You are on page 1of 1

N

W
S
INCINERATOR
BAR SECONDARY
SCREEN
FINE CLARIFIER
SCREEN
REFINERY
SEWERAGE
SUMP
PIT
SECONDARY
CLARIFIER
POLYMER
PREPARATION
TANK
CENTRIFUGAL
TANK SUCTION
PUMPS 1
Air Line
(3W+1S)
CHEMICAL
SLUDGE
HOLDING TANK 1
SECONDARY
CLARIFIER
EMERGENCY
STORAGE TANK 1
Air Line
CATIONIC POLYMER
DOSING PUMPS EMERGENCY
TO
(3W+1S) STORAGE TANK 2
INCINERATOR
Belt Press
Feed Pumps CENTRIFUGAL
TANK SUCTION
(2W+1S) SECONDARY
PUMPS 2
(3W+1S) CLARIFIER
Belt Press
To Equalization
Tank
Air Line
Sludge Thickener Sludge Thickener PROJECT
Feed Pumps
(2W+1S)
REFINERY WASTE WATER
TREATMENT PLANT
CAPACITY
WASTE WATER TREATMENT PLANT
Thickened Sludge
500m³/hr
Holding Tank DETAIL ENGINEERING & DESIGNING
CONTRACTOR
TYPE
REFINERY WASTE WATER
TREATMENT PLANT
CONTENTS SHEET TITLE
TREATED
WATER REFINERY TREATMENT
TANK
PLANT P&ID
PROJECT DATE SCALE SIZE SHEET No. REV.
TREATED WATER LINE
OCTOBER 2023 N.T.S A3 01 OF 01 01
BACKWASH LINE BACKWASH LINE BACKWASH LINE DESIGNED BY DRAWN BY REVIEW BY APPROVED BY
TZ MZM AW AW

You might also like