethinking
support forof the structures.
cabling Increased
and grid connection
sed and
ting
ensure electrical
in the
that
structures. theentire
The power
Design management.
design
Basis
foundation process – from
is structures
ready Prior
for tion
crete process
conditions
and
facturers ofand
evaluation
and the much
wind
of Eigen
operators more.
turbines and
frequencies.
in identifying size of offshore
for the turbines,
onshore wind farm in particular,
site, subsea
i- to drafting
geotechnical
certification. power purchase
recommendations
of offshore wind farms, in particular, are agreements,
to soil based
areas for optimisation regarding off tech-
on best available and known challenges traditional
cabling, internal cabling,designs
and shore andtoengi-
es
We analysis
we
costlysupport andare
and to the
you the design
through
parts that andare
power certification
grid
mostana- nologies
shore wind as well as optimised
turbines and windfoundation
farms. We neering to be We
shore linkage. adapted to deeper in
have experience and
es.
n, of the
lysis, foundation
including powerdesign.
exposed to the physical environment. quality and stability concepts, site assessment
have created integrated solutions and layout. for transformer stations, switchboards,
more strenuous waves and harsher wind
ure analysis, loadthe flow calculations and short
ion
WTG We
Layout
To optimize
have
circuit the
Optimisation
leading
calculations
costs,
as
it is essential
expert
required. knowledge
to
for
Grid
windConnection
farm layout, foundation, materials monitoring and
conditions. We control
have a systems,
well proven loadtrack
and

nd
Saving
both
You choose
carefully
shallow
Moneysafe
and
and
deep
Creatingfor
parameters
water installations,
and(andElectrical
costs) for tower,
Innovation Power
blades and fou- power of
record quality analysis manufacturers
supporting etc. For small-scaleand
e
Valuegeotechnical information, wind, waves,
including
Management
ndation,
Intelligent
production
Solutions
processes, logistics, wind farms or single turbines in
wind developers with the utilisation of remote
We waterevaluation
ice, provide andof
consultancy
levels the
otherand (often
design
site critical)
conditi- quality control
Power to Connect and transportation to the areas,
new we analyse
materials, hybrid systems
optimisation and off-
of struc-
ed
u- effect
support
ons. of cyclic
for loads
cabling
Our experienced from
and wind
grid in combi-
connection
team optimize and construction site. grid solutions.
Mostnation
developers
for the with
onshore gowind
current, fortides,
standard
farm waves
site, solu-
and
subsea ice. Design and manufacturing of wind tures, new innovative designs, transfer
evaluate
tions,Webut we on
can these
help parameters,
you do better. taking Ourturbines,
experienced team is ready to back you of knowledge from other engineering
intouse
cabling, the
account
A successfully
latest
internal
delivered
computer
thecabling,
requirementsand
optimisation
technology
shore to
in the upfor
through
foundations,
the process of
and blades
grid connection
calls
sectors, new principles for the construc-
We with
standards and guidelines. We provideto
shore
process
Finite
linkage.
can non-linear
reduce
Element
We
O&M
Method
have modelling
experience
costs, increased
in
and
Foundations
new approaches, innovation and
electrical of power management. Prior
Tender Design
tion process and much more.
and include
transformer
you with stations,
a Site effects of cracked
switchboards,
Assessment ready for con- rethinking
Latest Technology the structures.
to your Increased Get the Right Bids
or
als energy
creteoutput,
monitoringand shorter
evaluation
and construction
controlof Eigen
systems, frequencies.
load and to drafting
size of power purchase
offshore turbines, agreements,
in particular,
certification. Advantage
power quality analysis etc. For small-scale challenges traditional designs and engi- We inspire contractors to optimise the
cs, wind farms or single turbines in remote neering
Our teamtohas beextensive
adapted to deeper and
experience in the price and quality through a tender de-
the Design
areas, we analyseBasis hybrid systems and off- more strenuous waves
design and certification of onshore and harsherand wind sign which is in the comfort zone for the
n Grid
grid Connection
solutions.
Best Available Methods conditions. We have a well
offshore foundations. We provide consul- proven track contractors, adapted to the operating
and Electrical Power record of supporting
ting in the entire design manufacturers
process – fromand conditions of the wind turbines and
Management
The Design Basis outlines all assumpti- wind developers with
geotechnical recommendations the utilisation
to soilof based on best available and known tech-
Tender
Power Design
to Connect
ons, specifications and methodologies new materials, optimisation
analysis and to the design and certificationof struc- nologies as well as optimised foundation
- Get the
for the RightofBids
design the primary structures. tures,
of the new innovative
foundation design. designs, transfer concepts, site assessment and layout.
Our
The design basisteam
experienced is ready
defines how to theback
Siteyou of knowledge from other engineering
up
We through
inspire the process
contractors of
to grid
Assessment parameters are to be ap- connection
optimise the sectors,
We havenew principles
the leading for the
expert construc-
knowledge for
sed
he and
priceelectrical power management.
plied in the design of wind turbinesde-
and quality through a tender Prior
and tion process and much more.
both shallow and deep water installations, Innovation
d to drafting
sign whichpower
foundations. is in purchase
the
Since the firstagreements,
comfort zone for the
large-scale including evaluation of the (often critical) Intelligent Solutions
ul- contractors,
offshore wind adapted
farm, weto have
the operating
developed effect of cyclic loads from wind in combi-
conditions of the wind
leading experience turbines
in the and
determina- nation with current, tides, waves and ice. Design and manufacturing of wind
based
tion of loads and load combinations.tech-
on best available and known We use the latest computer technology turbines, foundations, and blades calls
tion nologies as well
By choosing as optimised
intelligent methodsfoundation
and with Finite Element Method modelling to for new approaches, innovation and
concepts, site assessment
specifications, we minimise your and layout.
risk and include non-linear effects of cracked con- rethinking of the structures. Increased
ensure that the Design Basis is ready for crete and evaluation of Eigen frequencies. size of offshore turbines, in particular,
e for certification. challenges traditional designs and engi-
ons, Innovation neering to be adapted to deeper and
al) Intelligent Solutions more strenuous waves and harsher wind
bi- WTG Layout Optimisation Grid Connection conditions. We have a well proven track
e. Design
Savingand Youmanufacturing of wind
Money and Creating and Electrical Power record of supporting manufacturers and
y turbines,
Value foundations, and blades calls Management wind developers with the utilisation of
to for new approaches, innovation and Power to Connect new materials, optimisation of struc-
on- rethinking of the go
Most developers structures. Increased
for standard solu- tures, new innovative designs, transfer
ies. size of offshore turbines, in particular,
tions, but we can help you do better. Our experienced team is ready to back you of knowledge from other engineering
challenges traditional
A successfully designs
delivered and engi-
optimisation up through the process of grid connection sectors, new principles for the construc-
neering to be adapted to deeper and
process can reduce O&M costs, increased and electrical power management. Prior tion process and much more.
more
energy output, shorter constructionwind
strenuous waves and harsher to drafting power purchase agreements,
conditions. We have a well proven track
record of supporting manufacturers and
Design Basis design and certification of onshore and sig
Best Available Methods offshore foundations. We provide consul- con
ting in the entire design process – from con
The Design Basis outlines all assumpti- geotechnical recommendations to soil bas
ons, specifications and methodologies analysis and to the design and certification nol
for the design of the primary structures. of the foundation design. con
The design basis defines how the Site
Assessment parameters are to be ap- We have the leading expert knowledge for
plied in the design of wind turbines and both shallow and deep water installations, In
foundations. Since the first large-scale including evaluation of the (often critical) Int

Design
offshore wind farm, we have developed effect of cyclic loads from wind in combi-
leading experience in the determina- nation with current, tides, waves and ice. De
tion of loads and load combinations. We use the latest computer technology tur
By choosing intelligent methods and with Finite Element Method modelling to for
specifications, we minimise your risk and include non-linear effects of cracked con- ret
ensure that the Design Basis is ready for crete and evaluation of Eigen frequencies. size
certification. cha
nee
mo

Design
Site Assessment
Optimised Input take
WTG
periods
Saving
and
all costs
Layout
increasedOptimisation
You Money
factors
focus on QA. We
and Creating
into consideration,
Valuelayout opportunities and ensure
weGrid
supportConnection
and
lysis,
you through power grid ana-
Electrical
including
Management
Power
power quality and stability
con
rec
win
identify analysis, load flow calculations and short
Prior to the design of the structures for the most cost efficient power production Power
circuit to Connect
calculations as required. new
the onshore wind farm, the physical Most compromising
without developers go for standard solu-
requirements. tur
conditions on the selected site must be tions, but we can help you do better. WeOur experienced
provide teamand
consultancy is ready
designto back you of k
assessed as well as the effects on the WeAhave
successfully
supported delivered optimisation
developers, manu- up through the process of grid
support for cabling and grid connection connection sec
structures. The foundation structures process can reduce O&M
facturers and operators in identifyingcosts, increased for and electricalwind
the onshore powerfarmmanagement.
site, subsea Prior tion
of offshore wind farms, in particular, are energy
areas output, shorter
for optimisation construction
regarding off to drafting power purchase
cabling, internal cabling, and shore agreements,
to
Site
costly andAssessment
are the parts that are most periods and increased focus
shore wind turbines and wind farms. on QA.WeWe shore linkage. We have experience grid
we support you through power in ana-
exposed to the Input
Optimised physical environment. take all costs factors into
have created integrated solutions forconsideration, lysis, including
transformer power
stations, quality and stability
switchboards,
To optimize the costs, it is essential to identify
wind layout opportunities
farm layout, and ensure
foundation, materials analysis, load flow calculations
monitoring and control systems, load and and
short
Prior tochoose
carefully the design of the structures
safe parameters for for thecosts)
(and mostfor cost efficient
tower, power
blades andproduction
fou- circuit
power calculations
quality analysisasetc.
required.
For small-scale
the onshoreinformation,
geotechnical wind farm, the
wind,physical
waves, without
ndation, compromising
production requirements.
processes, logistics, wind farms or single turbines in remote
ice,conditions onand
water levels the other
selected
sitesite must be
conditi- quality control and transportation to the We we
areas, provide consultancy
analyse and design
hybrid systems and off-
ons. Our experienced team optimizethe
assessed as well as the effects on and We have supported
construction site. developers, manu- support for
grid solutions. cabling and grid connection
structures.
evaluate The foundation
on these parameters,structures
taking facturers and operators in identifying for the onshore wind farm site, subsea
ofaccount
into offshorethe
wind farms, in particular,
requirements in the are areas for optimisation regarding off cabling, internal cabling, and shore to
costly and are the parts that
standards and guidelines. We provide are most Foundations
shore wind turbines and wind farms. We Tender Design
shore linkage. We have experience in
exposed to the physical environment.
you with a Site Assessment ready for have Technology
Latest created integrated solutions for
to your Get the Right Bids switchboards,
transformer stations,
To optimize the costs, it is essential to
certification. wind
Advantagefarm layout, foundation, materials monitoring and control systems, load and
carefully choose safe parameters for (and costs) for tower, blades and fou- Wepower
inspirequality analysistoetc.
contractors For small-scale
optimise the
geotechnical information, wind, waves, Ourndation,
team hasproduction processes, logistics,
extensive experience in the wind farms or single turbines
price and quality through a tender in remote
de-
Design
ice, waterBasis
levels and other site conditi- design and certification of onshore andto the
quality control and transportation areas,
sign which weisanalyse hybrid systems
in the comfort zone for and
theoff-
ons. Our experienced
Best Available Methods team optimize and construction
offshore site. We provide consul-
foundations. grid solutions.
contractors, adapted to the operating
evaluate on these parameters, taking ting in the entire design process – from conditions of the wind turbines and
Theinto account
Design Basisthe requirements
outlines in the
all assumpti- geotechnical recommendations to soil based on best available and known tech-
standards
ons, and guidelines.
specifications We provide
and methodologies Foundations
analysis and to the design and certification Tender
nologies Design
as well as optimised foundation
foryou
the with a Site
design Assessment
of the ready for
primary structures. Latest
of the Technology
foundation design. to your Get thesite
concepts, Right Bids and layout.
assessment
certification.
The design basis defines how the Site Advantage
Assessment parameters are to be ap- We have the leading expert knowledge for We inspire contractors to optimise the
plied in the design of wind turbines and Ourshallow
both team has andextensive
deep waterexperience in the
installations, Innovation
price and quality through a tender de-
Design Basis
foundations. Since the first large-scale design and certification of onshore
including evaluation of the (often critical) and sign whichSolutions
Intelligent is in the comfort zone for the
Best Available
offshore wind farm,Methods
we have developed offshore
effect foundations.
of cyclic loads fromWe provide
wind consul-
in combi- contractors, adapted to the operating
leading experience in the determina- nation with current, tides, waves and from
ting in the entire design process – ice. conditions
Design of the wind turbines
and manufacturing of windand
The
tion of Design Basis
loads and outlines
load all assumpti-
combinations. Wegeotechnical
use the latestrecommendations
computer technology to soil based on best available and
turbines, foundations, and blades knowncallstech-
ons, specifications and methodologies
By choosing intelligent methods and analysis
with Finite and to the
Element designmodelling
Method and certification
to nologies as well as optimised
for new approaches, innovation and foundation
for the design
specifications, weofminimise
the primaryyourstructures.
risk and of the foundation design.
include non-linear effects of cracked con- concepts,
rethinking ofsite
theassessment
structures. and layout.
Increased
The design basis defines how
ensure that the Design Basis is ready the Site
for crete and evaluation of Eigen frequencies. size of offshore turbines, in particular,
Assessment parameters are to be ap-
certification. We have the leading expert knowledge for challenges traditional designs and engi-
plied in the design of wind turbines and both shallow and deep water installations, Innovation
neering to be adapted to deeper and
foundations. Since the first large-scale including evaluation of the (often critical) Intelligent
more strenuousSolutions
waves and harsher wind
WTG Layout
offshore Optimisation
wind farm, we have developed Grid
effectConnection
of cyclic loads from wind in combi- conditions. We have a well proven track
leading
Saving experience
You Money and in theCreating
determina- and Electrical
nation with current,Power
tides, waves and ice. Design
record and manufacturing
of supporting of windand
manufacturers
tion
Value of loads and load combinations. Management
We use the latest computer technology turbines, foundations, and blades
wind developers with the utilisation of calls
By choosing intelligent methods and with Finite
Power to Connect Element Method modelling to for new approaches, innovation
new materials, optimisation of struc- and
specifications,
Most developers gowefor
minimise
standard your risk and
solu- include non-linear effects of cracked con- rethinking
tures, of the structures.
new innovative Increased
designs, transfer
tions, but we can help you do better. for
ensure that the Design Basis is ready Ourcrete and evaluation
experienced team isofready
Eigentofrequencies.
back you size of offshore turbines, in
of knowledge from other engineeringparticular,
certification.delivered optimisation
A successfully up through the process of grid connection challenges
sectors, traditionalfor
new principles designs and engi-
the construc-
process can reduce O&M costs, increased and electrical power management. Prior neering to be adapted
tion process and much more. to deeper and
energy output, shorter construction to drafting power purchase agreements, more strenuous waves and harsher wind
WTG Layout Optimisation Grid Connection conditions. We have a well proven track
Saving You Money and Creating and Electrical Power record of supporting manufacturers and
Tendering

Tendering Our procurement experts have over the


Get the Rules and Price Right years supported wind farm developers
– the First Time in the procurement process, moni-
toring of contract implementation
For smooth and cost competitive pro- and commissioning of plants. Our
ject implementation, the approach to assistance covers procurement plans,
procurement planning and tendering is enabling requirements for project
of vital importance. During this process implementation, tender document pre-
the interaction between the owner and paration, contract basis, bid schedules,
developer on the one side and the sup- bid evaluation, contract negotiation,
pliers and contractors on the other is contract management and follow-up
outlined and project risks limited. and claims management.
Construction

Logistics Health and Safety


Implementation the Smart Way Keeping You on the Safe Side

An important and cost saving aspect of Working environments for wind farm
the construction phase is well planned activities are high risk construction
logistics and optimised transportation areas with large construction materials
of all equipment from the manufac- and a large scale investment, so prioti-
turer’s site to the construction site. sation on health and safety is essential.
Close and efficient monitoring at the Health and safety management is an
manufacturer’s site can also increase the integral part of managing wind con-
overall efficiency of the whole project, struction, partly in relation to creating
ensuring timely delivery and budget a culture of safe working practices and
performance. at the same time safeguarding the
future success of the wind farm. Legal
We have demonstrated on several wind requirements for health and safety dif-
farm projects (incl. large scale offshore fer from country to country, but have
projects) that savings can be made to be fully respected and integrated
through detailed and efficient planning into project implementation.
of logistics, optimisation of harbour
facilities, availability of the right vessels, We support in establishing health &
and close monitoring of the manufactu- safety management procedures and
ring process. guidelines, performing audits, analy-
sing and reporting on incidents and in
following up on causes. We also carry
Project and Interface out audits at manufacturers’ sites.
Management
Your Success on Our Competences

Project management and interface


management are essential elements in
ensuring the success of construction.
Our project managers are experts in
project and interface management
during construction activities with focus
on delivering on time, to quality and
budget, meeting all specifications.
We provide support at the construction
site and at the manufacturers’ produ-
ction sites and we manage the supply
chain activities with logistics manage-
ment and contract and claims manage-
ment. Our people also manage and
supervise activities through manufactu-
ring supervision and site and installation
supervision at the construction location.
Finally, we handle testing and commis-
sioning activities.
Operation
Operation and
and Maintenance
Maintenance

Operation and wind farms worldwide. On your behalf


Operation and
Maintenance wind farms worldwide. On your behalf
we perform independent reviews and
Maintenance
Increase Efficiency, Reduce the we perform independent reviews and
inspections of wind farms, identifying
Increase Efficiency, Reduce the
Headache inspections of wind farms, identifying
potential technical problems, options for
Headache
nd Maintenance
potential technical problems, options for
optimisation of normal operation as well
optimisation of normal operation as well
Long-term availability of the wind farm as technical due diligence inspections.
Long-term availability of the wind farm as technical due diligence inspections.
is crucial for the payback on investment. Further, we support you in planning
is crucial for the payback on investment. Further, we support you in planning
Normally the availability will be 97% or and tendering for the service contract,
Normally the availability will be 97% or and tendering for the service contract,
more, but this requires a dedicated focus Warranty Operation and Maintenance
more, but this requires a dedicated focus Warranty Operation and Maintenance
on O&M from the outset. Agreements (WOMA) and in troubles-
on O&M from the outset. Agreements (WOMA) and in troubles-
hooting. Our experience allows us to
hooting. Our experience allows us to
Our team of experts has decades of ex- effectively define O&M requirements
Our team of experts has decades of ex- effectively define O&M requirements
perience in operating and maintaining during detailed design.
perience
wind farmsin operating
worldwide.and
Onmaintaining
your behalf during detailed design.
we perform independent reviews and
inspections of wind farms, identifying
potential technical problems, options for
optimisation of normal operation as well
m as technical due diligence inspections.
ent. Further, we support you in planning
or and tendering for the service contract,
ocus Warranty Operation and Maintenance
Agreements (WOMA) and in troubles-
hooting. Our experience allows us to
x- effectively define O&M requirements
g during detailed design.
Nørrekær Enge Onshore Wind Farm, Denmark

Description Services
In Denmark commercial wind farming Limfjorden, in the northern part of Denmark. • Design basis, geotechnical studies
has existed for some 20 years. As the The project consists of a replacement of 77 • Detailed design, access and site
development of wind turbines in terms wind turbines installed from 1988 to 1990 roads
of effect and dimensions has been with a combined capacity of 17 MW. The • Detailed design, 13 pile supported/
gradually increased since the beginning turbines are replaced with 13 Siemens 2,3 direct gravity based foundations
of commercial wind farming initiated in the MW turbines with a combined capacity of 30 • Clearance of all permits with
80’s, some 175 MW of the installed Danish MW, equivalent to the energy demand of ~ authorities
wind energy capacity today is produced by 30.000 households. • Tender documents, contract
wind turbines subject to replacement by negotiation
modern MW range wind turbines. Grontmij | Carl Bro has designed and • Preparation of foundation design
provided the documentation for a DNV documentation for DNV certification
With the wind turbine scrap and certified foundation design for the wind • Project management
replacement act of 2004, the Danish turbines. The foundations are customized • Total works site supervision
government has made way for a to the soil conditions on site, calling for a
modernisation and effect improvement combination of pile supported and direct Client:
of the existing Danish onshore wind farm gravity based foundations. The foundation Vattenfall A/S
capacity, without introducing new onshore design is performed in accordance with
wind farm sites. The act allows for old, less IEC 61.400-1 code. Grontmij | Carl Bro Period:
effective wind turbines to be replaced with has provided all tender documents and 2008–2009
modern and more effective ones. conducted the negotiations with the involved
contractors on behalf of the client, Vattenfall
Grontmij | Carl Bro has provided A/S.
consultancy services to Vattenfall A/S in the
complete design and project management During 2009 Grontmij | Carl Bro has
of the Nørrekær Enge Onshore Wind supervised all works on site, and managed
Farm, on the coast of the inland waters, the project in total.
Rødsand 2 Offshore Wind Farm, Denmark

Project Description
Rødsand 2 Offshore Wind Farm is situated The project consists of: Sea depth is 6-12 m.
in Denmark, south of the island Lolland , • 90 pcs. SWP 2.3 MW, total 207 MW Sea bed consists of clay till.
approximately 3 km west of Nysted Offshore • Gravity based concrete foundations
Wind Farm. from Aarsleff Bilfinger JV Offshore works were initiated in August
• Internal MV electrical grid is supplied 2008 with pre-trenching for cables. Foun-
Owner is EON. Owners consultant is Grontmij by NSW dation manufacture in Poland started in
| Carl Bro. • Wind turbines installed by A2SEA January 2009. Dredging for foundations
• Substation and grid to coast started January 2009.
contracted by Energinet.dk
Commissioning of wind farm with 207 MW
in operation will be end of 2010.

Consultancy Services:
Consultancy and basic design for wind farm • Basic design of inter turbine grid • Study of collision friendly foundation
owner during tender and production period. connection design
The services include: • Offshore sub station: Interface • Planning of construction site in Rødby
• EIA presentation at public meeting planning and negotiation between and Nyborg
and assistance in adapting project to owners of 36 kV system and 132 kV • Review of contractors detailed design
public comments on EIA system of foundations
• Preparation and initialization of • Planning and supervision of complete • Interface management
compensation negotiations with geotechnical investigations including
Danish Fishermen’s Association laboratory testing for 90 wind turbines Client:
• Layout optimization of wind farm • Tender assistance for wind turbines, EON Vind AB
including production prediction, foundations and grid
screening of geotechnical information • Site assessment and design basis for Project period:
and grid cost evaluation foundation (incl. DNV certification) 2007-2010
Photographer: Petri & Betz
Foundations in Deeper Water, UK
Offshore Wind Accelerator
Project Manager

Project Description installed in 40 m water depth and uses a


Consultancy Services
In 2009 the Carbon Trust is launching a Project manager on the program
steel jacket quadruped foundation which
major new Technology Accelerator initiative Offshore Wind Accelerator (OWA), off-
is not commercially viable at present. The
focused on reducing the cost of energy (£/ shore foundations.
development of cost effective foundations,
MWh) from offshore wind energy by 10%+. • Foundation concept competition
suitable both technically and commercially
The Offshore Wind Accelerator (OWA) • Development of 5-8 new platform
for the physical conditions likely to be
is the name of the program and will fund concepts on 30-60 meter water depth
encountered on Round 3 projects, is
large-scale research, development and • Review of foundation concepts from
therefore needed in order to improve the
demonstration (RD&D) projects to unlock 5-8 consultants/contractors
economic viability of large scale offshore
technological barriers to advance the industry • Make plans for tests of some of the
wind projects.
and thereby accelerate its development so concepts
that significant carbon emissions reductions • Development of site assessment and
This OWA project will demonstrate the
are achieved. design basis.
viability of a (number of) deployable new
• Confirm and detail the work plan/
generation foundation(s), that will enable
Offshore wind farms to date have been Gantt
economic operation of deeper water wind
predominantly constructed using either • Advise costumer on eliminating/
farms at depths of both 30-45m and 45-
concrete gravity bases or monopile proceeding with designs
60m. Viability will be judged in terms of
foundations. These structures are considered • Advise costumer issues that might
potential for volume fabrication, installation,
too expensive for the deeper water projects, arise with concept verification
maintainability, supply chain opportunities
particularly those which The Crown • Negotiate with Crown Estate on the
and operability.
Estate will offer in Round 3 (and beyond). provision of a Round 3 demonstration
Project Beatrice is the first UK wind farm site
• Ensure project is run on time and
budget
• Develop and run the concept
competition
• Create a standard response format
and criteria for the design competition
• Develop and apply generic site data for
initial concept screening
• Contract development support for
concept designs where required
• Provide funding to designers where
required
• Gather and synthesise data on OWA
sites selected from OWA partners
• Advise customer on final selection
process

Client:
Carbon Trust in corporation with Airtricity,
DONGEnergy, RWE Innogy, Scottish
Power and Statoil/Hydro.

Period:
2009-2010
Kriegers Flak Offshore Wind Farm, Sweden

Project Description Consultancy Services:


On the Swedish part of the site “Krieg- managed negotiations with all tenders and • Foundation Design basis
ers Flak”, the power company Vattenfall prepared a contract. • Sediment Spill Assesment for
is planning a 640 MW offshore wind farm Concrete Foundations
constituting 128 pieces of 5 MW turbines. During the summer of 2007 Grontmij | Carl • Tender preparation for geotechnical
The water depths on the site vary between Bro supervised the geotechnical investiga- investigations
15 and 42 m. tions. • Contract preparation for geotechnical
investigations
Grontmij | Carl Bro has provided perma- Further Grontmij | Carl Bro has been • Supervision of geotechnical
nent staff for preparation of design basis project manager of a foundation concept investigations
for foundations of the offshore wind farm. study where 5 consortia of consultants and
The services provided include evaluation associated contractors have developed Client:
of wave, current, tide and surge as well as new or improved foundation concepts Vattenfall
evaluation of ice. Further load combination including steel monopile, optimized jacket,
evaluations including wind turbine loads drilled concrete monopile, gravity concrete Project period:
were carried out. The evaluations lead to tripod and gravity concrete cone. Results 2006-2010
prediction of loads for different founda- are presented at a seminar in Stockholm in
tion structures. Grontmij | Carl Bro also March 2009.
provided assistance to writing of the design
basis according to IEC61400-3 and DNV-
OS-J101.

A spill assessment for possible future


implementation of concrete foundations
was prepared as an amendment of the
EIA-report in order to open the possibility of
using concrete foundations.

For the offshore geotechnical investigations


Grontmij | Carl Bro has provided several
services.

Initially a geotechnical baseline had to


be provided in order to plan and optimise
the future geotechnical investigations that
would be deemed necessary. Grontmij |
Carl Bro evaluated existing geophysical
and geotechnical data and planned an ad-
ditional geophysical investigation and the
full geotechnical investigation. The detailed
geophysical and geotechnical evaluation
planned by Grontmij | Carl Bro resulted in a
substantial reduction of the initially planned
necessary number of borings and CPT –
and a substantial reduction of the budget.

In order for the Client to tender for contrac-


tors for the geotechnical investigations
Grontmij | Carl Bro prepared pre-qualifica-
tion and tender documents for international
tendering in accordance with EU rules and
based on FIDIC. Following the evaluation,
Grontmij | Carl Bro on behalf of Vattenfall
Taean Offshore Wind Farm, Korea
Feasibility Study

Project Description Consultancy Services:


Taean Offshore Wind Farm (indicated with possible wind farm project. Wind- and Feasibility Study, including i.e.:
an ”X” on figure) is located 6 km off the wave regime in the area seems modest, • EIA-input and authorities issues
western coast of Korea. but is not yet verified. • Wind farm layouts for different site
locations and installed capacity
Republic of Korea has a long developed Foundations
• Assessment of geotechnical proper-
onshore wind farm program, and the Geotechnical properties are challenging
first offshore wind farms are now under with water depths of 10-30 m and ties
preparation. The company IREE has by the additionally 10-20 m of mud or soft clay. • Assessment of design basis
ministry been awarded consent to prepare Feasible foundation types are concrete • Grid connection
an offshore wind farm around 200 MW off gravity based or steel mono-piles, • Assessment of foundation concepts,
Daesan Hang in southwest of Seoul. though there is also a local know- including suction type designs
how with suction-buckets for bridge • Types of wind turbines
During 2008 Grontmij | Carl Bro prepared construction. • Operation and maintenance aspects
a Feasibility study. The study also • Economics and risks
included assessment of possible tidal Electrical Interconnection • Assessment of a hybrid Tidal power
power technology and sucktion-bucket There is a 3500 MW coal-fired Thermal
system
technology. Meteorological mast were Power Plant located at the shore with
installed. Preliminary wind farm layouts interconnection to the national 345 kV
and production estimates were provided. transmission system. So interconnection Client:
The layout considered production, visual to the Electrical transmission system I’REE
aspects, geotechnical situation, grid is feasible, even without an offshore
connection, environmental issues and transformer Platform. Project period:
navigation. 2007-2008
Environmental Study
The Wind Farm Area The primary areas of possible concern
The area is a scenic cliff coast with resort are related to: Fishing, navigation, resting
areas. The whole coastline suffered under birds, visual impacts and recreational
an oil tanker spillage in autumn 2007, but activities.
there is strong local political support to a
Planned installation: After 2010.
Wind Farm in El-Zayt, Egypt
Feasibility Study of a120 MW Wind Farm

Project Description Consultancy Services:


Based on the findings of the prefeasiblity The services included:
study for a large wind farm in Egypt, Grontmij • Site assessment incl. investigations
| Carl Bro was requested by the client, • Detailed wind resource estimations
Italgen, to prepare a more detailed feasibility • Production estimation
study of a 120-360 MW wind farm in El-Zayt, • Selection of WTGs
Egypt. • Grid Connection Assessment
• Investment estimate (turbines and
The study included a comprehensive balance of plant)
assessment of potential sites, taking into • Technical feasibility
account issues such as bird migration, • Preparations for inclusion of CDM
orography and flooding. option
• Financial feasibility
Further the potential production and thereby • Environmental Impact Assessment
income were assessed taking into account
different potential WTG set-ups. Client:
Italgen/Italcementi group
The technical feasibility of establishing
the wind farm was then assessed. This Project Period:
included construction issues (foundations, 2006-2007
cables, internal roads, flood protection) and
operational issues hereunder assessment of
set-up of an O&M organisation.

Based on the above findings investment and


operation costs were estimated. With the
income and cost side estimated a financial
analysis was prepared to calculate NPVs,
pay back periods and IRRs.

Finally Grontmij | Carl Bro prepared a plan


for how the client could go through the final
planning phase, tender phase and execution
phase in order to get the wind farm in
operation when required.

A pre-requisite for initiating this was that the


Environmental Impact study, also prepared
by Grontmij | Carl Bro, was issued by the
client to the authorities in Egypt.
Wind Farm in Laayounne, Morocco
Pre-feasibility study of a 10-40 MW Wind Farm

Project Description Consultancy Services:


This study is the third study prepared by Gront- The services included:
mij | Carl Bro for the client Italgen. • Grid Connection Assessment
• Wind Resource Assessment
Italgen’s cement factory is located in southern • Site Assessment
Morocco in an area with governmental focus • Project Proposal
on private power plant investments to cover the
increasing electricity demand. Italgen therefore
requested Grontmij | Carl Bro to look into the
Client:
Italgen/Italcementi group
possibility of supplying power through wind tur-
bines.
Project Period:
Grontmij | Carl Bro assessed the wind resource 2006-07
potential and a possible layout and estimated
the likely production.

Grontmij | Carl Bro further looked into the grid


connection possibilities.

Based on these findings Grontmij | Carl Bro out-


lined a project proposal and recommended the
Client to go into a planning and design phase
in order to get the wind farm in operation ex-
peditiously.
Marsa Alam Wind Farm, Egypt
Feasibility study of a 20 MW Wind Farm

Project Description Consultancy Services:


Marsa Alam Wind Farm (indicated with an Feasibility Study, including i.e.:
”X” on the figure) is located near the Red • EIA-input and authorities issues
Sea coast, about 200 km south of Hurghada. • Wind farm layouts for different site
locations and installed capacity
Main components of the planned project in- • Assessment of geotechnical proper-
clude: ties
• 20 MW Wind Farm, consisting of 20- • Electrical connection
24 turbines, cooperating with an • Foundation
existing Diesel power plant. • Modelling of electrical production
• Gravity based concrete foundations and consumption
• Electrical interconnection to nearby • Types of wind turbines
power plant • Operation and maintenance aspects
• Economics and risks
Marsa Alam Tourist Development Area is not • Assessment of CDM option
interconnected to the national grid but has
its own electrical power supply from a local Client:
diesel power plant. The wind farm is meant EMAK (Egypt – Mohammed Abdulmohsin
to save diesel consumption. Current instal- Al-Kharafi & Sons)
led diesel capacity is 30 MW, which is plan-
ned to increase to approximately 200 MW Project period:
during the next 20 years of development of 2007-2008
the area. The wind farm will operate as an
ordinary grid connected wind farm, however
a central regulation of the power output will
be possible in order to keep wind power pro-
duction below certain limits of the total elec-
trical production.

Planned installation: After 2010.


Middelgrunden Offshore Wind Farm, Denmark

Project Description Consultancy Services


The offshore wind farm at Middelgrunden Conceptual design
consists of 20 x 2 MW Bonus turbines (hub Feasibility study of the foundation for 27 nos.
height 64 m, rotor diameter 76 m). The 1.65 MW wind turbines.
foundation water depth is 4 to 8 metres at an The services include:
old dump site. Foundation weight is 1,800 Assessment of environmental conditions
tonnes. Average wind speed at 50 m height including blockage of current in Øresund,
is 7.2 m/s. The expected production is 100 ship impact, wave load, ice load, geotechni-
GWh/year. The farm was constructed in year cal conditions and technical feasibility study
2000. The investment amounts to 48 mill. of the foundation for 27 nos. 1.65 MW wind
EUR. turbines.

Middelgrunden offshore wind farm Detailed design


represents the start of Denmark’s large Establishment of an offshore wind farm con-
offshore wind farm development. The sisting of 20 Nos. of 2,0 MW wind turbines.
project should create the required technical The services include:
knowledge for the coming 150 MW wind • Preparation of a design basis inclu-
farm. ding determination of combined loads
from ice, currents and waves.
First estimates for combined forces from • Conceptual design gravity concrete
wind, waves and ice were developed during foundation detailed for tendering
the project forming the basis of Denmark’s • Tender documents and contracting
first technical design recommendation for • Detailed design of a composite con-
offshore wind farms. crete foundation incl. FEM modelling
• Documentation for certification by
DNV
• Evaluation of spill from dredging
works
• Project management
• Supervision

Operation and mainenance including:


• Technical assistant for owner of
wind farm
• 5 year control of foundation
• New service agreement for O&M
30 kV grid and service boat
• Planning of the installation process of
new transformers
• Optimal use and hiring of offshore
equipment in O&M

Client:
Middelgrunden Wind Turbine Cooperative

Period:
1997-2009
Clogher Head Offshore Wind Farm
Pre-feasibility Study in the Irish Sea

Project Description Consultancy Services


Grontmij | Carl Bro provided a desk-based The services included:
pre-feasibility study of foundation works • Screening of existing information on
through marine and civil engineering especially geology/geotechnics and
assessment. Site at 20-50 m water depth climate
and envisaged for a Phase 1 of 100 MW and • Concept evaluation of floating
Phase 2 of 400 MW were included. 3-4 MW foundation structure
wind turbines were assumed. • Outline design of bottom
mounted structure
In connection with the studies new advanced • Indicative cost estimated
models for determining the wave loads from • Preliminary Risk Assessment
steep waves to various foundation concepts • Recommended additional
(Tripod, monopile, gravity foundation) geotechnical and hydrographical
were used. Further a new methodology for site investigations
determining the dynamic interaction between • Evaluation of overall suitability
the wind load and the wave load depending
upon the flexibility of the foundation and the Client:
ration between the wind load and the wave Airtricity
load was utilised for extreme loads as well
as fatigue. Period:
2002-2003
Review and Inspection of Wind Power Plants

Project Description Work Areas


Grontmij provides the services of - Review and Inspection
independent review and inspections prior to - Meeting with customer and supplier
acceptance of delivery, end of liability period - Minutes of meeting
or in case of occurring technical problems. - Vibration measurements
Our team handles electrical and mechanical
parts of the plant with an experience based Contacts
on more than one hundred examinations of Jan Svenson
wind power plants in Sweden. Tel. +45 4348 6064
jan.svenson@grontmij-carlbro.dk
Review and Inspection prior to acceptance
of delivery may influence guarantee, Agnete Olesen
insurances, payments and the correction of Tel. +45 4348 4476
errors. agnete.olesen@grontmij-carlbro.dk

Prior to end of liability period we examine


the plant in terms of performance, reliability,
existing errors and other problems.

Selling and purchasing plants as well as


insurance conditions may call for a detailed
determination of the plant condition.

We also do investigations, analyses


and troubleshooting.

Examples of assignments:
• Aapua 7 x 1,5 MW
• Långåvålen 5 x 2 MW
• Hunflen 2 x 1,5 MW
• Valsås 2 x 600 kW
Nysted Offshore Wind Farm, Denmark

Project Description Consultancy Services


Establishing one of the large-scale offshore Based on our earlier conceptual evaluations • M ember of the leading team for plan-
wind parks in Denmark, with a rated power we performed detailed design of gravity- ning and designing, with special focus on
capacity of 158 MW (72 wind turbines of based foundations and input to tender establishing a design basis
2.3 MW each), went into production in 2003 documents for a Design & Construct • Assistant editor of EIA
at Nysted / Rødsand. Rødsand is located Contract. We assisted in tender evaluation • Assistance on construction issues
southwest of Rødby in the Baltic Sea south and provided expert assistance to the • Conceptual design for gravity
of Denmark. supervision during construction. foundation of either concrete, compo-
site or mono-piles
With expert and editor assistance from • Detailed design of gravity based foundation
Grontmij | Carl Bro, the EIA was concluded. • Preparation of Tender Documents
Design basis for all types of foundation • Tender evaluation
concepts, has been set by Grontmij | Carl • Assistance during follow up & supervision
Bro based on e.g. physical model test
determining ice loads and wave loads on Client:
conical structures. SEAS / Energi E2

Period:
2000-03
Belwind Off Shore Wind Farm, Belgium

Project Description Consultancy Services


Belwind is the second Belgian offshore wind Belwind is a 330 MW off shore wind farm • D evelopment and implementation of a
farm. on the Bligh Bank, a sandbank located 46 document control system
km from the Belgian coast. Phase 1 was • Registration and mitigation of risks
The site is located on the Bligh Bank sand commissioned December 2010. Grontmij | • Development and implementation of a
bank at an approx. 46 km distance North of Carl Bro has assisted with development of production forecast system
Zeebrugge at 20-37m water depth. the O&M tasks and organisation, including: • Development and implementation of a
QHSE management system
The construction of this farm will be in 2 • T raining of the permanent O&M team • Organizing as-build-documentation and
phases. For the first phase 55 pcs. • Development and implementation of manuals
3 MW Vestas type V90 turbines are used. monitoring and reporting tools • Refining and management of the O&M
The 165 MW wind farm will be supplying • Development and implementation of an contracts
electricity to approx. 165.000 household. O&M plan and budget
EPCM – Management of 200 MW Wind Farm
project in Egypt

Description Consultancy Services:


Grontmij | Carl Bro are awarded by the Egyp- Besides the above shall Grontmij | Carl Bro • Project design, Project management
tian Ministry of Electricity and Energy – New deliver Clean Development Mechanism • Tendering, Contracting and Procurement
and Renewable Energy Authority (NREA) to (CDM) documentation and ensure the imple- of turbines, civil works and grid connec-
execute the EPCM-management of a 200 mentation of remedial action in relation to a tion
MW wind farm in the bay of El Zayt, Egypt. significant number of migratory birds which • Consultancy during Manufacturing, Con-
bi-yearly crosses the site area in large num- struction, Installation, Commissioning and
The project will be installed and put into ope- bers and at relative low altitudes. consultancy / supervision during a five
ration during the coming three to four years year warranty period.
and the El Zayt project is the first large scale The project area is located approximately • Wind farm layouts.
wind turbine project in this region of Egypt, 300 km southeast of Cairo and 130 km nort- • Detailed Design on Access and Site ro-
apart from the more northern Zafarana pro- hwest of the resort city of Hurghada. The ads
jects, and it will be funded by the Egyptian Wind Resource in the region is considered • Detailed Design on O&M facilities
government, the EU and the German de- as one of the richest with very homogeneous • Total works site supervision
velopment bank KfW. wind conditions and with very steady speeds
with an yearly average around 11 m/s. Egypt Client:
Efficient project organization: has as general large wind resources in the NREA (New and Renewable Energy Autho-
Grontmij | Carl Bro is leading Engineering area south of Suez along the Red Sea coast. rity)
Consultant on this Egyptian project which in- The desert area along the Red Sea is esti-
cludes Engineering Consultancy within fields mated potential of more than 20,000 MW of Period:
of project design, tendering, procurement, wind generated electrical power.
2009-2018
contracting, engineering supervision during
construction, installation, commissioning
phases and O&M consultancy during a five
year warranty period. Apart from establishing
the wind farm, new infrastructure, including
overhead high voltage lines connecting to
the existing 220 kV grid at Zafarana, sub-
station and facilities for O&M personnel is a
part of the project. The project is expected to
be operational in 2013 - 2014.
References
Technical Due Diligence on the pre-construction acquisition of Borkum
2012 Riffgrund I Offshore Wind Farm Denmark
Client: Kirkbi and William Demant
Grontmij was hired to conduct a Technical Due Diligence assignment on the pre-
construction purchase of the offshore wind farm area Borkum Riffgrund I. The
consultancy services included the following tasks:

1. Production estimates including:


• Availability loss over time
• Wake effect impact (internal and external)
• Production estimates
• Review of the proposed classification of costs
• Assessment of the market price development aligned with the
expected energy market development in Germany
• Decommissioning costs estimates

2. Liaison with the investment bankers and lawyers on assessing the


financial and legal framework for the construction and operation of Borkum
Riffgrund I.

3. Identification of main technical risks/threats to the park and the


estimated impact on the proposed cash flow:
• Permit and licence requirements for the construction and the
operational periods
• Weather risks during construction and operational periods
• Production export conditions in relation to the TSO operational
planning
• Gearboxes and switch gear
• Foundations and risks associated to the sub seabed conditions as
well as the grouting issue
• Ship collision
• SCADA system
• Spare part strategy
• Blades and main bearings
• Cabling and connections to the substation and converter station
• Documentation

2011-2012 Feasibility Study of seven potential wind farm sites Kenya


Client: Kenya Electricity Generating Company Ltd:
The overall objective of the study was to assess the feasibility of wind power develop-
ment at the 7 sites identified by KenGen in various parts of the country, ranking the
sites according to their suitability for wind power development, preparing conceptual
designs and conducting preliminary environmental and social impact assessment on
the selected sites.
To realise this objective, the following tasks were undertaken:
Phase I: Investigation and assessment of wind power resource;
Phase 2: Conceptual design, financial and economic analysis.
A training program for the clients’ staff on use of the software for wind data analysis,
wind farm design, micro-siting, and financial modelling of a wind farm was also
implemented.
• EIA-input and authorities issues
• Preliminary wind measurement campaign
References
• Wind farm layouts for different site locations and installed capacity
• Assessment of geotechnical and topographical properties
• Electrical connection
• Foundation
• Modelling of electrical production and consumption
• Types of wind turbines
• Operation and maintenance aspects
• Economics and risks
• Assessment of CDM option
2010 Technical Due Diligence, Nysted Offshore Wind Farm Denmark
Client: PensionDanmark
Grontmij was hired to conduct a Technical Due Diligence assignment on the
investment in a part of the DONG Energy operated 165 MW Nysted off-shore wind
farm.
The consultancy services included the following tasks:

Main technical Issues;


• Production estimates
• Wake effect impact;
• Fixed OPEX level
• Variable OPEX level
• Decommissioning costs estimates
• Insurance costs
• Balancing

Key technical parameters;


• Gearboxes
• Blades
• Generators
• Transformers
• Rail and towers
• Retrofits
• Foundation
• Ship collision
• Electrical system and grid connection
• SCADA system
• Organisation and facilities
• Spare part strategy
2010 Due Diligence on 2 Onshore Wind Farms for EIB UK
Due Diligence / Appraisal of Wind Farm Project, part of EIB-UK Financing
Programme 30MW Wind Farm in Kelburn, Scotland
Appraisal encompassing Technical, Financial and Environmental issues
Client EIB
• Project’s consistency with EU objectives
• Wind turbine technology
• Production estimates
• Electrical grid connection and civil works
• Tariffs / operating costs
• Employment of staff
• Procurement
References
2010-2011 Substation Tender Design and Management Egypt
Tender Manager for grid connection of the large-scale onshore wind farm in Egypt.
Tender design and management for the Implementation of 220/20 kV GIS Substation
for the 200 MW Wind Farm in El-Zayt, Egypt.
• Preparation of tender documents
• Evaluation process
• Performing sequential evaluation in accordance with the tender including a
substantiated contract award proposal in agreement with the executing agency,
EETC, kFW and EC.
• Performing support in contract negotiations and conclusion of contract.
• Performing supervision support to EETC during the execution of the works on
site.
2010-2011 Wind Power Integration Study for Ceylon Electricity Board (CEB), World Bank Sri Lanka
Development of the Sri Lanka wind power integration plan up to year 2020. Technical
analysis on the operational implications, solutions, and costs associated with
integrating both the current wind power project pipeline, and the maximum prudent
level of wind power penetration that the Sri Lankan electricity system can absorb up
to year 2020, consistent with safe and reliable operation of the power system,
considering economic cost-effectiveness. The analysis comprised:
• Wind Power Expansion Issues and Options Identification
• Power System Modelling and Simulation
• System Upgrade Requirements
• Preparation of Specifications, Standards and Practices
• Training of CEB Engineers in wind power and power systems
Technical Due Diligence Lake Turkana 300 MW Wind Farm for African
2010-2011 Development Bank Kenya
Technical Due diligence of Lake Turkana Wind Power Project, a 300 MW wind farm
near Lake Turkana in the Great Rift Valley of Kenya. The planned wind farm
comprises 365 Vestas V52 turbines of 850 KW capacity each and is the biggest wind
farm in Africa. It is expected to provide clean, reliable, low cost power to Kenya and
increase the national installed power by 25%.

Technical services included analyses, reviews and data collection:


• Project Technology and Design
• Wind Turbines
• Site assessment
• Construction Contracts
• Associated Infrastructure
• Level of Contingencies
• Water Supply
• Power Purchase Agreement
• Associated Infrastructure Operation and Maintenance
• Wind Farm O&M Contract
• Interconnection to the National Grid
• Review of Interfaces
• Environmental and Social
• Procurement
2010 Design Basis Addendum Dan-Tysk Offshore Wind Farm Germany
Re-analysis of metocean data for optimised design parameters, including extreme
value analysis, misalignment analyses, wave spreading, joint probability distributions
References
and wave run-up model and load model.
2010 Ice Design Specialist Assistance Baltic 2 Germany
Definition of ice design conditions including
• Extreme ice conditions
• Operational ice conditions

2010 Foundation Concept Development Offshore Wind N.of Shanghai, China Denmark
Establishments of Design Basis including
• Metocean conditions
• Soil condition
• Combined wind and wave loads for selected foundation structures assessment
Foundation concept review including
• Screening of selected potential feasible foundation structures
• Preliminary sizing and check of determining parameters
• Cost estimate
• Recommendation of most feasible foundation structures
2010 Detailed Foundation Design Hagesholm Wind Farm Denmark
Engineering of roads and foundations for difficult soil for the wind farm and tender of:
• Design basis, geotechnical studies
• Detailed design, access and site roads
• Detailed design, 3 pile supported/direct gravity based foundations
• Clearance of all permits with authorities
• Tender documents, contract negotiation
• Preparation of foundation design documentation for DNV certification
• Project management
• Total works site supervision
2010-2011 Moray Firth Foundation Concept Development UK
Moray Firth is the 1500 MW zone 1 of the UK round 3 offshore wind zones. The
Client is EDPR and SERL which has formed the limited company MORL. MORL
intends to develop 1500 MW of offshore wind by 2020 within the zone.
Grontmij shall undertake the foundation development, and the services are:
• Site Assessment, Design Basis and Loads
• Foundation screening for WTG and Substation incl. installation
• Conceptual design of 3 foundations for WTG
• Conceptual design of 3 foundations for Substation
• Cost and Risk assessment
• Preliminary structural Basis of Design for FEED
• Scope of Work for FEED
2010 O&M Management Belwind Offshore Wind Farm Belgium
Belwind is a 330 MW off shore wind farm on the Bligh Bank, a sandbank located 46
km from the Belgian coast. Phase 1 was commissioned December 2010. Grontmij |
Carlbro has assisted with development of the O&M tasks and organisation, including:
• Training of the permanent O&M team
• Development and implementation of monitoring and reporting tools
• Development and implementation of an O&M plan and budget
• Development and implementation of a document control system
• Registration and mitigation of risks
• Development and implementation of a production forecast system
• Development and implementation of a QHSE management system
References
• Take over as build documentation and manuals and filing it
• Refining and management of the O&M contracts
2010 O&M Planning, Amrumbank Offshore Wind Farm Germany
The maximum 400 MW Wind-farm of Helgoland is being worked to financial close by
E.on Germany. GMCB was procured to asses O&M concepts:
• Detailed O&M budget
• Concept screening including offshore accommodation
• Compare Service Agreements proposal and recommend improvements
2010 Due Diligence Assistance Forest Wind Farm Sweden
E.on is bidding on 200 MW onshore in middle Sweden. GMCB to asses terms and
conditions for O&M and optimize concept with matching 25 year O&M budget.
Services provided include:
• O&M concept
• Detailed O&M budget

2010 Geotechnical Specialist Assistance Baltic 2 Germany


Baltic 2 is a planned 400 MW offshore wind farm in the Baltic Sea. The provided
services include:
• Optimisation of unit skin friction in chalk for monopile design
• Optimisation of tip resistance for monopile design

2010 Preliminary Wind Farm Layout Södra Midsjöbankarna Offshore Wind Sweden
Södra Midsjobankarna are situated at 10-20 m sea depth south of Sweden. EON
plans to construct up to 1000 MW offshore wind in 2015-16. The services provided
are:
• Suggestions for Site Layout
• Design Evaluation of Meteorology mast
2010 Tender Design Concrete Foundations Kaarehamn Offshore Wind Farm Sweden
Kaarehamn is a planned 50 MW offshore wind farm North East of Öland. EON plans
to construct the wind farm during 2012-13. The services provided are:
• Evaluation of Site Layout
• Site assessment for design purpose
• Design Basis for Design purpose
• Tender Foundation Loads – estimate of wave and wind load and combination
hereof
• Tender foundation design – concrete design including evaluation and quantities
for price determination
• Technical requirements for foundation
• Geotechnical evaluation and tender documents for detailed site survey
2010 Low Frequency Noise – Wind Estate Wind Farm Denmark
Review of recent research on low frequency noise from wind turbines with special
relevance for danish conditions.

2010 Noise Specifications for Wind Farm Denmark


Assistance in setting up noise specifications in a contract on a wind farm for Vestas
Celtic.
2010 Noise Emission measurement Brorstrup Kær, acc. To IEC61400-11 Denmark
Accredited noise emission measurement on wind turbines according to IEC 61400-11
for Siemens Wind Power.
References
2010 Silencer Design for Vestas V112 Denmark
Assistance in noise reduction on a wind turbine
• Air in-take silencer design
• Noise insulation measurements in-situ of nacelle parts
2010 Noise Measurement at Rask Mølle Wind Turbine Denmark
Accredited noise emission measurement on wind turbines according to Danish
Guidelines for Gaia Wind.

2010 Low Frequency Noise Analysis for Wind Turbine Denmark


Prediction and evaluation of low frequency noise from small wind farm for Wind
Estate.

2010 HSWind Denmark


Accredited noise emission measurement on wind turbines according to IEC 61400-11
for HSWind.
2010 Preparation Work for new Wind Turbine Noise Standard IEC61400-11 Denmark
Revision of the IEC 61400-11. Participation in and convenor for the international
standardisation group MT11 under IEC TC88 for
Siemens Wind Power, Vestas Wind Systems and Suzlon.
2010 Technical Tender Assistance Hanstholm Pier Wind Farm Denmark
The harbour of Hanstholm is to be extended significantly, and as part of that 2 new
piers will be constructed into the North Sea at a site with one of Denmarks best wind
resources. At the pier the plan is to construct a wind farm. The provided services
include:
• Preparation of EIA
• Tendering strategy assistance for the wind farm development
• Technical tender preparation including annual energy production calculation,
wind farm layout proposal, foundation concept development and design, design
of electrical layout
2010 Wave Assessment and Wave Load Calculation Finland
Design assistance for concrete foundation for one-turbine nearshore project in Porri.

2010 Supervision of Manufacture of T.P. for Offshore Substation Baltic 1 Germany


Employers Supervisory Rep during installation and repair of combined concrete ice
cone and boat landing onto the transition piece for the Offshore substation located in
the dry dock of Nordic Yard in Rostock.
2010 Development Nearshore Wind Farm Mejl Flak Denmark
Assistance to developer of nearshore wind farm outside City of Aarhus. 20 wind
turbines of 3-5 MW are proposed in one line similar to Middelgrunden. The services
covered are:
• Desk study of soil conditions
• Assessment of ship routes
• Layout of wind farm
• Calculation of Annual Energy Production with WinPRO
• Economic life-time calculation of CAPEX and OPEX
• Technical and financial risk assessment report for Owner and Energy Agency

2010 Development Nearshore Wind Farm Lillegrund Denmark


Assistance to developer of offshore wind farm near city of Sønderborg. 20 wind
References
turbines of 3-5 MW are proposed in a 5 by 4 grid in the Middle of Little Belt. The
services covered are:
• Desk study of soil conditions
• Assessment of ship routes
• Screening of possible sites all around Als
• Layout of wind farm
• Calculation of Annual Energy Production with WinPRO
• Economic life-time calculation of CAPEX and OPEX
• Technical and financial risk assessment report for Owner and Energy Agency
2010 Development Nearshore Wind Farm Vejsnæs Denmark
Assistance to developer of offshore wind farm south of island of Ærø. 20 wind
turbines of 3-5 MW are proposed in one line. The services covered are:
• Desk study of soil conditions
• Assessment of ship routes
• Layout of wind farm
• Calculation of Annual Energy Production with WinPRO
• Economic life-time calculation of CAPEX and OPEX
• Technical and financial risk assessment report for Owner and Energy Agency

2010 Conceptual Design Concrete Gravity Base of Steel Jacket Foundation France
Conceptual Design of concrete gravity base for a Steel Jacket Structure for offshore
wind turbines for a French offshore wind farm.
2010-2011 Post Construction Bird Monitoring Rødsand 2 Offshore Wind Farm Denmark
Consultancy for wind farm owner E.ON on post-construction monitoring programme
on migrating land birds. The project consists of 90 pcs. 2.3 MW SWP wind turbines in
the Fehmarn Belt south-west Baltic Sea.
The services include:
• Planning
• Implementation
• Analyzing and reporting Radar- and laser optical as well as TADS (Infrared-
Camera system) surveys of migrating land birds
2010-2011 Post Construction Bird Monitoring Horns Rev 2 Offshore Wind Farm Denmark
Consultancy for wind farm owner DONG on post-construction monitoring programme
on resting waterfowl in the Horn Rev 2 Offshore Wind Farm.
The services include:
• Planning
• Implementation
• Analyzing and reporting of Aerial surveys of foraging waterfowl in a c. 600 km2
area of the North Sea around the Horns Rev
2010-2011 Monitoring Birds&Bats at National Testcenter for Large Wind Turbines Denmark
Consultancy for Danish Ministry of Environment on developing a +5 years monitoring-
programme on birds- and bat for a new large National Testcenter for Large (up till
250 m) wind-turbines. The services include:
• Preparation of tender material, evaluate teqnical proposals and selection of
consultant to carry out the task
• Assist on a following group on the monitoring programme on the impacts on
birds and bats
2009-2010 EIA for Large Test Turbines near Måde Wind Farm, Esbjerg Denmark
Consultancy for site owner planning to erect 4, up to 200 m high, test turbines in an
References
existing wind farm close to the Wadden Sea, which is a protected Natura 2000 area
housing large quantities of resting and breeding birds. The services covered were:
• Field surveys of resting and migrating birds using radar and laser optical
equipment to chart flyways and flying heights in order to assess future collision
risk.
• Assessment of impacts on protected habitats and species (mainly birds) in the
nearby Natura 2000 site.
• Writing of the EIA-report on subjects other than visual impacts
2009-2010 Engineering Assistance for Neart Na Gaoithe Offshore Wind Farm UK
Mainstream Renewable Power (MRP) is developing a 450MW wind farm
approximately 15km offshore of the east coast of Scotland. The site has a water
depth in the range 40m-50m. Our services includes:
• Procurement of Geotechnical Investigations
• Supervision Geotechnical Investigations
• Design of Anemometry Mast & Foundation
• Preliminary Wind Turbine Foundation Design
2009-2010 Concrete Tripod Foundation Development (R&D project) Sweden
With reference to Dan-Tysk Offshore Wind Farm the Conceptual design study for a
Concrete Tripod is made as a R&D project including:
• Installation issues
• Combined design loads
• Conceptual foundation considerations
• Risk and cost
• Comparison with existing foundation types (monopile and GBS)
2009-2010 Foundation Load Measuring Project, Rødsand 2 Denmark
In cooperation with EON and Risoe, GMCB has developed a project for
measurement of foundation loads and collection of load data for wind farm load
model validation. The project covers:
• Corrosion Surveillance
• Combined Wind and Wave loads
• Wake induced loads deep in large Wind Farm
2009-2016 200 MW Wind Farm in El Zayt, KfW, EU and EIB for NREA Egypt Egypt
Total consultancy on the establishment of a 200 MW Wind Farm in El Zayt, Egypt
including:
• Total Consultancy on the Design and Construction contract on turbines,
electrical work, civil works and grid connection.
• Project Management and coordination
• CDM project design
• Detailed design
• Tendering of turbines, civil works and grid connection
• Supervision during implementation and commissioning
• Supervision and follow-up during Warranty period
• Wind resource estimates
• Production estimates and micro-siting
• Power performance verification
• Factory inspection of components and assembly
• Supervision during erection, installation and commissioning
• Final Acceptance inspections
• O&M planning and follow up during warranty period
References
2007-2010 Consultancy, Rødsand 2 Offshore Wind Farm Denmark
Consultancy for wind farm owner E.ON during tender and production period. The
project consists of 90 pcs. 2,3 MW SWP wind turbines on concrete gravity
foundations from Aasleff Bilfinger JV with internal grid from NSW. Commissioning of
207 MW by end of 2010.
The services include:
• EIA Presentation at public meeting and assistance in adapting project to public
comments on EIA
• Preparation and initialization of compensation negotiations with Danish
Fishermen’s Association
• Layout optimization of Wind Farm including production prediction, screening of
geotechnical information and grid cost evaluation
• Basic Design of Inter Turbine grid connection
• Offshore Sub Station: Interface planning and negotiation between owners of 36
kV system and 132 kV system
• Planning and supervision of complete geotechnical investigations including
laboratory testing
• Tender assistance for wind turbines, foundations and grid
• Site assessment and design basis for foundation (incl. DNV certification)
• Load calculation, documentation and Project certification (DNV)
• Optimized geotechnical design on 3 location with difficult soil conditions
• Evaluation of chalk properties and cyclic induced settlements for clay
• Study of collision friendly foundation design
• Planning of construction site in Rødby and Nyborg
• Review of contractors detailed design of foundations
• Interface management
• Coordinate project certification at DNV according to IEC 61400-22.
• Supervision of foundation manufacture on sites in Denmark and Poland
• Supervision of marine foundation implementation
• Maintenance Manual on Foundations
• Planning assistance and Certification of O&M
• Transfer to operation
2009-2010 Offshore Wind Accelerator (OWA), UK Round 3 Offshore Foundations UK
Project manager on the program Offshore Wind Accelerator (OWA). The aim is to
develop 5-8 new platform concepts on water depth 30-60 meter for multi-MW turbines
with participation of Airtricity, DONG Energy, RWE Innogy, Scottish Power and
Statoil/Hydro. Phase 2 plans for tests of some foundation concepts. Technical
Delivery Consultant including:
• Development of site assessment and design basis.
• Technical Tender documents preparation
• Evaluation of 100+ offers
• Technical Management of 8 design companies work including review and
support
• Concepts for 30-60 meter sea depth
• Jackets, supported monopiles, tensionleg platform, tripods, suction buckets,
gravity structures.
2009-2010 Expert assistance on Offshore Wind Farm Tenders Netherlands
Expert assistance for utility on tenders of several offshore wind farms in the Dutch
sector of the North Sea.
References
2009-2010 Feasibility Study and Tender Documents, 50 MW Wind Farm Thailand
Consultant on the feasibility study and preparation of tender documents for
establishment of a 50 MW Wind Farm in Thailand including:
• Project Management and coordination
• Full feasibility study
• Wind resource estimates
• Production estimates and micro-siting
• Civil works design
• Electrical grid connection design
• CDM project design
• Tender documents for turbines, foundation and grid connection

2009-2010 Preliminary Foundation Design on Offshore Wind Farm, Atlantic Ocean France
Including:
• Design Basis on deeper water and 5 MW turbine
• Harbour feasibility study
• Recomendations & installation methods

2009-2010 Met Mast Tender Preparation France


Tender design on 110m Met Mast in the English Channel.
Including:
• Preliminary Design Basis
• Design of Concrete Gravity and Monopile foundation concept
• Installation procedure
• Sensitivity analysis
• Cost estimation
2009-2010 Monopile Tender Design for Butendiek 300 MW Offshore Wind Farm Germany
Monopile Foundation Tender design for 300 MW project including:
• Review on Design Basis & Basic Design.
• Propose possible optimization
• Value Engineering and alternative solutions
• Define the design Risks
• Drivability analysis
• Scour Protection Design

2009-2010 Bornholm’s Offshore Wind Farm Denmark


Application for Danish Energy Agency for 90 MW Offshore Wind farm close to
Bornholm:
• Layout, design, and application
• Technical and financial risk assessment
2008-2010 Offshore Transformer Assistance, Middelgrunden Denmark
Optimizing cost and use of equipment when shifting transformers on Middelgrunden
Offshore Wind Farm:
• Planning of the installation process.
• Optimal use and hiring of offshore equipment
2009-2010 Operation and Maintenance, Middelgrunden Offshore Wind Farm Denmark
• Technical assistant for Owner of wind farm
• New Service agreement with service boat and manufacture.
References
2009 Finngrunden, Offshore Wind Farm, Ice Conditions Sweden
Analysis of ice conditions and design ice loads for selected foundation concepts in
areas with ice ridges and rubbles:
• Conceptual foundation drawings
2009 Modal Testing of Wind Turbine Blade Denmark
Evaluation of modal structural dynamic parameters for blades of 37 to 53 meters,
mounted in a horizontal test rig. Performed for LM Glasfiber. The service included:
• Measurement applying Operational Modal Analysis
• Evaluation of natural frequencies, damping ratios and 3D mode shapes
2009 Offshore Wind Farm, UK Round 3, Design Basis UK
Rough design basis for offshore wind farm including:
• Operational weather for Installation
• Conceptual foundation design
• Installation vessels and methodology
2009 Kriegers Flak I, Certifiable Design Basis for Metocean Data Germany
A certifiable documentation of metocean data and a metocean design basis has been
prepared. It is based on the combined results of comprehensive numerical modelling
(hindcast analysis utilizing DHI’s MIKE 21) and on-site measurements of
environmental conditions. The metocean data report is in accordance with valid rules
and standards (IEC, DNV and GL a.o.) for offshore wind farms including the German
BSH standard. State of the art certifiable design basis of site specific metocean data
including:
• Waves
• Current
• Water level
• Ice sea
• Correlated events, incl. state of the art detailed misalignment analysis of wind
and waves
• Other environmental conditions, such as Saltwater ingression, i.e. highly saline
inflows into the Baltic Sea

2009 Civil Works Consultancy, Nørrekær Enge 30 MW Wind Farm Denmark


Engineering of new foundation for difficult soil including removing old concrete
foundation, new roads for the wind farm and tender of:
• Design basis, geotechnical studies
• Detailed design, access and site roads
• Detailed design, 3 pile supported/direct gravity based foundations
• Clearance of all permits with authorities
• Tender documents, contract negotiation
• Preparation of foundation design documentation for DNV certification
• Project management
• Total works site supervision
2009 Wind Plan for Copenhagen Municipality Denmark
Preliminary evaluation of areas of interest for Wind Projects in Greater Copenhagen
including:
• Recommendation of turbine technology (type and size)
• Screening of environmental impact
• Evaluation of grid connection
• Evaluation of potential production capacity and “business case” on relevant
References
projects.
• Process recommendation for planned projects.
2009 Feasible Foundation Concepts, 5 MW Turbines for Noordostpolder Netherlands

Assistance to developer in defining feasible foundation concepts, installation vessels


and methodologies for installation of 5 MW turbines at very shallow water.

2009 Monopile Tender Design for 400 MW Offshore Wind Farm Netherlands
Tender design for monopile foundation for 400 MW project including:
• Preliminary Site Assesment
• Preliminary Design Basis
• Metocean data; hydrography, wind, waves, currents and water depths.
• Impact of different soils profiles
• Energy for ship impact.
• Review on Design Basis & Basic Design.
• Propose possible optimization
• Value Engineering and alternative solutions
• Define the design Risks
• Drivability analysis
• Scour Protection Design

2009 Due Diligence on 23 Wind Farms Europe


Review of 23 planned wind farm with a total capacity of 800 MW including:
• Civil work
• Electrical interconnection
• Implementation schedule
• Project economy (CAPEX/OPEX)
2009 Suurhiekka Offshore Wind Farm Finland
Input for planning of wind farm including:
• Optimization of layout with respect to accessability due to shallow water
• Conceptual foundation design with due respect to heavy ice loading
• Defining installation vessels and methodology
• Preliminary project Programme
2008-2009 Wind Planning and Feasibility Study for Sindbjerg Municipality Denmark
• Screening of environmental impact
• Local and regional planning conditions
• Evaluation of potential production capacity and “business case” on relevant
projects.
• Feasibility study
2008-2009 Conceptual Foundation Design for Offshore Wind Farm France
Conceptual Foundations Design was made for a 5 MW turbine on water depths in
range of 21-28 meters including:
• Concrete gravity based structure (GBS)
• Manufacturing site evaluation
• Installation evaluation
• Cost evaluation
2008-2009 Krieger’s Flak 1 Offshore Wind Farm Germany
Site assessment inclusive estimate of design soil conditions, design basis for 4
different foundation types and 4 different turbines (3MW- 5 MW), feasibility study of
References
80 positions with water depth of 20 to 45 m and varying soil conditions, risk
assessment.
2008-2009 Foundation Concepts, Krieger’s Flak 640 MW Offshore Wind Farm Sweden
Project management of and technical assistance to 0.6 MEUR study on development
of foundation concepts for Krieger’s Flak 640 MW offshore wind farm in Baltic Sea 40
km off the coast.

The services include validation and recommendation of:


• Project management
• Wind-wave load analysis on 3.6 and 5 MW turbines (FLEX5)
• Supervision on advanced geotechnical laboratory test
• 3D geological model
2008-2009 Dan-Tysk Offshore Wind Farm Germany

Review of site assessment, soil program and foundation concept studies.

2008 Baltic 1, Offshore Wind Farm Germany

New improved ice design conditions and design ice loads to monopole
2008 Shanghai Donghai Bridge Offshore Wind Farm China

Technical review of foundation design


2008 Conceptual Foundation Design Netherlands
Conceptual Design of foundations for WTGs and Offshore Transformer for 2 Dutch
Offshore Wind Farms of 200 MW and 300 MW including:
• Draft Offshore Transformer unit design
• Draft design of Monopile foundations
2008 Due Diligence of 2 Wind Farms Romania
Review of two wind farm projects of 20 MW and 90 MW including:
• Electrical interconnection
• Implementation schedule
• Project economy
2008 Conceptual Offshore Foundation Design USA
Foundation feasibility study for four offshore wind turbines for Hull.
• Geotechnical data evaluation
• Manufacturing facility assessment
• Technical and economical feasibility
2008 Pre Feasibility Study for Wind Farm Vietnam
Review of options for installation of 20 MW wind farm near cement plant in Southwest
of Vietnam including:
• Estimate of wind resources
• Draft wind farm layout
• Electrical interconnection
• Environmental and authority related issues
• Implementation schedule
• Project economy
2008 Geotechnical Investigation for Baltic 1 Offshore Wind Farm Germany

Tender and contract preparation as well as implementation supervision for offshore


geotechnical investigations for the offshore wind farm.
The services include:
References
• Planning of full geotechnical investigation
• Contract preparation and negotiation
• Implementation Supervision of offshore geotechnical investigations

2008 Bird Studies for Large Onshore Wind Farm North Africa

Preparation and implementation of Bird studies including:


• Radar and laser-optical studies of soaring and nocturnal migrants in potential
area.
• Data-analysis and reporting
• Application of findings from migration studies into EIA of a 120-400 MW wind
farm

2008 Geotechnical Investigation and Design Basis, Krieger’s Flak 1 Offshore Germany

Tender and contract preparation as well as implementation supervision for offshore


geotechnical investigations for the offshore wind farm.
The services include:
• Planning of full geotechnical investigation
• Contract preparation and negotiation
• Implementation Supervision of offshore geotechnical investigations
• Review of Site Assessment and Design Basis

2008 EIA, Avedøre Holme Offshore Test Wind Farm Denmark

Environmental Impact Assessment (EIA) of project for establishment of Avedøre


Holme offshore test wind farm (3 turbines, 3-5 MW) for DONG Energy.
The services include:
• Review of and commenting on sub-consultants reports on different
environmental impacts
• Writing and editing of EIA-report for public commenting
2008 Walney Offshore Wind Farm UK
Assistance to Owners Engineering Team:
• Management of metocean study.
• Preparation of hydrologic part of site assessment
• Calculation of wave and current loads
• Calculation of combined wind turbine and wave loads
2008 Wind Farm in Forest Area Sweden

• Calculation/Estimation of production
2008 Proposal for 350 MW Offshore Wind Farm USA
Technical assistance to major North American energy utility on preparation of
proposal for concession of 350 MW offshore wind farm 30 km off the coast.
The services include validation and recommendation of:
• Foundation engineering
• Construction schedule
• Wind resources
• Environmental scoping
And preparation of:
• Loads analysis
• Operation and maintenance plan
References
• Decommissioning plan
2008 Greater Gabbard Offshore Wind Farm UK
Assistance to owners Engineering Team:
• Review of site assessment
• Calculation of wave loads and combined wind turbine and wave loads
2008 Trolleboda Design Basis, Offshore Wind Farm Sweden

Assistance to owners Engineering Team


2007-2009 Post Construction Evaluation of 6 Operating Wind Farms China
Evaluation of state of 6 operating Chinese wind farms compared to original feasibility
reports. The task will be carried out for the authority China Hydropower Engineering
Consulting Group with subsidy from DANIDA.
The services include:
• Desk Study of background of investment decision
• Planning of evaluation program
• Data Collection in the wind farms – technical and other
• Analysis of results
• Reporting to relevant parties in China
2007-08 Alfa Ventus Offshore Wind Farm Germany
Assistance to owners Engineering Team:
• Review of site assessment, design basis and
• Tender design.
2007-2008 EIA, Frederikshavn Offshore Test Wind Farm Denmark

Environmental Impact Assessment (EIA) of project for establishment of


Frederikshavn offshore test wind farm (6 turbines) for DONG Energy.
The services include:
• Review of and commenting on sub-consultants reports on different
environmental impacts
• Writing and editing of EIA-report for public commenting

2007-2008 Feasibility Study for Offshore Wind Farm. Taean Korea


Feasibility study for 300 MW offshore wind farm at Taean in South Korea.
The services include:
• EIA assistance
• Input for authorities
• Wind Turbine Technology assistance
• Foundations study
• Grid assessment
• O&M assessment
• Budget assistance
2007 EIA Vonå 10 MW Wind Farm Denmark
EIA of a 10 MW Wind farm west of Ringkøbing, Jutland, Denmark. Client: Østjysk
Vindenergi Aps.
• EIA on environmental aspect
• Bird- migration field studies
• Impact assessment in relation to nearby EU-bird Protection site
2007 EIA Nørrekær Enge 30-40 MW Wind Farm Denmark
Writing of EIA for a 30-40 MW Wind farm to be implemented at Nørrekær Meadows,
Jutland, Denmark. Client: Vattenfall.
References
• EIA on environmental aspect
• Bird- migration field studies
• Impact assessment in relation to nearby EU-bird Protection site.
2007 Geotechnical Investigation Store Middelgrund Offshore Wind Farm Sweden
Supply of crew, drilling rig and performance of geotechnical offshore drilling for met
mast as well as geotechnical expert back-up.
2007-2008 Feasibility Study, Wind Farm for Marsa Alam Egypt

Feasibility Study for Mohammed Abdulmohsin Al-Kharafi & Sons, Kuwait. Study
included:
• Wind resource assessment
• Location and evaluation of site proposals
• Elaboration of farm layout
• Grid connection assessment
• Evaluation of potential wind turbines
• Budgeting and Financial analysis
• Assessment of potential CDM contribution to project output
2007 Site Screening Guide for Offshore Wind Farm Developer Sweden
Developing and editing screening note which ranks offshore sites according to cost
implications of sea bed conditions
2007 Due Diligence Wind Power Portfolio UK, N, PL
Due diligence for major European energy company on potential purchase of a
renewable energy developer with portfolio of 1,400 MW onshore wind power in the
United Kingdom, Norway and Poland.

2007 EIA, Krieger’s Flak 640 MW Offshore Wind Farm Sweden

The services include:


• Desk Study on Spill Assessment for concrete foundations
• Grab Tests: Planning, boat and equipment contracting, offshore field works
managing, laboratory contracting, result evaluation.

2007 Basic Design, 250 MW El-Zayt Wind Farm Egypt

Carrying out owner’s pre-tender basic design for a large wind farm in Egypt.
The study include:
• Contracting supply and installation of 2 met mast
• Preparing mine clearance of site
• Wind Resource Study
• Planning and contracting Soil Investigation Campaign on Site
• Basic Design covering layout, cabling, grid connection, foundations and O&M
facilities
Design Basis, Borkum West Offshore Wind Farm Germany
2007

Support for owner in development of design basis to be used for foundation design.
The Services include:
• Review of site assessment
• Prediction of wave loads and combined wind and wave loads on monopiles as
well as concrete gravity structures
Design Basis, Greater Gabbard Offshore Wind Farm UK
2007

Support for owner in development of design basis to be used for foundation design.
The Services include:
References
• Review of site assessment
• Prediction of wave loads and combined wind and wave loads on monopiles as
well as concrete gravity structures

2006-2007 Geotechnical Investigation, Krieger’s Flak 640 MW Offshore Wind Farm Sweden

Tender and contract preparation as well as implementation supervision for offshore


geotechnical investigations for the huge offshore wind farm of Power Company
Waterfall.
The Services include:
• Evaluation of existing geophysical and geotechnical data
• Planning of additional geophysical investigation
• Planning of full geotechnical investigation
• International Pre-qualification after EU rules
• International Tender preparation after EU rules
• Contract preparation and negotiation
• Implementation Supervision of offshore geotechnical investigations
2006-2007 Foundation Design, Utgrunden II Offshore Wind Farm Sweden
Tender Design of Foundations for tendering Contractor.
The Services include:
• Conceptual investigation
• Tender Design of Drilled Monopile foundation for installation in rock in sea bed
• Tender Design of Concrete Gravity foundation for installation on piles
• Contact to sub-contractors for pricing of supplies
2006-2007 Design Basis, Krieger’s Flak 640 MW Offshore Wind Farm Sweden
Permanent staff for preparation of Design Basis for foundations of the huge offshore
wind farm of Power Company Vattenfall.
The Services include:
• Wave, Current, Tide and Surge evaluation
• Ice evaluation
• Load Combination evaluation including wind turbine loads
• Load prediction for different foundation structures
• Assistance to Writing of Design Basis according to IEC61400-3 and DNV-OS-
J101
2006-2007 EIA, Rødsand 2 Offshore Wind Farm Denmark

Environmental Impact Assessment (EIA) of project for establishment of 215 MW


Rødsand 2 offshore wind farm for DONG Energy (former Energi E2).
The services include:
• Review of and commenting on sub-consultants reports on different
environmental impacts
• Writing and editing of EIA-report for public commenting
2006-2007 Feasibility Study, 120 MW El-Zayt Wind Farm Egypt

Feasibility Study for Italgen / Italcementi Group, Italy.


Study included:
• Site assessment including soil investigations
• Catalogue and short listing of preferred WTGS
• Wind data analysis, energy calculations and loss/uncertainties
• Estimation of costs for connection to grid
• Financial analysis including sensitivity analysis
• Environmental Impact assessment ready for submittal to authorities
2006 Pre Feasibility Study, Wind Farm Laayounne Morocco
References
Study carried out for large international private investor. The wind turbine project
covers a two phase project of 10 MW to be installed in 2007, and 40 MW to be
installed in 2008.
The services include:
• Site visit
• Visualization
• Wind Data evaluation
• Wind Resource Prediction
• General Feasibility study of environment, grid, wind resource, economy,
installation, transport, soil
• Wind Turbine market survey
2006 Operation and Maintenance, Contract Negotiations for Middelgrunden Denmark
Support for Owner in re-structuring and contracting operation and maintenance setup
to reduce costs on the basis of 5 years operation.
The services include:
• Evaluation 5 years continued and successful O&M
• Identifying potential alternative suppliers
• Setting up tender call
• Negotiating with tenders on turbine O&M as well as boat-supply

2006 Sound Power Measurement Software Denmark

Specialized software for in-situ measurement of wind speed and direction, suitable for
use in connection with sound power determination

2006 EIA, Horns Rev 2 Offshore Wind Farm Denmark

Environmental Impact Assessment (EIA) of project for establishment of 215 MW


Horns Rev 2 offshore wind farm for DONG Energy (former Energi E2).
The services include:
• Review of and commenting on sub-consultants reports on different
environmental impacts
• Writing and editing of EIA-report for public commenting
• Baseline and impact studies dealing on fish, marine mammals and benthic fauna

2006 Pre-feasibility Study, Wind farm for Marsa Alam Egypt

Pre-feasibility Study for Mohammed Abdulmohsin Al-Kharafi & Sons, Kuwait. Study
included:
• Wind resource assessment
• Location and evaluation of site proposals
• Elaboration of farm layout
• Grid connection assessment
• Evaluation of potential wind turbines
• Budgeting and Financial analysis
• Assessment of potential CDM contribution to project output

2006 Sound Power Measurements for Vestas Asia Pacific Denmark

Noise measurements carried out for the wind turbine manufacturer Vestas on four
V80 wind turbines in South Korea:
• Measurement and analysis according to standard IEC 61400-11
• Measurements of sound power for on-shore and off-shore gear
References

2006 Foundation Design, SIWT EU-supported Offshore Wind Demo Project Denmark

Contract Preparation of Offshore Wind Farm project for Energy Company. The project
consists of joint installation of foundation and 3.6 MW wind turbine at Nysted Wind
Farm for up to 4 wind turbines
The actual services include:
• Revision of Project Budget
• Review of contract with EU on demonstration support

2006 Foundation Design, Lynn and Inner Dowsing Offshore Wind Farm UK

Tender Design of foundations for a tendering contractor.


The services include:
• Screening of geotechnical information
• Prediction of combined Wind and Wave Design Loads
• Tender Design of Monopile Foundations
• Tender Design of Concrete Foundations

2006 Pre-feasibility Study, Wind Farm for El-Zayt Egypt

Pre-Feasibility Study for Italgen / Italcementi Group, Italy.


Study included:
• Wind resource assessment
• Site location assessment
• Grid connection assessment
• Preliminary wind turbine proposals
• Budgeting and Financial analysis
• Assessment of potential CDM contribution to project output
• Screening of potential areas in Egypt

2006 Foundation Design, Robin Rigg 200 MW Offshore Wind Farm UK

Tender Design of foundations for a tendering contractor.


The services include:
• Screening of geotechnical information
• Prediction of combined Wave and Wind Turbine Design Loads
• Tender Design of Monopile Foundations

2006 Wind Energy Potential Study Indonesia

Study for DANIDA on potential implementation of wind farms in Aceh, Indon.


The services include:
• Power sector study
• Site Screening
• Wind Resource assessment
• Grid Connection, Civil Works and Electrical Works assessment
• Financial Assessment
• Dissemination of wind energy technology

2006 Condition Monitoring and Evaluation of Middelgrunden Foundations Denmark


References

After 5 years of operation a visit and technical review on all 20 Middelgrunden


Foundations to control condition of foundations was carried out.

2006 Project Development, Holmön 126 MW Wind Farm Development Sweden

Project Development Consultancy for a Consortium consisting of a Power Company,


the Local Authority and a Cooperative of local citizens. The 42 turbine project is to be
constructed along the coast-lines of two islands.
The services include:
• Budgeting for Wind Farm Project
• Wind Resource estimation
• Wind Turbine Technology assessment
• Micro Siting
• Pier sketching
• Production Estimation
• Civil and Electrical Engineering evaluation

2006 Commenting on International Offshore Wind Farm Standard Denmark

Review and Commenting on Committee Draft for new edition of IEC61400-3 on


behalf of Danish Power Company.

2006 Foundation Design, Utgrunden II 86 MW Offshore Wind Farm Sweden

Conceptual foundation design for Power Company.


The services include:
• Assessment of geotechnical data and input for supplementary investigation
• Structural design
• Installation investigation
• Budgetary estimation

2006 Tender Manager, Utgrunden II 86 MW Offshore Wind Farm Sweden


Expert staff for the first offshore wind project of the Power Company EON-Sweden.
The services include:
• Foundation Tender Manager to prepare tender, evaluate tenders, prepare
contract and supervise project implementation of design and construct
foundation contract.
• Electrical Tender Manager to prepare tender, evaluate tenders, prepare contract
and supervise project implementation of design and construct cable and grid
connection contract.

2003-2006 Capacity Building, SIDA-Course “Management of Wind Power Dev.” Sweden

SIDA every year sponsors an international 4 weeks course on Management of Wind


Power Development. The course is carried out in different locations in Sweden. In
2003, 2004, 2005 and 2006 Grontmij | Carl Bro has supplied teachers for the course.

2003-2006 IEC 61400-3, Technical Standard for Offshore Wind Turbines UK

Expert member of working Committee

2005 Foundation Design, Lillgrund 110 MW Wind Farm Sweden

Tender Design of foundations for NCC Construction Sverige AB in tendering to


References
supply 48 foundations for 2 MW wind turbines.
The scope of work included:
• Screening of geotechnical information
• Prediction of combined Wind and Wave Design Loads
• Development of design basis for the foundations
• Tender Design of Concrete Foundations including dimensions and geometry,
reinforcement principles and concrete requirements.
• Design of scour protections
• List of quantities such as concrete and reinforcement
• Lightning protection and secondary steel as well as formwork
• Sketched maintenance manual

2005 Design Basis, London Array and Scarweather S. Offshore Wind Farms UK

Supply of permanent staff for Danish Power Company Energi E2’s design team for
offshore wind farms. During 2005 work was concentrated on preparation of London
Array West where first project phase shall consist of around 86 wind turbines of 3-5
MW at water depths ranging from 0-30 m, and on Scarweather Sands, where 30 3-4
MW turbines shall be installed at water depths ranging from 5-25 m.
The tasks included:
• Evaluation of met-ocean conditions
• Evaluation of optimal foundation concept
• Determination of wave forces on monopiles and gravity base foundations
• Combination of nature loads with advanced load model
• Development of Design Basis for Foundations

2005 Elforsk Sweden

Building and reporting of joint standard for naming of components and systems in
Wind Plants.

2004-2005 Capacity Credit Analysis and Performance Study for Wind Farms Egypt

The analysis was carried out for the Egyptian Ministry of Energy & Electricity, New &
Renewable Energy Authority (NREA)
The services included:
• Selection of model for analysis of large-scale incorporation of Wind Power into
existing grid
• Training staff in use of load carrying and power production simulation models
• Power Capacity load / Power Production analysis
• Evaluation of yearly productions compared to simulations
• Evaluation of wake effects through the wind farms
• Recommendations regarding optimal spacing in wind farms
• Training in wind resources and wind power production analysis

2004-2005 Design Basis, Borkum Riffgrund Offshore Wind Farm Germany


Assistance to owners Engineering Team:
• Review of site assessment
• Calculation of wave loads and combined wind turbine and wave loads

2004 EIA, Horns Rev 1 Offshore Wind Farm Denmark


References

Fishery acoustics expert


Services include:
• Assessment of fish attraction to artificial structures
• Horizontal hydro-acoustical surveys on fish distribution

2004 Sound Power and Tonality Evaluation Germany

Noise measurements carried out for the wind turbine manufacturer Enercon on the
wind turbine E-33 in northern Germany. Measurement and analysis according to
standards IEC 61400-11.

2004 COD-NNE5-2001-00633 Sweden

Support of the European Energy Authorities in an EU-project with the objective to


develop policy and requirements for identification and implementation of offshore
wind power in S, DK, D, Ire, GB, NL and B. Energy Authorities from all these
countries participated in the project.

2003-2004 Capacity Building, Small Scale Energy Sweden

Capacity Building for African and Asian managers in two SIDA financed projects
regarding small-scale energy. Training in development of wind turbines,
aerodynamics, rotors, tender processes, environmental impact, economy and
financing.

2001-2004 Research, Ice Loads on offshore Wind Turbine Foundations Denmark

Research project carried out in cooperation with Risø, DHI, Elsam, SEAS and wind
turbine manufacturer Bonus. The research included physical model tests of ice loads
and improved methods for defining the determining load combination for offshore
wind turbine foundations.

2001-2004 Research, Load Measurement, Middelgrunden Offshore Wind Farm Denmark

Participation in research project on loads on a wind turbine and the foundation at


Middelgrunden Offshore Wind Farm. Work done in cooperation with Risoe National
Laboratory, DHI Water&Environment, Bonus Energy A/S and Workgroup for Wind
turbines at Middelgrunden and SEAS A.m.b.A
The services included:
• Load monitoring, including measuring and analysis
• Reanalysis / comparison to assumed design loads from wind, waves, current
and ice.

2003 Specialized Measurement System for Wind Turbine Noise Spain/Denmark

For the wind turbine manufacturer GAMESA Eólica a user-friendly system for field
measurements was developed for sound power measurements and tonality analysis
based on 15 years of experience and according to Danish and international noise
measurement standards.
The system features:
• Compact, portable equipment based on laptop computer
• User-friendly graphical user-interface
• Continuous on-screen evaluation of measurement parameters and
• sound power results
• Choice between several standards
• Automatic chart generation in several languages via the Windows clipboard for
direct insertion into other applications
References
• Handling of various user-defined channels
• Measurement of turbulence intensity

2003 Sound Power and Tonality Evaluation Spain

Noise measurements carried out for the wind turbine manufacturer NEG Micon on a
wind turbine of the type NTK 600/43 in north-western Spain. Measurement and
analysis according to standards IEC 61400-11 and FGW-1.

2002-2003 Screening of Potential Sites for Wind Power in Southern Italy Italy

Screening and evaluation of 60 different locations for wind power potential for the
Power Company EOS Energia. An area of about 300 km2 of the mountainous
Basilicata, Southern Italy, was covered.
The services included:
• Physical inspection and assessment
• Recording of geographical, meteorological and technical features and site-
specific properties.
• Processing of maps and other technical, legal and financial information
• Pre-feasibility analysis
• Visualization of potential wind farms
• Proposal for a site specific one-year measuring program covering four sites.
2001-2003 Project Implementation, Wind Farms in Cap Verde (II) Cap Verde

Establishing for World Bank and Government of Cap Verde of 3 wind farms on sites
of existing wind farms (1.2 - 4.8 MW for each farm). Services are carried out as sub
consultant to Risoe National Laboratory.
The services included:
• Meteorological measurements
• Power systems analysis
• Performance Design
• Prequalification
• Tender documents (World Bank, EPC)
• Tendering, including evaluation of wind turbines and Contracting
• Contract Management
• Supervision
• Performance evaluation
• Operation and maintenance assistance

2002 Composition of Proposal for a Wind Farm Sweden

Composition of proposal for Kuling Energi AB for 4 wind turbines outside Falkenberg.

2002 Krieger’s Flak Offshore Wind Farm Sweden

Expert assistance to Eurowind AB in preliminary evaluation of concept for foundation


of wind farm comprising 150-200 turbines (4.5 MW) at water depths of 17-35 m 40 km
from the shore. Seabed of sand/clay till over chalk.

2002 Environmental Reports for Wind Projects Sweden

Annual reports to environmental authorities for the three wind farms 1) Vindön Wind
Farm, 2) BO 01 wind turbine Boel and 3) the wind farm at Trelleborg, Solvik. Client
was Sydkraft Vind AB.
References

2001-2002 Design Basis, Nysted Offshore Wind Farm Denmark


The Design Basis engineer was stationed with the owner.
The services included:
• Evaluation of site assessment concerning waves, currents, sea state and ice
conditions
• Development of Design Basis covering, wave loads, wind loads, ice loads and
combined loads as well as relevant load combinations for monopiles and
concrete gravity foundation
• Scour protection design

2001-2002 Örestad Offshore Wind Farm, Lillgrund Sweden

Eurowind AB prepared to establish an offshore wind farm comprising 48 wind


turbines of 2MW or larger at Lillgrund in Øresund.
The services included:
• Initial expert advise on Tender strategy
• Development of Design Basis including wave and ice loads
• Expert evaluation of program for geotechnical site investigation
• Conceptual design of wind farm
• Detailed design of gravity based foundations
• Preparation of Technical Specifications for Tender, Design and Construct
• Project management in Owners organization for all electrical works
• Analysis and specification for grid connection to existing grid

2001-2002 Fladen Grund Offshore Wind Farm Sweden

Expert assistance to a joint venture of Göteborg Energi AB, Nordex and ABB in
preliminary evaluation of tripod concept for foundation of wind farm comprising 150
turbines at water depths of 12-17 m.

2001-2002 Roenland Wind farm, EIA and Foundation Tendering Denmark

Establishing for the wind project developer Dansk Vindenergi ApS the near shore
wind farm comprising of 8-16 wind turbines (2.0-2.5 MW) at Roenland in NW Jutland,
Denmark. The wind farm was erected in 2002.
The services included:
• EIA regarding ornithological investigations and marine benthic fauna, impact on
fishing, bottom flora, risk of ship collision, hydraulics, sedimentation and marine
archaeology.
• Establishing design basis
• Conceptual and detailed design of gravity based foundations
• Preparation of Tender Documents
• Supervision
• Design of and negotiations with authorities on the development of ornithological
and marine monitoring programmes for operational phase

Manual for EIA’s on Land-based Wind Farms Denmark


2001-2002

For the Danish Energy Authority writing of manual for reporting of EIA’s on land
based wind farms. The manual is a description of the administrative processes,
legislative background, tools for the process, and formal demands for reporting EIA’s
on land based wind farms and is exemplified with text and figure from various EIA-
reports on wind-farms.
References

1999-2002 Malmö, BO-01 conference, 2 MW Wind Power Plant Sweden

Establishment for Sydkraft Vind AB of a 2 MW Wind turbine in connection with the


BO-01 conference.
The services included:
• Risk analysis
• EIA and approval from authorities
• Technical specification
• Tender documents
• Tender evaluation
• Yearly environmental reports to authorities

2001 Due Diligence, Sun ‘n’ Sand Beach Hotels Ltd. Kenya

The project was carried out for IFC/African Project Development Fund as part of a
technical/financial due diligence in connection with a loan application.
The services included:
• Wind resources, present and future power capacity demand and consumption,
and energy pricing
• Technical/financial analyses
• Environmental Impact Assessment

2001 Owners Tender Design Foundation Nysted Offshore Wind Farm Denmark

Conceptual design of concrete gravity foundation from Middelgrunden design to a


safer and more cost effective foundation for the more offshore site of the 72 wind
turbine wind farm.
The services include:
• Geotechnical design
• Structural design based on FEM and other tools
• Specification of lab tests of wave-loads, scour and ice-loads as well as analysis
of this
• Cost optimization to reduce owners eventual foundation costs taking into
consideration also manufacture and installation
• Development of design procedures outside existing standards to approach, what
was afterwards included in IEC61400-3

2001 Grid-control for Grid-connection of 2 Wind Turbines Sweden

Grid-control for grid-connection of 2 wind turbines to distribution grid for Södra


Hallands kraft.

2001 Research, Wind Turbine Communication Protocol Sweden

Participation in Elforsk financed research project regarding test and evaluation of a


communication protocol for wind turbines.

2001 Utgrunden I Sweden

Preliminary Design of grid connection for Utgrunden Offshore Wind Farm for wind
turbine manufacturer Enron Wind AB, and evaluation of insurance conditions for
Utgrunden Offshore Wind Farm.
References

2001 Power System Stability Studies Sweden

Power system stability studies carried out for Sydkraft Elnät.

2001 Task Management for Grid-connection Engineering for Lillgrund Sweden

Task Management for grid connection onshore for Eurowind on the offshore wind
farm Lillgrund as well as SCADA and electricity in the project.

2000-2001 EIA, Nysted Offshore Wind Farm Denmark


The EIA editor was stationed with the owner.
The services include:
• Review meetings with all sub-supplying environmental experts producing for the
EIA
• Participation in redefinition of sub-suppliers tasks
• Writing parts of the EIA on the basis of expert inputs
• Fisheries and acoustics surveys on fish

1999-2001 Middelgrunden Offshore Wind Farm, Detailed Design Denmark

Establishment of an offshore wind farm consisting of 20 wind turbines of 2 MW from


the wind turbine manufacturer Bonus.
The services included:
• Preparation of a design basis including determination of combined loads from
ice, currents and waves.
• Conceptual design gravity concrete foundation detailed for tendering
• Tender documents and contracting
• Detailed design of a composite concrete foundation incl. FEM modelling
• Documentation for certification by DNV
• Evaluation of spill from dredging works
• Project management
• Supervision
Grontmij is a leading European design, Contacts

engineering and management Denmark


(and market outside Europe)
United Kingdom
Grove House
Granskoven 8
consultancy, employing over 11,000, DK - 2600 Glostrup
Mansion Gate Drive
Leeds L27 4DN
+45 4348 6060
with almost 300 offices across Europe Sigurd Lauritsen
+44 113 262 00 00
Chris Paddey
sigurd.lauritsen@grontmij.dk chris.paddey@grontmij.co.uk
and a further 50 offices globally. Niels Kåre Bruun
nielskare.bruun@grontmij.dk

The Netherlands France


De Holle Bilt 22 18-20 rue Treihard
3732 HM De Bilt 75008 Paris
+31 30 2220 79 11 +33 1 56 69 19 40
Jeroen Rijnhart contact@gingergroup.com
jeroen.rijnhart@grontmij.nl

Sweden Germany
Box 47303 Friedrich-Missler-str. 42
100 74 Stockholm 28211 Bremen
Mejerivägen 1 +49 421 20 32 6
+46 10 480 00 00 Peter Weinem
Ann-Britt Östberg peter.weinem@grontmij.de
ann-britt.ostberg@grontmij.se

We are a leading sustainable


design, engineering and manage-
ment consultancy active in the
growth markets of water, energy, Poland Turkey
transportation and sustainable ul. ziebicka 35 Dereboyu Cad. Meydan Sok. No:1
planning. We aim to provide added
60-164 Poznan Beybi Giz Plaza K:10 B:37
value throughout the entire process
of design, consulting, engineering, +48 61 864 93 00 34398 Maslak, Istanbul
contracting and managing multidi- Dariusz Czerniak +90 5335 147472
sciplinary projects. dariusz.czerniak@grontmij.pl Kerem Sadiklar
Kerem.sadiklar@grontmij.com.tr

Belgium
Stationsstraat 51
2800 Mechelen
+32 1545 1300
Herman D’hoedt
herman.dhoedt@grontmij.be grontmij.com