Reference No. :
Package : B4
Review Date : 4th May 2021
Review by : CSTR HSE Team
FRONT PAGE
1. Front page of PHSE Plan must include the following Completed HSE Plan has been signed by the
items: respective parties.
a. Prepared by who (SHO/SSS/HSE Practitioner)
INTRODUCTION
1. Scope Completed
d. For certain roles e.g. First Aider, must attached To attach certified competency
certified competency certificate for reference certificate.
3. Safety Data Sheet (SDS) To be To provide Safety Data Sheet
provided (if (SDS) for chemical hazardous to
a. Identified all chemicals used at site necessary) health as per listed in Schedule I
or II (Use and Standards of
b. Provide SDS for all chemicals used at site
Exposure of Chemicals
c. Company provide method on labelling and Hazardous to Health Regulation)
storage of chemicals under Environmental
Quality Act 1974 Environmental Quality
(Scheduled Waste) Regulation 2005 (if
applicable)
4. Legal and other Requirements Completed
Approval Status
No objection
X Resubmission Required
Comments: