STEAM HUMIDIFIER CONDENSING UNIT

HVAC SYMBOLS AND ABBREVIATIONS SCHEDULE SCHEDULE

SYMBOL DESCRIPTION MARK H-1 H-2 MARK CU-1 CU-2


SERVICE SERVICE AHU-1 AHU-2
TURNING VANES LWT LEAVING WATER TEMPERATURE STEAM PRESS (PSIG) 5 5 CAPACITY (TONS) 50 30
STEAM OUTPUT (LB/HR) 329 205
VOLUME DAMPER MC MECHANICAL CONTRACTOR
MANIFOLD LENGTH (INCHES) 36" 36" REFRIGERANT TYPE PURON PURON
F FIRE DAMPER MCA MINIMUM CIRCUIT AMPERAGE EVAPORATOR DISTANCE (INCHES) 21.3 22.0 41.2 43.1
CFM 13,000 8,000 COMPRESSOR DATA
S SMOKE DAMPER MOD MOTOR OPERATED DAMPER
CONDENSATE LOAD (LB/HR) 330 205 NUMBER/HP EACH 3/- 2/-
SMOKE DETECTOR (BY EC) MOP MAXIMUM OVERLOAD PROTECTION MANUFACTURER UNIT CAPACITY STEPS 44 22
MODEL NUMBER 28MK 28MK CONDENSER DATA
MOTOR OR PNEUMATICALLY OPERATED DAMPER OA OUTSIDE AIR
REMARKS 1 1 NUMBER FANS/HP EACH 3 2
SUPPLY DUCT PC PLUMBING CONTRACTOR REMARKS: ELECTRICAL DATA (VOLT./PH.) 460/3 460/3
1. FACTORY ASSEMBLED MULTIPLE TUBE INJECTION TYPE. PROVIDE UNIT KW/MCA/MOP 50.1/97.9/110.0 31.40/66.3/90.0
RETURN OR EXHAUST DUCT R RETURN GRILLE COMPLETE WITH STEAM SEPERATOR, DDC STEAM CONTROL VALVE,
FLOAT THERMOSTATIC TRAP, HIGH LIMIT HUMIDISTAT, DIGITAL WALL MANUFACTURER CARRIER CARRIER
HUMIDISTAT, AIR PROVING SWITCH, INLET ADAPTER, AND 9" TYPE MB
FLEXIBLE DUCT CONNECTION RA RETURN AIR MODEL NUMBER 38APD 38APD
STEAM TUBES.
OPERATING WEIGHT (LBS.) 2174 1300
ACOUSTICALLY LINED DUCTWORK REX REMOVE EXISTING
REMARKS 1-8 1-8
EXISTING DUCTWORK & EQUIPMENT RHC REHEAT COIL REMARKS:
1. DIGITAL COMPRESSORS
EXISTING DUCTWORK & EQUIPMENT TO BE RR REMOVE AND RELOCATE 2. SINGLE POINT POWER CONNECTION WITH
DISCONNECT SWITCH
REMOVED 3. LOW SOUND FAN AND COMPRESSORS
S SUPPLY GRILLE OR DIFFUSER
4. WIND BAFFLE
BALANCING VALVE
5. SCROLLING MARQUEE DISPLAY
SA SUPPLY AIR 6. DUAL CIRCUIT
CHECK VALVE 7. VAV CONTROLLER
SD SMOKE DAMPER 8. ROOF EQUIPMENT SUPPORT RAILS WITH SPRING
CONTROL VALVE (2-WAY) ISOLATORS

SF SUPPLY FAN
EXISTING PIPING
SO SUPPLY OUTLET
EXISTING PIPING TO BE REMOVED
SS STAINLESS STEEL
EXPANSION JOINT/COMPENSATOR
STR STRAINER AIR HANDLING
FLEXIBLE PIPE CONNECTION UNIT HEATER
UNIT SCHEDULE SCHEDULE
T TRANSFER GRILLE
REMOVE TO POINT AND CAP
(DIRECT EXPANSION)
MARK UH-1 UH-2
TB TERMINAL BOX MARK AHU-1 AHU-2
TYPE HORIZ DISCH HORIZ DISCH
REMOVE TO POINT FOR RECONNECTION FAN SECTIONS: CAPACITY (MBH/KW) 29.8 29.8
TG TRANSFER GRILLE
SUPPLY AIR (CFM) 13,000 8,000 WATER FLOW (GPM) 3.5 3.5
SHUT OFF VALVE
MIN OUTSIDE AIR (CFM) 3,900 2,400 180/160 180/160
VAV VARIABLE AIR VOLUME
WATER PRESS DROP (FT) .12 .12
STEAM TRAP TOTAL STATIC PRESS ("WG) 5.10 4.81
VD VOLUME DAMPER AIR DELIVERY (CFM) 750 750
EXT STATIC PRESS ("WG) 2.50 2.50
STRAINER W/BLOW DOWN 60 60
FAN TYPE/SIZE PF CLASS II PF CLASS II
EXT. STATIC PRESS. ("WG) - -
UNION BHP 15.8 10.2 MOTOR HP 1/20 1/20
MOTOR HP 20 15 ELECTRICAL DATA (VOLT./PH.) 120/1 120/1
PIPE BRANCH TAKE-OFF FROM BOTTOM
RPM 1497 1788 MOUNTING ARRANGEMENT SUSPENDED SUSPENDED
RECESS DEPTH - -
PIPE BRANCH TAKE-OFF FROM TOP VFD MARK VFD-SF-1 VFD-SF-2
GENERAL HVAC NOTES: MANUFACTURER AIRTHERM AIRTHERM
RETURN/EXHAUST FAN
PIPE DROP MODEL NUMBER HA-048B HA-048B
1. THE HVAC SYSTEM INSTALLATION SHALL BE IN ACCORDANCE WITH NFPA, PENNSYLVANIA AND TOTAL STATIC PRESS ("WG) - -
REMARKS 3 3
INTERNATIONAL CODES AND ALL LOCAL CODES AND ORDINANCES.
PIPE RISE EXT STATIC PRESS ("WG) 1.00 1.00
REMARKS:
2. DRAWINGS ARE DIAGRAMMATIC. INDICATED POSITIONS SHALL BE FOLLOWED AS CLOSELY AS FAN TYPE/SIZE FC CLASS I FC CLASS I 1. DISCONNECT SWITCH
CD A/C CONDENSATE DRAIN PIPING
POSSIBLE, EXACT EQUIPMENT LOCATIONS AND DUCTWORK AND PIPING ROUTING SHALL BE SUBJECT 2. HANGER RODS
BHP 7.8 3.0
TO BUILDING CONSTRUCTION AND INTERFERENCES WITH OTHER TRADES. 3. AQUASTAT
HWR HEATING WATER RETURN PIPING 4. UNIT MOUNTED THERMOSTAT
MOTOR HP 10 5
3. ALTHOUGH ATTEMPTS HAVE BEEN MADE TO IDENTIFY EXISTING EQUIPMENT LOCATIONS, PIPE AND RPM 778 587
HWS HEATING WATER SUPPLY PIPING DUCTWORK ROUTING AND SIZES WITH THE USE OF EXISTING DRAWINGS AND FIELD OBSERVATIONS, MC
SHALL FIELD VERIFY ALL EXISTING INFORMATION. REPORT ANY DISCREPANCIES TO THE ARCHITECT VFD MARK VFD-RF-1 VFD-RF-2
LPR LOW PRESSURE CONDENSATE PIPING OR ENGINEER. NOTE ALL DISCREPANCIES ON THE AS-BUILT DRAWINGS. COOLING COIL OCTAVE BAND CENTER FREQUENCY, HZ
LPS LOW PRESSURE STEAM PIPING 4. COORDINATE ALL WORK WITH THE PHASING OF THE PROJECT. SOME SERVICES MUST REMAIN ACTIVE TOTAL CAPACITY (MBH) 540.74 349.60
63 125 250 500 1000 2000 4000 8000
TO SERVE OCCUPIED SPACES DURING CONSTRUCTION. SCHEDULE ALL SERVICE SHUTDOWNS WITH SENSIBLE CAPACITY (MBH) 383.72 248.00
V VENT PIPING OWNER AND/OR CONSTRUCTION MANAGER. AHU-1
MAX FACE VELOCITY (FPM) 532.6 373.1 87 87 92 94 91 86 84 83
SUPPLY FAN
H HUMIDISTAT 5. ALL FIRE-STOPPING SHALL BE PERFORMED BY THE CONTRACTOR PERFORMING THE WORK REQUIRING 80/66 95.0 AHU-1
THE PENETRATION. REFER TO THE DETAILS PERTAINING TO TYPE AND METHOD REQUIRED. 90 86 76 75 76 76 73 66
53/52 52/51 RETURN FAN
S SENSOR
6. REFER TO ARCHITECTURAL REFLECTED CEILING PLANS FOR EXACT LOCATIONS OF CEILING DIFFUSERS REFRIGERANT TYPE R-410A R-410A AHU-2
87 85 89 88 87 87 89 89
AND GRILLES. SUPPLY FAN
T THERMOSTAT 40.2 43.1
AHU-2
7. ATTENTION IS CALLED TO THE LIMITED CEILING SPACE. HOLD ALL DUCTWORK AS HIGH AS POSSIBLE, TO COIL ROWS/FINS PER INCH 6/8 6/8 84 80 71 64 66 62 58 49
RETURN FAN
T NIGHT THERMOSTAT DECK BETWEEN BEAMS IF REQUIRED, AND TIGHT TO STEEL STRUCTURE. PROVIDE ANY AND ALL
N AIR PRESS DROP ("WG) 0.86 0.49
OFFSETS AND EFFORT REQUIRED FACILITATING DUCT ROUTING. CU-1
87.1 85.4 86.0 86.5 84.7 80.1 75.4 67.5
L LOUVERED DOOR HEATING COIL
8. ALL EQUIPMENT AND DAMPERS MUST BE ACCESSIBLE. IF LOCATED ABOVE DRYWALL CEILING OR TOTAL CAPACITY (MBH) 830.1 439.4 CU-2
UCD BEHIND FINISHED WALLS, PROVIDE ACCESS DOOR. COORDINATE ALL ACCESS DOOR LOCATIONS WITH 84.3 83.6 84.0 84.7 83.0 78.3 73.6 65.9
UNDERCUT DOOR
ARCHITECT. 47/106.1 47/97.8

AIRFLOW DIRECTION AIR PRESS DROP ("WG) 0.13 0.03


9. HVAC PIPING AND DUCTWORK SHALL NOT BE INSTALLED IN ELECTRICAL ROOMS AND INFORMATION
TECHNOLOGY (LOW VOLTAGE) ROOMS UNLESS THE PIPING AND/OR DUCTWORK IS DIRECTLY RELATED COIL ROWS/FINS PER INCH 1/9 1-6
PETE'S PLUG TO HVAC EQUIPMENT CONDITIONING THE ROOM. CONTACT ARCHITECT/ENGINEER PRIOR TO MAX FACE VELOCITY (FPM) 562.0 393.9
INSTALLATION OF ANY UNRELATED PIPING OR DUCTWORK.
PRESSURE GAUGE CONDENSATE LOAD (LB/HR) 864 457
10. PROVIDE AIR VENTS IN PIPING SYSTEMS AS REQUIRED FOR COMPLETE AIR ELIMINATION. PROVIDE STEAM - RATE (LB/HR) 830 439
RELIEF OR SAFETY VALVE HOSE END DRAIN VALVES AS REQUIRED TO PERMIT COMPLETE SYSTEM DRAINING. NOTE LOCATIONS
ON AS-BUILT DRAWINGS. STEAM - PRESSURE (PSIG) 5.0 5.0
FILTER DATA
THERMOMETER 11. PROVIDE DUCTWORK ACCESS DOORS FOR ALL AUTOMATIC DAMPERS, FIRE DAMPERS, SMOKE
PREFILTER TYPE MERV 8 MERV 8
DAMPERS, FIRE/SMOKE DAMPERS AND REHEAT COIL INLETS AND OUTLETS. WHERE REHEAT COIL IS
AD ACCESS DOOR INTEGRAL WITH A VAV TERMINAL UNIT, TERMINAL UNIT SHALL INCLUDE A BOTTOM ACCESS DOOR. PRESS DROP ("WG)
IMPORTANT THAT ALL DUCTWORK ACCESS DOORS ARE ACCESSIBLE. IF LOCATED ABOVE DRYWALL
FINAL FILTER TYPE MERV 14 MERV 14
AFF ABOVE FINISHED FLOOR CEILING OR BEHIND FINISHED WALLS, PROVIDE ACCESS DOOR. COORDINATE ALL ACCESS DOOR
LOCATIONS WITH ARCHITECT. PRESS DROP ("WG)
ALUM ALUMINUM ELECTRICAL DATA (VOLT./PH.) 460/3 460/3
12. INSTALL AND PROPERLY SUPPORT FLEXIBLE DUCTWORK TO AVOID ANY AIRFLOW RESTRICTIONS, NO
KINKS OR CRIMPS ARE PERMITTED. MANUFACTURER CARRIER CARRIER
AV AIR VENT
MODEL NUMBER 39MW 39MW
13. PROVIDE VOLUME DAMPER HANDLE EXTENSIONS FOR VOLUME DAMPERS INSTALLED IN INSULATED
CEIL CEILING DUCTWORK. OPERATING WEIGHT (LBS.) 9555 9295
REMARKS 1-5 1-3,5,6
CO CLEAN OUT 14. PROVIDE VOLUME DAMPER IN DUCTWORK AT ALL CONNECTIONS TO DIFFUSERS AND GRILLES.
EXCEPTION - VAV TERMINAL UNIT SERVING A SINGLE SUPPLY AIR DIFFUSER, VOLUME DAMPER IS NOT
REMARKS:
CTE CONNECT TO EXISTING REQUIRED AT CONNECTION TO DIFFUSER OR GRILLE.
1. SECTIONS:
15. DO NOT SUPPORT DUCTWORK OR PIPING FROM ANOTHER DUCT, PIPE OR CONDUIT. DO NOT SUPPORT A. RETURN FAN
DDC DIRECT DIGITAL CONTROL
ANY ITEM FROM METAL ROOF DECK. B. EXHAUST MIXING BOX
C. COMBINATION FILTER / MIXING BOX
DV DRAIN VALVE 16. D. PRE-FILTER 30% (2 SETS)
OTHERWISE. E. HEATING COIL WITH FACE AND BYPASS
E EXHAUST GRILLE F. INTERTWINED COOLING COIL (0.035 TUBE WALL THICKNESS)
17. DURING CONSTRUCTION, COVER ALL SUPPLY, RETURN AND EXHAUST DUCTWORK OPENINGS TO G. SUPPLY FAN
EAT ENTERING AIR TEMPERATURE PREVENT CONSTRUCTION DUST FROM ENTERING THE DUCTWORK. IF DUST COLLECTS INSIDE H. BAG FINAL FILTER 90.95% (2 SETS)
DUCTWORK, DUCTWORK MUST BE CLEANED PRIOR TO PROJECT TURNOVER. I. ACCESS SECTION
EC ELECTRICAL CONTRACTOR J. HUMIDIFIER DISPERSION SECTION
18. ALL STRAIGHT BRANCH INLET DUCTS TO VAV TERMINAL UNITS WITHIN FIVE FEET OF THE SUPPLY MAIN K. DISCHARGE PLENUM SECTION
SHALL BE THE VAV TERMINAL UNIT CONNECTION SIZE. IF BRANCH INLET DUCT INCLUDES ELBOWS OR 2. UV LAMP ON COOLING COIL WITH 2 SETS OF SPARE LAMPS (SEE
EF EXHAUST FAN
SPECIFICATIONS)
TERMINAL UNIT INLET. 3. VFD'S WITH DISCONNECT SWITCH AND BYPASS
EI EXHAUST INLET 4. 24" HIGH ROOF CURB
SHEET SIZE 30x42 J:\2011\110078\SVHC OR\Sheets\Mechanical\H0-1 HVAC LEGENDS, SCHEDULES & GENERAL NOTES.dwg

19. SUPPLY DUCTWORK UPSTREAM OF VAV TERMINAL UNITS SHALL BE CONSTRUCTED PER SMACNA 5. 36" HIGH ROOF CURB
ETR EXISTING TO REMAIN STANDARDS FOR 4 INCH STATIC PRESSURE. REFER TO SPECIFICATIONS. 6. AGION COATING

EWT ENTERING WATER TEMPERATURE 20. DUCTWORK SHALL BE PRESSURE TESTED AS INDICATED IN THE SPECIFICATIONS. IF A SECTION OF
DUCTWORK FAILS THE TEST, THE SECTION SHALL BE SEALED AND RETESTED UNTIL IT PASSES.
EXC EXPANSION COMPENSATOR
21.

FD FIRE DAMPER

FPC FIRE PROTECTION CONTRACTOR

F&T FLOAT & THERMOSTATIC TRAP PHASE 2 AREA OF WORK

H HUMIDIFER
SAVED: CHICAR 2011-10-31 12:50 PLOT: 2011-10-31 12:58

HC HEATING COIL

LAT LEAVING AIR TEMPERATURE

KEY PLAN
2 18/16 18/8 2

36/14 1 450 1 1
48/9 75 1 5 14/8 14/6
54/10 200
18/10 18/10 12/6 275 350
18/6 6
12/6 275 14/8
250 250 275
900 400 18/12
18/6 18/10 10" 10"
24/8 14/8 26/8 2 4 2
14/8 24/8 10" 1 10"
4 4 200

18/1218/12
3 150
T 10" 12" 14" 20/18 18/12 2
8" T 500
8 8"
48/9

36/14
7

34/8
8" 3
T
275 T 2 75 GENERAL NOTES

14/9
12"

24/8
6 1. CONTRACTOR SHALL CONDUCT COMPLETE

18/10
1

14/8
250 200 14/6 10" 7 FIELD SURVEY OF EXISTING CONDITIONS PRIOR
250
12/8 4 14/12 TO SUBMISSION OF BID PRICE. NO ADDITIONAL
1 350

34/10
8" 1 3 3 PAYMENTS WILL BE MADE ON CLAIMS THAT
14/8 14/8 T 3 ARISE FROM LACK OF KNOWLEDGE OF EXISTING
3 8"
38/8 2 CONDITIONS.
3
10/8 12/6

48/9
75
18/10
18/8 X DUCTWORK DEMO NOTES

18/8
8" 32/12 48/18
18/10 1. REMOVE EXISTING SA DIFFUSER.

24/8
18/6 20/8

20/10
16/10
12/10 7
2. REMOVE EXISTING RETURN/EXHAUST GRILLE.
T
3. REMOVE EXISTING DUCTWORK BACK TO MAIN

36/24
34/14
T AND CAP AS INDICATED.

28/8
T

18/10
36/14
4. REMOVE EXISTING TERMINAL BOX AND
CONTROLS AS INDICATED.
12/8 20/6 16/6
5. REMOVE EXISTING EXHAUST FAN AND
8/8
8" CONTROLS ABOVE.

20/9
20/6
14/10
8" 20/18 12"
10" 6. PROVIDE COMPLETE AIR BALANCE SURVEY OF
40/18 14/6 15/12 20/12 ALL SUPPLY/EXHAUST/RETURN GRILLES,

24/10
16/9
DIFFUSERS AND TERMINAL BOXES. PROVIDE
T REPORT PRIOR TO START OF DEMOLITION.

34/9
32/8

28/12
16/10

22/10
30/10 14/6 7. DUCT MAINS TO REMAIN.
24/8 8/8
8. REMOVE AND REINSTALL ALL DUCTWORK AND
24/6 24/6
14/12 16/15 14/16 12/6 8" DIFFUSERS FOR NEW SA/RA DUCT STUBS IN THIS
AREA. REMOVE AND REINSTALL CEILING AS
14/6
24/8

44/10 REQUIRED.
20/6

10"

44/10
T

46/14
18/10

36/12
18/10

20/8

54/16
10/8
14/10

14/10

20/8
10/10 8/8 14/6

30/10
10/10 8"
14/6 14/8 T 16/14
18/6
14/12

52/14
14/12 20/18 14/6

FIRST FLOOR DUCTWORK DEMOLITION PLAN


SCALE: 1/8" = 1'-0"

0 2' 4' 6' 8' 12' 16'

1" B

A A

3
4"
X PIPING DEMO NOTES
B A. DISCONNECT EACH TERMINAL BOX AND REMOVE
1" HWR HWS/HWR PIPING BACK TO MAIN.
HWS A A
HWR
HWS
B. REMOVE AND REINSTALL PIPING AS REQUIRED
3 FOR NEW SA/RA DUCTS IN THIS AREA.
4"

A
A
HWS
1"
4"
3" 3"
1" 8" SAN
HWS

8" ST
8" HZCW
3" LPS 11 4"
2" LPR 112"
3"
5" HWHR
5" HWHS

3
CHS

4" A
CHR

1"
112"
3
4"

HWR
HWS
5"
CHR
112" CHS

CHS
CHR

CHR
A

CHS
CHR

HWS
CHS

1"
6" 3"
HWR
3"
1" HWR
3"
CHS

HWS

11 4"
CHR

2"
SHEET SIZE 30x42 J:\2011\110078\SVHC OR\Sheets\Mechanical\PHASE 2\HD-01 FIRST FLOOR DEMOLITION PLANS.dwg

HWS
HWR

HWR

HWS

HWR
3"
HWR

1"
1"
3
"

FIRST FLOOR PIPING DEMOLITION PLAN PHASE 2 AREA OF WORK


SCALE: 1/8" = 1'-0"

0 2' 4' 6' 8' 12' 16'


SAVED: CHICAR 2011-10-31 12:50 PLOT: 2011-10-31 12:58

KEY PLAN
SEE ENLARGED OR 5 & 7 SEE ENLARGED PLAN
PLAN ON DRAWING H5-01 ON DRAWING H5-01 FOR
FOR WORK IN THIS AREA WORK IN THIS AREA

18/6

18/6
24/8 14/8
14/8 24/8

36/14

34/8

14/9
24/8
14/8
T T

34/10
14/8 14/8 T
38/8
10/8

16/10
18/10
18/8 48/18
32/12
18/10

24/8
18/6 20/8

36/24
34/14
T

28/8
T

18/10
36/14

20/6 16/6

20/9
20/6
14/10
8" 20/18 12"
40/18 14/6 15/12 20/12
16/9
T

34/9

28/12
16/10

22/10
30/10 14/6
8/8
24/6 24/6
14/12 16/15 14/16 12/6 8"
14/6
44/10
20/6

10"

44/10
T

46/14
10/8

36/12
20/8

54/16
20/8

8/8

30/10
8"
14/6 14/8 T 16/14
18/6 CTE CTE

52/14
14/12 20/18 14/6

FIRST FLOOR DUCTWORK PLAN


SCALE: 1/8" = 1'-0"

0 2' 4' 6' 8' 12' 16'

1"

X PLAN NOTES
1. CONNECT NEW 1" HWS/HWR TO EXISTING MAIN.
1 1
UH-1 T T UH-2

1"

HWS
4"
3" 3"
1" 8" SAN
HWS

8" ST
8" HZCW
3" LPS 11 4"
2" LPR 112"
3"
5" HWHR
5" HWHS

3
CHS

4"
CHR

1"
112"
3
4"

HWR
HWS
5"
CHR
112" CHS

CHS
CHR

CHR
CHS
CHR

HWS
CHS

1"
6" 3"
HWR
3"
1" HWR
3"
CHS

HWS

11 4"
CHR

2"
HWS
HWR

HWR
SHEET SIZE 30x42 J:\2011\110078\SVHC OR\Sheets\Mechanical\PHASE 2\H1-01 FIRST FLOOR HVAC PLANS.dwg

HWS

HWR
3"
HWR

1"
1"
3
"

FIRST FLOOR PIPING PLAN PHASE 2 AREA OF WORK


SCALE: 1/8" = 1'-0"

0 2' 4' 6' 8' 12' 16'


SAVED: CHICAR 2011-10-31 12:51 PLOT: 2011-10-31 13:02

KEY PLAN
B
H5-02

3
2

AHU-1
CU-1 X DEMOLITION NOTES
A. REMOVE EXISTING EXHAUST FAN.

B. REMOVE AND REROUTE EXISTING 4" VENT THRU


ROOF.

5
1
X HVAC PLAN NOTES
1. MAINTAIN 25'-0" BETWEEN OUTSIDE AIR INTAKE
AND EXHAUST/VENT OUTLETS.
(TYP-3) B
2. REFRIGERANT PIPING SIZED BY MANUFACTURER.
4
3. PIPE SUPPORTS (TYPICAL).

4. EQUIPMENT RAIL (TYPICAL).

5. MAINTAIN EXISTING ROOF WARRANTY.


A COORDINATE WITH ARCHITECT AND OWNER.

H5-02
A
X PLUMBING PLAN NOTES
A. 4" VENT THRU ROOF.

EXISTING
AC-5

CHS
CHR

PRV-6

CHR

CHS

MECHANICAL ROOF PLAN


SCALE: 1/4" = 1'-0"

0 2' 4' 6' 8'


SHEET SIZE 30x42 J:\2011\110078\SVHC OR\Sheets\Mechanical\H1-02 MECHANICAL ROOF PLAN.dwg

PHASE 2 AREA
OF WORK
SAVED: CHICAR 2011-10-31 12:51 PLOT: 2011-10-31 13:03

KEY PLAN
C
H5-02

X DEMOLITION NOTES
A. REMOVE AND REROUTE EXISTING 6" ROOF
DRAIN.
4
CU-2 3
X HVAC PLAN NOTES
1. MAINTAIN 25'-0" BETWEEN OUTSIDE AIR INTAKE
AND EXHAUST/VENT OUTLETS.
2
2. REFRIGERANT PIPING SIZED BY MANUFACTURER.

3. PIPE SUPPORTS (TYPICAL).

4. EQUIPMENT RAIL (TYPICAL).

5. MAINTAIN EXISTING ROOF WARRANTY.


COORDINATE WITH ARCHITECT AND OWNER.

6. 64/18 RA DUCT RUN WITHIN 36" HIGH ROOF CURB.


PROVIDE DUCT SUPPORTS.

X PLUMBING PLAN NOTES


A. EXISTING 4" VENT THRU ROOF.

B. REROUTED 6" ROOF DRAIN.

PRV-5 EXISTING
AC-3

CHS
CHR

EXISTING EXHAUST FAN


CHR
CHS

CHS

CHR
SHEET SIZE 30x42 J:\2011\110078\SVHC OR\Sheets\Mechanical\H1-03 MECHANICAL ROOF PLAN.dwg

PHASE 2 AREA OF WORK


SAVED: CHICAR 2011-10-31 12:52 PLOT: 2011-10-31 13:04

MECHANICAL ROOF PLAN


SCALE: 1/4" = 1'-0"

0 2' 4' 6' 8'

KEY PLAN
X PLAN NOTES
1. OUTLINE OF CU-1 ABOVE.

2. OUTLINE OF CU-2 ABOVE.

3. 81/25 SA DUCT FROM AHU-1 DOWN THRU ROOF


ABOVE.

4. 71/56 RA DUCT FROM AHU-1 DOWN THRU ROOF


ABOVE.

5. 74/25 SA DUCT FROM AHU-2 DOWN THRU ROOF


ABOVE.

6. 64/18 RA DUCT FROM AHU-2 DOWN THRU ROOF


ABOVE.

7. REMOVE AND REINSTALL CEILING TO INSTALL


NEW SA/RA DUCTS.

8. AHU-1 ABOVE.

9. AHU-2 ABOVE.

10. RELOCATED SA/RA GRILLE. BALANCE TO 400


T T CFM.

11. CONNECT NEW DUCT TO EXISTING AS


INDICATED.

ENLARGED FIRST FLOOR HVAC PLAN


SCALE: 1/4" = 1'-0"

0 2' 4' 6' 8'

18/6

11

14/8
7 18/6 24/8
14/8 10
24/8 5

OR 7 OR 5
2500 CFM 2000 CFM
3300 CFM 3000 CFM
36/14

34/8

6 10
24/8

11 11
16/8 14/8

10/8
14/8 T
34/10

14/8
8/8

10/8
18/10

18/10

11
SHEET SIZE 30x42 J:\2011\110078\SVHC OR\Sheets\Mechanical\H5-01 ENLARGED FIRST FLOOR HVAC PLANS.dwg

PHASE 2 AREA OF WORK


SAVED: CHICAR 2011-10-31 12:52 PLOT: 2011-10-31 13:05

ENLARGED FIRST FLOOR HVAC PLAN - OR 5 & 7


SCALE: 1/4" = 1'-0"

0 2' 4' 6' 8'

KEY PLAN
CU-1 CU-1
AHU-1

3 4

1 1
2

56/71 RA
25/81 SA X PLAN NOTES
1. EQUIPMENT RAILS

5 5 2. ROOF CURB

3. PIPE SUPPORT

4. REFRIGERANT PIPING

5. INSULATED (R-19) CAP SA & RA ABOVE


CEILING.

6. DUCT SUPPORT

SECTION A A SECTION B B
SCALE: 1/4" = 1'-0" H1-02 SCALE: 1/4" = 1'-0" H1-02

0 2' 4' 6' 8' 0 2' 4' 6' 8'

AHU-2

2 64/18 RA WITHIN CURB

6 (TYP) 25/74 SA

5 5

SECTION C C
SCALE: 1/4" = 1'-0" H1-03

0 2' 4' 6' 8'


SHEET SIZE 30x42 J:\2011\110078\SVHC OR\Sheets\Mechanical\H5-02 MECHANICAL SECTIONS.dwg

PHASE 2 AREA OF WORK


SAVED: CHICAR 2011-10-31 12:55 PLOT: 2011-10-31 13:00

KEY PLAN
GENERAL NOTES:
31'-9"
1. DUCT RUNOUT SIZE SHALL BE THE SAME AS THE AIR INLET/OUTLET
X AHU-1 PLAN NOTES
CONNECTION SIZE UNLESS NOTED OTHERWISE. 1. RA FAN SECTION
AIRFOIL TURNING VANES 4 8 9 10 11
A B
PER SMACNA STANDARDS 2. DUCT RUNOUT SIZE SHALL BE THE SAME AS THE TERMINAL INLET 2. EXHAUST BOX
CONNECTION SIZE UNLESS NOTED OTHERWISE.
3. MIXING BOX
3. REFER TO ARCHITECTURAL REFLECTED CEILING PLAN FOR CEILING
4. ANGLE FILTER
MATERIALS AND EXACT LOCATIONS OF AIR DISTRIBUTION DEVICES.
AIRFOIL TURNING 5. STEAM COIL

9'-4"
VANES PER SMACNA 4. FLEXIBLE DUCTWORK SHALL BE INSTALLED WITHOUT KINKS AND WITHOUT
STANDARDS BENDS GREATER THAN 30 DEGREES. 6. DIRECT EXPANSION COIL

5. ALL DUCTWORK DIMENSIONS SHOWN ARE GROSS, NET FREE AREA OF 7. HUMIDIFIER
LINED DUCTWORK IS REDUCED BY THE DUCT LINING THICKNESS.
A+B 8. PLENUM
6. ACCESS DOORS SHALL BE PROVIDED IN DUCTWORK FOR ACCESS TO ALL
FIRE DAMPERS, FIRE/SMOKE DAMPERS, SMOKE DAMPERS, MOTOR 1 2 6 7 9. BLOW-THRU SUPPLY FAN
OPERATED DAMPERS AND COILS. (UPSTREAM AND DOWNSTREAM OF ALL 3
5 10. BAG/CARTRIDGE FILTER
COILS)
NOTE: NOTE: 11. BLOW-THRU PLENUM SECTION
2" RADIUS VANES - DUCT WIDTH TO 12" 2" RADIUS VANES - DUCT WIDTH TO 12" 7. INSTALL ALL EQUIPMENT REQUIRING AN ELECTRICAL CONNECTION IN SUCH
A MANNER SO THAT PROPER CLEARANCE IS PROVIDED FOR SERVICING PER SCALE: NONE
4" RADIUS VANES - DUCT WIDTH 13" AND ABOVE. 4" RADIUS VANES - DUCT WIDTH 13" AND ABOVE. 12. 24" ROOF CURB
NATIONAL ELECTRICAL CODE.
4 8 9 10 11
8. FLEXIBLE DUCTWORK SHALL NOT PENETRATE THRU WALLS, RIGID SHEET
RECTANGULAR DUCT TEE METAL DUCTWORK IS REQUIRED AT ALL WALL PENETRATIONS.
DUCT ELBOW WITH WITH TURNING VANES 9. FLEXIBLE DUCTWORK SHALL NOT BE USED IN EXPOSED LOCATIONS.
TURNING VANES

5'-2"
12 1 2 3 5 6 7 12

2-WAY CONTROL
VALVE
SCALE: NONE SCALE: NONE
BALANCING
VALVE (TYP.)

MANUAL AIR
MAXIMUM SPACING 10'-0" OR VENT (TYP.)
CWR
AS REQUIRED BY PIPE SIZE
REFER TO SPECIFICATIONS
REFER TO PLAN
FOR PIPE SIZES
THERMOMETER
29'-3"
(TYP.)
GALVANIZED STEEL
CHANNEL TRACK
CWS X AHU-2 PLAN NOTES
COIL MANUAL 1. RA FAN SECTION
AIR VENT SHUT-OFF 4 6 8 9 10 11
VALVE (TYP.) 2. EXHAUST BOX
CURB CAP
STRAINER
3 3. MIXING BOX
4"
HOSE END
ROOFING MEMBRANE PATE PRS PIPE THREADED DRAIN
TO RUN UP UNDER ROLLER SUPPORTS PETE'S PLUG (TYP.) 4. ANGLE FILTER
VALVE WITH CAP
CURB CAP

10'-4"
ROOF COOLING COIL 5. STEAM COIL

3 6. DIRECT EXPANSION COIL


EQUIPMENT SUPPORT CURB 4"
HOSE END THREADED
FASTEN EQUIPMENT
LENGTH AS REQUIRED DRAIN VALVE W/ CAP (TYP.)
SUPPORT TO ROOF DECK 7. HUMIDIFIER
3
4" COIL DRAIN LINE
TO OVER FLOOR DRAIN 8. PLENUM
NOTE: USE PATE NO. PRS-2 PIPE SUPPORT FOR SINGLE-PLY ROOFING
AND PATE NO. PRS-5 PIPE SUPPORT FOR BUILT-UP ROOFING. FLANGED OR UNION 1 2 5 7
CONNECTION FOR 3 9. BLOW-THRU SUPPLY FAN
COIL REMOVAL (TYP.)
10. BAG/CARTRIDGE FILTER
ROOFTOP PIPE SUPPORT DETAIL NOTE: PIPE COIL COUNTER FLOW AIR TO WATER
(PIPE ROLLER) SCALE: NONE SCALE: NONE 11. BLOW-THRU PLENUM SECTION

12. 36" ROOF CURB


COOLING COIL PIPING DIAGRAM 4 6 8 9 10 11
(SINGLE COIL - 2-WAY CONTROL VALVE) SCALE: NONE

5'-1"
SPRING ISOLATORS

12 1 2 3 5 7 12

GALVANIZED STEEL
CHANNEL TRACK
MANUAL AIR VENT
COMBINATION BALANCE & SCALE: NONE SCALE: NONE
CURB CAP SHUT-OFF VALVE W/ FLOW PETE'S PLUG (TYP.)
INDICATOR AND PETE'S
PLUGS. "BELL & GOSSETT
ROOFING MEMBRANE
CB" OR EQUAL.
TO RUN UP UNDER
CURB CAP HWR
ROOF REFER TO PLAN REHEAT COIL
FOR PIPE SIZES NO
HWS
FASTEN EQUIPMENT
SUPPORT TO ROOF DECK EQUIPMENT SUPPORT CURB SHUT-OFF VALVE UNION CONNECTION
LENGTH AS REQUIRED FOR COIL REMOVAL
STRAINER
NOTE: USE PATE NO. PRS-2 PIPE SUPPORT FOR SINGLE-PLY ROOFING 3 2-WAY CONTROL VALVE
4" HOSE END THREADED
AND PATE NO. PRS-5 PIPE SUPPORT FOR BUILT-UP ROOFING. DRAIN VALVE WITH CAP

ROOFTOP PIPE SUPPORT DETAIL HOT WATER REHEAT COIL PIPING DIAGRAM
SCALE: NONE (2-WAY CONTROL VALVE) SCALE: NONE

ROOFTOP UNIT

CAULK

EXTRUDED ALUMINUM CONTINUOUS NEOPRENE MOTOR OPERATOR


SPONGE PAD (REFER TO SPECIFICATIONS) 8'-0" MAXIMUM
ISOLATION BASE
SPACING
ISOLATION CONTROL VALVE
STEAM JACKETED DISTRIBUTION
STRAINER FURNISHED DUCT ABOVE ROOF. SEE
MANIFOLD, REFER TO SCHEDULE
CADMIUM PLATED STEEL W/ HUMIDIFIER PLAN FOR ARRANGEMENT.
SHEET FOR NUMBER OF MANIFOLDS.
SPRINGS NOMINAL 1" UNION (TYP.) (DISCHARGE HOLES POINTED
DEFLECTION UPSTREAM AGAINST AIR FLOW) UNISTRUT SUPPORT TOP
AND BOTTOM OF DUCT
WEATHER SHIELD
REFER TO PLAN
GASKET FURNISHED WITH FOR PIPE SIZES
ROOFTOP UNIT LPS

WOOD NAILER
TEMPERATURE
REINFORCED NEOPRENE SWITCH CONTROL
NEOPRENE WEATHER CONTINUOUS PERIMETER LINE
SEAL UNISTRUT SUPPORTS
ROOF CURB FURNISHED (TYP.)
TEMPERATURE
WITH ROOFTOP UNIT
SWITCH
RIGID INSULATION SUPPLY DUCT
SHUT-OFF
MC TO PROVIDE (1) LAYER OF 2 PSF VALVE FITTING (TYP.)
ROOFING
(TYP.)
SHEET SIZE 30x42 J:\2011\110078\SVHC OR\Sheets\Mechanical\H6-01 HVAC DETAILS & DIAGRAMS.dwg

BARIUM LOADED VINYL, (2) LAYERS


OF 1" 8 PCF MINERAL WOOL IN SEPARATOR, REFER TO
AREA ENCLOSED BY ROOF CURB. HUMIDIFIER SCHEDULE FOR
SIZE AND CAPACITY. EQUIPMENT SUPPORT
CURB LENGTH AS
DIRT LEG REQUIRED
NOTE:
LPR
INVERTED BUCKET TRAP USE PATE No. ES-2 EQUIPMENT
CHECK SUPPORT FOR SINGLE-PLY PHASE 2 AREA OF WORK
FURNISHED W/ HUMIDIFIER CURB CAP
VALVE ROOFING AND PATE NO. ES-5
ROOF MEMBRANE TO RUN EQUIPMENT SUPPORT FOR
ROOF DECK STEAM HUMIDIFIER PIPING DIAGRAM UP UNDER CURB CAP BUILT-UP ROOFING.
(MULTIPLE MANIFOLD) SCALE: NONE
SAVED: CHICAR 2011-10-31 12:53 PLOT: 2011-10-31 13:06

MOUNT AND FASTEN CURB TO DECK FASTEN EQUIPMENT SUPPORT


OR MOUNT ON STEEL BELOW TO ROOF DECK

ROOFTOP AIR CONDITIONING UNIT


MOUNTING DETAIL ROOFTOP DUCT SUPPORT DETAIL
SCALE: NONE
(W/ SPRING CURB) SCALE: NONE
KEY PLAN
GENERAL ELECTRICAL DEMOLITION NOTES
ELECTRICAL SYMBOL LEGEND ELECTRICAL ABBREVIATIONS
1. ALL FIXTURES, DEVICES, AND MISCELLANEOUS EXISTING CONDITIONS SHOWN ON THE
SYMBOL DESCRIPTION ABBREVIATION DESCRIPTION DEMOLITION PLANS ARE THE RESULT OF FIELD INSPECTIONS AND ARE NOT INTENDED TO
REPRESENT EXACT FIELD CONDITIONS, BUT RATHER THE EXTENT OF ELECTRICAL DEMOLITION.
1 THE ELECTRICAL CONTRACTOR SHALL FIELD VERIFY THE EXTENT OF DEMOLITION PRIOR TO
HOMERUN TO PANEL 'A' INDICATING CIRCUIT NUMBER(S): ALL WIRING SHALL BE #12 WITH A AMPERES
SUBMITTING BID.
A EQUIPMENT GROUNDING CONDUCTOR, UON. (INCREASE TO #10 FOR CIRCUITS WITH
DISTANCES AS LISTED IN SPECIFICATIONS. ALL HOMERUNS ARE TO A 20 AMPERE, ADA AMERICANS WITH DISABILITIES ACT
2. REMOVE AND/OR RELOCATE EXISTING ELECTRICAL DEVICES ON WALLS OR CEILINGS BEING
SINGLE POLE CIRCUIT BREAKER, UON. PROVIDE QUANTITY OF CONDUCTORS AS
REMOVED. COORDINATE SUCH CONDITIONS WITH ARCHITECTURAL DRAWINGS. SEE NEW FLOOR
NECESSARY TO ACCOMMODATE CIRCUITS AND CONTROL INDICATED ON DRAWINGS. AF AMP FUSED
PLANS FOR NEW LOCATIONS OF EXISTING DEVICES BEING RELOCATED.
CONDUIT STUB
AFF ABOVE FINISHED FLOOR
3. EXISTING CONDUITS, CIRCUITS OR SYSTEMS IN WALLS OR CEILINGS BEING REMOVED WHICH
CONDUIT TURNED DOWN SERVE SURROUNDING UNREMODELED AREAS SHALL BE REWORKED AND MAINTAINED.
AFG ABOVE FINISHED GRADE

CONDUIT TURNED UP 4. EXISTING CONDUITS, CIRCUITS OR SYSTEMS PASSING THROUGH THE REMODELED AREAS WHICH
AS AMP SWITCH
SERVE UNREMODELED AREAS SHALL REMAIN AND BE PROTECTED DURING DEMOLITION AND
REMODELING. RELOCATE AND REROUTE IF REQUIRED.
CONDUIT INSTALLED BELOW GRADE OR BELOW FINISHED FLOOR ATS AUTOMATIC TRANSFER SWITCH
5. CONTINUITY OF CIRCUITS INTERRUPTED BY REMOVAL OF ELECTRICAL DEVICES SHALL BE
E-1 E-1 ELECTRICAL CONNECTION TO EQUIPMENT ITEM 'E-1' (LETTER DESIGNATION BAS BUILDING AUTOMATION SYSTEM
MAINTAINED. PROVIDE JUNCTION BOXES, CONDUIT, AND WIRING EXTENSIONS FOR RELOCATION
AS APPLICABLE) - SEE CORRESPONDING EQUIPMENT CONNECTION SCHEDULE TO ABOVE ACCESSIBLE CEILINGS.
BFF BELOW FINISHED FLOOR
DUPLEX RECEPTACLE (20A, 125V) AT 18" AFF, UON 6. RE-SUPPORT EXISTING CONDUIT AND CABLES WHICH REMAIN ABOVE CEILINGS PER NATIONAL,
BFG BELOW FINISHED GRADE
'TV' = MOUNTED NEXT TO VIDEO OUTLET STATE, AND LOCAL CODES.
C DEVICE MOUNTED AT 8" ABOVE COUNTER
DOUBLE DUPLEX RECEPTACLE AT 18" AFF, UON, TYPE AS INDICATED ON DRAWINGS 7. MAINTAIN CONTINUITY OF BRANCH CIRCUITS AND COMMUNICATION CIRCUITS TO ALL DEVICES
AND FIXTURES SHOWN TO REMAIN (ETR). EXTEND AND MODIFY AS REQUIRED.
C/B CIRCUIT BREAKER

DUPLEX RECEPTACLE (20A, 125V) MOUNTED 8" ABOVE COUNTER, UON 8. ALL NEW AND RELOCATED CONDUIT AND WIRING IN REMODELED AREAS SHALL BE CONCEALED
CATV COMMUNITY ANTENNA TELEVISION (CABLE TELEVISION)
UNLESS OTHERWISE NOTED. COORDINATE WITH ARCHITECT IN FIELD.
DUPLEX RECEPTACLE (20A, 125V) GROUND FAULT CIRCUIT INTERRUPTER MOUNTED 8" CM CONSTRUCTION MANAGER
9. FOR ALL DEVICES AND FIXTURES BEING REMOVED (REX), REMOVE RELATED CONDUIT AND WIRING
ABOVE COUNTER, UON
TO SOURCE. RE-LABEL EXISTING CIRCUIT BREAKERS AS "SPARE" WHEN LOAD IS COMPLETELY
EC ELECTRICAL CONTRACTOR
REMOVED OR REVISE LABEL ON PANEL DIRECTORY APPROPRIATELY.
SWITCH (20A, 120/277V, SINGLE POLE) AT 48" AFF, UON
EMT ELECTRICAL METALLIC TUBING
'3' = THREE-WAY 10. WHERE ELECTRICAL DEVICES ARE DESIGNATED TO BE REMOVED, REMOVE DEVICES AND
BACKBOXES AND PATCH/REPAIR WALLS, UNLESS OTHERWISE DIRECTED BY ARCHITECT.
EPO EMERGENCY POWER OFF

ETR EXISTING ELECTRICAL DEVICE TO REMAIN

EWC ELECTRIC WATER COOLER


30AS NON-FUSED DISCONNECT SWITCH - SIZE AS INDICATED
GC GENERAL CONTRACTOR
30AS FUSED DISCONNECT SWITCH - FUSING AS INDICATED
30AF GFCI GROUND FAULT CIRCUIT INTERRUPTER - PERSON PROTECTION

SINGLE OR THREE PHASE MOTOR - SEE DRAWINGS FOR DESCRIPTION GFP GROUND FAULT PROTECTION

LIGHTING FIXTURE - AT CEILING, SURFACE OR RECESSED MOUNTED


HPF HIGH POWER FACTOR GENERAL ELECTRICAL NOTES
HVAC HEATING, VENTILATING, AND AIR CONDITIONING 1. ALL CONDUIT PENETRATIONS THROUGH FIRE RATED WALLS, FLOORS, OR SHAFTS SHALL BE
SEALED IN ACCORDANCE WITH ELECTRICAL FIRESTOPPING SPECIFICATIONS.
LIGHTING FIXTURE DESIGNATED FOR EGRESS WIRED TO LIFE SAFETY CIRCUIT - AT IG ISOLATED GROUND
NL CEILING, SURFACE OR RECESSED MOUNTED 2. CONTRACTOR SHALL COORDINATE LOCATIONS OF ALL LIGHTING FIXTURES AND CEILING
KEC KITCHEN EQUIPMENT CONTRACTOR MOUNTED DEVICES WITH THE ARCHITECTURAL REFLECTED CEILING PLANS, ELEVATIONS,
LIGHTING FIXTURE - MOUNTED AS INDICATED ON DRAWINGS SECTIONS AND DETAILS. CONTRACTOR SHALL ALSO COORDINATE LOCATIONS OF RECEPTACLES
KWC KILOWATTS CONNECTED AND OTHER WALL MOUNTED DEVICES WITH THE ARCHITECTURAL WALL ELEVATIONS AND
LIGHTING FIXTURE - AT CEILING, SURFACE OR RECESSED MOUNTED FINISHES.
KWD KILOWATTS DEMAND
ILLUMINATED EXIT SIGN WITH INDICATING FACE - CEILING MOUNTED 3. CONTRACTOR SHALL VERIFY THE EXACT LOCATION OF MECHANICAL EQUIPMENT WITH THE
MC MECHANICAL CONTRACTOR MECHANICAL CONTRACTOR. EXACT ELECTRICAL REQUIREMENTS SHALL BE VERIFIED IN THE
FIELD WITH THE EQUIPMENT'S NAMEPLATE DATA. THE CONTRACTOR SHALL MAKE APPROPRIATE
M LIGHTING CONTROL OCCUPANCY SENSOR - CEILING MOUNTED
MCB MAIN CIRCUIT BREAKER ADJUSTMENTS TO WIRE AND FUSE SIZES IN ACCORDANCE WITH THE NAMEPLATE DATA.
'PC3' = PASSIVE INFRARED, 120/277V, EXTENDED RANGE LENS
M LIGHTING CONTROL OCCUPANCY SENSOR - WALL MOUNTED MLO MAIN LUGS ONLY 4. THE ELECTRICAL WIRING, CONNECTION AND PROTECTION REQUIREMENTS FOR OWNER
'PS3' = PASSIVE INFRARED, SINGLE LEVEL SWITCHING, TWO LEVEL DETECTION, FURNISHED EQUIPMENT SHALL BE VERIFIED IN THE FIELD WITH THE OWNER'S EQUIPMENT
MOUNTED AT 48" AFF, UON NEC NATIONAL ELECTRICAL CODE SUPPLIER, AND WITH THE NAMEPLATE DATA. CONTRACTOR SHALL FURNISH THE PROPER NEMA
RECEPTACLE CONFIGURATIONS, CONNECTIONS, CORDS AND PLUGS, AND CIRCUITS IN
F FIRE ALARM PULL STATION AT 48" AFF, UON NEX REMOVE EXISTING ELECTRICAL DEVICE AND INSTALL NEW ELECTRICAL DEVICE IN ACCORDANCE WITH THE MANUFACTURER'S RECOMMENDATIONS.
EXISTING OUTLET BOX. REFER TO NEW FLOOR PLANS FOR NEW DEVICE TYPE AND
FIRE ALARM SMOKE DETECTOR - CEILING MOUNTED, UON WIRING REQUIREMENTS. PROVIDE NEW COVERPLATE. 5. ALL BRANCH CIRCUITS AND FEEDERS SHALL CONTAIN AN INSULATED GROUNDING CONDUCTOR
IN ACCORDANCE WITH ELECTRICAL SERVICE AND POWER DISTRIBUTION SPECIFICATIONS.
D NFPA NATIONAL FIRE PROTECTION ASSOCIATION NEUTRAL CONDUCTORS SHALL NOT BE SHARED IN ACCORDANCE WITH ELECTRICAL BASIC
FIRE ALARM MAGNETIC DOOR HOLDER AT 72" AFF, UON
MATERIALS AND METHODS SPECIFICATIONS.
NIC NOT IN CONTRACT
FIRE ALARM AUDIO/VISUAL DEVICE WITH SPEAKER ROUGH-IN SUCH THAT BOTTOM OF 6. THE DISCONNECTING MEANS FOR ALL MOTORS AND EQUIPMENT SHALL BE INSTALLED IN A
VISUAL LENS IS NO LESS THAN 80" AFF NL NIGHT LIGHT WIRED AHEAD OF LOCAL LIGHTING CONTROL "READILY ACCESSIBLE" LOCATION AND SHALL HAVE PROPER WORKING SPACE AS DEFINED IN
NEC ARTICLE 100 AND 110.
FIRE ALARM VISUAL DEVICE ROUGH-IN SUCH THAT BOTTOM OF LENS IS NO LESS THAN OBC OHIO BUILDING CODE
80" AFF 7. UTILIZATION OF THE PHRASE "PROVIDED BY" WITHIN THE CONTEXT OF THESE DOCUMENTS
OFE OWNER FURNISHED EQUIPMENT SHALL EXPLICITLY REPRESENT "FURNISHED AND INSTALLED BY".
VOICE/DATA ROUGH-IN OUTLET BOX AT 18" AFF, UON
PC PLUMBING CONTRACTOR 8. THE ELECTRICAL CONTRACTOR SHALL ASSUME REMOVING EXISTING CEILING TILES TO INSTALL
V VIDEO ROUGH-IN OUTLET BOX AT 84" AFF, UON NEW WORK AND REPLACING WITH EXISTING OR NEW CEILING TILES AS REQUIRED FOR THE
PHASE INSTALLATION OF ALL WORK. THE AREAS INCLUDE SPACES IN THE NEW WORK AS INDICATED ON
CLOSED CIRCUIT TELEVISION CAMERA ROUGHIN AT 90" AFF, UON THE DRAWINGS AND AREAS NOT SHOWN WHERE THE CONTRACTOR IS REQUIRED TO INSTALL
RD NEW LOCATION OF RELOCATED ELECTRICAL DEVICE NEW WORK. DAMAGED TILES SHALL BE REPLACED.

REX REMOVE EXISTING ELECTRICAL DEVICE ALONG WITH RELATED CONDUIT AND 9. THE ELECTRICAL CONTRACTOR SHALL PROVIDE ALL CUTTING AND PATCHING NECESSARY FOR
WIRING, UON INSTALLATION OF NEW WORK. CUTTING OF A STRUCTURAL MEMBER IS PROHIBITED WITHOUT
SPECIFIC WRITTEN PERMISSION FROM THE ARCHITECT.
RR REMOVE AND RELOCATE EXISTING ELECTRICAL DEVICE AS SHOWN OR AS NOTED
LIGHTING CIRCUITING GUIDE ON DRAWINGS

TB TELECOMMUNICATIONS BACKBOARD
SYMBOL DESCRIPTION
TC TECHNOLOGY CONTRACTOR
B LIGHTING CIRCUITING DESIGNATION,
X1
TCC TEMPERATURE CONTROL CONTRACTOR
B X: REFER TO PANEL SCHEDULE ABBREVIATION KEY, PER DRAWING.
1: CIRCUIT NUMBER.
TGB TELECOMMUNICATIONS GROUNDING BUSBAR
a,b
NOTE:
TMGB TELECOMMUNICATIONS MAIN GROUNDING BUSBAR
SWITCHING SCHEME ALL WIRING SHALL BE #12 WITH EQUIPMENT GROUNDING
CONDUCTOR, UON. (INCREASE TO #10 FOR CIRCUITS WITH DISTANCES
UG UNDERGROUND
AS LISTED IN SPECIFICATIONS). ALL HOMERUNS ARE TO A 20 AMPERE,
LIGHTING DESIGNATION -
SINGLE POLE CIRCUIT BREAKER, UON. PROVIDE QUANTITY OF
REFER TO LIGHTING UON UNLESS OTHERWISE NOTED
CONDUCTORS AS NECESSARY TO ACCOMMODATE CIRCUITS AND
FIXTURE SCHDULE
CONTROL INDICATED ON DRAWINGS.
UPS UNINTERRUPTIBLE POWER SUPPLY

V VOLTS

POWER CIRCUITING GUIDE W WIRE

WP WEATHERPROOF
SYMBOL DESCRIPTION

X1 POWER CIRCUITING DESIGNATION,


X: REFER TO PANEL SCHEDULE ABBREVIATION KEY, PER DRAWING.
1: CIRCUIT NUMBER.

DEVICE, JUNCTION BOX, FLOOR BOX, ETC.


NOTE:
ALL WIRING SHALL BE #12 WITH EQUIPMENT GROUNDING
CONDUCTOR, UON. (INCREASE TO #10 FOR CIRCUITS WITH DISTANCES
AS LISTED IN SPECIFICATIONS). ALL HOMERUNS ARE TO A 20 AMPERE,
SINGLE POLE CIRCUIT BREAKER, UON. PROVIDE QUANTITY OF
CONDUCTORS AS NECESSARY TO ACCOMMODATE CIRCUITS
INDICATED ON DRAWINGS.
SHEET SIZE 30x42 J:\2011\110078\SVHC OR\Sheets\Electrical\PHASE 2\E0-1 ELECTRICAL LEGEND.dwg

SAVED: MGAREE 2011-10-31 11:33 PLOT: 2011-10-31 11:40


LIGHTING FIXTURE SCHEDULE STEEL STUD STEEL STUD

1 OR 2 HOUR FIRE
DESIGNATION LAMP(S) BALLAST(S) FIXTURE FIXTURE CATALOG RATED GYPSUM
FIXTURE DESCRIPTION NOTES
WATTAGE VOLTAGE SERIES BOARD WALL
TYPE TYPE WATTS QUANTITY TYPE QUANTITY
ASSEMBLY
CONDUIT (EMT)
FLUORESCENT 4' LONG, STANDARD STRIP FIXTURE WITH STEEL HOUSING METALUX SSF
AND BAKED WHITE ENAMEL FINISH. LITHONIA C
DAY-BRITE T
S4 T8 32 1 E 1 30 120 COLUMBIA CS CONDUIT (EMT)
LIGHTOLIER SW
HE WILLIAMS 764

CONDUIT (EMT)

LIGHTING FIXTURE SCHEDULE KEY:


FLUORESCENT ELECTRONIC
1. LAMP TYPE:
T8 = LINEAR FLUORESCENT
BALLAST SCHEDULE
FIRE BARRIER MOLDABLE
LAMP(S) ADVANCE BALLAST SERIES NOTES PUTTY PAD
2. BALLAST TYPE:
E = ELECTRONIC TYPE WATTS INSTANT START PROGRAMMED START 1
FRONT VIEW SIDE VIEW
T8 17 OP-P32SC IOP-XS32-SC
25 (3') OP-P32SC IOP-XS32-SC
25 (4') - IOP-XS32-SC
28
30
- IOP-XS32-SC ELECTRICAL BOX FIRESTOP DETAIL
- IOP-XS32-SC
SCALE: NONE
32 IOPX-P32SC IOP-XS32-SC
APPLIES TO BOXES GREATER THAN 4" SQUARE IN FIRE RATED WALLS,
OR IF MULTIPLE 4" BOXES ARE LOCATED WITHIN 24" IN THE SAME FIRE
GENERAL LAMP AND BALLAST NOTES RATED WALL.
1. REFER TO LIGHTING SPECIFICATION SECTION FOR ADDITIONAL
BALLAST AND LAMP REQUIREMENTS. LAMP AND BALLAST
X
BALLAST SCHEDULE NOTES: DETAIL NOTE
MANUFACTURERS LISTED SHALL BE PROVIDED. PROVIDE SHOP
DRAWINGS AS REQUIRED BY ELECTRICAL GENERAL PROVISIONS 1. PROVIDE PROGRAMMED START BALLASTS FOR OCCUPANCY SENSOR ELECTRICAL CONTRACTOR SHALL FURNISH AND INSTALL MOLDABLE PUTTY PADS FOR
SPECIFICATION SECTION. ELECTRONIC BALLASTS SHALL OPERATE APPLICATIONS. USE WITH FLUSH UL LISTED METALLIC ELECTRICAL BOXES. MOLDABLE PUTTY PADS ARE
ABOVE A FREQUENCY OF 40KHZ. ELECTRONIC BALLASTS SHALL TO BE INSTALLED TO COMPLETELY COVER THE EXTERIOR SURFACES OF THE BOX WITHIN
HAVE A MINIMUM POWER FACTOR OF 90%, A MINIMUM BALLAST THE STUD CAVITY. PROVIDE PUTTY MATERIAL TO PLUG THE END OF EACH ELECTRICAL
FACTOR OF 85%, A MAXIMUM CREST FACTOR OF 1.7, AND A METALLIC TUBE OR CONDUIT AT ITS CONNECTION TO THE BOX. A MINIMUM 1/8"
MAXIMUM TOTAL HARMONIC DISTORTION OF 10%, WHEN USED AT THICKNESS OF PUTTY MATERIAL IS REQUIRED ON THE EXTERIOR SURFACES OF FLUSH
NOMINAL VOLTAGE WITH PRIMARY LAMP.
BOXES IN 1 AND 2 HR FIRE RATED ASSEMBLIES. WHEN THE MOLDABLE PUTTY PAD
2. MANUFACTURER "GENERIC" BALLASTS ARE NOT ACCEPTABLE. MATERIAL IS USED AS DIRECTED, THE HORIZONTAL SEPARATION BETWEEN BOXES ON
OPPOSITE SIDES OF THE WALL MAY BE LESS THAN 24" PROVIDED THAT THE BOXES ARE
3. BALLASTS SHALL BE AS MANUFACTURED BY ADVANCE, OR EQUAL NOT INSTALLED BACK TO BACK.
BY OSRAM-SYLVANIA OR UNIVERSAL. PERFORMANCE CRITERIA
SHALL BE EQUIVALENT.

4. ALL LIGHTING FIXTURES WITH DOUBLE ENDED FLUORESCENT


LAMPS THAT HAVE A BALLAST(S) SHALL INCORPORATE A
LUMINAIRE BALLAST DISCONNECT, PER THE NEC. IF THIS
DISCONNECT IS NOT AVAILABLE BY THE FIXTURE MANUFACTURER,
THE EC SHALL PROVIDE THE DISCONNECT, AND WIRE PER THE
NEC.

5. LOW WATTAGE COMPACT FLUORESCENT LAMPS NOT INDICATED


ARE ONLY AVAILABLE WITH MAGNETIC BALLASTS.

6. REFER TO SPECIFICATIONS FOR SPECIAL BALLASTS (DIMMABLE,


EMERGENCY, ETC.).

GYPSUM WALL MINERAL WOOL PACKING


BOARD ASSEMBLY BATT, NOMINAL 6 PCF,
DEPTH AS REQUIRED BY MASONRY/CONCRETE MINERAL WOOL PACKING
GYPSUM WALL INTUMESCENT FIRESTOP
THE MANUFACTURER WALL BATT, NOMINAL 4 PCF,
BOARD ASSEMBLY SEALANT, DEPTH AS
DEPTH AS REQUIRED BY
REQUIRED BY THE
THE MANUFACTURER
MANUFACTURER

INTUMESCENT FIRESTOP
METALLIC CONDUIT METALLIC CONDUIT MINERAL WOOL PACKING
SEALANT, DEPTH AS
INTUMESCENT FIRESTOP BATT, NOMINAL 6 PCF,
REQUIRED BY THE METALLIC CONDUIT
SEALANT, DEPTH AS DEPTH AS REQUIRED BY
MANUFACTURER
REQUIRED BY THE THE MANUFACTURER
MANUFACTURER
SHEET SIZE 30x42 J:\2011\110078\SVHC OR\Sheets\Electrical\PHASE 2\E0-2 ELECTRICAL LIGHTING FIXTURE SCHEDULE.dwg

FIRESTOP FOR METALLIC CONDUIT THROUGH GYPSUM BOARD WALL


FIRESTOP FOR METALLIC CONDUIT THROUGH GYPSUM BOARD WALL FIRESTOP FOR METALLIC CONDUIT 1 OR 2 HOUR RATED SCALE: NONE
1 OR 2 HOUR RATED SCALE: NONE
THROUGH MASONRY/CONCRETE WALL
1 OR 2 HOUR RATED SCALE: NONE
SAVED: MGAREE 2011-10-31 11:33 PLOT: 2011-10-31 11:44
REX
REX REX REX
REX REX REX REX REX REX REX REX
REX REX
REX
REX REX REX REX
REX REX REX REX REX REX REX
REX REX
REX REX
REX REX

REX REX REX


REX REX REX REX REX REX REX REX REX
REX

REX REX REX


REX REX REX REX REX
REX
REX REX REX REX REX
REX REX REX REX REX REX REX
REX REX
REX
REX N-1-7E N-1-2 REX REX REX
(ETR) (ETR) REX GENERAL NOTES
N-1-UPS REX 1. CONTRACTOR SHALL CONDUCT COMPLETE
(ETR) REX
(ETR) FIELD SURVEY OF EXISTING CONDITIONS PRIOR
TO SUBMISSION OF BID PRICE. NO ADDITIONAL
PAYMENTS WILL BE MADE ON CLAIMS THAT
ARISE FROM LACK OF KNOWLEDGE OF EXISTING
CONDITIONS.

AREA OF WORK

FIRST FLOOR LIGHTING DEMOLITION PLAN


SHEET SIZE 30x42 J:\2011\110078\SVHC OR\Sheets\Electrical\PHASE 2\ED-01 FIRST FLOOR LIGHTING DEMOLITION PLAN.dwg

SCALE: 1/8" = 1'-0"

0 2' 4' 6' 8' 12' 16'

PHASE 2 AREA OF WORK


SAVED: MGAREE 2011-10-28 15:28 PLOT: 2011-10-31 11:42

KEY PLAN
REX
REX REX REX
REX

REX REX REX


REX
REX REX REX
REX REX REX REX
REX REX REX REX
I REX
REX
REX
REX REX
I REX
REX REX REX REX
I REX REX REX REX
I
REX REX
REX
REX
REX N-1-7E N-1-2
(ETR) (ETR) REX
REX
I REX REX GENERAL NOTES
(ETR) REX REX REX 1. CONTRACTOR SHALL CONDUCT COMPLETE
N-1-UPS
(ETR) ETR FIELD SURVEY OF EXISTING CONDITIONS PRIOR
REX REX REX TO SUBMISSION OF BID PRICE. NO ADDITIONAL
PAYMENTS WILL BE MADE ON CLAIMS THAT
ARISE FROM LACK OF KNOWLEDGE OF EXISTING
CONDITIONS.

AREA OF WORK

FIRST FLOOR ELECTRICAL DEMOLITION PLAN


SHEET SIZE 30x42 J:\2011\110078\SVHC OR\Sheets\Electrical\PHASE 2\ED-02 FIRST FLOOR ELECTRICAL DEMOLITION PLAN.dwg

SCALE: 1/8" = 1'-0"

0 2' 4' 6' 8' 12' 16'

PHASE 2 AREA OF WORK


SAVED: MGAREE 2011-10-31 11:32 PLOT: 2011-10-31 11:44

KEY PLAN
GENERAL NOTES
1. CONTRACTOR SHALL CONDUCT COMPLETE
FIELD SURVEY OF EXISTING CONDITIONS PRIOR
TO SUBMISSION OF BID PRICE. NO ADDITIONAL
PAYMENTS WILL BE MADE ON CLAIMS THAT
ARISE FROM LACK OF KNOWLEDGE OF EXISTING
CONDITIONS.

X PLAN NOTES
1. ALTERNATE E-1: PROVIDE NEW SWITCHBOARD
AND CONDUIT FEEDER FOR NEW PANEL SDP-7EB
ON FIRST FLOOR.

2. ALTERNATE E-2: PROVIDE (2) 4"C & (1)2-1/2"C


FROM SWITCHGEAR ROOM TO FIRST FLOOR
ELECTRICAL CLOSET. CAP CONDUITS AND
PROVIDE PULLSTRINGS FOR FUTURE USE.

3. VERIFY ROUTES ABOVE CEILING W/ SVHC


FACILITIES PERSONEL. PROVIDE PULLBOXES
MAX 150 FT APART AND AS REQUIRED BY CODE.

SDP-3
(ETR)

N-G-17
(ETR)
PULL BOX
SDP-2
(ETR)
(ETR) SDP-3E
(ETR)

SDP-3EA
TS-1A (ETR)
(ETR)
SDP-1
(ETR)
SDP-2EA
(ETR)

TS-1A
SDP-2E (ETR)
(ETR)

1
3

METER (ETR)
METER (ETR)

4KV
SWITCHGEAR
(ETR)

MDP-1
(ETR)

UPS (ETR)

(ETR)
SHEET SIZE 30x42 J:\2011\110078\SVHC OR\Sheets\Electrical\PHASE 2\E2-00 GORUND FLOOR ELECTRICAL PLAN.dwg

BATTERIES
(ETR) (FRONT)
TS-5A
(ETR)
(REAR)
1 SDP-7EA
SDP-7E
(ETR)
TS-6A
(ETR) PHASE 2 AREA OF WORK

SDP-9 T-27
(ETR)
SAVED: MGAREE 2011-10-31 11:33 PLOT: 2011-10-31 11:43

(ETR)
SUBSTATION 3 SUBSTATION 4
(ETR) (ETR)

T-26
(ETR)

KEY PLAN
N-1-7E N-1-2
SPE-7EB
(ETR) (ETR)

N-1-UPS (ETR) GENERAL NOTES


(ETR) 1. CONTRACTOR SHALL CONDUCT COMPLETE
1 2 FIELD SURVEY OF EXISTING CONDITIONS PRIOR
3 ETR TO SUBMISSION OF BID PRICE. NO ADDITIONAL
PAYMENTS WILL BE MADE ON CLAIMS THAT
ARISE FROM LACK OF KNOWLEDGE OF EXISTING
CONDITIONS.

AREA OF WORK
X PLAN NOTES
1. ALTERNATE E-1: PROVIDE NEW DISTRIBUTION
BOARD AT LOCATION SHOWN.

2. CONTRACTOR TO PROVIDE TEMPORARY


CONSTRUCTION LIGHTING.

3. ALTERNATE E-2: STUB CONDUITS 12" AFF AND


CAP FOR FUTURE USE.

FIRST FLOOR ELECTRICAL PLAN


SCALE: 1/8" = 1'-0"
SHEET SIZE 30x42 J:\2011\110078\SVHC OR\Sheets\Electrical\PHASE 2\E2-01 FIRST FLOOR ELECTRICAL PLAN.dwg

0 2' 4' 6' 8' 12' 16'

PHASE 2 AREA OF WORK


SAVED: MGAREE 2011-10-31 11:32 PLOT: 2011-10-31 11:43

KEY PLAN
T1R2-19 T1R2-19
S4 S4
GENERAL NOTES
T1R2-19 1. CONTRACTOR SHALL CONDUCT COMPLETE
FIELD SURVEY OF EXISTING CONDITIONS PRIOR
TO SUBMISSION OF BID PRICE. NO ADDITIONAL
PAYMENTS WILL BE MADE ON CLAIMS THAT
ARISE FROM LACK OF KNOWLEDGE OF EXISTING
CONDITIONS.

2. REFER TO MECHANICAL EQUIPMENT


CONNECTION SCHEDULE ON SHEET E8-01.

X PLAN NOTES
INTERSITUAL ELECTRICAL PLAN 1. DISCONNECT EXHAUST FAN. DEMO CONDUIT
AND CONDUCTORS BACK TO SOURCE.
SCALE: 1/8" = 1'-0"

0 2' 4' 6' 8' 12' 16'

AREA OF
WORK

CU-2
T1R2-17
100AS L/R
90AF 1

AREA OF
WORK

200AS
L/R L/R
T1R2 T1R2-15 T1R2-15 110AF L/R
ETR T1R2-15
RTU-1 RF RTU-1 SF CU-1

L/R RTU-2 RF
T1R2-17

L/R
T1R2-17

RTU-2 SF

SECOND FLOOR ELECTRICAL PLAN


SCALE: 1/8" = 1'-0"

0 2' 4' 6' 8' 12' 16'


SHEET SIZE 30x42 J:\2011\110078\SVHC OR\Sheets\Electrical\PHASE 2\E2-02 SECOND FLOOR ELECTRICAL PLAN.dwg

PHASE 2 AREA OF WORK


SAVED: MGAREE 2011-10-31 11:32 PLOT: 2011-10-31 11:43

KEY PLAN
FEEDER SCHEDULE - COPPER
CONDUCTORS EQUIPMENT
DESIGNATION CONDUIT
AWG/KCMIL GROUND

A 4 #12 #12

B 4 #10 #10

C 4 #8 #10 1"

D 4 #6 #10 1"

E 4 #4 #8

F 4 #2 #8

G 4 #1 #6 2"

H 4 #1/0 #6 2"

I 4 #2/0 #6 2"

J 4 #3/0 #6

K 4 #4/0 #4

L 4 #250 #4

M 4 #350 #4 3"

N 4 #500 #2 4"

O (2) SETS OF 4 #250 #2

P (2) SETS OF 4 #350 #1 (2) 3"

R (2) SETS OF 4 #500 #1/0 (2) 4"


2
S (3) SETS OF 4 #500 #2/0 (3) 4"

T (4) SETS OF 4 #350 #3/0 (4) 4"

U (5) SETS OF 4 #500 #4/0 (5) 4"

V (6) SETS OF 4 #500 #250 (6) 4"

W (7) SETS OF 4 #500 #350 (7) 4"

X (8) SETS OF 4 #500 #500 (8) 4"

Y (11) SETS OF 4 #500 #500 (11) 4"

1. RETROFIT TS-1A PER SPECIFICATIONS 26-31-20.

NIC 2. RETROFIT TS-2A PER SPECIFICATIONS 26-31-20.

3. PROVIDE STACKED DOUBLE LUG 500KCMIL CABLE LUGS O


EXISTING INCOMING 1600A MAIN LUGS BUS.

ALL EQUIPMENT AND FEEDERS ON THIS SHEET


ARE EXISTING TO REMAIN, UNLESS SPECIFICALLY
NOTED OTHERWISE. SEE AREA OF NEW WORK
BOXES.

EHSDP ECC

MASTER/ENGINE
GENERATOR
CONTROLS

TS-7A
G
1600A

ALTERNATE E-1
AREA OF NEW
WORK G2

ETR

NEW
3
REFER
R
TO
PANEL
SCHEDULES

NEW
1

ELSDP
SHEET SIZE 30x42 J:\2011\110078\SVHC OR\Sheets\Electrical\PHASE 2\E7-01 ELECTRICAL ONE-LINE DIAGRAM.dwg

SAVED: MGAREE 2011-10-31 11:32 PLOT: 2011-10-31 11:42

ELECTRICAL ONE LINE DIAGRAM - EXISTING


EQUIPMENT CONNECTION SCHEDULE
No. CONDUIT AND CKT
LOCATION DESCRIPTION VOLTAGE PH HP FLA KW CONN. PANEL C/B NOTES
WIRE SIZE NO.

E2-02 RTU-1 SF AIR HANDLER SUPPLY FAN 480 3 20 - 20 VFD 3 # 6, 1 #8 GND, 1"C SDP-7EB 1 50/3 1

E2-02 RTU-1 RF AIR HANDLER RETURN FAN 480 3 10 - 10 VFD 3 # 10, 1 #10 GND, 3/4"C SDP-7EB 2 25/3 1

E2-02 RTU-2 SF AIR HANDLER SUPPLY FAN 480 3 15 - 15 VFD 3 # 8, 1 #10 GND, 1"C SDP-7EB 4 40/3 1

E2-02 RTU-2 RF AIR HANDLER RETURN FAN 480 3 5 - 5.4 VFD 3 # 12, 1 #12 GND, 3/4"C SDP-7EB 5 15/3 1

E2-02 CU-1 CONDENSOR UNIT 480 3 - 50 FS 3 # , 1 #8 GND, 1-1/2"C SDP-7EB 3 125/3

E2-02 CU-2 CONDENSOR UNIT 480 3 - 32 FS 3 # 4, 1 #8 GND, 1-1/2"C SDP-7EB 6 90/3

X MECHANICAL EQUIPMENT SCHEDULE NOTES MECHANICAL EQUIPMENT SCHEDULE LEGEND:


1. VFD FURNISHED BY MECHANICAL CONTRACTOR, INSTALLED, WIRED AND FS - FUSED DISCONNECT SWITCH
FINAL TERMINATIONS BY ELECTRICAL CONTRACTOR.
VFD - VARIABLE FREQUENCY DRIVE PROVIDED BY MC, WIRED BY EC.
UNIT DISCONNECT PROVIDED BY MC.
SHEET SIZE 30x42 J:\2011\110078\SVHC OR\Sheets\Electrical\PHASE 2\E8-01 ELECTRICAL PANEL SCHEDULES.dwg

SAVED: MGAREE 2011-10-31 11:31 PLOT: 2011-10-31 11:42