Subsoil Investment
Opportunities
MAGNETS
Magnets
of Ukraine
KHORTYTSIA ISLAND
CHORNOBYL: PROMPRYLAD.
RENAISSANCE RENOVATION
LA PERLA AZZURRA
KYIV
REGION
CHORNOBYL
Renaissance
Magnets SCIENCE
of Ukraine & TOURISM
SCIENTIFIC CLUSTER
genetic studies
atomic studies
ecology
2600 km2
CHORNOBYL
TOURIST
is a unique territory covering
2600 km2 and focusing
CENTRE
on 5 directions of regional
GREEN development – security, science,
ENERGY tourism, culture, urbanism.
CENTRE
1 mln
TOURISTS
PER YEAR
KHORTYTSIA
ISLAND
Magnets TOURISM
of Ukraine
23.59 km2
(12.5 KM LONG AND UP
TO 2.5 KM WIDE)
KHORTYTSIA
ISLAND RECREATION
& SPORT
Purpose of the project is to
ZONE
transform the largest island with
historical background on the
HISTORICAL Dnipro river into an international
ZONE tourist centre.
50 km
OF BICYCLE AND
WALKING TOURS
DANUBE
RIVIERA
Magnets TOURISM
of Ukraine
16 km
THE LENGTH OF THE BEACH
500 m
THE WIDTH
6,35 km2 OF THE BEACH
DANUBE
RIVIERA“
TOURIST
Purpose of the project is CENTRE
to create a new popular
summer resort in the
BIOSPHERE South of Ukraine.
RESERVE
150 days
FOR THE SUMMER
HOLIDAY SEASON
PYLYPETS
Magnets TOURISM
of Ukraine
cycling
rafting
extreme tourism
hang-gliding
4,7 km alpinism
THE LONGEST TRACK
PYLYPETS
Borzhava Polonyna is a
95
OF SKI-RUNS
km
21 Ukrainian Carpathians
and popular ski resort.
LIFTS
20k
SKIERS PER HOUR
PROMPRYLAD
Renovation
Magnets IT INFRASTRUCTURE
of Ukraine
SCIENCE
CREATIVITY
38k m2
TOTAL AREA
PROMPRYLAD
RENOVATION
IT
is a unique place for cummunity-
business-authorities interaction.
4
An innovative centre in the
revitalized plant in Ivano-Frankivsk
focuses on four directions of
the regional development: new
PAVILIONS economy, urbanism, contemporary
OF THE OLD art, non-formal education.
PLANT 1,8 ha
TERRITORY IN THE
CITY CENTER
LA PERLA
AZZURRA
Magnets TOURISM
of Ukraine
296,16 ha
LAKE MIRROR SURFACE AREA
300 ha
BUILDING
596.16 km 2 AREA
COVERAGE AREA
LA PERLA
AZZURRA 3.6 km
COASTLINE
Sea Resort Project
6.5 km in the South of
Ukraine
LAKE BEACH
LINE
30k persons
POTENTIAL
CAPACITY
STATE
PROPERTY
FUND
OF UKRAINE
JSC “TURBOATOM”
PJSC “SUMYKHIMPROM”
SE “UKRSPYRT”
SE “ELEKTROVAZHMASH”
JSC “DNIPRO CHP”
JSC “KHARKIVOBLENERGO”
JSC “MYKOLAIVOBLENERGO”
JSC „UNITED MINING &
CHEMICAL COMPANY” JSC “ТERNOPILOBLENERGO”
PJSC “CENTRENERGO”
PJSC “ZAPORIZHIAOBLENERGO”
SE “SEVERODONETSK CHP”
KHARKIV
REGION
JSC
TURBO-
ATOM
STATE
PROPERTY LARGE-SCALE
FUND PRIVATIZATION
OF UKRAINE
BUSINESS $96.1 mln PRODUCTION FACILITIES
JSC
ODESA
PORTSIDE PLANT
STATE
PROPERTY LARGE-SCALE
FUND PRIVATIZATION
OF UKRAINE
BUSINESS $41.1 mln PRODUCTION FACILITIES
ACTIVITY:
2 units for production of ammonia with an annual capacity of
550 thousand tons each;
REVENUE 2018
2 units for production of carbamide with an annual capacity of
430 thousand tons each;
The main purpose of the Ammonia overload complex with annual capacity up to 4 million
plant is the production of tons, with storage structure up to 120 thousand tons;
Carbamide overload complex with annual capacity up to 3.6
ammonia and carbamide; million tons, with storage capacity of 80 thousand tons
overload on export of
2 500
Methanol overload complex with an annual capacity of up to 1
ammonia, carbamide and million tons, with a storage capacity of 36 thousand tons
methanol of other Liquid carbon dioxide production unit with annual capacity up to
16 thousand tons
enterprises and own EMPLOYEES
production.
LEGAL OBLIGATIONS
$270 million overdue accounts payable
and $117 million related penalties
PJSC
SUMY-
KHIMPROM
STATE
PROPERTY LARGE-SCALE
FUND PRIVATIZATION
OF UKRAINE
BUSINESS $85.8 mln PRODUCTION FACILITIES
ADDITIONAL INFORMATION
SE
UKRSPYRT
STATE
PROPERTY LARGE-SCALE
FUND PRIVATIZATION
OF UKRAINE
BUSINESS $65.8 mln PRODUCTION FACILITIES
4 201
in use: 1,342.8 ha
of alcoholic beverages, rented: 125.6 ha
pharmacy, medicine, perfume,
wine, confectionery industry,
animal breeding and other EMPLOYEES LEGAL OBLIGATIONS
sectors of the national no data
economy.
ADDITIONAL INFORMATION
SE
ELEKTRO-
VAZHMASH
STATE
PROPERTY LARGE-SCALE
FUND PRIVATIZATION
OF UKRAINE
BUSINESS $86.0 mln PRODUCTION FACILITIES
3 769
in use: 67.9 ha
DC machines and traction rented: 0.4 ha
electrical equipment for
urban and railway electric LEGAL OBLIGATIONS
EMPLOYEES
transport to Ukraine and
The Company has overdue loan (UAH 592.7 million).
other countries. The debt to Sberbank (UAH 515.3 million at the end
of 2018) is the bulk of the company’s loan portfolio.
The debt has not been restructured.
JSC
PRESIDENT-
HOTEL
STATE
PROPERTY LARGE-SCALE
FUND PRIVATIZATION
OF UKRAINE
BUSINESS $1.5 mln FACILITIES
7
owned: 0 ha
built in 1990 permanent in use: 2.5 ha
and reconstructed rented: 0 ha
in 2012. EMPLOYEES
(others outsourced)
LEGAL OBLIGATIONS
The property complex is in long-term lease.
HOTEL
DNIPRO
STATE
PROPERTY LARGE-SCALE
FUND PRIVATIZATION
OF UKRAINE
BUSINESS $2.2 mln FACILITIES
JSC
UMCC
STATE
PROPERTY LARGE-SCALE
FUND PRIVATIZATION
OF UKRAINE
BUSINESS $118.1 mln PRODUCTION FACILITIES
5 274
of ilmenite concentrate,
production of zircon LAND PLOT
concentrate, extraction of owned: no data
ores of other nonferrous EMPLOYEES in use: no data
metals, concentrate rented: no data
enrichment services.
LEGAL OBLIGATIONS
no data
JSC
DNIPRO
CHP
STATE
PROPERTY LARGE-SCALE
FUND PRIVATIZATION
OF UKRAINE
BUSINESS $16.7 mln PRODUCTION FACILITIES
EMPLOYEES
LEGAL OBLIGATIONS
no data
$58.0
ADDITIONAL INFORMATION
mln Sales geography: Electricity market, Public Utility
Enterprise “Heating Network” of the Kamianske City
TOTAL ASSETS 2018 Council.
JSC
KHARKIV
OBLENERGO
STATE
PROPERTY LARGE-SCALE
FUND PRIVATIZATION
OF UKRAINE
BUSINESS $332.7 mln PRODUCTION FACILITIES
ADDITIONAL INFORMATION
$216.3 mln The company has 6 district sales offices in Kharkiv,
28 offices in Kharkiv region and 3 high voltage
power districts. Management of the company -
TOTAL ASSETS 2018 12 persons.
JSC
KHMELNYTSK
OBLENERGO
STATE
PROPERTY LARGE-SCALE
FUND PRIVATIZATION
OF UKRAINE
BUSINESS $102.1 mln PRODUCTION FACILITIES
Power distribution
in Khmelnytskyi region. LAND PLOT
The operation area is owned: 0.5 ha
2 954
in use: 139.9 ha
20.6 thousand km². rented: 120.9 ha
EMPLOYEES
LEGAL OBLIGATIONS
no data
JSC
KRYVYI
RIH CHP
STATE
PROPERTY LARGE-SCALE
FUND PRIVATIZATION
OF UKRAINE
BUSINESS $28.3 mln PRODUCTION FACILITIES
ADDITIONAL INFORMATION
$126.3 mln The company owns and operates 6 district gas boilers,
equipped with 31 steam and hot water boilers of ten
types; 382.208 km of long- and short-distance heating
TOTAL ASSETS 2018 networks with a diameter of 57-1,020 mm.
JSC
MYKOLAIV
OBLENERGO
STATE
PROPERTY LARGE-SCALE
FUND PRIVATIZATION
OF UKRAINE
BUSINESS $137.4 mln PRODUCTION FACILITIES
ADDITIONAL INFORMATION
JSC
ТERNOPIL
OBLENERGO
STATE
PROPERTY LARGE-SCALE
FUND PRIVATIZATION
OF UKRAINE
BUSINESS $76.3 mln PRODUCTION FACILITIES
2 017
owned: 0 ha
to consumers. in use: 240.7 ha
rented: 15 ha
ADDITIONAL INFORMATION
$34.0
JSC “Ternopiloblenergo” includes 18 districts of electric grids.
mln 110-150 kV air lines - 856 km, 35 kV overhead lines – 1,395
km, 10 kV overhead lines – 8,713 km, 0.38 kV overhead lines –
12,159 km, 0.4-35 kV overhead lines – 1,028 km, 110- 150 kV
TOTAL ASSETS 2018 substations – 41 unit, 35 kV substations – 112 units, TP 6-20
kV substations – 5,991 unit, 6-20 kV substations – 64 units.
JSC
KHERSON
CHP
STATE
PROPERTY LARGE-SCALE
FUND PRIVATIZATION
OF UKRAINE
BUSINESS $15.2 mln PRODUCTION FACILITIES
Generation of
electric power, LAND PLOT
supply of heat & owned: 0 ha
electric power
460 in use: 23.1 ha
rented: 0 ha
EMPLOYEES
LEGAL OBLIGATIONS
no data
$19.2
ADDITIONAL INFORMATION
mln Tnstalled electric power capacity - 80 MWh
Installed heat power capacity - 567 Gcal/h
TOTAL ASSETS 2018
JSC
ODESA
CHP
STATE
PROPERTY LARGE-SCALE
FUND PRIVATIZATION
OF UKRAINE
BUSINESS $18.2 mln PRODUCTION FACILITIES
PJSC
CENTR-
ENERGO
STATE
PROPERTY LARGE-SCALE
FUND PRIVATIZATION
OF UKRAINE
BUSINESS $533.0 mln PRODUCTION FACILITIES
$304.2
ADDITIONAL INFORMATION
mln In 2018, Centrenergo’s share of total power generated
by all CHPs was 20% . Meanwhile, the Company’s
TOTAL ASSETS 2018 total installed capacity reaches 31% which implies
significant potential for increasing market share.
PJSC
ZAPORIZHIA-
OBLENERGO
STATE
PROPERTY LARGE-SCALE
FUND PRIVATIZATION
OF UKRAINE
BUSINESS $226.1 mln PRODUCTION FACILITIES
ACTIVITY:
The length of the distribution network with 154-0.4 kW voltage
amounts to 37,317 km as of 1.1.2019 . Power distribution
REVENUE 2018 volumes in 2018 amount to 8,220,101 ths. kWh. (6.8% of total
power distribution in Ukraine).
Power distribution
LAND PLOT
to consumers in
owned: 0.2 ha
the Zaporizhia in use: 425.3 ha
region (803,000
consumers). 4 381 rented: 23.4 ha
LEGAL OBLIGATIONS
EMPLOYEES As of 31.12.2018 the Company’s debt to SE “Energorynok”
amounts to UAH 827 million. It was restructured with a
planned maturity in 2022. Additionally, there are potential
tax (VAT) penalties in the amount of UAH 292 million (as of
October 2019).
$110.6
ADDITIONAL INFORMATION
mln The company is a natural monopolist in the region in the
power distribution sector. The region is one of the most
favorable for the development of electricity production
TOTAL ASSETS 2018 from alternative sources, in particular solar, wind and
hydro generation.
SE
SEVERO-
DONETSK CHP
STATE
PROPERTY LARGE-SCALE
FUND PRIVATIZATION
OF UKRAINE
BUSINESS $23.3 mln PRODUCTION FACILITIES
Production of
electricity; supply LAND PLOT
of steam, hot owned: 0 ha
water and
433
in use: 91.8 ha
rented: 0 ha
conditioned air.
EMPLOYEES
LEGAL OBLIGATIONS
no data
$29.2
ADDITIONAL INFORMATION
mln In the market of heat energy sales in the city of
Severodonetsk the share of the enterprise makes
TOTAL ASSETS 2018 about 60%.
PASSENGER COMPLEX
IN ODESA SEA PORT
KHERSON AIRPORT
ZAPORIZHZHIA AIRPORT
Construction of
1435 mm railway line
MOSTYSKA –
SKNYLIV
Construction of $ 20.8 mln Invest in
1435 mm
railway line ESTIMATED
COST
MOSTYSKA –
SKNYLIV
2021 EXPECTED OUTCOME
ESTIMATED TIMELINE
FOR PROJECT
IMPLEMENTATION integration with EU railway
network;
access of EU railway undertakings to the
rail network of Ukraine;
estimated increase in passenger traffic Ukraine –
EU - Ukraine -up to 3 trains per day, i.e 634 thousand
passengers per year;
The information provided herein
has been prepared in good-faith for
information purposes only and none improving quality of services;
of it shall be treated as an offer or
solicitation to deal in any transaction. reducing customs control and waiting time for up to 4 hours.
VOLYN
REGION
Reconstruction of
1435 mm railway line
KOVEL - YAHODYN -
POLAND BORDER
with further electrification
Reconstruction
of 1435 mm $ 54.2 mln Invest in
railway line ESTIMATED
COST
KOVEL - YAHODYN -
POLAND BORDER
with further
electrification
EXPECTED OUTCOME
2024
ESTIMATED TIMELINE integration with EU railway
network;
FOR PROJECT
IMPLEMENTATION access of EU railway undertakings to
the rail network of Ukraine;
increase in passenger traffic Ukraine –
EU - Ukraine-up to 2 trains per day, i.e. 315
thousand passengers per year;
reducing customs control and waiting time for up to
4 hours
Construction of
the «Dry port» - logistic hub
MOSTYSKA 2 –
POLISH BORDER
Construction of
the «Dry port» - 100 ha Invest in
logistic hub APPROXIMATE
AREA
MOSTYSKA 2 –
POLISH BORDER
2026 BENEFITS
Combined transport bill
of lading containerization
ESTIMATED TIMELINE
FOR PROJECT EXPECTED OUTCOME
IMPLEMENTATION
Reconstruction of
PASSENGER
RAILWAY STATIONS
through PUBLIC-PRIVATE
PARTNERSHIPS
7
KHARKIV RAILWAY STATION
BUSINESS Annually served 5.7 mln passengers
Stations through
Public-Private KHMELNYTSKY RAILWAY STATION
Partnerships Annually served 1.6 mln passengers
KEY INVESTMENT
51 km
HIGHLIGHTS
1ST STAGE
IMPLEMENTATION PERIOD Kyiv region has the most intensive traffic. The traffic
flow across Kyiv is more then 30 000 cars per day;
CHORNOMORSK
SEA PORT
4.5 mln tons Invest in
BUSINESS IN RAILWAY WAGONS
OPPORTUNITY:
Concession of the
Ferry Terminal
in Chornomorsk 150k THE POST IS LOCATED ON THE NORTH-
Sea Port HEAVY DUTY
WESTERN SHORE OF THE BLACK SEA
TRUCKS
IN CHORNOMORSK SEA PORT
CONTAINER TERMINAL IN
CHORNOMORSK
SEA PORT
75 ha Invest in
BUSINESS TERMINAL AREA
OPPORTUNITY:
Concession of the
Container Terminal
in Chornomorsk 6
Sea Port BERTHS CONTAINER TERMINAL OPPORTUNITY
in the biggest sea port of Ukraine
1+ m KEY INVESTMENT
HIGHLIGHTS
TEU CONTAINER
CAPACITY
PASSENGER COMPLEX IN
ODESA
SEA PORT
2.6 ha Invest in
BUSINESS TOTAL AREA
OPPORTUNITY:
Concession of the
Passenger Complex
in Odesa Sea Port 5
BERTHS
KEY INVESTMENT
HIGHLIGHTS
1 mpax
TERMINAL ANNUAL
The complex includes:
CAPACITY
- 1000-seat Concert and Exhibition Hall with
total covered area of 4,970 sq.m and open
Lviv
DANYLO HALYTSKYI
AIRPORT
ESTIMATED NATURE
BUSINESS INVESTMENT
Newly built runway and terminal during EURO-
ACTIVITY: To be verified
by international
2012 football cup
Terminal A (47 233 m2) – 2 000 PAX per hour
consultants
Runway (3 305 m) – ICAO CAT II
Lviv airport is the aviation
hub for 7 regions of 51 destinations, 21 airlines in 2019
western Ukraine (total PAX: 2017 – 1,1 million (+48% y-o-y), 2018 – 1,6
million (+36% y-o-y), 2019 – 2,1 million (+31 y-o-y)
catchment area – 10+
million passengers)
2.1
CONCESSION
mln
The airport is state-owned and managed by the
Ministry of Infrastructure of Ukraine
PASSENGERS IN 2019
(+31% Y-O-Y)
PROJECT STATUS
SOCIOECONOMIC EFFECT
KHERSON
AIRPORT
$57.7 mln NATURE
OPPORTUNITY:
renewal of the work of the PMM laboratory,
a cargo terminal, hotel, a hangar for repair
of avt
CONCESSION Area of 292 sq. M
PROJECT STATUS
Public-Private
Partnership Technical tasks: already completed
OWNERSHIP Additional needs: International standards and
requirements of ICAO IATA, ISO is needed
Airport is operating, year round regular
international flights. The aerodrome can receive
code 4C aircrafts.
IMPLEMENTATION PERIOD
SOCIOECONOMIC EFFECT
ZAPORIZHZHYA
AIRPORT
BUSINESS CONCESSION
NATURE
IMPLEMENTATION PERIOD
SOCIOECONOMIC EFFECT
The information provided herein The area of the new terminal is more than 12 thousand
has been prepared in good-faith for square meters. It will be able to serve 400 passengers
information purposes only and none per hour. They can potentially be increased to 500.
of it shall be treated as an offer or
solicitation to deal in any transaction.
CHERNIVTSI
REGION
Chernivtsi
LEONID
KADENIUK AIRPORT
$43-45 mln NATURE
BUSINESS ESTIMATED
INVESTMENT
Goals of the project:
Runway reconstruction and expansion, taxiway
OPPORTUNITY: reconstruction and reconstruction of aircraft
parking to fulfill operational requirements of
modern aircrafts;
AIRPORT
Construction of new passenger terminal with
CONCESSION opportunities for commercial lease.
Municipal
OWNERSHIP PROJECT STATUS
1 year
for airside improvements;
terminal construction – depending on SOCIOECONOMIC EFFECT
construction project
IMPLEMENTATION PERIOD
Rapid expansion of passenger and cargo
flights.
Increase passenger traffic to 400 people per
The information provided herein
has been prepared in good-faith for hour.
information purposes only and none Increasing the tourist potential of the region.
of it shall be treated as an offer or
solicitation to deal in any transaction. Creating of over 1000 new workplaces.
VINNYTSYA
REGION
Vinnytsya
INTERNATIONAL
AIRPORT
BUSINESS $15-90 mln PROJECTS
OPPORTUNITY: depending on
business project
Airdrome modernization: to serve Airbus 320 and Boeing
737-800 aircraft with no restrictions to payload or due to low
visibility
ESTIMATED
AIRPORT BUSINESS INVESTMENT
Passenger terminal reconstruction to satisfy international
standards and allow international and domestic same time
& INFRASTRUCTURE operations
Council
and/or PPP PROJECT STATUS
OWNERSHIP
Design concept developed and approved by stakeholders
“BILA TSERKVA”
$ 90 mln NATURE
PROJECT STATUS
IMPLEMENTATION PERIOD
SOCIOECONOMIC EFFECT
Invest in
REGIONAL MULTIFUNCTIONAL EXHIBITION
CENTER
INNOVATIVE
MULTI-FUNCTIONAL EXHIBITION & CONGRESS CENTER IRRIGATION
SYSTEM
TECHNOPARK “FLIGHT CITY”
SODA ASH PLANT
CONSTRUCTION OF THE BRIDGE OVER
THE SOUTHERN BUH RIVER SODA ASH PLANT
AT SLAVYANSK
LOGISTICS CENTER HLYBOCHYTSIA
DEVELOPMENT OF ELECTRIC ENERGY
THE AIR CARGO TERMINAL IN DNIPRO FROM HYDROCARBONS FUEL CELLS
HYDRO POWER PLANT KAKHOVKA HPP 2
RESTORATION OF SYSTEM
WATER SUPPLY
WATER DELIVERY AND WASTEWATER CONSTRUCTION OF A CENTRAL WASTE FACILITY
DISPOSAL OF RESORT AREA
SOLID WASTE LANDFILL STORAGE IN KONOTOP
REGIONAL MULTIDISCIPLINARY
HOSPITAL
KYIV MEDICAL CENTER SHATSK RECREATION AREA
Regional multifunctional
EXHIBITION
CENTER
Invest in
$ 5 mln NATURE
PROJECT STATUS
2.5 years
UAH 12 mln grant from the Government
of Ukraine received for design and start of
construction works
IMPLEMENTATION TIME
SOCIOECONOMIC EFFECT
Multi-functional
EXHIBITION
& CONGRESS CENTER
Invest in
€ 20 mln NATURE
Available industrial area and property complex
BUSINESS
ESTIMATED for construction of the complex (including close
INVESTMENT infrastructure: park, parking areas, etc. in Poltava,
OPPORTUNITY:
Marshala Biriuzova Str., 37);
Distance to the center of Poltava - 6 km;
Absence of similar objects within the region;
FINANCIAL INDICATORS
Payback period: up to 10-15 years
PROJECT STATUS
Business proposition
3-5 years
Calculated preliminary business plan;
Identified Brownfield land within the city of Poltava
The initiative is included in the Poltava Integrated
IMPLEMENTATION PERIOD Development Concept by 2030 year.
SOCIOECONOMIC EFFECT
The information provided herein Creation of new job places for people
has been prepared in good-faith for Increasing the number of tourists and visitors to the city
information purposes only and none
of it shall be treated as an offer or Additional admission to the institutions of the hotel and
restaurant business
solicitation to deal in any transaction.
KIROVOHRAD
REGION
TECHNOPARK
“FLIGHT CITY”
Invest in
$ 250 mln DESCRIPTION
SOCIOECONOMIC EFFECT
Construction of
THE BRIDGE
over the Southern Buh river
Invest in
BUSINESS $440 mln NATURE
OPPORTUNITY: ESTIMATED The bridge over the Southern Bug river, Northen bypass
of Mykolayiv, M-14 Highway
INVESTMENT
Total length of bridge with access roads – 13.2 km
DEBT FINANCING including the bridge – 2,050 m
Public
PROJECT STATUS
OWNERSHIP
5 years
IMPLEMENTATION PERIOD
SOCIOECONOMIC EFFECT
LOGISTICS CENTER
HLYBOCHYTSIA
Invest in
$ 9 mln NATURE
Object class – A
PROJECT STATUS
15 month Land plot with area of 6.3 ha
IMPLEMENTATION PERIOD Business plan developed
Concept developed
SOCIOECONOMIC EFFECT
AIR
CARGO
TERMINAL
in Dnipro
Invest in
$ 15 mln NATURE
BUSINESS
Creating the logistic hub port for receipt, handling cargo
ESTIMATED charters on the equipped aprons.
INVESTMENT
OPPORTUNITY:
Enabling cargo transits through Dnipro International Airport.
Expected volume of cargo transshipment:
- The 1st Stage (1 year) - 1.5K ton per year;
CO-FINANCE - The 2nd Stage (5 years) - 3K ton per year.
FINANCIAL INDICATORS
Payback period: 5 years
PROJECT STATUS
Project development;
Warehouse construction (loading/unloading cargoes of the
2 years
aircrafts and other vehicles)
IMPLEMENTATION PERIOD
SOCIOECONOMIC EFFECT
Restoration of
WATER
SUPPLY SYSTEM
Invest in
€269.7 mln NATURE
Restoration of the system water supply by reconstruction
BUSINESS ESTIMATED and major repairs of water supply and drainage networks
buildings
INVESTMENT
OPPORTUNITY:
Ensuring continuous water supply to the population of
Donetsk region
Improvement of drinking water quality
Public-private Implementation of the projects for the construction of
partnership renewable energy facilities (construction of wind power
plants, solar electric generation stations and small hydro-
power plant) in order to reduce the energy costs of the
Company’s most energy-consuming facilities
Public-Private
Partnership PROJECT STATUS
OWNERSHIP Implementation of the project on the lands allotted to the
Public Company “Company” Voda Donbasu“ on a permanent
basis
Developed the concept of implementation of renewable
energy
Partially developed design estimate documentation of
2019-2030
subprojects, and partially subprojects are at the pre-designed
proposal stage
IMPLEMENTATION PERIOD
SOCIOECONOMIC EFFECT
WATER
DELIVERY &
WASTEWATER
DISPOSAL
of resort area
Invest in
$ 40 mln NATURE
Communal
OWNERSHIP
PROJECT STATUS
Feasibility study
Pre-design and design works
Infrastructure documentation developed
2 years
IMPLEMENTATION PERIOD
SOCIOECONOMIC EFFECT
Regional
multidisciplinary
HOSPITAL
Invest in
€277.6 mln DESCRIPTION
BUSINESS ESTIMATED
INVESTMENT
Construction of Regional multidisciplinary hospital of
tertiary (highly specialized) level of medical care with
OPPORTUNITY: capacity of 600 beds;
PROJECT STATUS
18 ha
A positive expert report at the stage of feasibility study
TOTAL LAND AREA
The land plot allocated
50 months
(4.1 years)
CONSTRUCTION PERIOD SOCIOECONOMIC EFFECT
KYIV MEDICAL
CENTER
Invest in
$6.65 mln NATURE
The Kyiv City State Administration will conduct an investment
BUSINESS ESTIMATED tender to determine the best investment proposal that will
comply with the terms of the tender and the provisions of the
INVESTMENT investment project for the construction of a private medical
OPPORTUNITY: center
Opportunity to construct a private medical center with the
GBA of 18,935 sq.m
INNOVATIVE Land plot: 1.2 ha (part of the territory of Kyiv City Clinical
HEALTH Hospital № 14)
OWNERSHIP
PROJECT STATUS
Innovative
IRRIGATION
SYSTEM
Invest in
BUSINESS
up to $1 bln NATURE
INNOVATIVE
IRRIGATION
SYSTEM PROJECT’S STAKEHOLDERS
DEVELOPMENT agrarian-water users
PROJECT STATUS
Creation of a platform of 600 thousand ha of irrigated land
is in progress
SOCIOECONOMIC EFFECT
SODA ASH
PLANT
Invest in
$380 mln NATURE
FINANCIAL DETAILS
Private Payback period: 8 years
OWNERSHIP Internal Rate of Return: 20%
PROJECT STATUS
Developed concept
FS documentation developed
IMPLEMENTATION PERIOD
SOCIOECONOMIC EFFECT
SODA ASH
PLANT
at Slavyansk
Invest in
$380 mln NATURE
INVESTMENT
PROJECT STATUS
(2.5 years)
IMPLEMENTATION PERIOD
SOCIOECONOMIC EFFECT
Development of
ELECTRIC
ENERGY
from hydrocarbons fuel cells
Invest in
$ 12 mln NATURE
BUSINESS
The most efficient technology for obtaining electric energy
ESTIMATED from hydrocarbons
INVESTMENT
OPPORTUNITY:
The chemical energy of fuel gas and air oxygen molecules
turns into electric energy directly, without intermediate
transformations
PROJECT STATUS
1 year
Developed concept
Land plot allocated
FS documentation developed
IMPLEMENTATION PERIOD
SOCIOECONOMIC EFFECT
HYDRO
POWER PLANT
KAKHOVKA HPP 2
Invest in
€ 500 mln NATURE
Kakhovka HPP with 334 MW capacity is the lower level
BUSINESS ESTIMATED
INVESTMENT
of Dnipro cascade HPP-PSPP with the lowest capacity.
Kakhovka HPP belongs to mid-merit power plant by
OPPORTUNITY:
function in power system.
Implementation of project “Kakhovka HPP-2 Construction”
corresponds to the priority directions of the energy policy
RENEWABLE of Ukraine.
Additional 250 MW capacities will regulate renewable
RESOURCES energy sources (SPPs and WPPs).
USAGE
FINANCIAL DETAILS
OWNERSHIP
PROJECT STATUS
Investment project documents are prepared for the state
expertise.
up to 6 years
Land management documentation process concerning the
assignment of land plots for permanent and temporary use
for the construction of the Kakhovka HPP-2 has started.
(depends on Development of design documentation of Design stage is
business plan) ongoing.
Construction of
A CENTRAL
WASTE FACILITY
Invest in
BUSINESS NATURE
of Central Receiving sorted waste from other sorting stations for the
further processing at the cogeneration unit
waste facility in Area of the plot is 33 ha
Lysychansk City
TECHNICAL & ECONOMIC INDICATORS
€25.04 mln
Amount of waste: 8.33 thousand tons / month
ESTIMATED Design capacity of the complex: 100.0
INVESTMENT thousand tons / year
Capacity of the generated electricity: 4.5 MW
Payback period: 7 years
PROJECT STATUS
3 years
Preliminary feasibility study
IMPLEMENTATION PERIOD
SOCIOECONOMIC EFFECT
SOLID WASTE
LANDFILL
STORAGE
in Konotop
Invest in
$ 16.2 mln NATURE
BUSINESS ESTIMATED
INVESTMENT
The construction of a landfill for the storage of solid
household waste is envisaged in 4 launch complexes
OPPORTUNITY: and takes into account all objects of the economic
zone (buildings, structures, utilities, sorting line, etc.).
Communal
OWNERSHIP
PROJECT STATUS
3 years
IMPLEMENTATION PERIOD
SOCIOECONOMIC EFFECT
SHATSK
RECREATION AREA
Invest in
NATURE
Development of tourism and recreational potential of Shatsk
OPPORTUNITY:
recreational and sports facilities
Favorable geographic location
Renovated waterfront area of the Svitiaz village
GREENFIELD
INVESTMENT $40-250 mln Improved road and sports infrastructure
Realization of the final stage of the sewerage project and
IN TOURISM ESTIMATED
construction of sewage treatment plants in Shatsk urban type
village, Svitiaz and Pulmo villages
INVESTMENT Negotiations with the Polish side are held on the opening of
the Adamchuky-Zberezhe border crossing point
PROJECT STATUS
Private
of the Shatsk district, Volyn region
Documentation for infrastructure development is drafted
OWNERSHIP
SOCIOECONOMIC EFFECT
CENTRAL
PARK
of culture and recreation
Invest in
$ 78 mln NATURE
Creation of a modern creative space for recreation, cultural
CONCESSION
FINANCIAL INDICATORS
Payback period: 10 years
Internal Rate of Return: 12.5%
ADVANTAGES
SOCIOECONOMIC EFFECT
TOURIST &
RECREATION COMPLEX
“BATURYN”
Invest in
$38 mln NATURE
Construction of a tourist and recreational complex in
BUSINESS ESTIMATED
INVESTMENT
the developed touristic area near the river Seym;
Private
OWNERSHIP
PROJECT STATUS
Concept of a tourist and recreational complex
developed
2 years
IMPLEMENTATION PERIOD
SOCIOECONOMIC EFFECT
RESORT CITY
KHMILNYK
Invest in
$ 10-50 mln NATURE
PROJECT STATUS
12-48 month Land plots suggested for investment are communal property
and offered for purchase at a land auction
(depends on
business plan) SOCIOECONOMIC EFFECT
IMPLEMENTATION PERIOD
Increase the number of tourists in health resorts by 2
times (up to 100 thousand people per year)
SUBSOIL
investment opportunities
Invest in
23 7
Promising plots Promising plots
HYDROCARBONS METALLIC
MINERALS
BUSINESS
OPPORTUNITY:
Ukraine creates
Public-privateconditions
comfortable
partnership
for attracting foreign
investment in subsoil
exploration and
production
63 3
Promising plots Promising plots
NON-METALLIC GROUNDWATER
MINERALS