Business Case: Quantity of defective tablets is around 10% to the expected yield
Problem Existing coating process generates around 178 kg of defective tablets each batch.
Statement:
Page 1 of 2
Project Charter_Lacosamide tabs. V1.0
Other Miscellaneous pre-requisites:
i. The identified personnel are required to be deployed from the project activities from 29 Aug 2021.
ii. Creation of Dedicated document repository in directory: K > OpEx > Lacosamide Tablets.
iii. User login with Manager privilege’s for Honeywell PLC -Glatt [EID012]
iv. Revision of BMR for including optimization conditions.
v. Roles updation in PASX module.
Name & Designation Sign with date
Prepared By Arun Prasad,
Manager Op Ex-FTO3
Reviewed by Vishal Gaikwad
Associate Director OpEx
V.Venkatnarayanan
Authorized by
Plant Head-FTO3
S. Padmanabhan
Vice President-Operations
Ramnath
Vice President-FR&D
Ganadish Kamat
Vice President-Quality
Page 2 of 2
Project Charter_Lacosamide tabs. V1.0