You are on page 1of 1

CiMEC Infralabs Private Limited w

ACCREDITED'
Laboratory : Plot. No. 179/13, Anand lndustrial Estate, Mohan Nagar, Ghaziabad-201007
Ph : 01 20-4909853, l\4. 95993831 43; Fax : 01 20-4'1 56544, E-mail : cimecinlralabs @ gniail.com
Regd, Ollice : 4/1 697, Plot No. 1 7, Shop No. 2, Mahavir Block, Bhola Nath Nagar, Shahdara, Delhi-32
CIN: U73100D12013PrC257132 {
ISO 9001-2015 Certified
cIMEC' www.cimec.in
Manaqement Systems
Certification Body Format No: CtL/LAB_QFI7.8_01
MSCB-1 21

Test Report
No: c|Ll210324032 Page No. 1 of 1

Date 06 04.2021 Date of Receipt : 24.03.2021


Date of Completion :06.04.2021

Issued To t\4/s Casta Engineers Pvt. Ltd. JVwith SOWiI Ltd.


House No.-4129, Ward No.-3'1 , lndian Colony,
Sugar lVlill Bypass, Near Railway Bridge, Sonipat, Haryana-131001

Letter Ref. No. : CASTtuGSHPl/Gohana-SonipatlTLl2l21l2B4A, dl-24.03.2021

Name of Work 4-Laning of Gohana-Sonipat (Pkg-2) Section from km 40.60'1 to km 78.837 (Length=38.236 km) of NH-
352,4 in the state of Haryana under Bharatmala Priyojna under NH (O) to be implemented on Hybrid
Annuity Model(HAM).

A. Particulars of Sample (Declared by Customer) :-


lVlaterial : Granular Sub Base (GSB)
Sample lD : Badwasini Camp Stock yard
Condition of Sample : Satisfactory
Any other information : Sampling by Customer

B. Test Parameters

Sl No. TEST TEST METHOD TEST RESULTS


l. Mechanicai Testing
1. Permeability Test, m/d lS:2720 (Pt-36) a.Aa

(By Constarrt Head)

C. Remarks: --Nil--

S Rana, Director)
#"p-t Authorised Signatory

Note: (1) The above Fiesults are related only


to the tests pefformed on the sampre. Endorsement
be feproduced wholly or rn part & forbjdden of product is neither inferred nor impried. (2)
to be used in any advertislng media without the permission This report js not to
of fi4anaging Director in writing. (3) Any discrepancjes
;,fl[ii]l::,[;'iH:l',,i::,h'j:[t#1"^'5Jjtr'" tn" Laboratory-within ,""r,'rol rotar Liabirity or crrvrii is rim,teo to the invojced
'r "." amount onry (5)

You might also like