Professional Documents
Culture Documents
Q
site investigation activities carried out after the project to ensure problems n
D)
are solved
tr
maintenance
soil mechanics
specifications
detailed plan of proposed structures
dimensions and measurements
extensive investigation to evaluate the load-bearing qualities
..-
C
D)
'<
and stability of the ground 0
0
technical drawings investigation to assess both financial and engineering 3:
"tI
aspects of a project >
:z
commission a project offer of a bid for an engineering contract -<
"tI
costing system procedure to monitor the costs of a project so that ;;0
0
management can get information on development "11
,...
tender study of the proposed location to assess geology of the area In
(/)
turnkey project to order a plan to be carried out
Phase Tasks
detailed design.
feasibility study.
Before construction extensive site investigation.
preliminary site investigation.
maintenance
After construction
3 The following extract is from a letter written by a qualified civil engineer in response to a job
engineer
I am writing in connection with the job advertisement for a civil (a) _ _ _ __ (renigeen), which
appeared in today's Civil Engineering.
I have a degree in (b) industrial (rnlutiasid) engineering. After graduation, I worked for four years at
Locke Engineers in the field of (c) construction (onscorutitcn) consulting. During my time there, I
specialized in (d) claims (ilamsc) preparation and construction (e) scheduling (ehdnsgulic). I am
particularly interested in the opportunities to further develop my skills, especially in the following areas:
• development of (f) draft (tdfar) work plans
47
• (g) site (elis) investigations
• preparation of (h) client (nictel) communications