Dammam University

Dammam, Kingdom of Saudi Arabia

Project : Sport Facilities (20A, 20B & 20C) Mohamed Al-Sabek


Architects, Planners Consulting Engineers

NOTIFICATION FOR POURING (NFP)


Contractor: AZMEEL Contracting & Construction Company NFP # : 107

Rev: 0

To : MOHAMED AL-SABEK Consulting Engineers Date : 27-Sep-11

Rec'd : / / / /

Contractors Request for Inspection of Work

Build. # 20-B (Part B) Area / Location : Grid on: 15-24 / B-G

Structure: RCC - Columns Grade of Concrete : 30Mpa Placing: Pump

Type of Concrete: RCC - Type I


Work to be Inspected : Pouring Concrete of Columns for Second Floor.
Approved RFI #: 271; 273
Spec./Drwg Reference : As per attached drawing.

Required Date : 28-Sep-11 Required Time : 1.00 Pm

Requested By: Noted by:-

Engr. Mohammed Younus Engr. Jijo Joseph Engr.Shahid Ali Engr. Alsayed Asherif
QA/QC. Engineer QA/QC Electrical Engineer QA[QC Mechanical Engineer Area Technical Manager

Inspection's Results
Sub Activity Check List Action Code Remarks/ Inspection Date

Action Code :

A Poured

B Not Poured

C Not Completed
Inspected Date : / / Inspected Time : : am / pm

Remarks:

Checked By : Supervisor Representative:

Signature : Signature :

Date :

Any approval relative to this inspection do not relieve the Contractor from compliance with the requirements of the Contract Documents and standards of good construction practice.
This inspection is only for review of general performance with the design concept of the project and general compliance with the information given in the Contract documents.
The Contractor is responsible for confirming and correlating all quantities and dimensions, selecting fabrication processes and techniques of construction,
coordinating his work with that of other trades, and performing his work in a safe, timely, and satisfactory manner.