Study of Total Station and Total Station Survey to

determine the coordinates of various station.

Topcon Topcon Sokkia Sokkia Leica


GTS-211D DS 101AC 530R/330R Set 1X/Set 2x TS15 1000R
TOTAL STATION: Total station is an electronic or optical instrument used in modern surveying,
construction, engineering and mining project. It is the combination of electronic transit theodolite and
electronic distance meter. It is also integrated with microprocessor, electronic data collector and
storage system.
The instrument is used sloping distance of object to the instrument, horizontal and vertical angles. This
microprocessor unit enable for computation of data collected to further calculate the horizontal
distance, coordinate and reduced level of that point.

VARIOUS PARTS OF
TOPCON GTS-211D:
AIM OF EXCREMENT: Study of Total Station and Total Station survey to determine the coordinates of
various points.

OBJECTIVE OF THE EXPREMENT:


» Field work is carried out very fast with high standard of accuracy.
» To determine angle, distance and RL value
» To layout of project on the field

LIST OF INSTRUMENTS REQUIRED FOR THE EXPREMENT:


» Total Station Instrument
» Tripod Stand
» Prism stand
» Prism Pole
» External Batteries if required
FUNCTIONAL KEY OF
TOPCON GTS-211D:
WORKING MANUAL OF TOPCON GTS-211D:
» Switch on the instrument
» Press F1 for tilt and set the tilt with foot screw
» Then press ESC button and the press the MENU button
» Press F3 for Memory Manager again press F3 for File Maintain
» Select file by using upper and lower navigation key
» Press DCL then press YES and press ESC
» Press File Maintain
» Press F1 for REN and give a name of the file by using ANG key
» Press F4 for Enter then press ESC and press MENU
» Press F1 for Data Collect again Press F1 for List
» Select file by using upper and lower navigation key and press F4 for Enter
» Press F1 for Occ Pt and put the value of
» Pt:
» ID:
» Ins. Ht:
» Press F4 for OCNEZ and put the value of
» PT:
» Press F3 for input
» N:
» E;
» Z;
» Then press F4 for enter and press ESC then press F2 for back sight
» BS:
» P code:
» RHt and press F4 after that target the back sight prism very accurately and then
» Press F3 for Meas press NEZ press Set then press YES again press F3
» Give P Code: value and RHt and press Meas/All and then press Set and press YES.
VARIOUS PARTS OF TOPCON DS 101 AC:
WORKING MANUAL OF TOPCON DS 101 AC :
» Switch on the instrument and click on Tilt
» Set the tilt with foot screw and click on Back
» Press ESC button and press PRG button
» Click on Magnet Field and press Enter button
» Click on Job and then click on New Job
» Give a name of the job file and give comments
» Click on Next
» Coordinate System (not required for plane surveying)
» Projection (none). Datum (none). Geoid Model (none)
» Click on the Next
Unit Setting:
» Distance unit (Meter). Precision (0.1234).Area (Sq.M.). Volume Q.M
Display Setting:
» Coord Type (Ground/WGS84 Lat Long/WGS84NEZ)
» Coord Order (N,E,Z/E,N,Z)
» Disp Dir as (Azimuth/Bearing)
» Disp CL as (1234.0000/12+34.0000)
» Click on Next and click for tick mark on Alarm Setting
» Click on Set up and click on Back Sight
Occupation Point:
» Point: Give point number and click for tick mark
» HI: Give instrument Ht and click for tick mark
» Back Sight point:
» Point: Give point number and click for tick mark
» HI: Give B.S Target (Prism) Ht and click for tick mark
» Click on Add point
WORKING MANUAL OF TOPCON DS 101 AC :
» Point: It will automatically come as per previous record
» Code: Select code and put the instrument station value of N:, E:, Z:
» Click for tick mark on Control Point
» Fill Back Sight point details as Instrument station
» Click for tick mark and press ESC button 3 times
» Click on Survey and click on Topography
» Click on measure icon or measure and save icon.

WORKING MANUAL OF SOKKIA 530R / 330R:


How To Create Job File:
» Switch on the instrument and press ESC button
» Press F3 for MEM and press enter button when selected on JOB
» Press enter button when selected on JOB Selection
» Press F1 for LIST and select a job file that’s right side value is ‘0’
by up and down navigation key then press enter button
» Press navigation key to go to one steep down
» Press F1 for LIST and select the same job file by navigation key
» Press enter button and go to Job Name Edit by down navigation key
» Write a name of the job by using of FUNC key then enter button
» Press ESC button 2 times.

How To Take Measurement with Sokkia 530R/330R:


» Press F1 for MEAS and press FUNC to go to P2 (page 2) then press F2 for Tilt
» Set the Tilt with foot screw and press ESC and press FUNC to go to P1 (page 1)
» Press F4 for COORD and press Enter when Stn. Orientation is selected
How To Take Measurement with Sokkia 530R/330R:
» Press Enter when Stn. Coordinate is selected and then press F3 for EDIT
» Put the value of N: , E: , Z: , Inst. H: , Tgt. H:
after that press F4 for OK
» Go to Back Sight by Down navigation key and
press Enter
» Press Enter when selected on Angle or Coord
( Angle is select when you have only instrument
station coordinate value and back sight Azimuth
or bearing. Coord is select when you have both
the stations coordinates)
» Select Coord and press F3 for EDIT then put the
value of N: , E: , Z: and press F4 for OK
» Again press F3 for EDIT back sight and put the
value of N: ,E: ,Z:
» Turn the instrument and target the B.S prism
then press F4 for OK
» Press ESC 3 times then go to Observation by
down navigation key and press enter
» You will get the details measurement data on
screen.

PARTS OF SOKKIA SET 1X/:2X


X
WORKING MANUAL OF SOKKIA SET 1X/2X:
How To Create Job File:
» Switch on the instrument and done all the temporary adjustment
» Press program
» Click on function
» Click on Job
» Click on New
» Input the Job name
» Press Function control(FUNC CTRL) then enter
» Press Function control then enter

How To Take Measurement:


» Click on Survey then click on Topography
» Press Function control then press enter
» Change auto point number
» Press Function control then enter
» Input the station (instrument station) point
» Input N,E, Elevation, Instrument height and code
» Press Function control then enter
» Sight back sight properly
» Input back site point number and press Function control then enter
» Select Azimuth(If you the Co-ordinate of BS then click on Co-ordinate)
» Input the code and Azimuth and then press Function control then enter
» Then press trigger key for taking measurement
» After data capture Input the Target height and then press Function control then enter
» For Capturing another Point, Sight the object properly and press Trigger key
» After Capturing the data press Function control then enter.
OBSERVATION TABLE FOR TOTAL STATION SURVEY:

Inst. Obs. Bearing Distance Northing Easting Elevation Inst. Ht. Trg. Ht. remarks
Stn. Stn.
S1 √ √ √ √

BS √ √ √ √ √ √

2 √ √ √ √ √ √ √

3 √ √ √ √ √ √ √

FUNCTION PERFORED BY TOTAL STATION:


» Averaging multiple angle and distance measurements.
» Correcting electronically measured distances from prism constant, atmospheric pressure, and
temperature.
» Making curvature and refraction corrections to elevations determine by trigonometric levelling.
» Reducing slope distances to their horizontal and vertical components.
» Calculating point elevations from the vertical distance components
» Computing coordinates of survey points from horizontal angle and horizontal distance.
» Averages multiple angle measurements and distance measurements.
» Computes horizontal and vertical distances and also corrections for temp, pressure and humidity.
» Computes inverses, polars, resections and computes X, Y and Z coordinates.
Thanks for watching
You Tube Channel Name:
SURVEYING PLANNING
https://www.youtube.com/channel/UCbclZK27adFwpgfS5ZC9k8g

Please subscribe this channel for upgrade yourself about Surveying Theory and Practical,