CONTINUOUS ASSESSMENT TEST - II

Program : B.Arch Max. Marks : 30


Course : Specifications and Estimation Time : 1 Hour
Course code: SAR1402 Sem : VII
Batch : 2018-2023 Date : 21.10.21
Part-A Answer ALL the questions (5×2=10)
(Attach sketches wherever necessary)

Q.No Questions CO (L)


1. Mention 4 points why there is a need for rate analysis. CO3(1)
How do you calculate indirect expenses in a project?Explain.
2. CO3(1)
Analysis of rate of excavation in foundation in ordinary soil including
lift upto 2m and lead up to 30m and including filling ,watering and CO3(2)
3. ramming of excavated earth and removal and disposal of surplus
earth as directed by the engineering – in-charge upto a distance of
80m.
4. Does the economy impact the construction field.Explain. CO4(2)
5. List down the steps to be adopted for rate analysis? CO4(1)

Part-B Answer ALL the questions (2×10=20)

Q.No Questions CO (L)


Explain the factors which will affect the rate, if one of the
CO3(2)
6. construction to be carried out in a rural area and the other in an urban
area.
(OR)
What are the factors which impact the rate of an item.Discuss. CO3(5)
7.

8. Explain how economics play a role in estimation with a case study. CO4(6)
(OR)
How technology has a role to play in the construction field.Quote
9. with examples. CO4(5)