Professional Documents
Culture Documents
SF SUPPLY FAN
EXISTING PIPING
SO SUPPLY OUTLET
EXISTING PIPING TO BE REMOVED
SS STAINLESS STEEL
EXPANSION JOINT/COMPENSATOR
STR STRAINER AIR HANDLING
FLEXIBLE PIPE CONNECTION UNIT HEATER
UNIT SCHEDULE SCHEDULE
T TRANSFER GRILLE
REMOVE TO POINT AND CAP
(DIRECT EXPANSION)
MARK UH-1 UH-2
TB TERMINAL BOX MARK AHU-1 AHU-2
TYPE HORIZ DISCH HORIZ DISCH
REMOVE TO POINT FOR RECONNECTION FAN SECTIONS: CAPACITY (MBH/KW) 29.8 29.8
TG TRANSFER GRILLE
SUPPLY AIR (CFM) 13,000 8,000 WATER FLOW (GPM) 3.5 3.5
SHUT OFF VALVE
MIN OUTSIDE AIR (CFM) 3,900 2,400 180/160 180/160
VAV VARIABLE AIR VOLUME
WATER PRESS DROP (FT) .12 .12
STEAM TRAP TOTAL STATIC PRESS ("WG) 5.10 4.81
VD VOLUME DAMPER AIR DELIVERY (CFM) 750 750
EXT STATIC PRESS ("WG) 2.50 2.50
STRAINER W/BLOW DOWN 60 60
FAN TYPE/SIZE PF CLASS II PF CLASS II
EXT. STATIC PRESS. ("WG) - -
UNION BHP 15.8 10.2 MOTOR HP 1/20 1/20
MOTOR HP 20 15 ELECTRICAL DATA (VOLT./PH.) 120/1 120/1
PIPE BRANCH TAKE-OFF FROM BOTTOM
RPM 1497 1788 MOUNTING ARRANGEMENT SUSPENDED SUSPENDED
RECESS DEPTH - -
PIPE BRANCH TAKE-OFF FROM TOP VFD MARK VFD-SF-1 VFD-SF-2
GENERAL HVAC NOTES: MANUFACTURER AIRTHERM AIRTHERM
RETURN/EXHAUST FAN
PIPE DROP MODEL NUMBER HA-048B HA-048B
1. THE HVAC SYSTEM INSTALLATION SHALL BE IN ACCORDANCE WITH NFPA, PENNSYLVANIA AND TOTAL STATIC PRESS ("WG) - -
REMARKS 3 3
INTERNATIONAL CODES AND ALL LOCAL CODES AND ORDINANCES.
PIPE RISE EXT STATIC PRESS ("WG) 1.00 1.00
REMARKS:
2. DRAWINGS ARE DIAGRAMMATIC. INDICATED POSITIONS SHALL BE FOLLOWED AS CLOSELY AS FAN TYPE/SIZE FC CLASS I FC CLASS I 1. DISCONNECT SWITCH
CD A/C CONDENSATE DRAIN PIPING
POSSIBLE, EXACT EQUIPMENT LOCATIONS AND DUCTWORK AND PIPING ROUTING SHALL BE SUBJECT 2. HANGER RODS
BHP 7.8 3.0
TO BUILDING CONSTRUCTION AND INTERFERENCES WITH OTHER TRADES. 3. AQUASTAT
HWR HEATING WATER RETURN PIPING 4. UNIT MOUNTED THERMOSTAT
MOTOR HP 10 5
3. ALTHOUGH ATTEMPTS HAVE BEEN MADE TO IDENTIFY EXISTING EQUIPMENT LOCATIONS, PIPE AND RPM 778 587
HWS HEATING WATER SUPPLY PIPING DUCTWORK ROUTING AND SIZES WITH THE USE OF EXISTING DRAWINGS AND FIELD OBSERVATIONS, MC
SHALL FIELD VERIFY ALL EXISTING INFORMATION. REPORT ANY DISCREPANCIES TO THE ARCHITECT VFD MARK VFD-RF-1 VFD-RF-2
LPR LOW PRESSURE CONDENSATE PIPING OR ENGINEER. NOTE ALL DISCREPANCIES ON THE AS-BUILT DRAWINGS. COOLING COIL OCTAVE BAND CENTER FREQUENCY, HZ
LPS LOW PRESSURE STEAM PIPING 4. COORDINATE ALL WORK WITH THE PHASING OF THE PROJECT. SOME SERVICES MUST REMAIN ACTIVE TOTAL CAPACITY (MBH) 540.74 349.60
63 125 250 500 1000 2000 4000 8000
TO SERVE OCCUPIED SPACES DURING CONSTRUCTION. SCHEDULE ALL SERVICE SHUTDOWNS WITH SENSIBLE CAPACITY (MBH) 383.72 248.00
V VENT PIPING OWNER AND/OR CONSTRUCTION MANAGER. AHU-1
MAX FACE VELOCITY (FPM) 532.6 373.1 87 87 92 94 91 86 84 83
SUPPLY FAN
H HUMIDISTAT 5. ALL FIRE-STOPPING SHALL BE PERFORMED BY THE CONTRACTOR PERFORMING THE WORK REQUIRING 80/66 95.0 AHU-1
THE PENETRATION. REFER TO THE DETAILS PERTAINING TO TYPE AND METHOD REQUIRED. 90 86 76 75 76 76 73 66
53/52 52/51 RETURN FAN
S SENSOR
6. REFER TO ARCHITECTURAL REFLECTED CEILING PLANS FOR EXACT LOCATIONS OF CEILING DIFFUSERS REFRIGERANT TYPE R-410A R-410A AHU-2
87 85 89 88 87 87 89 89
AND GRILLES. SUPPLY FAN
T THERMOSTAT 40.2 43.1
AHU-2
7. ATTENTION IS CALLED TO THE LIMITED CEILING SPACE. HOLD ALL DUCTWORK AS HIGH AS POSSIBLE, TO COIL ROWS/FINS PER INCH 6/8 6/8 84 80 71 64 66 62 58 49
RETURN FAN
T NIGHT THERMOSTAT DECK BETWEEN BEAMS IF REQUIRED, AND TIGHT TO STEEL STRUCTURE. PROVIDE ANY AND ALL
N AIR PRESS DROP ("WG) 0.86 0.49
OFFSETS AND EFFORT REQUIRED FACILITATING DUCT ROUTING. CU-1
87.1 85.4 86.0 86.5 84.7 80.1 75.4 67.5
L LOUVERED DOOR HEATING COIL
8. ALL EQUIPMENT AND DAMPERS MUST BE ACCESSIBLE. IF LOCATED ABOVE DRYWALL CEILING OR TOTAL CAPACITY (MBH) 830.1 439.4 CU-2
UCD BEHIND FINISHED WALLS, PROVIDE ACCESS DOOR. COORDINATE ALL ACCESS DOOR LOCATIONS WITH 84.3 83.6 84.0 84.7 83.0 78.3 73.6 65.9
UNDERCUT DOOR
ARCHITECT. 47/106.1 47/97.8
19. SUPPLY DUCTWORK UPSTREAM OF VAV TERMINAL UNITS SHALL BE CONSTRUCTED PER SMACNA 5. 36" HIGH ROOF CURB
ETR EXISTING TO REMAIN STANDARDS FOR 4 INCH STATIC PRESSURE. REFER TO SPECIFICATIONS. 6. AGION COATING
EWT ENTERING WATER TEMPERATURE 20. DUCTWORK SHALL BE PRESSURE TESTED AS INDICATED IN THE SPECIFICATIONS. IF A SECTION OF
DUCTWORK FAILS THE TEST, THE SECTION SHALL BE SEALED AND RETESTED UNTIL IT PASSES.
EXC EXPANSION COMPENSATOR
21.
FD FIRE DAMPER
H HUMIDIFER
SAVED: CHICAR 2011-10-31 12:50 PLOT: 2011-10-31 12:58
HC HEATING COIL
KEY PLAN
2 18/16 18/8 2
36/14 1 450 1 1
48/9 75 1 5 14/8 14/6
54/10 200
18/10 18/10 12/6 275 350
18/6 6
12/6 275 14/8
250 250 275
900 400 18/12
18/6 18/10 10" 10"
24/8 14/8 26/8 2 4 2
14/8 24/8 10" 1 10"
4 4 200
18/1218/12
3 150
T 10" 12" 14" 20/18 18/12 2
8" T 500
8 8"
48/9
36/14
7
34/8
8" 3
T
275 T 2 75 GENERAL NOTES
14/9
12"
24/8
6 1. CONTRACTOR SHALL CONDUCT COMPLETE
18/10
1
14/8
250 200 14/6 10" 7 FIELD SURVEY OF EXISTING CONDITIONS PRIOR
250
12/8 4 14/12 TO SUBMISSION OF BID PRICE. NO ADDITIONAL
1 350
34/10
8" 1 3 3 PAYMENTS WILL BE MADE ON CLAIMS THAT
14/8 14/8 T 3 ARISE FROM LACK OF KNOWLEDGE OF EXISTING
3 8"
38/8 2 CONDITIONS.
3
10/8 12/6
48/9
75
18/10
18/8 X DUCTWORK DEMO NOTES
18/8
8" 32/12 48/18
18/10 1. REMOVE EXISTING SA DIFFUSER.
24/8
18/6 20/8
20/10
16/10
12/10 7
2. REMOVE EXISTING RETURN/EXHAUST GRILLE.
T
3. REMOVE EXISTING DUCTWORK BACK TO MAIN
36/24
34/14
T AND CAP AS INDICATED.
28/8
T
18/10
36/14
4. REMOVE EXISTING TERMINAL BOX AND
CONTROLS AS INDICATED.
12/8 20/6 16/6
5. REMOVE EXISTING EXHAUST FAN AND
8/8
8" CONTROLS ABOVE.
20/9
20/6
14/10
8" 20/18 12"
10" 6. PROVIDE COMPLETE AIR BALANCE SURVEY OF
40/18 14/6 15/12 20/12 ALL SUPPLY/EXHAUST/RETURN GRILLES,
24/10
16/9
DIFFUSERS AND TERMINAL BOXES. PROVIDE
T REPORT PRIOR TO START OF DEMOLITION.
34/9
32/8
28/12
16/10
22/10
30/10 14/6 7. DUCT MAINS TO REMAIN.
24/8 8/8
8. REMOVE AND REINSTALL ALL DUCTWORK AND
24/6 24/6
14/12 16/15 14/16 12/6 8" DIFFUSERS FOR NEW SA/RA DUCT STUBS IN THIS
AREA. REMOVE AND REINSTALL CEILING AS
14/6
24/8
44/10 REQUIRED.
20/6
10"
44/10
T
46/14
18/10
36/12
18/10
20/8
54/16
10/8
14/10
14/10
20/8
10/10 8/8 14/6
30/10
10/10 8"
14/6 14/8 T 16/14
18/6
14/12
52/14
14/12 20/18 14/6
1" B
A A
3
4"
X PIPING DEMO NOTES
B A. DISCONNECT EACH TERMINAL BOX AND REMOVE
1" HWR HWS/HWR PIPING BACK TO MAIN.
HWS A A
HWR
HWS
B. REMOVE AND REINSTALL PIPING AS REQUIRED
3 FOR NEW SA/RA DUCTS IN THIS AREA.
4"
A
A
HWS
1"
4"
3" 3"
1" 8" SAN
HWS
8" ST
8" HZCW
3" LPS 11 4"
2" LPR 112"
3"
5" HWHR
5" HWHS
3
CHS
4" A
CHR
1"
112"
3
4"
HWR
HWS
5"
CHR
112" CHS
CHS
CHR
CHR
A
CHS
CHR
HWS
CHS
1"
6" 3"
HWR
3"
1" HWR
3"
CHS
HWS
11 4"
CHR
2"
SHEET SIZE 30x42 J:\2011\110078\SVHC OR\Sheets\Mechanical\PHASE 2\HD-01 FIRST FLOOR DEMOLITION PLANS.dwg
HWS
HWR
HWR
HWS
HWR
3"
HWR
1"
1"
3
"
KEY PLAN
SEE ENLARGED OR 5 & 7 SEE ENLARGED PLAN
PLAN ON DRAWING H5-01 ON DRAWING H5-01 FOR
FOR WORK IN THIS AREA WORK IN THIS AREA
18/6
18/6
24/8 14/8
14/8 24/8
36/14
34/8
14/9
24/8
14/8
T T
34/10
14/8 14/8 T
38/8
10/8
16/10
18/10
18/8 48/18
32/12
18/10
24/8
18/6 20/8
36/24
34/14
T
28/8
T
18/10
36/14
20/6 16/6
20/9
20/6
14/10
8" 20/18 12"
40/18 14/6 15/12 20/12
16/9
T
34/9
28/12
16/10
22/10
30/10 14/6
8/8
24/6 24/6
14/12 16/15 14/16 12/6 8"
14/6
44/10
20/6
10"
44/10
T
46/14
10/8
36/12
20/8
54/16
20/8
8/8
30/10
8"
14/6 14/8 T 16/14
18/6 CTE CTE
52/14
14/12 20/18 14/6
1"
X PLAN NOTES
1. CONNECT NEW 1" HWS/HWR TO EXISTING MAIN.
1 1
UH-1 T T UH-2
1"
HWS
4"
3" 3"
1" 8" SAN
HWS
8" ST
8" HZCW
3" LPS 11 4"
2" LPR 112"
3"
5" HWHR
5" HWHS
3
CHS
4"
CHR
1"
112"
3
4"
HWR
HWS
5"
CHR
112" CHS
CHS
CHR
CHR
CHS
CHR
HWS
CHS
1"
6" 3"
HWR
3"
1" HWR
3"
CHS
HWS
11 4"
CHR
2"
HWS
HWR
HWR
SHEET SIZE 30x42 J:\2011\110078\SVHC OR\Sheets\Mechanical\PHASE 2\H1-01 FIRST FLOOR HVAC PLANS.dwg
HWS
HWR
3"
HWR
1"
1"
3
"
KEY PLAN
B
H5-02
3
2
AHU-1
CU-1 X DEMOLITION NOTES
A. REMOVE EXISTING EXHAUST FAN.
5
1
X HVAC PLAN NOTES
1. MAINTAIN 25'-0" BETWEEN OUTSIDE AIR INTAKE
AND EXHAUST/VENT OUTLETS.
(TYP-3) B
2. REFRIGERANT PIPING SIZED BY MANUFACTURER.
4
3. PIPE SUPPORTS (TYPICAL).
H5-02
A
X PLUMBING PLAN NOTES
A. 4" VENT THRU ROOF.
EXISTING
AC-5
CHS
CHR
PRV-6
CHR
CHS
PHASE 2 AREA
OF WORK
SAVED: CHICAR 2011-10-31 12:51 PLOT: 2011-10-31 13:03
KEY PLAN
C
H5-02
X DEMOLITION NOTES
A. REMOVE AND REROUTE EXISTING 6" ROOF
DRAIN.
4
CU-2 3
X HVAC PLAN NOTES
1. MAINTAIN 25'-0" BETWEEN OUTSIDE AIR INTAKE
AND EXHAUST/VENT OUTLETS.
2
2. REFRIGERANT PIPING SIZED BY MANUFACTURER.
PRV-5 EXISTING
AC-3
CHS
CHR
CHS
CHR
SHEET SIZE 30x42 J:\2011\110078\SVHC OR\Sheets\Mechanical\H1-03 MECHANICAL ROOF PLAN.dwg
KEY PLAN
X PLAN NOTES
1. OUTLINE OF CU-1 ABOVE.
8. AHU-1 ABOVE.
9. AHU-2 ABOVE.
18/6
11
14/8
7 18/6 24/8
14/8 10
24/8 5
OR 7 OR 5
2500 CFM 2000 CFM
3300 CFM 3000 CFM
36/14
34/8
6 10
24/8
11 11
16/8 14/8
10/8
14/8 T
34/10
14/8
8/8
10/8
18/10
18/10
11
SHEET SIZE 30x42 J:\2011\110078\SVHC OR\Sheets\Mechanical\H5-01 ENLARGED FIRST FLOOR HVAC PLANS.dwg
KEY PLAN
CU-1 CU-1
AHU-1
3 4
1 1
2
56/71 RA
25/81 SA X PLAN NOTES
1. EQUIPMENT RAILS
5 5 2. ROOF CURB
3. PIPE SUPPORT
4. REFRIGERANT PIPING
6. DUCT SUPPORT
SECTION A A SECTION B B
SCALE: 1/4" = 1'-0" H1-02 SCALE: 1/4" = 1'-0" H1-02
AHU-2
6 (TYP) 25/74 SA
5 5
SECTION C C
SCALE: 1/4" = 1'-0" H1-03
KEY PLAN
GENERAL NOTES:
31'-9"
1. DUCT RUNOUT SIZE SHALL BE THE SAME AS THE AIR INLET/OUTLET
X AHU-1 PLAN NOTES
CONNECTION SIZE UNLESS NOTED OTHERWISE. 1. RA FAN SECTION
AIRFOIL TURNING VANES 4 8 9 10 11
A B
PER SMACNA STANDARDS 2. DUCT RUNOUT SIZE SHALL BE THE SAME AS THE TERMINAL INLET 2. EXHAUST BOX
CONNECTION SIZE UNLESS NOTED OTHERWISE.
3. MIXING BOX
3. REFER TO ARCHITECTURAL REFLECTED CEILING PLAN FOR CEILING
4. ANGLE FILTER
MATERIALS AND EXACT LOCATIONS OF AIR DISTRIBUTION DEVICES.
AIRFOIL TURNING 5. STEAM COIL
9'-4"
VANES PER SMACNA 4. FLEXIBLE DUCTWORK SHALL BE INSTALLED WITHOUT KINKS AND WITHOUT
STANDARDS BENDS GREATER THAN 30 DEGREES. 6. DIRECT EXPANSION COIL
5. ALL DUCTWORK DIMENSIONS SHOWN ARE GROSS, NET FREE AREA OF 7. HUMIDIFIER
LINED DUCTWORK IS REDUCED BY THE DUCT LINING THICKNESS.
A+B 8. PLENUM
6. ACCESS DOORS SHALL BE PROVIDED IN DUCTWORK FOR ACCESS TO ALL
FIRE DAMPERS, FIRE/SMOKE DAMPERS, SMOKE DAMPERS, MOTOR 1 2 6 7 9. BLOW-THRU SUPPLY FAN
OPERATED DAMPERS AND COILS. (UPSTREAM AND DOWNSTREAM OF ALL 3
5 10. BAG/CARTRIDGE FILTER
COILS)
NOTE: NOTE: 11. BLOW-THRU PLENUM SECTION
2" RADIUS VANES - DUCT WIDTH TO 12" 2" RADIUS VANES - DUCT WIDTH TO 12" 7. INSTALL ALL EQUIPMENT REQUIRING AN ELECTRICAL CONNECTION IN SUCH
A MANNER SO THAT PROPER CLEARANCE IS PROVIDED FOR SERVICING PER SCALE: NONE
4" RADIUS VANES - DUCT WIDTH 13" AND ABOVE. 4" RADIUS VANES - DUCT WIDTH 13" AND ABOVE. 12. 24" ROOF CURB
NATIONAL ELECTRICAL CODE.
4 8 9 10 11
8. FLEXIBLE DUCTWORK SHALL NOT PENETRATE THRU WALLS, RIGID SHEET
RECTANGULAR DUCT TEE METAL DUCTWORK IS REQUIRED AT ALL WALL PENETRATIONS.
DUCT ELBOW WITH WITH TURNING VANES 9. FLEXIBLE DUCTWORK SHALL NOT BE USED IN EXPOSED LOCATIONS.
TURNING VANES
5'-2"
12 1 2 3 5 6 7 12
2-WAY CONTROL
VALVE
SCALE: NONE SCALE: NONE
BALANCING
VALVE (TYP.)
MANUAL AIR
MAXIMUM SPACING 10'-0" OR VENT (TYP.)
CWR
AS REQUIRED BY PIPE SIZE
REFER TO SPECIFICATIONS
REFER TO PLAN
FOR PIPE SIZES
THERMOMETER
29'-3"
(TYP.)
GALVANIZED STEEL
CHANNEL TRACK
CWS X AHU-2 PLAN NOTES
COIL MANUAL 1. RA FAN SECTION
AIR VENT SHUT-OFF 4 6 8 9 10 11
VALVE (TYP.) 2. EXHAUST BOX
CURB CAP
STRAINER
3 3. MIXING BOX
4"
HOSE END
ROOFING MEMBRANE PATE PRS PIPE THREADED DRAIN
TO RUN UP UNDER ROLLER SUPPORTS PETE'S PLUG (TYP.) 4. ANGLE FILTER
VALVE WITH CAP
CURB CAP
10'-4"
ROOF COOLING COIL 5. STEAM COIL
5'-1"
SPRING ISOLATORS
12 1 2 3 5 7 12
GALVANIZED STEEL
CHANNEL TRACK
MANUAL AIR VENT
COMBINATION BALANCE & SCALE: NONE SCALE: NONE
CURB CAP SHUT-OFF VALVE W/ FLOW PETE'S PLUG (TYP.)
INDICATOR AND PETE'S
PLUGS. "BELL & GOSSETT
ROOFING MEMBRANE
CB" OR EQUAL.
TO RUN UP UNDER
CURB CAP HWR
ROOF REFER TO PLAN REHEAT COIL
FOR PIPE SIZES NO
HWS
FASTEN EQUIPMENT
SUPPORT TO ROOF DECK EQUIPMENT SUPPORT CURB SHUT-OFF VALVE UNION CONNECTION
LENGTH AS REQUIRED FOR COIL REMOVAL
STRAINER
NOTE: USE PATE NO. PRS-2 PIPE SUPPORT FOR SINGLE-PLY ROOFING 3 2-WAY CONTROL VALVE
4" HOSE END THREADED
AND PATE NO. PRS-5 PIPE SUPPORT FOR BUILT-UP ROOFING. DRAIN VALVE WITH CAP
ROOFTOP PIPE SUPPORT DETAIL HOT WATER REHEAT COIL PIPING DIAGRAM
SCALE: NONE (2-WAY CONTROL VALVE) SCALE: NONE
ROOFTOP UNIT
CAULK
WOOD NAILER
TEMPERATURE
REINFORCED NEOPRENE SWITCH CONTROL
NEOPRENE WEATHER CONTINUOUS PERIMETER LINE
SEAL UNISTRUT SUPPORTS
ROOF CURB FURNISHED (TYP.)
TEMPERATURE
WITH ROOFTOP UNIT
SWITCH
RIGID INSULATION SUPPLY DUCT
SHUT-OFF
MC TO PROVIDE (1) LAYER OF 2 PSF VALVE FITTING (TYP.)
ROOFING
(TYP.)
SHEET SIZE 30x42 J:\2011\110078\SVHC OR\Sheets\Mechanical\H6-01 HVAC DETAILS & DIAGRAMS.dwg
CONDUIT TURNED UP 4. EXISTING CONDUITS, CIRCUITS OR SYSTEMS PASSING THROUGH THE REMODELED AREAS WHICH
AS AMP SWITCH
SERVE UNREMODELED AREAS SHALL REMAIN AND BE PROTECTED DURING DEMOLITION AND
REMODELING. RELOCATE AND REROUTE IF REQUIRED.
CONDUIT INSTALLED BELOW GRADE OR BELOW FINISHED FLOOR ATS AUTOMATIC TRANSFER SWITCH
5. CONTINUITY OF CIRCUITS INTERRUPTED BY REMOVAL OF ELECTRICAL DEVICES SHALL BE
E-1 E-1 ELECTRICAL CONNECTION TO EQUIPMENT ITEM 'E-1' (LETTER DESIGNATION BAS BUILDING AUTOMATION SYSTEM
MAINTAINED. PROVIDE JUNCTION BOXES, CONDUIT, AND WIRING EXTENSIONS FOR RELOCATION
AS APPLICABLE) - SEE CORRESPONDING EQUIPMENT CONNECTION SCHEDULE TO ABOVE ACCESSIBLE CEILINGS.
BFF BELOW FINISHED FLOOR
DUPLEX RECEPTACLE (20A, 125V) AT 18" AFF, UON 6. RE-SUPPORT EXISTING CONDUIT AND CABLES WHICH REMAIN ABOVE CEILINGS PER NATIONAL,
BFG BELOW FINISHED GRADE
'TV' = MOUNTED NEXT TO VIDEO OUTLET STATE, AND LOCAL CODES.
C DEVICE MOUNTED AT 8" ABOVE COUNTER
DOUBLE DUPLEX RECEPTACLE AT 18" AFF, UON, TYPE AS INDICATED ON DRAWINGS 7. MAINTAIN CONTINUITY OF BRANCH CIRCUITS AND COMMUNICATION CIRCUITS TO ALL DEVICES
AND FIXTURES SHOWN TO REMAIN (ETR). EXTEND AND MODIFY AS REQUIRED.
C/B CIRCUIT BREAKER
DUPLEX RECEPTACLE (20A, 125V) MOUNTED 8" ABOVE COUNTER, UON 8. ALL NEW AND RELOCATED CONDUIT AND WIRING IN REMODELED AREAS SHALL BE CONCEALED
CATV COMMUNITY ANTENNA TELEVISION (CABLE TELEVISION)
UNLESS OTHERWISE NOTED. COORDINATE WITH ARCHITECT IN FIELD.
DUPLEX RECEPTACLE (20A, 125V) GROUND FAULT CIRCUIT INTERRUPTER MOUNTED 8" CM CONSTRUCTION MANAGER
9. FOR ALL DEVICES AND FIXTURES BEING REMOVED (REX), REMOVE RELATED CONDUIT AND WIRING
ABOVE COUNTER, UON
TO SOURCE. RE-LABEL EXISTING CIRCUIT BREAKERS AS "SPARE" WHEN LOAD IS COMPLETELY
EC ELECTRICAL CONTRACTOR
REMOVED OR REVISE LABEL ON PANEL DIRECTORY APPROPRIATELY.
SWITCH (20A, 120/277V, SINGLE POLE) AT 48" AFF, UON
EMT ELECTRICAL METALLIC TUBING
'3' = THREE-WAY 10. WHERE ELECTRICAL DEVICES ARE DESIGNATED TO BE REMOVED, REMOVE DEVICES AND
BACKBOXES AND PATCH/REPAIR WALLS, UNLESS OTHERWISE DIRECTED BY ARCHITECT.
EPO EMERGENCY POWER OFF
SINGLE OR THREE PHASE MOTOR - SEE DRAWINGS FOR DESCRIPTION GFP GROUND FAULT PROTECTION
REX REMOVE EXISTING ELECTRICAL DEVICE ALONG WITH RELATED CONDUIT AND 9. THE ELECTRICAL CONTRACTOR SHALL PROVIDE ALL CUTTING AND PATCHING NECESSARY FOR
WIRING, UON INSTALLATION OF NEW WORK. CUTTING OF A STRUCTURAL MEMBER IS PROHIBITED WITHOUT
SPECIFIC WRITTEN PERMISSION FROM THE ARCHITECT.
RR REMOVE AND RELOCATE EXISTING ELECTRICAL DEVICE AS SHOWN OR AS NOTED
LIGHTING CIRCUITING GUIDE ON DRAWINGS
TB TELECOMMUNICATIONS BACKBOARD
SYMBOL DESCRIPTION
TC TECHNOLOGY CONTRACTOR
B LIGHTING CIRCUITING DESIGNATION,
X1
TCC TEMPERATURE CONTROL CONTRACTOR
B X: REFER TO PANEL SCHEDULE ABBREVIATION KEY, PER DRAWING.
1: CIRCUIT NUMBER.
TGB TELECOMMUNICATIONS GROUNDING BUSBAR
a,b
NOTE:
TMGB TELECOMMUNICATIONS MAIN GROUNDING BUSBAR
SWITCHING SCHEME ALL WIRING SHALL BE #12 WITH EQUIPMENT GROUNDING
CONDUCTOR, UON. (INCREASE TO #10 FOR CIRCUITS WITH DISTANCES
UG UNDERGROUND
AS LISTED IN SPECIFICATIONS). ALL HOMERUNS ARE TO A 20 AMPERE,
LIGHTING DESIGNATION -
SINGLE POLE CIRCUIT BREAKER, UON. PROVIDE QUANTITY OF
REFER TO LIGHTING UON UNLESS OTHERWISE NOTED
CONDUCTORS AS NECESSARY TO ACCOMMODATE CIRCUITS AND
FIXTURE SCHDULE
CONTROL INDICATED ON DRAWINGS.
UPS UNINTERRUPTIBLE POWER SUPPLY
V VOLTS
WP WEATHERPROOF
SYMBOL DESCRIPTION
1 OR 2 HOUR FIRE
DESIGNATION LAMP(S) BALLAST(S) FIXTURE FIXTURE CATALOG RATED GYPSUM
FIXTURE DESCRIPTION NOTES
WATTAGE VOLTAGE SERIES BOARD WALL
TYPE TYPE WATTS QUANTITY TYPE QUANTITY
ASSEMBLY
CONDUIT (EMT)
FLUORESCENT 4' LONG, STANDARD STRIP FIXTURE WITH STEEL HOUSING METALUX SSF
AND BAKED WHITE ENAMEL FINISH. LITHONIA C
DAY-BRITE T
S4 T8 32 1 E 1 30 120 COLUMBIA CS CONDUIT (EMT)
LIGHTOLIER SW
HE WILLIAMS 764
CONDUIT (EMT)
INTUMESCENT FIRESTOP
METALLIC CONDUIT METALLIC CONDUIT MINERAL WOOL PACKING
SEALANT, DEPTH AS
INTUMESCENT FIRESTOP BATT, NOMINAL 6 PCF,
REQUIRED BY THE METALLIC CONDUIT
SEALANT, DEPTH AS DEPTH AS REQUIRED BY
MANUFACTURER
REQUIRED BY THE THE MANUFACTURER
MANUFACTURER
SHEET SIZE 30x42 J:\2011\110078\SVHC OR\Sheets\Electrical\PHASE 2\E0-2 ELECTRICAL LIGHTING FIXTURE SCHEDULE.dwg
AREA OF WORK
KEY PLAN
REX
REX REX REX
REX
AREA OF WORK
KEY PLAN
GENERAL NOTES
1. CONTRACTOR SHALL CONDUCT COMPLETE
FIELD SURVEY OF EXISTING CONDITIONS PRIOR
TO SUBMISSION OF BID PRICE. NO ADDITIONAL
PAYMENTS WILL BE MADE ON CLAIMS THAT
ARISE FROM LACK OF KNOWLEDGE OF EXISTING
CONDITIONS.
X PLAN NOTES
1. ALTERNATE E-1: PROVIDE NEW SWITCHBOARD
AND CONDUIT FEEDER FOR NEW PANEL SDP-7EB
ON FIRST FLOOR.
SDP-3
(ETR)
N-G-17
(ETR)
PULL BOX
SDP-2
(ETR)
(ETR) SDP-3E
(ETR)
SDP-3EA
TS-1A (ETR)
(ETR)
SDP-1
(ETR)
SDP-2EA
(ETR)
TS-1A
SDP-2E (ETR)
(ETR)
1
3
METER (ETR)
METER (ETR)
4KV
SWITCHGEAR
(ETR)
MDP-1
(ETR)
UPS (ETR)
(ETR)
SHEET SIZE 30x42 J:\2011\110078\SVHC OR\Sheets\Electrical\PHASE 2\E2-00 GORUND FLOOR ELECTRICAL PLAN.dwg
BATTERIES
(ETR) (FRONT)
TS-5A
(ETR)
(REAR)
1 SDP-7EA
SDP-7E
(ETR)
TS-6A
(ETR) PHASE 2 AREA OF WORK
SDP-9 T-27
(ETR)
SAVED: MGAREE 2011-10-31 11:33 PLOT: 2011-10-31 11:43
(ETR)
SUBSTATION 3 SUBSTATION 4
(ETR) (ETR)
T-26
(ETR)
KEY PLAN
N-1-7E N-1-2
SPE-7EB
(ETR) (ETR)
AREA OF WORK
X PLAN NOTES
1. ALTERNATE E-1: PROVIDE NEW DISTRIBUTION
BOARD AT LOCATION SHOWN.
KEY PLAN
T1R2-19 T1R2-19
S4 S4
GENERAL NOTES
T1R2-19 1. CONTRACTOR SHALL CONDUCT COMPLETE
FIELD SURVEY OF EXISTING CONDITIONS PRIOR
TO SUBMISSION OF BID PRICE. NO ADDITIONAL
PAYMENTS WILL BE MADE ON CLAIMS THAT
ARISE FROM LACK OF KNOWLEDGE OF EXISTING
CONDITIONS.
X PLAN NOTES
INTERSITUAL ELECTRICAL PLAN 1. DISCONNECT EXHAUST FAN. DEMO CONDUIT
AND CONDUCTORS BACK TO SOURCE.
SCALE: 1/8" = 1'-0"
AREA OF
WORK
CU-2
T1R2-17
100AS L/R
90AF 1
AREA OF
WORK
200AS
L/R L/R
T1R2 T1R2-15 T1R2-15 110AF L/R
ETR T1R2-15
RTU-1 RF RTU-1 SF CU-1
L/R RTU-2 RF
T1R2-17
L/R
T1R2-17
RTU-2 SF
KEY PLAN
FEEDER SCHEDULE - COPPER
CONDUCTORS EQUIPMENT
DESIGNATION CONDUIT
AWG/KCMIL GROUND
A 4 #12 #12
B 4 #10 #10
C 4 #8 #10 1"
D 4 #6 #10 1"
E 4 #4 #8
F 4 #2 #8
G 4 #1 #6 2"
H 4 #1/0 #6 2"
I 4 #2/0 #6 2"
J 4 #3/0 #6
K 4 #4/0 #4
L 4 #250 #4
M 4 #350 #4 3"
N 4 #500 #2 4"
EHSDP ECC
MASTER/ENGINE
GENERATOR
CONTROLS
TS-7A
G
1600A
ALTERNATE E-1
AREA OF NEW
WORK G2
ETR
NEW
3
REFER
R
TO
PANEL
SCHEDULES
NEW
1
ELSDP
SHEET SIZE 30x42 J:\2011\110078\SVHC OR\Sheets\Electrical\PHASE 2\E7-01 ELECTRICAL ONE-LINE DIAGRAM.dwg
E2-02 RTU-1 SF AIR HANDLER SUPPLY FAN 480 3 20 - 20 VFD 3 # 6, 1 #8 GND, 1"C SDP-7EB 1 50/3 1
E2-02 RTU-1 RF AIR HANDLER RETURN FAN 480 3 10 - 10 VFD 3 # 10, 1 #10 GND, 3/4"C SDP-7EB 2 25/3 1
E2-02 RTU-2 SF AIR HANDLER SUPPLY FAN 480 3 15 - 15 VFD 3 # 8, 1 #10 GND, 1"C SDP-7EB 4 40/3 1
E2-02 RTU-2 RF AIR HANDLER RETURN FAN 480 3 5 - 5.4 VFD 3 # 12, 1 #12 GND, 3/4"C SDP-7EB 5 15/3 1