Annex V: Electrical Calculations for Adama City WwTP Detailed Design Study

ELECTRICAL CALCULATIONS

ANNEX V

June 2019
CONSULTING SERVICES FOR FEASIBILITY STUDY AND DETAIL DESIGN OF WASTE WATER WwTP Detailed Design Study
MANAGEMENT SYSTEM FOR ADAMA, MEKELLE AND DIRE DAWA TOWNS
Annex V: Electrical Calculations for Adama City

Installed Transformer Installed on


No Code Mechanical Equipment Description
Power (kW) Selection Generator
PRELIMINARY-PRIMARY TREATMENT (C01)- A.S. Conventional System
1 C01.01_P1 A1' Lift pump (280m3/hr at 14m) 15,00 15,00 15,00
2 C01.01_P2 A2' Lift pump (280m3/hr at 14m) 15,00 15,00
3 C01.01_P3 B1' Lift pump (280m3/hr at 14m) 15,00
4 C01.01_ST-P1 Soft Starter for P1 -
5 C01.01_ST-P2 Soft Starter for P2 -
6 C01.01_ST-P3 Soft Starter for P3 -
7 C01.01_FM-1 A' Input flow meter (max 400 m3/h) 24 VDC
8 C01.01_FM-2 B' Input flow meter (max 400 m3/h) 24 VDC
9 C01.01_LC.1 Level transmitter for Lift pumping Station 24 VDC
10 C01.01_LLFS_P1/2/3 Low level floater switch for P.1/2/3
11 C01.01_MX.1a Mixer for lift pumping station 1,50 1,50 1,50
12 C01.01_MX.1b Mixer for lift pumping station 1,50 1,50
13 C01.01_LLFS_MX.1 Low level floater switch for MX.1a/1b
14 C01.02_CPU-1.1 A' Compact Preatreatment Unit - Screen 1,10 1,10 1,10
15 C01.02_CPU-2.1 B' Compact Preatreatment Unit - Screen 1,10 1,10
16 C01.02_AL-EL.CPU1.1 Alarm level electrode for CPU-1.1
17 C01.02_HL-EL.CPU1.1 Higher level electrode for CPU-1.1
18 C01.02_LL-EL.CPU1.1 Lower level electrode for CPU-1.1
19 C01.02_AL-EL.CPU2.1 Alarm level electrode for CPU-2.1
20 C01.02_HL-EL.CPU2.1 Higher level electrode for CPU-2.1
21 C01.02_LL-EL.CPU2.1 Lower level electrode for CPU-2.1
22 C01.02_CPU-2.1 Compact Preatreatment Unit - Grit Conveying Screw 0,75 0,75 0,75
23 C01.02_CPU-2.2 Compact Preatreatment Unit - Grit Conveying Screw 0,75 0,75
24 C01.02_CPU-3.1 Compact Preatreatment Unit - Grit Elevating Screw 0,75 0,75 0,75

June 2019 page 1 - 11


CONSULTING SERVICES FOR FEASIBILITY STUDY AND DETAIL DESIGN OF WASTE WATER WwTP Detailed Design Study
MANAGEMENT SYSTEM FOR ADAMA, MEKELLE AND DIRE DAWA TOWNS
Annex V: Electrical Calculations for Adama City

Installed Transformer Installed on


No Code Mechanical Equipment Description
Power (kW) Selection Generator
25 C01.02_CPU-3.2 Compact Preatreatment Unit - Grit Elevating Screw 0,75 0,75
26 C01.02_BL-1.1_CPU1 Blower for Sand Removal Unit (66,5m3/h at 250mbar) 1,50 1,50 1,50
27 C01.02_BL-1.2_CPU2 Blower for Sand Removal Unit (66,5m3/h at 250mbar) 1,50 1,50
28 C01.02_CPU-4.1 Compact Preatreatment Unit - Oil Scrapper 0,55 0,55 0,55
29 C01.02_CPU-4.2 Compact Preatreatment Unit - Oil Scrapper 0,55 0,55
30 C01.02_V_CPU.1 Electromagnetic valve for washing system CPU.1
31 C01.02_V_CPU.2 Electromagnetic valve for washing system CPU.2
32 C01.02_PPC1 Oil and grease pump 0,37 0,37 0,37
33 C01.02_PPC2 Oil and grease pump 0,37 0,37
32 C01.03_BPST_1 Bridge system for A' Primary Sedimentation Tank (bridge, scrapper, scum 0,55 0,55 0,55
33 C01.03_BPST_2 removal, overflower
Bridge system etc)
for B' Primary Sedimentation Tank (bridge, scrapper, scum 0,55 0,55 0,55
34 C01.03_P.4a removal,
A' Primaryoverflower etc) pump (12m3/h at 6,5m)
Sludge rejection 1,20 1,20 1,20
35 C01.03_P.4b B' Primary Sludge rejection pump (12m3/h at 6,5m) 1,20 1,20 1,20
36 C01.03_FC_P4a Frequency Converter for P4a -
37 C01.03_FC_P4b Frequency Converter for P4b -
38 C01.03_FM-4 Primary Sludge Rejection flow meter (max 20 m3/h) 24 VDC
39 C01.03_LC.2a Level control for Primary Sludge Pumping Station 24 VDC
40 C01.03_LLFS_P.4 Low level floater switch for P.4 24V
41 C01.03_P.5a A' Primary Sedimentation scum pump (10 m3/h at 12m) 1,50 1,50 1,50
42 C01.03_P.5b B' Primary Sedimentation scum pump (10 m3/h at 12m) 1,50 1,50 1,50
43 C01.03_LC.2b Level control for sludge rejection pumping Station 24 VDC
44 C01.03_LLFS_P.5a/b Low level floater switch for P.5a/b
PRELIMINARY-PRIMARY TREATMENT (C01) 64,54 kW 49,54 kW 28,02 kW

June 2019 page 2 - 11


CONSULTING SERVICES FOR FEASIBILITY STUDY AND DETAIL DESIGN OF WASTE WATER WwTP Detailed Design Study
MANAGEMENT SYSTEM FOR ADAMA, MEKELLE AND DIRE DAWA TOWNS
Annex V: Electrical Calculations for Adama City

Installed Transformer Installed on


No Code Mechanical Equipment Description
Power (kW) Selection Generator
BIOLOGICAL TREATMENT (C02)- A.S. Conventional System
1 C02.04_MX.2a A' Mixer for pre - anoxic tank 2,12 2,12 2,12
2 C02.04_MX.2b B' Mixer for pre - anoxic tank 2,12 2,12
3 C02.04_LLFS_MX.2 Low level floater switch for MX.2
4 C02.05_MX.3a A' Mixer for A' Anaerobic tank 2,50 2,50 2,50
5 C02.05_MX.3b B' Mixer for A' Anaerobic tank 2,50 2,50
6 C02.05_LLFST_MX.3a Low level floater switch for MX.3a
7 C02.05_LLFS_MX.3b Low level floater switch for MX.3b
8 C02.05_MX.4a A' Mixer for B' Anaerobic tank 2,50 2,50 2,50
9 C02.05_MX.4b B' Mixer for B' Anaerobic tank 2,50 2,50
10 C02.05_LLFS_MX.4a Low level floater switch for MX.4a
11 C02.05_LLFS_MX.4b Low level floater switch for MX.4b
12 C02.06_MX.5a A' Mixer for A' Anoxic Tank 8,50 8,50 8,50
13 C02.06_MX.5b B' Mixer for A' Anoxic Tank 8,50 8,50
14 C02.06_LLFS_MX.5 Low level floater switch for MX.5
15 C02.06_MX.6a A' Mixer for B' Anoxic Tank 8,50 8,50 8,50
16 C02.06_MX.6b B' Mixer for B' Anoxic Tank 8,50 8,50
17 C02.06_LLFS_MX.6 Low level floater switch for MX.6
18 C02.06_RD.1 ORP meter for A' Anoxic Tank 24 VDC
19 C02.06_RD.2 ORP meter for B' Anoxic Tank 24 VDC
20 C02.07_BL-1_A/B A' Air blower for A/B aeration tank (3000 m3/h at 650mbar) 75,00 75,00 75,00
21 C02.07_BL-2_A/B B' Air blower for A/B aeration tank (3000 m3/h at 650mbar) 75,00 75,00 75,00
22 C02.07_BL-3_A/B C' Air blower for A/B aeration tank (3000 m3/h at 650mbar) 75,00 75,00

June 2019 page 3 - 11


CONSULTING SERVICES FOR FEASIBILITY STUDY AND DETAIL DESIGN OF WASTE WATER WwTP Detailed Design Study
MANAGEMENT SYSTEM FOR ADAMA, MEKELLE AND DIRE DAWA TOWNS
Annex V: Electrical Calculations for Adama City

Installed Transformer Installed on


No Code Mechanical Equipment Description
Power (kW) Selection Generator
23 C02.07_BL-4_A/B D' Air blower for A/B aeration tank (3000 m3/h at 650mbar) 75,00 75,00
24 C02.07_BL-1_A/B E' Air blower for A/B aeration tank (3000 m3/h at 650mbar) 75,00
25 C02.07_FC-BL-1_A/B Frequency Converter for BL1 -
26 C02.07_FC-BL-2_A/B Frequency Converter for BL2 -
27 C02.07_FC-BL-3_A/B Frequency Converter for BL3 -
28 C02.07_FC-BL-4_A/B Frequency Converter for BL4 -
29 C02.07_FC-BL-5_A/B Frequency Converter for BL5 -
30 C02.07_DO.1 Dissolved Oxygen Meter for A tank 24 VDC
31 C02.07_DO.2 Dissolved Oxygen Meter for B tank 24 VDC
32 C02.07_pH.1 pH meter for A Tank 24 VDC
33 C02.07_pH.2 pH meter for B Tank 24 VDC
34 C02.08_P6a A1' MLSS Recirculation pump for A' Denitrification Tank (512m3/hr at 4,5m) 9,00 9,00 9,00
35 C02.08_P6b A2' MLSS Recirculation pump for A' Denitrification Tank (512m3/hr at 4,5m) 9,00
36 C02.08_P7a B1' MLSS Recirculation pump for B' Denitrification Tank (512m3/hr at 4,5m) 9,00 9,00 9,00
37 C02.08_P7b B2' MLSS Recirculation pump for B' Denitrification Tank (512m3/hr at 4,5m) 9,00
38 C02.08_FC_P6a Frequency Converter for P6a -
39 C02.08_FC_P6b Frequency Converter for P6b -
40 C02.08_FC_P7a Frequency Converter for P7a -
41 C02.08_FC_P7b Frequency Converter for P7b -
42 C02.08_FM-6 A' MLSS recirculation flow meter (max 1100m3/h) 24 VDC
43 C02.08_FM-7 B' MLSS recirculation flow meter (max 1100m3/h) 24 VDC
44 C02.08_LC.4a Level control for A' MLSS recirculation pumping station 24 VDC
45 C02.08_LC.4b Level control for B' MLSS recirculation pumping station 24 VDC

June 2019 page 4 - 11


CONSULTING SERVICES FOR FEASIBILITY STUDY AND DETAIL DESIGN OF WASTE WATER WwTP Detailed Design Study
MANAGEMENT SYSTEM FOR ADAMA, MEKELLE AND DIRE DAWA TOWNS
Annex V: Electrical Calculations for Adama City

Installed Transformer Installed on


No Code Mechanical Equipment Description
Power (kW) Selection Generator
46 C02.08_LLFS_P.6a/b Low level float switch for P.6a/b
47 C02.08_LLFS_P.7a/b Low level float switch for P.7
48 C02.09_AG.1 Agitator for A' Flocculation Pit 0,37 0,37 0,37
49 C02.09_AG.2 Agitator for B' Flocculation Pit 0,37 0,37 0,37
50 C02.09_DP.1a A' Dosing Pump for P chemical removal (20lt/h) 0,18 0,18 0,18
51 C02.09_DP.1d B' Dosing Pump for P chemical removal (20lt/h) 0,18 0,18
52 C02.09_LC.5 Level control for FeCl3 storage vessel 24 VDC
BIOLOGICAL TREATMENT (C02) 460,34 kW 367,34 kW 193,04 kW
FINAL CLARIFICATION -CHLORINATION (C03)- A.S. Conventional System
1 C03.10_BST_1 Bridge system for A' Clarification Tank (bridge, scrapper, scum removal, 0,55 0,55 0,55
2 C03.10_BST_2 overflower etc)for
Bridge system D=20m
B' Clarification Tank (bridge, scrapper, scum removal, 0,55 0,55 0,55
3 C03.10_P8a overflower
A1' Sludge etc) D=20m pump for Nitrification Line (160m3/hr at 6,5m)
Recirculation 15,00 15,00 15,00
4 C03.10_P8b A2' Sludge Recirculation pump for Nitrification Line (160m3/hr at 6,5m) 15,00 15,00
5 C03.10_P8c A3' Sludge Recirculation pump for Nitrification Line (160m3/hr at 6,5m) 15,00
6 C03.10_FC_P8a Frequency Converter for P8a -
7 C03.10_FC_P8b Frequency Converter for P8b -
8 C03.10_FC_P8c Frequency Converter for P8c -
9 C03.10_FM-8 A' Sludge Recirculation flow meter (max 500m3/h) 24 VDC
10 C03.10_LC.6 Level control for sludge recirculation pumping station 24 VDC
11 C03.10_LLFS_P.8 Low level floater switch for P.8a/b/c 220V
12 C03.10_P9a A' Sludge Rejection pump (15m3/hr at 10m) 1,50 1,50 1,50
13 C03.10_P9b B' Sludge Rejection pump (15m3/hr at 10m) 1,50
14 C03.10_FC_P9a Frequency Converter for P9a -

June 2019 page 5 - 11


CONSULTING SERVICES FOR FEASIBILITY STUDY AND DETAIL DESIGN OF WASTE WATER WwTP Detailed Design Study
MANAGEMENT SYSTEM FOR ADAMA, MEKELLE AND DIRE DAWA TOWNS
Annex V: Electrical Calculations for Adama City

Installed Transformer Installed on


No Code Mechanical Equipment Description
Power (kW) Selection Generator
15 C03.10_FC_P9b Frequency Converter for P9b -
16 C03.10_FM-9 Sludge Rejection flow meter (max 50m3/h) 24 VDC
17 C03.10_LC.7 Level control for sludge rejection pumping Station 24 VDC
18 C03.10_LLFS_P.9 Low level floater switch for P.9a/b 220V
19 C03.10_P.10a A' Sedimentation scum pump (10 m3/h at 12m) 1,50 1,50 1,50
20 C01.10_P.10b B' Sedimentation scum pump (10 m3/h at 12m) 1,50
21 C03.10_LC.8 Level control for sludge scum pumping Station 24 VDC
22 C03.10_LLFS_P.10 Low level floater switch for P.10a/b
23 C03.11_FM.10 Flow meter for treated wastewater (max 850m3/hr) 24 VDC
24 C03.11_CL.1 Free Chlorine Measurement 24 VDC
25 C03.11_DP.2a A' Dosing Pump for NaOCl (80l/h) 0,18 0,18 0,18
26 C03.11_DP.2b B' Dosing Pump for NaOCL (80l/h) 0,18 0,18
27 C03.11_LC.9 Level control for NaOCl storage vessel 24 VDC
FINAL CLARIFICATION -CHLORINATION (C03) 52,46 kW 34,46 kW 19,28 kW

June 2019 page 6 - 11


CONSULTING SERVICES FOR FEASIBILITY STUDY AND DETAIL DESIGN OF WASTE WATER WwTP Detailed Design Study
MANAGEMENT SYSTEM FOR ADAMA, MEKELLE AND DIRE DAWA TOWNS
Annex V: Electrical Calculations for Adama City

Installed Transformer Installed on


No Code Mechanical Equipment Description
Power (kW) Selection Generator
SLUDGE TREATMENT (C04) - A.S. Conventional System
1 C04.12_THM_1 A' Thickener scrapper for primary sludge 0,37 0,37 0,37
2 C04.12_LC.10 Level control for A' thickener 24 VDC
3 C04.12_P.11a A' anaerobic stabilization primary sludge feeding pump (7m3/h at 2bar) 4,00 4,00 4,00
4 C04.12_P.11b B' anaerobic stabilization primary sludge feeding pump (7m3/h at 2bar) 4,00
5 C04.12_FC_P11a Frequency Converter for P11a -
6 C04.12_FC_P11b Frequency Converter for P11b -
7 C04.12_EV-P11 Electromagnetic Valve for P11 - DN32 24 VDC
8 C04.12_FM.11 Thickening Primary Sludge flow meter (max 50m3/h) 24 VDC
9 C04.15_LC.11 Level control for Anaerobic primary sludge stabilization tank 24 VDC
10 C04.13_THM_2 B' Thickener scrapper for biological sludge 0,37 0,37 0,37
11 C04.13_LC12 Level control for B' thickener 24 VDC
12 C04.13_P.12a A' aerobic mixing sludge feeding pump (22m3/h at 2bar) 5,50 5,50 5,50
13 C04.13_P.12b B' aerobic mixing sludge feeding pump (22m3/h at 2bar) 5,50
14 C04.13_FC_P12a Frequency Converter for P12a -
15 C04.13_FC_P12b Frequency Converter for P12b -
16 C04.13_EV-P12 Electromagnetic Valve for P12 - DN32 220V
17 C04.14_FM.12 Thickening biological Sludge flow meter (max50m3/h) 24 VDC
18 C04.14_LC.13 Level control for Aerobic sludge mixing tank 24 VDC
19 C04.14_BL-7.1 A' Air blower for sludge mixing tank (3000 m3/h at 650mbar) 75,00 75,00 75,00
20 C04.14_BL-7.2 B' Air blower for sludge mixing tank (3000 m3/h at 650mbar) 75,00
21 C04.14_FC-BL-7.1 Frequency Converter for BL7.1 -
22 C04.14_FC-BL-7.2 Frequency Converter for BL7.2 -

June 2019 page 7 - 11


CONSULTING SERVICES FOR FEASIBILITY STUDY AND DETAIL DESIGN OF WASTE WATER WwTP Detailed Design Study
MANAGEMENT SYSTEM FOR ADAMA, MEKELLE AND DIRE DAWA TOWNS
Annex V: Electrical Calculations for Adama City

Installed Transformer Installed on


No Code Mechanical Equipment Description
Power (kW) Selection Generator
SLUDGE TREATMENT (C04) 169,74 kW 85,24 kW 85,24 kW
A' Centrifuge Decanter (C04.1) - A.S. Conventional System
25 C04.14_P.12a A' Centrifuge Decanter feeding pump (1) (18m3/h at 2bar) 5,50 5,50
26 C04.14__P.12b A' Centrifuge Decanter feeding pump (2) (18m3/h at 2bar) 5,50
23 C04.14_FM.13a A' Centrifugal separator feeding pumpflow meter (max 50m3/h) 24 VDC
29 C04.14_FC_P12a Frequency Converter for P12a -
30 C04.14_FC_P12b Frequency Converter for P12b -
33 C04.14_EV - P.12a/b Electromagnetic Valve for P12 - DN32 220V
37 C04.16_CS.1 A' Centrifuge Decanter 22m3/h, 522Kg SS/h 44,50 44,50
39 C04.14_P.13a A' Water pump (20m3/h at 6bar) 9,00 9,00
43 C04.16_PPU.1 Polyelectrolyte Preparation Unit (2000lt/hr) 1,50 1,50
45 C04.16_DP.3a A' Polyelectrolyte Dosing pump for CD.1 (2000l/h at 2bar) 0,75 0,75
46 C04.16_DP.3b B' Polyelectrolyte Dosing pump for CD.1 (2000l/h at 2bar) 0,75
49 C04.16_FM-14a A' polyelectrolyte flow meter (max 10000l/h) 24 VDC
51 C04.16_SCR_1.1 A' Inclined Screw Conveyor 1,50 1,50
52 C04.16_SCR_1.2 A' Pivoting horizontal screw conveyor 1,50 1,50
A' Centrifuge Decanter (C04.1) 70,50 kW 64,25 kW 0,00 kW
B' Centrifuge Decanter (C04.2) - A.S. Conventional System
27 C04.14__P.12c B' Centrifuge Decanter feeding pump (1) (18m3/h at 2bar) 5,50 5,50 5,50
28 C04.14_P.12d B' Centrifuge Decanter feeding pump (2) (18m3/h at 2bar) 5,50
24 C04.14_FM.13b B' Centrifugal separator feeding pumpflow meter (max 50m3/h) 24 VDC
31 C04.14_FC_P12c Frequency Converter for P12c -
32 C04.14_FC_P12d Frequency Converter for P12d -

June 2019 page 8 - 11


CONSULTING SERVICES FOR FEASIBILITY STUDY AND DETAIL DESIGN OF WASTE WATER WwTP Detailed Design Study
MANAGEMENT SYSTEM FOR ADAMA, MEKELLE AND DIRE DAWA TOWNS
Annex V: Electrical Calculations for Adama City

Installed Transformer Installed on


No Code Mechanical Equipment Description
Power (kW) Selection Generator
34 C04.14_EV - P.12c/d Electromagnetic Valve for P12 - DN32 220V
38 C04.16_CS.2 B' Centrifuge Decanter 22m3/h, 522Kg SS/h 44,50 44,50 44,50
40 C04.14_P.13b B' Water pump (20m3/h at 6bar) 9,00 9,00 9,00
44 C04.16_PPU.2 Polyelectrolyte Preparation Unit (2000lt/hr) 1,50 1,50 1,50
47 C04.16_DP.4a A' Polyelectrolyte Dosing pump for CD.2 (2000l/h at 2bar) 0,75 0,75 0,75
48 C04.16_DP.4b B' Polyelectrolyte Dosing pump for CD.2 (2000l/h at 2bar) 0,75
50 C04.16_FM-14b B' polyelectrolyte flow meter (max 10000l/h) 24 VDC
53 C04.16_SCR_2.1 B' Inclined Screw Conveyor 1,50 1,50 1,50
54 C04.16_SCR_2.2 B' Pivoting horizontal screw conveyor 1,50 1,50 1,50
55 C04.17_P14a 3
A' Drainage pump (55m /hr at 12m) 3,50 3,50 3,50
56 C04.17_P14b B' Drainage pump (55m3/hr at 12m) 3,50 3,50
57 C04.17_LC.14 Level control for drainage pumping Station 24 VDC
58 C04.17_LLFS_P.14a/b Low level floater switch for P.14 a/b
B' Centrifuge Decanter (C04.2) 77,50 kW 71,25 kW 67,75 kW
FAECAL SLUDGE (C05) - A.S. Conventional System
1 C05.18_SCG Screw Conveyor Grid 1,50 1,50 1,50
2 C05.18_SC.1 A' Feacal sludge Step Screen 1,10 1,10 1,10
3 C05.18_SC.2 B' Feacal sludge Step Screen 1,10 1,10 1,10
4 C05.18_P15a 3
Wetland feeding pump 1 ( 15 m /hr at 12m) 2,20 2,20 2,20
5 C05.18_P15b 3
Wetland feeding pump 2 ( 15 m /hr at 12m) 2,20 2,20
6 C05.18_ST-P15a Soft Starter for P15a -
7 C05.18_ST-P15b Soft Starter for P15b -
8 C05.18_FM-16 Flow meter (max m3/h) 24 VDC

June 2019 page 9 - 11


CONSULTING SERVICES FOR FEASIBILITY STUDY AND DETAIL DESIGN OF WASTE WATER WwTP Detailed Design Study
MANAGEMENT SYSTEM FOR ADAMA, MEKELLE AND DIRE DAWA TOWNS
Annex V: Electrical Calculations for Adama City

Installed Transformer Installed on


No Code Mechanical Equipment Description
Power (kW) Selection Generator
9 C05.18_LC.15 Level control of sedimentation tank effluent pumping Station 24 VDC
10 C05.18_LLFS_P1/2 Low level float switch for P 1/2 220V
11 C05.18_P16a 3
Drying Beds drainage pump 1 ( 10 m /hr at 12m) 1,10 1,10 1,10
12 C05.18_P16b Drying Beds drainage pump 2 (10 m3/hr at 12m) 1,10 1,10 1,10
13 C05.18_FM-17 Flow meter (max m3/h) 24 VDC
14 C05.18_LC.15 Level control of Drying Beds drainage pumping Station 24 VDC
15 C05.18_LLFS_P16a/b Low level float switch for P 16a/b 220V
FAECAL SLUDGE (C05) 10,30 kW 10,30 kW 8,10 kW
ANAEROBIC SLUDGE DIGESTERS (C06)- A.S. Convetional System
1 C06.19_SRP1 Sludge Recycle Pump 1 2,00 2,00 2,00
2 C06.19_SRP2 Sludge Recycle Pump 2 2,00
3 C05.19_BB Biogas Bloweer 2,20 2,20 2,20
4 C06.19_AB Air Blower 5,50 5,50 5,50
5 C06.19_B1 Boiler 5,00 5,00 5,00
6 C06.19_B2 Boiler 5,00 5,00 5,00
ANAEROBIC SLUDGE DIGESTERS (C06) 21,70 kW 19,70 kW 19,70 kW

June 2019 page 10 - 11


CONSULTING SERVICES FOR FEASIBILITY STUDY AND DETAIL DESIGN OF WASTE WATER WwTP Detailed Design Study
MANAGEMENT SYSTEM FOR ADAMA, MEKELLE AND DIRE DAWA TOWNS
Annex V: Electrical Calculations for Adama City

Installed Transformer Installed on


No Code Mechanical Equipment Description
Power (kW) Selection Generator
Control Building (C07)
14 Internal Lighting 5,00 5,00
1 Internal Sockets 5,00 5,00
22 External Lighting 10,00 10,00 10,00
Control Building (C07) 20,00 kW 20,00 kW 10,00 kW

Plant Installed Power 947,08 kW 722,08 kW 431,13 kW


Calculation for Transformer / Generator 1241,08 kVA 592,80 kVA
Selected Transformer / Generator 1250,00 kVA 600,00 kVA

June 2019 page 11 - 11


CONSULTING SERVICES FOR FEASIBILITY STUDY AND DETAIL DESIGN OF WASTE WATER WwTP Detailed Design Study
MANAGEMENT SYSTEM FOR ADAMA, MEKELLE AND DIRE DAWA TOWNS
Annex V: Electrical Calculations for Adama City

Line Installed
Length Mechanical Equipment Description Cable
Code Power (kW)
PRELIMINARY-PRIMARY TREATMENT (C01)- A.S. Conventional System
C01 80 m 43.42 kW PRIMARY TREATMENT (C01) J1VV-R (3x70+35)+1x35
C01.1 35 m 15.00 kW A1' Lift pump - C01.01_P1 J1VV-R 4x6
C01.2 35 m 15.00 kW A2' Lift pump - C01.01_P2 J1VV-R 4x6
C01.3 35 m 15.00 kW A3' Lift pump - C01.01_P3 J1VV-R 4x6
C01.4 35 m 1.50 kW Mixer for lift pumping station - C01.01_MX.1a J1VV-R 4x2.5
C01.5 35 m 1.50 kW Mixer for lift pumping station - C01.01_MX.1b J1VV-R 4x2.5
C01.6 30 m 1.10 kW A' Compact Preatrmnt Unit - Screen -C01.02_CPU-1.1 J1VV-R 4x2.5
C01.7 30 m 1.10 kW B' Compact Preatrmnt Unit - Screen -C01.02_CPU-1.1 J1VV-R 4x2.5
C01.8 30 m 0.75 kW Comp Preatr Unit - Grit Conv Scr -C01.02_CPU-2.1 J1VV-R 4x2.5
C01.9 30 m 0.75 kW Comp Preatrm Unit - Grit Conv Scr-C01.02_CPU-2.2 J1VV-R 4x2.5
C01.10 30 m 0.75 kW Comp. Preatr. Unit - Grit Elev Scr -C01.02_CPU-3.1 J1VV-R 4x2.5
C01.11 30 m 0.75 kW Comp. Preatr. Unit - Grit Elev Scr -C01.02_CPU-3.2 J1VV-R 4x2.5
C01.12 30 m 1.50 kW Blower for Sand Removal - C01.02_BL-1.1_CPU1 J1VV-R 4x2.5
C01.13 30 m 1.50 kW Blower for Sand Removal - C01.02_BL-1.2_CPU2 J1VV-R 4x2.5
C01.14 30 m 0.55 kW Comp Preatr Unit - Oil Scrapper - C01.02_CPU-4.1 J1VV-R 4x2.5
C01.15 30 m 0.55 kW Comp Preatr Unit - Oil Scrapper - C01.02_CPU-4.2 J1VV-R 4x2.5
C01.16 30 m 0.37 kW Oil and grease pump - C01.02_PPC1 J1VV-R 4x2.5
C01.17 30 m 0.37 kW Oil and grease pump - C01.02_PPC2 J1VV-R 4x2.5
C01.18 35 m 1.20 kW A' Primary Sludge rejection pump - C01.03_P.4a J1VV-R 4x2.5
C01.19 35 m 1.20 kW B' Primary Sludge rejection pump - C01.03_P.4b J1VV-R 4x2.5
C01.20 50 m 0.55 kW Bridge system for A' Prim Sedm Tank- C01.03_BPST_1 J1VV-R 4x2.5
C01.21 50 m 0.55 kW Bridge system for B' Prim Sedm Tank- C01.03_BPST_2 J1VV-R 4x2.5
C01.22 45 m 1.50 kW A' Primary Sedimentation scum pump - C01.03_P.5a J1VV-R 4x2.5
C01.23 45 m 1.50 kW B' Primary Sedimentation scum pump - C01.03_P.5b J1VV-R 4x2.5
BIOLOGICAL TREATMENT (C02)- A.S. Conventional System
C02.Π 190 m 357.30 kW BIOLOGICAL TREATMENT (C02) J1VV-R 3x(3x240+120)+3x120
C02.1 85 m 2.12 kW A' Mixer for pre - anoxic tank - C02.04_MX.2a J1VV-R 4x2.5
C02.2 85 m 2.12 kW B' Mixer for pre - anoxic tank - C02.04_MX.2b J1VV-R 4x2.5
C02.3 95 m 2.50 kW A' Mixer for A' Anaerobic tank - C02.05_MX.3a J1VV-R 4x2.5

June 2019 page 1 - 5


CONSULTING SERVICES FOR FEASIBILITY STUDY AND DETAIL DESIGN OF WASTE WATER WwTP Detailed Design Study
MANAGEMENT SYSTEM FOR ADAMA, MEKELLE AND DIRE DAWA TOWNS
Annex V: Electrical Calculations for Adama City

Line Installed
Length Mechanical Equipment Description Cable
Code Power (kW)
C02.4 95 m 2.50 kW B' Mixer for A' Anaerobic tank - C02.05_MX.3b J1VV-R 4x2.5
C02.5 70 m 2.50 kW A' Mixer for B' Anaerobic tank - C02.05_MX.4a J1VV-R 4x2.5
C02.6 70 m 2.50 kW B' Mixer for B' Anaerobic tank - C02.05_MX.4b J1VV-R 4x2.5
C02.7 95 m 8.50 kW A' Mixer for A' Anoxic Tank - C02.06_MX.5a J1VV-R 4x4
C02.8 70 m 8.50 kW B' Mixer for A' Anoxic Tank - C02.06_MX.5b J1VV-R 4x4
C02.9 70 m 8.50 kW A' Mixer for B' Anoxic Tank - C02.06_MX.6a J1VV-R 4x4
C02.10 60 m 8.50 kW B' Mixer for B' Anoxic Tank - C02.06_MX.6b J1VV-R 4x2.5
C02.11 20 m 75.00 kW A' Air blower for A/B aeration - C02.07_BL-1_A/B J1VV-R 3x120+70
C02.12 18 m 75.00 kW B' Air blower for A/B aeration - C02.07_BL-2_A/B J1VV-R 3x120+70
C02.13 14 m 75.00 kW C' Air blower for A/B aeration - C02.07_BL-3_A/B J1VV-R 3x120+70
C02.14 12 m 75.00 kW D' Air blower for A/B aeration - C02.07_BL-4_A/B J1VV-R 3x120+70
C02.15 10 m 75.00 kW Ε' Air blower for A/B aeration - C02.07_BL-5_A/B J1VV-R 3x120+70
C02.16 60 m 9.00 kW A1' MLSS Recirculation - C02.08_P6a J1VV-R 4x4
C02.17 60 m 9.00 kW A2' MLSS Recirculation - C02.08_P6b J1VV-R 4x4
C02.18 70 m 9.00 kW B1' MLSS Recirculation - C02.08_P7a J1VV-R 4x4
C02.19 70 m 9.00 kW B2' MLSS Recirculation - C02.08_P7b J1VV-R 4x4
C02.20 60 m 0.37 kW Agitator for A' Flocculation Pit - C02.09_AG.1 J1VV-R 4x2.5
C02.21 60 m 0.37 kW Agitator for Β' Flocculation Pit - C02.09_AG.2 J1VV-R 4x2.5
C02.22 60 m 0.18 kW A' Dosing Pump for P chemical removal C02.09_DP.1a J1VV-R 4x2.5
C02.23 60 m 0.18 kW B' Dosing Pump for P chemical removal C02.09_DP.1b J1VV-R 4x2.5
FINAL CLARIFICATION -CHLORINATION (C03) - A.S. Conventional System
C03 210 m 35.41 kW FINAL CLARIFICATION -CHLORINATION (C03) J1VV-R (3x50+25)+1x25
C03.1 70 m 0.55 kW Bridge system for A' Clarif. Tank - C03.10_BST_1 J1VV-R 4x2.5
C03.2 70 m 0.55 kW Bridge system for B' Clarif. Tank - C03.10_BST_2 J1VV-R 4x2.5
C03.3 50 m 15.00 kW A1' Sludge Recirc pump for Nitrif - C03.10_P8a J1VV-R 4x10
C03.4 50 m 15.00 kW A2' Sludge Recirc pump for Nitrif - C03.10_P8b J1VV-R 4x10
C03.5 50 m 15.00 kW A3' Sludge Recirc pump for Nitrif - C03.10_P8c J1VV-R 4x10
C03.6 50 m 1.50 kW A' Sludge Rejection pump - C03.10_P9a J1VV-R 4x2.5
C03.7 50 m 1.50 kW B' Sludge Rejection pump - C03.10_P9b J1VV-R 4x2.5
C03.8 50 m 1.50 kW A' Sedimentation scum pump - C03.10_P.10a J1VV-R 4x2.5

June 2019 page 2 - 5


CONSULTING SERVICES FOR FEASIBILITY STUDY AND DETAIL DESIGN OF WASTE WATER WwTP Detailed Design Study
MANAGEMENT SYSTEM FOR ADAMA, MEKELLE AND DIRE DAWA TOWNS
Annex V: Electrical Calculations for Adama City

Line Installed
Length Mechanical Equipment Description Cable
Code Power (kW)
C03.9 50 m 1.50 kW B' Sedimentation scum pump - C03.10_P.10b J1VV-R 4x2.5
C03.10 50 m 1.50 kW A' Dosing Pump for NaOCl - C03.11_DP.2a J1VV-R 4x2.5
C03.11 50 m 1.50 kW A' Dosing Pump for NaOCl - C03.11_DP.2a J1VV-R 4x2.5
SLUDGE TREATMENT (C04) - A.S. Conventional System
C04 150 m 222.80 kW SLUDGE TREATMENT (C04) J1VV-R 2x(3x185+120) +2x120
C04.1 25 m 0.37 kW A' Thickener scrapper for prim sludge C04.12_THM_1 J1VV-R 4x2.5
C04.2 15 m 4.00 kW A' anaerobic stabiliz. primary sludge C04.12_P.11a J1VV-R 4x2.5
C04.3 15 m 4.00 kW B' anaerobic stabiliz. primary sludge C04.12_P.11b J1VV-R 4x2.5
C04.4 25 m 0.37 kW B' Thickener scrapper for prim sludge C04.13_THM_2 J1VV-R 4x2.5
C04.5 15 m 5.50 kW A' aerobic mixing sludge - C04.13_P.12a J1VV-R 4x2.5
C04.6 15 m 5.50 kW B' aerobic mixing sludge - C04.13_P.12b J1VV-R 4x2.5
C04.7 15 m 75.00 kW A' Air blower for sludge mix tank - C04.14_BL-7.1 J1VV-R 3x120+70
C04.8 15 m 75.00 kW B' Air blower for sludge mix tank - C04.14_BL-7.2 J1VV-R 3x120+70
C04.Ε1 70 m 59.79 kW A' Centrifuge Decanter (C04.1) J1VV-R (3x95+50)+1x50
C04.Ε2 70 m 63.45 kW B' Centrifuge Decanter (C04.2) J1VV-R (3x95+50)+1x50
C04.Ε3 100 m 16.09 kW ANAEROBIC SLUDGE DIGESTERS (C06) J1VV-R 5x10
A' Centrifuge Decanter (C04.1)
C04.1 70 m 59.79 kW A' Centrifuge Decanter (C04.1) J1VV-R (3x95+50)+1x50
C04.1.1 10 m 5.50 kW A' Centrifuge Decanter feed pump 1 - C04.14_P.12a J1VV-R 4x2.5
C04.1.2 10 m 5.50 kW A' Centrifuge Decanter feed pump 2 - C04.14_P.12b J1VV-R 4x2.5
C04.1.3 15 m 44.50 kW A' Centrifuge Decanter - C04.16_CS.1 J1VV-R 3x50+25
C04.1.4 15 m 9.00 kW A' Water pump - C04.14_P.13a J1VV-R 4x4
C04.1.5 10 m 1.50 kW Polyelectrolyte Preparation Unit - C04.16_PPU.1 J1VV-R 4x4
C04.1.6 10 m 0.75 kW A' Polyelectr. Dosing pump for CD.1 - C04.16_DP.3a J1VV-R 4x2.5
C04.1.7 10 m 0.75 kW B' Polyelectr. Dosing pump for CD.1 - C04.16_DP.3b J1VV-R 4x2.5
C04.1.8 15 m 1.50 kW A' Inclined Screw Conveyor - C04.16_SCR_1.1 J1VV-R 4x2.5
C04.1.9 15 m 1.50 kW A' Pivoting horiz. screw conveyor - C04.16_SCR_1.2 J1VV-R 4x2.5
B' Centrifuge Decanter (C04.2)
C04.2 70 m 63.45 kW B' Centrifuge Decanter (C04.2) J1VV-R (3x95+50)+1x50
C04.2.1 10 m 5.50 kW B' Centrifuge Decanter feed pump 1 - C04.14_P.12c J1VV-R 4x2.5

June 2019 page 3 - 5


CONSULTING SERVICES FOR FEASIBILITY STUDY AND DETAIL DESIGN OF WASTE WATER WwTP Detailed Design Study
MANAGEMENT SYSTEM FOR ADAMA, MEKELLE AND DIRE DAWA TOWNS
Annex V: Electrical Calculations for Adama City

Line Installed
Length Mechanical Equipment Description Cable
Code Power (kW)
C04.2.2 10 m 5.50 kW B' Centrifuge Decanter feed pump 2 - C04.14_P.12d J1VV-R 4x2.5
C04.2.3 15 m 44.50 kW B' Centrifuge Decanter - C04.16_CS.2 J1VV-R 3x50+25
C04.2.4 15 m 9.00 kW B' Water pump - C04.14_P.13b J1VV-R 4x4
C04.2.5 10 m 1.50 kW Polyelectrolyte Preparation Unit - C04.16_PPU.2 J1VV-R 4x4
C04.2.6 10 m 0.75 kW A' Polyelectr. Dosing pump for CD.2 - C04.16_DP.4a J1VV-R 4x2.5
C04.2.7 10 m 0.75 kW B' Polyelectr. Dosing pump for CD.2 - C04.16_DP.4b J1VV-R 4x2.5
C04.2.8 15 m 1.50 kW B' Inclined Screw Conveyor - C04.16_SCR_2.1 J1VV-R 4x2.5
C04.2.9 15 m 1.50 kW B' Pivoting horiz. screw conveyor - C04.16_SCR_2.2 J1VV-R 4x2.5
C04.2.10 5m 3.50 kW A' Drainage pump - C04.17_P14a J1VV-R 4x2.5
C04.2.11 5m 3.50 kW B' Drainage pump - C04.17_P14b J1VV-R 4x2.5
FAECAL SLUDGE (C05) - A.S. Conventional System
C05 200 6.00 kW FAECAL SLUDGE (C05) J1VV-R 5x10
C05.1 20 m 1.50 kW Screw Conveyor Grid - C05.18_SCG J1VV-R 4x2.5
C05.2 20 m 1.10 kW A' Feacal sludge Step Screen - C05.18_SC.1 J1VV-R 4x2.5
C05.3 20 m 1.10 kW B' Feacal sludge Step Screen - C05.18_SC.2 J1VV-R 4x2.5
C05.4 30 m 2.20 kW Wetland feeding pump 1 - C05.18_P15a J1VV-R 4x2.5
C05.5 30 m 2.20 kW Wetland feeding pump 2 - C05.18_P15b J1VV-R 4x2.5
C05.6 100 m 1.10 kW Drying Beds drainage pump 1 - C05.18_P16a J1VV-R 4x2.5
C05.7 100 m 1.10 kW Drying Beds drainage pump 2 - C05.18_P16b J1VV-R 4x2.5
ANAEROBIC SLUDGE DIGESTERS (C06)- A.S. Convetional System
C06 80 m 16.09 kW ANAEROBIC SLUDGE DIGESTERS (C06)- A.S. Convetional System J1VV-R 5x10
C04.3.1 20 m 2.00 kW Sludge Recycle Pump 1 - C06.19_SRP1 J1VV-R 4x2.5
C04.3.2 20 m 2.00 kW Sludge Recycle Pump 2 - C06.19_SRP2 J1VV-R 4x2.5
C04.3.3 20 m 2.20 kW Biogas Blower - C05.19_BB J1VV-R 4x2.5
C04.3.4 20 m 5.50 kW Air Blower - C06.19_AB J1VV-R 4x2.5
C04.3.5 20 m 5.00 kW Boiler - C06.19_B1 J1VV-R 4x4
C04.3.6 20 m 5.00 kW Boiler - C06.19_B2 J1VV-R 4x4
Control Building (C07)
C07.Π 80 m 11.20 kW Control Building (C07) J1VV-R 5x10
C07.1 40 m 2.50 kW Internal Lighting H07V-U 3x1.5

June 2019 page 4 - 5


CONSULTING SERVICES FOR FEASIBILITY STUDY AND DETAIL DESIGN OF WASTE WATER WwTP Detailed Design Study
MANAGEMENT SYSTEM FOR ADAMA, MEKELLE AND DIRE DAWA TOWNS
Annex V: Electrical Calculations for Adama City

Line Installed
Length Mechanical Equipment Description Cable
Code Power (kW)
C07.2 40 m 2.50 kW Internal Lighting H07V-U 3x1.5
C07.3 200 m 4.00 kW External Lighting J1VV-R 4x4
C07.4 200 m 4.00 kW External Lighting J1VV-R 4x4
C07.5 300 m 3.00 kW External Lighting J1VV-R 4x6
C07.6 40 m 4.00 kW Sockets H07V-U 3x2.5
C07.7 40 m 4.00 kW Sockets H07V-U 3x2.5

June 2019 page 5 - 5


CONSULTING SERVICES FOR FEASIBILITY STUDY AND DETAIL DESIGN OF WASTE WATER WwTP Detailed Design Study
MANAGEMENT SYSTEM FOR ADAMA, MEKELLE AND DIRE DAWA TOWNS
Annex V: Electrical Calculations for Adama City

Cable type Diameter Total Length (m)


J1VV-R (3x50+25)+1x25 210 m
J1VV-R (3x70+35)+1x35 100 m
J1VV-R (3x95+50)+1x50 280 m
J1VV-R 2x(3x185+120) +2x120 150 m
J1VV-R 3x(3x240+120)+3x120 190 m
H07V-U 3x1.5 100 m
J1VV-R 3x120+70 110 m
H07V-U 3x2.5 100 m
J1VV-R 3x50+25 30 m
J1VV-R 4x10 150 m
J1VV-R 4x2.5 2700 m
J1VV-R 4x4 1000 m
J1VV-R 4x6 450 m
J1VV-R 5x10 500 m
M M